RecordWell Data

Parks and Public Works Committee

City of Prescott · Pierce County · meeting of Oct 19, 2026 · Agendas

Open the original document More from City of Prescott

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

CITY OF PRESCOTT PARKS & PUBLIC WORKS COMMITTEE MONDAY, OCTOBER 19, 2026 5:00 PM MUNICIPAL BUILDING 800 BORNER ST PRESCOTT, WI 54021 1) Call to Order 2) Roll Call 3) Approve Minutes for September 21, 2026 4) Consideration to Purchase and Install Snowplow Equipment on Public Works Truck 5) Discussion on Spraying Riverfront with Herbicide AquaNeat 6) Fairy Wonderland Project Grant Contract and Cedar Corporation Engineering Services Contract 7) Review of Parks Improvement Fund and Capital Improvement Items 8) Other Business a) Update on Trail Connection from Magee Park to Walnut Circle 9) Adjourn NOTICE ACCESS TO THE MUNICIPAL BUILDING FOR THE DISABLED IS AVAILABLE AT THE MAIN ENTRANCE. ALL THOSE WITH SPECIAL NEEDS SHOULD CALL CITY HALL OFFICES (715-262-5544) IF ASSISTANCE IS REQUIRED IT IS POSSIBLE THAT A QUORUM OF THE COMMON COUNCIL OR OTHER CITY COMMITTEES MAY BE PRESENT AT THIS MEETING. THIS IS INCIDENTAL AND NO ACTION WILL BE TAKEN BY THE COUNCIL OR ANY OTHER COMMITTEES. Parks and Public Works Committee Meeting Minutes September 21st, 2026 Pursuant to due call and notice thereof, a meeting of the Parks and Public Works Committee was held September 21st, 2026, Municipal Building, 800 Borner Street, Prescott, Wisconsin, 54021. The meeting was called to order at 5:01 PM. Committee Present: Ben Bettis, Dar Hintz, Lindsey Sorenson Committee Absent: None Staff Present: City Administrator Matt Wolf, City Planner Luke Wiese Others Present: Mayor Mike Gerke, Greg Adams of Cedar Corporation 1. Approve Minutes for July 20th, 2026 Hintz motioned to approve the minutes for July 20th. Bettis seconded; motion passed without a negative voice (3-0). 2. Discussion on Riverfront Improvements Dock Planning City Administrator Wolf provided an update on the potential riverfront transient dock. The City was awarded a $53,395 Boating Infrastructure Grant for the Phase 2 riverfront improvements. The grant is intended for transient recreational vessels 26 feet or longer. Greg Adams of Cedar Corporation presented the riverfront transient dock proposal. The dock incorporates multiple slip sizes and angled slips. Committee member Bettis expressed concerns with the current design. He noted that the angled slips are oriented opposite the direction of the river flow, which may make it difficult to park. Bettis also raised concerns about ice and said the dock should be designed with that in mind. Bettis asked if some of the slips could be seasonal. Wolf explained that the grant may not allow seasonal slips, but staff would confirm. Wolf stated that if the grant does not allow seasonal slips, it may be better for the City to forego the grant if seasonal slips are preferred. The Committee supported incorporating electrical service, public Wi-Fi, potable water service, dock lighting, security cameras, and slip numbering into the design. Committee member Sorenson suggested that staff coordinate with the Fire Chief regarding safety equipment and emergency access features. 3. Well 4 Park Concept Plan City Planner Luke Wiese presented the Well 4 Park Concept Plan. The concept plan would replace the existing Prescott Skate Park. The plan incorporates climbing as a central play element while also adding a trail connection from Borner Street to Dexter Street. A picnic pavilion, playground equipment, and possible relocation of equipment from Shane Park Circle are also included in the plan. The Committee generally supported the concept plan, including climbing as the central recreational element, and preferred the name The Bluffs Park. Staff will continue refining the concept and return with a final design at a future meeting. 4. 526-11 Dead or Diseased Tree Removal on Private Property City Administrator Wolf gave an overview of City Code § 526-11. The ordinance allows the City to require removal of dead or diseased trees on private property when the trees constitute a hazard to life and property or harbor insects or disease that pose a potential threat to other trees within the City. Property owners are notified in writing and have 60 days after service of the notice to remove the tree at their own expense. If the property owner does not comply, the City may remove the tree and charge the cost of removal on the owner's property tax notice. Wolf explained that the City has typically addressed these issues after receiving a complaint and asked whether the Committee would like staff to take a more proactive approach. The Committee preferred to first get an idea of how many trees and properties this would apply to. They also stated that enforcement should focus on trees that present an immediate threat and directed staff to create a set of parameters. Greg Adams of Cedar Corporation said there is a Wisconsin DNR grant opportunity that may help offset the cost of tree removal. 