RecordWell Data

Board of Zoning Appeals Regular Meeting Agenda Packet (PDF)

Village of Plover · Portage County · meeting of Apr 17, 2024 · Agenda packets

Open the original document More from Village of Plover

This document is no longer listed on Village of Plover's website. We kept the copy we read.

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

BOARD OF ZONING APPEALS AGENDA Plover Municipal Center Board Room 2400 Post Road Plover, WI 54467 Wednesday, April 17, 2024 5:00 p.m. 1. Call to order/Introductions 2. 5:00 p.m. – Public Hearing – Temporary Use Request - Gerke Excavating Inc. – Temporary asphalt/concrete crushing operations for CTH B reconstruction project – STH 54 (PIN: 173230827-15.08) 3. Reconvene for possible discussion and consideration – Temporary Use Request – Gerke Excavating Inc. – Temporary asphalt/concrete crushing operations for CTH B reconstruction project. – STH 54 (PIN: 173230827-15.08) 4. Adjournment subject to call of the chair NOTICE IS HEREBY GIVEN that a majority of the members of the Village Board may attend this meeting to gather information about a subject over which they have decision making authority. NOTICE IS HEREBY GIVEN that the Village of Plover Board of Zoning Appeals will hold a Public Hearing on Wednesday, April 17, 2024 at 5:00 PM in the Plover Municipal Center Board Room, 2400 Post Road, Plover, WI 54467, to consider a Temporary Use Request from Gerke Excavating Inc. to operate a tempo- rary asphalt/concrete crushing site related to the CTH B reconstruction project at the Moodie, Inc. property located at STH 54 - PIN: 173230827-15.08. All interested parties are invited to attend the public hearing and will be given a reasonable opportunity to be heard. Further information is available at the Community Development Department, or by calling 715-345-5250 EXT. 128. Tammy Wojtalewicz, Village Clerk Village of Plover COMMUNITY DEVELOPMENT DEPARTMENT 2400 POST ROAD - PO Box 37 - PLOVER, WISCONSIN 54467 Phone: 715-345-5250 Website: www.ploverwi.gov STAFF REPORT TO: Plan Commission and Board of Zoning Appeals FROM: Adam DeKleyn, Community Development Manager RE: Temporary Use (2024-TU-001): Asphalt/concrete crushing operations for CTH B reconstruction project DATE: April 15, 2024 (PC) April 17, 2024 (BOZA) Request: Gerke Excavating, Inc. requests approval of a temporary asphalt/concrete crushing operation for the CTH B reconstruction project, at the above referenced property location. Background: The CTH B reconstruction project commenced on April 8, 2024. Associated with the project is the crushing and recycling of pavement. Per Municipal Code §550-45 (C)(1)(d) - Temporary Uses: The Board of Zoning Appeals (BOZA) has the authority to grant temporary uses in any zoning district. This section also requires the Plan Commission (PC) to review and make a recommendation to the BOZA. Back in 2022, the PC and BOZA approved a temporary use permit for a crushing plant at the same location for the Business 51/Post Rd project. Analysis: Applicant proposes a temporary crushing operation on approximately 4 acres, as detailed in the attached site plan. The site will have a temporary scale, portable crusher and stockpiles of materials onsite. Ingress/egress will be via an existing driveway off STH 54. Active operations are planned to occur in the center of the +31 acre site, which limits potential impacts to adjacent properties. After crushing, some of the material will be returned to CTH B to be used as road base, with the remaining being transported to a 12-acre fill/waste site owned by Classic Development - south of Lexington Place Subdivision as part of a future residential development. The fill/waste site still needs additional material to be added to bring the site to the grades show in the attached plans. All property owners within 300’ of theparcel in which the temporary use is proposed on, have been notified. Additionally, a public hearing will be held by the BOZA on Wednesday, April 17 at 5:00 PM. Address: STH 54 Parcel #: 173230827-15.08 Zoning: Light Manufacturing (M-1) Future Land Use: Industrial/Manufacturing Current Use: Undeveloped/Trailer Storage Temporary Use: Pavement Crushing Operation In summary, the crushing operation is temporary in nature and generally compatible with the parcel/area. As proposed, the temporary use is consistent with Village ordinances and requirements. Furthermore, all Village department managers have reviewed, commented on, and recommended approval of the temporary use. Recommendation: Staff recommends approval of the Temporary Use, conditioned on the following: (1) Temporary Use (asphalt/concrete crushing) shall be approved to operate From: 04/17/2024 To: 12/31/2024. (2) Hours of operation shall be limited to Monday through Friday, 7:00 AM – 5:00 PM. (3) Effective dust suppression measures are required to minimize airborne dust emissions. Water truck shall be available onsite to spray water onto the work area and the concrete during crushing to minimize dust. (4) Activities shall be limited to crushing, temporary storage and hauling operations. (5) All erosion control and stormwater management BMP’s shall be installed and maintained, including tracking pads and silt fences. (6) Hauling operations shall not obstruct traffic flow and shall be confined to the routes approved by the Village of Plover Public Works Department. (7) Proposed crushing equipment and operations shall be a minimum 100 feet from all property lines, all operations shall be confined to the approved areas identified in the application. (8) No portion of the crushing operations shall be located on a public or private street; excluding trucking/hauling to and from the site. (9) Site restoration required - Restore disturbed areas, replant vegetation, and return to original condition. (10) Applicant is responsible for any remedial road repairs within 12 months of completion to restore the condition of the roadways to pre-use condition or better. (11) Fill/waste site shall be graded according to approved plans. (12) All activities onsite shall be in accordance with the approved plans. Any changes to the approved plans, specifications and/or activities shall not be made without approval of the Community Development Department. (13) Conformance with all other applicable requirements, ordinances, regulations and standards. In the event that a temporary use does not conform to the conditions above, the permit may be terminated by action of the BOZA. Exhibits:  Location Map  Site Details  Storm Water Pollution Prevention Plan Location Map: Temporary Crushing Site: Crushing Site CENTRAL STATE CONSTRUCTION, LLC 15341 STH 131 TOMAH, WI 54660 608-372-4203 PHONE 608-372-4139 FAX centralstateconstructionllc.com CENTRAL STATE CONSTRUCTION, LLC Page i Storm Water Management Report April 12, 2021 Storm Water Pollution Prevention Plan: Waste & Borrow Sites: Village of Plover Waste & Borrow Site: SW ¼ of SW ¼ Section 27, T23N, R08E, Crushing Site: SE ¼ of SE ¼ of Section 28, T23N, R08E Village of Plover, WI CENTRAL STATE CONSTRUCTION, LLC Page ii Storm Water Management Report STORMWATER POLUTION PREVANTION PLAN PREPARED FOR: DNR PREPARED BY: CENTRL STATE CONSTRUCTION 1534 STATE HWY 131, TOMAH, WI 54660 Distribution List R e c i p i e n t N u m b e r o f C o p i e s D N R , W I 1 CENTRAL STATE CONSTRUCTION, LLC Page iii Storm Water Management Report Table of Contents Page 1.0 BACKGROUND AND GENERAL INFORMATION ........................................................ 1 1.1 Project Location ......................................................................................................................... 