BOARD OF ZONING APPEALS AGENDA
Plover Municipal Center Board Room
2400 Post Road
Plover, WI 54467
Wednesday, April 17, 2024
5:00 p.m.
1. Call to order/Introductions
2. 5:00 p.m. – Public Hearing – Temporary Use Request - Gerke Excavating Inc. –
Temporary asphalt/concrete crushing operations for CTH B reconstruction project –
STH 54 (PIN: 173230827-15.08)
3. Reconvene for possible discussion and consideration – Temporary Use Request – Gerke
Excavating Inc. – Temporary asphalt/concrete crushing operations for CTH B
reconstruction project. – STH 54 (PIN: 173230827-15.08)
4. Adjournment subject to call of the chair
NOTICE IS HEREBY GIVEN that a majority of the members of the Village Board may attend this meeting to gather
information about a subject over which they have decision making authority.
NOTICE IS HEREBY GIVEN that the Village of Plover Board of Zoning Appeals will hold a Public Hearing
on Wednesday, April 17, 2024 at 5:00 PM in the Plover Municipal Center Board Room, 2400 Post Road,
Plover, WI 54467, to consider a Temporary Use Request from Gerke Excavating Inc. to operate a tempo-
rary asphalt/concrete crushing site related to the CTH B reconstruction project at the Moodie, Inc. property
located at STH 54 - PIN: 173230827-15.08. All interested parties are invited to attend the public hearing
and will be given a reasonable opportunity to be heard. Further information is available at the Community
Development Department, or by calling 715-345-5250 EXT. 128.
Tammy Wojtalewicz, Village Clerk
Village of Plover
COMMUNITY DEVELOPMENT DEPARTMENT
2400 POST ROAD - PO Box 37 - PLOVER, WISCONSIN 54467
Phone: 715-345-5250 Website: www.ploverwi.gov
STAFF REPORT
TO: Plan Commission and Board of Zoning Appeals
FROM: Adam DeKleyn, Community Development Manager
RE: Temporary Use (2024-TU-001): Asphalt/concrete crushing operations for CTH B
reconstruction project
DATE: April 15, 2024 (PC) April 17, 2024 (BOZA)
Request: Gerke Excavating, Inc. requests approval of a temporary asphalt/concrete crushing
operation for the CTH B reconstruction project, at the above referenced property location.
Background: The CTH B reconstruction project commenced on April 8, 2024. Associated with the
project is the crushing and recycling of pavement.
Per Municipal Code §550-45 (C)(1)(d) - Temporary Uses: The Board of Zoning Appeals (BOZA)
has the authority to grant temporary uses in any zoning district. This section also requires the Plan
Commission (PC) to review and make a recommendation to the BOZA.
Back in 2022, the PC and BOZA approved a temporary use permit for a crushing plant at the same
location for the Business 51/Post Rd project.
Analysis: Applicant proposes a temporary crushing operation on approximately 4 acres, as
detailed in the attached site plan. The site will have a temporary scale, portable crusher and
stockpiles of materials onsite. Ingress/egress will be via an existing driveway off STH 54. Active
operations are planned to occur in the center of the +31 acre site, which limits potential impacts to
adjacent properties.
After crushing, some of the material will be returned to CTH B to be used as road base, with the
remaining being transported to a 12-acre fill/waste site owned by Classic Development - south of
Lexington Place Subdivision as part of a future residential development. The fill/waste site still
needs additional material to be added to bring the site to the grades show in the attached plans.
All property owners within 300’ of theparcel in which the temporary use is proposed on, have been
notified. Additionally, a public hearing will be held by the BOZA on Wednesday, April 17 at 5:00
PM.
Address: STH 54 Parcel #: 173230827-15.08
Zoning: Light Manufacturing (M-1) Future Land Use: Industrial/Manufacturing
Current Use: Undeveloped/Trailer Storage Temporary Use: Pavement Crushing Operation
In summary, the crushing operation is temporary in nature and generally compatible with the
parcel/area. As proposed, the temporary use is consistent with Village ordinances and
requirements. Furthermore, all Village department managers have reviewed, commented on, and
recommended approval of the temporary use.
Recommendation: Staff recommends approval of the Temporary Use, conditioned on the
following:
(1) Temporary Use (asphalt/concrete crushing) shall be approved to operate From:
04/17/2024 To: 12/31/2024.
(2) Hours of operation shall be limited to Monday through Friday, 7:00 AM – 5:00 PM.
(3) Effective dust suppression measures are required to minimize airborne dust emissions.
Water truck shall be available onsite to spray water onto the work area and the concrete
during crushing to minimize dust.
(4) Activities shall be limited to crushing, temporary storage and hauling operations.
(5) All erosion control and stormwater management BMP’s shall be installed and maintained,
including tracking pads and silt fences.
(6) Hauling operations shall not obstruct traffic flow and shall be confined to the routes
approved by the Village of Plover Public Works Department.
(7) Proposed crushing equipment and operations shall be a minimum 100 feet from all
property lines, all operations shall be confined to the approved areas identified in the
application.
(8) No portion of the crushing operations shall be located on a public or private street;
excluding trucking/hauling to and from the site.
(9) Site restoration required - Restore disturbed areas, replant vegetation, and return to
original condition.
(10) Applicant is responsible for any remedial road repairs within 12 months of completion to
restore the condition of the roadways to pre-use condition or better.
(11) Fill/waste site shall be graded according to approved plans.
(12) All activities onsite shall be in accordance with the approved plans. Any changes to the
approved plans, specifications and/or activities shall not be made without approval of the
Community Development Department.
(13) Conformance with all other applicable requirements, ordinances, regulations and
standards.
In the event that a temporary use does not conform to the conditions above, the permit may be
terminated by action of the BOZA.
Exhibits: Location Map Site Details Storm Water Pollution Prevention Plan
Location Map:
Temporary Crushing Site:
Crushing Site
CENTRAL STATE CONSTRUCTION, LLC
15341 STH 131
TOMAH, WI 54660
608-372-4203 PHONE
608-372-4139 FAX
centralstateconstructionllc.com
CENTRAL STATE CONSTRUCTION, LLC Page i
Storm Water Management Report
April 12,
2021
Storm Water Pollution Prevention Plan:
Waste & Borrow Sites: Village of Plover
Waste & Borrow Site: SW ¼ of SW ¼ Section 27, T23N, R08E,
Crushing Site: SE ¼ of SE ¼ of Section 28, T23N, R08E
Village of Plover, WI
CENTRAL STATE CONSTRUCTION, LLC Page ii
Storm Water Management Report
STORMWATER POLUTION PREVANTION PLAN
PREPARED FOR:
DNR
PREPARED BY:
CENTRL STATE CONSTRUCTION
1534 STATE HWY 131, TOMAH, WI 54660
Distribution List
R e c i p i e n t N u m b e r o f C o p i e s
D N R , W I 1
CENTRAL STATE CONSTRUCTION, LLC Page iii
Storm Water Management Report
Table of Contents
Page
1.0 BACKGROUND AND GENERAL INFORMATION ........................................................ 1
1.1 Project Location ......................................................................................................................... 1
2.0 STATE AND LOCAL REQUIREMENTS .......................................................................... 2
2.1 Objectives .................................................................................................................................... 2
2.2 Submittal List .............................................................................................................................. 2
3.0 POTENTIAL SOURCES OF CONTAMINATION ............................................................ 2
3.1 Sediment ...................................................................................................................................... 2
3.2 Oil & Grease ................................................................................................................................ 2
3.3 Tracking Sediment Off-Site ................................................................................................... 2
4.0 EROSION CONTROL BEST MANAGEMENT PRACTICESE ........................................... 3
4.1 Erosion Control Measures ..................................................................................................... 3
4.2 Oil and Grease Control ........................................................................................................... 4
4.3 Good Housekeeping ................................................................................................................ 4
4.4 Preventive Maintenance ......................................................................................................... 4
4.5 Spill Prevention Plan ................................................................................................................ 4
4.6 Visual Inspections ..................................................................................................................... 4
4.7 Stockpiling of Soil and other Materials ............................................................................. 5
5.0 POST-CONSTRUCTION STORM WATER MANAGEMENT ........................................... 5
5.1 Waste & Borrow Site Performance Standards .............................................................. 5
5.2 Long Term Maintenance ........................................................................................................ 5
List of Appendices
Appendix A General Maps & Additional Information
Appendix B Site/Project Specific
Appendix C WisDOT Standard Specification
CENTRAL STATE CONSTRUCTION, LLC Page 1
Storm Water Management Report
April 12, 2021
STORMWATER MANAGEMENT & EROSION CONTROL PLAN
1.0 BACKGROUND AND GE NERAL INFORMATION
The purpose of this report is to provide a framework for a Crus hing & Borrow and Waste Site
associated with a WISDOT HWY 51 reconstruction project. The pro posed crushing site is located
west of HWY 51 in Plover and Borrow & Waste Site is located at the end of Kensington Pl road.
