APRIL VILLAGE BOARD MEETING — Agenda packet
Village of Park Ridge · Portage County · APRIL VILLAGE BOARD MEETING · meeting of Apr 21, 2025 · Agenda packets
Open the original document More from Village of Park Ridge
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
VILLAGE OF PARK RIDGE .BOARD MEETING
IN-PERSON AT VILLAGE HALL OR VIA ZOOM
1 . Convene in Open Session
• Salute to the flag
• Roll call
• Approve agenda
PARK RIDGE VILLAGE HALL
24 Crestwood Drive
Stevens Point, WI
April 21, 2025
5:30 PM
2. Introduce: New Clerk: Anne Arndt
3. Persons who wish to address the Village Board on specific agenda items other than a "Public
Hearing" must register their request at this time. Individuals should not expect to engage in
discussions with members of the Board or the Village Clerk.
4. Persons who wish to address the Village Board for up to three (3) minutes regarding a non
agenda item may do so at this time. Individuals should not expect to engage in discussions
with members of the Board or the Village Clerk.
5. Review and Approve Board Meeting Minutes from March 19, 2025
6. Review and Approve Special Board Meeting Minutes from March 27, 2025
7. Review and Approve Special Board Meeting Minutes from April 14, 2025
8. Review and Accept March Treasurer's Report
9. Review and Approve March and April bills/payments
10. Quarterly Reports
• Building Permits
• Fire Department
• Zoning Committee
• Payroll
DISCUSSION AND/OR POSSIBLE ACTION ON THE FOLLOWING ITEMS :
11. Road Project Update
10. Resolution to Adopt Stevens Point Urban Area Sewer Service Area Plan
11. Hazard Mitigation Plan Adoption
12. NFIP (National Flood Insurance Program) Resolution and Application
13. Update on Innovation Planning Grant
14. Spring Election Results
15. Discuss Village of Park Ridge proposed burning ordinance amendment
16. Discuss Spring Branch pick-up
17. Discuss American Flag placement in the village by Memorial Day
18. Village-Wide Rummage Sale - Saturday, May 10, 2025
19. Discuss Walk Wisconsin scheduled for June 7, 2025
20. Set Date and Time for the Next Board Meeting
21. Adjourn Meeting
Posted: April 17, 2025
ZOOM MEETING INFORMATION
Topic: Village Board Meeting
Time: April 21, 2025, 5:30 PM Central Time (US and Canada)
Join Zoom Meeting:
https://us06web .zoom.us/j/8464629990?pwd=MmNiR 1 pFZ24wbmRPNGk2VkZET3Nsdz09&omn=8715
7048270
Meeting ID: 846 462 9990
Passcode: 737897
Dial-in 1-312-626-6799
Use the Meeting ID and Password above
Requests from people with disabilities who need assistance to participate in this meeting should be
submitted to the Clerk's Office at 715-343-1590 with as much advance notice as possible.
VILLAGE OF PARK RIDGE
BOARD MEETING MINUTES
March 19, 2025
********************************************************************* ***************
MEETING CALLED TO ORDER - President Steve Menzel called the Park Ridge Village Board to order at 5:34 pm.
The Village Board meeting was held in person at the Village Hall. After the recitation of the Pledge of Allegiance by
members present, roll call was taken . Trustees Gordon Renfert, Dan Holloway, Barb Friedrich, Kristin Paulson and
President Steve Menze. Clerk Lisa Lucht attended by zoom. Village resident Shawn Paulson attended by zoom.
Village residents Tori Jennings and Christine Neidlein attended the meeting in person.
AGENDA ITEM #1 -APPROVAL OF THE MARCH AGENDA - Menzel asked the Board members if there were any
changes regarding the March agenda. Friedrich made a motion to approve, with no changes . Renfert seconded the
motion. Motion carried by voice vote, with no negative votes.
AGENDA ITEM #2 - PUBLIC COMMENT PERIOD - The public comment section was opened to anyone who wished
to speak on any agenda item. No comments were made.
AGENDA ITEM #3 - PUBLIC COMMENT PERIOD - The public comment section was opened to anyone who wished
to speak on any non-agenda item. No comments were made.
AGENDA ITEM #4 - REVIEW & APPROVE BOARD MEETING MINUTES FROM FEBRUARY 17, 2025 - Paulson
motioned to approve the minutes with minor changes to be made. Seconded by Holloway. Motion carried by voice
vote, with no negative votes.
AGENDA ITEM #5 - REVIEW AND APPROVE BOARD MEETING MINUTES FROM MARCH 11, 2025 - Friedrich
motioned to approve the minutes. Seconded by Renfert. Motion carried by voice vote, with no negative votes.
AGENDA ITEM #6 - REVIEW AND ACCEPT FEBRUARY TREASURER'S REPORT - Friedrich made the motion to
accept Treasurer's Report, seconded by Holloway. Roll call was taken; Paulson - yes, Holloway -yes, Friedrich -
yes, Renfert - yes, Menzel - yes.
AGENDA ITEM #7- REVIEW AND APPROVE FEBRUARY AND MARCH BILLS/ PAYMENTS- Paulson made
motion to approve January and February bills/ payments. Seconded by Renfert. Roll call was taken; Holloway - yes,
Friedrich - yes, Renfert - yes, Paulson - yes, Menzel - yes.
DISCUSSION AND/OR POSSIBLE ACTION ON THE FOLLOWING ITEMS:
AGENDA ITEM #8- DISCUSS ROAD PROJECT- MUNICIPAL WATER AGREEMENT-Village president Steve
Menzel informed the trustees of the following information: on March 17, 2025, the City of Stevens Point passed the
amendment to chapter 13 of the city ordinances . This amendment follows the recommendation of both the Plan
Commission as well as the Utility Commission. It states the properties that have been added to the list are adjacent to
the first phase of water main installation for Hillcrest Drive and Greenbriar Avenue . Trustees requested clarification
on section 1 of line items 4 and 5 a through c. Steve village president stated he will contact the City of Stevens Point
and Utility Commission for clarification on the above items noted. Once clarified information is obtained , information
will be shared with the trustees.
AGENDA ITEM #9 -DISCUSSION OF CONTRACT RENEWALS WITH STEVENS POINT FIRE DEPARTMENT -
REVIEW AND APPROVE RENEWAL SPFD FIRE PROTECTION AGREEMENT/ REVIEW AND APPROVE
RENEWAL OF SPFD EMS CONTRACT - The current agreement ends May 31, 2025. The SPFD proposed
agreement will be moving from a 3-year agreement to a 4-year agreement which would end in December 2029 and
then proceeding to a 5-year agreement starting in the year 2030 with renewal on January 1st of the renewal year. The
renewal process for the 5-year agreement would start in September of 2029. The proposed rate for the 4-year
agreement starting June 1, 2025, will be the following : remaining months for 2025 services will cost $60,125.28, with
$8,589.32 due on or before June 30, 2025, $25,767.98 due on or before September 30, 2025, and $25,767 .98 due
on or before December 31 , 2025. In 2026 yearly services will cost $135,876.68, in 2027 yearly services will cost
$139,953.00, in 2028 yearly services will cost $144,151.60 and 2029 yearly services will cost $148,476 .08 (the yearly
cost is paid in four equal quarterly payments).
Steve village president stated anytime city services are bought, except for water service, services can be up charged.
The residents of the Village of Park Ridge will pay more than a resident from the City of Stevens Point for fire and
EMS services.
The current EMS agreement ends May 31 , 2025. The proposed EMS agreement would start June 1, 2025, through
December 31, 2029, with an annual sum of $1,500.00 paid in single installment commencing in June first of each
year for the period of the agreement. The EMS agreement with the City of Stevens Point enhances EMS services
provided by the Portage County. In summary residents of the Village of Park Ridge will be provided with the same
services as a resident of the City of Stevens Point receives.
Holloway made the motion to approve contract renewal with Stevens Point Fire Department for fire protection and
EMS services, seconded by Friedrich. Roll call was taken; Paulson - yes, Holloway - yes, Friedrich - yes, Renfert -
yes, Menzel - yes.
AGENDA ITEM #10- UPDATE ON HAZARD MITIGATION PLAN- NFIP (NATIONAL FLOOD INSURANCE
PROGRAM) APPLICATION - Steve informed the board that he consulted with Bob Weinert to review the current 22-
page application, to ensure application is appropriate for the Village of Park Ridge. The application states a summary
of the village, goals of the village, hazards the village might incur and a plan to address the possible hazards. Steve
feels the application is at the point where village board members can review application and offer viewing to village
residents by having application available at town hall and on village website. Steve stated after a couple of weeks of
having it publicly reviewed by village residents, he will have a resolution to adopt the plan in April at the monthly
board meeting. Steve Menzel is the primary contact on the application and Gordon Renfert is the alternative contact
on the application. The hazard mitigation team will be the village trustees. Steve informed the board that he will make
information available to village board members and will have information available to village residents at the village
hall and on the village website.
Steve informed the board that the village is currently not a member of the National Flood Insurance Program. Minimal
properties are noted in the flood zone in the Village of Park Ridge. Properties noted in the flood zone are by Iverson
Park. If the municipality becomes a member of the National Flood Insurance Program, no cost is noted to apply, it
enhances the municipality's ability to obtain FEMA funding. Steve village president has application ready for the
program and a draft resolution. This program would allow residents to purchase flood insurance cheaper than what
can be purchased by open market.
No vote needed by board members at meeting tonight, item will be placed on April's agenda for monthly board
meeting to review and determine if Village of Park Ridge should proceed with application.
AGENDA ITEM #11-APPLICATION FOR INNOVATION PLANNING GRANT-This grant was applied for by Steve
village president on 02-26-2025. If awarded this grant will allow the municipality to investigate services provided by
the Village of Park Ridge and help create an operation that will be more efficient, not excluding consolidation with
another municipality for services (ex: fire protection or hiring a contracted employee). The grant application was
vague Steve stated. The amount of the grant applied for was $25,000.00. If awarded this would be applied to
researching village operations/ services and becoming more efficient and cost effective. Currently, no information
has been received about whether the village will be awarded a grant. McMahon will be the consulting company that
will be working with the village if awarded the grant.
AGENDA ITEM #12-APPOINTMENT OF INTERIM TRUSTEE TO FULFILL TERM UNTIL APRIL OF 2026 FOR
BARBARA FRIEDRICH - Barb trustees and Steve village president reached out to Joe Thompson (27 Ridgewood
Drive Stevens Point, WI 54481) who seemed interested in position, and both felt Joe would be a great fit in the
position. Joe has agreed to finish out term. Joe will start on April 21, 2025. The village board had no nominations for
the position. Shawn IT contractor will create email for Joe. Steve made a motion to approve Joe Thompson as interim
trustee to fulfill term until April 2026. Seconded by Holloway. Roll call was taken; Paulson - yes, Holloway-yes,
Friedrich - abstain, Renfert - yes, Menzel - yes.
AGENDA ITEM #13 - BURNING ORDINANCE - Burning ordinance has been updated per recommendation of the
Stevens Point Fire Department. The Stevens Point Fire Department recognized differences between the City of
Stevens Point and the Village of Park Ridge. The village board realized that the current ordinance had areas of
improvement and parts of the ordinance that needed to be removed. Holloway is in the process of revising the
ordinance and will be presented to the board when completed. The item will remain on the agenda for the monthly
meeting until passed by the board.
AGENDA ITEM #14 - SPRING PRIMARY ELECTION RESULTS - Number of absentee voters - 21 , express vote
ballots - 79, total number of voters - 100, numbers of voters printed on the poll list - 462, percentage results -
21 .65% and total number of election day registration - 1 .
AGENDA ITEM #15- DISCUSSION OF VILLAGE SPRING NEWSLETTER-Village trustees discussed possible
newsletter going out in either April, May or June of 2025. Paulson stated has had several residents inquiring about
newsletter. Trustees stated possible information to put in the newsletter could be the following: fire safety, spring stick
pickup, fall large item pickup, road project information, burning guidelines, right of way ordinance, information
regarding parking on street and introduce Joe Thompson as trustee. Steve village president will work with trustee
Kristin Paulson and village clerk in completing newsletter.
AGENDA ITEM #16-SET DATE AND TIME FOR NEXT BOARD MEETING - Monthly board meeting for April will
be on April 21, 2025, at 5:30 p.m.
AGENDA ITEM #17 -ADJOURN MEETING - Meeting adjourned at 7:54 p.m.
LISA LUCHT
VILLAGE CLERK
STEVE MENZEL
VILLAGE PRESIDENT
VILLAGE OF PARK RIDGE
SPECIAL CLOSED BOARD MEETING MINUTES
March 27, 2025
AGENDA ITEM #2 - CONVENE IN OPEN SESSION - President Steve Menzel called the Park Ridge Village Board
to order at 5:30 pm. Roll call was taken: Trustees Dan Holloway and Kristine Paulson were present. Clerk Lisa Lucht
present was present.
AGENDA ITEM #2 -APPROVE SPECIAL MEETING AGENDA - Paulson made a motion to approve the agenda.
Seconded by Holloway. Motion carried by voice vote, with no negative votes.
AGENDA ITEM #3 - VOTE TO CONTINUE IN CLOSED SESSION - Menzel read the following: "The Board will
consider a motion to go into closed session pursuant to Wisconsin Statutes sect. 1985 (1 )(c) considering
employment, promotion, compensation, or performance evaluation data of any public employee over which the
governmental body has jurisdiction or exercise responsibility to wit: Clerk position. Holloway made a motion to go
into Closed Session at 5:35 p.m. Seconded by Paulson. Roll call was taken: Paulson - yes, Holloway - yes Menzel
-yes.
CLOSED SESSION
AGENDA ITEM #4 - VOTE TO CONTINUE IN OPEN SESSION - Holloway made a motion to go back into Open
Session at 6:05 p.m. Seconded by Paulson. Roll call was taken: Holloway - yes, Paulson - yes, Menzel - yes.
AGENDA ITEM #5 - CLOSED SESSION - Holloway made a motion to move forward to hiring for clerk position as
stated in closed session. Seconded by Paulson. Roll call was taken: Holloway -yes , Paulson - yes, Menzel - yes.
The meeting adjourned at 6:06 pm.
LISA LUCHT
VILLAGE CLERK
STEVE MENZEL
VILLAGE PRESIDENT
VILLAGE OF PARK RIDGE
SPECIAL CLOSED BOARD MEETING MINUTES
April 14, 2025
AGENDA ITEM #2 - CONVENE IN OPEN SESSION - President Steve Menzel called the Park Ridge Village Board
to order at 5:36 pm. Roll call was taken: Trustees Gordon Renfert and Kristin Paulson were present. Clerk Lisa Lucht
present was present. Resident Shanna Behrend was also present, (Shanna former clerk present due to being on the
interview panel team).
AGENDA ITEM #2 - APPROVE SPECIAL MEETING AGENDA - Paulson made a motion to approve the agenda.
Seconded by Renfert. Motion carried by voice vote, with no negative votes.
AGENDA ITEM #3 - VOTE TO CONTINUE IN CLOSED SESSION - Menzel read the following: "The Board will
consider a motion to go into closed session pursuant to Wisconsin Statutes sect. 1985 (1 )(c) considering
employment, promotion, compensation, or performance evaluation data of any public employee over which the
governmental body has jurisdiction or exercise responsibility to wit: Clerk position. Paulson made a motion to go into
Closed Session at 5:38 p.m. Seconded by Renfert. Roll call was taken: Paulson -yes, Renfert-yes, Menzel - yes.
CLOSED SESSION
AGENDA ITEM #4 - VOTE TO CONTINUE IN OPEN SESSION - Renfert made a motion to go back into Open
Session at 6:45 p.m. Seconded by Paulson. Roll call was taken: Renfert - yes, Paulson - yes, Menzel - yes.
AGENDA ITEM #5 - CLOSED SESSION - Paulson made a motion that village board gives village president Steve
Menzel approval to offer clerk position to priority applicants as discussed in closed session. Seconded by Renfert.
Roll call was taken: Renfert - yes, Paulson - yes, Menzel - yes.
The meeting adjourned at 6:49 pm.
LISA LUCHT
VILLAGE CLERK
STEVE MENZEL
VILLAGE PRESIDENT
1:31 PM VILLAGE OF PARK RIDGE
04/01/25 Balance Sheet Prev Year Comparison
Accrual Basis As of March 31, 2025
Mar 31, 25 Mar 31, 24 $ Change % Change
ASSETS
Current Assets
Checking/Savings
11110 • Checking 1,000.00 665.37 334.63 50.3%
11310 • Operating Account 349,727 .78 173,435.09 176,292.69 101 .7%
11340 • Reserve Account-Pineries-ARPA 31,178.29 30,823.88 354.41 1.2%
11343 • Pineries MM# 8005-467-9 113,621 .58 112,330.01 1,291 .57 1.2%
11345 • Reserve Account-Bank of Amherst 10,190.34 10,120.31 70.03 0.7%
11350 • CD Account 107,830.92 104,834.94 2,995.98 2.9%
11360 • Petty Cash 300.00 200.00 100.00 50.0%
Total Checking/Savings 613,848.91 432,409.60 181,439.31 42.0%
Other Current Assets
1210 • Accounts Receivable-Other 0.00 4,328.55 -4,328.55 -100.0%
12100 • Taxes Receivable 317,533.72 335,408.27 -17,874 .55 -5.3%
1499 • Undeposited Funds 51.00 17.00 34.00 200.0%
Total Other Current Assets 317,584.72 339,753.82 -22,169.10 -6.5%
Total Current Assets 931,433 .63 772,163.42 159,270.21 20.6% --
TOTAL ASSETS 931,433.63 772,163.42 159,270.21 20.6%
LIABILITIES & EQUITY
Liabilities
Current Liabilities
Credit Cards
2046 • Village Credit Card - Katie2258 0.00 1,123.97 -1 ,123.97 -100.0%
Total Credit Cards 0.00 1,123.97 -1 , 123.97 -100.0%
Other Current Liabilities
2100 • State W/H Tax 186.38 453.69 -267.31 -58.9%
21511 • Federal W/H Tax 346.20 771 .66 -425.46 -55.1%
24700 • Due other taxing authorities 239,656.87 250,404.72 -10,747.85 -4.3%
24800 • Due SP Utilities 4,927.62 4,058.00 869.62 21.4%
Total Other Current Liabilities 245,117 .07 255,688.07 -10,571 .00 -4.1%
Total Current Liabilities 245,117 .07 256,812.04 -11 ,694.97 -4.6% --
Total Liabilities 245,117.07 256,812.04 -11 ,694.97 -4.6%
Page 1
1:31 PM VILLAGE OF PARK RIDGE
04/01/25 Balance Sheet Prev Year Comparison
Accrual Basis As of March 31, 2025
Mar 31, 25 Mar 31, 24 $ Change % Change
Equity
3010 • Office Equipment Reserve 82.68 82.68 0.00 0.0%
3018 • Street Reserve 638.28 638.28 0.00 0.0%
3020 • Sewer Reserve 2,500.00 2,500.00 0.00 0.0%
3025 • Reassessment Reserve 9,000.00 9,000.00 0.00 0.0%
3060 • Disaster Reserve 12,345.31 12,345.31 0.00 0.0%
3070 • Santa Visit Reserve 1,126.19 1,550.00 -423.81 -27.3%
34100 • General Undesignated Fund Bal 103,265.36 103,265.36 0.00 0.0%
3900 • Retained Earnings 240,411.15 165,087.03 75,324.12 45.6%
Net Income 316,947.59 220,882.72 96,064.87 43.5% --
Total Equity 686,316.56 515,351.38 170,965.18 33.2%
TOTAL LIABILITIES & EQUITY 931,433.63 772,163.42 159,270.21 20.6%
Page 2
1:29 PM
04/01/25
Accrual Basis
VILLAGE OF PARK RIDGE
Profit & Loss Prev Year Comparison
January through March 2025
Jan - Mar 25 Jan - Mar 24 $ Change
Ordinary Income/Expense
Income
41110 • Local Tax Levied 492,496.00 361 ,769.37 130,726.63
41800 • Int & Penalties on Taxes Levied 0.00 1.74 -1.74
43531 • Transportation Aid 3,308.14 3,335.21 -27.07
43545 • Recycling Grant 0.00 0.00 0.00
44120 • Cigarette/Bartender's Licenses 0.00 50.00 -50.00
44200 • Dog Licenses 646.00 597.00 49.00
44300 • Building Permits/Inspections 84.00 676.73 -592.73
44500 • Cable Franchise Fees 1,465.22 1,385.83 79.39
48100 • Interest 1,357.91 1,489.98 -132.07
48200 • CD Interest 0.00 730.00 -730.00
48900 • Miscellaneous Income 30,000.00 -6,931.63 36,931.63
Total Income 529,357.27 363,104.23 166,253.04
Expense
51100 • Village Board
5110001 • President Salary 941 .94 941 .94 0.00
5110002 • Trustee Salary 861.20 861 .20 0.00
5110003 • Santa Visit 474.70 805.99 -331.29
5110004 • League of Municipalities Dues 91.38 0.00 91.38
5110006 • Board Expenses 0.00 15.82 -15.82
Total 51100 • Village Board 2,369.22 2,624.95 -255.73
51410 • Clerk/Treasurer
5141001 • Clerk Compensation 8,736.10 12,975.43 -4,239.33
5141006 • General Office Supplies 719.85 641 .89 77.96
5141010 • Tax Collection Fee 1,401 .54 1,450.56 -49.02
5141011 • Villagewide Mailing 109.50 0.00 109.50
5141014 • Pineries Bank Fees/Supplies 20.00 0.00 20.00
5141016 • Accounting Consultation 1,030.00 0.00 1,030.00
5141022 • Dues & Subscriptions 423.24 509.36 -86.1 2
5141025 • Background Checks 0.00 7.00 -7.00
5141026 • Treasurer Compensation 1,472.92 0.00 1,472.92
5141027 • IT Services 300.00 200.00 100.00
Total 51410 • Clerk/Treasurer 14,213.15 15,784.24 -1,571 .09
51420 • Elections
5142001 • Inspectors 524.00 681 .78 -157.78
5142002 • Election Expenses 17.17 56.91 -39.74
5142006 • Election Equipment 0.00 154.40 -154.40
Total 51420 • Elections 541 .17 893.09 -351.92
51430 • Publication Fees 22.61 30.25 -7.64
51510 • Accounting 0.00 111.16 -111.16
51530 • Assessment of Property
5153001 • Assessor Contract 1,035.00 870.00 165.00
Total 51530 • Assessment of Property 1,035.00 870.00 165.00
51600 • Village Hall
5160001 • Maintenance Compensation 129.60 125.05 4.55
5160004 • Utilities 1,427.88 1,173.93 253.95
5160005 • Supplies and Equipment 0.00 99.80 -99.80
5160006 • Repairs & Maintenance 97.00 1,767.08 -1 ,670.08
Total 51600 • Village Hall 1,654.48 3,165.86 -1,511.38
51938 • Insurance
5193801 • General Liability 2,473.00 2,445.00 28.00
5193802 • Local Gov't Property 0.00 1,048.00 -1,048.00
5193803 • Worker's Compensation 863.00 1,645.00 -782.00
Total 51938 • Insurance 3,336.00 5,138.00 -1 ,802.00
% Change
36.1%
-100.0%
-0.8%
0.0%
-100.0%
8.2%
-87.6%
5.7%
-8.9%
-100.0%
532.8%
45.8%
0.0%
0.0%
-41 .1%
100.0%
-100.0%
-9.7%
-32.7%
12.2%
-3.4%
100.0%
100.0%
100.0%
-16.9%
-100.0%
100.0%
50.0%
-10.0%
-23.1%
-69.8%
-100.0%
-39.4%
-25.3%
-100.0%
19.0%
19.0%
3.6%
21 .6%
-100.0%
-94.5%
-47.7%
1.2%
-100.0%
-47.5%
-35.1%
Page 1
1:29 PM VILLAGE OF PARK RIDGE
04/01/25 Profit & Loss Prev Year Comparison
Accrual Basis January through March 2025
Jan - Mar 25 Jan - Mar 24 $ Change %Change
52100 • Crossing Guard 1,059.28 1,235.82 -176.54 -14.3%
52205 • Fire & EMS Protection
5220521 • Fire Protection & EMT Contract 26,267.98 27,017.49 -749.51 -2.8%
Total 52205 • Fire & EMS Protection 26,267.98 27,017.49 -749.51 -2.8%
52400 • Building Inspection 1,236.36 810.17 426.19 52.6%
52450 • Zoning Administration 134.56 134.56 0.00 0.0%
53311 • Street Maintenance
5331101 • Snow Plowing 16,248.00 16,776.00 -528.00 -3.2%
5331113 • Engineering 83,036.60 9,968.00 73,068.60 733.0%
Total 53311 • Street Maintenance 99,284.60 26,744 .00 72,540.60 271 .2%
53420 • Street Lighting
5342001 • Electric & Maintenance 2,963.12 3,027.44 -64.32 -2.1%
5342004 • Digger Requests 486.53 813.48 -326.95 -40.2%
Total 53420 • Street Lighting 3,449.65 3,840.92 -391.27 -10.2%
53620 • Garbage Collection
5362001 • Garbage Collection 8,290.56 7,931.48 359.08 4.5%
Total 53620 • Garbage Collection 8,290.56 7,931.48 359.08 4.5%
53635 • Recycling cost
5363501 • Recycling Collection 2,075.18 1,983.50 91.68 4.6%
5363503 • Yard Waste Drop Off 5,300.00 5,300.00 0.00 0.0%
Total 53635 • Recycling cost 7,375.18 7,283.50 91.68 1.3%
54100 • Humane Society Contract 1,839.01 1,356.02 482.99 35.6%
55200 • Parks Dept. Pledge ($5.50/per) 2,915.00 0.00 2,915.00 100.0%
6560 • Payroll Expenses 135.87 0.00 135.87 100.0%
Total Expense 175,159.68 104,971 .51 70,188.17 66.9%
Net Ordinary Income 354,197.59 258,132.72 96,064.87 37.2%
Other Income/Expense
Other Expense
58100 • Loan Principal
58110 • Linwood Ave Project 5,209.31 5,116.89 92.42 1.8%
58120 • Line of Credit 18,840.16 19,415.30 -575.14 -3.0%
Total 58100 • Loan Principal 24,049.47 24,532.19 -482.72 -2.0%
58200 • Loan Interest
58210 • Linwood Ave Project 3,040.69 3,133.11 -92.42 -3.0%
58220 • Line of Credit 10,159.84 9,584.70 575.14 6.0%
Total 58200 • Loan Interest 13,200.53 12,717.81 482.72 3.8%
Total Other Expense 37,250.00 37,250.00 0.00 0.0%
Net Other Income -37,250.00 -37,250 .00 0.00 0.0%
Net Income 316,947.59 220,882.72 96,064.87 43.5%
Page 2
VILLAGE OF PARK RIDGE
Revenues & Expenses Budget vs. Actual
January through March 2025
Jan - Mar 25 Budget $ Over Budget
Ordinary Income/Expense
Income
41110 • Local Tax Levied 492,496.00 492,496.00 0.00
43410 • Shared Revenues 0.00 52,855.18 -52,855.18
43420 • Fire Insurance 0.00 3,200.00 -3,200.00
43430 • Exempt Computer Aid 0.00 462.47 -462.47
43440 • Personal Property Aid 0.00 5,074.43 -5,074.43
43450 • State Video (Cable) Aid 0.00 1,700.20 -1,700.20
43531 • Transportation Aid 3,308.14 13,232.56 -9,924.42
44110 • Liquor and Malt Beverage 0.00 1,200.00 -1 ,200.00
44120 • Cigarette/Bartender's Licenses 0.00 300.00 -300.00
44200 • Dog Licenses 646.00 250.00 396.00
44300 • Building Permits/Inspections 84.00 2,000.00 -1 ,916.00
44400 • ZoningNariance Fees 0.00 200.00 -200.00
44500 • Cable Franchise Fees 1,465.22 5,400.00 -3,934.78
46100 • General Government 0.00 100.00 -100.00
48100 • Interest 1,357.91 3,500.00 -2,142.09
48200 • CD Interest 0.00 3,000.00 -3,000.00
48900 • Miscellaneous Income 30,000.00 1,500.00 28,500.00
Total Income 529,357.27 586,470.84 -57, 113.57
Expense
51100 • Village Board
5110001 • President Salary 941.94 3,768.00 -2,826.06
5110002 • Trustee Salary 861 .20 3,445.00 -2,583.80
5110003 • Santa Visit 474.70 1,000.00 -525.30
5110004 • League of Municipalities Dues 91.38 553.29 -461.91
5110006 • Board Expenses 0.00 1,000.00 -1 ,000.00
Total 51100 • Village Board 2,369.22 9,766.29 -7,397.07
51300 • Legal 0.00 8,000.00 -8,000.00
51410 • Clerk/Treasurer
5141001 • Clerk Compensation 8,736.10 42,000.00 -33,263.90