1 2.0 STATE AND LOCAL REQUIREMENTS .......................................................................... 2 2.1 Objectives .................................................................................................................................... 2 2.2 Submittal List .............................................................................................................................. 2 3.0 POTENTIAL SOURCES OF CONTAMINATION ............................................................ 2 3.1 Sediment ...................................................................................................................................... 2 3.2 Oil & Grease ................................................................................................................................ 2 3.3 Tracking Sediment Off-Site ................................................................................................... 2 4.0 EROSION CONTROL BEST MANAGEMENT PRACTICESE ........................................... 3 4.1 Erosion Control Measures ..................................................................................................... 3 4.2 Oil and Grease Control ........................................................................................................... 4 4.3 Good Housekeeping ................................................................................................................ 4 4.4 Preventive Maintenance ......................................................................................................... 4 4.5 Spill Prevention Plan ................................................................................................................ 4 4.6 Visual Inspections ..................................................................................................................... 4 4.7 Stockpiling of Soil and other Materials ............................................................................. 5 5.0 POST-CONSTRUCTION STORM WATER MANAGEMENT ........................................... 5 5.1 Waste & Borrow Site Performance Standards .............................................................. 5 5.2 Long Term Maintenance ........................................................................................................ 5 List of Appendices Appendix A General Maps & Additional Information Appendix B Site/Project Specific Appendix C WisDOT Standard Specification CENTRAL STATE CONSTRUCTION, LLC Page 1 Storm Water Management Report April 12, 2021 STORMWATER MANAGEMENT & EROSION CONTROL PLAN 1.0 BACKGROUND AND GE NERAL INFORMATION The purpose of this report is to provide a framework for a Crus hing & Borrow and Waste Site associated with a WISDOT HWY 51 reconstruction project. The pro posed crushing site is located west of HWY 51 in Plover and Borrow & Waste Site is located at the end of Kensington Pl road. Properties involved are owned by the same property owner: David Moodie. The borrow & waste site is approximately 12 acres in size and the crushing site is approximately 5 acres. The proposed waste site is an agricultural field and will be raised approximately 4’ to distribute soil material from the road grading project. 1.1 Project Location The project is located in the SW ¼, SE ¼ of Section 27, T23N, R 8E and SE ¼, SE ¼ of Section 28, T23N, R8E Village of Plover, Portage County, Wisconsin, con taining approximately 17 acres. The sites will be used as Borrow & Waste site and Crushing Site for excess grading material from adjacent road reconstruction project. Said properties consist of agricultural fields and site yard. Crushing Site Borrow & Waste Site CENTRAL STATE CONSTRUCTION, LLC Page 2 Storm Water Management Report 2.0 STATE AND LOCAL REQUIREMENTS 2.1 Objectives The primary goal of this Storm Water Pollution Prevention Plan (SWPPP) is to reduce the amount of sediment contained in the initial runoff for the Borrow/Waste Sites and ensure that downstream water bodies are not adversely affected by the proposed activities. This SWPPP will: • Identify sources of possibl e stormwater contamination • Identify and prescribe appropriate best management practices ( BMPs) to reduce the amount of pollutants in the runoff prior to discharge from the site • Prescribe an implementation schedule to ensure that the action s recommended in this report are carried out at appropriate times 2.2 Submittal List • State of Wisconsin Departm ent of Natural Resources • Portage County (If Requested) • Village of Plover (If Requested) Other approving authorities will be copied as needed or requested. 3.0 POTENTIAL SOURCES OF CONTAMINATION 3.1 Sediment The primary objective for runoff pollution is sediment that wil l be carried offsite by storm water runoff. A perimeter silt fence or soil berm shall be construct ed along the downstream of the disturbed area, which in the case of top soil berm will also pr ovide storage for topsoil and overburden. Upon construction the berm shall be seeded and mul ched to minimize erosion from it. Once the site is filled-in, top soil berm will be re-spread and distributed over disturbed area with at a min. of 6” thickness layer. 3.2 Oil & Grease A secondary concern for this site is oil and grease in the stor mwater runoff. Oil and grease may come from leaky vehicles, such as trucks entering and exiting the site, equipment on site, or other devices using oil and grease such as scales. 3.3 Tracking Sediment Off-Site A rock entrance will be constructed at the entrance to the site to minimize sediment tracking onto existing roads. As needed the entrance will be replaced so as to remain effective. A gravel roadway may be used for this purpose as well. CENTRAL STATE CONSTRUCTION, LLC Page 3 Storm Water Management Report 4.0 EROSION CONTROL BEST MANAGEMENT PRACTICESE 4.1 Erosion Control Measures All areas prone to soil erosion shall be protected using the following erosion control devices. • Silt Fence Continuous silt fencing will be used along all areas downstream of disturbed areas. The silt fencing will provide a siltation barrier between the disturbed area and all downstream water bodies. • Rock Entrance A Rock Entrance will be constructed at the entrance to the site to minimize sediment tracking onto existing roads. As needed, the entrance will be replaced so as t o r e m a i n e f f e c t i v e . A g r a v e l roadway may be used for this purpose as well. • Temporary Grading Practices Temporary grading practices such as creating topsoil berms will be used to help monitor discharge from the site. Berms will direct stormwater runoff to appropri ate outlet areas. They will also help in the attenuation, and subsequently TSS reduction by allowing the stormwater to only discharge at engineered outlet locations. • Rock Check Dam Outlets Sediment basin with rock outlet provides for attenuation of stormwater, increase TSS reduction on site, and provide a safe passage for stormwater runoff exiting the site. • Waste and Material Disposal All waste and unused building materials (including garbage, deb ris, cleaning wastes, or other mining materials) shall be properly disposed of and not allowed to be carried by runoff into a receiving channel. • Seeding and Mulching Overburden Over burden piles shall be seeded and mulched as soon as practi cal. Seeding and mulching the overburden piles will encourage vegetative cover to form on the slopes, which will hold the disturbed soil in place during rain events. This will reduce the sediment load being carried by rain water that falls on the site. Fertilizer shall be applied prior to seeding at a rate of seven pounds per 1000 square feet. The latest seeding shall be completed on or before September 15th: Seeding Application Rates shall be: Seed mixtures shall be WISDOT seed mixtures for seeding borrow pits and material disposal sites beyond the right of way, use seed mixtures conforming to seed mixture 10, 20, 70, 70A, or 75 of 630.2.1.5.1.1 or a borrow pit mixture composed of seeds of the species, purity, germination and proportions, by weight as given below: Permanent Seed Mix Species Purity Min. % Germination Min. % Alfalfa 9 8 9 0 Bromegrass 8 5 8 5 Orchardgrass 8 0 8 5 Timothy 9 8 9 0 Red Clover 9 8 9 0 Alsike Clover 9 7 9 0 Ladino Clover 9 5 9 0 Kentucky Bluegrass 9 8 8 5 CENTRAL STATE CONSTRUCTION, LLC Page 4 Storm Water Management Report Mulch shall be placed on the same day that the area is seeded. Mulch the area by hand or using a blowing machine. Spread the material uniformly to a depth of ½ to 1 11/2 inch using 1 ½ to 3 tons of material per acre. Additional erosion control measures may be implemented as needed. 