5. Firewood Shed at Magee Park City Administrator Wolf presented the request from Coulee River Trails to place a small firewood shed at Magee Park for use by park visitors. The shed would be constructed through the Prescott High School woods/technical education program and would measure approximately 8 feet wide by 6 feet deep. The final location and placement of the shed would be coordinated with City staff. Hintz motioned to recommend the fire shed at Magee Park to Council for approval. Bettis seconded; motion passed without a negative voice (3-0). 6. Other Business City Administrator Wolf provided an update on the Armstrong Bench. After looking at the non-motorized boat launch, the Armstrong family preferred to have the bench moved to another location within Mercord Mill Park. The Committee said the bench could be moved when Public Works has time. Committee member Hintz commented on potholes on Campbell Street and Henry Street. Hintz also raised a lighting concern for the area and said it should be accounted for if the City pursues a trail system along Campbell Street. Commissioner Hintz motioned to adjourn. Bettis seconded; motion passed without a negative voice (3-0). The meeting was adjourned at 6:24 PM. The next Parks & Public Works Committee will be October 19, 2026, at 5:00 PM. Respectfully Submitted, Luke Wiese, Planner To: Parks and Public Works Committee From: Matt Wolf, City Administrator Date: October 15, 2026 Subject: Purchase and Install Snowplow Equipment on Public Works Truck Background The City of Prescott Public Works Department currently utilizes a 2017 Chevrolet flatbed truck for snowplowing alleys and parking lots in the City. Over the years, this vehicle has experienced considerable wear and tear from regular use, particularly during winter plowing. The truck also has relatively low ground clearance, which is a concern during snow removal operations. This creates challenges when navigating deeper snow, snowbanks, and uneven road surfaces. To address these concerns, the Public Works Department is proposing to transition from the 2017 flatbed truck to the City's 2024 Chevrolet Silverado three-quarter- ton pickup truck. This vehicle is better suited for the Department's plowing and would allow Public Works to utilize a newer piece of equipment for winter maintenance. Figure 1 2017 Flat Bed Truck Used for Plowing Alleys and Parking Lots Figure 2 Proposed 2024 3/4 Ton Truck for Snowplowing Discussion The Public Works Department is requesting authorization to purchase and install a new 9'6" SnowDogg V-Wing snowplow on the 2024 Chevrolet Silverado. The proposed installation would also include the necessary mounting equipment, lighting system, controls, and other accessories. City staff contacted three vendors to obtain pricing for the proposed snowplow installation: 1. Ellsworth Ford – Quote requested; no response received. 2. Gerlach's – Quote requested; no response received. 3. Kinni Sport & Power - Quote received. Kinni Sport & Power was the only vendor to provide a quotation. Their September 2026, proposal includes the snowplow, mounting hardware, controls, lighting, shipping, and installation labor for a total of $13,187.92. Financial Considerations The proposed snowplow purchase and installation were not included in the City's adopted 2026 Public Works budget. However, the City is currently anticipating higher-than-budgeted interest revenue ($187,000 currently vs. $100,000 budgeted) during 2026 due to interest rates remaining elevated. It is proposed that the $13,187.92 purchase be paid from the City's existing 2026 Public Works budget, with the necessary budget amendment completed at the end of the fiscal year. The amendment would recognize the additional interest revenue and adjust the appropriate Public Works expenditure appropriation to account for the purchase. This approach would allow the Department to place the new plow into snowplowing service for the upcoming winter season while accounting for the unbudgeted expenditure with a year-end budget amendment process. Recommendation Consider approval moving the quote from Kinni Sport & Power to Council for consideration of installation of snowplow, mounting hardware, controls, lighting, shipping, and installation labor for a total of $13,187.92. Attachment 1. Kinni Sport & Power Quote 1 CP:SamO Q U O T A T I O N DATE: CUSTOMER #: P.O.