Properties involved are owned by the same property owner: David Moodie. The borrow & waste
site is approximately 12 acres in size and the crushing site is approximately 5 acres. The proposed
waste site is an agricultural field and will be raised approximately 4’ to distribute soil material from
the road grading project.
1.1 Project Location
The project is located in the SW ¼, SE ¼ of Section 27, T23N, R 8E and SE ¼, SE ¼ of Section
28, T23N, R8E Village of Plover, Portage County, Wisconsin, con taining approximately 17 acres.
The sites will be used as Borrow & Waste site and Crushing Site for excess grading material from
adjacent road reconstruction project. Said properties consist of agricultural fields and site yard.
Crushing Site Borrow & Waste Site
CENTRAL STATE CONSTRUCTION, LLC Page 2
Storm Water Management Report
2.0 STATE AND LOCAL REQUIREMENTS
2.1 Objectives
The primary goal of this Storm Water Pollution Prevention Plan (SWPPP) is to reduce the amount
of sediment contained in the initial runoff for the Borrow/Waste Sites and ensure that downstream
water bodies are not adversely affected by the proposed activities. This SWPPP will:
• Identify sources of possibl e stormwater contamination
• Identify and prescribe appropriate best management practices ( BMPs) to reduce the
amount of pollutants in the runoff prior to discharge from the site
• Prescribe an implementation schedule to ensure that the action s recommended in this
report are carried out at appropriate times
2.2 Submittal List
• State of Wisconsin Departm ent of Natural Resources
• Portage County (If Requested)
• Village of Plover (If Requested)
Other approving authorities will be copied as needed or requested.
3.0 POTENTIAL SOURCES OF CONTAMINATION
3.1 Sediment
The primary objective for runoff pollution is sediment that wil l be carried offsite by storm water
runoff. A perimeter silt fence or soil berm shall be construct ed along the downstream of the
disturbed area, which in the case of top soil berm will also pr ovide storage for topsoil and
overburden. Upon construction the berm shall be seeded and mul ched to minimize erosion from
it. Once the site is filled-in, top soil berm will be re-spread and distributed over disturbed area with
at a min. of 6” thickness layer.
3.2 Oil & Grease
A secondary concern for this site is oil and grease in the stor mwater runoff. Oil and grease may
come from leaky vehicles, such as trucks entering and exiting the site, equipment on site, or other
devices using oil and grease such as scales.
3.3 Tracking Sediment Off-Site
A rock entrance will be constructed at the entrance to the site to minimize sediment tracking onto
existing roads. As needed the entrance will be replaced so as to remain effective. A gravel roadway
may be used for this purpose as well.
CENTRAL STATE CONSTRUCTION, LLC Page 3
Storm Water Management Report
4.0 EROSION CONTROL BEST MANAGEMENT PRACTICESE
4.1 Erosion Control Measures
All areas prone to soil erosion shall be protected using the following erosion control devices.
• Silt Fence
Continuous silt fencing will be used along all areas downstream of disturbed areas. The silt fencing
will provide a siltation barrier between the disturbed area and all downstream water bodies.
• Rock Entrance
A Rock Entrance will be constructed at the entrance to the site to minimize sediment tracking onto
existing roads. As needed, the entrance will be replaced so as t o r e m a i n e f f e c t i v e . A g r a v e l
roadway may be used for this purpose as well.
• Temporary Grading Practices
Temporary grading practices such as creating topsoil berms will be used to help monitor discharge
from the site. Berms will direct stormwater runoff to appropri ate outlet areas. They will also help
in the attenuation, and subsequently TSS reduction by allowing the stormwater to only discharge
at engineered outlet locations.
• Rock Check Dam Outlets
Sediment basin with rock outlet provides for attenuation of stormwater, increase TSS reduction on
site, and provide a safe passage for stormwater runoff exiting the site.
• Waste and Material Disposal
All waste and unused building materials (including garbage, deb ris, cleaning wastes, or other
mining materials) shall be properly disposed of and not allowed to be carried by runoff into a
receiving channel.
• Seeding and Mulching Overburden
Over burden piles shall be seeded and mulched as soon as practi cal. Seeding and mulching the
overburden piles will encourage vegetative cover to form on the slopes, which will hold the
disturbed soil in place during rain events. This will reduce the sediment load being carried by rain
water that falls on the site. Fertilizer shall be applied prior to seeding at a rate of seven pounds per
1000 square feet. The latest seeding shall be completed on or before September 15th:
Seeding Application Rates shall be:
Seed mixtures shall be WISDOT seed mixtures for seeding borrow pits and material disposal
sites beyond the right of way, use seed mixtures conforming to seed mixture 10, 20, 70, 70A, or
75 of 630.2.1.5.1.1 or a borrow pit mixture composed of seeds of the species, purity, germination
and proportions, by weight as given below:
Permanent Seed Mix
Species Purity Min. % Germination Min. %
Alfalfa 9 8 9 0
Bromegrass 8 5 8 5
Orchardgrass 8 0 8 5
Timothy 9 8 9 0
Red Clover 9 8 9 0
Alsike Clover 9 7 9 0
Ladino Clover 9 5 9 0
Kentucky Bluegrass 9 8 8 5
CENTRAL STATE CONSTRUCTION, LLC Page 4
Storm Water Management Report
Mulch shall be placed on the same day that the area is seeded. Mulch the area by hand or using
a blowing machine. Spread the material uniformly to a depth of ½ to 1 11/2 inch using 1 ½ to 3
tons of material per acre.
Additional erosion control measures may be implemented as needed.
4.2 Oil and Grease Control
Oil and grease control will be provided by the gravel/limestone subgrade along temporary
construction roadways and tracking pads. Hydrocarbons tend to cling to the lime stone and degrade
under exposure to the elements and UV light.
4.3 Good Housekeeping
Good housekeeping practices shall be used on site to help provi de a safe work environment, as
well as reducing the amount of exposure that storm water has with materials that may contribute to
contamination of the storm water.
4.4 Preventive Maintenance
Preventive maintenance involves regularly inspecting, cleaning, and testing all facility equipment
and operational systems. These actions will help detect problems while they are small and can be
easily repaired, rather than allowing for a large release of a contaminant due to a system failure.
4.5 Spill Prevention Plan
All employees on site shall be trained in the proper response to a contaminant spill so as to increase
worker safety, and reduce the amount of time that it takes to stop, and remediate a spill. A copy of
the procedures will be kept on site at all times and should be reviewed annually.
Materials will be stored so that the chance that a spill will reach soils, groundwater or surface water
is minimized. In the event that a spill does occur, the spill must be immediately contained by using
appropriate response techniques including diking and absorbents . Clean-up of the spill should
occur immediately once the spill is stabilized and contained. Spills will be cleaned up using
methods such as removal of contaminated soils. In all cases cl eanup standards will adhere to
local, state and federal requirements.
4.6 Visual Inspections
The Owner or Owner designated re presentative will be responsibl e for inspection of the
construction site erosion control measures for this construction activity.
The Owner or Owner designated representative shall conduct the following inspections:
• Weekly inspections of implemented erosion and sediment controls.
• Inspections of erosion and sediment controls within 24 hours after a precipitation event 0.5 inches
or greater which results in runoff during active construction periods.
The Owner or Owner designated representative shall maintain wee kly written reports of all
inspections that include:
• The date, time, and exact place of the inspection.
• The name of the individual who performed the inspection.
• An assessment of the condition of erosion and sediment controls.
• A description of any erosion and sediment control implementation and maintenance performed.
CENTRAL STATE CONSTRUCTION, LLC Page 5
Storm Water Management Report
Repairs shall be made immediately, as required, to maintain eff ectiveness, until permanent
vegetation is established and final paving is completed.
Monitoring, reporting and maintenance shall be completed in accordance with this Report and the
requirements of NR 216. The current DNR Construction Site Insp ection Report form (3400-187)
may be used by the Owner or Owner designated representative to record information collected
d u r i n g t h e i n s p e c t i o n s . A c o p y o f t h e C o n s t r u c t i o n S i t e I n s p ection Report is included in the
Appendix.
4.7 Stockpiling of Soil and other Materials
Topsoil and B-horizon material will be removed, segregated, and stockpiled. Management of topsoil
will follow methods described in Section 625 of the WisDOT Stan dard Specifications. Topsoil
redistribution and site preparation will follow methods describ ed in Section 625 of the WisDOT
Standard Specifications. Site preparation prior to application of the topsoil and B-horizon material
will use methods that ensure optimum adherence between the topsoil/B-horizon and the underlying
overburden material.