4.2 Oil and Grease Control Oil and grease control will be provided by the gravel/limestone subgrade along temporary construction roadways and tracking pads. Hydrocarbons tend to cling to the lime stone and degrade under exposure to the elements and UV light. 4.3 Good Housekeeping Good housekeeping practices shall be used on site to help provi de a safe work environment, as well as reducing the amount of exposure that storm water has with materials that may contribute to contamination of the storm water. 4.4 Preventive Maintenance Preventive maintenance involves regularly inspecting, cleaning, and testing all facility equipment and operational systems. These actions will help detect problems while they are small and can be easily repaired, rather than allowing for a large release of a contaminant due to a system failure. 4.5 Spill Prevention Plan All employees on site shall be trained in the proper response to a contaminant spill so as to increase worker safety, and reduce the amount of time that it takes to stop, and remediate a spill. A copy of the procedures will be kept on site at all times and should be reviewed annually. Materials will be stored so that the chance that a spill will reach soils, groundwater or surface water is minimized. In the event that a spill does occur, the spill must be immediately contained by using appropriate response techniques including diking and absorbents . Clean-up of the spill should occur immediately once the spill is stabilized and contained. Spills will be cleaned up using methods such as removal of contaminated soils. In all cases cl eanup standards will adhere to local, state and federal requirements. 4.6 Visual Inspections The Owner or Owner designated re presentative will be responsibl e for inspection of the construction site erosion control measures for this construction activity. The Owner or Owner designated representative shall conduct the following inspections: • Weekly inspections of implemented erosion and sediment controls. • Inspections of erosion and sediment controls within 24 hours after a precipitation event 0.5 inches or greater which results in runoff during active construction periods. The Owner or Owner designated representative shall maintain wee kly written reports of all inspections that include: • The date, time, and exact place of the inspection. • The name of the individual who performed the inspection. • An assessment of the condition of erosion and sediment controls. • A description of any erosion and sediment control implementation and maintenance performed. CENTRAL STATE CONSTRUCTION, LLC Page 5 Storm Water Management Report Repairs shall be made immediately, as required, to maintain eff ectiveness, until permanent vegetation is established and final paving is completed. Monitoring, reporting and maintenance shall be completed in accordance with this Report and the requirements of NR 216. The current DNR Construction Site Insp ection Report form (3400-187) may be used by the Owner or Owner designated representative to record information collected d u r i n g t h e i n s p e c t i o n s . A c o p y o f t h e C o n s t r u c t i o n S i t e I n s p ection Report is included in the Appendix. 4.7 Stockpiling of Soil and other Materials Topsoil and B-horizon material will be removed, segregated, and stockpiled. Management of topsoil will follow methods described in Section 625 of the WisDOT Stan dard Specifications. Topsoil redistribution and site preparation will follow methods describ ed in Section 625 of the WisDOT Standard Specifications. Site preparation prior to application of the topsoil and B-horizon material will use methods that ensure optimum adherence between the topsoil/B-horizon and the underlying overburden material. Soil compaction will be minimized by limiting unnecessary traff ic or tracked vehicles during and after the placement of the subsoil and topsoil layers. If it is determined that subsoil and/or top soil have been over-compacted, the topsoil layer will be removed and stockpiled and the subsoil layer will be loosened by discs or other equipment prior to replacement of top soil. Topsoil redistribution will not be performed during or immediately following a precipitation event. 5.0 POST-CONSTRUCTION STO RM WATER MANAGEMENT 5.1 Waste & Borrow Site Performance Standards Post construction performance standards for this site will be met as the site is returned to use as a farm field land. There is no proposed increase of imperviousnes s for this site in the post- development land use. Waste & Borrow site will be returned to a n agricultural land use, removing perimeter erosion control measures and re-spreading top soil. 5.2 Long Term Maintenance There are no specific or permanent best management practices for this project. Site will be returned as agricultural land use. Gerke Excavating, Inc. Attn: Chad Gerke 15341 STH 131 Tomah, WI 54460 P: (608) 372-4203 F: (608) 372-41 CENTRAL STATE CONSTRUCTION, LLC Storm Water Pollution Prevention Plan APPENDIX A G e n e r a l M a p s & A d d i t i o n a l I n f o r m a t i o n Topo DISCLAIMER: The information shown on these maps has been obtained from various sources, and are of varying age, reliability and resolution. These maps are not intended to be used for navigation, nor are these maps an authoritative source of information about legal land ownership or public access. No warranty, expressed or implied, is made regarding accuracy, applicability for a particular use, completeness, or legality of the information depicted on this map. For more information, see the DNR Legal Notices web page: http://dnr.wi.gov/legal/7,920 0.3 1:NAD_1983_HARN_Wisconsin_TM Miles0.30.13 Notes Waste Site Legend 0 Wetland Identifications and Confirmations Wetland Class Points Dammed pond Excavated pond Filled excavated pond Filled/drained wetland Wetland too small to delineate Filled Points Wetland Class Areas Wetland Upland Filled Areas Wetland Class Points Dammed pond Excavated pond Filled excavated pond Filled/drained wetland Wetland too small to delineate Filled Points Wetland Class Areas Wetland Upland Filled Areas NRCS Wetspots Maximum Extent Wetland Indicators Municipality State Boundaries County Boundaries Major Roads Interstate Highway State Highway US Highway County and Local Roads County HWY Local Road Railroads Tribal Lands Rivers and Streams Intermittent Streams TopoMap DISCLAIMER: The information shown on these maps has been obtained from various sources, and are of varying