#: 100118 TERMS:Net 10th EOM 9/30/2026Kinni Sport & Power LLC 151 State Road 35 River Falls, WI 54022 Phone #: (715)307-4685 Fax #: (715)629-7042 PHONE #: ALT. #: (651)269-8437 LOCATION:1 STATUS:Quote1 PAGE: ORDER #:23704 SALES TYPE:Quote (651)269-8437CELL #: City Of Prescott 800 Borner St RIVER FALLS, WI 54022 US City Of Prescott 800 Borner St RIVER FALLS, WI 54022 US 100118BILL TO SHIP TO MFR PRODUCT NUMBERDESCRIPTION QTY PRICE NET TOTAL SNWY99101409 $5,847.52 $5,847.52 $5,847.52 129 V-WING SERIES 2 POWER PAK SNWY99101427 $3,752.00 $3,752.00 $3,752.00 19'6" 29VHD V-WING SERIES 2 FLARED WING BLADE SNWY99101397 $605.26 $425.60 $425.60 1PRO CONTROL 2 PLUS - WIRED SNWY99101364 $511.84 $511.84 $511.84 12020 CHEVY SILVERADO MOUNT KIT SNWY99100892 $454.72 $454.72 $454.72 1CENTER MEMBER SNWY99101399 $394.24 $394.24 $394.24 1ESS SMART LIGHTING SYSTEM SNWY99101441 $402.00 $402.00 $402.00 19'6" EZ FIT DEFLECTOR KIT **** SHP $400.00 $400.00 $400.00 1SHIPPING / HANDLING, freight to destination **** LABOR SNOW PLOW $125.00 $125.00 $1,000.00 8LABOR SNOW PLOW Prices reflected on this quote are valid for 30 days and while current supplies last. However, prices are subject to change if the program or promotion the prices were quoted under is no longer in effect. $13,187.92ORDER TOTAL: $0.00TAX: SUBTOTAL: $13,187.92 Authorized By: To: Parks and Public Works Committee From: Matt Wolf, City Administrator Date: October 15, 2026 Subject: Treating Riverfront with AquaNeat Background The City of Prescott currently budgets $1,500 annually for weed control along the riverfront. Due to the proximity to the Mississippi and St. Croix Rivers, the City has identified AquaNeat, for treating weeds above the ordinary high-water mark. (AquaNeat Aquatic Herbicide is registered with the U.S. Environmental Protection Agency (EPA) to treat for weeds and brush in aquatic environments) Although funding for this activity was increased beginning in 2025, the City has not conducted herbicide treatments along the riverfront since that budget increase due to licensing requirements. Staff is seeking direction from the Parks and Public Works Committee on whether the City should resume this activity in 2027 or eliminate the associated funding from the budget. Discussion Staff contacted the Wisconsin Department of Agriculture, Trade and Consumer Protection (DATCP) for the requirements for applying AquaNeat along the City's riverfront. This includes the following at a total cost of $148: 1. Obtain workbook in Category 5.0 – Aquatic and Mosquito. 2. Complete the necessary training and pass the certification examination. 3. Apply for a commercial applicator government license following certification. These requirements would need to be completed before the City could begin spraying. Also to note, Councilmember Ruona would like the City to not spray the riverfront due to potential environmental impacts and employee safety. Budget Considerations The City's existing $1,500 annual allocation could continue supporting treatment if the Committee wishes to start treatment. However, staff would first need to obtain the necessary certification and licensing. Alternatively, the Committee could direct staff to discontinue treatment and eliminate the $1,500 allocation from the 2027 budget. Recommendation Determine whether the City should resume weed control treatments along the riverfront by retaining the $1,500 allocation in the 2027 Budget or eliminate the funding and leave the riverbank untreated removing the $1,500 from the budget. To: Parks and Public Works Committee From: Matt Wolf, City Administrator Date: October 15, 2026 Subject: Fairy Wonderland Improvements Background In 2023, the City Council approved a concept plan for improvements to Fairy Wonderland Park in partnership with Healing Play, Inc. The improvements include additional playground equipment, a stormwater pond, parking lot, youth soccer/football field, restroom facilities, lighting, and other park amenities (see attached Concept Plan). Healing Play, Inc. has raised more than $500,000 toward the installation of the first two phases of playground equipment, with the remaining improvements planned as part of the final phase. Following the completion of the Elm/Washington Street project, the City identified $1,138,457 in surplus funding within its Capital Projects Fund resulting from grant funding received after the City's 2023 borrowing. To avoid additional borrowing for planned 