Soil compaction will be minimized by limiting unnecessary traff ic or tracked vehicles during and
after the placement of the subsoil and topsoil layers. If it is determined that subsoil and/or top soil
have been over-compacted, the topsoil layer will be removed and stockpiled and the subsoil layer
will be loosened by discs or other equipment prior to replacement of top soil. Topsoil redistribution
will not be performed during or immediately following a precipitation event.
5.0 POST-CONSTRUCTION STO RM WATER MANAGEMENT
5.1 Waste & Borrow Site Performance Standards
Post construction performance standards for this site will be met as the site is returned to use as a
farm field land. There is no proposed increase of imperviousnes s for this site in the post-
development land use. Waste & Borrow site will be returned to a n agricultural land use, removing
perimeter erosion control measures and re-spreading top soil.
5.2 Long Term Maintenance
There are no specific or permanent best management practices for this project. Site will be returned
as agricultural land use.
Gerke Excavating, Inc.
Attn: Chad Gerke
15341 STH 131
Tomah, WI 54460
P: (608) 372-4203
F: (608) 372-41
CENTRAL STATE CONSTRUCTION, LLC
Storm Water Pollution Prevention Plan
APPENDIX A
G e n e r a l M a p s & A d d i t i o n a l I n f o r m a t i o n
Topo
DISCLAIMER: The information shown on these maps has been obtained from various
sources, and are of varying age, reliability and resolution. These maps are not intended to be
used for navigation, nor are these maps an authoritative source of information about legal land
ownership or public access. No warranty, expressed or implied, is made regarding accuracy,
applicability for a particular use, completeness, or legality of the information depicted on this
map. For more information, see the DNR Legal Notices web page: http://dnr.wi.gov/legal/7,920
0.3
1:NAD_1983_HARN_Wisconsin_TM
Miles0.30.13
Notes
Waste Site
Legend
0
Wetland Identifications and
Confirmations
Wetland Class Points
Dammed pond
Excavated pond
Filled excavated pond
Filled/drained wetland
Wetland too small to delineate
Filled Points
Wetland Class Areas
Wetland
Upland
Filled Areas
Wetland Class Points
Dammed pond
Excavated pond
Filled excavated pond
Filled/drained wetland
Wetland too small to delineate
Filled Points
Wetland Class Areas
Wetland
Upland
Filled Areas
NRCS Wetspots
Maximum Extent Wetland
Indicators
Municipality
State Boundaries
County Boundaries
Major Roads
Interstate Highway
State Highway
US Highway
County and Local Roads
County HWY
Local Road
Railroads
Tribal Lands
Rivers and Streams
Intermittent Streams
TopoMap
DISCLAIMER: The information shown on these maps has been obtained from various
sources, and are of varying age, reliability and resolution. These maps are not intended to be
used for navigation, nor are these maps an authoritative source of information about legal land
ownership or public access. No warranty, expressed or implied, is made regarding accuracy,
applicability for a particular use, completeness, or legality of the information depicted on this
map. For more information, see the DNR Legal Notices web page: http://dnr.wi.gov/legal/7,920
0.3
1:NAD_1983_HARN_Wisconsin_TM
Miles0.30.13
Notes
Crushing Site
Legend
0
Township
Section
Quarter-Quarter
County Boundary
Cities, Towns & Villages
City
Village
Civil Town
Municipality
State Boundaries
County Boundaries
Major Roads
Interstate Highway
State Highway
US Highway
County and Local Roads
County HWY
Local Road
Railroads
Tribal Lands
Rivers and Streams
Intermittent Streams
Lakes and Open water
24K USGS Quad Index -
Level 7 - 16
Wetlands
DISCLAIMER: The information shown on these maps has been obtained from various
sources, and are of varying age, reliability and resolution. These maps are not intended to be
used for navigation, nor are these maps an authoritative source of information about legal land
ownership or public access. No warranty, expressed or implied, is made regarding accuracy,
applicability for a particular use, completeness, or legality of the information depicted on this
map. For more information, see the DNR Legal Notices web page: http://dnr.wi.gov/legal/3,960
0.1
1:NAD_1983_HARN_Wisconsin_TM
Miles0.10.06
Notes
Legend
0
Wetland Identifications and
Confirmations
Wetland Class Points
Dammed pond
Excavated pond
Filled excavated pond
Filled/drained wetland
Wetland too small to delineate
Filled Points
Wetland Class Areas
Wetland
Upland
Filled Areas
Wetland Class Points
Dammed pond
Excavated pond
Filled excavated pond
Filled/drained wetland
Wetland too small to delineate
Filled Points
Wetland Class Areas
Wetland
Upland
Filled Areas
NRCS Wetspots
Maximum Extent Wetland
Indicators
Municipality
State Boundaries
County Boundaries
Major Roads
Interstate Highway
State Highway
US Highway
County and Local Roads
County HWY
Local Road
Railroads
Tribal Lands
Rivers and Streams
Intermittent Streams
Wetlands
DISCLAIMER: The information shown on these maps has been obtained from various
sources, and are of varying age, reliability and resolution. These maps are not intended to be
used for navigation, nor are these maps an authoritative source of information about legal land
ownership or public access. No warranty, expressed or implied, is made regarding accuracy,
applicability for a particular use, completeness, or legality of the information depicted on this
map. For more information, see the DNR Legal Notices web page: http://dnr.wi.gov/legal/7,920
0.3
1:NAD_1983_HARN_Wisconsin_TM
Miles0.30.13
Notes
Waste Site
Legend
0
Wetland Identifications and
Confirmations
Wetland Class Points
Dammed pond
Excavated pond
Filled excavated pond
Filled/drained wetland
Wetland too small to delineate
Filled Points
Wetland Class Areas
Wetland
Upland
Filled Areas
Wetland Class Points
Dammed pond
Excavated pond
Filled excavated pond
Filled/drained wetland
Wetland too small to delineate
Filled Points
Wetland Class Areas
Wetland
Upland
Filled Areas
NRCS Wetspots
Maximum Extent Wetland
Indicators
Municipality
State Boundaries
County Boundaries
Major Roads
Interstate Highway
State Highway
US Highway
County and Local Roads
County HWY
Local Road
Railroads
Tribal Lands
Rivers and Streams
Intermittent Streams
9
Custom Soil Resource Report
Soil Map
4923750 4923790 4923830 4923870 4923910 4923950 4923990 4924030
4923750 4923790 4923830 4923870 4923910 4923950 4923990
296740 296780 296820 296860 296900 296940 296980 297020 297060 297100 297140
296740 296780 296820 296860 296900 296940 296980 297020 297060 297100 297140
44° 26' 27'' N
89° 33' 16'' W
44° 26' 27'' N
89° 32' 55'' W
44° 26' 18'' N
89° 33' 16'' W
44° 26' 18'' N
89° 32' 55'' W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84
0 50 100 200 300
Feet
0 30 60 120 180
Meters
Map Scale: 1:2,030 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:20,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Portage County, Wisconsin
Survey Area Data: Version 17, Jun 8, 2020
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Apr 28, 2011—Nov 2,
2016
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Custom Soil Resource Report
10
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
FrA Friendship loamy sand, 0 to 3
percent slopes
10.8 100.0%
Totals for Area of Interest 10.8 100.0%
Map Unit Descriptions
The map units delineated on the detailed soil maps in a soil survey represent the
soils or miscellaneous areas in the survey area. The map unit descriptions, along
with the maps, can be used to determine the composition and properties of a unit.
A map unit delineation on a soil map represents an area dominated by one or more
major kinds of soil or miscellaneous areas. A map unit is identified and named
according to the taxonomic classification of the dominant soils. Within a taxonomic
class there are precisely defined limits for the properties of the soils. On the
landscape, however, the soils are natural phenomena, and they have the
characteristic variability of all natural phenomena. Thus, the range of some
observed properties may extend beyond the limits defined for a taxonomic class.
Areas of soils of a single taxonomic class rarely, if ever, can be mapped without
including areas of other taxonomic classes. Consequently, every map unit is made
up of the soils or miscellaneous areas for which it is named and some minor
components that belong to taxonomic classes other than those of the major soils.
Most minor soils have properties similar to those of the dominant soil or soils in the
map unit, and thus they do not affect use and management. These are called
noncontrasting, or similar, components. They may or may not be mentioned in a
particular map unit description. Other minor components, however, have properties
and behavioral characteristics divergent enough to affect use or to require different
management. These are called contrasting, or dissimilar, components. They
generally are in small areas and could not be mapped separately because of the
scale used. Some small areas of strongly contrasting soils or miscellaneous areas
are identified by a special symbol on the maps. If included in the database for a
given area, the contrasting minor components are identified in the map unit
descriptions along with some characteristics of each. A few areas of minor
components may not have been observed, and consequently they are not
mentioned in the descriptions, especially where the pattern was so complex that it
was impractical to make enough observations to identify all the soils and
miscellaneous areas on the landscape.