age, reliability and resolution. These maps are not intended to be used for navigation, nor are these maps an authoritative source of information about legal land ownership or public access. No warranty, expressed or implied, is made regarding accuracy, applicability for a particular use, completeness, or legality of the information depicted on this map. For more information, see the DNR Legal Notices web page: http://dnr.wi.gov/legal/7,920 0.3 1:NAD_1983_HARN_Wisconsin_TM Miles0.30.13 Notes Crushing Site Legend 0 Township Section Quarter-Quarter County Boundary Cities, Towns & Villages City Village Civil Town Municipality State Boundaries County Boundaries Major Roads Interstate Highway State Highway US Highway County and Local Roads County HWY Local Road Railroads Tribal Lands Rivers and Streams Intermittent Streams Lakes and Open water 24K USGS Quad Index - Level 7 - 16 Wetlands DISCLAIMER: The information shown on these maps has been obtained from various sources, and are of varying age, reliability and resolution. These maps are not intended to be used for navigation, nor are these maps an authoritative source of information about legal land ownership or public access. No warranty, expressed or implied, is made regarding accuracy, applicability for a particular use, completeness, or legality of the information depicted on this map. For more information, see the DNR Legal Notices web page: http://dnr.wi.gov/legal/3,960 0.1 1:NAD_1983_HARN_Wisconsin_TM Miles0.10.06 Notes Legend 0 Wetland Identifications and Confirmations Wetland Class Points Dammed pond Excavated pond Filled excavated pond Filled/drained wetland Wetland too small to delineate Filled Points Wetland Class Areas Wetland Upland Filled Areas Wetland Class Points Dammed pond Excavated pond Filled excavated pond Filled/drained wetland Wetland too small to delineate Filled Points Wetland Class Areas Wetland Upland Filled Areas NRCS Wetspots Maximum Extent Wetland Indicators Municipality State Boundaries County Boundaries Major Roads Interstate Highway State Highway US Highway County and Local Roads County HWY Local Road Railroads Tribal Lands Rivers and Streams Intermittent Streams Wetlands DISCLAIMER: The information shown on these maps has been obtained from various sources, and are of varying age, reliability and resolution. These maps are not intended to be used for navigation, nor are these maps an authoritative source of information about legal land ownership or public access. No warranty, expressed or implied, is made regarding accuracy, applicability for a particular use, completeness, or legality of the information depicted on this map. For more information, see the DNR Legal Notices web page: http://dnr.wi.gov/legal/7,920 0.3 1:NAD_1983_HARN_Wisconsin_TM Miles0.30.13 Notes Waste Site Legend 0 Wetland Identifications and Confirmations Wetland Class Points Dammed pond Excavated pond Filled excavated pond Filled/drained wetland Wetland too small to delineate Filled Points Wetland Class Areas Wetland Upland Filled Areas Wetland Class Points Dammed pond Excavated pond Filled excavated pond Filled/drained wetland Wetland too small to delineate Filled Points Wetland Class Areas Wetland Upland Filled Areas NRCS Wetspots Maximum Extent Wetland Indicators Municipality State Boundaries County Boundaries Major Roads Interstate Highway State Highway US Highway County and Local Roads County HWY Local Road Railroads Tribal Lands Rivers and Streams Intermittent Streams 9 Custom Soil Resource Report Soil Map 4923750 4923790 4923830 4923870 4923910 4923950 4923990 4924030 4923750 4923790 4923830 4923870 4923910 4923950 4923990 296740 296780 296820 296860 296900 296940 296980 297020 297060 297100 297140 296740 296780 296820 296860 296900 296940 296980 297020 297060 297100 297140 44° 26' 27'' N 89° 33' 16'' W 44° 26' 27'' N 89° 32' 55'' W 44° 26' 18'' N 89° 33' 16'' W 44° 26' 18'' N 89° 32' 55'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84 0 50 100 200 300 Feet 0 30 60 120 180 Meters Map Scale: 1:2,030 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:20,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Portage County, Wisconsin Survey Area Data: Version 17, Jun 8, 2020 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 28, 2011—Nov 2, 2016 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 10 Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI FrA Friendship loamy sand, 0 to 3 percent slopes 10.8 100.0% Totals for Area of Interest 10.8 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. Custom Soil Resource Report 11 Portage County, Wisconsin FrA—Friendship loamy sand, 0 to 3 percent slopes Map Unit Setting National map unit symbol: 2t80r Elevation: 720 to 1,440 feet Mean annual precipitation: 31 to 35 inches Mean annual air temperature: 43 to 46 degrees F Frost-free period: 110 to 150 days Farmland classification: Not prime farmland Map Unit Composition Friendship and similar soils: 90 percent Minor components: 10 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Friendship Setting Landform: Outwash plains Landform position (two-dimensional): Toeslope Landform position (three-dimensional): Talf Down-slope shape: Linear Across-slope shape: Linear Parent material: Sandy lacustrine deposits Typical profile Oe - 0 to 1 inches: moderately decomposed plant material A - 1 to 5 inches: loamy sand Bw1 - 5 to 12 inches: sand Bw2 - 12 to 19 inches: sand Bw3 - 19 to 30 inches: sand C1 - 30 to 43 inches: sand C2 - 43 to 49 inches: sand C3 - 49 to 79 inches: sand Properties and qualities Slope: 0 to 3 percent Depth to restrictive feature: More than 80 inches Drainage class: Moderately well drained Runoff class: Negligible Capacity of the most limiting layer to transmit water (Ksat): Moderately low to high (0.14 to 14.03 in/hr) Depth to water table: About 42 to 60 inches Frequency of flooding: None Frequency of ponding: None Maximum salinity: Nonsaline to very slightly saline (0.0 to 2.0 mmhos/cm) Available water capacity: Low (about 3.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4s Hydrologic Soil Group: A Forage suitability group: Low AWC, adequately drained (G089XY002WI) Custom Soil Resource Report 13 Other vegetative classification: Low AWC, adequately drained (G089XY002WI), Pinus/Vaccinium-Gaultheria (PVG) Hydric soil rating: No Minor Components Meehan Percent of map unit: 7 percent Landform: Outwash plains Landform position (two-dimensional): Toeslope Landform position (three-dimensional): Talf Down-slope shape: Linear Across-slope shape: Linear Other vegetative classification: Low AWC, high water table (G089XY001WI), Pinus/Euphorbia (PEu) Hydric soil rating: No Plainfield Percent of map unit: 3 percent Landform: Outwash plains Landform position (two-dimensional): Toeslope Landform position (three-dimensional): Rise Down-slope shape: Linear Across-slope shape: Linear Other vegetative classification: Low AWC, adequately drained (G089XY002WI), Pinus/Vaccinium-Gaultheria (PVG) Hydric soil rating: No Custom Soil Resource Report 14 17 Custom Soil Resource Report Map—Hydrologic Soil Group 4923750 4923790 4923830 4923870 4923910 4923950 4923990 4924030 4923750 4923790 4923830 4923870 4923910 4923950 4923990 296740 296780 296820 296860 296900 296940 296980 297020 297060 297100 297140 296740 296780 296820 296860 296900 296940 296980 297020 297060 297100 297140 44° 26' 27'' N 89° 33' 16'' W 44° 26' 27'' N 89° 32' 55'' W 44° 26' 18'' N 89° 33' 16'' W 44° 26' 18'' N 89° 32' 55'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84 0 50 100 200 300 Feet 0 30 60 120 180 Meters Map Scale: 1:2,030 