2027 capital improvements, the City allocated $683,567 of these funds toward Fairy Wonderland Park. In partnership with Healing Play, Inc., the City submitted a grant application to the Wisconsin Department of Natural Resources (DNR) to assist with funding the final phase. On September 18, 2025, the City was notified that it had been awarded $387,594 through the federal Land and Water Conservation Fund (LWCF), administered by the Wisconsin DNR. Discussion The City has now received the formal grant contract from the Wisconsin DNR (see attached) for the Fairy Wonderland Park Improvements. With the grant the financing breaks down as follows: The grant provides approximately 40.41% of the estimated project cost, with the remaining 59.59% funded through the City's previously allocated Capital Improvement Fund. Funding Total Project Estimate $959,210 Wisconsin DNR Grant $387,594 City's Estimated Share $571,616 Previously Allocated City Funding $111,951 Estimated Savings to City $111,951 The agreement establishes a grant period of August 25, 2026, through August 24, 2029, and requires compliance with applicable federal and state requirements, including bidding, permitting, accessibility, and continued use of the property for public outdoor recreation. The agreement also requires DNR approval of development plans before construction and places permanent restrictions on converting the property to uses inconsistent with public outdoor recreation. To advance the project toward construction in 2027, Cedar Corporation has submitted an Engineering Services Agreement (see attached) for the Fairy Wonderland Park Improvements. The proposed services include topographic surveying, preliminary and final engineering design, permitting, preparation of construction plans and specifications, bidding assistance, construction staking, construction observation, and project administration. Cedar Corporation's proposal estimates a construction cost of $848,900 and engineering fees totaling $110,300. The proposed project schedule anticipates completion of final engineering design in February 2027, construction bidding in March 2027, commencement of construction in April 2027, and final project completion by August 31, 2027. The engineering services moves forward project specifications, obtain necessary regulatory approvals, and solicit competitive construction bids. Final project costs will be established following completion of the bidding process and reviewed against the available project funding. Recommendation 1. Consider recommendation of the Land and Water Conservation Fund Grant through the Wisconsin DNR for $387,594 to City Council for Approval 2. Consider recommendation of Approval of the Engineering Services Agreement with Cedar Corporation for a total of $110,300 to City Council for Approval Attachments 1. Fairy Wonderland Concept Plan 2. Wisconsin DNR Grant – Land and Water Conservation Fund Grant 3. Cedar Corporation Engineering Proposal C O R P O R A T I O N STORMPOND SOCCER FIELD RESTROOMS CITY OF PRESCOTTFAIRY WONDERLAND PARKCONCEPT PLAN EXISTINGTRAIL FAIRY WONDERLANDCONCEPT LAYOUT PEARL STREET CANTON STREET FENCE PARKING LOT PARALLEL PARKING(TYP) 29 STALLS RELOCATEEXISTINGTRAIL 21 STALLS LIGHT POLES(TYP) 2 SOLAR LIGHT(TYP)60' SPACING BICYCLE RACKS Project No. Pl338-234 Date: Oct 9, 2026 Standard Short Fonn Agreement for Professional Services 2019 Agreement- Page 1 of8 Attached: Standard Conditions Confirmation of Client Request for Services between Cedar Corporation (ENGINEER) and City of Prescott (CLIENT) Authorization to Perform Professional Engineering Services ENGINEER is hereby authorized to proceed with the project listed below. The services are to be completed in a timely manner mutually agreeable with the CLIENT and ENGINEER. Project: Fairy Wonderland Park Improvements Scope of Work: Engineer will complete professional design and construction engineering services including topographic survey , utility data, base mapping, photo documentation, boundary verification, preliminary design, public information meetings, staff/committee/council meetings, final design documents, opinion of probable costs, permitting, specifications, bid documents, construction staking, construction observation and construction administration services for the Fairy Wonderland Park Improvements Project for construction in year 202 7. Scope of Services: Cedar Corporation (hereinafter called "Engineer") proposes to render professional design, bidding, contract award, and construction engineering services for the City of Prescott (hereinafter called "Client") with respect to the above