5141002 • Mileage and Expense 0.00 1,000.00 -1,000.00
5141006 • General Office Supplies 719.85 3,000.00 -2,280.15
5141007 • Training 0.00 1,500.00 -1 ,500.00
5141010 • Tax Collection Fee 1,401 .54 1,500.00 -98.46
5141011 • Villagewide Mailing 109.50 1,500.00 -1,390.50
5141013 • Treasurer Bond 0.00 1,000.00 -1,000.00
5141014 • Pineries Bank Fees/Supplies 20.00 150.00 -130.00
5141016 • Accounting Consultation 1,030.00 0.00 1,030.00
5141022 • Dues & Subscriptions 423.24 3,000.00 -2,576.76
5141025 • Background Checks 0.00 200.00 -200.00
5141026 • Treasurer Compensation 1,472.92 6,000.00 -4,527.08
5141027 • IT Services 300.00 1,500.00 -1,200.00
Total 51410 • Clerk/Treasurer 14,213.15 62,350.00 -48,136.85
% of Budget
100.0%
0.0%
0.0%
0.0%
0.0%
0.0%
25.0%
0.0%
0.0%
258.4%
4.2%
0.0%
27.1%
0.0%
38.8%
0.0%
2,000.0%
90.3%
25.0%
25.0%
47.5%
16.5%
0.0%
24.3%
0.0%
20.8%
0.0%
24.0%
0.0%
93.4%
7.3%
0.0%
13.3%
100.0%
14.1%
0.0%
24.5%
20.0%
22.8%
Page 1
VILLAGE OF PARK RIDGE
Revenues & Expenses Budget vs. Actual
January through March 2025
Jan • Mar 25 Budget $ Over Budget
51420 • Elections
5142001 • Inspectors 524.00 2.000.00 -1,476 .00
5142002 • Election Expenses 17.17 1.000.00 -982.83
5142006 • Election Equipment 0.00 500.00 -500.00
Total 51420 • Elections 541.17 3,500.00 -2,958.83
51430 • Publication Fees 22.61 500.00 -477.39
51510 • Accounting
5151001 • Reporting (Form C) 0.00 1,000.00 -1 ,000.00
Total 51510 • Accounting 0.00 1,000.00 -1 ,000.00
51530 • Assessment of Property
5153001 • Assessor Contract 1,035.00 6,900.00 -5,865.00
Total 51530 • Assessment of Property 1,035.00 6,900.00 -5,865.00
51600 • Village Hall
5160001 • Maintenance Compensation 129.60 2,200.00 -2,070.40
5160004 • Utilities 1,427.88 4,200.00 -2,772.12
5160005 • Supplies and Equipment 0.00 3,000.00 -3,000.00
5160006 • Repairs & Maintenance 97.00 2,500.00 -2,403.00
Total 51600 • Village Hall 1,654.48 11,900.00 -10,245.52
51910 • Uncollectible Taxes 0.00 200.00 -200.00
51938 • Insurance
5193801 • General Liability 2,473.00 2,500.00 -27.00
5193802 • Local Gov't Property 0.00 1,000.00 -1 ,000.00
5193803 • Worker's Compensation 863.00 2,000.00 -1 ,137.00
Total 51938 • Insurance 3,336.00 5,500.00 -2,164.00
52100 • Crossing Guard 1,059.28 4,500.00 -3,440 .72
52205 • Fire & EMS Protection
5220521 • Fire Protection & EMT Contract 26,267.98 107,230.00 -80,962.02
Total 52205 • Fire & EMS Protection 26,267.98 107,230.00 -80,962.02
52400 • Building Inspection 1,236.36 4,000.00 -2,763.64
52450 • Zoning Administration 134.56 550.00 -415.44
53311 • Street Maintenance
5331101 • Snow Plowing 16,248.00 27,000.00 -10,752. 00
5331103 • Street Maintenance 0.00 61 ,000.00 -61,000.00
5331104 • Street Maint-Trees/pickup 0.00 4,000.00 -4,000.00
5331113 • Engineering 83,036.60 79,000.00 4,036.60
Total 53311 • Street Maintenance 99,284.60 171,000.00 -71 ,715.40
53315 • Sewers 0.00 75.00 -75.00
53420 • Street Lighting
5342001 • Electric & Maintenance 2,963.12 13,500.00 -10,536.88
5342004 • Digger Requests 486.53 4,000.00 -3,513.47
Total 53420 • Street Lighting 3,449.65 17,500.00 -14,050 .35
% of Budget
26.2%
1.7%
0.0%
15.5%
4.5%
0.0%
0.0%
15.0%
15.0%
5.9%
34.0%
0.0%
3.9%
13.9%
0.0%
98.9%
0.0%
43.2%
60.7%
23.5%
24.5%
24.5%
30.9%
24.5%
60.2%
0.0%
0.0%
105.1%
58.1%
0.0%
21 .9%
12.2%
19.7%
Page 2
VILLAGE OF PARK RIDGE
Revenues & Expenses Budget vs. Actual
January through March 2025
Jan - Mar 25 Budget $ Over Budget
53620 • Garbage Collection
5362001 • Garbage Collection 8,290.56 33,500.00 -25,209 .44
5362002 • Fall Large Item Pick-up 0.00 900.00 -900.00
Total 53620 • Garbage Collection 8,290 .56 34,400 .00 -26,109.44
53635 • Recycling cost
5363501 • Recycling Collection 2,075.18 9,000.00 -6,924.82
5363503 • Yard Waste Drop Off 5,300.00 5,400 .00 -100.00
Total 53635 • Recycling cost 7,375.18 14,400.00 -7,024.82
54100 • Humane Society Contract 1,839.01 1,700.00 139.01
55200 • Parks Dept. Pledge ($5.50/per) 2,915 .00 3,000.00 -85.00
6560 • Payroll Expenses 135.87
Total Expense 175,159.68 467 ,971 .29 -292,811 .61
Net Ordinary Income 354,197.59 118,499 .55 235,698 .04
Other Income/Expense
Other Income
49100 • Long Term Debt Proceeds 0.00 1,592,000.00 -1 ,592,000.00
49105 • Grant Funds 0.00 400,000 .00 -400,000 .00
Total Other Income 0.00 1,992,000.00 -1 ,992,000 .00
Other Expense
57101 • Undesignated Fund Bal Outlay 0.00 81 ,249.55 -81 ,249.55
57200 • Capital Project Outlay 0.00 1,992,000.00 -1 ,992,000.00
58100 • Loan Principal
58110 • Linwood Ave Project 5,209.31 5,209.31 0.00
58120 • Line of Credit 18,840.16 18,840.16 0.00
Total 58100 • Loan Principal 24,049.47 24,049.47 0.00
58200 • Loan Interest
58210 • Linwood Ave Project 3,040.69 3,040.69 0.00
58220 • Line of Credit 10,159.84 10,159.84 0.00
Total 58200 • Loan Interest 13,200 .53 13,200.53 0.00
Total Other Expense 37,250 .00 2,110,499 .55 -2,073,249.55
Net Other Income -37,250 .00 -118,499 .55 81 ,249.55
Net Income 316,947.59 0.00 316,947.59
% of Budget
24.7%
0.0%
24.1%
23.1%
98.1%
51.2%
108.2%
97.2%
37.4%
298 .9%
0.0%
0.0%
0.0%
0.0%
0.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100 .0%
1.8%
31 .4%
100.0%
Page3
v,//4? or /p,(/, /,-(r
/,.,/c/21 ~;,-;_y
;fl ~"',=A.-/.u_ J_oz.5'
STEVENS POINT
1701 FRANKLIN STREET
715-344-1833
Jb D. MOODY
FIRE CHIEF
FIRE DEPARTMENT
STEVENS POINT, WI 54481
FAX: 715-346-1599
Police & Fire Commission
Fire Chiefs Report - January 2025
57 Members Approved
Significant Events
• Taco Johns Fundraiser $153.59
Monthly Training :
• Axene Training
o Provider Safety
o Patient Safety
o EMS Ops Hazmat MCI &
NIMS
• PSTrax Narcotics
• Adrenal Crisis
• Rapid Sequence Intubation
• Jail Tour
Public Activities:
• ODC Station Tour
• Hands Only CPR UWSP
• Explorer Post Mtg
• Celebrity Lunch Jefferson School
• Career Day Pacelli Middle School
• Red Cross Smoke Detector Install
55 Positions Funded 45 Positions Staffed
01/22/2025
• Role of Motor Pump Operator
• SCBA Survival and Drags
• Confined Space
• Search and Rescue
• Comm Techs CAD
• PS/TFP Crew Meeting with Chief
• Triple Lay 2.5" Hose Load
• Victim/Bailout kits
• Vent Enter Isolate Search (VEIS)
• Mask Fit Testing
01/10/2025
01/14/2025
01/16/2025
01/24/2025
01/29/2025
01/29/2025
STEVENS POINT
1701 FRANKLIN STREET
715-344-1833
Jb D. MOODY
FIRE CHIEF
Police & Fire Commission
FIRE DEPARTMENT
STEVENS POINT, WI 54481
FAX: 715-346-1599
Fire Chiefs Report - February 2025
57 Members Approved 55 Positions Funded
Significant Events
• FF/P Jared Higgins resigned
• Role out of PSTrax for Narcotic Tracking
Monthly Training:
• Ice Water rescue Operations
• Fire Pump Hydraulics
• M PO Expectations
• Crew Expectations
• Donning and Mask up Drills
• Ropes and Knots
• Confined Space
• Wisconsin State Fire Chiefs Conference
• Sprinkler Systems and Fire Alarms
• SOPs Review and A
• 624 Lindbergh After Action Review
• Comm Tech CAD
• Needle Decompression
. • Protocol Review and 10 Access
• Patient Care Report Writing
• Axene Capnography Pulse Ox
• Field Training Evaluation Program
Public Activities:
• MSTC EMR Class
• SPASH Lunch and Basketball
• Explorers Meeting
• DNR FIT Capacity Standby
44 Positions Staffed
02/15/2025
02/13/2025
02/18/2025
02/19/2025
02/25/2025
STEVENS POINT
1701 FRANKLIN STREET
715-344-1833
Jb D. MOODY
FIRE CHIEF
Police & Fire Commission
FIRE DEPARTMENT
STEVENS POINT, WI 54481
FAX: 715-346-1599
Fire Chiefs Report - March 2025
57 Members Approved 55 Positions Funded 46 Positions Staffed
Significant Events
• 5,000.00 Grant for Live Scope from Community Foundation of Central WI
• 2 new hires start Fire and EMS Academy #2501 03/31/2025
Monthly Training:
• Field Training Paramedic Program Completed
• Officer and Crew Meeting with Chief
• Forcible Entry
• Water Hydraulics
• Window/Door Based Searches
• Fire Investigation Camera Training
• Wildland and Pump and Roll Engine 1
• Ice Rescue
• High Angle/Raise and Lower
• Weekly Scrap Fire Engineering
• Dr. Sinclair OB/GYN
• EMS Protocol Review
• Hand Tevy
• Tempus Monitor and Glide-Scope Review
• Emergency Vehicle Driving
Public Activities:
• Point Brewery Bock Run Ambulance Standby
• Station Tour Station 2
• SPASH Career Fair
• Charity Dinner Phi Sigma Phi fraternity
• Student Shadow
• PC Business Council ADRC government day
Fire Runs:
55 Maplewood Drive
23 Crestwood Drive
802 Linwood Avenue
EMS Assist
EMS Assist
Powerline down
03/01/2025
03/01/2025
03/12/2025
03/13/2025
03/17/2025
03/27/2025
01/28/2025
02/21/2025
03/23/2025
DATE TICKET# COMPLETED $50.00 $25.00 $10.00 TOTAL
1/27 501122 1/27 $10.00 $10.00
2/7 606999 2/7 $10.00 $10.00
2/7 607011 2/7 $10.00 $10.00
2/7 607014 2/7 $10.00 $10.00
2/7 607024 2/7 $10.00 $10.00
2/10 700515 2/10 $10.00 $10.00
2/21 806499 • 2/21 $10.00 $10.00
3/18 1208473 3/18 $10.00 $10.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
,..-,../ $0.00
~o~J '(t A' I $0.00
$0.00
J-O;) s·
(~
\ $0.00
Q $0.00
(D ( C er: {(. 5
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$ .. 0
TOTAL $0.00 $0.00 $80.00 $80.00
VILLAGE OF PARK RIDGE
04/01/25 Company Payroll Expense Chargeback Report
January through March 2025
Type Date Name Account Amount
Behrend, Shanna L
Paycheck 01/01/20 Behrend, Shann ... 6560 • Payroll Expe ... 71.30
Paycheck 01/01/20 Behrend, Shann ... 6560 • Payroll Expe ... 16.68
Paycheck 01/01/20 Behrend, Shann ... 6560 • Payroll Expe ... 0.00
Paycheck 01 /15/20 Behrend, Shann ... 6560 • Payroll Expe ... 22.99
Paycheck 01 /15/20 Behrend, Shann ... 6560 • Payroll Expe ... 5.37
Paycheck 01 /15/20 Behrend, Shann ... 6560 • Payroll Expe ... 0.00
Paycheck 01/29/20 Behrend, Shann ... 6560 • Payroll Expe ... 5.94
Paycheck 01/29/20 Behrend, Shann ... 6560 • Payroll Expe ... 1.39
Paycheck 01/29/20 Behrend, Shann ... 6560 • Payroll Expe ... 0.00
Paycheck 02/12/20 Behrend, Shann ... 6560 • Payroll Expe ... 6.20
Paycheck 02/12/20 Behrend, Shann ... 6560 • Payroll Expe ... 1.45
Paycheck 02/12/20 Behrend, Shann ... 6560 • Payroll Expe ... 0.00
Paycheck 02/26/20 Behrend, Shann ... 6560 • Payroll Expe ... 9.30
Paycheck 02/26/20 Behrend, Shann ... 6560 • Payroll Expe ... 2.18
Paycheck 02/26/20 Behrend, Shann ... 6560 • Payroll Expe ... 0.00
Total Behrend, Shanna L 142.80
Friedrich , Barbara J
Paycheck 01/11/20 Friedrich, Barba ... 6560 • Payroll Expe ... 12.40
Paycheck 01/11/20 Friedrich, Barba ... 6560 • Payroll Expe ... 2.90
Total Friedrich, Barbara J 15.30
Holloway, Daniel A
Paycheck 01/11/20 Holloway, Danie ... 6560 • Payroll Expe ... 12.40
Paycheck 01/11/20 Holloway, Danie ... 6560 • Payroll Expe ... 2.90
Total Holloway, Daniel A 15.30
Kraft, John E.
Paycheck 01/11/20 Kraft, John E. 6560 • Payroll Expe ... 28.52
Paycheck 01/11/20 Kraft , John E. 6560 • Payroll Expe ... 6.67
Paycheck 01/11/20 Kraft, John E. 6560 • Payroll Expe ... 0.00
Total Kraft, John E. 35.19
Lepak, Rebecca A
Paycheck 01/29/20 Lepak, Rebecca ... 6560 • Payroll Expe ... 2.11
Paycheck 01/29/20 Lepak, Rebecca ... 6560 • Payroll Expe ... 0.49
Paycheck 01/29/20 Lepak, Rebecca ... 6560 • Payroll Expe ... 0.00
Paycheck 03/26/20 Lepak, Rebecca .. . 6560 • Payroll Expe ... 4.21
Paycheck 03/26/20 Lepak, Rebecca ... 6560 • Payroll Expe ... 0.99
Paycheck 03/26/20 Lepak, Rebecca ... 6560 • Payroll Expe ... 0.00
Total Lepak, Rebecca A 7.80
Lucht, Lisa C
Paycheck 01/01/20 Lucht, Lisa C 6560 • Payroll Expe ... 43.52
Paycheck 01/01/20 Lucht, Lisa C 6560 • Payroll Expe ... 10.18
Paycheck 01/01/20 Lucht, Lisa C 6560 • Payroll Expe ... 0.00
Paycheck 01 /15/20 Lucht, Lisa C 6560 • Payroll Expe ... 58.66
Paycheck 01/15/20 Lucht, Lisa C 6560 • Payroll Expe ... 13.72
Paycheck 01/15/20 Lucht, Lisa C 6560 • Payroll Expe ... 0.00
Paycheck 01/29/20 Lucht, Lisa C 6560 • Payroll Expe ... 72.66
Paycheck 01/29/20 Lucht, Lisa C 6560 • Payroll Expe ... 16.99
Paycheck 01/29/20 Lucht, Lisa C 6560 • Payroll Expe ... 0.00
Paycheck 02/12/20 Lucht, Lisa C 6560 • Payroll Expe ... 62.50
Paycheck 02/12/20 Lucht, Lisa C 6560 • Payroll Expe ... 14.62
Paycheck 02/12/20 Lucht, Lisa C 6560 • Payroll Expe ... 0.00
Paycheck 02/26/20 Lucht, Lisa C 6560 • Payroll Expe ... 51.70
Paycheck 02/26/20 Lucht, Lisa C 6560 • Payroll Expe ... 12.09
Paycheck 02/26/20 Lucht, Lisa C 6560 • Payroll Expe ... 0.00
Paycheck 03/12/20 Lucht, Lisa C 6560 • Payroll Expe ... 54.69
Paycheck 03/12/20 Lucht, Lisa C 6560 • Payroll Expe ... 12.79
Paycheck 03/12/20 Lucht, Lisa C • 6560 • Payroll Expe ... 0.00
Paycheck 03/26/20 Lucht, Lisa C 6560 • Payroll Expe ... 51.21
Type Date Name Account Amount
Paycheck 03/26/20 Lucht, Lisa C 6560 • Payroll Expe ... 11 .98
Paycheck 03/26/20 Lucht, Lisa C 6560 • Payroll Expe ... 0.00
Total Lucht, Lisa C 487.31
Manville, James D.
Paycheck 01/11/20 Manville, James ... 6560 • Payroll Expe ... 7.75
Paycheck 01/11/20 Manville, James ... 6560 • Payroll Expe ... 1.81
Paycheck 01/11/20 Manville, James ... 6560 • Payroll Expe ... 0.00
Total Manville, James D. 9.56
Menzel, Stephen F
Paycheck 01/1 1/20 Menzel, Stephe ... 6560 • Payroll Expe ... 54.25
Paycheck 01/11/20 Menzel, Stephe ... 6560 • Payroll Expe ... 12.69
Total Menzel, Stephen F 66.94
Miller, LoisJean C.
Paycheck 01/11/20 Miller, LoisJean ... 6560 • Payroll Expe ... 61 .01
Paycheck 01/1 1/20 Miller, LoisJean ... 6560 • Payroll Expe ... 14.27
Paycheck 01/11/20 Miller, LoisJean ... 6560 • Payroll Expe ... 0.00
Total Miller, LoisJean C. 75.28
Paulson, Kristin
Paycheck 01/11/20 Paulson, Kristin 6560 • Payroll Expe ... 12.40
Paycheck 01/11/20 Paulson, Kristin 6560 • Payroll Expe ... 2.90
Total Paulson, Kristin 15.30
Renfert, Gordon J.
Paycheck 01/11/20 Renfert, Gordon ... 6560 • Payroll Expe ... 12.40
Paycheck 01/11/20 Renfert, Gordon ... 6560 • Payroll Expe ... 2.90
Total Renfert, Gordon J. 15.30
Zepp , James P.
Paycheck 01/11/20 Zepp, James P. 6560 • Payroll Expe ... 71 .21
Paycheck 01/11/20 Zepp, James P. 6560 • Payroll Expe ... 16.65
Paycheck 01/11/20 Zepp, James P. 6560 • Payroll Expe ... 0.00
Total Zepp, James P. 87.86
No name
General Jour. .. 01/01/20 6560 • Payroll Expe ... -141.68
General Jour. .. 01/11/20 6560 • Payroll Expe ... -336.03
General Jour. .. 01/15/20 6560 • Payroll Expe ... -100.74
General Jour ... 01/29/20 6560 • Payroll Expe ... -99.58
General Jour ... 02/28/20 6560 • Payroll Expe ... -160.04
Total no name -838.07
TOTAL 135.87
Page 2
RESOLUTION NO. 001.2025R
A Resolution wherein the Board of Trustees of the Village of Park Ridge of
Portage County, WI adopts the Stevens Point Urban Area Sewer Service Area Plan
2040 Update.
WHEREAS, The Village of Park Ridge of Portage County, WI adopted the
current Sewer Service Area Plan in 2007 as required by the Federal Clean Water Act
legislation and State Administrative Code N.R. 121 to protect water quality; and
WHEREAS, in order to continue compliance with these regulations the
Stevens Point Urban Area Sewer Service Advisory Committee, with assistance from
the North Central Wisconsin Regional Planning Commission has undertaken the
necessary planning process to update the Stevens Point Urban Area Sewer Service
Area Plan; and
WHEREAS, through meetings of the Advisory Committee, including a
public hearing, information was provided, analyzed, and considered for inclusion in
the Plan Update; and
WHEREAS, the Plan Update identifies environmentally sensitive areas and
proposes environmentally sound sewer service extension goals, objectives, and
policies that will protect water quality within the sewer service area boundary; and
WHEREAS, the Plan Update also identifies policies and procedures to make
future amendments to the Plan;
NOW, THEREFORE, BE IT RESOLVED that the Board of Trustees of the
Village of Park Ridge of Portage County, WI, having considered the input of the
Stevens Point Urban Area Sewer Service Advisory Committee and comments heard
at the public hearing, hereby adopts the Stevens Point Urban Area Sewer Service
Area Plan 2040 Update.
ADOPTED: ---------
Steve Menzel - Village President Date
ADOPTED: ---------
Lisa Lucht - Clerk Date
STEVENS POINT URBAN AREA SEWER SERVICE AREA PLAN 2040
prepared for:
Stevens Point Urban Area Sewer Service Advisory Committee
by:
North Central Wisconsin Regional Planning Commission
Approved by Advisory Committee on:
August22 , 2023
This Plan was prepared at the request and under the supervision of the Stevens Point
Urban Area Sewer Service Advisory Committee and Portage County Planning & Zoning
Department by the North Central Wisconsin Regional Planning Commission (NCWRPC).
For more information, contact:
NORTH CENTRAL WISCONSIN REGIONAL PLANNING COMMISSION
210 McCLELLAN STREET, SUITE 210
WAUSAU , WI 54403 r , I
1"1·~
NCWRPC
Telephone: 715-849-5510 FAX: 715-849-5110 email: staff@ncwrpc.org
www.ncwrpc.org
TABLE OF CONTENTS
PAGE
SECTION 1 INTRODUCTION 1
1.1 Purpose 1
1.2 Description of the Study Area 2
1.3 Reasons for Update to 2007-2027 SSA Plan 2
1.4 Federal and State Legislative Framework 3
1.5 Water Quality Management Roles and Responsibilities 3
1.6 Interrelationships: Sewer Service Area Plan, Facilities Plans
and Wisconsin River Watershed Plans 4
1.6.1 Watershed Plans 5
1.6.2 Facilities Plans 6
1.6.3 Sewer Service Area Plans 6
1.7 Guidelines for Preparation of the SSA Plan 6
1.8 Overview of Planning Process and Public Involvement 6
SECTION 2 LOCAL PLANS FOR WASTEWATER FACILITIES 10
2.1 Background on Facilities Plans 10
2.2 Existing Wastewater Treatment & Collection Systems 10
2.2.1 City of Stevens Point Collection and Treatment System 11
2.2.2 Village of Plover Collection and Treatment System 12
2.2.3 Village of Whiting Collection and Treatment System 14
2.3 Status of the Local Wastewater Facilities Plans 14
2.4 Planning Considerations for Non-Sewered Areas 15
SECTION 3 AREAWIDE WATER QUALITY MANAGEMENT PLANNING
AND LOCAL WATER QUALITY CONDITIONS 17
3.1 Background on AWQMP Planning 17
3.2 Wisconsin River Total Maximum Daily Load (TMDL) 18
3.3 Discussion of Water Conditions in the Stevens Point Area 19
3.3.1 Wisconsin River Basin 20
3.3.2 Mill Creek Watershed 21
3.3.3 Little Plover/Plover River Watershed 21
SECTION 4 PLANNING AREA GROWTH PROJECTIONS 23
4.1 Introduction 23
4.2 Historical Population Growth 23
4.3 Population Projections 24
4.4 Urban Area Land Use Projections 25
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft NCWRPC i
4.4.1 Introduction 25
4.4.2 Residential Land Requirements 26
4.4.2AAverage Household Size 26
4.4.2BAverage Residential Density 27
4.4.2C Residential Land Requirements 27
4.4.3 Commercial and Industrial Land Requirements 28
4.4.4 Public and Institutional Land Requirements 29
4.4.5 Park and Outdoor Recreation Land Requirements 29
4.4.6 Right-of-Way Land Requirements 30
4.4.7 Allowance for Market Factors 30
4.4.8 Total Urban Area Land Requirements 31
4.4.9 Infill and Redevelopment of Vacant Lands 31
4.4.10 SSA Additional Land Area Needs By Community 2040 32
SECTION 5 ENVIRONMENTALLY SENSITIVE AREAS 31
5.1 Delineation of Environmentally Sensitive Areas 33
5.2 Floodways 35
5.3 Wetlands 35
5.4 Steep Slopes 36
5.5 Protection of ESAs and Related Areas 38
SECTION 6 URBAN AREA COMPREHENSIVE PLANS 40
6.1 Introduction 40
6.2 Urban Area Comprehensive Plans 40
SECTION 7 SEWER SERVICE AREA PLAN GOALS, OBJECTIVES &
POLICIES 43
7.1 Introduction 43
7.2 Goals of the Sewer Service Area Plan 43
7.3 Additional Sewer Service Policies 45
7.3.1 Selection of Development Limitations Criteria Which Will
Identify Lands Not Conducive to Sewered Development 45
7.3.2 Specific Exceptions for Areas with Use Restrictions 45
7.3.3 Specific Exceptions for Areas with Physical Limitations 46
7.3.4 Individual Jurisdiction Policies 47
7.3.5 Gaining Access to Serviceable Land 47
7.3.6 Replacement of Existing Sewers 47
7.3.7 Designated Health Hazard Conditions in Sewer Service Area47
7.3.8 Undesignated Health Hazard Areas 48
SECTION 8 SEWER SERVICE AREA BOUNDARY PLAN 49
8.1 Introduction 49
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft NCWRPC ii
8.2 2040 Sewer Service Area Boundary Map 49
SECTION 9 PLAN IMPLEMENTATION AND INSTITUTIONAL
PROCEDURES
List of Maps
53
9.1 Introduction 53
9.2 Procedures and Review Requirements for Sewer Extensions 53
9.3 Review of Plumbing Plans Submitted for State Approval 54
9.4 Other Reviews 56
9.5 Procedures and Standards for Amending the Sewer Service
Area Boundary 56
9.5.1 Boundary Amendment Procedures 56
9.5.2 Boundary Amendment Standards 60
9.6 Other Plan Amendments 61
9.7 Appeals 61
9.8 Notification of Large-Scale On-Site Waste Disposal Systems 62
9.9 Sewer Service Area Plan Update 62
9.10 Institutional Structure for Continuing Plan Implementation 62
9.11 Public Participation and Hearing Requirements 63
1
2
3
4
Study Area
Water Quality Plan Relationships
Environmentally Sensitive Areas
2040 Sewer Service Area Boundary Map
8
9
37
52
List of Figures
List of Tables
1
2
3
4
1
2
3
4
5
6
7
WRB Total Maximum Daily Load (TMDL)
Sewer Extension Review Flowchart
Type I Amendment Process Flowchart
Type II Amendment Process Flowchart
Capacity/Loading Info. Area Treatment Plants
Pop. Trends 1970-2020 Stevens Point Area
WI DOA Projected Pop. For Stevens Point Urban
WI DOA Projected Pop. For Adjacent Towns
Projected Change in Ave. Persons Per Household
Average Residential Development Density
Residential Land Requirements for Urban Core
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft
19
55
57
58
10
24
25
25
26
27
28
NCWRPCiii
8 Commercial Land Requirements for Urban Core 28
9 Industrial Land Requirements for Urban Core 29
10 Public/Institutional Land Requirements for Urban Core 29
11 Park/Outdoor Rec. Land Requirements for Urban Core 30
12 ROW Land Requirements for Urban Core 30
13 Total Additional Land Area Requirements for Urban Core 31
14 Additional Land Area Needs by Community for Urban Core 32
15 Environmentally Sensitive Area (ESA) Guidelines 34
16 Sewer Service Area Boundary Allocations 51
Appendix
A. Stevens Point Urban Area Sewer Service Advisory Committee Bylaws
B. Planning Process Documentation
C. Community Future Land Use Maps
D. Community Sewer System Maps
E. Previous SSA Boundary Map
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft NCWRPCiv
SECTION 1.0 INTRODUCTION
1.1 PURPOSE
This plan updates and supersedes the 2007-2027 Steven Point Urban Area Sewer
Service Area Plan, which is a formal element of Wisconsin's Areawide Water Quality
Management Plan (AWQMP) for the Wisconsin River Basin. This plan was prepared by
the North Central Wisconsin Regional Planning Commission (NCWRPC) with the
support of the Portage County Planning & Zoning Department. This plan delineates the
sewer service boundary for the Stevens Point Urban Area and lists the institutional
structures, policies and procedures to implement the Sewer Service Area Plan.
The sewer service boundary identifies the geographic land area within which sanitary
sewer service is acceptable, including delineation of environmentally sensitive areas to
be excluded from sewered development to protect water quality , and intergovernmental
jurisdictional issues and processes to enable cost-effective sewer service through the
year 2040.
In addition to delineating a sewer service boundary, the Sewer Service Area Plan
provides a framework for future planning at each individual municipal level. The data,
trends, projections and findings developed in this Plan are consistent with the
community plans for the City of Stevens Point, the Villages of Park Ridge, Plover and
Whiting, and the Towns of Linwood, Hull, Plover and Stockton. The goals and policies
updated during this planning process update and supersede those of the previous
sewer service area plan and are to be used in the development of local policies
concerning land use within these communities.
The Sewer Service Area Plan:
• establishes the geographic boundaries for possible sanitary sewer service to the
year 2040;
• updates the existing institutional structure and processes for reviewing boundary
and plan amendments and for conducting conformance reviews for sewer
extensions at the local level;
• serves as a framework for community land development decisions;
• identifies environmentally sensitive areas (ESA) excluded from publicly sewered
development to protect water quality in accordance with federal law and state
statutes and administrative code. ESA delineations influence community
development patterns, directing growth outside of these areas to protect water
quality. Preserving environmental amenities also enhances and builds upon
existing social , cultural and economic value in local communities.
• is a format element of Wisconsin's Areawide Water Quality Management Plan
and its implementation is therefore required to be in conformance with the state's
water quality management plans and Wisconsin River Total Maximum Daily Load
(TMDL) documents and implementation plans.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 1
1.2 DESCRIPTION OF THE STUDY AREA
The planning area for the Stevens Point Urban Area 2040 Sewer Service Area Plan is
shown in Map 1. This area includes the communities with public sewer systems, the
City of Stevens Point and the Villages of Plover and Whiting, along with the surrounding
communities into which sewer service might be extended over the time horizon of the
plan. These communities include the Towns of Linwood, Hull, Plover and Stockton.
The Village of Park Ridge is currently served by the Stevens Point system. All of the
communities lie within Portage County. The planning area identifies the area of study
for data collection and mapping and encompasses a total land area of approximately
124,330 acres. An understanding of the growth and development trends affecting the
surrounding communities is necessary for a good planning process.