The presence of minor components in a map unit in no way diminishes the
usefulness or accuracy of the data. The objective of mapping is not to delineate
pure taxonomic classes but rather to separate the landscape into landforms or
landform segments that have similar use and management requirements. The
delineation of such segments on the map provides sufficient information for the
development of resource plans. If intensive use of small areas is planned, however,
onsite investigation is needed to define and locate the soils and miscellaneous
areas.
Custom Soil Resource Report
11
Portage County, Wisconsin
FrA—Friendship loamy sand, 0 to 3 percent slopes
Map Unit Setting
National map unit symbol: 2t80r
Elevation: 720 to 1,440 feet
Mean annual precipitation: 31 to 35 inches
Mean annual air temperature: 43 to 46 degrees F
Frost-free period: 110 to 150 days
Farmland classification: Not prime farmland
Map Unit Composition
Friendship and similar soils: 90 percent
Minor components: 10 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Friendship
Setting
Landform: Outwash plains
Landform position (two-dimensional): Toeslope
Landform position (three-dimensional): Talf
Down-slope shape: Linear
Across-slope shape: Linear
Parent material: Sandy lacustrine deposits
Typical profile
Oe - 0 to 1 inches: moderately decomposed plant material
A - 1 to 5 inches: loamy sand
Bw1 - 5 to 12 inches: sand
Bw2 - 12 to 19 inches: sand
Bw3 - 19 to 30 inches: sand
C1 - 30 to 43 inches: sand
C2 - 43 to 49 inches: sand
C3 - 49 to 79 inches: sand
Properties and qualities
Slope: 0 to 3 percent
Depth to restrictive feature: More than 80 inches
Drainage class: Moderately well drained
Runoff class: Negligible
Capacity of the most limiting layer to transmit water (Ksat): Moderately low to high
(0.14 to 14.03 in/hr)
Depth to water table: About 42 to 60 inches
Frequency of flooding: None
Frequency of ponding: None
Maximum salinity: Nonsaline to very slightly saline (0.0 to 2.0 mmhos/cm)
Available water capacity: Low (about 3.9 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 4s
Hydrologic Soil Group: A
Forage suitability group: Low AWC, adequately drained (G089XY002WI)
Custom Soil Resource Report
13
Other vegetative classification: Low AWC, adequately drained (G089XY002WI),
Pinus/Vaccinium-Gaultheria (PVG)
Hydric soil rating: No
Minor Components
Meehan
Percent of map unit: 7 percent
Landform: Outwash plains
Landform position (two-dimensional): Toeslope
Landform position (three-dimensional): Talf
Down-slope shape: Linear
Across-slope shape: Linear
Other vegetative classification: Low AWC, high water table (G089XY001WI),
Pinus/Euphorbia (PEu)
Hydric soil rating: No
Plainfield
Percent of map unit: 3 percent
Landform: Outwash plains
Landform position (two-dimensional): Toeslope
Landform position (three-dimensional): Rise
Down-slope shape: Linear
Across-slope shape: Linear
Other vegetative classification: Low AWC, adequately drained (G089XY002WI),
Pinus/Vaccinium-Gaultheria (PVG)
Hydric soil rating: No
Custom Soil Resource Report
14
17
Custom Soil Resource Report
Map—Hydrologic Soil Group
4923750 4923790 4923830 4923870 4923910 4923950 4923990 4924030
4923750 4923790 4923830 4923870 4923910 4923950 4923990
296740 296780 296820 296860 296900 296940 296980 297020 297060 297100 297140
296740 296780 296820 296860 296900 296940 296980 297020 297060 297100 297140
44° 26' 27'' N
89° 33' 16'' W
44° 26' 27'' N
89° 32' 55'' W
44° 26' 18'' N
89° 33' 16'' W
44° 26' 18'' N
89° 32' 55'' W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84
0 50 100 200 300
Feet
0 30 60 120 180
Meters
Map Scale: 1:2,030 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:20,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Portage County, Wisconsin
Survey Area Data: Version 17, Jun 8, 2020
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Apr 28, 2011—Nov 2,
2016
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Custom Soil Resource Report
18
9
Custom Soil Resource Report
Soil Map
4923880 4923910 4923940 4923970 4924000 4924030 4924060
4923850 4923880 4923910 4923940 4923970 4924000 4924030 4924060
298080 2981 10 298140 298170 298200 298230 298260 298290 298320 298350 298380
298080 2981 10 298140 298170 298200 298230 298260 298290 298320 298350 298380
44° 26' 30'' N
89° 32' 15'' W
44° 26' 30'' N
89° 31' 59'' W
44° 26' 23'' N
89° 32' 15'' W
44° 26' 23'' N
89° 31' 59'' W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84
0 50 100 200 300
Feet
0 20 40 80 120
Meters
Map Scale: 1:1,520 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:20,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Portage County, Wisconsin
Survey Area Data: Version 17, Jun 8, 2020
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Apr 28, 2011—Nov 2,
2016
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Custom Soil Resource Report
10
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
FrA Friendship loamy sand, 0 to 3
percent slopes
2.4 44.2%
RfA Richford loamy sand, 0 to 2
percent slopes
3.1 55.8%
Totals for Area of Interest 5.5 100.0%
Map Unit Descriptions
The map units delineated on the detailed soil maps in a soil survey represent the
soils or miscellaneous areas in the survey area. The map unit descriptions, along
with the maps, can be used to determine the composition and properties of a unit.
A map unit delineation on a soil map represents an area dominated by one or more
major kinds of soil or miscellaneous areas. A map unit is identified and named
according to the taxonomic classification of the dominant soils. Within a taxonomic
class there are precisely defined limits for the properties of the soils. On the
landscape, however, the soils are natural phenomena, and they have the
characteristic variability of all natural phenomena. Thus, the range of some
observed properties may extend beyond the limits defined for a taxonomic class.
Areas of soils of a single taxonomic class rarely, if ever, can be mapped without
including areas of other taxonomic classes. Consequently, every map unit is made
up of the soils or miscellaneous areas for which it is named and some minor
components that belong to taxonomic classes other than those of the major soils.
Most minor soils have properties similar to those of the dominant soil or soils in the
map unit, and thus they do not affect use and management. These are called
noncontrasting, or similar, components. They may or may not be mentioned in a
particular map unit description. Other minor components, however, have properties
and behavioral characteristics divergent enough to affect use or to require different
management. These are called contrasting, or dissimilar, components. They
generally are in small areas and could not be mapped separately because of the
scale used. Some small areas of strongly contrasting soils or miscellaneous areas
are identified by a special symbol on the maps. If included in the database for a
given area, the contrasting minor components are identified in the map unit
descriptions along with some characteristics of each. A few areas of minor
components may not have been observed, and consequently they are not
mentioned in the descriptions, especially where the pattern was so complex that it
was impractical to make enough observations to identify all the soils and
miscellaneous areas on the landscape.