Scope of Work related to the Fairy Wonderland Park Improvements Project in accordance with the City of Prescott (hereinafter called "Project"). The Engineer will provide required professional services during the course of the Project as follows: Land Surveying: • Perform field topographic survey and utility data collection and incorporate into a base map for the Fairy Wonderland Park project area, to complete the engineering design of the Project described above. Perform any additionally required information including , sanitary sewer, water main and laterals, storm sewer, property boundary for the project. Preliminary Design Engineering: • Attend initial kickoff meeting with city staff and city committee to discuss overall Project goals and to finalize the Project work plan and schedule. The project concept plan has been developed over the last several years. The project design will incorporate the features outlined in the project concept plan attached with this proposal. • Preparation of preliminary plans showing the bathroom building, parking lot, athletic field, storm water pond, parking plan on Pearl Street, and existing trail modifications. Project No. Pl338-234 Date: Oct 9, 2026 Standard Short Fann Agreement for Professional Services 2019 Agreement- Page 2 of 8 Attached: Standard Conditions • Review governing agency permit requirements. Preliminary review of all WDNR required construction site erosion control, and cultural resources permits. • Meet with city staff, committee & council to review preliminary designs. Incorporation and refinement of any necessary or suggested changes in the preliminary design. Coordinate public informational meeting, if required. • Attend required city staff, committee, council, and other governing agency meetings. Final Design Engineering, Plans, Specifications, Bidding Documents, Permits: • Preparation of final design documents, bathroom building plan, athletic field plan, parking lot plan, construction detail sheets, erosion control plan, grading and restoration plan, traffic control plan, construction specifications and bidding documents, and opinion of probable costs. • Preparation and submittal of necessary regulatory permit request application forms to the Wisconsin Department ofNatural Resources for storm water management and construction erosion control Water Resource Application Project Permit Discharge Storm Water from Construction Site (WRAPP), and cultural resources permits. • Submittal of 90% completed plans and specifications for review by the Client. • Updated cost estimates at the 90% complete stage. • Incorporation of comments received and prepare 100% completed plans and specifications. • Bid documents to comply with the WDNR Knowles Nelson Grant requirements. Bidding and Contracts: • Prepare Advertisement for Bid to be published in the Client's official newspaper. Engineer will post the Project to its Website via the Quest Electronic Construction Document Network for bid documents download by prospective bidders. • Provide answers and clarification of questions from contractors, suppliers, sub-contractors, and Client during bidding, including preparation of any necessmy bid addendums. • Coordinate electronic public bid opening. • Review the bid results, prepare bid tabulation results for all bidders, confirm that low bidder has obtained all bonds and insurance, and is capable of completing the work, and recommend bid award after review of all bids. Project No. Pl338-234 Date: Oct 9, 2026 Standard Short Fann Agreement for Professional Services 2019 Agreement- Page 3 of 8 Attached: Standard Conditions • The Engineer will coordinate the issuance of Notice of Award, execution of Contract Documents, required Bonds and Insurance, and Notice to Proceed with the Client. • Attend required city staff, cmmnittee, council and other governing agency meetings. Construction Engineering: • Conduct a pre-construction meeting with Client, contractor, sub-contractors, utility companies, etc. • Provide one-time horizontal and vertical control staking and layout for construction, as needed. Engineer is not responsible for preservation of construction staking for the contractor, and any required re-staking due to contractor negligence will be performed at the expense of the contractor. Any required re-staking due to vandalism or severe weather will be discussed and negotiated with the Client. • Provide full-time resident Project representative construction observation services during underground utility construction and periodic part-time hours as needed during other construction related work to observe contractor's