1.3 REASONS FOR AN UPDATE TO THE 2007-2027 SEWER SERVICE AREA
PLAN
The existing sewer service area plan was not causing any issues for new developments
in the urban area and no boundary amendments have been required. However, the
plan is reaching its planning horizon, and local officials deemed it was time for an
update. This would allow for the reassessment of new development over last 15 years
and account for current growth trends.
For example , both the previous Sewer Service Area Plan and local community
comprehensive plans identify that future development will expand into "good agricultural
land" around the fringe of the urban area.
Since the previous SSA plan, some additional "good agricultural land" has been
developed, primarily in relation to continued expansion of the Portage County Business
Park and the Crossroads Commons retail center just to the east of Interstate 39.
However, this has been relatively limited, consisting of primarily lower tier ag-lands that
would require intensive irrigation. The bulk of the prime ag-land lies further east of the
urban area.
• Long-term as the urban area continues to grow, it will likely experience the need to
expand further into some of these prime agricultural lands. This factor is recognized in
the sewer service area planning. Good agricultural lands are specifically not defined as
environmentally sensitive areas for the purposes of the SSA plan based on findings that
development limitations on these lands are not deemed significant enough to preclude
sewered development and are not restricted from the sewer service area. This is not to
detract from the importance and value of these types of lands to the culture and
economy of the County and local communities. Preservation and protection of ag-lands
remains a local policy decision that is implemented through comprehensive planning,
zoning and the Wisconsin Farmland Preservation Program.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page2
1.4 FEDERAL AND ST ATE LEGISLATIVE FRAMEWORK
Federal legislation for areawide water quality planning was enacted under the Federal
Water Pollution Control Act Amendment of 1972 (Public Law 92-500), commonly known
as the Clean Water Act and subsequent amend men ts in 1977 and 1987. These Acts
set the framework for state and national water quality management programs with the
goal of making the nation's waters safe for fish and aquatic life uses, recreational use,
and human consumption (e.g., fishable, swimmable and drinkable). Congress
mandated that this goal be achieved through a comprehensive program of water quality
planning, municipal wastewater treatment facilities, and a national discharge permit
program for municipal and industrial wastewater discharges. A key section of the Act(s)
requires the preparation and implementation of Areawide Water Quality Management
Plans.
Pursuant to these congressional mandates, the Wisconsin Legislature created chapters
281.11, 281.12 and 283.83 of the Wisconsin Statutes which gives the Wisconsin
Department of Natural Resources (WDNR) the state-level authority to act in the role of a
delegated agency for the USEPA in the implementation of the Clean Water Act. Under
this authority, Chapter NR121 of the Wisconsin Administrative Code was established
specifying the policies, procedures and requirements for Wisconsin's Areawide Water
Quality Management Plan program.
Under this framework, the USEPA together with the state of Wisconsin, has designated
three water quality planning areas: Dane County, the seven county Southeastern
Wisconsin Regional Planning Area, and the Fox Valley Water Quality Planning Area.
Within these "designated planning areas" every community with sanitary sewer is
required to participate in sewer service area planning. Outside of these heavily
populated metropolitan areas, there are 26 "undesignated" sewer service areas with
populations over 10,000. In the Central Wisconsin River Basin, sewer service area
planning is conducted by Marshfield, Merrill, Stevens Point, Wausau and Wisconsin
Rapids. All plans (often referred to as 208 or sewer service area (SSA) plans)
developed under this program must be approved by the WDNR and certified as
amendments to the state's AWQMP through formal action by USEPA.
1.5 WATER QUALITY MANAGEMENT PLANNING ROLES AND
RESPONSIBILITIES
Under NR 121.03 (8) "designated management agency" means any agency in an
areawide water quality management plan having responsibility for implementing specific
plan policies or duties. This may be done through direct activities of the designated
management agency or through delegation to other agencies or units of government.
Within the context of the Stevens Point Urban Area Sewer Service Area Plan, the
following agencies are involved:
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 3
City of Stevens Point/Village of PloverNillage of Whiting - As owners of the local
wastewater treatment facilities, these communities serve as the designated
management agencies for the purpose of sewer service area planning. The municipal
wastewater utilities provide primary oversight of sewer service area administration;
however, their Council/Boards have final approval authority.
Stevens Point Urban Area Sewer Service Advisory Committee - is made up of
representatives from the City of Stevens Point, the Villages of Park Ridge, Plover and
Whiting , and the surrounding towns, including: Linwood, Hull, Plover and Stockton. The
advisory committee provides oversight on the development of the Sewer Service Area
Plan updates and continues to act on recommendations for boundary amendments
other plan amendments (non-boundary) and plan updates. See the Appendix for the
Bylaws created to provide the organizational structure for the committee.
Portage County Planning and Zoning Department - acts as the administrative agent for
the Sewer Service Area Plan implementation. Responsibilities include reviewing
proposed sewer extensions for plan compliance and providing recommendations
regarding service area amendments.
North Central Wisconsin Regional Planning Commission (NCWRPC) - conducts plan
update development processes for the sewer service area plan. Acts as a neutral third
party in coordinating between the communities and Portage County.
1.6 INTERRELATIONSHIPS: SEWER SERVICE AREA PLANS, FACILITIES
PLANS, WISCONSIN RIVER WATERSHED PLANS
In Wisconsin, the WDNR is the delegated agency for Clean Water Act implementation.
WDNR implements water quality programs in part through the Areawide Water Quality
Management Plan (AWQMP) Framework, which is a compilation of guidance and
programs to implement the Clean Water Act.
Certain elements have individual processes that are automatically certified as part of the
state's AWQMP, and other elements are transmitted in annual letters from the WDNR to
·the USEPA as formal updates to the state's AWQMP. This process varies in terms of
public participation, time frames and procedures. All elements are connected, and the
Agency strives for consistency and continuity of programs for quality resource
management.
Federal regulations (40 CFR 130.6) require that the AWQMP Programs address the
following elements:
• Total maximum daily loads-learn more about TMDLs .
(https://dnr.wi.gov/topic/tmdls/)
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page4
• Effluent limitations-effluent limits are covered under the WPDES program
administered by WDNR.
(https ://d n r .wi .gov /topic/Wastewater/Discharge Types. html)
• Municipal and industrial waste treatment-see DNR's Wastewater Program for
more information. (https://dnr.wi.gov/topic/wastewater/)
• Nonpoint source management and control-learn more about DNR's Nonpoint
Source Pollution Program .
(https://dnr.wi.gov/topic/Nonpoint/aboutNPSprogram.html)
• Management agencies-see information about applicable laws, policies,
guidance, and memoranda of agreement/understanding. [Regional Planning
Agency and local SSA Planning].
(https://dnr.wi.gov/topic/SurfaceWater/planning/ssaplanning.html)
• Implementation measures-DNR implements various measures to carry out the
AWQMP within the individual water quality programs .
(https://dnr.wi.gov/topic/SurfaceWater/index.html)
• Dredge or fill program-DNR certifies dredge and fill permits (issued by the US
Army Corps of Engineers) through its §401 certification program.
• Ground water-visit DEQ's Ground Water Program for more information.
(https://dnr.wi.gov/topic/Groundwater/index.html)
• Watershed plans-learn more about assessments and surface water planning.
(https://dnr.wi.gov/topic/surfacewater/wqmplanning.html)
These elements are addressed in numerous programs that span WDNR's water
division . Additional components of the state's AWQMP include integrated reports,
administrative rules, surface water monitoring and assessment programs, water quality
standards and wastewater treatment programs.
Locally, these elements are reflected through a variety of planning requirements,
including: watershed plans, facilities plans and sewer service area plans. The
relationships between these plans within Central Wisconsin is described below and
• illustrated in Map 2.
1.6.1 WATERSHED PLANS
The Central Wisconsin River Basin is one of 32 major river basins in the State. The
basin is comprised of the watersheds for each of the tributaries that drain into the
Wisconsin River. Watershed plan development is on-going around the state in the
highest priority areas based on the levels of water quality impairment. The primary
purpose of watershed plans is as a management guide for federal, state and local
actions such as grant awards, conditions for waste treatment discharge permits and
identification of specific local planning and action recommendations.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 5
1.6.2 FACILITIES PLANS
In contrast with the regional character of watershed plans, the facilities plans are limited
to a local area within a major river basin. The facilities plans deal with the planning and
preliminary design related to the construction of municipal sewage treatment plants.
Through a systematic evaluation of alternatives, the facilities plan is intended to assure
that only cost-effective and environmentally sound treatment facilities are constructed.
1.6.3 SEWER SERVICE AREA PLANS
The Sewer Service Area Plan is also a local area plan that outlines procedures, land
areas and decision criteria for ensuring cost-effective provision of public sanitary sewer.
Unlike the facilities plan, which is an engineering plan for the treatment plant and
collection system, the Sewer Service Area Plan identifies land areas projected for
development with public sewer based on population projections, community growth
trends and natural resource constraints.
1.7 GUIDELINES FOR PREPARATION OF THE SEWER SERVICE AREA PLAN
1) The Sewer Service Area Plan shall be consistent with the requirements of
Wisconsin Administrative Code NR121 "Areawide Water Quality Management
Plans".
2) The Plan shall be generally consistent with the land use policies and
recommendations of locally adopted comprehensive plans.
3) The Stevens Point Urban Area Sewer Service Advisory Committee shall oversee
the development of the Plan and be responsible for all public policy aspects of
the Plan.
4) Opportunities for public participation , including a public hearing per NR121.08 ,
will be provided as part of the development of the Sewer Service Area Plan.
5) Portage County Planning and Zoning will serve as the designated agent for
administration of sewer extension reviews and sewer service area amendments.
1.8 OVERVIEW OF PLANNING PROCESS AND PUBLIC INVOLVEMENT
This Sewer Service Area Plan update was conducted by the North Central Wisconsin
Regional Planning Commission (NCWRPC) in conjunction with Portage County.
Development was overseen by the Stevens Point Urban Area Sewer Service Advisory
Committee which is made up of duly designated representatives of each community in
the service area, as follows:
• Joel Lemke, City of Stevens Point
• Steve Kunst, Village of Plover
• Jake Wilcox, Village of Whiting
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page6
• Steve Menzel, Village of Park Ridge
• Dave Wilz, Town of Hull
• Howard Krieski , Town of Linwood
• James Garbe, Town of Plover
• Jeanne Dodge, Town of Stockon
The process involved planning meetings of the Advisory Committee to develop a draft
plan update. The committee also held a formal public hearing on the proposed plan.
The committee meetings and the public hearing were open to the public and posted per
Portage County standard notice procedures . Documentation of these meetings can
found in Appendix B
The final plan adoption process involves the local communities moving the plan through
committees/commissions to full Board/Council at regularly scheduled, open and noticed
meetings . Approval process documentation will be addended to Appendix Bas it is
completed.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 7
DRAFT Map 1
Stevens Point Urban Area Sewer Service Area
Study Area
+
This map is neither a legally recorded map nor a survey
and is not intended to be used as one. This drawing is
a compilation of records, information and data used for
reference purposes only. NCWRPC is not responsible for
any inaccuracies herein contained.
Prepared by:
North Central
Wisconsin Regional
~~ Planning Commission
210 McClellan Street, Suite 210, Wausau, Wisconsin 54403
(715) 849-5510 www.ncwrpc .org
DRAFT
Bayfield
Douglas
Washburn Sawyer
Barron Rusk
Chippewa
Dunn
Eau Claire
Pepin
Buffalo Tremp-
• Facilities plans for municipal
wastewater treatment
• Sewer Service Area Plans
LJ County Boundaries
ealeau
Ashland
Map 2
Stevens Point Urban Area Sewer Service Area
Water Quality Plan Relationships
Price
Taylor
Clark
Waupaca
Jackson
Monroe
Lake
Juneau
Vernon
Columbia
Richland Sauk
Dane
Iowa
Lafayette Green Rock
·+
0 10 20 40 60 80
Winnebago Calumet
Fond du Lac
Dodge
Jefferson
Wash
ington
Mil
Waukesha wau-
kee
Racine
Walworth
Kenosha
Prepared by:
North Central
-... I I I Miles
This map is neither a legally recorded map nor a survey
and is not intended to be used as one. This drawing is
- Central Wisconsin River Basin Planning Area
a compilation of records, information and data used for
reference purposes only. NCWRPC is not responsible for
any inaccuracies herein contained.
Wisconsin Regional
Planning Commission
210 McClellan Street, Suite 210, Wausau, Wisconsin 54403
(715) 849-5510 www.ncwrpc.org
SECTION 2.0 LOCAL PLANS FOR WASTEWATER FACILITIES
2.1 BACKGROUND ON FACILITIES PLANS
A local wastewater facilities plan (often referred to as a 201 plan) identifies the facilities,
programs, operational improvements, and policies necessary to meet the regulatory
framework and permitting requirements. The WDNR regulates municipal (and
industrial) operations discharging wastewater to surface water or groundwater through
the Wisconsin Pollutant Discharge Elimination System (WPDES) permit program.
State statutes that apply to facilities planning and operation include: Chapter 227 on
Administrative Procedure and Review, Chapter 281 on Water and Sewage and Chapter
283 on Pollution Discharge Elimination. In addition, a variety of rules have been
promulgated into Wisconsin Administrative Code by the WDNR to implement these
statutes. Plans for wastewater treatment facilities must be reviewed and approved by
the WDNR. Section 281.41, Wis. Stats. requires WDNR review of municipal and
industrial treatment plant construction plans as well as related monitoring systems and
groundwater monitoring wells.
This section provides a status report on the current municipal wastewater collection and
treatment systems in the Stevens Point Urban Area and their respective facilities plans.
2.2 EXISTING WASTEWATER TREATMENT AND COLLECTION SYSTEMS
Currently, there are three wastewater treatment systems within the Stevens Point Urban
Area located in the City of Stevens Point, the Village of Plover and the Village of
Whiting. Table 1 provides a basic summary of the design capacity and loading
information for each plant.
TABLE 1: Capacity/Loading Information - Area Treatment Plants
Biochemical Oxygen Demand (BOD):
2021 Average -
Design Rated -
Total Suspended Solids (TSS):
2021 Average -
Desi n Rated -
Stevens Point Plover
5,355 lb/day 4,694 lb/day
10,300 lb/day 7,950 lb/day
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft
Whiting
207 lb/day
590 lb/day
Page 10
Facility managers for each plant indicate that there is ample capacity to accommodate
anticipated future growth and even potentially major new unanticipated users depending
on the type and strength of wastewater to be generated. Development proposals are
monitored and evaluated to ensure the plants can handle the wastewater they will
generate before they are approved. Currently, both City of Stevens Point and Village of
Plover plants are each operating at about 50% capacity while Village of Whiting plant is
only at about 1/3 capacity due to the closure of a major industrial user.
In addition , each community periodically conducts systematic evaluations and facilities
planning to ensure their plant will remain able to provide for future growth as it develops .
Section 2.3, below, provides an overview of the current status of facilities planning for
each plant.
2.2.1 CITY OF STEVENS POINT COLLECTION AND TREATMENT SYSTEM
Stevens Point's wastewater treatment plant was first constructed in 1940. In 1963, a
major expansion was made to the treatment plant consisting of adding two additional
aeration tanks and a blower building and replacing the mechanical aerators with
compressed air aeration. Many minor upgrades were also made. Two variable speed
raw sewage pumps having a maximum capacity of 3,000 gpm replaced a 500 gpm and
1,000 gpm pump. Also, a piston sludge pump was installed along with two digested
sludge lagoons.
Another addition was made to the treatment plant in 1972. The modifications primarily
consisted of two comminuters, a bar screen, additional raw sewage pumping capacity ,
two primary settling tanks, two aeration tanks with two new blowers, a clarifier, a
chlorine contact tank and chlorination building, three new Return Activated Sludge
(RAS) pumps, a sludge division box, conversion of one existing primary tank to a waste
sludge thickener, one new digester , and one new sludge lagoon.
Beginning in 1992, the treatment plant underwent a major reconstruction. The new
design eliminated old technology and incorporated new, more modern technologies .
The comminutors were replaced by mechanically cleaned bar screens. Chlorine
disinfection was eliminated and replaced by Ultraviolet (UV) disinfection. Grit removal
· was added to reduce wear and tear on pumps and associated equipment. Sludge
storage lagoons were replaced by more environmentally friendly, sludge storage tanks.
In 1997, the activated sludge system was modified to facilitate enhanced biological
phosphorus removal (BPR). The new activated sludge operation utilizes the anaerobic/
oxic (A/0) process which incorporates biological phosphorus removal into the original
activated sludge system.
A series of improvements beginning in 2003 were implemented to address plant
efficiency and energy conservation. These improvements started with new grit removal
and fine screening equipment which handle the incoming solids more effectively. Also,
two 50 hp plant air compressors were replaced with one 15 hp unit which uses much
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 11
less electricity. In addition, two 15 hp channel aeration blowers were shut down and
replaced by new piping to utilize excess process air. Further, anaerobic digester sludge
thickener efficiency was increased by installing supplemental heating of polymer dilution
water and equipment that increased mixing for more effective dispersal of the polymers.
Also, a water to water heat exchanger was installed to allow methane generated hot
water to be utilized to heat 3 buildings. Additionally, a heat pump is now being used to
tap into the heat and cooling available from the effluent water before it is discharged to
the Wisconsin River. This is used to heat and cool the facility 's lab and office building.
The City wastewater utility also accepts high strength wastewater for treatment. Over
two million gallons are processed through the plant annually, generating significant
tipping fee revenue.
The Stevens Point sewage collection system is a network of sewers used to collect
liquid waste for subsequent treatment and disposal, see map in Appendix D. The
majority of the sanitary sewer collection system was installed between 1920 and 1980.
The network currently consists of more than 114 miles of 8" to 48" sewer pipe and has
14 lift stations. The collection network and treatment facility serves the entire developed
area within the City of Stevens Point, as well as the Village of Park Ridge.
The sewage collection system is in fair condition, however , inflow and infiltration (1/1) is
an on-going concern with significant infiltration during wet weather. The City has a
computer-generated preventative maintenance program and each of the lift stations are
checked and maintained at least once per month.
2.2.2 VILLAGE OF PLOVER COLLECTION AND TREATMENT SYSTEM
The Plover wastewater treatment plant was originally constructed in 1986. It was
upgraded in 1998 to provide biological phosphorus removal. Another upgrade in 1999
constructed auto-thermal aerobic digesters and upgraded preliminary treatment
systems. An upgrade in 2010 added aeration capacity, upgraded the phosphorus
removal process and several other plant systems.
Wastewater enters the preliminary treatment building and flows through a fine screen
·which removes large debris from the wastewater before a grit removal system. The
wastewater then falls into a wetwell and is pumped to the mixing basins by five
submersible pumps. The mixing basins are a series of four tanks with mixers that keep
solids in suspension. The tanks provide conditions that enhance bacteria's ability to
remove phosphorus from the wastewater and Return Activated Sludge (RAS) is
introduced into the tanks to provide for the removal of excess nitrogen.
The mixture flows from the mixing basins into aeration basins where blowers blow air
through a fine bubble aeration system mixing in oxygen and bacteria that consume the
organic matter as food. The mixture leaves the aeration basins and flows to the
oxidation ditch consisting of three channels. The first channel has four surface aerators
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 12
around the ditch. The mixture moves to the other channels through submerged ports.
Two disc aeration shafts provide aeration across channels two and three.
The mixture exits the oxidation ditch and flows to either of two clarifiers through
underground piping. As the mixture moves through the clarifiers, the activated sludge
settles out. It is collected and returned to the mixing basins. Effluent from both clarifiers
is combined in the effluent collection well. Water flows from the collection well to the
disinfection system. The disinfection system is operated from May 1 through
September 30. Clarified water flows past lamps that emit light at the ultraviolet
wavelength. Light at this wavelength disrupts cellular function and kills the bacteria or
leaves them incapable of reproducing. UV disinfection system effluent flows about 1200
feet through underground piping to the Wisconsin River.
A chemical feed system provides backup to the biological phosphorus removal system.
Liquid chemicals that bind and precipitate the phosphorus can be added if the biological
removal method does not work properly
Excess activated sludge, called Waste Activated Sludge (WAS) is generated by the
process. WAS is diverted from the RAS stream to aerated storage tanks. The WAS is
pumped to a gravity belt thickener which separates the water from the bacteria by
draining the water through a finely woven belt. The WAS is thickened to 4% to 6%
solids. Thickened WAS is discharged into the auto-thermal aerobic digesters. Heat is
generated by the bacteria as the WAS decomposes. This heat is retained in the
digesters and elevates the temperature in the tanks to 100 to 120 degrees. These
digesters consist of three tanks. Each tank has a propeller mixer and fine bubble
aeration diffusers mounted on the floor. Air is pumped through aeration system,
providing oxygen for the decomposing bacteria. Digested sludge flows through the
digesters in series. Digested sludge exits the auto-thermal digesters and flows to
aerated storage tanks. Digested sludge is pumped from the storage tank to the screw
press. Water is removed from the sludge as it moves through the screw press.
Chemicals are injected into the digested sludge to increase the water removal
efficiency. The sludge is discharged at about 16% solids content. It is moved to a
covered storage area and stored until it is applied to agricultural land in spring and fall.
-The Village wastewater utility also accepts hauled septage and landfill leachate for
treatment. In 2020, about 7.9 million gallons of holding/septic tank waste and about 5
million gallons of leachate was processed through the plant.
The wastewater collection system serves the developed area of the Village, see map in
Appendix D. The system consists of approximately 92 miles of sewer main and ten lift
stations. The lift stations are central collection points for a service area. Wastewater
flows by gravity to a lift station. It is then pumped via force main to the service area of
the gravity interceptor, or, in two cases, to the service area of an intermediate lift station.
The gravity interceptor carries the wastewater to the treatment facility. There are two
pumps in each lift station, which cycle on and off automatically. Nine of the ten lift
stations are of similar design. They consist of two submersible pumps that are installed
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 13
in the collection well. The remaining lift station has two pumps situated adjacent to the
well.
Infiltration through leaks into the collection system and intentional discharge from sump
pumps has been an issue. The Utility continues to dedicate resources to finding and
excluding the sources of clear water infiltration into the system. The collection system is
cleaned on a three-year cycle.
2.2.3 VILLAGE OF WHITING COLLECTION AND TREATMENT SYSTEM
The Village of Whiting's original wastewater treatment facility was completed in 1967.
The facility was upgraded in 1981 and again in 2009. Modifications made to the original
treatment facility included: an activated sludge process to remove 96% of organic and
inorganic materials from the wastewater. Preliminary treatment occurs via fine
screening and then the influent goes to mixing basins which were added in the 2009
upgrade to promote biological phosphorus removal. Alum addition is utilized for further
phosphorus removal. Effluent is then treated via an oxidation ditch, which was added in
the 2009 upgrade, and proceeds to final clarification. An additional final clarifier was
installed in 2009 and the original final clarifier was rehabilitated in 2021. Effluent is
disinfected seasonally with UV radiation prior to discharge to the Wisconsin River.
Activated sludge is treated in aerobic digesters and thickened via polymer addition and
a screw press or drying beds. The sludge is landspread on DNR approved fields.
The majority of the Whiting sanitary sewer collection system, see map in Appendix D,
was installed between 1963 and 1964 and consists of approximately 12 miles of sewer
pipe and three lift stations. The Whiting treatment facility serves the entire developed
area within the Village and does not accept hauled septage or leachate at this time.
The sewage collection system is in good condition. Deficient sewer pipes and collection
system manholes are rehabilitated as needed. There is a negligible amount of clear
water infiltration. The Village has a 33% / year maintenance program for sewer
cleaning and inspection.
• 2.3 STATUS OF LOCAL WASTEWATER FACILITIES PLANS
The City of Stevens Point's current wastewater facilities plan was completed in 2011 by
Donohue and Associates, Inc. This plan focused on efficiency improvements and
energy conservation. Plan recommendations included a new high strength receiving
station, lift station rehab, and other modifications, rehab and improvements around the
plant, including upgrades to the supervisory control and data acquisition (SCADA)
systems. Currently, all of the recommendations have been implemented and the City is
considering commissioning a new facility planning effort to address emerging issues
and new technologies.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 14
The Village of Plover's current wastewater facilities plan was completed in 2009 by
AECOM. This plan guided the last major plant upgrade in 2010 as well as on-going
improvements culminating with completion of upgrades to the supervisory control and
data acquisition (SCADA) systems in 2020. The Village is planning for a new facility
planning effort that will focus on tertiary treatment to ensure compliance with future
effluent phosphorus discharge limits.
The Village of Whiting's current wastewater facilities plan was completed in 2005 by
Earth Tech, Inc. This plan addressed peak flow capacity issues, aging of existing
facilities and other operational challenges. Recommendations involved upgrading many
of the existing facilities and adding a new oxidation ditch. Overtime, the Village has
implemented many of the upgrades. Currently, the Village has no specific plans to
begin a new facility plan.
Each facility plan evaluated several treatment alternatives and recommended the most
cost-effective alternative with minimal environmental impact on the planning area. The
selected alternatives have addressed system deficiencies and increased capacity for
both the City and the Villages.
One alternative considered in each of the facilities plans was regional treatment, or
regionalization, where a plant is decommissioned, and the sewerage is pumped to one
of the remaining facilities. Regionalization can have positive benefits under the right
circumstances. However, documentation in each of the plans show strong opposition to
the regionalization option. A number of adverse environmental, political and social
impacts were identified and determined to be significant enough to reject the
regionalization alternative.
Today, each treatment plant in the Stevens Point Urban Area is performing well with
ample capacity to provide for future growth. Each is working to meet new effluent
requirements, and compliance is not anticipated to be a problem. Internally, each
facility is also working to address the "next big thing" whether that be nitrates, PFAS or
something else and preparing for their next wastewater facilities plan update.
-2.4 PLANNING CONSIDERATIONS FOR NON-SEWERED AREAS
The most prevalent soil type across the study area is Plainfield Loamy Sand. This soil
is characterized as rapidly permeable and may constitute a moderate limitation for on
site sewage disposal systems because of the potential of contaminating groundwater.
This limitation would not apply in areas served by municipal sewer.
An exception to the Plainfield soil are the soils in northern areas of Stevens Point, which
are denser formed from residual bedrock material that is close to the surface. These
soils are subject to heaving and swelling due to frost action, thereby presenting potential
problems to urban development. Further complications can be expected by the
presence of bedrock in the same area.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 15
Another exception is a band of Friendship soils which extends across the area south of
the Village of Plover. These Friendship soils are characterized as saturated within 3 to
5 feet of the surface. These conditions combined with rapid permeability may present a
more severe limitation for on-site sewage disposal systems.
Private onsite wastewater treatment system regulations are implemented by Portage
County through its Private Sewage System Ordinance (Chapter 7.9 Portage County
Code of Ordinances) . Some of these soil conditions present in the non-sewered areas
surrounding the urbanized area may require alternative on-site systems such as a
mound or holding tank depending on local site conditions.
As noted above, the Stevens Point and Plover wastewater treatment plants accept and
treat hauled waste from these areas as well as other parts of the state. Private haulers
of septage can apply for permits to drop their waste loads for treatment on an individual
basis. Specific holding tank service areas are not defined to maintain flexibility of
choice for local residents, private contractors and the treatment plants. Volume and
strength of incoming waste is carefully monitored to maintain optimal treatment plant
operations.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 16
SECTION 3.0 AREAWIDE WATER QUALITY MANAGEMENT PLANNING AND
LOCAL WATER QUALITY CONDITIONS
3.1 BACKGROUND ON AREAWIDE WATER QUALITY MANAGEMENT
PLANNING
WDNR is required by section 303(e) of the Clean Water Act to develop a Continuing
Planning Process (CPP). The CPP may be described as an umbrella that coordinates
all aspects of water pollution control to help ensure the states maintain progress toward
protecting and preserving water quality. The state CPP is a description of the state's
water quality management and planning activities, providing references to technical
documents and sources that explain water quality programs in greater detail. The CPP
describes ongoing processes and planning requirements of the state's Areawide Water
Quality Management Plan (AWQMP).
Water quality planning in Wisconsin occurs on many levels in many agencies. Each
plan begins with monitoring to evaluate the health of Wisconsin's waters. Biologists and
trained volunteers collect monitoring data on representative segments on rivers,
streams and lakes across the state. Water quality data are then evaluated against
water quality standards to assess conditions. WDNR staff conduct studies to better
define pollutant loads, sources and impairments and to develop plans that identify
management activities and strategies to enhance and protect our waters.
The AWQMP is not a single plan or document but rather a compilation of the guidance
and programs that DNR uses to implement Clean Water Act requirements. The
AWQMP Program provides a structure and foundation on which implementation
activities are attached , including Sewer Service Area Plans, Wastewater Facility Plans,
permits for effluent limits, stormwater plans and other projects funded through CWA
monies, as well as watershed plans, which identify the condition of water and
recommendations for management actions.
Watershed Plans (formerly called "Basin Plans") document and summarize the
-condition of health of water resources within the area. Watershed plans incorporate
information on current and changing land use, population change, water resource
potential and assessments of current conditions based on biological, physical and
chemical data compared to established water quality standards and thresholds.
Watershed plans identify ecological restoration and remediation priorities and goals of
the waters and watersheds and provide recommendations for specific management
actions including rivers, lakes, nonpoint source grants, monitoring, and additional
management actions. Watershed plans are updated on a rotating basis, with a higher
priority, targeted focus on areas with known issues related to restoration, protection or
management.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 17
The CPP encompasses the broad picture of how decisions are made, how programs
relate, and how the public is involved. Wisconsin's AWQMP concerns how programs
are implemented, particularly within a specific basin or watershed - through monitoring,
assessments, grants, and more. Watershed plans apply the rules, programs, guidance,
and identify opportunities for management actions at a catchment (basin/watershed)
and water level (stream, lake, etc.).
The Stevens Point Urban Area lies within the Wisconsin River Basin, and all three
wastewater treatment plants discharge to the Wisconsin River. The most recent
planning by the WDNR for the Wisconsin River Basin is focused on the Wisconsin River
TMDL which is cataloged in the report titled Total Maximum Daily Loads for Total
Phosphorus in the Wisconsin River Basin.