The presence of minor components in a map unit in no way diminishes the
usefulness or accuracy of the data. The objective of mapping is not to delineate
pure taxonomic classes but rather to separate the landscape into landforms or
landform segments that have similar use and management requirements. The
delineation of such segments on the map provides sufficient information for the
development of resource plans. If intensive use of small areas is planned, however,
Custom Soil Resource Report
11
Portage County, Wisconsin
FrA—Friendship loamy sand, 0 to 3 percent slopes
Map Unit Setting
National map unit symbol: 2t80r
Elevation: 720 to 1,440 feet
Mean annual precipitation: 31 to 35 inches
Mean annual air temperature: 43 to 46 degrees F
Frost-free period: 110 to 150 days
Farmland classification: Not prime farmland
Map Unit Composition
Friendship and similar soils: 90 percent
Minor components: 10 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Friendship
Setting
Landform: Outwash plains
Landform position (two-dimensional): Toeslope
Landform position (three-dimensional): Talf
Down-slope shape: Linear
Across-slope shape: Linear
Parent material: Sandy lacustrine deposits
Typical profile
Oe - 0 to 1 inches: moderately decomposed plant material
A - 1 to 5 inches: loamy sand
Bw1 - 5 to 12 inches: sand
Bw2 - 12 to 19 inches: sand
Bw3 - 19 to 30 inches: sand
C1 - 30 to 43 inches: sand
C2 - 43 to 49 inches: sand
C3 - 49 to 79 inches: sand
Properties and qualities
Slope: 0 to 3 percent
Depth to restrictive feature: More than 80 inches
Drainage class: Moderately well drained
Runoff class: Negligible
Capacity of the most limiting layer to transmit water (Ksat): Moderately low to high
(0.14 to 14.03 in/hr)
Depth to water table: About 42 to 60 inches
Frequency of flooding: None
Frequency of ponding: None
Maximum salinity: Nonsaline to very slightly saline (0.0 to 2.0 mmhos/cm)
Available water capacity: Low (about 3.9 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 4s
Hydrologic Soil Group: A
Forage suitability group: Low AWC, adequately drained (G089XY002WI)
Custom Soil Resource Report
13
Other vegetative classification: Low AWC, adequately drained (G089XY002WI),
Pinus/Vaccinium-Gaultheria (PVG)
Hydric soil rating: No
Minor Components
Meehan
Percent of map unit: 7 percent
Landform: Outwash plains
Landform position (two-dimensional): Toeslope
Landform position (three-dimensional): Talf
Down-slope shape: Linear
Across-slope shape: Linear
Other vegetative classification: Low AWC, high water table (G089XY001WI),
Pinus/Euphorbia (PEu)
Hydric soil rating: No
Plainfield
Percent of map unit: 3 percent
Landform: Outwash plains
Landform position (two-dimensional): Toeslope
Landform position (three-dimensional): Rise
Down-slope shape: Linear
Across-slope shape: Linear
Other vegetative classification: Low AWC, adequately drained (G089XY002WI),
Pinus/Vaccinium-Gaultheria (PVG)
Hydric soil rating: No
RfA—Richford loamy sand, 0 to 2 percent slopes
Map Unit Setting
National map unit symbol: 2wpwv
Elevation: 790 to 1,310 feet
Mean annual precipitation: 31 to 33 inches
Mean annual air temperature: 43 to 46 degrees F
Frost-free period: 125 to 160 days
Farmland classification: Farmland of statewide importance
Map Unit Composition
Richford and similar soils: 90 percent
Minor components: 10 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Richford
Setting
Landform: Plains
Landform position (three-dimensional): Talf
Down-slope shape: Linear
Across-slope shape: Linear
Custom Soil Resource Report
14
Parent material: Sandy and loamy outwash
Typical profile
Ap - 0 to 7 inches: loamy sand
Bw - 7 to 27 inches: loamy sand
Bt - 27 to 41 inches: sandy loam
C - 41 to 79 inches: sand
Properties and qualities
Slope: 0 to 2 percent
Depth to restrictive feature: More than 80 inches
Drainage class: Somewhat excessively drained
Runoff class: Negligible
Capacity of the most limiting layer to transmit water (Ksat): High (1.98 to 6.00
in/hr)
Depth to water table: More than 80 inches
Frequency of flooding: None
Frequency of ponding: None
Maximum salinity: Nonsaline to very slightly saline (0.0 to 2.0 mmhos/cm)
Available water capacity: Low (about 5.6 inches)
Interpretive groups
Land capability classification (irrigated): 3s
Land capability classification (nonirrigated): 3s
Hydrologic Soil Group: A
Hydric soil rating: No
Minor Components
Plainfield
Percent of map unit: 6 percent
Landform: Plains
Landform position (three-dimensional): Talf
Down-slope shape: Linear
Across-slope shape: Linear
Hydric soil rating: No
Rosholt
Percent of map unit: 3 percent
Landform: Plains
Landform position (three-dimensional): Talf
Down-slope shape: Linear
Across-slope shape: Linear
Hydric soil rating: No
Pearl
Percent of map unit: 1 percent
Landform: Plains
Landform position (three-dimensional): Dip
Down-slope shape: Linear
Across-slope shape: Linear
Hydric soil rating: No
Custom Soil Resource Report
15
18
Custom Soil Resource Report
Map—Hydrologic Soil Group
4923880 4923910 4923940 4923970 4924000 4924030 4924060
4923850 4923880 4923910 4923940 4923970 4924000 4924030 4924060
298080 2981 10 298140 298170 298200 298230 298260 298290 298320 298350 298380
298080 2981 10 298140 298170 298200 298230 298260 298290 298320 298350 298380
44° 26' 30'' N
89° 32' 15'' W
44° 26' 30'' N
89° 31' 59'' W
44° 26' 23'' N
89° 32' 15'' W
44° 26' 23'' N
89° 31' 59'' W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84
0 50 100 200 300
Feet
0 20 40 80 120
Meters
Map Scale: 1:1,520 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:20,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Portage County, Wisconsin
Survey Area Data: Version 17, Jun 8, 2020
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Apr 28, 2011—Nov 2,
2016
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Custom Soil Resource Report
19
YEAR 1
Developer:
Project:
Date:
County: Version 1.0
Activity
(1)
Begin
Date
(2)
End Date
(3)
Period
% R
(4)
Annual R
Factor
(5)
Sub Soil Texture
(6)
Soil
Erodibility K
Factor (7)
Slope
(%)
(8)
Slope
Length
(ft)
(9)
LS
Factor
(10)
Land Cover
C Factor
(11)
Soil loss A
(tons/acre)
(12)
SDF
(13)
Sediment Control
Practice
(14)
Sediment
Discharge
(t/ac) (15)
04/10/24 11/01/24 91.6% 130 0.15 2.3% 212 0.28 1.00 5.0 0.961 2.9
11/01/24 04/01/25 7.1% 130 Sand 0.15 2.3% 212 0.28 0.10 0.0 0.961 0.0
04/01/25 ----- ----- ----- ------- ----- 2.3% 212 0.28 ------ ----- 0.000 0.0
----- ----- ----- ------- ----- 2.3% 212 0.28 ----- ----- 0.000 0.0
----- ----- ----- ------- ----- 2.3% 0 ----- ----- ----- 0.000 0.0
----- ----- ----- ------- ----- 0.0% 0 ----- ----- ----- 0.000 0.0
TOTAL 5.1 TOTAL 2.9
Notes:
% Reduction
Required NONE
See Help Page for further descriptions of variables and items in drop-down boxes.
The last land disturbing activity on each sheet must be 'End'. This is either 12 months from the start of construction or final stabilization.
For periods of construction that exceed 12 months, please demonstrate that 5 tons/acre/year is not exceeded in any given 12 month period.
Recommended Permanent Seeding Dates:
4/15-6/1 and 8/1-8/21 Turf, introduced grasses and legumes Designed By: SSR
Thaw-6/30 Native Grasses, forbs, and legumes Date 4/12/2021
NOTE: THIS TOOL ONLY ADDRESSED SOIL EROSION DUE TO
SHEET FLOW. MEASURES TO CONTROL CHANNEL EROSION MAY
ALSO BE REQUIRED TO MEET SEDIMENT DISCHARGE
REQUIREMENTS.