work in conformance with plans, specifications and contract documents. The Engineer cannot guarantee the performance of, and shall have no responsibility for, the actions or omissions of any contractor, sub-contractor, supplier, vendor, or any other entity furnishing materials or performing any construction work on the Project. Provide Client copies of construction observation report documents. • Provide construction coordination and administration services for the Project during construction. Oversee and coordinate construction activities, including processing change orders and payment requests. Attend weekly on-site progress meeting with contractor and Client. • The Client shall review and approve all Work Directives or Change Orders for the Project as presented by the Engineer prior to the work being commenced by the contractor. • Prepare and provide as-built construction record drawings to the Client in AutoCAD electronic and hard copy format upon completion. • Attend required city staff, cmmnittee, and other governing agency meetings. • Assist the Client with the requirements of the WDNR Knowles Nelson grant. Project No. Pl338-234 Date: Oct 9, 2026 Standard Short Fann Agreement for Professional Services 2019 Agreement- Page 4 of 8 Attached: Standard Conditions Method of Compensation: Work will be completed on a Lump Sum basis for $100,300 [not-to-exceed without prior approval of CLIENT] for professional design and construction engineering services for the Project in the amount described below pursuant to the proposed services listed in the above Scope of Services. Any additional work not included in the Scope of Services will be invoiced to the Client on a time and material basis. The Engineer will provide the Client a written quote for any additional work at the Client's request. The Client will be responsible for all applicable governing agency fees including but not limited to permit, review, application, recording, etc., fees. Payments are due and payable thiliy (30) days from the date of the ENGINEER's invoice. Amounts unpaid thirty (30) days after the invoice date shall bear interest at the rate of one percent (I%) per month from invoice date. Project No. Pl338-234 Date: Oct 9, 2026 Agreement- Page 5 of 8 Attached: Standard Conditions Standard Short Fonn Agreement for Professional Services 2019 FAIRY WONDERLAND PARK IMPROVEMENTS Construction Cost Estimate $848,900 Design Construction Engineering Fees: Topographic Field Survey Geotechnical Services Utility Locating Preliminary Design Engineering Required City Meetings Final Design Engineering Agency Permitting Specifications, bid documents, final cost estimate Construction Engineering Fee: Advertising, Bidding and Contract Services Shop Drawing Reviews, Preconstruction Meeting Construction Staking and Layout Construction Observation Construction Coordination and Administration Construction Record Drawings $4,000 $3,500 $1,500 $38,000 $1,500 $20,000 $3,500 $2,500 $2,200 $1,600 $5,500 $19,000 $6,500 $1,000 Total Engineering Lump Sum "Not to Exceed" Fee $110,300 Project No. Pl338-234 Date: Oct 9, 2026 Standard Short Form Agreement for Professional Services 2019 Agreement- Page 6 of8 Attached: Standard Conditions Timeline: Work will be completed as follows: TASK COMPLETION DATE City Council Notice to Proceed Preliminary Design Engineering Final Design Engineering Bid Opening City Council Award Bid Notice of Award & Contract Documents Pre-Construction Meeting Commence Construction Substantial Completion of Construction Final Completion October 26, 2026 November 2026 February 2027 March 11, 2027 March 22, 2027 April 5, 2027 April 9, 2027 April 12, 2027 August 6, 2027 August 31, 2027 Client Supplied Information: The Client will provide the Engineer with available copies of construction record plans for existing water system, sanitary sewer system, storm sewer system, water main, sanitary sewer, laterals, and storm sewer field location marking, utility systems maps, sanitary sewer televising video and reports, assessor property owner maps and parcel information, right -of-way maps, recorded easement documen ts, prope1iy title search if needed, known site environmental issues and concerns, boundary survey/certified survey/plat maps, Project review input and comments, etc. for the Project. Project No. Pl338-234 Date: Oct 9, 2026 Standard Short Form Agreement for Professional Services 2019 Agreement- Page 7 of8 Attached: Standard Conditions Services Not Provided as Part of this Proposal: Archaeological studies and investigations, environmental studies and assessments, environmental investigations, boundary