3.2 WISCONSIN RIVER TOT AL MAXIMUM DAILY LOAD (TMDL)
In recent years, the Wisconsin Department of Natural Resources' efforts in planning for
and managing water quality within the Wisconsin River basin have revolved around the
development of a total maximum daily load or TMDL. The Wisconsin River TMDL study
area applies to a large area from the river's headwaters in Vilas County to Lake
Wisconsin in Columbia County, covering 9,156 square miles - approximately 15 percent
of the state.
TMDLs were created by the Clean Water Act in the 1970s, but were not implemented or
enforced by EPA until the late 1990s when a string of lawsuits challenged EPA's
inaction. The Wisconsin River TMDL process began in 2009 with an extensive water
quality monitoring process throughout the watershed to provide data for detailed
watershed and reservoir model development. The TMDL report was completed in April
of 2019, and various implementation components are underway.
A TMDL is the amount of a pollutant that can be discharged into a waterway and still
meet water quality standards. In the Wisconsin River Basin, the TMDL includes the
total amount of phosphorus and suspended solids that can be discharged into the river,
its tributaries and reservoirs, and still meet water quality standards. Under existing
• conditions, many reservoirs and tributaries in the Wisconsin River do not meet water
quality standards due to excess pollutant loads, meaning they are not suitable for their
designated uses, such as fishing, wildlife habitat, and/or recreational activities such as
boating and swimming. The TMDL concept is illustrated in Figure 1.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 18
FIGURE 1
WRB Total Maximum Daily Load (TMDL)
Each subwatershed is assessed for:
Load Allocation
• Runoff from the landscape
Background Load
• Naturally occurring from
wetlands, forests
• Municipal Wastewater
• Industrial Wastewater
• Permitted Municipal Storm
Sewer Systems
TMD L • CAFO Production Areas
3.3 DISCUSSION OF WATER QUALITY CONDITIONS IN THE STEVENS POINT
AREA
The natural water quality in most areas of Portage County is generally good. Where
natural water quality problems exist, they include aesthetic concerns such as iron and
manganese , and health concerns such as radionuclides, corrosive water and nitrates.
Information on water quality conditions in Portage County was taken from the County's
Land and Water Resource Management Plan.
The Stevens Point Urban Area lies within the Wisconsin River Basin. The basin is
divided into a number of watersheds, several of which encompass the urban area. The
primary watersheds that the municipal wastewater treatment facilities are located within
are the Mill Creek Watershed and the Little Plover/Plover River Watershed. The basin
contains multiple impaired waters and has a Total Maximum Daily Load (TMDL)
established. The northwest section of Portage County drains to the Wisconsin River
and has primarily surface water management problems due to less coarse soils of the
region. These conditions cause excessive runoff, resulting in flashy streams and long
term saturated soil conditions. Best Management Practices (BMPs) can improve and
protect valuable soil, water, and wildlife resources. Streambank areas throughout the
County have been fenced to protect them from livestock. Since 2014, 14,861 feet of
fencing have been installed voluntarily.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 19
Groundwater availability in the northwest part of the County is limited because of the
crystalline rock that is near the surface, making potable water difficult to develop.
However, the groundwater in the central plain area is easily accessible. Portage County
has developed a groundwater management plan to aid in the management and
protection of groundwater.
Residential development around lakes and streams has impacted water quality and
aesthetics. Several lakes have experienced low oxygen conditions in the past, affecting
the fish populations. Green areas, buffer zones, and possibly sewer systems could be
incorporated into developments to reduce nutrient delivery. A lake management
planning program has been completed and is currently in the implementation phase.
The increased use of these lakes has also led to the introduction of aquatic invasive
species (AIS). Portage County has utilized grant opportunities and partnered with
Golden Sands Resource Conservation and Development (RC&D) to provide information
and education prevention campaigns.
3.3.1 WISCONSIN RIVER BASIN
The western two thirds of Portage County drains to the Wisconsin River and is included
in the Wisconsin River TMDL for phosphorus. This TMDL was developed by the DNR
and approved by U.S. EPA per the Clean Water Act in April 2019. The TMDL is largely
driven by the need to reduce algae blooms on downstream lakes and reservoirs. Local
stream water quality varies in the county, with streams west of the Wisconsin River
having higher phosphorus levels than those east of the river. The impaired waterbodies
addressed by the TMDL include one of Wisconsin's two largest inland lakes, Petenwell.
Reducing phosphorus loading to local surface waters acts not only to protect and
improve local water quality and local economies which rely on clean water, it also
benefits these downstream impaired waters.
The Upper Wisconsin River is divided into three sub-basins: the Upper, Central, and
Southern. Portions of the Central and Southern sub-basins are within Portage County,
and the Stevens Point Urban Area lies within the Central Sub-basin which extends from
the Whiting Dam upstream to the City of Merrill. The section of Wisconsin River in
Portage County receives discharges from three municipal and four industrial wastewater
-treatment facilities. Its waste load is allocated from the Whiting Dam downstream (out
of Portage County) to the Petenwell Dam. Waste load allocation is intended to maintain
surface water quality standards during periods of low flows and high temperatures
within a River segment. Computer modeling is used to establish discharge limits, which
are then divided among dischargers in the River segment.
Toxic contaminants are a concern and have been detected in water, fish, and sediment
samples throughout the River. Micro-contaminants in fish tissue have been detected.
Fish have been collected for analysis in Portage County below the Stevens Point
Flowage and at Lake Du Bay. Currently, part of the Wisconsin River from the Whiting
Plover Dam to the Biron Dam is an advisory area for PFOS and mercury.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 20
3.3.2 MILL CREEK WATERSHED
The Mill Creek Watershed Implementation Plan (i.e., Nine Key Element Watershed
Based Plan) was approved by both WDNR and U.S. EPA in May 2019 and will be used
to help implement the Wisconsin River Basin TMDL.
Mill Creek has been listed by the U. S. EPA as degraded 303(d) waters due to lack of
dissolved oxygen for extended periods. The watershed includes 165 square miles in
eastern Wood and western Portage Counties. About 101 square miles of the watershed
are within Portage County. Mill Creek is 57 miles long from its mouth at the Wisconsin
River to its headwaters, which is near Marshfield. About 18 miles of Mill Creek are
within Portage County.
Five municipal wastewater treatment plants discharge to Mill Creek or its tributaries.
These include: Marshfield, Blenker-Sherry, Junction City, Hewitt, and Milladore.
Junction City is the only WWTP in Portage County that discharges to Mill Creek. The
treatment plants are sources of nutrients. Coordination with Wood County will be
necessary to improve water quality in the Mill Creek watershed. Sixty-four square miles
of the watershed and 39 miles of Mill Creek are in Wood County.
A voluntary, non-regulatory farmer led group, Farmers of Mill Creek Watershed Council,
was formed in 2016 and is working toward improving the water quality of Mill Creek.
3.3.3 LITTLE PLOVER/PLOVER RIVER WATERSHED
The Little Plover and Plover River Watershed includes 195 square miles in eastern
Marathon and northern Portage Counties, with small portions in western Langlade and
Shawano Counties. About 89 square miles of the watershed are within Portage County.
The Little Plover River is six miles long, from its mouth at the Wisconsin River to its
headwaters. It is entirely within Portage County. It has one dam on it, which creates
Springville Pond. The Plover River is 64 miles long from its mouth at the Wisconsin
River to its headwaters, northwest of Aniwa. About 16 miles of the Plover River are
within Portage County. It has four reservoir forming dams on it: McDill Pond (262
acres), Jordan Pond (85 acres), Christensen Pond (19 acres), and Bentley Pond (75
-acres).
The Little Plover River and its basin have been extensively studied. Numerous studies
directed at surface water, groundwater, and land use have been completed. The
University of Wisconsin-Stevens Point (UWSP) has conducted water quality monitoring
of seven sites along the Little Plover River since 1971.
Groundwater concentrations of nitrate-N above the enforcement standard of 10 mg/L
have been documented in the monitoring wells since 1980. Because the Little Plover
River is groundwater fed, the source of nitrate in the river is thought to be groundwater.
Excess nutrients are also affecting Springville Pond by contributing to nuisance aquatic
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 21
plant growths , mainly Eurasian Water Milfoil. Phosphorus is the limiting nutrient in
Springville Pond.
The impacts of the high in-stream nitrate concentrations are unknown. However, nitrate
concentrations of two mg/L have been shown to cause increased mortality of rainbow
trout fry and eggs. The Little Plover River is a Class I brook trout stream (naturally
reproducing population} , and numerous habitat improvement projects have been done
to help improve the fishery. The effects of nitrate on brook trout are unknown, but
declining water quality may threaten the trout population , despite the habitat
improvement work.
Pesticides have also been detected in surface and groundwater in the Little Plover River
Basin. Eight pesticides or pesticide metabolites were detected in groundwater in a 1995
and 1996 study conducted through the UWSP.
The loss of water quantity is another concern in the Little Plover River basin. Municipal
wells of the Villages of Plover and Whiting are within the basin. In addition , there is a
high density of high-capacity wells for irrigated agriculture in the area. This results in
large quantities of groundwater being pumped from the aquifer. Water used by the
municipalities is lost from the watershed. Once residents use the water , it flows to a
treatment plant and is discharged to the Wisconsin River.
A portion of the Little Plover River dried up for several weeks in 2005, 2006, and 2007.
The Little Plover River Workgroup meets approximately twice a year to address issues
in the watershed. The Workgroup is made up of representatives of the Friends of the
Little Plover River, Villages of Plover and Whiting , Towns of Buena Vista, Plover, and
Stockton, UWSP, DNR, Portage County, Trout Unlimited, Del Monte, several area
potato and vegetable growers, and WI River Alliance , along with advisory support from
the WI Wildlife Federation , WI Geologic and Natural History Survey, U. S. Geological
Service (USGS}, and U. S. Department of Agriculture-Natural Resources Conservation
Service (USDA-NRCS).
The sandy soils of the watershed make it extremely susceptible to groundwater
contamination . Land use practices are greatly influencing groundwater and surface
·water quality and quantity.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 22
SECTION 4.0 PLANNING AREA GROWTH PROJECTIONS
4.1 INTRODUCTION
Communities regularly develop and use population projections for various reasons,
including local comprehensive plans, facilities plans for municipal wastewater treatment,
and others. The methodology used to generate projections can sometimes skew the
numbers in favor of a particular outcome. To avoid such bias, regulatory applications of
population projections may specify the required projections or methodologies to be
used. This is the case with the sewer service area planning program in which WisDNR
regulations require use of the latest official state population projections developed by
the Wisconsin Department of Administration (DOA).
The current DOA projections extend municipal populations out to the year 2040. These
DOA based population projections serve as the base from which the various
calculations and projections for the sewer service area were developed for this plan.
4.2 HISTORICAL POPULATION GROWTH
According to the 2020 Census, the incorporated core of the Stevens Point Urban Area
has a population of 41,316 or roughly 59% of the overall Portage County population
base. Portage County has been a steadily urbanizing county with the growth of the
urban area. Historically, the growth of the Stevens Point Urban Area has been a major
portion of the overall growth of the County.
The City of Stevens Point has grown slowly with ups and downs since 1970, increasing
by 9% from 23,479 to 25,666 in 2020 (refer to Table 2). However, the City's population
appears to have dropped slightly since 2010. Over this same time period, the Village of
Plover incorporated in 1971 and experienced rapid growth of 400% from 2,618 to
13,519. The Village's growth rate has slowed over time but remained a strong 12%
from 2010 to 2020.
The Village of Whiting experienced notable growth during the 1970's, but this was
followed by steady decrease due in part to being locked on three sides by Stevens Point
and Plover with environmental constraints on the other. The Village of Park Ridge, land
locked entirely by the City, experienced significant decline between 1970 and 2000,
however, it has rebounded slightly during the 201 O's.
Adjacent to the urban core, the Towns of Hull and Plover have been the main recipients
of the urban area development pressures over time. The City of Stevens Point was
incorporated in 1858 and has been growing primarily into the Town of Hull ever since.
However, even with annexation , the Town of Hull has recorded considerable population
growth of its own. Hull's population increased by 70% between 1970 and 2020, from
3,124 to 5,287 residents . The Town's land use is primarily single family residential, in
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 23
larger lot, suburban-style subdivisions located to the east-northeast of Stevens Point,
concentrated along State Highway 66, north and south of the U.S. Highway 10 corridor ,
and along the Old Highway 18 corridor.
The Town of Plover stabilized for a while following the incorporation of the Village of
Plover. However, they have taken additional losses in the 2000's and 201 O's. Overall,
the Town's population has dropped from 3,692 in 1970 just prior to the incorporation to
1,565, a decline of 58%. In 2005 the Town and Village of Plover entered into an
intergovernmental agreement that includes a revenue sharing agreement , a cost
sharing agreement for the reconstruction of Porter Road, identification of future Village
growth areas, identification of future areas that the Village would agree to provide
municipal sewer and water without annexation to the Village and joint land use planning
recommendations for the Village's Extraterritorial Area.
The Towns of Stockton and Linwood have experienced significant growth between 1970
and 2020 although rates have tapered off in recent years. Stockton has increased by
96% from 1,537 to 3,018 while Linwood has grown by 38% from 773 to 1,070. These
towns have not seen a lot of development pressure from the urban area, although their
growth can be attributed in-part to bedroom-commun ity status. The urban area is
reaching toward Stockton as development spreads east of the Interstate and out along
Highway 10. However, environmental restrictions have limited expansion into Linwood.
TABLE 2: Population Trends 1970-2020 Stevens Point Area
Stevens Point V. Plover Whiting Park Ridge Hull T. Plover Stockton Linwood
Yr Pop. %fl Pop. %fl Pop. %fl Pop. %fl Pop. %fl Pop. %fl Pop. %fl Pop.
1970 23,479 -- 2,618* - 1,782 -- 817 - 3,124 - 3,692 -- 1,537 - 773
1980 22,970 -2 5,310 103 2,050 15 643 -21 5,122 64 2,330 -37 2,208 44 1,082
1990 23,002 0 8,176 54 1,838 -11 546 -15 5,563 9 2 ,223 -5 2,494 13 1,035
2000 24,551 7 10,520 29 1,760 -4 488 -11 5,493 -1 2,415 9 2,896 16 1 ,111
2010 26,717 9 12,123 15 1,724 -2 491 1 5,346 -3 1,701 -30 2,917 1 1 ,121
2020 25,666 -4 13,519 12 1,601 -7 530 8 5,287 -1 1,565 -8 3,018 3 1 ,070
Source US Census and WI DOA. 2022 *Village of Plover incorporated m 1971
4.3 POPULATION PROJECTIONS
The Wisconsin Department of Administration is predicting fairly strong growth overall for
the Stevens Point urban core with a 13.5 percent increase which equates to 5,559
additional people in the area by 2040. Table 3 compares the DOA projections with the
current population for the city and villages. The bulk of the increase is provided by
Stevens Point with 4,484 additional residents by 2040. The Village of Plover adds
another 1,251 new residents , while the DOA figures for Whiting and Park Ridge show a
slight decrease in population.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 24
%fl
--
40
-4
7
1
-5
2025 # Change % Change
2020-2040 2020-2040
Stevens Point 25,666 29,110 29,640 29,980 30,150 4,484 17.5
Villa e of Plover 13,519 13,770 14,200 14,530 14,770 1,251 9.3
1,601 1,620 1,575 1,520 1,460 -141 -8.8
530 505 505 500 495 -35 -6.6
41 ,316 45,005 45,920 46,530 46,875 5,559 13.5
Source. US Census. WI DOA 2013 & NCWRPC 2022
Adjacent to the urban core, the DOA projections anticipate a strong rebound for Town of
Plover with an increase of 415 new residents by 2040. Hull, Stockton and Linwood
populations are expected to remain stable with slight increases over the time period.
Table 4 compares the DOA projections with the current population for the adjacent towns.
# Change % Change
2020-2040 2020-2040
Hull 5,287 5,465 5,450 5,405 5,325 38 0.7
Town of Plover 1,565 1,880 1,920 1,955 1,980 415 26.5
Stockton 3,018 3,135 3,180 3,205 3,210 192 6.4
Linwood 1,070 1,150 1,150 1,145 1,135 65 6.1
Totals 10,940 11 ,630 11 ,700 11,710 11,650 710 6.5
Source US Census. WI DOA 2013 & NCWRPC 2022
4.4 URBAN AREA LAND USE PROJECTIONS
4.4.1 INTRODUCTION
Precise projections of the future land use requirements of an urban area are often difficult
to determine because of continually changing conditions, and the fact that land area
needs of an urban area are satisfied in large part by lands throughout the County. The
Sewer Service Area Plan recognizes that the primary determinants of land needs on a
long-range basis are subject to significant change that will certainly happen over time,
and that such change cannot be accurately accounted for.
Such determinants include private sector decisions that determine the market for doing
business in the urban area, technological and economic factors which may increase or
decrease land needs for certain uses, governmental policy and regulation, energy factors
and continually changing cultural preferences for styles of working and living.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 25
This Plan contains projections of the additional acreage of lands within the urban area
judged necessary for and having "potential" for commercial , industrial and residential
uses, and which have a reasonable likelihood of development according to current trends
and economic outlooks. While these projections are not based exclusively upon future
population, they nevertheless were developed with future population needs in mind.
In doing this, the projected additional quantities of land required to meet the needs of the
urban area include excess lands beyond actual need. The excess lands are provided to
account for the reality that in a free market economy there is expected to be flexibility of
choice of building sites when purchasing land for development. This is necessary to avoid
excessively high prices which would be caused by unreasonable limitations on land
availability. This "market factor" is further discussed later in this section.
4.4.2 RESIDENTIAL LAND REQUIREMENTS
4.4.2A A VERA GE HOUSEHOLD SIZE
Projections of the average number of persons per household are an important variable
in estimating the amount of additional land that will be needed for residential purposes.
On the national level, the population per household has steadily declined since the
1960's, while the nation's total population has increased. The decline in household size
is reflected in the large increase in the nation's housing stock.
On a community level, changes in average number of persons per household are
influenced by national trends , but even more so by the mix of housing types and the age
and cost of the community 's housing stock. The factors that influence household size
on a community basis make these projections difficult ; however , such projections
remain necessary to determine the amount of residential land consumption during the
planning period.
The persons per household projections shown in Table 5 were developed by the
Department of Administration as part of their population projection program. The
decline in average household size for each community in the urban area is shown from
2020 to 2040.
TABLE 5: Projected Change in Average Persons Per Household for
Stevens Point Area
2020 2025 2030 2035 2040
Stevens Point 2.17 2.16 2.15 2.13 2.13
V. Plover 2.40 2.39 2.37 2.36 2.35
Whiting 2.10 2.08 2.07 2.06 2.05
Park Ridqe 2.22 2.21 2.20 2.18 2.18
Hull 2.54 2.52 2.51 2.49 2.49
T. Plover 2.62 2.60 2.59 2.57 2.56
Stockton 2.64 2.63 2.61 2.59 2.59
Linwood 2.57 2.55 2.53 2.52 2.51
Source · DOA 2013.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 26
4.4.2B A VERA GE RESIDENTIAL DENSITY
Projecting future development density is another important variable in determining
residential land needs. Table 6 shows the densities at which the level current
development has occurred through 2020 for each community in the planning area.
These densities were determined using land areas calculated through the project
geographic information system (GIS) database, the 2020 Census population, and the
above persons per household data.
The overall population density of the Stevens Point area ranges from 0.05 persons per
acre in the Town of Linwood to 3.68 in the Village of Park Ridge. The average density
within residential sections of the area range from 0. 73 persons per residential acre
(Linwood) to 8.42 (Stevens Point). This population density converts to residential
development densities ranging from about 0.28 (Linwood) to 3.88 (Stevens Point)
housing units per residential acre.
The densities are significantly higher in the sewered parts of the planning area. These
higher density levels are needed for cost-effective sewer service.
TABLE 6: Average Residential Development Density in Stevens Point Area
Overall Average Average Residential Average Residential
Population Density Population Density Development Density
(persons per acre) (persons/residential acre) /housina units oer res. acre)
Stevens Point 2.31 8.42 3.88
V. Plover 1.98 5.52 2.30
Whiting 1.34 4.02 1.91
Park Ridge 3.68 5.89 2.65
Hull 0.30 1.40 0.55
T. Plover 0.06 1.27 0.48
Stockton 0.08 0.91 0.34
Linwood 0.05 0.73 0.28
Source NCWRPC 2022
4.4.2C RESIDENTIAL LAND REQUIREMENTS
An estimated additional 774 net acres will be required to meet the needs of the urban
area population by the year 2040. This is determined by dividing the projected
population growth from 2020 to 2040 by the projected persons per household in each
community to arrive at the estimated number of new housing units required to meet the
additional need. The number of additional housing units is then divided by the
estimated development density of units per acre to determine the additional acreage of
residential land that will require sewer service. Table 7 displays the estimated net acres
for incorporated area.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 27
I
TABLE 7: Residential Land Requirements for Urban Core Area - 2040
2020 Pop Projected New Units 2040 New
Pop 2040 Pop Change PPH Housing per Acres Needed
Units Acre
Stevens Point 25,666 30,150 4,484 2 .13 2,105 3.88 542.53
V. Plover 13,519 14,770 1,251 2.35 532 2.30 231.30
Whiting 1,601 1,460 -141 2.05 0 1.91 0
Park Ridge 530 495 -35 2.18 0 2.65 0
Totals 41 ,316 46,875 5,559 2,637 773.83
Source US Census W/DOA 2013 & NCWRPC 2022
4.4.3 COMMERCIAL AND INDUSTRIAL LAND REQUIREMENTS
Commercial and industrial growth are important determinants of land requirements in
the urban area. Base labor force figures were obtained from the U.S. Census
Longitudinal Employer-Household Data. This data shows an average annual growth in
employment of 2.47% for Stevens Point and 1.15% for Village of Plover. Whiting and
Park Ridge have been losing employment in recent years. By 2040, this rate of growth
projects an increase of 13,638 jobs over the 2019 base year employment.
The employment projections are used to calculate the acres required to meet the needs
of the urban area for economic development through the growth and expansion of its
commercial and industrial areas. An estimated additional 1,437 net acres will be
required by the year 2040. Tables 8 and 9 displays the estimated net acres broken
down by commercial and industrial for each core community. Employment percentages
by sector are derived from the Census employment data, and employees per acre is
generated through GIS analysis.
TABLE 8: Commercia l Land Requirements for Urban Core Area - 2040
2040 Total Percentage New Jobs- Commercial 2040 Acres
New Jobs Commercial Commercial Employees Needed
Per Acre Commercial
Stevens Point 12,077 88.0 10,628 22.49 472.57
V. Plover 1,561 61.9 966 4.02 240.30
Whiting 0 64.7 0 12.17 0
Park Ridge 0 91.2 0 14.00 0
Totals 13,638 11,594 712.87
Source Long,tudmal Employer-Household Data 2019 & NCWRPC 2022
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 28
TABLE 9: Industrial Land Requirements for Urban Core Area - 2040
2040 Total Percentage New Jobs - Industrial 2040 Acres
New Jobs Industrial Industrial Employees Needed
Per Acre Industrial
Stevens Point 12,077 12.0 1 ,449 2.51 577.29
V. Plover 1,561 38.1 595 4.06 146.55
Whitino 0 35.3 0 2 .12 0
Park Ridoe 0 8.8 0 -- 0
Totals 13,683 2,044 723.84
Source· Long,tudmal Employer-Household Data 2019 & NCWRPC 2022
4.4.4 PUBLIC AND INSTITUTIONAL LAND REQUIREMENTS
Public and institutional use of land is typically a smaller but important element of an
urban area. In some cases public land consumption may be more significant such as
the location of the county seat (as with Stevens Point) or a heavy state government
presence. Typically, this category of land use includes things like: government services,
schools, utilities, churches and hospitals among others. An estimated additional 568
net acres will be required to meet the needs of the urban area population by the year
2040. This projection is based on the existing level of service in terms of the land area
devoted to public and institutional uses per person in each community, see Table 10
TABLE 10: Public & Institutional Land Requirements for Urban
Core Area - 2040.
Acres per Population. 2040 Acres Needed
Person Chanoe 2040 Public & Institutional
Stevens Point 0.11 4,484 493.24
V. Plover 0.06 1,251 75.06
Whiting 0.15 -141 0
Park Ridge 0.00 -35 0
Totals 5,559 568.30
Source NCWRPC 2022
4.4.5 PARK AND OUTDOOR RECREATION LAND REQUIREMENTS
Park and outdoor recreation needs can constitute a significant portion of land within the
future urban area. The recommended standard used by the NCWRPC in figuring park
needs is 10.5 acres per 1,000 persons. This standard is not intended to include
specialized outdoor recreational facilities such as nature reserves, hunting grounds,
public utility lands, golf courses, athletic fields, private facilities or school lands. The
above standard may be conservative in meeting current and future needs. An
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 29
estimated additional 60 net acres will be required to meet the needs of the urban area
population by the year 2040.
TABLE 11 : Park & Outdoor Recreation Land Requiremen ts for Urban
Core Area - 2040.
Acres per Population. 2040 Acres Needed
1,000 Pop.* Change 2040 Parks & Recreational
Stevens Point 10.5 4,484 47.08
V. Plover 10.5 1,251 13.14
Whitina 10.5 -141 0
Park Ridae 10.5 -35 0
Totals 5,559 60.22
Source NCWRPC 2022 *NCWRPC Rec Planning Standard
4.4.6 RIGHT-OF-WAY LAND REQUIREMENTS
The space consumed for the transportation facilities which the population uses to access
all the land types discussed above is often overlooked when doing acreage allocation for
land use needs. Although modern planning practice is often recommending that
communities shift to "nee-traditional " standards including narrower streets, right-of-way
can still consume significant amounts of land which must be accounted for because other
"hard" development cannot locate within these reserved areas.
Right-of-way often consumes a significant percentage of the developed area of
communities in Wisconsin. For purposes of determining the portion of development
being devoted to right-of-way in the Steven Point urban area, the project GIS database
was used to calculate right-of-way within each community , see Table 12. An estimated
additional 397 net acres will be required to meet the needs of the urban area population
by the year 2040.
TABLE 12: Right -of- Way Land Requirements for Urban
Core Area - 2040.
% Local R-O-W New R-O-W in Acres
Stevens Point 13.8 294.31
V. Plover 14.6 103.13
Whitina 14.5 0
Park Ridae 26.4 0
Totals 397.44
Source NCWRPC 2022
4.4.7 ALLOWANCE FOR MARKET FACTORS
To accommodate flexibility and choice in development sites a market factor of 2 has
been incorporated . This factor was based on the projected future land area needs and
a cursory review of undeveloped lands in and around the urban area, as well as the
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 30
likelihood that a given piece of property will be available for development at any given
time.
The market factor makes available an additional 6,473 acres over the actual net need
within the year 2040 sewer service area to accommodate market decisions. While not
all of this additional acreage would be expected to be developed during the planning
period, it is anticipated that this acreage will provide additional opportunities for
development in the event of other lands being kept off the real estate market.
4.4.8 TOTAL URBAN AREA LAND REQUIREMENTS
The estimated additional net acreage sewered area needs in the year 2040 for the
Stevens Point urban area are projected to be 3,236.50 acres plus the market factor of
6,743 acres for a total additional land need of 9,709.50 acres. This acreage will consist
of the following land use needs shown in Table 13.
TABLE 13: Total Additional Land Area Requirements for Steven Point Urban
Core Area to Year 2040
Land Use Net Acreage Demand Market Factor Total Acreage
Demand
Residential 773.83 1,547.66 2,321.49
Commercial 712.87 1,425.74 2,138.61
Industrial 723.84 1,447.68 2,171.52
Public/Institutional 568.30 1,136.60 1,704.90
Recreation 60.22 120.44 180.66
ROW 397.44 794.88 1,192.32
Totals 3,236.50 6,473.00 9,709.50
Source NCWRPC 2022. Some totals may not add due to roundmg.
4.4.9 INFILL AND REDEVELOPMENT OF VACANT LANDS
A certain amount of undeveloped land exists within the current incorporated limits of the
. communities of the urban area. A basic analysis of land use inventory data was done to
identify undeveloped areas with infill potential within the existing sewer service area.
Within the City of Stevens Point approximately 1,383 acres of unused/vacant properties
were identified , and 1,630 acres were identified with the Village of Plover.
A detailed inventory of sites available for possible redevelopment was beyond The
scope of this Plan. However, local officials are promoting and actively working toward
infill and redevelopment. Based on these considerations, significant infill and
redevelopment is expected to take place moving forward.
This Sewer Service Area Plan recognizes that infill development and redevelopment are
good public policy and establishes goals and objectives to achieve infill and
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 31
redevelopment. There is a clear cost effectiveness advantage to infill development that
has infrastructure like sewer and water lines already installed nearby.
4.4.10 SSA ADDITIONAL ACREAGE ALLOCATION BY COMMUNITY 2040
The total additional urban area land area requirements for 2040 are allocated to each
community based on their portion of the projected growth as shown in Table 14.
TABLE 14: Additional Land Area Needs by Community for Stevens Point Urban Core Area - 2040
2040 2040 2040 Acres 2040 2040 2040 Acres 2040 Acres Acres Needed Acres Acres Market Infill 2040 Acres
Needed Needed Needed Public Needed Needed Factor Factor Needed
Residential Commercial Industrial Institutional Outdoor ROW Acres Acres Total
Recreation
Stevens 542.53 472.57 577.29 493.24 47.08 294.31 4,854.04 -1 ,383 5,898.06 Point
V. Plover 231 .30 240.30 146.55 75.06 13.14 103.13 1,618.96 -1 ,630 798.44
Whitin 0 0 0 0 0 0 0 n/a 0
Park Rid e 0 0 0 0 0 0 0 n/a 0
Totals 773.83 712.87 723.84 568.30 60.22 397.44 6,473.00 -3,013 6,696.50
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 32
SECTION 5.0 ENVIRONMENTALLY SENSITIVE AREAS
5.1 DELINEATION OF ENVIRONMENTALLY SENSITIVE AREAS
Delineating environmentally sensitive areas (ESAs) is one of the most important
components of a sewer service area plan. These areas need to be protected in order to
protect water quality.