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:20,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Portage County, Wisconsin Survey Area Data: Version 17, Jun 8, 2020 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 28, 2011—Nov 2, 2016 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 18 9 Custom Soil Resource Report Soil Map 4923880 4923910 4923940 4923970 4924000 4924030 4924060 4923850 4923880 4923910 4923940 4923970 4924000 4924030 4924060 298080 2981 10 298140 298170 298200 298230 298260 298290 298320 298350 298380 298080 2981 10 298140 298170 298200 298230 298260 298290 298320 298350 298380 44° 26' 30'' N 89° 32' 15'' W 44° 26' 30'' N 89° 31' 59'' W 44° 26' 23'' N 89° 32' 15'' W 44° 26' 23'' N 89° 31' 59'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84 0 50 100 200 300 Feet 0 20 40 80 120 Meters Map Scale: 1:1,520 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:20,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Portage County, Wisconsin Survey Area Data: Version 17, Jun 8, 2020 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 28, 2011—Nov 2, 2016 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 10 Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI FrA Friendship loamy sand, 0 to 3 percent slopes 2.4 44.2% RfA Richford loamy sand, 0 to 2 percent slopes 3.1 55.8% Totals for Area of Interest 5.5 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, Custom Soil Resource Report 11 Portage County, Wisconsin FrA—Friendship loamy sand, 0 to 3 percent slopes Map Unit Setting National map unit symbol: 2t80r Elevation: 720 to 1,440 feet Mean annual precipitation: 31 to 35 inches Mean annual air temperature: 43 to 46 degrees F Frost-free period: 110 to 150 days Farmland classification: Not prime farmland Map Unit Composition Friendship and similar soils: 90 percent Minor components: 10 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Friendship Setting Landform: Outwash plains Landform position (two-dimensional): Toeslope Landform position (three-dimensional): Talf Down-slope shape: Linear Across-slope shape: Linear Parent material: Sandy lacustrine deposits Typical profile Oe - 0 to 1 inches: moderately decomposed plant material A - 1 to 5 inches: loamy sand Bw1 - 5 to 12 inches: sand Bw2 - 12 to 19 inches: sand Bw3 - 19 to 30 inches: sand C1 - 30 to 43 inches: sand C2 - 43 to 49 inches: sand C3 - 49 to 79 inches: sand Properties and qualities Slope: 0 to 3 percent Depth to restrictive feature: More than 80 inches Drainage class: Moderately well drained Runoff class: Negligible Capacity of the most limiting layer to transmit water (Ksat): Moderately low to high (0.14 to 14.03 in/hr) Depth to water table: About 42 to 60 inches Frequency of flooding: None Frequency of ponding: None Maximum salinity: Nonsaline to very slightly saline (0.0 to 2.0 mmhos/cm) Available water capacity: Low (about 3.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4s Hydrologic Soil Group: A Forage suitability group: Low AWC, adequately drained (G089XY002WI) Custom Soil Resource Report 13 Other vegetative classification: Low AWC, adequately drained (G089XY002WI), Pinus/Vaccinium-Gaultheria (PVG) Hydric soil rating: No Minor Components Meehan Percent of map unit: 7 percent Landform: Outwash plains Landform position (two-dimensional): Toeslope Landform position (three-dimensional): Talf Down-slope shape: Linear Across-slope shape: Linear Other vegetative classification: Low AWC, high water table (G089XY001WI), Pinus/Euphorbia (PEu) Hydric soil rating: No Plainfield Percent of map unit: 3 percent Landform: Outwash plains Landform position (two-dimensional): Toeslope Landform position (three-dimensional): Rise Down-slope shape: Linear Across-slope shape: Linear Other vegetative classification: Low AWC, adequately drained (G089XY002WI), Pinus/Vaccinium-Gaultheria (PVG) Hydric soil rating: No RfA—Richford loamy sand, 0 to 2 percent slopes Map Unit Setting National map unit symbol: 2wpwv Elevation: 790 to 1,310 feet Mean annual precipitation: 31 to 33 inches Mean annual air temperature: 43 to 46 degrees F Frost-free period: 125 to 160 days Farmland classification: Farmland of statewide importance Map Unit Composition Richford and similar soils: 90 percent Minor components: 10 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Richford Setting Landform: Plains Landform position (three-dimensional): Talf Down-slope shape: Linear Across-slope shape: Linear Custom Soil Resource Report 14 Parent material: Sandy and loamy outwash Typical profile Ap - 0 to 7 inches: loamy sand Bw - 7 to 27 inches: loamy sand Bt - 27 to 41 inches: sandy loam C - 41 to 79 inches: sand Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Drainage class: Somewhat excessively drained Runoff class: Negligible Capacity of the most limiting layer to transmit water (Ksat): High (1.98 to 6.00 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Maximum salinity: Nonsaline to very slightly saline (0.0 to 2.0 mmhos/cm) Available water capacity: Low (about 5.6 inches) Interpretive groups Land capability classification (irrigated): 3s Land capability classification (nonirrigated): 3s Hydrologic Soil Group: A Hydric soil rating: No Minor Components Plainfield Percent of map unit: 6 percent Landform: Plains Landform position (three-dimensional): Talf Down-slope shape: Linear Across-slope shape: Linear Hydric soil rating: No Rosholt Percent of map unit: 3 percent Landform: Plains Landform position (three-dimensional): Talf Down-slope shape: Linear Across-slope shape: Linear Hydric soil rating: No Pearl Percent of map unit: 1 percent Landform: Plains Landform position (three-dimensional): Dip Down-slope shape: Linear Across-slope shape: Linear Hydric soil rating: No Custom Soil Resource Report 15 18 Custom Soil Resource Report Map—Hydrologic Soil Group 4923880 4923910 4923940 4923970 4924000 4924030 4924060 4923850 4923880 4923910 4923940 4923970 4924000 4924030 4924060 298080 2981 10 298140 298170 298200 298230 298260 298290 298320 298350 298380 298080 2981 10 298140 298170 298200 298230 298260 298290 298320 298350 298380 44° 26' 30'' N 89° 32' 15'' W 44° 26' 30'' N 89° 31' 59'' W 44° 26' 23'' N 89° 32' 15'' W 44° 26' 23'' N 89° 31' 59'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84 0 50 100 200 300 Feet 0 20 40 80 120 Meters Map Scale: 1:1,520 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:20,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Portage County, Wisconsin Survey Area Data: Version 17, Jun 8, 2020 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 28, 2011—Nov 2, 2016 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 19 YEAR 1 Developer: Project: Date: County: Version 1.0 Activity (1) Begin Date (2) End Date (3) Period % R (4) Annual R Factor (5) Sub Soil Texture (6) Soil Erodibility K Factor (7) Slope (%) (8) Slope Length (ft) (9) LS Factor (10) Land Cover C Factor (11) Soil loss A (tons/acre) (12) SDF (13) Sediment Control Practice (14) Sediment Discharge (t/ac) (15) 04/10/24 11/01/24 91.6% 130 0.15 2.3% 212 0.28 1.00 5.0 0.961 2.9 11/01/24 04/01/25 7.1% 130 Sand 0.15 2.3% 212 0.28 0.10 0.0 0.961 0.0 04/01/25 ----- ----- ----- ------- ----- 2.3% 212 0.28 ------ ----- 0.000 0.0 ----- ----- ----- ------- ----- 2.3% 212 0.28 ----- ----- 0.000 0.0 ----- ----- ----- ------- ----- 2.3% 0 ----- ----- ----- 0.000 0.0 ----- ----- ----- ------- ----- 0.0% 0 ----- ----- ----- 0.000 0.0 TOTAL 5.1 TOTAL 2.9 Notes: % Reduction Required NONE See Help Page for further descriptions of variables and items in drop-down boxes. The last land disturbing activity on each sheet must be 'End'. This