Soil Loss & Sediment Discharge Calculation Tool
for use on Construction Sites in the State of Wisconsin
04/04/24
WDNR Version 2.0 (06-29-2017)
Gerke Excavating
David Moodie Borrow Site
Bare Ground
Seed with Mulch or Ero
End
Sand
Portage
Silt Fence
Silt Fence
M:\_Projects\2024\Q24027 DOT Feb No 28 - Plover WI Ave to Hoover Ave\Project Management\USLE Form
CENTRAL STATE CONSTRUCTION, LLC
Storm Water Pollution Prevention Plan
APPENDIX B
S i t e P r o j e c t S p e c i f i c M a p s
1082
1084
10861086108410801076107810821084
173230827-16173230827-16173230827-16173230827-16173230827-16
ROWROWROWROWROW
ROWROWROWROWROW
173230827-15.08173230827-15.08173230827-15.08173230827-15.08173230827-15.08173230827-15.07173230827-15.07173230827-15.07173230827-15.07173230827-15.07173230827-15.03173230827-15.03173230827-15.03173230827-15.03173230827-15.03
030230834-02.01030230834-02.01030230834-02.01030230834-02.01030230834-02.01030230834-05.01030230834-05.01030230834-05.01030230834-05.01030230834-05.01
173230827-12.02B173230827-12.02B173230827-12.02B173230827-12.02B173230827-12.02B173230827-12.02A173230827-12.02A173230827-12.02A173230827-12.02A173230827-12.02A173230827-12.01173230827-12.01173230827-12.01173230827-12.01173230827-12.01173230827-12.01A173230827-12.01A173230827-12.01A173230827-12.01A173230827-12.01A173230827-12.03173230827-12.03173230827-12.03173230827-12.03173230827-12.03
030230834-01.04I030230834-01.04I030230834-01.04I030230834-01.04I030230834-01.04I
\\ssr2\Gerke\Q2\2021\Q2 Gerke SWPPP\Plover\Base.dwgC1.0Q2 4/12/21SSRTEMPORARY CRUSHING SITESHEET NAME:PROJECT:ADDRESS:PROJECT NO:SHEETPLOT DATE :PLOT BY :PLOVER, WIREVISION:REVISIONSNO.BYDATE15341 STATE HWY 131◦ Tomah, WI 54660608-372-4203 (Office)◦ www.centralstateconstructionllc.comThis document contains confidential or proprietary information of Central States Construction, LLC.Neither this document nor the information herein is to be reproduced, distributed, used or disclosedeither in whole or in part except as specifically authorized by Central States Construction LLC.BORROW, WASTE & CRUSHING SITEFOR WISDOT HWY 51GERKE EXCAVATINGCENTRAL STATECONSTRUCTION, LLC
FILE NAME :
Wis Statute 182.0175 (1974)Requires Min. 3 Work DaysNotice Before You Excavate
To Obtain Location ofParticipants UndergroundFacilities Before YouDig in WisconsinCALL DIGGERS HOTLINE1-800-242-8511
TRACKING PAD
EROSION CONTROL NOTES:1.ALL EXISTING UNDERGROUND UTILITY LOCATIONS ARE APPROXIMATE AND SHOULD BEFIELD VERIFIED PRIOR TO CONSTRUCTION.2.ALL EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO CONSTRUCTION.3.SILT FENCE, TEMPORARY SEDIMENT BASIN, & ROCK CONSTRUCTION ENTRANCE SHALL BEINSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITIES, INCLUDING CLEARING &GRUBBING.4.ANY AREAS WHERE GRADING IS COMPLETE SHALL BE STABILIZED WITH FERTILIZER, SEED, &MULCH AS SOON AS POSSIBLE.5.ALL BEST MANAGEMENT PRACTICES WILL BE INSTALLED BY THE TIME THE CONSTRUCTIONSITE IS CONSIDERED STABILIZED.6.STOCKPILES LEFT INACTIVE FOR 7 DAYS SHALL BE SEEDED AND SURROUNDED BY SILTFENCE.7.ALL WASTE AND UNUSED BUILDING MATERIALS (INCLUDING GARBAGE, DEBRIS, CLEANING WASTES, OR OTHER CONSTRUCTION MATERIALS) SHALL BE PROPERLY DISPOSEDOF AND NOT ALLOWED TO BE CARRIED BY RUNOFF INTO RECEIVING CHANNEL.8.ALL VEHICLE TRAFFIC IS PROHIBITED WITHIN THE UNDISTURBED LAND BUFFER WHENEVERPRACTICAL.9.EROSION CONTROL MAT CLASS I, TYPE A WILL BE USED IN NON-CHANNEL AREAS ANDCLASS I, TYPE B WILL BE USED IN CHANNEL AREAS.10.ALL DEWATERING PERMITTING, IF REQUIRED, IS THE RESPONSIBILITY OF THE CONTRACTORAND SHALL BE IN ACCORDANCE WITH DNR TECHNICAL STANDARD 1061.11.STREETS SHALL BE SWEPT AT THE END OF EACH WORK DAY OR AS DIRECTED BY THEMUNICIPALITY.12.TRACKING PADS SHALL BE USED AT THE CONSTRUCTION ENTRANCE AND EXITS.13.ALTHOUGH ROCK CONSTRUCTION TRACKING PADS MAY NOT BE SHOWN ON THE PLANS,THE CONTRACTOR SHALL INSTALL THEM AS NECESSARY OR AS DIRECTED BY THE ENGINEERTO MINIMIZE TRACKING ONTO ADJACENT STREETS. THESE PADS ARE CONSIDEREDINCIDENTAL TO THE WORK AND WILL NOT BE MEASURED OR PAID FOR SEPARATELY.14.CONTRACTOR WILL BE RESPONSIBLE FOR ALL DUST CONTROL.15.ALL BANK AREAS DISTURBED SHALL BE STABILIZED WITH EROSION CONTROL MATIMMEDIATELY.16.ALL FILL PLACED UNDER BUILDING AND PAVED AREAS SHALL BE STRUCTURALLY SOUND.17.SEDIMENT WILL BE REMOVED FROM BEHIND SEDIMENT FENCES AND BARRIERS BEFORE ITREACHES A DEPTH THAT IS EQUAL TO HALF THE BARRIER'S HEIGHT.18.BREAKS AND GAPS IN SEDIMENT FENCES AND BARRIERS WILL BE REPAIRED IMMEDIATELY.DECOMPOSING STRAW BALES WILL BE REPLACED (TYPICAL BALE LIFE IS THREE MONTHS).19.ALL SEDIMENT THAT MOVES OFF-SITE DUE TO CONSTRUCTION ACTIVITY OR STORM EVENTSWILL BE CLEANED UP BEFORE THE END OF THE SAME WORKDAY.20.ALL INSTALLED EROSION CONTROL PRACTICES WILL BE MAINTAINED UNTIL THE DISTURBEDAREAS THEY PROTECT ARE STABILIZED.21.ALL EROSION CONTROL MAT SHALL BE INSTALLED WITHIN 24 HOURS OF FINAL GRADESBEING ESTABLISHED.
CRUSHING PILES, TYP.
SILT FENCE, TYP.
LEGEND PORTAGE COUNTY
51PAVEMENT RECYCLING SITE FORUS HIGHWAY 51 WISDOT PROJECT 2021
1074
1074
1076
10681076
1080.01079
1075.010761077
1075.01076 10761077
17398L11217398L11217398L11217398L11217398L112173230827-11.01173230827-11.01173230827-11.01173230827-11.01173230827-11.01173230828-16.24173230828-16.24173230828-16.24173230828-16.24173230828-16.24
173230828-16.35173230828-16.35173230828-16.35173230828-16.35173230828-16.35
173230828-16.09173230828-16.09173230828-16.09173230828-16.09173230828-16.0917398L10817398L10817398L10817398L10817398L10817398L10917398L10917398L10917398L10917398L10917398L11017398L11017398L11017398L11017398L11017398L11117398L11117398L11117398L11117398L11117398L11417398L11417398L11417398L11417398L11417398L11317398L11317398L11317398L11317398L113
173230828-16.34173230828-16.34173230828-16.34173230828-16.34173230828-16.34
173230828-16.24173230828-16.24173230828-16.24173230828-16.24173230828-16.24ROWROWROWROWROW173230828-16.08173230828-16.08173230828-16.08173230828-16.08173230828-16.0817398K12417398K12417398K12417398K12417398K124173230828-16.32173230828-16.32173230828-16.32173230828-16.32173230828-16.32
173230828-16.14173230828-16.14173230828-16.14173230828-16.14173230828-16.1417398G9017398G9017398G9017398G9017398G90173230828-16.12173230828-16.12173230828-16.12173230828-16.12173230828-16.12173230828-16.22173230828-16.22173230828-16.22173230828-16.22173230828-16.22173230828-15.13173230828-15.13173230828-15.13173230828-15.13173230828-15.1317398J10017398J10017398J10017398J10017398J100173230828-16.24173230828-16.24173230828-16.24173230828-16.24173230828-16.24
173230834-06173230834-06173230834-06173230834-06173230834-06030230833-01.01030230833-01.01030230833-01.01030230833-01.01030230833-01.01030230833-02030230833-02030230833-02030230833-02030230833-02