According to Administrative Code NR 121 provisions, "Major areas unsuitable for the
installation of waste treatment systems because of physical or environmental
constraints are to be excluded from the service area. Areas to be considered for
exclusion from the sewer service area because of the potential for adverse impacts on
the quality of the waters of the state from both point and nonpoint sources of pollution
include but are not limited to wetlands , shorelands , floodways and floodplains, steep
slopes/highly erodible soils and other limiting soil types, groundwater protection areas,
and other such physical constraints."
The Stevens Point Urban Area Sewer Service Advisory Committee determined that the
designated environmentally sensitive areas for the Sewer Service Area Plan update
would remain the same as the previous, 2007, plan. Therefore, floodways , wetlands
and areas of steep slopes 12% or greater will be the elements that comprise the ESA
for this Sewer Service Area Plan.
Environmentally sensitive areas are defined, generally, as those areas that are
unsuitable for sewered development because of the potential significant adverse impact
upon water quality (see NR 121.05(1 )(g)2.c.). The sewer service area is that area
presently served or anticipated to be served by a sewage treatment system within a
sewer service area plan's planning period. Technically, the sewer service area does not
include environmentally sensitive areas, which are delineated separately and do not
count in acreage allocations for sewered development.
The Plan uses the term "environmentally sensitive areas" rather than "environmental
_ corridors" primarily due to the inconsistent use of the term "environmental corridors"
across the state. Additionally , "environmental corridors" implies the need for the subject
resource to be linear or contiguous within the sewer service area, however , such
contiguity is not required for an area to be sensitive and in need of protection under
N R 121 for maintenance of water quality.
A sewer service plan regulates only sewered development. Its authority does not
prohibit unsewered development from occurring in environmentally sensitive areas
(although these areas may be regulated by the U.S. Army Corps of Engineers or other
agencies). A proposal that would encroach on land under the environmentally sensitive
area designation to allow sewered development may require a Clean Water Act Section
404 permit or a Wisconsin Statutes Chapter 30 permit and water quality certification for
compliance with NR103, or other permits in order to protect water quality.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 33
To install new sewer lines, a community needs a sewer extension "conformance letter"
from the water quality planning agency, sometimes referred to as the water quality
management (WQM) letter. The agency needs to determine that the proposed
development lies within the sewer service area, but not within a designated
environmentally sensitive area.
The environmentally sensitive areas shown on the sewer service area maps are a
representation of the conditions at the time of map preparation, using the best available
data. The maps do not reflect field survey work that specific development proposals
require. The presence and location of navigable waters, floodways, wetlands and
similar site features must be verified by field survey, and applicable permits must be
obtained prior to any land disturbing activity. Verification may be required by the WDNR
for water quality certification purposes before approving any sewer extension or SSA
amendment. Site inspection takes precedence over the sewer service area map.
It is not the intent of designated environmentally sensitive areas to prevent or obstruct
necessary maintenance , expansion or construction of transportation or utility facilities
intended to serve areas outside of the sensitive area, needed to maintain or improve
continuity of those systems, or designed to serve compatible uses in the designated
areas such as park shelters or facilities. Environmentally sensitive area delineations
sometimes include features that are not water quality related, so not every sensitive
area development proposal will require a permit.
The remaining entries of this section discuss in detail the elements that comprise the
environmentally sensitive area for purposes of this sewer service area plan. Table 15,
below, provides a "quick reference" summary of the guidelines for environmentally
sensitive area designation.
TABLE 15: ENVIRONMENTALLY SENSITIVE AREA (ESA) GUIDELINES
Element Applicable Features Delineation Guide
FLOODWAY Waterways delineated in ✓ Channel of stream and the
WDNR Surface Water Data adjoining area required to
Viewer/ FEMA Flood carry flood flows associated
Insurance Rate Maps with the regional flood
(NR116.03, Wis. Adm. Code)
WETLANDS Wetlands delineated on WI ✓ Mapped Area
Wetland Inventory Maps
STEEP Areas of Slope 12% or ✓ General Area of Slope
SLOPES Greater
Source NCWRPC 2022
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 34
5.2 FLOODWAYS
The floodplain is the land calculated to be covered by floodwater during the 100-year
flood. The floodplain includes the floodway and the flood fringe. The floodway is the
channel of the river or stream and those portions of the floodplain adjoining the channel
required to carry and discharge the flood waters or flood flows associated with the 100-
year flood (see NR 116.03 Wis. Adm. Code).
Local, state and federal regulations control development in floodplain areas. These
regulations primarily include federal floodplain management standards established by
the National Flood Insurance Program or NFIP (44 CFR 50-72), Wisconsin's floodplain
management standards which parallel the NFIP (NR 116 Wis. Adm. Code), and local
level floodplain zoning including chapters 7.6 Portage County Code, 23 City of Stevens
Point Code, 530 Village of Plover Code, and 20 Village of Whiting Code. Most
development is not allowed within the floodway. Development can occur within the
flood fringe with appropriate flood proofing measures. The added expense of
developing in the flood fringe versus other upland areas will control the rate and extent
of floodplain development.
To prevent development in a high hazard area, floodways are excluded from sewer
service areas. The Department of Natural Resources will not approve any sewer
service area plan or amendment that is not consistent with an approved floodplain
zoning ordinance or which allows new service to new development in the floodway.
Plans or amendments which would result in a reduction of storm or flood water
conveyance or storage capacity must be denied unless remedial actions which conform
to NR 116 are identified and approved prior. When there is an existing , lawful
development within the floodway , a plan or amendment may include the development
within the boundaries of the proposed service area.
Lands officially determined to be out of the mapped floodway are considered removed
from the ESA unless other factors dictate. These areas are typically documented with a
Letter of Map Revision (LOMR) or Letter of Map Amendment (LOMA) issued by FEMA.
-The FEMA DFIRM, or Digital Flood Insurance Rate Map, data was used to map the
floodway as part of the environmentally sensitive area for this Plan. FEMA completed
an update of the flood mapping for Portage County in 2009.
Floodways in the Stevens Point area are primarily associated with the Wisconsin and
Plover Rivers, see Map 3.
5.3 WETLANDS
Wetlands are areas where water is at, near or above the land surface long enough to be
capable of supporting aquatic or hydrophytic vegetation and having soils indicative of
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 35
wet conditions (see NR 103 Wis. Adm. Code). Although wetlands are often associated
with waterbodies, especially shoreland wetlands which are very ecologically important,
many wetland areas may not be directly related to a lake or stream. Local, state and
federal regulations control development activities in wetland areas. Permits are
required for activities that impact wetlands. In some cases, wetland mitigation or
replacement is required.
Wetlands perform many indispensable roles in the proper function of the hydrologic
cycle and local ecological systems. In terms of hazard mitigation, they act as water
storage devices in times of high water. Like sponges, wetlands are able to absorb
excess water and release it back into the watershed slowly, preventing flooding and
minimizing flood damage. As more impermeable surfaces are developed, this excess
capacity for water runoff storage becomes increasingly important.
Wetland plants and soils have the capacity to store and filter pollutants ranging from
pesticides to animal wastes. Calm wetland waters, with their flat surface and flow
characteristics, allow particles of toxins and nutrients to settle out of the water column.
Plants take up certain nutrients from the water. Other substances can be stored or
transformed to a less toxic state within wetlands. As a result, wetlands play an
important role in water quality.
To protect water quality wetlands are excluded from sewer service areas. The
Department of Natural Resources will not approve any sewer service area plan or
amendment that allows new service to new development in wetlands.
The Department of Natural Resources' Wisconsin Wetland Inventory data was used to
map the wetlands as part of the environmentally sensitive area for this Plan, see Map 3.
However, field survey may be required to verify boundaries.
Pockets of wetland are scattered across the urban area, although more concentrated
along the various streams and rivers in the area. Extensive areas of wetlands lie to the
north and west of the urban area in the Towns of Hull and Linwood.
5.4 STEEP SLOPES
Areas with slopes 12% and over were identified using digital elevation and contour data
from the County's Geographic Information System and mapped as part of the
environmentally sensitive area for this Plan, see Map 3. These areas are generally
found along the Plover River throughout the planning area, and along the east and
southeast banks of the Wisconsin River in the Village of Plover.
Slopes over 12% are environmentally sensitive because construction on steep slopes
can result in severe bank erosion and damaging siltation of a water body. Evidence of
sedimentation problems are already apparent in the Plover River and its impoundment
known as McDill Pond. The steep slope areas along the Wisconsin and Plover Rivers
do not have enough lateral dimension away from the banks to allow development on or
over these slope areas.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 36
DRAFT
..
TOWN OF GRANT
Roads
~ Water
Q Municipal Boundary
..
....
.,
TO N OF PLOVER
Proposed Sewer Service
Boundary
Steep Slopes
Wetlands
1111 Floodway
~ -~
" .
' . .
" .
l
Map 3
Stevens Po111t Urban Area Sewer Service Arca
Environmentally Se11s1t1ve Areas
-.c ~ .
-
~
•
-~-
• \
I
TOW~ OF STOCKTON
QJ
,.
_,.
,,.
,:
.,I--
"
I)
®
.,,. TOWN OF BUENA VIST{\!J
1.5 6 0.25 0,5
._,;,_d--.i::==::l.-....i Mi1es Prepared by:
North Central
Wisconsin Regional
Plannina Commission
Thi$ map t:s nekhor a legalty recorded map nor a _:survey
800 i5 not Intended 10 be used as one, This drew.rig Is
a COllllilation of records, information and data used for
ref~.-ence purposes only. NCWRPC Is not resporl5ibla IOf
any inaccuradeshere inCQntained.
210 McClellan Street. Suite 21r, Wausau, Wisconsin 54403
(715) 849-5510 www.ncwrpc.org
5.5 PROTECTION OF ESAs AND RELATED AREAS
The environmentally sensitive areas delineated in this Plan, floodways, wetlands and
steep slopes, are excluded from the sewer service area, and new sewered development
is generally not permitted in these delineated areas. Floodways and wetlands are
integral parts of the overall systems of water resources within the Stevens Point area
and Portage County. Protecting water quality is one of the primary functions of a sewer
service area plan.
Sewer extensions will not be approved for development of environmentally sensitive
areas identified within this Plan, however, they may be allowed to cross certain sensitive
areas with the appropriate permits if necessary to facilitate development adjacent to
these areas. The sewer service area plan does not supersede any existing or future
regulations or requirements that are applicable to any environmentally sensitive area. A
proposed sewered development is still responsible for meeting all legal requirements
and obtaining all necessary permits, as well as, compliance with the sewer service area
plan.
Surface water, including lakes, rivers, streams and their associated shorelands and
floodplains, wetlands, and groundwater are protected by a layered system of regulations
and programs. The remainder of this subsection references these regulations and
programs.
Development along the shoreline of lakes and streams is controlled through state
standards and programs and through local shoreland zoning regulations. The
shoreland area is within 1,000 feet of the ordinary high water mark of navigable lakes,
ponds and flowages and within 300 feet of navigable rivers and streams. State
Administrative Code NR 115 establishes the Wisconsin Shoreland Protection Program
which mandates Portage County shoreland zoning (Chapter 7.7 Portage County Code
of Ordinances) in unincorporated areas with the DNR maintaining oversight
responsibilities. State Administrative Code NR 116 establishes the Wisconsin
Floodplain Management Program in conformance with the National Flood Insurance
Program (44 CFR 59-72) which requires County Floodplain Zoning (Chapter 7.6
_ Portage County Code of Ordinances). Incorporated villages and cities are required to
adopt and enforce their own floodplain zoning under NR 116 as well as shoreland
zoning under NR 117 which establishes the Wisconsin City & Village Shoreland
Wetland Protection Program (see Chapter 23 of the City of Stevens Point Code of
Ordinances, Chapter 530 Village of Plover Code of Ordinances , and Chapter 20 Village
of Whiting Code of Ordinances). These local zoning regulations include standards for
minimum lot sizes, building setbacks, vegetative buffers, filling, grading, lagooning ,
dredging, ditching and excavating, impervious surfaces, height of structures, and
regulations controlling nonconforming structures and uses.
Activities in wetlands are regulated by the U.S. Army Corps of Engineers, the Wisconsin
Department of Natural Resources and by local counties, cities and villages. Excavating
or placement of any material in a wetland requires a DNR permit. Permit reviews
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 38
include compliance with the requirements of section 281.36, Wis. Statutes, and NR 103
and NR 299 Wis. Adm. Code.
To prevent runoff and erosion from polluting waters, particularly in highly erodible areas
of steep slope, construction projects that disturb one acre or more of land must comply
with state regulations for construction site erosion control and stormwater management
under NR 216 Wis. Adm. Code. In addition, municipalities designated as an MS4 are
required to adopt construction site erosion control and post-construction stormwater
management ordinances under NR 216. An MS4 is a municipal separate stormwater
system designated by the US EPA as part of its national pollution discharge elimination
system. The list of communities designated is expanding in phases under the rule. The
City of Stevens Point has been an MS4 for some time and has a construction site
erosion control and stormwater management ordinance (Chapter 31 Stevens Point
Code of Ordinances) that conforms to state standards. The Village of Plover recently
came under MS4 designation and will have to develop an ordinance.
Wellhead protection programs typically include some kind of zoning controls and
implement groundwater pollution prevention measures within the recharge areas of
public water supply wells, see NR 811.12(6) Wis. Adm. Code. All of the communities
within the urban area have wellhead protection programs in place for their public water
supply wells. Portage County has a groundwater management plan designed to help
local officials in setting groundwater policy and serves as a resource on strategies to
address groundwater issues.
Best management practices , or BMPs, are encouraged and sometimes mandated to
minimize loss of a resource through a variety of techniques to reduce the impact of
construction and development on the natural environment.
In general, local planning and zoning dictate appropriate development conditions in all
of the instances noted above. In some cases, sewer service may be a necessary
solution to address problems of an existing development with failing on-site systems
resulting in health concerns.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 39
SECTION 6.0 URBAN AREA COMPREHENSIVE PLANS
6.1 INTRODUCTION
Under current state law, for a community's plan to carry any legal weight it must be a
comprehensive plan as defined in the statute. As a result, most communities have done
or are in the process of comprehensive planning. Such is the case in the Stevens Point
area. A review and analysis of the completed plans and planning efforts in progress for
the participating municipalities within the study area is an essential element in the
development of the Stevens Point Urban Area Sewer Service Area Plan. Consideration
of the individual community's comprehensive plans assisted in the development of a
Sewer Service Area Plan that safeguards area water quality while being compatible with
the community's view of future development. Likewise, study area communities
develop future plans or updates that are consistent with the goals and objectives of this
Sewer Service Area Plan.
Sewerage facilities are an important part of an interactive system of land use and
development. These facilities are influenced by the pattern of development and exert a
strong force in determining that pattern. The following sections discuss the locally
adopted plans which represent the desired development patterns of the urban area
communities. These plans guide the urban area's future growth and assist local
engineers and consultants in designing sewer systems to accommodate expected
growth.
6.2 URBAN AREA COMPREHENSIVE PLANS
Currently, the City of Stevens Point, Village of Plover, Village of Whiting, Village of Park
Ridge, and the Towns of Hull, Linwood, Plover and Stockton have adopted
comprehensive plans. The Village of Plover and Town of Linwood were nearing
completion of plan updates at the time of this writing, and the City of Stevens Point and
Town of Hull were in the early stages of plan update. These community comprehensive
-planning efforts were consulted for development of this sewer service area plan, see
Appendix for each community Future Land Use Plan map.
The City of Stevens Point adopted its comprehensive plan in 2005, however, the city's
community development department is in the beginning stages of updating the plan.
The update will be built on a framework of neighborhood plans. The current plan was
developed by the city with the assistance of the Portage County Planning & Zoning
Department. The city plan is consistent with the purpose of the sewer service area plan
as illustrated by stated goals and objectives such as "To provide public utilities and
services in a manner that will promote efficient and orderly growth and development."
(UCF Goal 1) and "Encourage the provision of public utilities in areas a) that can be
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 40
most efficiently and economically served, and b) that are environmentally suitable for
urban development." (UCF Objective c)
In addition, the city's comprehensive plan also promotes infill and redevelopment, a key
element of sewer service area planning. The sewer service area boundary is directly
incorporated into the comprehensive pl.an as an urban growth boundary concept.
Development trends in the City of Stevens Point have shifted to infill and higher density
residential development along with a focus on redevelopment of the downtown area.
Commercial and industrial growth has outpaced other areas. The city would like to see
new subdivision style development in the future.
The Village of Plover adopted its last comprehensive plan in 2006, however an update
was in progress simultaneously with the sewer service area plan update. Draft material
from the update was reviewed for this SSA plan. The 2006 plan and the update were
developed by the village with the assistance of the Portage County Planning & Zoning
Department. The village plan is consistent with the purpose of the sewer service area
plan as illustrated by stated goals and objectives such as "To provide public utilities and
services in a manner that will promote efficient and orderly growth and development"
(UCF Goal 1 ), "Encourage the provision of public utilities in areas that can be most
efficiently and economically served" (UCF Objective c), and "Promote the extension of
public utilities only in areas environmentally suitable for urban development." (UCF
Objective d)
In addition, the Village's comprehensive plan extensively integrates the sewer service
area plan and acknowledges its role in allocating adequate land area to meet projected
future land use needs for the village.
The village has seen a lot of single family development in the southeast corner and
some in the southwest with some general commercial here and there. The east side
business park has been building up with only a few parcels remaining. Some new
commercial development is anticipated in the northeast corner.
The Village of Whiting adopted its comprehensive plan in 2004. The plan was
• developed with the assistance of the Portage County Planning & Zoning Department.
The village plan is consistent with the purpose of the sewer service area plan as
illustrated by stated goals and objectives such as "To provide sanitary sewer, water and
other necessary public utilities to existing and planned future development in an efficient
and cost effective manner" (UCF Goal 1 ), "Encourage the provision of public utilities in
areas that can be most efficiently and economically served" (UCF Objective a), and
"Promote the extension of public utilities only in areas environmentally suitable for
urban development." (UCF Objective b) In addition, the village's comprehensive plan
also promotes infill and redevelopment, a key element of sewer service area planning .
The Village of Whiting is essentially land-locked which restricts its ability to expand.
Population growth has been somewhat stagnant, and some major industries have been
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 41
lost. However, the village continues to see a little residential and some commercial
development here and there.
The Village of Park Ridge comprehensive plan was adopted in 2004 and updated in
2022. The Town of Hull plan was adopted in 2006, but an update is also currently
underway. The Town of Linwood comprehensive plan was adopted in 2009, but the
town is nearing completion of an update. The Town of Plover completed a new
comprehensive plan update in 2021. The Town of Stockton has a current
comprehensive plan adopted in 2016. All of these plans/planning efforts were assisted
by the Portage County Planning & Zoning Department. These plans all contain goals
and objectives similar to those previously discussed , thus also making them consistent
with the purpose of the sewer service area plan.
Park Ridge is entirely land-locked, and any new development is essentially limited to
infill and redevelopment. The Town of Hull's development has primarily limited to only
10-12 new homes per year , and this is not expected to change. The Towns of Linwood
and Stockton are in a similar position, although anticipated growth rates are slightly
higher than Hull. The Town of Plover has had very light residential growth except for
the extensive solar farm being developed in the southwest portion. The town does have
a notable commercial development at the intersection of Business 51 and Interstate 39
which is being limited by lack of sewer service. The Town of Plover plan does promote
some high-density development such as this, in coordination with the Village of Plover.
The communities within the Stevens Point Urban Area have a strong history of
intergovernmental agreements and cooperation. With regard to boundaries and
land use, the Village of Plover and Town of Plover recently renewed a cooperative
boundary agreement which includes areas within the Town in which the Village has
agreed to provide municipal sewer and water without annexation. The City of Stevens
Point and Town of Hull have also been in discussions regarding a cooperative boundary
agreement. A variety of other agreements are in place among the urban area
communities, for example : the Village of Park Ridge and City of Stevens Point have
intergovernmental agreements relating to sewer, water and fire protection.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 42
7 .0 SEWER SERVICE AREA PLAN GOALS, OBJECTIVES & POLICIES
7 .1 INTRODUCTION
One of the most important steps in drafting an urban area sewer service plan is to
establish some overall goals and policies to guide the development and implementation
of the Plan. The goals, objectives and policies presented in the previous, 2007, Sewer
Service Area Plan were reviewed and updated by the Urban Area Sewer Service
Advisory Committee Policy.
The following goals and policies constitute the adopted guidelines by which the Advisory
Committee and its administrative staff will:
1) Establish the boundaries of the sewer service area,
2) Review sewer extension requests,
3) Review Sewer Service Plan amendments, and
4) Make other reviews related to sewer service as needed.
7.2 GOALS OF THE SEWER SERVICE PLAN
Goal 1. To provide and maintain sanitary sewer service which efficiently meets the needs
of all segments of area communities while protecting the quality of water resources and
the quality of the environment.
Objective 1. By controlling development of areas where environmental conditions
indicate that development should not take place, especially, wetlands, floodways and
areas with steep slopes.
Policies: a) Environmentally sensitive areas must be identified and preserved,
and not used for urban development.
b) Future development is directed to locate in areas suitable for development
where environmental impacts can be avoided or sufficiently mitigated.
c) Protect natural drainageways from impacts of development.
Objective 2. By eliminating conditions created by inadequate sewage collection and
treatment facilities which result in potential threats to the health and welfare of the
public.
Policy a) Eliminate inadequate on-site sewage systems within the Sewer Service
Area through connection to a municipal sewer system.
Goal 2. To guide the future development in the urban core of Portage County within the
defined Sewer Service Area limits in an efficient, orderly, and compatible manner.
Objective 1. By encouraging utilization of vacant land within the Urban Area
communities that is already provided with urban services.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 43
Policy a) Direct in-fill development and re-development of areas that do not require
upgrading existing public facilities, where appropriate, is emphasized.
Objective 2. By providing sufficient land area in which the future development of the
Urban Area communities can be accommodated.
Policy a) Areas adjacent to the CityNillage limits which are contiguous to urban
development and are experiencing documented development pressures should be
included within the sewer service area.
Objective 3. By extending sanitary sewer service to those areas where demand exists
within the Sewer Service Area.
Policies: a) Public sanitary sewer service will be extended to development areas
on a cost-effective basis.
b) Sewer service extensions will be used as a tool to implement community plans
by directing growth into the most desirable areas.
c) Extensions will not be made beyond the Sewer Service Area unless the Sewer
Service Area Plan Map is amended. Where compatible with community plans and
other community policies, sanitary sewer extensions into areas in proximity to
existing development will be given high priority.
d) Sewers may not be extended beyond the Sewer Service Area, however, they
can be sized to accommodate future basin development that may occur outside of
the service area in the future.
Goal 3. To encourage future development located outside the Sewer Service Area limits
to occur in an efficient, orderly, and compatible manner.
Objective 1. By encouraging development that is consistent with City, Village, Town,
and County plans.
Policy a) Coordinate planning efforts of the four incorporated municipalities with
the four towns in the Urban Area planning area and Portage County to develop
future land uses.
Objective 2. By encouraging the orderly and compatible extension of urban services,
with the intent of preventing the premature development of agricultural land.
Policy a) Agricultural areas should not be used for urban development unless
identified for such development in the community's Comprehensive Plan.
Objective 3. By minimizing problems associated with large lot rural subdivisions
locating in the urban service limits.
Policy a) Surveys and subdivision plats creating new development sites within the
Sewer Service Area limits should be discouraged unless arrangements are made
to ultimately accommodate urban services including sanitary sewer and water.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 44
7 .3 ADDITIONAL SEWER SERVICE POLICIES
These policies are intended to set the direction for the establishment and maintenance
of the Sewer Service Area boundary. These policies would also be used by the local
Sewer Service Advisory Committee and the State of Wisconsin Department of Natural
Resources in reviewing and deciding upon proposed sewer extensions, plan
amendments or other reviews as required.
7.3.1 SELECTION OF DEVELOPMENT LIMITATIONS CRITERIA WHICH WILL
IDENTIFY LANDS NOT CONDUCIVE TO SEWERED URBAN DEVELOPMENT
Wisconsin Administrative Code NR 121.05(1 )(g)2.c requires that: "Major areas
unsuitable for the installation of waste treatment systems because of physical or
environmental constraints are to be excluded from the service area. Areas to be
considered for exclusion from the sewer service area because of the potential for
adverse impacts on the quality of the waters of the state from both point and non-point
sources of pollution include but are not limited to wetlands, shorelands, floodways and
floodplains, steep slopes, highly erodible soils and other limiting soil types, groundwater
recharge areas, and other such physical constraints."
In accordance with this requirement, those areas have been considered for exclusion
from the Stevens Point Urban Area Sewer Service Boundary area. It was the
conclusion of the Stevens Point Urban Area Sewer Service Advisory Committee that the
following areas are identified as primary environmentally sensitive areas to be excluded
from development: wetlands (as identified on the Department of Natural Resources
Wetland Inventory Map, or as field verified by a certified professional), flood way (as
designated on FEMA Flood Insurance Rate Maps or field verified by a certified
professional), and steep slopes/highly erodible soils (12% and greater).
Sanitary sewers cannot be extended to serve development in primary environmentally
sensitive areas designated within this Plan.
7.3.2 SPECIFIC EXCEPTIONS FOR AREAS WITH USE RESTRICTIONS
Use restricted lands include large parcels of privately owned land (i.e. Izaak Walton
League lands, Stevens Point Country Club, or Sentry World golf course) and large
publicly owned parcels (municipal well fields and surrounding buffer areas, former "Boy
Scout" property, or municipal airport lands outside the central activity area) that have
been deemed unlikely to be developed/require sewer during the current planning period.
As such, these areas are also excluded from the sewer service area.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 45
7.3.3 SPECIFIC EXCEPTIONS FOR AREAS . WITH PHYSICAL DEVELOPMENT
LIMITATIONS
The Sewer Service Plan identifies additional land having some possible degree of
limitations for development other than those identified as primary environmentally
sensitive areas. These limitations include things like high ground water I bedrock and
good agricultural soils. However, these limitations are not deemed significant enough to
preclude sewered development. All developments proposed in these areas will,
nevertheless, be subject to the necessary development standards to mitigate possible
site-specific problems associated with development.
Good agricultural soils include those soils identified in adopted comprehensive plans as
"Highly Productive Agriculture Soils". The productive agricultural lands abutting the City
of Stevens Point and Village of Plover have the fewest physical limitations and
represent the natural expansion direction of the urban area. Both incorporated
communities may experience the need to expand their jurisdictions into some of these
productive agricultural lands to accommodate private sector growth needs. This factor is
recognized and accommodated in planning for the future sewer service area of these
communities. To provide for this possibility, it was determined that the good agricultural
lands within the planning area will not be restricted from sewer service.
There are also unique areas or circumstances across the Urban Area where extension
of sewer may be supported, even with the existence of physical limitations. The
rationale for permitting sewer extensions into these various geographic areas is
presented below by area description.
1. Northside of Stevens Point - This area is characterized by high bedrock, high
groundwater, and clay soil conditions. A portion of this zone will be restricted from
sewer service due to the wetlands found in the area. However, the majority of the
north side should not be denied future sewer service. In fact, the City has already
incurred significant infrastructure cost throughout the area. Most of these lands
are zoned for commercial and residential use. The area currently has scattered
development served by sanitary sewer, water, a street system and other urban
services. Continuing to allow contiguous urban expansion into such lands will
foster cost-effective infill and service to avoid urban sprawl while offering a better
level of environmental protection if they are serviced by municipal water and sewer
utilities.
2. West of the Wisconsin River - The west side of Stevens Point, including land in the
Town of Linwood, is virtually limited to existing sewer service because of the
presence of vast areas of floodplain and wetlands west of the Wisconsin River.
The high groundwater, high bedrock, and clay soil limitations which are found in
this area are basically overlain by the floodplains and wetlands which preclude
future sewered development. A very small amount of expansion of the sewer
service area west of the river is anticipated. However, for the most part, the lands
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 46
mapped as having development limitations ,n this portion of the urban area will fall
outside of the sewer service boundary.
3. High Groundwater Zone Through the Village and Town of Plover - The high
groundwater zone in the southern portion of the planning area represents an
anomaly not actually present the majority of the time. The historical record
indicates that high groundwater is physically present for only a short period of time
over a period of several decades. For this reason, the area is not restricted from
sewer service.
7.3.4 INDIVIDUAL JURISDICTION POLICIES
Individual jurisdictions providing sewer service may be more restrictive in deciding
which lands should and should not be served by sanitary sewers. The physical
development limitations identified within this Plan can be considered to the extent locally
judged to be appropriate, especially in the interest of cost-effectiveness of sewer
services. Hook-ups to existing sanitary sewers in these areas are considered
consistent with this Plan. Decisions on what, if any, development restrictions including
denial of sewer service, zoning, building code restrictions, etc., will be applied to such
lands with these other development limitations is strictly a local government judgment.
7.3.5 GAINING ACCESS TO SERVICEABLE LAND
Sewers may be extended through environmentally sensitive areas to serve other lands
without development limitations and identified as a planned growth area in this Plan. All
other prudent and cost-effective alternatives for this kind of sewer extension must be
considered to avoid sewer extensions through such environmentally sensitive areas if
possible. Subsequent development within floodplain and wetland areas adjacent to an
extension shall not be approved without an amendment to the Plan.
7.3.6 REPLACEMENT OF EXISTING SEWERS
This Plan does not prohibit replacing existing sewers which may lie within floodway or
wetland areas.
7.3.7 DESIGNATED HEAL TH HAZARD CONDITIONS WITHIN THE SEWER SERVICE
AREA
The extension of sewer to existing development within an environmentally sensitive
area will be deemed consistent with the policies of this Plan if a documented health
hazard condition exists. For purposes of this Plan, a health hazard condition exists
when the County and/or State Health Departments formally direct sanitary sewer
service is necessary to mitigate health problems in the area. The construction of
sewers to mitigate health hazards is ultimately the decision of the local units of
government. Sewer extensions to health hazard areas outside of the sewer service
area will still require a Plan (boundary) amendment.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 47
7.3.8 UNDESIGNATED HEALTH HAZARD AREAS
Areas currently having or thought to be susceptible to health problems due to lack of
sanitary sewer should receive strong consideration by the necessary local unit(s) of
government for the provision of sewer service and/or other measures which will address
the problem.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 48
8.0 STEVENS POINT URBAN AREA SEWER SERVICE AREA BOUNDARY PLAN
8.1 INTRODUCTION
This section ties together the previous sections of this report to establish the Stevens
Point Urban Area Sewer Service Area boundary for 2040. This official boundary is
depicted in the Sewer Service Area Boundary Map, see Map 4. This boundary is
administered according to the procedures and criteria outlined in Section 9 of this
report.