is either 12 months from the start of construction or final stabilization. For periods of construction that exceed 12 months, please demonstrate that 5 tons/acre/year is not exceeded in any given 12 month period. Recommended Permanent Seeding Dates: 4/15-6/1 and 8/1-8/21 Turf, introduced grasses and legumes Designed By: SSR Thaw-6/30 Native Grasses, forbs, and legumes Date 4/12/2021 NOTE: THIS TOOL ONLY ADDRESSED SOIL EROSION DUE TO SHEET FLOW. MEASURES TO CONTROL CHANNEL EROSION MAY ALSO BE REQUIRED TO MEET SEDIMENT DISCHARGE REQUIREMENTS. Soil Loss & Sediment Discharge Calculation Tool for use on Construction Sites in the State of Wisconsin 04/04/24 WDNR Version 2.0 (06-29-2017) Gerke Excavating David Moodie Borrow Site Bare Ground Seed with Mulch or Ero End Sand Portage Silt Fence Silt Fence M:\_Projects\2024\Q24027 DOT Feb No 28 - Plover WI Ave to Hoover Ave\Project Management\USLE Form CENTRAL STATE CONSTRUCTION, LLC Storm Water Pollution Prevention Plan APPENDIX B S i t e P r o j e c t S p e c i f i c M a p s 1082 1084 10861086108410801076107810821084 173230827-16173230827-16173230827-16173230827-16173230827-16 ROWROWROWROWROW ROWROWROWROWROW 173230827-15.08173230827-15.08173230827-15.08173230827-15.08173230827-15.08173230827-15.07173230827-15.07173230827-15.07173230827-15.07173230827-15.07173230827-15.03173230827-15.03173230827-15.03173230827-15.03173230827-15.03 030230834-02.01030230834-02.01030230834-02.01030230834-02.01030230834-02.01030230834-05.01030230834-05.01030230834-05.01030230834-05.01030230834-05.01 173230827-12.02B173230827-12.02B173230827-12.02B173230827-12.02B173230827-12.02B173230827-12.02A173230827-12.02A173230827-12.02A173230827-12.02A173230827-12.02A173230827-12.01173230827-12.01173230827-12.01173230827-12.01173230827-12.01173230827-12.01A173230827-12.01A173230827-12.01A173230827-12.01A173230827-12.01A173230827-12.03173230827-12.03173230827-12.03173230827-12.03173230827-12.03 030230834-01.04I030230834-01.04I030230834-01.04I030230834-01.04I030230834-01.04I \\ssr2\Gerke\Q2\2021\Q2 Gerke SWPPP\Plover\Base.dwgC1.0Q2 4/12/21SSRTEMPORARY CRUSHING SITESHEET NAME:PROJECT:ADDRESS:PROJECT NO:SHEETPLOT DATE :PLOT BY :PLOVER, WIREVISION:REVISIONSNO.BYDATE15341 STATE HWY 131◦ Tomah, WI 54660608-372-4203 (Office)◦ www.centralstateconstructionllc.comThis document contains confidential or proprietary information of Central States Construction, LLC.Neither this document nor the information herein is to be reproduced, distributed, used or disclosedeither in whole or in part except as specifically authorized by Central States Construction LLC.BORROW, WASTE & CRUSHING SITEFOR WISDOT HWY 51GERKE EXCAVATINGCENTRAL STATECONSTRUCTION, LLC FILE NAME : Wis Statute 182.0175 (1974)Requires Min. 3 Work DaysNotice Before You Excavate To Obtain Location ofParticipants UndergroundFacilities Before YouDig in WisconsinCALL DIGGERS HOTLINE1-800-242-8511 TRACKING PAD EROSION CONTROL NOTES:1.ALL EXISTING UNDERGROUND UTILITY LOCATIONS ARE APPROXIMATE AND SHOULD BEFIELD VERIFIED PRIOR TO CONSTRUCTION.2.ALL EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO CONSTRUCTION.3.SILT FENCE, TEMPORARY SEDIMENT BASIN, & ROCK CONSTRUCTION ENTRANCE SHALL BEINSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITIES, INCLUDING CLEARING &GRUBBING.4.ANY AREAS WHERE GRADING IS COMPLETE SHALL BE STABILIZED WITH FERTILIZER, SEED, &MULCH AS SOON AS POSSIBLE.5.ALL BEST MANAGEMENT PRACTICES WILL BE INSTALLED BY THE TIME THE CONSTRUCTIONSITE IS CONSIDERED STABILIZED.6.STOCKPILES LEFT INACTIVE FOR 7 DAYS SHALL BE SEEDED AND SURROUNDED BY SILTFENCE.7.ALL WASTE AND UNUSED BUILDING MATERIALS (INCLUDING GARBAGE, DEBRIS, CLEANING WASTES, OR OTHER CONSTRUCTION MATERIALS) SHALL BE PROPERLY DISPOSEDOF AND NOT ALLOWED TO BE CARRIED BY RUNOFF INTO RECEIVING CHANNEL.8.ALL VEHICLE TRAFFIC IS PROHIBITED WITHIN THE UNDISTURBED LAND BUFFER WHENEVERPRACTICAL.9.EROSION CONTROL MAT CLASS I, TYPE A WILL BE USED IN NON-CHANNEL AREAS ANDCLASS I, TYPE B WILL BE USED IN CHANNEL AREAS.10.ALL DEWATERING PERMITTING, IF REQUIRED, IS THE RESPONSIBILITY OF THE CONTRACTORAND SHALL BE IN ACCORDANCE WITH DNR TECHNICAL STANDARD 1061.11.STREETS SHALL BE SWEPT AT THE END OF EACH WORK DAY OR AS DIRECTED BY THEMUNICIPALITY.12.TRACKING PADS SHALL BE USED AT THE CONSTRUCTION ENTRANCE AND EXITS.13.ALTHOUGH ROCK CONSTRUCTION TRACKING PADS MAY NOT BE SHOWN ON THE PLANS,THE CONTRACTOR SHALL INSTALL THEM AS NECESSARY OR AS DIRECTED BY THE ENGINEERTO MINIMIZE TRACKING ONTO ADJACENT STREETS. THESE PADS ARE CONSIDEREDINCIDENTAL TO THE WORK AND WILL NOT BE MEASURED OR PAID FOR SEPARATELY.14.CONTRACTOR WILL BE RESPONSIBLE FOR ALL DUST CONTROL.15.ALL BANK AREAS DISTURBED SHALL BE STABILIZED WITH EROSION CONTROL MATIMMEDIATELY.16.ALL FILL PLACED UNDER BUILDING AND PAVED AREAS SHALL BE STRUCTURALLY SOUND.17.SEDIMENT WILL BE REMOVED FROM BEHIND SEDIMENT FENCES AND BARRIERS BEFORE ITREACHES A DEPTH THAT IS EQUAL TO HALF THE BARRIER'S HEIGHT.18.BREAKS AND GAPS IN SEDIMENT FENCES AND BARRIERS WILL BE REPAIRED IMMEDIATELY.DECOMPOSING STRAW BALES WILL BE REPLACED (TYPICAL BALE LIFE IS THREE MONTHS).19.ALL SEDIMENT THAT MOVES OFF-SITE DUE TO CONSTRUCTION ACTIVITY OR STORM EVENTSWILL BE CLEANED UP BEFORE THE END OF THE SAME WORKDAY.20.ALL INSTALLED EROSION CONTROL PRACTICES WILL BE MAINTAINED UNTIL THE DISTURBEDAREAS THEY PROTECT ARE STABILIZED.21.ALL EROSION CONTROL MAT SHALL BE INSTALLED WITHIN 24 HOURS OF FINAL GRADESBEING ESTABLISHED. CRUSHING PILES, TYP. SILT FENCE, TYP. LEGEND PORTAGE COUNTY 51PAVEMENT RECYCLING SITE FORUS HIGHWAY 51 WISDOT PROJECT 2021 1074 1074 1076 10681076 1080.01079 1075.010761077 1075.01076 10761077 17398L11217398L11217398L11217398L11217398L112173230827-11.01173230827-11.01173230827-11.01173230827-11.01173230827-11.01173230828-16.24173230828-16.24173230828-16.24173230828-16.24173230828-16.24 173230828-16.35173230828-16.35173230828-16.35173230828-16.35173230828-16.35 173230828-16.09173230828-16.09173230828-16.09173230828-16.09173230828-16.0917398L10817398L10817398L10817398L10817398L10817398L10917398L10917398L10917398L10917398L10917398L11017398L11017398L11017398L11017398L11017398L11117398L11117398L11117398L11117398L11117398L11417398L11417398L11417398L11417398L11417398L11317398L11317398L11317398L11317398L113 173230828-16.34173230828-16.34173230828-16.34173230828-16.34173230828-16.34 173230828-16.24173230828-16.24173230828-16.24173230828-16.24173230828-16.24ROWROWROWROWROW173230828-16.08173230828-16.08173230828-16.08173230828-16.08173230828-16.0817398K12417398K12417398K12417398K12417398K124173230828-16.32173230828-16.32173230828-16.32173230828-16.32173230828-16.32 173230828-16.14173230828-16.14173230828-16.14173230828-16.14173230828-16.1417398G9017398G9017398G9017398G9017398G90173230828-16.12173230828-16.12173230828-16.12173230828-16.12173230828-16.12173230828-16.22173230828-16.22173230828-16.22173230828-16.22173230828-16.22173230828-15.13173230828-15.13173230828-15.13173230828-15.13173230828-15.1317398J10017398J10017398J10017398J10017398J100173230828-16.24173230828-16.24173230828-16.24173230828-16.24173230828-16.24 173230834-06173230834-06173230834-06173230834-06173230834-06030230833-01.01030230833-01.01030230833-01.01030230833-01.01030230833-01.01030230833-02030230833-02030230833-02030230833-02030230833-02 173230828-16.20173230828-16.20173230828-16.20173230828-16.20173230828-16.2017398G8817398G8817398G8817398G8817398G8817398G8917398G8917398G8917398G8917398G8917398J10217398J10217398J10217398J10217398J10217398J10117398J10117398J10117398J10117398J101173230828-16.23173230828-16.23173230828-16.23173230828-16.23173230828-16.23173230828-15.14173230828-15.14173230828-15.14173230828-15.14173230828-15.1417398J10417398J10417398J10417398J10417398J10417398J10517398J10517398J10517398J10517398J10517398J10617398J10617398J10617398J10617398J10617398J10717398J10717398J10717398J10717398J107 