survey, easement documents, title search, land acquisition, field locating and marking of existing underground utility systems, governing agency permit fees, ecological studies and investigations, flood plain studies and determination, traffic impact analysis and report, WIDOT Trans 233 permits and approval request, and historical site studies and investigations are not included as part of this proposal. Sincerely, CEDAR CORPORATION Greg Adams, P.E. Municipal Engineering Team Leader Accepted this day of , 2027 By: _________________________________ ________________________________ Mike Gerke, Mayor Matt Wolf, City Administrator Standard Short Fonn Agreement.docx Agreement - Page 8 of 8 To: Parks and Public Works Committee From: Matt Wolf, City Administrator Date: October 16, 2026 Subject: Review of Parks Improvement Fund and Capital Improvement Items Discussion The City is updating our Capital Improvement Plan (CIP) for 2027-2033. The current plan is at the following link: https://www.prescottwi.gov/DocumentCenter/View/960/CIP- 2025-2031 As part of the updated CIP, the City will include projects funded through the Parks Improvement Fund. Staff would like the Parks and Public Works Committee to review projects that have previously been discussed or for which the City has existing obligations under approved development agreements. The Committee is being asked to provide feedback on project priorities, anticipated timelines, and any additional projects that should be considered for inclusion in the CIP. The list below identifies current and proposed park projects, along with their estimated costs and potential timelines. The Parks Improvement Fund currently has a balance of $252,596. However, $100,000 of this balance is already committed to improvements associated with the Coulee River Trail network under the grant agreement executed with Friends of Freedom Park. Additionally, the City has agreed to provide matching funds of up to $20,000 for future trail improvements based on funds raised by Friends of Freedom Park/Coulee River Item Estimated Cost (2027) Rationale Timeline Funding Proposed Non-Motorized Boat Launch Phase 2 $69,600 Repairs and Maintenance None Parks Improvement Fund The Bluffs Park Unknown Replacement of Shane Park Circle Park None Parks Improvement Fund Magee Park Shelter $12,500 Lion's Club Request & Cost Share 2027 Parks Budget Trail - Dexter Street to Borner Street $80,000 The Bluffs Development Agreement (D.A.) 2027-2030 Parks Improvement Fund Trail - Walnut Circle to Magee Park $140,000 Walnut Circle D.A. & FFP Grant Agreement 2027-2028 Parks Improvement Fund Trails. These commitments leave approximately $132,596 in currently uncommitted funds, assuming the full $20,000 matching contribution is utilized. The City does contribute its 30% of room tax that it received towards are Parks Improvement Fund, which conservatively adds $40,000 a year to the Fund balance. Additionally, any remaining funds within the Parks Budget Repair and Improvements Escrow line item goes into the Parks Improvement Fund balance, which varies annually depending on repairs and maintenance costs. The City currently has $157,995 in Parks Impact Fees available to fund eligible improvements identified in the Community Needs Assessment Report. However, the report does not currently include the proposed improvements to The Bluffs Park, which would replace the existing park at Shane Park Circle. Although a detailed cost estimate has not yet been prepared for The Bluffs Park, based on the improvements completed at Sunset Park, the estimated project cost is anticipated to range from $150,000 to $300,000. Staff would like the Parks and Public Works Committee to consider adding The Bluffs Park improvements to the Community Needs Assessment Report to potentially allow Parks Impact Fees to be used toward the project. If the Committee supports this approach, staff will contact Trilogy Consulting to determine whether the report can be amended, what the amendment process would involve, and whether the proposed improvements would qualify as eligible impact fee expenditures. Recommendation 1. Review the proposed park improvement projects and provide direction on project priorities, anticipated construction timelines, and any additional improvements that should be considered for inclusion in the City's 2027–2033 Capital Improvement Plan. 2. Provide direction on whether to pursue an amendment to the City's Parks Impact Fee Community Needs Assessment Report to include the proposed improvements to The Bluffs Park.

Source: City of Prescott website. First collected Oct 21, 2026.