The Areawide Water Quality Management Planning for the Wisconsin River basin,
described in Section 3 of this report, is the State level planning framework for water
quality management pursuant to the Federal Clean Water Act. This Sewer Service
Area Plan is considered an amendment to the Central Wisconsin River Basin Plan.
At the local level, this water quality management framework has two primary
components: the planning for facilities to improve water quality through the cost
effective collection and treatment of waste water; and the planning for an area within
which those wastewater facilities can be extended while excluding environmentally
sensitive areas that might impact water quality if developed. This Sewer Service Area
Plan provides that second component.
The facilities planning for the Stevens Point Urban Area is described in Section 2 of this
report. The processes for each of the facilities plans/studies and the process for the
sewer service area plan utilize the same source material for community growth plans
and projections, so theoretically, the sewer service area will be sized appropriately for
the planned facilities, and the capacity of the facilities will be adequate to handle the
anticipated growth.
The growth projections developed in Section 4 of this report determine what size the
sewer service area should be to accommodate that growth. The environmentally
sensitive areas identified in Section 5 determine where development must be prohibited
• to protect water quality: the primary purpose of this Plan. The comprehensive plans
discussed in Section 6 for the various communities in the urban area are used in
conjunction with the environmentally sensitive areas to help determine where the sewer
service area boundary lines are drawn. The goals and objectives of this Plan, as
spelled out in Section 7, are consistent with the local comprehensive plans in calling for
orderly growth that protects environmentally sensitive areas and water quality.
8.2 SEWER SERVICE AREA BOUNDARY MAP
The designation of a sewer service area boundary is the major element of the overall
planning process of this Sewer Service Area Plan. The boundary takes into account the
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 49
projections of future population, land demands, environmentally sensitive areas, and
input on the part of community representatives through individual community meetings
and via the Advisory Committee.
The sewer service area designated on the Boundary Map, see Map 4, in this section
provides for the projected land needs of the Stevens Point Urban Area to the year 2040
as identified in Section 4. The boundary excludes environmentally sensitive areas, as
identified in Section 5, to prohibit them from sewered development in order to protect
water quality. Areas of "use restrictions" are also omitted , as discussed in Section 7.
The Sewer Service Area can be amended to reflect changes in growth needs within the
urban area. The boundary amendment procedures are located in Section 9 of this
report.
Table 16 displays a summary of the change in the service area from the previous plan
and the new 2040 plan. Overall, the sewer service area increased by 7,199 acres. This
represents an increase of 30 % over the previous area. Based on the growth allocation
calculated from growth projections in Section 4 for Stevens Point, the Village of Plover
and Whiting, the combined change is within 1 % while individual community change is
within 4% of allocation. The Town of Plover acreage is intended to provide for lands
that may potentially be extended sewer and water utilities by the Village while remaining
in the Town of Plover under their cooperative boundary agreement. The Town of Plover
has the highest projected growth of the surrounding towns.
It should be noted that a number of factors are involved with the transition from the old
to the new. First, many of the individual data sets that make up the map, such as parcel
lines, road center lines, and environmental features such as slopes, hydro and wetlands
inventory, have all been updated since the last plan and accuracy levels continue to
improve. There was a significant difference in the environmentally sensitive areas data
from 2007 to 2022. Additionally, there are always problems, gaps, mismatches, etc, in
updating old data in a GIS system. Mapping technicians adjusted the boundary line
work to match up with current data, fixing gaps, slivers, alignment with obvious physical
elements on the ground (parcel lines, roads, tree lines, etc.) and incorporated the
updated wetland inventory and FEMA floodway data.
-The remainder of the changes were the result of planning meetings with community
officials. The communities identified new areas to add tQ the sewer service area to
accommodate projected future growth. The amount of growth is projected in Section 4.
In some cases, communities removed acres from the SSA because conditions have
changed, making those areas less likely than other to b~ developed within the planning
horizon.
Inclusion of lands within the Sewer Service Area does not imply that all of those lands
will be developed with sanitary sewer by the year 2040. Many factors including market
demand, land availability for sale, accessibility, and political decision making will
ultimately determine the amount of land which is sewered by the end of the planning
period.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 50
TABLE 16: Sewer Service Area Boundary Allocations *
Sewer Service Sewer Service Area Added 2040
Area 2007 Area 2022 for 2040*** Allocation
(Acres) (Acres) (Acres) Target (Acres)
Stevens Point** 11,477 17,350 5,873 5,989
V. Plover 10,138 10,965 827 798
T. Plover**** 1,278 1,777 499 n/a
Whiting 898 898 0 0
Totals 23,791 30,990 7,199 n/a
Source NCWRPC 2022 * Excludes area of ESAs & Use Restncted Lands.
** Includes Park Ridge
*** Add1t10ns w1thm 4% of Allocahon
**** Town area for potential sewer service under boundary agreement
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 51
DRAFT
Roads
•
~ Water
Q Municipal Boundary
Q Parcels Boundaries
1111 ...... . . Plover Boundary Agreement . . ......
Wastewater Treatment Plant
Proposed Sewer Service
Boundary
Environmental Sensitive Areas
Use Restriction
Map 4
Stevens Point Urban Area Sewer Service Area
Proposed SSA Boundary
6 0.25 0.5 1.5
m::ac:1--11111::===---- Miles
This map is mt~her o legally reeorded map oor a survey
and is not intended to be used as one. This drawing is
a COITllilationof records. information and data 11Sed ror
reforonce purpose s only. NCWRPC is not respollSiblo fo,
any lnaccumcieshereincontained .
Prepared by.
North Central
Wisconsin Regional
Plannina Comm ission
210 McClellan Street. Suite 21lJ. 'Nausau, Wisconsin 54403
(715) B49-5510 www.ncwrpc.org
9.0 PLAN IMPLEMENTATION AND INSTITUTIONAL PROCEDURES
9.1 INTRODUCTION
The purpose of this section is to establish administrative procedures for the
implementation of the Sewer Service Area Plan. Specific topics addressed in this
section include the sewer extension review process, other local reviews of sewer
service related actions, amending the sewer service area boundary/plan, and the plan
updating process.
The Stevens Point Urban Area Sewer Service Advisory Committee is responsible for
the implementation of this Plan, and the Portage County Planning & Zoning Department
has agreed to act as the designated agent for the administrative procedures established
in this Plan on behalf of the Committee.
9.2 PROCEDURES AND REVIEW REQUIREMENTS FOR SEWER EXTENSIONS
This process is triggered by a sewer extension project or other development project
within the Stevens Point Urban Area sewer service area boundary that includes sanitary
sewer requiring permits from the Department of Natural Resources or the Department of
Safety and Professional Services. Proposed projects not requiring review under
s.281.41 Wis. Stats., NR 108 & 110 Wis. Adm. Code or SPS 382 Wis. Adm. Code are
not subject to sewer extension review under this Plan.
The local review will be conducted to determine whether or not the proposed sewer
extension is in conformance with the approved Plan. NR 110, Wis. Adm. Code,
requires that all sewer extensions for reviewable projects must be in conformance with
the sewer service area plan. This determination will focus on the location of the
proposed extension and any primary environmentally sensitive areas (ESAs); in other
words, does the extension go beyond the established sewer service area boundary and
does it violate an ESA? Note that a sewer line may actually cross a primary ESA if
there are no other feasible options for avoiding it, but the proposed sewered
· development must not be in the primary ESA. The following paragraphs outline the
local review process (see also Figure 2):
1) There are two different types of requests for the physical extension of sanitary
sewer infrastructure: extension of public sewer main, and private connection to
existing sewer. For the extension of public sewer, an official request form must
be initiated and submitted by the Municipality in which the sewer extension is
proposed (not the developer). For the extension of a "Private Interceptor Main
Sewer and/or Building Sewer", the request form may be initiated and submitted
by the plumber or developer's agent. In either case the request form and a
general location map of the proposed sewer extension(s) shall be submitted to
the Portage County Planning and Zoning Department. The location map must
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 53
show the location and length of the proposed sewer extension and its service
area. The extension request must be made early in the planning process to
ensure that local review and approval of the extension is made prior to submittal
of detailed sewer plans to the Department of Natural Resources.
2) The County Planning and Zoning Department will review the sewer extension
request to determine if the extension is in conformance with the Sewer Service
Area Plan. Within five (5) working days of receipt of the request, the Planning
and Zoning Director or his designee shall provide the applicant with the Planning
and Zoning Department's review of the request. If the proposed sewer extension
is in conformance with the Plan, the Planning and Zoning Department shall
approve the request and so indicate on the sewer extension request form. This
form would then be returned to the applicant, to be attached to the sewer
extension plans to be submitted to the Department of Natural Resources by the
applicant.
3) If the proposed extension is not in conformance with the Sewer Service Area
Plan, or if there are questions about consistency, the applicant will be notified of
such by the Planning and Zoning Department within five (5) days. The proposed
extension will be submitted to the Urban Area Sewer Service Advisory
Committee for their consideration if an amendment to the Plan is requested.
4) Within thirty (30) days of the initial receipt of the sewer extension request by the
Planning Department, the Sewer Service Advisory Committee shall meet to
review the amendment request (see boundary amendment procedures, below).
The Committee's decision on the request will be transmitted in writing by the
Planning Department to the applicant and to the Department of Natural
Resources.
5) Sewer extension requests or Plan amendments denied by the Sewer Service
Advisory Committee may be appealed directly to the Department of Natural
Resources.
·9.3 REVIEW OF PLUMBING PLANS SUBMITTED FOR STATE APPROVAL
Plumbing plans for certain types of plumbing installations require a conformance letter
under Wisconsin Administrative Code Chapter SPS 382.20(4)(b)2.a. Before the
Department of Safety and Professional Services can approve the plumbing plans, the
contractor needs a conformance letter from the water quality planning agency (Portage
County Planning & Zoning Office) stating that the proposed structure is within the sewer
service area but not within a primary environmentally sensitive area. The review
procedure for such plumbing plans follows the same outline as for sewer extensions,
above. •
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 54
FIGURE 2: SEWER EXTENSION REVIEW PROCESS FLOW DIAGRAM
STEVENS POINT URBAN AREA SEWER SERVICE AREA PLAN
I
+
Extension in Conformance
with Sewer Service Area
Plan
Compliance Letter Issued
Sewer Extension Plans and
Compliance Letter Sent to DNR
by Applicant
Request Form Submitted to
County Planning & Zoning
Request Reviewed by County
I P&Z Within 5 Days of Receipt
I
• Extension NOT in
Conformance with Sewer
Service Area Plan
Letter of Non
conformance Issued
Applicant Wishes to
Pursue Extension
Applicant May Submit
Request for Boundary
Amendment
Applicant Does Not
Wish to Pursue
Extension
Please contact the Portage County Planning & Zoning Department at (715) 346-1334 with any questions .
9.4 OTHER REVIEWS
From time to time, the Department of Natural Resources or other state agency may
request I require review of various activities related to sewer service, but not specifically
identified within this Plan. These reviews will parallel procedures established in this
Section. If it is determined that the requested review does not fit within guidelines of
this Plan, the Stevens Point Urban Area Sewer Service Advisory Committee will meet to
discuss and make a recommendation.
9.5 PROCEDURES AND STANDARDS FOR AMENDING THE SEWER SERVICE
AREA BOUNDARY
Sewer service area boundary line amendments may be requested by the municipality in
which the amendment is desired. The following amendment procedure is provided to
give municipalities and private developers the needed flexibility to accommodate
unanticipated community growth, additional technical data, or new community needs.
Two types of sewer service area boundary amendments are possible.
❖ Type I Boundary Amendment. The Type I Boundary Amendment occurs when
a community requests to amend its service arep boundary without increasing the
total land area that the community has within its sewer service area. For every
acre of land which is added to the community's service area, an area of
developable land of equal size must be removed from their service area. This
type of amendment is provided to accommodate unanticipated shifts in the
location of future growth as identified by this Plan. Under this amendment
procedure, total community growth served by sewer service is expected to
remain approximately the same as provided for in the Plan.
❖ Type II Boundary Amendment. A Type II Boundary Amendment occurs when a
community amends its sewer service area boundary and increases its total
service area acreage. The primary justification for a Type II Boundary
Amendment is for unanticipated new population or mercantile growth to be
served by sanitary sewers above that which was projected in the Sewer Service
Area Plan.
9.5.1 BOUNDARY AMENDMENT PROCEDURES
For Type I and Type II Boundary Amendment Requests, the following procedures shall
be followed (see also Figures 3 and 4):
1. The municipality requesting the change shall submit a written request for a
boundary amendment to the Portage County Planning and Zoning Department,
acting as administrative agent for the Advisory Committee. The request shall
include the following information:
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 56
FIGURE 2: SEWER EXTENSION REVIEW PROCESS FLOW DIAGRAM
STEVENS POINT URBAN AREA SEWER SERVICE AREA PLAN
I
+
Extension in Conformance
with Sewer Service Area
Plan
Compliance Letter Issued
Sewer Extension Plans and
Compliance Letter Sent to DNR
by Applicant
Request Form Submitted to
County Planning & Zoning
Request Reviewed by County
I P&Z Within 5 Days of Receipt
I
• Extension NOT in
Conformance with Sewer
Service Area Plan
Letter of Non
conformance Issued
Applicant Wishes to
Pursue Extension
Applicant May Submit
Request for Boundary
Amendment
Applicant Does Not
Wish to Pursue
Extension
i
I No Action I
Please contact the Portage County Planning & Zoning Department at (715) 346-1334 with any questions.
FIGURE 3: TYPE I AMENDMENT PROCESS FLOW DIAGRAM
STEVENS POINT URBAN AREA SEWER SERVICE AREA PLAN
Written Request Submitted to
County Planning & Zoning
County P&Z Review
Deny
Sewer Service Area Policy Advisory
Committee 14-Day Review
No Objection Objection
Advisory
~----- ... Committee --------~
Meeting
Affirm Approval/
Overturn Denial
DNR
Approve
Judicial
Appeal
Overturn Approval
/ Uphold Denial
DNR Appeal
FIGURE 4: TYPE II AMENDMENT PROCESS FLOW DIAGRAM
STEVENS POINT URBAN AREA SEWER SERVICE AREA PLAN
Written Request Submitted to
County Planning & Zoning
County P&Z Review
JJ
Sewer Service Area Policy Advisory
Committee Meeting w/Public Hearing
Approve Deny
JJ
Judicial
Appeal
a. A map showing the location and extent of the property, including the
acreage.
b. A general description of the development proposal.
c. A general timetable for implementing the proposal.
d. Submission by the local engineer, consultant, or the designated agent of the
municipality of a description of how the proposed development would affect
the capacity of the community's treatment plant and related collection system
or any other information judged to be relevant to the application.
e. In the case of a Type I Amendment request, a map showing the boundaries
and acreage of the land which the community would like considered for
removal from the sewer service area. The acreage of this land shall be
equal to the amount that is being requested to be added to the service area.
f. In the case of a Type II Amendment request, a comparison of the growth
projections of the Sewer Service Area Plan with the actual population and
mercantile growth which the community has experienced.
2. Approval for Type I requests. Upon receipt of the amendment request from the
community, the Planning and Zoning Department will review the request for
compliance with the boundary amendment standards listed below. Planning and
Zoning Department staff may approve the request if compliance is found.
Notification of the approval shall be forwarded to the Sewer Service Advisory
Committee members. Committee members shall have fourteen (14) days to
register any objections to the approval with the Planning and Zoning Department.
If such objection is registered, a meeting of the Sewer Service Advisory
Committee will be scheduled at the earliest possible date for review and action.
If for any reason the Planning and Zoning Department is unable to approve the
request, it will be referred to the Sewer Service Advisory Committee for review
and action.
3. Approval for Type II requests. Upon receipt of the amendment request from the
community, the Planning and Zoning Department will schedule a public hearing
on the request before the Sewer Service Advisory Committee.
Planning and Zoning Department staff shall prepare a staff report for review and
consideration by the Sewer Service Advisory Committee which assesses the
completeness of information submitted in support of any sewer service area
adjustment request. The report shall also assess the degree to which the
request meets the boundary amendment standards listed below.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 59
4. The decision (by Committee or Planning and Zoning Department) will be
transmitted in writing to the applicant and the Department of Natural Resources.
The Department of Natural Resources has final approval authority over all
amendments. Any amendment requests denied by the Advisory Committee may
be appealed by the applicant to the Department of Natural Resources.
9.5.2 BOUNDARY AMENDMENT STANDARDS
In order to provide an equitable and uniform basis for revising the sewer service
boundaries , all proposed amendments must meet standards 1 through 3 below, and
either standard 4 or 5.
1. There will be minimal adverse impact on water quality from the development
which would be made possible by the amendment.
2. Existing or planned sewage facilities and interceptors must have sufficient
capacity to transport and treat the projected wastewater flows generated by the
added territory .
3. The boundary amendment and proposed development must be in conformance
with adopted local community comprehensive plans and the established goals
and policies of the Sewer Service Area Plan.
4. For a Type I amendment, the configuration of the sewer service area boundary
may be modified provided there is no increase in the total acreage projected in
the Sewer Service Area Plan for a particular community. Modifications of the
boundary must be shown to be cost-effective, orderly, and a logical extension of
urban development. This type of amendment would most likely occur where
urban development in a particular location abuts the current limits of a
community's service area and requires sewer service. Also, where a developer
or municipality proposes additional development beyond this boundary in
conformance with adopted local plans, an amendment would be considered.
Since this type of boundary amendment does not involve an increase in the total
service area acreage, an area which is equal to the amount of land added must
be removed from the service area.
5. For a Type II amendment, the established acreage of a community's sewer
service area will be increased only when it can be demonstrated that the
circumstances and/or market forces leading to the request (residential or
nonresident ial) were not anticipated at the time the Sewer Service Area Plan's
projected growth rate for the community was projected. Any amendments under
this site-specific boundary adjustment standard must also be cost-effective,
orderly, and a logical extension of urban development. One of the following
criteria must be met for a Type II amendment:
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 60
A. There is a documented need for a sanitary sewer collection system for areas
of existing development.
B. There is a documented need for sanitary sewer to serve a proposed unique
facility or development.
C. There is a documented need for flexibility to accommodate unanticipated
short-term development required for reasonable community growth that is
consistent with adopted community plans.
D. An environmentally sensitive area is re-designated provided there are no
significant adverse water quality impacts.
E. There is an error in the maps, data, projections or allocations of the adopted
Plan.
9.6 OTHER PLAN AMENDMENTS
Except for sewer service area boundary changes which follow the specific procedures
above, any other amendments to this Plan will require approval of the Stevens Point
Urban Area Sewer Service Advisory Committee.
Proposed amendments will be submitted to members of the Sewer Service Advisory
Committee at least one week prior to the meeting at which action on the amendment is
expected to be taken. Amendments approved by the Committee will be transmitted by
the Portage County Planning & Zoning Office to the WDNR for review and final
approval.
9.7 APPEALS
The department will accept a designated management agency (DMA), i.e. community
that operates wastewater treatment system, appeal of an amendment proposal that has
-been denied by a water quality planning agency. The department does not accept
revisions or personal appeals submitted by developers, individuals or other
organizations.
Any person aggrieved by a Department of Natural Resources water quality
management plan decision has the right to file a judicial appeal of the decision.
Wisconsin Statutes and Administrative Code establish time periods within which
requests to review department decisions must be filed. For judicial review of a decision
pursuant to s.227 .52 and 227 .53, Wisconsin Statutes, a petition for review must be filed
with the appropriate circuit court within 30 days after service of the decision. The
respondent in an action for judicial appeal is the WDNR.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 61
9.8 NOTIFICATION OF LARGE-SCALE ON-SITE WASTE DISPOSAL SYSTEMS
The Portage County Planning and Zoning Department On-Site Waste Section will notify
the appropriate Engineer and Building Inspector of all applications for on-site waste
disposal systems of a capacity of 1,500 gallons per day/per acre or greater, applied for
within the sewer service areas of Stevens Point, Whiting, and Plover.
9.9 SEWER SERVICE AREA PLAN UPDATE
The Sewer Service Area Plan should have a comprehensive review by the Sewer
Service Advisory Committee every five years. If it is determined that a major update is
required, the update must include the following as a minimum:
• A review and update of the urban area growth trends and population projections.
• A review of the population (development) densities , household size change, and
urban development trends in the area.
• An assessment of any significant changes to environmentally significant lands in
the area.
• An assessment of any major land use changes or developments in the Stevens
Point urban area.
• Any necessary revisions to the goals and policies of the Sewer Service Area
Plan.
• A revised sewer service area boundary extended to accommodate the urban
area's projected growth.
• A brief description of any amendments to the Plan and service area boundaries
which were made prior to the comprehensive update.
• Any necessary revisions to the Plan implementation and institutional procedures.
• A public hearing on the updated Sewer Service Area Plan.
9.10 INSTITUTIONAL STRUCTURE FOR CONTINUING PLAN IMPLEMENTATION
With the approval of this Sewer Service Area Plan an institutional structure is
established whereby the Stevens Point Urban Area Sewer Service Advisory Committee
will continue to function as the local policy body responsible to the Department of
Natural Resources for maintaining this Sewer Service Area Plan under NR 121 of the
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 62
Administrative Code. The Committee will continue to function under the by-laws
adopted by the Committee on November 9, 1982, as amended on January 3, 2007.
Under this institutional structure, the Portage County Planning and Zoning Department
will function as the administrative agent for the Sewer Service Advisory Committee in
accordance with the Committee's by-laws and the Planning and Zoning Department's
Annual Work Program as approved by the Portage County Planning and Zoning
Committee. As agent for the Committee, the Planning and Zoning Department is
responsible for assisting the Committee with all its administrative functions, and for
providing professional planning advice.
9.11 PUBLIC PARTICIPATION AND HEARING REQUIREMENTS
The broad make-up of the Stevens Point Urban Area Sewer Service Advisory
Committee has, in itself, enabled the preparation of this Sewer Service Area Plan to
reflect the desires and needs of the various urban area units of government.
Other measures taken to provide for public participation include: public notice of all
Committee meetings, individual community meetings, and a public hearing on the Plan.
After taking testimony and comments on the Plan at the public hearing, the Committee
shall take action to adopt the Sewer Service Area Plan incorporating any comments
from the hearing which the Committee deems appropriate to be included in the Sewer
Service Area Plan. The Plan will then be transmitted to the Department of Natural
Resources for formal review and approval.
Upon approval of the Sewer Service Area Plan by the Department of Natural
Resources, the Committee shall send notification of the approval of the Plan to each of
the member communities. The notice shall inform them of the Plan's existence and
necessity for the community to make local staff and developers aware of the need to
coordinate their development proposals with the requirements of the Sewer Service
Area Plan.
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 63
APPENDIX A
STEVENS POINT URBAN AREA SEWER SERVICE AREA PLAN
Stevens Point Urban Area Sewer Service Advisory Committee Bylaws
Stevens Point Urban Area Sewer Service Area Plan 2040 final draft Page 64
BY-LAWS
of the
Stevens Point Urban Area
Sewer Service Advisory Committee
PREAMBLE
In accordance with the ongoing relationship between the Wisconsin Department of
Natural Resources (DNR) and the Portage County Planning and Zoning Department, a
Stevens Point Urban Area Sewer Service Advisory Committee is formed and may adopt
by-laws to govern its operation. It is the intent of this Advisory Committee to enact
these by-laws, consistent with the laws of the State of Wisconsin, to further define its
role and operating procedures. The Advisory Committee's function is to provide
recommendations to the Planning and Zoning Department in producing the Stevens
Point urban area's "Areawide Water Quality Management Plan", a component of the
State's Water Quality Management Plan. After completion of the local Plan, the
Advisory Committee is intended to have local review authority over local sewer
boundary expansions and other amendments to the above local Plan.
Article I - Name of Committee
Section 1. The name of this committee shall be the Stevens Point Urban Area Sewer
Service Advisory Committee, and hereinafter shall be referred to as the Advisory
Committee.
Article II - Authority and Purpose
Section 1. Section 208 of Public Law 92-500 passed by Congress in 1972 requires
the State of Wisconsin to prepare areawide water quality management plans to achieve
the overall goal of making Wisconsin's water fishable and swimmable.
Section 2. Pursuant to the mandates of Public Law 92-500, the Wisconsin
Legislature created Chapters 281.11, and 283.83 of the Wisconsin Statutes, which
authorizes the DNR to organize a comprehensive State program for the enhancement
-and protection of all waters of the State. Under this authority, Chapter NR121 of the
Wisconsin Administrative Code was established specifying the policies, procedures, and
requirements for Wisconsin's areawide water quality planning process.
Section 3. NR121.05(g)(4) requires that an Areawide Water Quality Management
Plan (AWQMP) be prepared for urban areas over 10,000 in population. The overall
purpose of this plan and planning process is to:
Protect and enhance water quality.
Encourage the most cost-effective method of providing public services,
particularly wastewater treatment.
Protect environmentally sensitive areas.
Stevens Point Urban Area Sewer Service Advisory Committee By-Laws Page - 1
Section NR121.05(g)(4) further specifies that preparation of this AWQMP should be
carried out by a local planning agency in conjunction with a local policy advisory
committee consisting of representatives of the various local units of government within
the planning area.
Article Ill - Functions and Responsibilities
Section 1. The overall function of the Advisory Committee shall be to oversee and
guide the preparation of an AWQMP for the Stevens Point Urban Area to be part of the
State's "Water Quality Management Plan" in accordance with Wisconsin Administrative
Code NR121.05(g). In carrying out this overall function, the Advisory Committee shall
be responsible for:
A. The establishment of all policy matters of the AWQMP, including guidance to the
Portage County Planning and Zoning Department in development of the Plan.
The Advisory Committee and Portage County Planning and Zoning Department
shall develop this Plan in accord with an agreed upon schedule.
B. The establishment of institutional mechanisms and procedures for monitoring
and review of all sanitary sewer extensions, based upon wastewater treatment
plant capacity, within the Stevens Point Urban Area as required by the Wisconsin
Administrative Code.
C. The establishment of procedures for Sewer Service Plan amendments and
updates consistent with Wisconsin Administrative Code Section NR121.08.
D. During development and prior to formal adoption, this Areawide Water Quality
Management Plan shall be subject to a public participation process including, at
a minimum, one public hearing.
Article IV - Membership and Administration
Section 1 - Membership. There shall be eight (8) voting members on the Advisory
Committee, consisting of one member from each of the following municipalities in
Portage County:
City of Stevens Point
Village of Plover
Village of Whiting
Village of Park Ridge
Section 2 - Membership Selection.
Town of Hull
Town of Plover
Town of Linwood
Town of Stockton
A. Principal Representative. The governing body (City Council, Village/Town
Board) of each municipality to be represented on the Advisory Committee shall
appoint (at its discretion) its chief elected official or a representative elected by a
majority vote of the governing body. Any appointed designee , as the principal
representative, shall also be an elected official of the community.
Stevens Point Urban Area Sewer Service Advisory Committee By-Laws Page - 2
B. Alternate Representatives. In addition to appointing the principal representative
to the Advisory Committee, the governing body of each municipality shall also
select one or more alternate representatives that shall be entitled to full voting
privileges on all matters coming before the Advisory Committee in the absence of
the principal member. Alternate representatives shall not serve in a permanent
or regular capacity on the Advisory Committee. The alternate representatives
shall announce to the Advisory Committee at the commencement of the meeting
his/her name and representative capacity. A list of alternate members will be
maintained by the Planning and Zoning Department.
C. Term of Appointment. Persons appointed to the Advisory Committee as principal
or alternate representatives by each local governing body shall serve for a period
designated by the local governing body.
Section 3 - Ex-Officio Members. The County Planning and Zoning Director, as Project
Director of the AWQMP, or his/her designee, shall be an ex-officio member of the
Advisory Committee for the principal purpose of functioning as the Advisory
Committee's administrative officer. Ex-Officio members shall not be entitled to hold any
office within this Committee or vote on any matters before the Advisory Committee. The
ex-officio member or his/her designee shall be in attendance at all meetings of the
Advisory Committee for the principal function of recording the proceedings, decisions,
and voting records of the Advisory Committee. As an ex-officio member of the Advisory
Committee, the County Planning and Zoning Director or his/her designee shall be
responsible for the following specific duties:
A. Preparation and distribution of all agendas, minutes, and correspondence for the
Advisory Committee; and
B. Recording the minutes of all Advisory Committee meetings; and
C. The keeping of all resolutions, transactions, findings, determinations, and plan(s)
of the Advisory Committee; and
0. Preparation of a staff report, for review and consideration by the Advisory
Committee, which assesses the completeness of information submitted in
support of any sewer service area adjustment request. The report shall also
assess the degree to which the request meets the criteria set forth in the Stevens
Point Urban Area Areawide Water Quality Management Plan for approval.
Section 4 - Officers. The Officers of the Advisory Committee shall be a Chairperson
and Vice-Chairperson.
A. Chairperson. The Chairperson of the Advisory Committee shall preside at all
meetings of the Advisory Committee. The Chairperson shall perform such duties
as are entrusted to the Chairperson by these by-laws.
B. Vice-Chairperson. The Vice-Chairperson shall preside in the absence of the
Chairperson, or in the event that the Chairperson is incapacitated or unable to
serve.
Stevens Point Urban Area Sewer Service Advisory Committee By-Laws Page -3
C. Selection of Officers. Selection of the Chairperson and Vice-Chairperson shall
be made by the Advisory Committee. Nominations shall be made by Advisory
Committee members and confirmed by a simple majority vote of the Advisory
Committee. Should any office become vacant for any cause, the Advisory
Committee may select a successor from the Advisory Committee members who
may serve until the next meeting of the Advisory Committee, at which time the
Advisory Committee shall elect a replacement under these same procedures.
D. Removal from Office. Any of the officers may be removed for cause or if
incapacitated or unable to participate in Advisory Committee meetings or to
attend to the affairs of their office. Removal from office shall require a simple
majority vote of the Advisory Committee members present.