173230828-16.20173230828-16.20173230828-16.20173230828-16.20173230828-16.2017398G8817398G8817398G8817398G8817398G8817398G8917398G8917398G8917398G8917398G8917398J10217398J10217398J10217398J10217398J10217398J10117398J10117398J10117398J10117398J101173230828-16.23173230828-16.23173230828-16.23173230828-16.23173230828-16.23173230828-15.14173230828-15.14173230828-15.14173230828-15.14173230828-15.1417398J10417398J10417398J10417398J10417398J10417398J10517398J10517398J10517398J10517398J10517398J10617398J10617398J10617398J10617398J10617398J10717398J10717398J10717398J10717398J107
173230828-15.16173230828-15.16173230828-15.16173230828-15.16173230828-15.16\\ssr2\Gerke\Q2\2021\Q2 Gerke SWPPP\Plover\Base.dwgC2.0Q2 4/12/21SSRBORROW & WASTE SITESHEET NAME:PROJECT:ADDRESS:PROJECT NO:SHEETPLOT DATE :PLOT BY :PLOVER, WIREVISION:REVISIONSNO.BYDATE15341 STATE HWY 131◦ Tomah, WI 54660608-372-4203 (Office)◦ www.centralstateconstructionllc.comThis document contains confidential or proprietary information of Central States Construction, LLC.Neither this document nor the information herein is to be reproduced, distributed, used or disclosedeither in whole or in part except as specifically authorized by Central States Construction LLC.BORROW, WASTE & CRUSHING SITEFOR WISDOT HWY 51GERKE EXCAVATINGCENTRAL STATECONSTRUCTION, LLC
FILE NAME :
Wis Statute 182.0175 (1974)Requires Min. 3 Work DaysNotice Before You Excavate
To Obtain Location ofParticipants UndergroundFacilities Before YouDig in WisconsinCALL DIGGERS HOTLINE1-800-242-8511EROSION CONTROL NOTES:1.ALL EXISTING UNDERGROUND UTILITY LOCATIONS ARE APPROXIMATE AND SHOULD BEFIELD VERIFIED PRIOR TO CONSTRUCTION.2.ALL EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO CONSTRUCTION.3.SILT FENCE, TEMPORARY SEDIMENT BASIN, & ROCK CONSTRUCTION ENTRANCE SHALL BEINSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITIES, INCLUDING CLEARING &GRUBBING.4.ANY AREAS WHERE GRADING IS COMPLETE SHALL BE STABILIZED WITH FERTILIZER, SEED, &MULCH AS SOON AS POSSIBLE.5.ALL BEST MANAGEMENT PRACTICES WILL BE INSTALLED BY THE TIME THE CONSTRUCTIONSITE IS CONSIDERED STABILIZED.6.STOCKPILES LEFT INACTIVE FOR 7 DAYS SHALL BE SEEDED AND SURROUNDED BY SILTFENCE.7.ALL WASTE AND UNUSED BUILDING MATERIALS (INCLUDING GARBAGE, DEBRIS, CLEANING WASTES, OR OTHER CONSTRUCTION MATERIALS) SHALL BE PROPERLY DISPOSEDOF AND NOT ALLOWED TO BE CARRIED BY RUNOFF INTO RECEIVING CHANNEL.8.ALL VEHICLE TRAFFIC IS PROHIBITED WITHIN THE UNDISTURBED LAND BUFFER WHENEVERPRACTICAL.9.EROSION CONTROL MAT CLASS I, TYPE A WILL BE USED IN NON-CHANNEL AREAS ANDCLASS I, TYPE B WILL BE USED IN CHANNEL AREAS.10.ALL DEWATERING PERMITTING, IF REQUIRED, IS THE RESPONSIBILITY OF THE CONTRACTORAND SHALL BE IN ACCORDANCE WITH DNR TECHNICAL STANDARD 1061.11.STREETS SHALL BE SWEPT AT THE END OF EACH WORK DAY OR AS DIRECTED BY THE
MUNICIPALITY.12.TRACKING PADS SHALL BE USED AT THE CONSTRUCTION ENTRANCE AND EXITS.13.ALTHOUGH ROCK CONSTRUCTION TRACKING PADS MAY NOT BE SHOWN ON THE PLANS,THE CONTRACTOR SHALL INSTALL THEM AS NECESSARY OR AS DIRECTED BY THE ENGINEERTO MINIMIZE TRACKING ONTO ADJACENT STREETS. THESE PADS ARE CONSIDEREDINCIDENTAL TO THE WORK AND WILL NOT BE MEASURED OR PAID FOR SEPARATELY.14.CONTRACTOR WILL BE RESPONSIBLE FOR ALL DUST CONTROL.15.ALL BANK AREAS DISTURBED SHALL BE STABILIZED WITH EROSION CONTROL MATIMMEDIATELY.16.ALL FILL PLACED UNDER BUILDING AND PAVED AREAS SHALL BE STRUCTURALLY SOUND.17.SEDIMENT WILL BE REMOVED FROM BEHIND SEDIMENT FENCES AND BARRIERS BEFORE ITREACHES A DEPTH THAT IS EQUAL TO HALF THE BARRIER'S HEIGHT.18.BREAKS AND GAPS IN SEDIMENT FENCES AND BARRIERS WILL BE REPAIRED IMMEDIATELY.DECOMPOSING STRAW BALES WILL BE REPLACED (TYPICAL BALE LIFE IS THREE MONTHS).19.ALL SEDIMENT THAT MOVES OFF-SITE DUE TO CONSTRUCTION ACTIVITY OR STORM EVENTSWILL BE CLEANED UP BEFORE THE END OF THE SAME WORKDAY.20.ALL INSTALLED EROSION CONTROL PRACTICES WILL BE MAINTAINED UNTIL THE DISTURBEDAREAS THEY PROTECT ARE STABILIZED.21.ALL EROSION CONTROL MAT SHALL BE INSTALLED WITHIN 24 HOURS OF FINAL GRADESBEING ESTABLISHED.
SILT FENCE, TYP.
LEGEND PORTAGE COUNTY
WASTE SITE: RAISE EX. GRADE ~4'US HIGHWAY 51 WISDOT PROJECT 2021TRACKING PAD
96'
USLE
3'MAX3'MAX3'MAX3'MAXFOLD3" MAX.SUPPORT CORDGEOTEXTILE FABRICFLOW2'± 2WOOD POSTLENGTH 4' MIN.2' MIN. DEPTH INGROUND
1FLOWDIRECTIONGEOTEXTILE FABRIC ONLYBACKFILL AND COMPACT TRENCHWITH EXCAVATED SOIL*
ATTACH THE FABRIC TO THEPOST w/WIRE STAPLES ORWOODEN LATH AND NAILS
SILT FENCE TIE BACK DETAILANCHOR STAKEMIN. 18" LONGTIE BACK BETWEENFENCE POSTAND ANCHORFLOW DIRECTIONGEOTEXTILE FABRICEXCESSFABRICTRENCH DETAILWOODPOST1321 NOTES:TRENCH SHALL BE A MINIMUM OF 4" WIDE BY 6" DEEP TO BURY AND ANCHOR THE GEOTEXTILE FABRIC, FOLD MATERIALTO FIT TRENCH AND BACKFILL AND COMPACT TRENCH WITH EXCAVATED SOIL.HORIZONTAL BRACE WITH 2" X 4" WOODEN FRAME OR EQUIVALENT AT TOP OF POST AS DIRECTED BY THE ENGINEER. WOOD POST SHALL BE A MINIMUM SIZE OF 1 1/8" X 1 1/8" OF OAK OR HICKORY.
2'4'4'10'21EXTEND GEOTEXTILE 6'FROM TOE OF CHECK
KEY RIP RAP 6" INTOEXISTING GROUND18"GEOTEXTILEWELL GRADEDANGULAR STONEWITH A D50 OF 3"3/8"-3/4"WASHED STONE6" THICK, TYP.FLOWDIRECTIONGEOTEXTILE21
ROCK DAM SECTION
9"6' TYP.A3'A 18"6"
DITCH SECTION *
WELL GRADED ANGULAR STONEWITH A D50 OF 3"GEOTEXTILE* "V" DITCH IS SHOWNHERE. SEE CIVIL PLANSFOR DITCH SECTION.
NOTE:8' POST SPACING ALLOWED IF AWOVEN GEOTEXTILE FABRIC IS USED.*
GEOTEXTILE FABRICWOOD POSTGEOTEXTILE FABRICGEOTEXTILE FABRICFLOW DIRECTION
GEOTEXTILE FABRICWOOD POSTJOINING LENGTHS OF SILT FENCE3'5:15:1
NOTE:MAINTAIN THE ROCK ENTRANCE TOPREVENT TRACKING ONTO PAVEMENT
3" CLEAR STONEMIN. 12" THICKGEOTEXTILE MATERIAL6" HIGH BERMEXISTINGPAVEMENTSECTION A-A1.FOLLOW WISCONSIN DNR TECHNICAL STANDARD 1057 FOR FURTHER DETAILS AND INSTALLATION.2.LENGTH - MINIMUM OF 50'.3.WIDTH - 24' MINIMUM, SHOULD BE FLARED AT THE EXISTING ROAD TO PROVIDE A TURNING RADIUS.4.ON SITES 'MTH A HIGH GROUND WATER TABLE OR WHERE SATURATED CONDITIONS EXIST, GEOTEXTILE FABRIC SHALL BE PLACEDOVER EXISTING GROUND PRIOR TO PLACING STONE. FABRIC SHALL BE WISDOT TYPE-HR GEOTEXTILE FABRIC.5.STONE - CRUSHED 3" CLEAR STONE SHALL BE PLACED AT LEAST 12" DEEP OVER THE ENTIRE LENGTH AND WIDTH OF ENTRANCE.6.SURFACE WATER - ALL SURFACE WATER FLOWING TO OR DIVERTED TOWARDS CONSTRUCTION ENTRANCES SHALL BE PIPEDTHROUGH THE ENTRANCE. MAINTAINING POSITIVE DRAINAGE. PIPE INSTALLED THROUGH THE STABILIZED CONSTRUCTION ENTRANCESHALL BE PROTECTED WITH A MOUNTABLE BERM WITH 5:1 SLOPES AND MINIMUM OF 6" STONE OVER THE PIPE. PIPE SHALL BE SIZEDACCORDING TO THE DRAINAGE REQUIREMENTS. WHEN THE ENTRANCE IS LOCATED AT A HIGH SPOT AND HAS NO DRAINAGE TOCONVEY A PIPE SHALL NOT BE NECESSARY. THE MINIMUM PIPE DIAMETER SHALL BE 6". CONTRACTOR SHALL BE RESPONSIBLE FORTHE MAINTENANCE OF SAID PIPE.7.LOCATION - A STABILIZED CONSTRUCTION ENTRANCE SHALL BE LOCATED WHERE CONSTRUCTION TRAFFIC ENTERS AND/OR LEAVESTHE CONSTRUCTION SITE. VEHICLES LEAVING THE SITE MUST TRAVEL OVER THE ENTIRE LENGTH OF THE TRACKING PAD.