173230828-15.16173230828-15.16173230828-15.16173230828-15.16173230828-15.16\\ssr2\Gerke\Q2\2021\Q2 Gerke SWPPP\Plover\Base.dwgC2.0Q2 4/12/21SSRBORROW & WASTE SITESHEET NAME:PROJECT:ADDRESS:PROJECT NO:SHEETPLOT DATE :PLOT BY :PLOVER, WIREVISION:REVISIONSNO.BYDATE15341 STATE HWY 131◦ Tomah, WI 54660608-372-4203 (Office)◦ www.centralstateconstructionllc.comThis document contains confidential or proprietary information of Central States Construction, LLC.Neither this document nor the information herein is to be reproduced, distributed, used or disclosedeither in whole or in part except as specifically authorized by Central States Construction LLC.BORROW, WASTE & CRUSHING SITEFOR WISDOT HWY 51GERKE EXCAVATINGCENTRAL STATECONSTRUCTION, LLC FILE NAME : Wis Statute 182.0175 (1974)Requires Min. 3 Work DaysNotice Before You Excavate To Obtain Location ofParticipants UndergroundFacilities Before YouDig in WisconsinCALL DIGGERS HOTLINE1-800-242-8511EROSION CONTROL NOTES:1.ALL EXISTING UNDERGROUND UTILITY LOCATIONS ARE APPROXIMATE AND SHOULD BEFIELD VERIFIED PRIOR TO CONSTRUCTION.2.ALL EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO CONSTRUCTION.3.SILT FENCE, TEMPORARY SEDIMENT BASIN, & ROCK CONSTRUCTION ENTRANCE SHALL BEINSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITIES, INCLUDING CLEARING &GRUBBING.4.ANY AREAS WHERE GRADING IS COMPLETE SHALL BE STABILIZED WITH FERTILIZER, SEED, &MULCH AS SOON AS POSSIBLE.5.ALL BEST MANAGEMENT PRACTICES WILL BE INSTALLED BY THE TIME THE CONSTRUCTIONSITE IS CONSIDERED STABILIZED.6.STOCKPILES LEFT INACTIVE FOR 7 DAYS SHALL BE SEEDED AND SURROUNDED BY SILTFENCE.7.ALL WASTE AND UNUSED BUILDING MATERIALS (INCLUDING GARBAGE, DEBRIS, CLEANING WASTES, OR OTHER CONSTRUCTION MATERIALS) SHALL BE PROPERLY DISPOSEDOF AND NOT ALLOWED TO BE CARRIED BY RUNOFF INTO RECEIVING CHANNEL.8.ALL VEHICLE TRAFFIC IS PROHIBITED WITHIN THE UNDISTURBED LAND BUFFER WHENEVERPRACTICAL.9.EROSION CONTROL MAT CLASS I, TYPE A WILL BE USED IN NON-CHANNEL AREAS ANDCLASS I, TYPE B WILL BE USED IN CHANNEL AREAS.10.ALL DEWATERING PERMITTING, IF REQUIRED, IS THE RESPONSIBILITY OF THE CONTRACTORAND SHALL BE IN ACCORDANCE WITH DNR TECHNICAL STANDARD 1061.11.STREETS SHALL BE SWEPT AT THE END OF EACH WORK DAY OR AS DIRECTED BY THE MUNICIPALITY.12.TRACKING PADS SHALL BE USED AT THE CONSTRUCTION ENTRANCE AND EXITS.13.ALTHOUGH ROCK CONSTRUCTION TRACKING PADS MAY NOT BE SHOWN ON THE PLANS,THE CONTRACTOR SHALL INSTALL THEM AS NECESSARY OR AS DIRECTED BY THE ENGINEERTO MINIMIZE TRACKING ONTO ADJACENT STREETS. THESE PADS ARE CONSIDEREDINCIDENTAL TO THE WORK AND WILL NOT BE MEASURED OR PAID FOR SEPARATELY.14.CONTRACTOR WILL BE RESPONSIBLE FOR ALL DUST CONTROL.15.ALL BANK AREAS DISTURBED SHALL BE STABILIZED WITH EROSION CONTROL MATIMMEDIATELY.16.ALL FILL PLACED UNDER BUILDING AND PAVED AREAS SHALL BE STRUCTURALLY SOUND.17.SEDIMENT WILL BE REMOVED FROM BEHIND SEDIMENT FENCES AND BARRIERS BEFORE ITREACHES A DEPTH THAT IS EQUAL TO HALF THE BARRIER'S HEIGHT.18.BREAKS AND GAPS IN SEDIMENT FENCES AND BARRIERS WILL BE REPAIRED IMMEDIATELY.DECOMPOSING STRAW BALES WILL BE REPLACED (TYPICAL BALE LIFE IS THREE MONTHS).19.ALL SEDIMENT THAT MOVES OFF-SITE DUE TO CONSTRUCTION ACTIVITY OR STORM EVENTSWILL BE CLEANED UP BEFORE THE END OF THE SAME WORKDAY.20.ALL INSTALLED EROSION CONTROL PRACTICES WILL BE MAINTAINED UNTIL THE DISTURBEDAREAS THEY PROTECT ARE STABILIZED.21.ALL EROSION CONTROL MAT SHALL BE INSTALLED WITHIN 24 HOURS OF FINAL GRADESBEING ESTABLISHED. SILT FENCE, TYP. LEGEND PORTAGE COUNTY WASTE SITE: RAISE EX. GRADE ~4'US HIGHWAY 51 WISDOT PROJECT 2021TRACKING PAD 96' USLE 3'MAX3'MAX3'MAX3'MAXFOLD3" MAX.SUPPORT CORDGEOTEXTILE FABRICFLOW2'± 2WOOD POSTLENGTH 4' MIN.2' MIN. DEPTH INGROUND 1FLOWDIRECTIONGEOTEXTILE FABRIC ONLYBACKFILL AND COMPACT TRENCHWITH EXCAVATED SOIL* ATTACH THE FABRIC TO THEPOST w/WIRE STAPLES ORWOODEN LATH AND NAILS SILT FENCE TIE BACK DETAILANCHOR STAKEMIN. 18" LONGTIE BACK BETWEENFENCE POSTAND ANCHORFLOW DIRECTIONGEOTEXTILE FABRICEXCESSFABRICTRENCH DETAILWOODPOST1321 NOTES:TRENCH SHALL BE A MINIMUM OF 4" WIDE BY 6" DEEP TO BURY AND ANCHOR THE GEOTEXTILE FABRIC, FOLD MATERIALTO FIT TRENCH AND BACKFILL AND COMPACT TRENCH WITH EXCAVATED SOIL.HORIZONTAL BRACE WITH 2" X 4" WOODEN FRAME OR EQUIVALENT AT TOP OF POST AS DIRECTED BY THE ENGINEER. WOOD POST SHALL BE A MINIMUM SIZE OF 1 1/8" X 1 1/8" OF OAK OR HICKORY. 2'4'4'10'21EXTEND GEOTEXTILE 6'FROM TOE OF CHECK KEY RIP RAP 6" INTOEXISTING GROUND18"GEOTEXTILEWELL GRADEDANGULAR STONEWITH A D50 OF 3"3/8"-3/4"WASHED STONE6" THICK, TYP.FLOWDIRECTIONGEOTEXTILE21 ROCK DAM SECTION 9"6' TYP.A3'A 18"6" DITCH SECTION * WELL GRADED ANGULAR STONEWITH A D50 OF 3"GEOTEXTILE* "V" DITCH IS SHOWNHERE. SEE CIVIL PLANSFOR DITCH SECTION. NOTE:8' POST SPACING ALLOWED IF AWOVEN GEOTEXTILE FABRIC IS USED.* GEOTEXTILE FABRICWOOD POSTGEOTEXTILE FABRICGEOTEXTILE FABRICFLOW DIRECTION GEOTEXTILE FABRICWOOD POSTJOINING LENGTHS OF SILT FENCE3'5:15:1 NOTE:MAINTAIN THE ROCK ENTRANCE TOPREVENT TRACKING ONTO PAVEMENT 3" CLEAR STONEMIN. 12" THICKGEOTEXTILE MATERIAL6" HIGH BERMEXISTINGPAVEMENTSECTION A-A1.FOLLOW WISCONSIN DNR TECHNICAL STANDARD 1057 FOR FURTHER DETAILS AND INSTALLATION.2.LENGTH - MINIMUM OF 50'.3.WIDTH - 24' MINIMUM, SHOULD BE FLARED AT THE EXISTING ROAD TO PROVIDE A TURNING RADIUS.4.ON SITES 'MTH A HIGH GROUND WATER TABLE OR WHERE SATURATED CONDITIONS EXIST, GEOTEXTILE FABRIC SHALL BE PLACEDOVER EXISTING GROUND PRIOR TO PLACING STONE. FABRIC SHALL BE WISDOT TYPE-HR GEOTEXTILE FABRIC.5.STONE - CRUSHED 3" CLEAR STONE SHALL BE PLACED AT LEAST 12" DEEP OVER THE ENTIRE LENGTH AND WIDTH OF ENTRANCE.6.SURFACE WATER - ALL SURFACE WATER FLOWING TO OR DIVERTED TOWARDS CONSTRUCTION ENTRANCES SHALL BE PIPEDTHROUGH THE ENTRANCE. MAINTAINING POSITIVE DRAINAGE. PIPE INSTALLED THROUGH THE STABILIZED CONSTRUCTION ENTRANCESHALL BE PROTECTED WITH A MOUNTABLE BERM WITH 5:1 SLOPES AND MINIMUM OF 6" STONE OVER THE PIPE. PIPE SHALL BE SIZEDACCORDING TO THE DRAINAGE REQUIREMENTS. WHEN THE ENTRANCE IS LOCATED AT A HIGH SPOT AND HAS NO DRAINAGE TOCONVEY A PIPE SHALL NOT BE NECESSARY. THE MINIMUM PIPE DIAMETER SHALL BE 6". CONTRACTOR SHALL BE RESPONSIBLE FORTHE MAINTENANCE OF SAID PIPE.7.LOCATION - A STABILIZED CONSTRUCTION ENTRANCE SHALL BE LOCATED WHERE CONSTRUCTION TRAFFIC ENTERS AND/OR LEAVESTHE CONSTRUCTION SITE. VEHICLES LEAVING THE SITE MUST TRAVEL OVER THE ENTIRE LENGTH OF THE TRACKING PAD. 50' MIN. 24'TYP.10'TYP.10'TYP. A A 1-SILT FENCE 2-TRACKING PAD W, END SECTIONWIDTHW + 4'OR ASNOTED ONPLANS 5DOR AS NOTED ON PLANSRIP RAP FLOWLINE A 6" MIN.-12" MAX.D, DEPTH OF RIP-RIPRIP RAPGEOTEXTILESECTION A-A PLAN VIEW CMP/HDPE PIPE 3-STONE DITCH CHECK RIP RAPCLASS123 d, DEPTH9"18"27"4 36"WIS DOTRIP RAP--LIGHTHEAVYEXTRA HEAVYEQUIVALENT4-RIP RAP AT PIPE INLET EXISTING GROUND SEDIMENT CONTROLLED LOGMIN. 