E. Additional Officers. The Advisory Committee, at any regular meeting, may create
such additional officers from among Advisory Committee members as they deem
necessary and prescribe their duties.
F. Term Limits. The term of office for Chairperson, Vice-Chairperson, or any
additional Officers shall be limited to one year. If the period of time between
meetings exceeds one year, selection of Officers shall be made at the beginning
of the next meeting after the one year period; the term of office shall extend until
this vote.
Section 5 - Subcommittees. The Chairperson may appoint such subcommittees, made
up of Advisory Committee members only, as may be necessary to carry out the
purposes of the Advisory Committee, and shall designate the Chairperson of such
subcommittee(s). Appointment of subcommittees and a Chairperson of such
subcommittee shall be subject to confirmation by the Advisory Committee as a whole.
No subcommittees shall have the authority to act on behalf of the Advisory Committee.
Section 6 - Guidance. The officers, members, and staff of the Advisory Committee
shall be guided by the regulations and guidelines of relevant federal legislation; by the
regulations and guidelines promulgated by federal agencies; by the laws enacted by the
State of Wisconsin, and by regulations and guidelines promulgated by agencies thereof.
Goals and objectives, comprehensive plans, development guides, and similar guidelines
and documents prepared and adopted by the participating communities and the County
-shall be recognized and considered by the Advisory Committee and its staff whenever
appropriate. To add technical expertise to Advisory Committee decisions, Advisory
Committee members may ask their representative community officials and staff to
attend Advisory Committee meetings and to provide information necessary to the
preparation of the AWQMP and its amendment. These officials may include, but are not
limited to: Public Works Director, engineers, planning staff, attorneys, consultants, etc.
Section 7 - Voting. Principal representatives, who are appointed by their communities
to serve as official representatives on the Advisory Committee, shall be entitled to full
voting and membership privileges on all matters before the Advisory Committee. A
community's alternate representative shall be entitled to full voting privileges on all
matters coming before the Advisory Committee in the absence of the principal member.
Members or their alternates must be personally in attendance to vote on matters before
the Committee.
Stevens Point Urban Area Sewer Service Advisory Committee By-Laws Page -4
The format for voting on the Advisory Committee By-Laws, AWQMP, AWQMP
amendments, and sewer service area boundary adjustments shall be in accordance
with the following schedule, with a minimum of 51 votes out of the 100 vote total
constituting a majority vote.
Municipality
City of Stevens Point
Village of Plover
Village of Whiting
Village of Park Ridge
Town of Hull
Town of Plover
Town of Linwood
Town of Stockton
Totals
Total
Votes
31
18
11
8
8
8
8
8
100
Article V - Meetings
Section 1 - Frequency and Notice. It is recommended that the Advisory Committee
meet on an as-needed basis. Special meetings may be called by the Chairperson or by
four (4) Advisory Committee members at more frequent intervals. The recording
secretary of the Advisory Committee shall mail or deliver written notice of each regular
meeting to each member of the Advisory Committee at least five (5) days prior to such
meeting.
Section 2 - Quorum. A simple majority of the full Advisory Committee shall constitute a
quorum for the purpose of carrying on any business of the Advisory Committee at any
duly called meeting thereof. A quorum shall be required for the Advisory Committee to
take action on any agenda item.
· Section 3 - Conduct of Meetings. Advisory Committee meetings shall be conducted in
accordance with the provisions of these by-laws and with the provisions of Robert's
Rules of Order.
Section 4 - Approval of Meeting Minutes. Advisory Committee meeting minutes shall
be approved, if possible, at the next scheduled Advisory Committee meeting. Approval
of minutes shall require a simple majority vote of those members present.
Article VI - General
Section 1 - Planning Staff. The Portage County Planning and Zoning Department will
provide ongoing assistance to the Advisory Committee in accordance with these by
laws and the Planning and Zoning Department's annual work program as approved by
the Portage County Planning and Zoning Committee.
Stevens Point Urban Area Sewer Service Advisory Committee By-Laws Page - 5
Section 2 - Cooperating Agencies. The Advisory Committee may cooperate with and
contribute to or accept services from Federal, State, or local agencies, public or semi
public agencies, private individuals or corporations, and may carry out such cooperative
undertaking. In carrying out such cooperative undertaking, the Advisory Committee
shall not obligate any financial, staff, or other municipal resources of any municipality
without prior approval of such municipal unit.
Section 3 - Compliance with Local and State Laws. In the event that these by-laws or
any provisions herein contained should in any manner be contrary to or violative of the
provisions of any local or State laws, the provisions of the local and State laws shall
prevail.
Section 4 - Amendments. Proposed amendments to these by-laws shall be mailed to
members at least five (5) business days prior to the meeting scheduled for proposed
amending of the by-laws. (See Article IV Section 7 for voting procedure).
Adopted this 3rd day of January, 2007.
I hereby certify that the foregoing by-laws were duly adopted by the Stevens Point
Urban Area Sewer Service Advisory Committee at a legal meeting held on this 3rd day
of January, 2007.
Stephen D. Brazzale, Director
Portage County Planning and Zoning Department
Advisory Committee Administrative Officer
Stevens Point Urban Area Sewer Service Advisory Committee By-Laws Page - 6
APPENDIX B
STEVENS POINT URBAN AREA SEWER SERVICE AREA PLAN
Planning Process Documentation
Stevens Point Urban Area Sewer Service Area Plan 2022-2040 final draft Page 70
MEETING NOTICE
Stevens Point Urban Area Sewer Service Ad¥isory Committee
Friiday, January 21, 2022 - 10 am
Conference Room 5, County· Annex Third Floor
1462 Strongs Avenue, Stevens Point, WI
AGENDA
1. Members of the Public Who Wish to Address the Committee on Specific Agenda Items
Must Register Their Request at This Time, With Such Comments Subject to the
Reasonable Control of the Committee Chair as Set Forth in Roberf s Rules cf Order
2. Call to Order
3. Committee Member Introductions
4. Review of Stevens Point Urban Area Sewer Service Advisory Commmee Bylaws
5. Overview of Sewer Service Area Planning Process - 2022-2042 Plan Update
6. Discuss Wastewater Treatment Plant Capacity
7. Discuss Development Trends and lssuesJConcems Related to Sewer Service Area
a.. Discuss Community American Rescue Ptan Act (ARPA) Allocation Plans
. 9. Discuss Next Meeting Date, Including Possible Virtual Attendance Option
10, Adjournment
NOT.IC'E: A quorum -of lhe Portage County Board of Supervisors
or any committee lheroof may be present at this meeting.
fl!l,ftl'W11hlt:'ll'Al!iWfflUlflWIFfW'Wfll' .. ••111 .. •J1t*ll••_..**•••·• .. ••·-t••••t111• .. ••••· .. ••**•*· .... ,\#a* ...... ***~•*~Ali Jnl'!liii k ltHWWA-* ,lrilJ'lllilll**lr ·*•A:*.._.lll,.*li-lr"ift"i.,_lli'~Yr-~ia
Any person who has special needs and plans on attending this meeting
should contact the Planning and Zoning Department as soon as possible to ensure that
reasonable accommodations can be made; Telephone 715-346-1334,
•• .. •·••lil:t:it11ti•••111* .. ••·•·••·• .. 1u1iu-,k.iU ·rt•tfrilfl :tU~*tlH11:iliHlbj:tHA:it111 t ·'it:illiillHi:A .. U• .. •·•·•••••• .. •u••ttHiltt:tl:l:,- t'tA H .illHA! lfit11<t•·1111 .. • ... •·•·ta••• ... •••·••J1RUh•1'•*
PLANNING • ZONING ANO CODE ADMINISTRATION • LAND AND WATER CONSERVATION
ON·SITE WASTE • GROUNDWATER MANA'GEMENT • ECONOMIC AND BUSINESS PARK DEVELOPMENT
MINUTES - Project Kick-Off Meeting
Stevens Point Urban Area Sewer Service Advisory Committee
January 21 , 2022
Municipality Primary Present Alternate Present Technical Staff/ Others Present
Member Member
City of Stevens Mike Wiza Joel Lemke X Ryan Kernosky
Point
Village of Park Steve Menzel Paul McGinley
/ I) RidQe
VillaQe of Plover Steve Kunst X Dan Ault ,/ 11"
~
VillaQe of WhitinQ Kevin Lutz Nie Schmeiser / x r Jake Wilcox
Town of Hull DaveWilz X Jan Wav } "' X
' Town of Linwood Howard Krieski X Daniel Wimme / / '- ' Town of Plover Jim Garbe Deb Sniadaieyvskl', ,11' X ,..,
' Town of Stockton Mike Bronk Jeanne Dopde ">
' ' North Central Wisconsin Regional Plan Commission Staff Pre~ t: ' ryl Landeau and D~ is~ wrence
Others Present: Al Haga, Portage County Board Chair
Staff Present: Tim Reed, Kristen Johnson, and Paula Cummings, Portage County Planning and Zoning Department
1. Members of the Public Who Wish to Address the Committee on,Specific Agenda Items Must Register Their
Request at this Time, with Such Comments Subject to the Reasonable Control of the Committee Chair as Set Forth
in Robert's Rules of Order
No members of the public were present.
2. Call to Order
Landeau called the kick-off meeting of the e Advisory (SSA) Committee to
order at 10:04 am in Conference hose present with a copy of the
current sewer service are ral Resources (DNR) on October
22, 2008.
3. Committee M
Those present (see c municipality they represent and position within
that municipality.
4. Review et Stevens Point l:.lrbar;i Area Sewer. Service ;A:dvisory Committee Bylaws
(NOTE: Bylaws were inGluded 'in the Committee meeting packet emailed prior to the meeting.)
Landeau refe red to the bylaws and no ed the sewer service process began as a requirement of the Clean Water
Act/as mandated by the State. Main purposes of the Plan, which covers urban areas with a 10,000+ population,
int ludes protect/enhance water quality, encourage cost-effective methods of providing public services, protect
envimnmentally sensitive are s, a d reduce sprawl. The plan boundary is based on projected growth and sewer
serv.ice development. The Plan update process will include review/re-establishment of the boundary, and review of
environmental areas, which can be amended as necessary. Landeau noted the plan update is overdue and should
be reviewett ever-y 10 years, on a 20-year cycle. Membership consists of urban core municipalities, and an election
of chair and vice-chair will take place at the next meeting. Landeau referred members to page 5 of the bylaws,
where a weightec:i vo irig struature is described. He noted 51 votes out of the potential 100 votes constitutes a
majority vote.
Kunst asked for clarification' that attending a meeting virtually, would align with the currently required "personally
attend" stipulation, and after brief discussion, members agreed virtual attendance would be accepted. Kunst then
asked for a description of how the weighted vote was calculated. Landeau noted he had seen other SSA
committees he worked with have a weighted vote based on population. He further noted our sewer service
boundary population today is similar to 2007, which is the last time the weighed vote was reviewed. Cummings
offered to research past records for a more detailed description.
1
Lawrence noted the previous SSA Committee Chair was from Park Ridge and the Vice-Chair was from the Village
of Plover. An election will be on the next agenda and then the Chair will run these meetings. Cummings suggested
anyone interested in either position contact Reed with their interest and to ask any questions they may have.
5. Overview of Sewer Service Area Planning Process - 2022-2042 Plan Update
Landeau felt a review of key plan elements could take place in 2-3 meetings (bi-monthly) . Wastewater facilities will
be discussed and determined as to how they will fit into the plan. Growth projections from the Department of
Administration, census data, and comprehensive plan information will be utilized. He noted the following will also
take place: review of environmentally sensitive areas, goals and policies, and administrative procedures, to then
determine what the sewer service boundary needs to look like. Text will then be updated/revised and agreed to by
municipalities represented on the committee, based on these reviews. Lawrence stated the hope is to have the
update completed in 6 meetings and referred to the current boundary map provided today. The update may
change boundary lines when factoring-in population and removing environmentally sensitive areas.
Kernosky referenced best practices being followed based on existing conditions/developments and taken into
consideration , such as Crossroads Commons/County Road HH line for sewer service boundary. Lawrence felt
those issues need to be identified and discussed, and then determine how it relates to the plan, He noted the DNR
looks from an areawide perspective, not a political aspect. Kernosky said his point was whether the plan is
considered a political document or best practice. Lawrence replied the document is best practice; system-wide
best practice.
6. Discuss Wastewater Treatment Plant Capacity
Landeau asked the City of Stevens Point, Village of Plover and Village of Whiting to describe their treatment plants.
Village of Plover: Kunst stated capacity is not a concern; they have vast capacity to handle current and future
growth. Landeau asked if there are any issues and Kunst replied they are dealing with Phosphorus and believe
Nitrates will be coming soon . Village of Whiting: Schmeiser reported they are using 1/3 of the capacity after a
2009 upgrade. Landeau asked about issues and Schmeiser replied there are none known, and they should be
okay on Phosphorus . City of Stevens Point: Lemke stated on the liquid side, they are close to 50%; at 2.2 million
gpd of a 4.4 million gpd capacity. As for solids, they are a bit over 50%; at 5-6,000 pounds per day of a 10,500
pounds per day capacity. Lemke noted this is not a simple figure because consumption changes ; it is a rating only.
A new rating could have a minor upgrade. Landeau referenced nitrate statistics and how that impacts plants.
Kernosky said that is hypothetical and the DNR has not come out with anything . Lemke referenced Total Maximum
Daily Loads (TMDL) are not at a need for upgrade but felt that would be a common theme as it comes down from
the DNR. As for cities and tertiary treatment, he felt they are all thinking about it. He then referenced PFAS, noting
those have an implication for Wisconsin and is more a solid waste issue. The City takes leachate but felt "we are
all in this together". Lemke referred to distributed resources - large communities vs. other resources such as a
regional treatment plant and felt this should be part of the committee's discussion . Landeau said discussion on
regionalization is required by the DNR and pros/cons will be discussed .
Lawrence asked about operational , customer, and/or cost issues. Schmeiser felt rates are a concern as a lower
number of users equals a higher cost.
7. Discuss Development Trends and Issues/Concerns Related to Sewer Service Area
Landeau noted comprehensive plans address future development and asked municipalities if their plans are
current. Johnson stated the Town of Hull is updating their plan, which should be finished this year, Linwood's plan
is almost done, and the Town of Plover just finished theirs. Kunst stated the Village of Plover is getting back into an
update that should be done before the end of the year. Kernosky noted the City of Stevens Point's 2015 update
was not adopted and they will begin again this summer with a focus on neighborhoods, which is a 3-4 year process.
Landeau asked about trends. Kunst stated the focus of the Village of Plover will be infill of higher density
redevelopment , i.e.: downtown area. There is a challenge with annexation and sewer/water, and they are working
with the Town of Plover. Commercial and manufacturing development has out-paced other areas of development.
They would like to see suburban neighborhoods and more subdivisions . Kernosky said the City has lost some
population and they are challenging the census data, but acknowledges it must be utilized. Kunst referenced
residential development (single family development by Smiley's) and general commercial growth, with additional
commercial growth coming. Schmeiser said the Village of Whiting is a bit condensed with some residential and
some commercial. He noted since 2007, the Village lost a huge industrial user with the papermill closing in 2013.
2
Landeau then asked about trends in the townships. Sniadajewski described very light residential development and
a potential solar farm that is being proposed on the southwest portion of the town into the Town of Grant. This is in
preliminary stages. There is concern about sewer service based around Shooter's/Kwik Trip/Highway 51 and 139
intersection/hotel and the extension of sewer and water there to help with their needs. Wilz stated there are 10-12
homes per year going up in the Town of Hull. Kunst stated politics should be taken out of the discussion, and with
seven planners on the committee, we should be able to come up with a good plan. He acknowledged the City and
Village had challenges in the past and current staff are willing to work together. Let's implement best practice and
remove politics. Lemke noted the last sewer service area map shows a proposed Town of Plover boundary. Kunst
stated the Village and Town of Plover have a boundary agreement, which was appro ed - areas were sewered
without annexation.
8. Discuss Community American Rescue Plan Act (ARPA) Allocation Pia s
Landeau asked where communities are with ARPA spending plans. Lawrer1ce asked if any plans would impact the
sewer service process or areas. This information can be used in the plarrnin process. Kunst stated the Village of
Plover is in early stages of prioritizing expenditures. Lemke noted the City is initially addiRg 20% to annual
reconstruction costs. Schmeiser said the Village of Whiting is preli ·marily looking at a 0/50 split between sewer
and water.
9. Discuss Next Meeting Date, Including Possible Virtual Attendance Option
Landeau said the next meeting would be in March, as they hope to meet bi-mor:ithly. Some members felt Friday
morning was not the best time to meet. It was decided that Cummings would send a Doodle poll to me 'bers
offering Tuesday, Wednesday, and Thursday morning or afternoon to determi e what day of week and time of day
is preferred. Members agreed that meetings should be offered both in .. person and virtual. Lawrence stated
meetings should be held to 1 or 1.5 hours. Larideau reminded me · bers a Chair and Vice-Chair will be elected at
the March meeting.
10. Adjournment
Meeting adjourned at 11 :09 am.
3
STEVENS POINT URBAN AREA SEWER SERVICE ADVISORY COMMITTEE
Tuesday, March 29, 2022 - 2:00 p.m.
Conference Room 5, County Annex Third Floor
1462 Strongs Avenue, Stevens Point, WI
AGENDA
REMOTE ATTENDANCE & COMMENT
To attend this meeting by telephone: dial 1-608-338-1399, after dialing the number you will then
be asked to enter in a meeting number. Use the following meeting number: 618 020 214, then
press#
To attend this meeting by video: Click here to join the meeting
Due to COVI D-19 and the potential risk to members of the public who attend meetings in
person, any person who plans to attend the meeting remotely, but wishes to comment on an
agenda item can send their comments via email to reedt@co.portage.wi.us. The deadline for
sending comments by email is 48 hours prior to the start of the meeting. Emailed comments will
be delivered to committee members at least 24 hours prior to the meeting. Remote comment by
the public during the meeting will be at the discretion of the Chair.
1. Call to Order / Attendance
2. PUBLIC NOTICE: Members of the public who wish to address the Committee on specific
agenda items must register their requests at this time, with such comments subject to the
reasonable control of the Committee Chair as set forth in Robert's Rules of Order
3. Introductions
4. Nomination and Election of Officers
5. Review/Approval of Minutes from January 21 , 2022
6. Review of Advisory Committee Vote Allocation within Bylaws
7. Discuss Planning Area Population and Growth Projections
8. Review Environmentally Sensitive Area Designations
9. Next Meeting Date
10. Adjournment
NOTICE: A quorum of the Portage County Board of Supervisors
or any committee thereof may be present at this meeting.
***************************** ************************************* ************ *********** ****************************** **************
Any person who has special needs and plans on attending this meeting
should contact the Planning and Zoning Department as soon as possible to ensure that
reasonable accommodations can be_ made. Telephone 715-346-1334 .
MINUTES
Stevens Point Urban Area Sewer Serv_ice Advisory Committee
March 29, 2022
Municipality Primary Present Alternate Present Technical Staff/ Others Present
Member Member
City of Stevens Mike Wiza Joel Lemke X Ryan Kernosky
Point
Village of Park Steve Menzel X Paul McGinley
Ridoe ~ ...
Village of Plover Steve Kunst X Dan Ault / I>
Village of Whiting Kevin Lutz Jake Wilcox ~x ~
Town of Hull DaveWilz X Jan Way I/ X(
Town of Linwood Howard Krieski Vacant / .,,.
' Town of Plover Jim Garbe X Deb SniadajewsRi ~ x~ 1,
Town of Stockton Mike Bronk Jeanne Dodge._ v ,...,
' North Central Wisconsin Regional Plan Commission Staff Pres8' ~ ryl Landeau ~
Others Present: ~ ~
Staff Present: Tim Reed, Kristen Johnson, and Amy Heins, Portage County Rlanning and Zoning Department
1. Call to Order
Landeau called the meeting of the Stevens Point Urban Area Sewer-Service Advisory (SSA) Committee to order at
2:05 pm in Conference Room 5 of the County Annex.
2. Members of the Public Who Wish to Aa • ic Agenda Items Must Register Their
Request at this Time, with Such Comments Subj e Committee Chair as Set Forth
in Robert's Rules of Order
No members of the public were present.
3. Introductions
Those present (see chart above) introduced themselves, n0 ing the municipality they represent and position within
that municipality.
4. Nomination and Election of Officers
Landeau asked for nominations for SSA Committee Ctiaif:
• SrtiaaaJewski nominated Kunst.
Hearing n, furtber nominations, Landeau called for a motion. Sniadajewski moved to elect Kunst as Chair;
secondea by1Wilz. Motion passed by voi e vote.
Kunst asked for nominations for SSA Committee Vice-Chair:
• K unst nominated Lemke.
Hearing no furtfler nominations, ~unst called for a motion. Kunst moved to elect Lemke as Vice-Chair; seconded by
Wilz. Motion passed by voice vote.
5. Review/Ap1:>roval of Minutes from January 21 , 2022
Kernosky referenced item #7, second paragraph, and stated the director and municipalities were mixed up and it
should read "Kernosky stated the focus of the City of Stevens Point will be infill of higher density redevelopment,
i.e.: downtown area. There i a challenge with annexation and sewer/water, and they are working with the Town of
Hull." Kunst replied that is how he remembered it as well.
Lemke moved to approve as amended. Motion was seconded by Menzel; which passed by voice vote.
6. Review of Advisory Committee Vote Allocation within Bylaws
Kunst noted for the record that the Bylaws have been reviewed and stand as is.
7. Discuss Planning Area Population and Growth Projections
1
Kunst stated the DNR requires the use of DOA numbers, and they are not consistent over 40 years which causes
challenges with population projections for the Village of Plover. Kunst asked to follow up with the DOA just to verify
and see if they would be willing to look at other methods if necessary. Landeau stated there are tricks/solutions like
adding acreage for a buffer. Kernosky noted that the County's population from 2010 to 2020 was quite stagnant,
very small increase, and it is not worth arguing since the DNR/DOA requires the use of their numbers. Landeau
replied that is correct, Marshfield tried, and it did not get them anywhere.
Lemke asked for an explanation of market factor. Landeau replied this accounts for a buffer to allow for market
trends and choices. Owners may not be wiling to offer up land for sewer service developmenUgrowth and this
provides a buffer of additional land to allow for that market variability. Lemke asked who comes up with the market
factor acreage. Landeau replied the community does, and the DNR approves the acto , by 1, 2, and occasionally 3.
Kunst stated that Town of Plover has commercial land served by Village of Plove~ sewer and asked if this needs to
be addressed in the plan. Landeau replied he would look into and work it into the plan.
Kernosky asked if the market factor area should be reduced so that the SSA Cammi ee would have to review
proposed sewered developments on the fringe? Landeau replied most communities make the boundaries larger to
prevent that issue. Kunst stated he wanted to continue as is otherwise it unnecessarily instill a group of this caliber
to politicize development projects. The goal is to let the community run themselves. Kernosky disagreed and stated
realistically we are not going to get anywhere near some of these boundaries by 2042 and suggested tightening it
up. Landeau reminded the Committee that the goal of this P.lan is to protect tlie water quality by prev nting
development in environmentally sensitive areas. Kernosky statecl the 200 map does not reflect that, most of the
City's wellhead protection areas are in the Town of Hull and the e i lipited :Fawn of Hull land included in this sewer
service plan. Landeau agreed and stated he would be looking into it. This is required by the Clean Water Act and
the DNR is implementing it.
Landeau asked members to review the draft map for inaccuracies (develor2ed versus not developed). Lemke asked
if there was room for a designation for undevelopable Ian . anaeau replied yes, just let him know the specific
areas.
Sniadajewski stated much of the pro o ped, but it is agricultural farm
fields and perhaps it was marked d to improvemen s o irrigation systems. Landeau replied that is
very possible and th .
8. Review Envi
Reviewed maps. Le f lodges/pavilions. Landeau replied that should
already b • ct the future development allocation.
9. N
The next ively set for May 17, 2022 at 2:00 p.m. in conference room 5.
10. ent
Wilz move rn the mee con e • y Lemke. Meeting adjourned at 3:35 pm.
Amy Heins
Recording Secretary
2
MINUTES
Stevens Point Urban Area Sewer Service Advisory Committee
June 7, 2022
Municipality Primary Present Alternate Present Technical Staff/ Others Present
Member Member
City of Stevens Mike Wiza Joel Lemke X Ryan Kernosky
Point
Village of Park Steve Menzel X Paul McGinley
Ridae ,..._
Village of Plover Steve Kunst X Dan Ault #
> ,.
Village of Whiting Kevin Lutz Jake Wilcox / X /
Town of Hull DaveWilz X Jan Way / X(
Town of Linwood Howard Krieski Vacant ~
"' Town of Plover Jim Garbe X Deb Sniadaiewsl<i I/ x" I\...
Town of Stockton Mike Bronk Jeanne Dodge" v X
' ' North Central Wisconsin Regional Plan Commission Staff Pres~ 9'ry1 Landeau ''-
Others Present: Nathan Sandwick , ~~
Staff Present: Tim Reed, Kristen Johnson, and Amy Hei s, Portage County Planning and Zanin Department
1. Call to Order
Kunst called the meeting of the Stevens Point Urban Area Sewec SeRvice Advisory (SSA) Committee to order at
2:01 pm in Conference Room 5 of the County Annex.
2. Members of the Public Who Wish to Ml genda Items Must Register Their
Request at this Time, with Such Comments Sul:>j e Committee Chair as Set Forth
in Robert's Rules of Order
No members of the public were present.
4. Review Revi
Maps were reviewed
5. Discuss Boundary
Landeau · t and the Village of Plover for their final acreage
alloc
6. MG~, ~
Revi discussion.
7. te
The next S me e is tentatively set for August 30, 2022 at 2:00 p.m. in conference room 5.
8. Adjournment
Lemke moved to adjourn the meeting; seconded by Menzel. Meeting adjourned at 2:38 pm.
Respectfully Submitted,
Amy Heins
Recording Secretary
1
STEVENS POINT URBAN AREA SEWER Sl:RVICE ADVISORY COMMITTEE
Tuesday, September 6, 2022- 2:00 p.m.
Conference Room 5, County Annex Third Floor
1462 Strongs Avenue, Stevens Point, WI
AGENDA
REMOTE ATTENDANCE & COMMENT
To attend this meeting by telephone: dial 1-608-338-1399, after dialing the number you will then
be asked to enter in a meeting number. Use the following meeting number: 687 996 971, then
press#
To attend this meeting by video: Click here to join the meeting
Due to COVI D-19 and the potential risk to members of the public who attend meetings in
person, any person who plans to attend the meeting remotely, but wishes to comment on an
agenda item can send their comments via email to reedt@co.portage.wi.us. The deadline for
sending comments by email is 48 hours prior to the start of the meeting. Emailed comments will
be delivered to committee members at least 24 hours prior to the meeting. Remote comment by
the public during the meeting will be at the discretion of the Chair.
1. Call to Order / Attendance
2. PUBLIC NOTICE: Members of the public who wish to address the Committee on specific
agenda items must register their requests at this time, with such comments subject to the
reasonable control of the Committee Chair as set forth in Robert's Rules of Order
3. Review/Approval of Minutes from June 7, 2022
4. Review Plan Implementation and Administrative Procedures
5. Discuss Development of Proposed Sewer Service Area Boundary Map
6. Next Meeting Date
7. Adjournment
NOTICE: A quorum of the Portage County Board of Supervisors
or any committee thereof may be present at this meeting.
******** *********** ******************** *********************** ****** **** **************** **************** ********** ****** ***** **** ****
Any person who has special needs and plans on attending this meeting
should contact the Planning and Zoning Department as soon as possible to ensure that
reasonable accommodations can be made. Telephone 715-346-1334 .
STEVENS POINT URBAN AREA SEWER SERVICE ADVISORY COMMITTEE
Tuesday, November 1, 2022- 2:00 p.m.
Conference Room 5, County Annex Third Floor
1462 Strongs Avenue, Stevens Point, WI
AGENDA
REMOTE ATTENDANCE & COMMENT
To attend this meeting by telephone: dial 1-608-338-1399, after dialing the number you will then
be asked to enter in a meeting number. Use the following meeting number: 870 336 682, then
press#
To attend this meeting by video: Click here to join the meeting
Due to COVID-19 and the potential risk to members of the public who attend meetings in
person, any person who plans to attend the meeting remotely, but wishes to comment on an
agenda item can send their comments via email to reedt@co.portage.wi.us. The deadline for
sending comments by email is 48 hours prior to the start of the meeting. Emailed comments will
be delivered to committee members at least 24 hours prior to the meeting. Remote comment by
the public during the meeting will be at the discretion of the Chair.
1. Call to Order I Attendance
2. PUBLIC NOTICE: Members of the public who wish to address the Committee on specific
agenda items must register their requests at this time, with such comments subject to the
reasonable control of the Committee Chair as set forth in Robert's Rules of Order
3. Review and Approve Minutes from September 6, 2022
4. Review Revised Draft Boundary Maps
5. Review and Approve Draft Sewer Service Area Document
6. Discuss Plan Adoption Process
7. Next Meeting Date
8. Adjournment
NOTICE: A quorum of the Portage County Board of Supervisors
or any committee thereof may be present at this meeting.
*************************************************************************************************************************************
Any person who has special needs and plans on attending this meeting
should contact the Planning and Zoning Department as soon as possible to ensure that
reasonable accommodations can be made. Telephone 715-346-1334 .
MINUTES
Stevens Point Urban Area Sewer Service Advisory Committee
September 6, 2022
Municipality Primary Present Alternate Present Technical Staff/ Others Present
Member Member
City of Stevens Mike Wiza Joel Lemke X Ryan Kernosky
Point
Village of Park Steve Menzel X Paul McGinley
Ridqe
Villaqe of Plover Steve Kunst X Dan Ault
Village of Whiting Kevin Lutz Jake Wilcox X
Town of Hull DaveWilz X Jan Way
Town of Linwood Howard Krieski Vacant
Town of Plover Jim Garbe X Deb Sniadaiewski X
Town of Stockton Mike Bronk Jeanne Dodqe X
North Central Wisconsin Regional Plan Commission Staff Present: Darryl Landeau
Staff Present: Tim Reed, Kristen Johnson, and Amy Heins, Portage County Planning and Zoning Department
1. Call to Order
Kunst called the meeting of the Stevens Point Urban Area Sewer Service Advisory (SSA) Committee to order at
2:02 pm in Conference Room 5 of the County Annex.