50' MIN.
24'TYP.10'TYP.10'TYP.
A
A
1-SILT FENCE
2-TRACKING PAD
W, END SECTIONWIDTHW + 4'OR ASNOTED ONPLANS
5DOR AS NOTED ON PLANSRIP RAP
FLOWLINE
A
6" MIN.-12" MAX.D, DEPTH OF RIP-RIPRIP RAPGEOTEXTILESECTION A-A
PLAN VIEW
CMP/HDPE PIPE
3-STONE DITCH CHECK
RIP RAPCLASS123 d, DEPTH9"18"27"4 36"WIS DOTRIP RAP--LIGHTHEAVYEXTRA HEAVYEQUIVALENT4-RIP RAP AT PIPE INLET
EXISTING GROUND
SEDIMENT CONTROLLED LOGMIN. 24" OVERLAPSTAKE
TEMPORARY SEDIMENT LOGSC3.0Q2 4/12/21SSREROSION CONTROL PLANSHEET NAME:PROJECT:ADDRESS:PROJECT NO:SHEET
FILE NAME : PLOT DATE :PLOT BY :PLOVER, WI
\\ssr2\Gerke\Q2\2021\Q2 Gerke SWPPP\Plover\02-DT.dwgREVISION:REVISIONSNO.BYDATEBORROW, WASTE & CRUSHING SITEFOR WISDOT HWY 51GERKE EXCAVATING15341 STATE HWY 131◦ Tomah, WI 54660608-372-4203 (Office)◦ www.centralstateconstructionllc.comThis document contains confidential or proprietary information of Central States Construction, LLC.Neither this document nor the information herein is to be reproduced, distributed, used or disclosedeither in whole or in part except as specifically authorized by Central States Construction LLC.CENTRAL STATECONSTRUCTION, LLC
WISDOT SECTION 630 SEEDING SPECIFICATIONS
C3.1Q2 4/12/21SSREROSION SPECSSHEET NAME:PROJECT:ADDRESS:PROJECT NO:SHEET
FILE NAME : PLOT DATE :PLOT BY :PLOVER, WI
\\ssr2\Gerke\Q2\2021\Q2 Gerke SWPPP\Plover\02-DT.dwgREVISION:REVISIONSNO.BYDATEBORROW, WASTE & CRUSHING SITEFOR WISDOT HWY 51GERKE EXCAVATING15341 STATE HWY 131◦ Tomah, WI 54660608-372-4203 (Office)◦ www.centralstateconstructionllc.comThis document contains confidential or proprietary information of Central States Construction, LLC.Neither this document nor the information herein is to be reproduced, distributed, used or disclosedeither in whole or in part except as specifically authorized by Central States Construction LLC.CENTRAL STATECONSTRUCTION, LLC
CENTRAL STATE CONSTRUCTION, LLC
Storm Water Pollution Prevention Plan
APPENDIX C
WisDOT Standard Specification
Effective with the December 2014 Letting 400 2015 Standard Specifications
Section 625 Topsoil and Salvaged Topsoil
625.1 Description
(1) This section describes furnishing, placing, spreading, and finishing humus-bearing soil, adapted to
sustain plant life, commonly known as topsoil, from locations the contractor furnishes beyond the limits of
the right of way.
(2) This section also describes removing topsoil from the sites of proposed roadway excavations and
embankments in amounts and depths available and necessary to cover the work slopes. This work also
includes reclamation, placing, spreading, and finishing of this topsoil.
625.2 Materials
(1) Topsoil consists of loam, sandy loam, silt loam, silty clay loam, or clay loam humus-bearing soils adapted
to sustain plant life, and ensure this topsoil is in a Ph range of 6.0 to 7.0.
(2) Salvaged topsoil consists of the loam, sandy loam, silt loam, silty clay loam or clay loam humus-bearing
soils available from overlying portions of areas to be occupied by the completed roadway.
625.3 Construction
625.3.1 Preparing the Roadway for Topsoil
(1) Undercut or underfill all areas designated to receive topsoil to a degree that if covered to the required
depth with topsoil the finished work conforms to the required lines, grades, slopes and cross sections the
plans and drawings show.
625.3.2 Processing Topsoil or Salvaged Topsoil
(1) Mow topsoil procurement areas to a height of approximately 6 inches. Remove litter such as brush, rock,
and other materials that will interfere with subsequent vegetation establishment.
(2) Strip off the humus-bearing soil. Take care to minimize removing the underlying sterile soil. Then
stockpile the topsoil on the right of way or place it directly on the designated areas.
(3) Under the Salvaged Topsoil bid item, remove topsoil from excavation areas and the roadway foundation
up to the quantity necessary to cover the slopes for the bid items of Salvaged Topsoil and Topsoil.
Salvage topsoil from embankment areas outside the roadway foundation only if that additional material is
required to cover the slopes.
(4) Use Salvaged Topsoil in excess of the contract quantity to replace contract quantities of Topsoil. Utilize
excess topsoil on the project or dispose of as specified in 205.3.12.
625.3.3 Placing
(1) After preparing and finishing the areas designated for topsoil to the required lines, grades, slopes and
cross section, place and spread the topsoil to a uniform depth as the plans show or the contract requires.
If no depth is shown, place and spread the topsoil to a minimum depth of 4 inches in rural areas and a
minimum depth of 6 inches in urban areas, or as the engineer designates.
(2) Break down all clods and lumps using the appropriate equipment to provide a uniformly textured soil.
(3) Where using either sod or seed mixture 40 ensure that, for the upper 2 inches, 100 percent of the
material passes a one-inch sieve and at least 90 percent passes the No. 10 sieve.
(4) Remove rocks, twigs, foreign material, and clods that cannot be broken down. Dress the entire surface to
present a uniform appearance. The engineer will not require rolling.
(5) If light sandy soils are covered with heavier clay bearing loam topsoil, then mix or blend the 2 types of
soils to a more or less homogeneous mixture by using the appropriate equipment.
625.4 Measurement
625.4.1 Topsoil
(1) The department will measure Topsoil acceptably completed by the square yard or by the cubic yard,
whichever the contract specifies.
(2) If the department measures by the square yard, the measured quantity shall equal the actual number of
square yards of topsoiled area to the depth specified within the limits of construction designated on the
plans, or in the contract, or as the engineer directs.
(3) If measured by the cubic yard, the department will measure material in the vehicle. If the contractor
transports the material in vehicles not adapted for measurement, then the department will measure the
Effective with the December 2014 Letting 401 2015 Standard Specifications
material in cubic yards of volume in its original position computed by the method of average end areas
with no correction for curvature; or if the engineer elects, by the method of truncated prisms.
625.4.2 Salvaged Topsoil
(1) The department will measure Salvaged Topsoil by the square yard acceptably completed. The quantity
measured for payment shall equal the actual number of square yards of area topsoiled to the depth
specified within the limits of construction designated on the plans or in the contract, or as the engineer
directs.
625.5 Payment
(1) The department will pay for measured quantities at the contract unit price under the following bid items:
ITEM NUMBER DESCRIPTION UNIT
625.0100 Topsoil SY
625.0105 Topsoil CY
625.0500 Salvaged Topsoil SY
625.5.1 Topsoil
(1) Payment for Topsoil is full compensation for providing, excavating, loading, hauling, and placing this
material; and for undercutting excavations, or underfilling embankments necessary to receive this
material. The department will make no allowance, adjustment, or measurement for payment under the
Excavation bid items for undercutting cut sections, or underfilling embankments.
625.5.2 Salvaged Topsoil
(1) Payment for Salvaged Topsoil is full compensation for removing, stockpiling, reclaiming, hauling, and
placing this material; and for undercutting excavations, or underfilling embankments necessary to receive
this material. The department will make no deductions from the Excavation bid items for the quantities of
Salvaged Topsoil material obtained from areas of cut sections. Additionally, the department will not
measure or pay for the volumes of Salvaged Topsoil removed from sites of proposed embankments
under the Excavation bid items, or make any allowance, adjustment, or measurement for payment under
the Excavation bid items for undercutting cut sections, or underfilling embankments.
(2) If an area is damaged by erosion after partial acceptance, the department will pay for restoring topsoil in
these areas at a unit price determined by multiplying the contract unit price bid for Salvaged Topsoil by 3,
or absent that bid item in the contract, as the contract unit price bid for Topsoil multiplied by 3, The
department will pay for restoration under the Restoration Post Acceptance Topsoil administrative item.
(3) The department will not pay for removing topsoil from outside the roadway foundation in embankment
areas unless that material is necessary to cover the slopes.
Source: Village of Plover website. First collected Oct 19, 2026.