24" OVERLAPSTAKE TEMPORARY SEDIMENT LOGSC3.0Q2 4/12/21SSREROSION CONTROL PLANSHEET NAME:PROJECT:ADDRESS:PROJECT NO:SHEET FILE NAME : PLOT DATE :PLOT BY :PLOVER, WI \\ssr2\Gerke\Q2\2021\Q2 Gerke SWPPP\Plover\02-DT.dwgREVISION:REVISIONSNO.BYDATEBORROW, WASTE & CRUSHING SITEFOR WISDOT HWY 51GERKE EXCAVATING15341 STATE HWY 131◦ Tomah, WI 54660608-372-4203 (Office)◦ www.centralstateconstructionllc.comThis document contains confidential or proprietary information of Central States Construction, LLC.Neither this document nor the information herein is to be reproduced, distributed, used or disclosedeither in whole or in part except as specifically authorized by Central States Construction LLC.CENTRAL STATECONSTRUCTION, LLC WISDOT SECTION 630 SEEDING SPECIFICATIONS C3.1Q2 4/12/21SSREROSION SPECSSHEET NAME:PROJECT:ADDRESS:PROJECT NO:SHEET FILE NAME : PLOT DATE :PLOT BY :PLOVER, WI \\ssr2\Gerke\Q2\2021\Q2 Gerke SWPPP\Plover\02-DT.dwgREVISION:REVISIONSNO.BYDATEBORROW, WASTE & CRUSHING SITEFOR WISDOT HWY 51GERKE EXCAVATING15341 STATE HWY 131◦ Tomah, WI 54660608-372-4203 (Office)◦ www.centralstateconstructionllc.comThis document contains confidential or proprietary information of Central States Construction, LLC.Neither this document nor the information herein is to be reproduced, distributed, used or disclosedeither in whole or in part except as specifically authorized by Central States Construction LLC.CENTRAL STATECONSTRUCTION, LLC CENTRAL STATE CONSTRUCTION, LLC Storm Water Pollution Prevention Plan APPENDIX C WisDOT Standard Specification Effective with the December 2014 Letting 400 2015 Standard Specifications Section 625 Topsoil and Salvaged Topsoil 625.1 Description (1) This section describes furnishing, placing, spreading, and finishing humus-bearing soil, adapted to sustain plant life, commonly known as topsoil, from locations the contractor furnishes beyond the limits of the right of way. (2) This section also describes removing topsoil from the sites of proposed roadway excavations and embankments in amounts and depths available and necessary to cover the work slopes. This work also includes reclamation, placing, spreading, and finishing of this topsoil. 625.2 Materials (1) Topsoil consists of loam, sandy loam, silt loam, silty clay loam, or clay loam humus-bearing soils adapted to sustain plant life, and ensure this topsoil is in a Ph range of 6.0 to 7.0. (2) Salvaged topsoil consists of the loam, sandy loam, silt loam, silty clay loam or clay loam humus-bearing soils available from overlying portions of areas to be occupied by the completed roadway. 625.3 Construction 625.3.1 Preparing the Roadway for Topsoil (1) Undercut or underfill all areas designated to receive topsoil to a degree that if covered to the required depth with topsoil the finished work conforms to the required lines, grades, slopes and cross sections the plans and drawings show. 625.3.2 Processing Topsoil or Salvaged Topsoil (1) Mow topsoil procurement areas to a height of approximately 6 inches. Remove litter such as brush, rock, and other materials that will interfere with subsequent vegetation establishment. (2) Strip off the humus-bearing soil. Take care to minimize removing the underlying sterile soil. Then stockpile the topsoil on the right of way or place it directly on the designated areas. (3) Under the Salvaged Topsoil bid item, remove topsoil from excavation areas and the roadway foundation up to the quantity necessary to cover the slopes for the bid items of Salvaged Topsoil and Topsoil. Salvage topsoil from embankment areas outside the roadway foundation only if that additional material is required to cover the slopes. (4) Use Salvaged Topsoil in excess of the contract quantity to replace contract quantities of Topsoil. Utilize excess topsoil on the project or dispose of as specified in 205.3.12. 625.3.3 Placing (1) After preparing and finishing the areas designated for topsoil to the required lines, grades, slopes and cross section, place and spread the topsoil to a uniform depth as the plans show or the contract requires. If no depth is shown, place and spread the topsoil to a minimum depth of 4 inches in rural areas and a minimum depth of 6 inches in urban areas, or as the engineer designates. (2) Break down all clods and lumps using the appropriate equipment to provide a uniformly textured soil. (3) Where using either sod or seed mixture 40 ensure that, for the upper 2 inches, 100 percent of the material passes a one-inch sieve and at least 90 percent passes the No. 10 sieve. (4) Remove rocks, twigs, foreign material, and clods that cannot be broken down. Dress the entire surface to present a uniform appearance. The engineer will not require rolling. (5) If light sandy soils are covered with heavier clay bearing loam topsoil, then mix or blend the 2 types of soils to a more or less homogeneous mixture by using the appropriate equipment. 625.4 Measurement 625.4.1 Topsoil (1) The department will measure Topsoil acceptably completed by the square yard or by the cubic yard, whichever the contract specifies. (2) If the department measures by the square yard, the measured quantity shall equal the actual number of square yards of topsoiled area to the depth specified within the limits of construction designated on the plans, or in the contract, or as the engineer directs. (3) If measured by the cubic yard, the department will measure material in the vehicle. If the contractor transports the material in vehicles not adapted for measurement, then the department will measure the Effective with the December 2014 Letting 401 2015 Standard Specifications material in cubic yards of volume in its original position computed by the method of average end areas with no correction for curvature; or if the engineer elects, by the method of truncated prisms. 625.4.2 Salvaged Topsoil (1) The department will measure Salvaged Topsoil by the square yard acceptably completed. The quantity measured for payment shall equal the actual number of square yards of area topsoiled to the depth specified within the limits of construction designated on the plans or in the contract, or as the engineer directs. 625.5 Payment (1) The department will pay for measured quantities at the contract unit price under the following bid items: ITEM NUMBER DESCRIPTION UNIT 625.0100 Topsoil SY 625.0105 Topsoil CY 625.0500 Salvaged Topsoil SY 625.5.1 Topsoil (1) Payment for Topsoil is full compensation for providing, excavating, loading, hauling, and placing this material; and for undercutting excavations, or underfilling embankments necessary to receive this material. The department will make no allowance, adjustment, or measurement for payment under the Excavation bid items for undercutting cut sections, or underfilling embankments. 625.5.2 Salvaged Topsoil (1) Payment for Salvaged Topsoil is full compensation for removing, stockpiling, reclaiming, hauling, and placing this material; and for undercutting excavations, or underfilling embankments necessary to receive this material. The department will make no deductions from the Excavation bid items for the quantities of Salvaged Topsoil material obtained from areas of cut sections. Additionally, the department will not measure or pay for the volumes of Salvaged Topsoil removed from sites of proposed embankments under the Excavation bid items, or make any allowance, adjustment, or measurement for payment under the Excavation bid items for undercutting cut sections, or underfilling embankments. (2) If an area is damaged by erosion after partial acceptance, the department will pay for restoring topsoil in these areas at a unit price determined by multiplying the contract unit price bid for Salvaged Topsoil by 3, or absent that bid item in the contract, as the contract unit price bid for Topsoil multiplied by 3, The department will pay for restoration under the Restoration Post Acceptance Topsoil administrative item. (3) The department will not pay for removing topsoil from outside the roadway foundation in embankment areas unless that material is necessary to cover the slopes.

Source: Village of Plover website. First collected Oct 19, 2026.