2. Members of the Public Who Wish to Address the Committee on Specific Agenda Items Must Register Their
Request at this Time, with Such Comments Subject to the Reasonable Control of the Committee Chair as Set Forth
in Robert's Rules of Order
No members of the public were present.
3. Review/Approval of Minutes from June 7, 2022
Wilz moved to approve as presented. Motion was seconded by Garbe, which passed by voice vote.
4. Review Plan Implementation and Administrative Procedures
- Review/Update "Request Form"
- Add appeal process verbiage
- Clarify Flow Chart to "notify Sewer Service Advisory Committee members"
Proposed draft to be brought to the next meeting, once approved, send draft to municipalities for review/approval
(allowing 3 months), bring back in February or March for a required Public Hearing and action, and then forward to
the DNR for final approval.
5. Discuss Development of Proposed Sewer Service Area Boundary Map
Thi~ item will be brought to the next meeting.
6. Next Meeting Date
The next SSA Committee meeting date is tentatively set for November 1, 2022, at 2:00 p.m. in conference room 5.
7. Adjournment
Lemke moved to adjourn the meeting; seconded by Wilz. Meeting adjourned at 2:44 pm.
Respectfully Submitted,
Amy Heins
Recording Secretary
1
MINUTES
Stevens Point Urban Area Sewer Service Advisory Committee
November 1, 2022
Municipality Primary Present Alternate Present Technical Staff/ Others Present
Member Member
City of Stevens Mike Wiza Joel Lemke X Ryan Kernosky
Point
Village of Park Steve Menzel X Paul McGinley
Ridge
Villaqe of Plover Steve Kunst X Dan Ault
Villaqe of Whitinq Kevin Lutz Jake Wilcox X
Town of Hull DaveWilz X Jan Way X
Town of Linwood Howard Krieski Vacant
Town of Plover Jim Garbe X Deb Sniadaiewski
Town of Stockton Mike Bronk Jeanne Dodqe
North Central Wisconsin Regional Plan Commission Staff Present: Darryl Landeau
Staff Present: Tim Reed, Kristen Johnson, and Amy Heins, Portage County Planning and Zoning Department
1. Call to Order
Kunst called the meeting of the Stevens Point Urban Area Sewer Service Advisory (SSA) Committee to order at
2:04 pm in Conference Room 5 of the County Annex.
2. Members of the Public Who Wish to Address the Committee on Specific Agenda Items Must Register Their
Request at this Time, with Such Comments Subject to the Reasonable Control of the Committee Chair as Set Forth
in Robert's Rules of Order
No members of the public were present.
3. Review/Approval of Minutes from September 6, 2022
Wilz moved to approve as presented. Motion was seconded by Menzel, which passed by voice vote.
4. Review Revised Draft Boundary Maps
Kunst stated the Village of Plover will meet with the Town of Plover to verify maps are ok.
5. Review and Approve Draft Sewer Service Area Document
• Page 12 - Should be "100-120" degrees F
• Page 15, 3rd paragraph - "stormwater" was misspelled
• Lemke to provide updates to the treatment system description
• Kunst to provide amendments for Table 1 of Section 2
6. Discuss Plan Adoption Process
The-Committee agreed that minor changes made with track changes and shared via email would be acceptable
prior to moving forward with the Department of Natural Resources (DNR) preliminary review. After the DNR
preliminary review, we will need to have a public hearing, a formal approval from the Committee, and then a final
approval from the DNR.
7. Next Meeting Date
No scheduled meeting at this time; the next SSA Committee meeting will be determined after the DNR reviews the
proposed plan.
8. Adjournment
Lemke moved to adjourn the meeting; seconded by Wilcox. Meeting adjourned at 2:39 pm.
Respectfully Submitted,
Amy Heins
Recording Secretary
1
* LocaliQ
PROOF OF PUBLICATION
PORTAGE COUNTY GOVT
SIB Portage Count y
1516 Church ST
Stevens Point Wl 54481-3501
Wisconsin
GANNETT
STATE OF WISCONSIN, COUNTY OF BROWN
Being duly sworn, doth depose and say that she/he is an
authorized representative of the Stevens Point Journal,
public newspaper publ ished in the city of Stevens Point, in
Portage and/or Wood counties; that a notice of which the
annexed is a copy, taken from said paper, has been
published in said newspaper in the issues dated :
08/08/2023,08/15/2023
That said newspaper was regularly issued and circulated on
those dates and that the fees charged are legal.
Sworn to and subscribed before on 08/15/2023
Notary , State of WI, Coy~ of Brown
y--,~,-c.,7
My commision expires
Publication Cost: $44.00
Order No: 9139082
1013285
9139082
Customer No:
PO·#:
Tl-ITS IS N OT AN TNVOI CE!
Please do 1101 use tl1is formfor payment remiffan ce.
DENISE ROBERTS
Notary Public
State of Wiscons in
# of Copies:
1
PO Box 630848 Cincinnati, OH 45263-0848
NOTICE OF PUBLIC HEARING
PROPOSED 2040 STEVENS POINT
URBAN AREA SEWER SERVICE AREA
PLAN
Notice is hereby given that on Tuesday,
August 22, 2023, at 2:00 p.m. in
Conference Room 5 of the County
Annex, 1462 Strongs Avenue, Stevens
Point, the Stevens Point Urban Area
Sewer Service Advisory Committee will
hold a public hearing at which time and
place all interested p ersons may appear
and will be given an opportunity to be
heard in support of or in opposition of the
proposed 2040 Stevens Point Urban Area
Sewer Service Area Plan, which will
update and revise a twenty-year
boundary to control sewered
development and protect water quality
within parts of the Towns of Hull, Plover,
and Stockton, the Villages of Park Ridge,
Plover, and Whiting, and the City of
Stevens Point.
The proposed Plan is available for
viewing online at
httRs://www.ncwrRc.org/ncwq2c2021 /stev
~oint-urban-area-sewer-service -area
Rlan-2040-upctfilfil or in-person at the
County Planning and Zoning Office, 1462
Strongs Avenue, on business days
between the hours of 7:30 AM and 4:30
PM. All interested persons are invited to
attend said hearing and be heard, and
accommodations have been made to do
so remotely if you prefer. To attend this
meeting by telephone dial 1-872-242-
7813, after dialing the number you will
then be asked to enter in a meeting
number. Use the following meeting
number: 317 626 714, then press #. To
attend . this meeting by video go to
www.m,RQ1:1ag~ and click on the
link in the agenda for the Stevens Point
Urban Area Sewer Service Advisory
Committee meeting in the
Agendas/Minutes Calendar. If you are
unable to attend the hearing, you may
submit written comments on agenda
items to the Planning and Zoning
Department by mail at 1462 Strongs
Avenue, Stevens Point, WI 54481, or by
e-mail at Uohnsokr@Cll..cRQlli!9e.wi.us).
.Dated this 8th day of August, 2023.
Kristen Johnson
Planner
Page 1 of 1
STEVENS POINT URBAN AREA SEWER SERVICE ADVISORY COMMITTEE
Tuesday, August 22, 2023 - 2:00 p.m.
Conference Room 5, County Annex Third Floor
1462 Strongs Avenue, Stevens Point, WI
AGENDA
REMOTE ATTENDANCE & COMMENT
To attend this meeting by telephone: dial 1-872-242-7813, after dialing the number you will then
be asked to enter in a meeting number. Use the following meeting number: 317 626 714, then
press#
To attend this meeting by video: Click nere lo 10111 th\:' me~tIno
1 . Call to Order / Attendance
PUBLIC HEARING:
2. Proposed 2040 Stevens Point Urban Area Sewer Service Area Plan, which will update
and revise a twenty-year boundary to control sewered development and protect water
quality within parts of the Towns of Hull, Plover, and Stockton, the Villages of Park
Ridge, Plover, and Whiting, and the City of Stevens Point.
BUSINESS MEETING:
3. PUBLIC NOTICE: Members of the public who wish to address the Committee on specific
agenda items must register their requests at this time, with such comments subject to the
reasonable control of the Committee Chair as set forth in Robert's Rules of Order.
4. Review and Approve Mi111utes from November 1, 2022
5. Discussion/Possible Action - Proposed 2040 Stevens Point Urban Area Sewer Service
Area Plan
6. Overview Final Steps
7. Adjournment
NOTICE: A quorum of the Portage County Board of SupeNisors
or any committee thereof may be present at this meeting.
Any person who has special needs and plans on attending this meeting
should contact the Planning and Zoning Department as soon as possible to ensure that
reasonable accommodations can be made. Telephone 715-346-1334 .
Municipality
City of Stevens
Point
Village of Park
Ridge
Village of Plover
VillaQe of WhitinQ
Town of Hull
Town of Linwood
Town of Plover
Town of Stockton
MINUTES
Stevens Point Urban Area Sewer Service Advisory Committee
August22 , 2023
Primary Present Alternate Present
Member Member
Mike Wiza Joel Lemke X
Steve Menzel X Paul McGinley
Steve Kunst X Dan Ault
Kevin Lutz Jake Wilcox X
DaveWilz X Jan Way
Howard Krieski Vacant
Jim Garbe X Deb Sniadajewski
Mike Bronk Jeanne Dodge
North Central Wisconsin Regional Plan Commission Staff Present: Darryl Landeau
Technical Staff/ Others
Present
Staff Present: Tim Reed, Kristen Johnson, and Amy Heins, Portage County Planning and Zoning Department
1. Call to Order
Kunst called the meeting of the Stevens Point Urban Area Sewer Service Advisory (SSA) Committee to order at
2:00 pm in Conference Room 5 of the County Annex.
PUBLIC HEARING:
2. Proposed 2040 Stevens Point Urban Area Sewer Service Area Plan, which will update and revise a twenty-
year boundary to control sewered development and protect water quality within parts of the Towns of Hull, Plover,
and Stockton, the Villages of Park Ridge, Plover, and Whiting, and the City of Stevens Point.
Having no public present for comment, Kunst asked for a motion to close the public hearing. Lemke moved to close
the public hearing. Motion was seconded by Menzel, which passed by voice vote.
BUSINESS MEETING:
3. Members of the Public Who Wish to Address the Committee on Specific Agenda Items Must Register Their
Request at this Time, with Such Comments Subject to the Reasonable Control of the Committee Chair as Set Forth
in Robert's Rules of Order
No members of the public were present.
4. Review/Approval of Minutes from November 1, 2022
Wilz moved to approve as presented. Motion was seconded by Wilcox, which passed by voice vote.
5. . Discussion/Possible Action - Proposed 2040 Stevens Point Urban Area Sewer Service Area Plan
Lemke moved to approve as presented. Motion was seconded by Garbe, which passed by voice vote.
6. Overview Final Steps
Landeau stated now that the plan has been approved, he will accept track-changes , correct any formatting issues,
add information from today's meeting including the minutes, and send to the DNR for final approval. Once the DNR
approves the plan it will be forwarded to the municipalities for their adoption. Landeau asked municipalities to
submit minutes to him or Heins showing the towns action.
7. Adjournment
Garbe moved to adjourn the meeting; seconded by Wilz. Meeting adjourned at 2:12 pm.
Respectfully Submitted,
Amy Heins
Recording Secretary
1
APPENDIX C
STEVENS POINT URBAN AREA SEWER SERVICE AREA PLAN
Area Future Land Use Plans
Stevens Point Urban Area Sewer Service Area Plan 2022-2042 final draft Page 86
I ••
'""
~ ,,
\
(
' ,,
) I,
/
To';,, ofHull
-~
~ .J--
J '
_r.:f-~_,,.,..,-v
I ,
I
I
I
r- 1
r
r ·-;J
I I I
lL---i _
··------,- -
L_
Map8.3
Future Land Use
Update
Future Land Use
-- -C,,-J
---- CorMadlllOffloeJ~
•- ~OlliOtlMlfi.lmlly
,l\l\lll\\\1--
W"'i ---PnChlrld __ ,_,, ..
P'A """"
----... _,
------· ... - --
w+•
I
0.25 0.5 1 Ml'tal
Sowa,: City ofSfeveDS Point (2005)
Portage County Plmming & Zoning (2005)
I Adopled: June 19. 2006
City of Stevens Point
Comprehensive Plan
~
\!SI
Portage County
Planning & Zoning
1462 Strongs Ave.
Stevena Point, 1M 54481
Pagi,- 167
!
L~-----------~-----} \'.K_\w----~~----- - ----------1 \~r-·T -rt}--L .~ ___ y _~--~-hj ~~-\ ~-J ---~-----·-·\t··_::-,~ ---'--··-··L --_·~---- ·--·--··.J,L. •• ----r·---
f
/l , ··\ ' ~ (- " ! , .~ 1" ~~,- ! ,·1r - ! , I \ '··7 \-.' 1?, ', ,~-- ,<of,:; Ii L ________ =J 11J. FJ ■-I '
~ • •~ il';!; •, \ ~<;; l~ - 1 .~ I
\ t...SHERMi\N •AV.E--'~- '-. : ..,.._...,t....Lt~ : , ___ jii'I L~-· '·, ,_/ 1:iiT RW C:.Q: ~ - ......--, - -==-=- ~
-.......... __ _ -;. _______ _
• .. r--=-:. ~ • ~=-:-:-~:-7".-£l:M~·s:r:!:i+r~~~Wllf£W'~ --~-·------;
Map 8.3
Future Land Use
Within 2018 Village
Boundary
I
.\ ,· l,----- 1-
i
-1 !.l
I i-
\_
I
i '-r1:
1··------- ~i
Land Use Classes
Single Family
Duplex
- Multi-family (3+ units)
- Mobile Home Park
- Commercial I Office
- Commercial/Industrial
fflffl Commercial/Residential
- Institutional / Governmental
- Industry
Agriculture
Park
- Not Developable
-Railroad
- Road Right-of-Way
l■,_I WJ:,:cg~~. ···~'~I" II f.::,':Wrrrr- nl1tlt1ili ti::!ffi~ ---- - !j i \Y(};q,;; , > - , m ,IIIJJIIJ CE 110P,;1 , 1 _______ _
_ _ __ = = ;=::i ~ l / 1 1t1 11, - v 11 OTffn , ~ ~ ·. - , . , . • I f i
" C!l "' ,(u;,l'r-. - , • ll ■ iil593 ~ ! '
[:_~_] Municipal Boundary
- Lakes and Streams
~
~ Cf - 1~ c i.■ 1m, ·· r'·7 ' ! • _,., ~-· - -,,r, t.., -- • . ~ - ~ ~ L 1 - - =1- -
t_ ___ .J l , . ,, ,-~ ,,w,rn n~~MAR~E,l'JR~"" ' T• ~ •iiiii iiiiiiiiiijr ===j r- -{ I !
! : i
I '
-- r'-~ "~- -- : - - I
W+E
s
---====-----■ M i les
0 0.25 0,5 1
Source : Portage County Plannin g & Zoning (2018)
Village of Plover (2018)
-
7
=:=--=~~ ----r L-r· -= 1 ·----··1
__ JI- " ~-,.~;:f §llLW1_l ~1~1111111•r-7Illa(} --~--'1-·::!:~ii!!!:v;~an
! i • :··-----·-·11! i O ~~)s
-------· --· " ' ( 0 . ~\ Portage County
Planning & Zoning
\a ~ ' '' • I '- "t \ -~-r•·-,.--'--· -··-' 1- 1 ~5- 1462 Strongs Ave.
Stevens Point, WI 54481
Page - 116
___/
- ~-~ □ Gl □- - -- .,,.,,_ -_ _ _ --= --- -L-;• I ,~
) I ln ~ n . l ll 1
1
i11Uij+l,lt1Efi
~~~~
Map 8.3
Future Land Use
Land Use
Single Family
Residential Planned Development
Duplex
- Multi-family (3+ Units)
1111 Commercial
.. Government/ Institutional
- Industrial
Park
- Natural Areas/ Open Space
- Road Righi-of-Way
- Railroad Right-of-Way
Water
* Please refer to Map 8.2 and
Section 8.2(E) for discussion of
these infill/redevelopm~nt areas.
w+,
s
Feet
500 1,000 2,000
Source: Portage County Planning & Zoning (2004)
Map Adopted: October 12, 2004
Village of Whiting
Comprehensive Plan
~~
\!!I
Portage County
Planning & Zoning
1462 Strongs Ave.
Stevens Point, WI 5448 I
Page/ 02
UJ
~
~
<(
5 ;,;
~~(E~.O~qo):}R
UJ
> ,,_
8
• I l~l I ■ z ::;
Map 8.2
Future Land Use
Future Land Use
_ Single Family
- Plex (2-5 Units)
- Governmental/Institutional
- Commercial/Office
- Planned Unit Development
- Road Right-of-Way
N
W+E
s
0 200 400 800
Feet
Source: Village of Park Ridge (2021)
Portage County Planning & Zoning (2021)
Map Produced: September, 2021
Village of Park Ridge
Comprehensive Plan
( :~ , -~ Cilim.J
~,tt 9f7
Portage County
Planning & Zoning
1462 Strongs Ave.
Stevens Point, WI 54481
Page- 71
~
IAR~IN·ISCA;,
'"'
i"e¥s •CN---'\l~~ I 4_,..,,__._,1!1:S~~,~,,:1• ~
"'
- ~- '141<s•cN)
--0' -
~ 2
f
m
f=te
'"
I ~ z I ~ ' z 0 - ---z-0- - c __ __ ,,, I
~~ ~---------
,,, ..
-, I I I ;; ~t / l ~ j ~,ffe l ~ ,/
Map 8.4
Future Land Use
Future Land Use
; ~ -- I Residential
R0- - ~...--
c,
~E-M·G0PPS OR I l_j
I~ I
'l'
Cl Rural Residential
- Commercial
Commercial I Mixed Use
L3 Limited Agriculture/Mixed Use
__ Industrial
- Institutional
Natural Areas - Limited
- Natural Areas - Protected
- Road Right-of-wa y
Urban Expansion
Discussion Area
W+E
s
--==----Mil es
0 0.25 0.5 1
Source: Portage County Planning & Zoning (2016)
Town Board Adopted : May 1, 2006
Town Board Amended : June 6, 2016
Map Printed: January 18, 2018
Town of Hull
Comprehensive Plan
£,.. ~ Portage County
{ ~ Planning & Zoning
·~ 9 ,. 1462 Strongs Ave.
~ -"'- Stevens Point, WI 54481
Page- 81
Future Land Use
Land Use
Residential
- Commercial
- Institutional
- Industrial
- L3 Limited Ag/Mixed Use
- Natural Areas - Protected
-Road
w+,
Miles
0 0.25 0.5 1
Source: Portage County Planning & Zoning (2009)
Map Printed: November 23, 2009
Town of Linwood
Comprehensive Plan
Portage County
Planning & Zoning
1462 Strongs Ave.
Stevens Point, WI 54481
Page86
... _
;
g)J
_ L--~---'T
-~
r'c! ' ).,
-~•'-'-"-. ____ :, n ..._________
1
I 1'1 -- ~ ~ JG!= \ ~ v:_--·- ~ -~~
PPI r\ J f71= ;~ · \
1
r···-···-·----- I
i-
···---- .... ·-···· i I
i
~~ '.•. / • 1 ""'"'-··--·-
-~,;7 ,/ -,...1.-·
.. . .
~ .l .,.. ,1/ __ u.
- -~ _,,"°...... ··-~ ....... ./ ~{.,_.,.
i
.~
I
...
.,· -;,
... / ., ,... .. , . ..
'-
·-.. ~-• . \\
J:CD" , ... " ~ : i \ ... .
i
r···•
,I
1...-1~.
I
I
----1 I !
, ....... ... ,.&!
~I
..... n,
Map 8.2
Future Land Use
Future Land Use
Low Density Residential
_ Medium Density Residential
- Commercial
[ ~ Industrial
- L 1 Enterprise Agriculture
- L2 Intermediate Agriculture
[ L3 Limited Agriculture/Mixed Use
- GovernmentaVlnstitutional
r Planned Unit Development
- Natural Areas• Protected
Natural Areas - Limited
- Road Right-of-Way
• N, wr.i Atu~ou,aodin::h.dt:: DNll lllnctl, Wtdanot Wl,klt ol I/lo 0<~11"
Diwkl. CotW!l)'PAltts, lornom;,w RiverStat 1 Trail, Scmo!Fore!t,lnd
lhoFloodw,yollhl> W1sconsinRN-•.
Drainage District Boundary
Extraterritorial Boundaries
W+E
s
0.5
Source: Town of Plover (2021)
Miles
2
Portage County Planning & Zoning (2021)
Town Board Adopted: February 11, 2021
Town Board Amended: July 7, 2021
Map Printed: September 28, 2021
Town of Plover
Comprehensive Plan
rm ,~
Portage County
Planning & Zoning
1462 Strongs Ave.
Stevens Point. WI 54481
Page- 104
Map 8.3
Future Land Use
--eNFft:E•t:N
Future Land Use
Residential
- Commercial
- Institutional
- Industrial
- L 1 Enterprise Agriculture
0
- L2 Intermediate Agriculture
L3 Limited Agriculture/Mixed Use
;ft;: Grave l Pit
Natural Areas
- .. - Extraterritorial Boundaries
.,,.. I
uNT/NGT0'1;,
z
•+E
Miles
025 0,5 1
Source: Portage County Planning & Zoning {2022)
Town of Stockton (2022)
Town Board Adopted: September 13, 2016
To.....-n Board Amended: April 11, 2022
Map Printed: September 20, 2022
3
~ JACKIES·R0 ~
-.-1-.~
Town of Stockton
Comprehensive Plan
Portage County
Planning & Zoning
1462 Strongs Ave.
Stevens Point, WI 54481
Page - 115
APPENDIX D
STEVENS POINT URBAN AREA SEWER SERVICE AREA PLAN
Community Sewer System Maps
Stevens Point Urban Area Sewer Service Area Plan 2022-2040 final draft Page 94
Stevens Point Sanitary Mains
Sanitary Mains -14" --21" --42"
--10" -15" --24" --48"
0 0.5 1 Miles
I I
--12" --18" --30" --54"
--12.18 --18.27 --36"
Sanitary -Collector
Sanitary: Mains
--10
-12
36
--15
-18
30
-21
33
-27.
24
:.....~-·-· 1'---
----·----·
-Other
Plover Village Limits
1ml
Earthstar Geographies
. . --
INV 1098.74; 0=4.
INV 1097.48 0=5 .
r L Lr r £Ct: { I/L.I Rim -1110
1 0" INV 1095.38; 0=1
12" INV 1094.84 0=1
im ~ 1107
= 1092.02; 0
% <'o
lit, ~~//)
~J"~r ~;,,e,,.
o, "'
4/19/2023, 12:51:07 PM
Sanitary: Mains - 8
- 5 10
12
18
I
~
Th%
%
,,, "'B,:
~""'o, ~
"..1;'i:>10(v,I
,,."'
o, ..,
~ :; .,
t
Whiting Sewer Map
·,l
,ietl'
(?\O
.0
0~
~ "',
Kozlczkowski
Park
Della S t
'°o.~,
1'.,
Lower VVhltlng
Park
~ 1
~
To-•¼, __ __,.,..,.. ...... ~ -...,....,,.. ~---"
.. ;
MacArthur Way l
Pnlton Dr
~
"'
"' <
ru
Porter Cl ._\.er Rd
<19
2n d St
1s t St W
<."'
o~h t..n
;;;
.c
~
m
" !:':
;;;
.c
~
r,:;;:,r
;;·
I
• W\n
,q,,..1,;.,
•-90'
" g
\
~
';/
Elm St
.J
11
"'ho,. 1.,,
Porte r Rd
Hickory Dr
-<J,,.l,jlO
Hic,to'j,Or ;;
.c
.. e . u ,
Russet Or
..
~
;;;
0. ..
~ \(1~ 0.,iG 01
Robor ls. Re1 0''
.c
~
,;;'
Cll l,1Pc-¥1'
0
0
"' 0,
/)'~
0.15
0.25
1:18,056
0.3
0.5
0.6mi
1 km
Esri Community Maps contrib utors, Esri, HERE, Garmin,
SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS,
EPA, NPS, US Census Bureau, USDA
Web AppBuilder for ArcGIS
Esri community Maps Contributors, Esri, HERE, Gam,in, SafeGraph, GeoTechnologies, Inc, METIINASA, USGS, EPA, NPS, us census Bureau, USDA I
APPENDIX E
STEVENS POINT URBAN AREA SEWER SERVICE AREA PLAN
Previous Sewer Service Area Boundary
Stevens Point Urban Area Sewer Service Area Plan 2022-2040 final draft Page 98
DRAFT
..
[!:]
TOWN OF GRANT
Roads
•
Wastewater Treatment Plant
.. Water
CJ
Existing SSA Boundary
0
Municipal Bounda.ry Proposed Sewer Service
Boundary
...... . . Plover Boundary Agreement Environmental Sensitive Areas . . ...... .. Use Restriction
Map 5
Stevens Po111t Urban Area Sewer Service Area
Existing SSA Boundary
...
o· 0,2s o.s 1.5
1111:::illc:1---====--- Miles
This map Is ne~het a legally recorded map nor a smvey
and is not lltend ed to be used as one. This drawing is
a cortl)ilati ono f records , inrorrmti on and data ~ed for
reference purposes only. NCWRPC is not respons!blo for
anylna ocuracies herein contalned,
TOWN OF SHARON •
L.
I - •
'. '
TOW~ OF STOCKTON
--
QJ
QJ
"
TOWN OF BUENA VISTfil
Prnpared by:
North Central
Wisconsin Regional
Plannina Commission
210 McClellan Street, Suite 21r. Wausau, Wisconsin 54403
(715) 849-5510 www.ncwrpc.org
23 - Village of Park Ridge
23.1 Local Hazard Mitigation Planning Team
Primary Point of Contact
Steve Menzel
Village President/Trustee
512 Sunset Avenue
Stevens Point, WI 54481
Telephone: 715-340-7228
Alternate Point of Contact
Gordon Renfert
Village Trustee
212 Sunrise Avenue
Stevens Point, WI 54481
Telephone: 715-252-9139
E-mail Address: smenzel@vi.parkridge.wi.gov E-mail Address: grenfert@vi.parkridge .wi.gov
This annex was developed by the local hazard mitigation planning team, whose members are listed in
Table 23-1.
Table 23-1. Local Mitigation Planning Team Members
Name Title
-- - - - - -
Joe Thompson
Dan Holloway __
Steve Menzel
Kristin Paulson
Gordon Renfert ,____ ----
'--------
-
Village Trustee
-1----
_ 1 Villa_g~_I_rustee
' Village
LPresident/Trustee
Village Trustee
I Village Tr~stee
!
23.2 Jurisdiction Profile
23.2.1 Location and Features
Name Title
---
I
-=r-- --
- --I
I .-- ---
-
---
The Village of Park Ridge, incorporated in 1938, is a small community located adjacent to the city of
Stevens Point in Portage County, Wisconsin. Known throughout the area for its quiet, neighborhood
atmosphere with 530 residents (2024), the Village also has a thriving commercial district along the
Highway 66 corridor hosting more than 50 businesses. The Village is in close proximity to other
important area institutions- within blocks of the region's largest grocery store (Metro Market),
Washington Elementary School, P.J. Jacobs Junior High School, and St. Michael's Hospital. The Village
occupies about 140 acres of nearly flat land with mostly sandy, well-drained soils. Roughly rectangular in
shape and measuring about 1,800 feet by 3,700 feet, much of the Village's east border abuts Iverson
Park and its entire south border abuts the Wisconsin Central Railroad tracks.
I
23.2.2 History
The Village of Park Ridge was incorporated in 1938, initially comprising 133.4 acres previously part of the
Town of Hull. According to a history compiled by Charlotte Wood (1988), at the time "there were 172
residents in the village, 66 of these children of school age. In addition there were two horses, more dogs
than were licensed, more cats than had owners, and several coops of chickens with early morning
crowing roosters. Through the largess of nature, there were stands of oak and jack pine, fields of wild
flowers, a variety of birds and hordes of mosquitoes. And through the largess of Jules Iverson aided by
the Work Projects Administration, there was Iverson Park as a playground below the ridge forming the
eastern boundary of the village. Hence the name Park Ridge." In keeping with its neighborhood culture
and feel, the Village is known for its "Santa Visits" event for kids, a tradition that dates back to 1940. The
Village Hall building at 24 Crestwood Drive was constructed in 1942. The Park Ridge volunteer fire
department was established in 1950 and served the Village until July 2022, when the Village dissolved its
fire department and entered into an agreement with Stevens Point Fire Department for fire and EMS
services. Law enforcement for the Village is provided by the Portage County Sheriff's Department.
23.2.3 Governing Body Format
Park Ridge is established as a Village under Chapter 61 if the Wisconsin State Statutes
(https:ljdocs.legis.wisconsin.gov/statutes/statutes/61 ). Local governance consists of a 5-member
elected Board of Trustees, including Village President, which is elected separately from the Trustees. All
trustees serve 2-year terms with no limits. Active committees, whose rosters include volunteer residents
of the Village, include a Zoning Committee, Zoning Board of Appeals, and Comprehensive Plan
Committee.
23.3 Current Trends
23.3.1 Population
The Village of Park Ridge, Wisconsin, exhibits a demographic profile characterized by a slight population
increase and a significantly older median age compared to the surrounding Portage County. As of 2020,
the population stood at 530 residents, representing an increase from the 2010 census. The community's
racial makeup is predominantly white {94.53%), with a median age of 53.5, that is significantly higher
than the county average of 38.3. A small percentage of the population (2.4%) speaks a language other
than English at home.
Economically, the Village of Park Ridge demonstrates strong performance in several areas. The median
household income ($87,679) is significantly higher than the county average ($70,061) and the poverty
rate {3.8%) is comparable to the county's 9.1%. Additionally, Park Ridge boasts a very high home
ownership rate (86.0%), exceeding the county average (66.9%).
The percentage of residents with a bachelor's degree or higher (61.8%) is significantly higher than the
county average (31.1%). However, the employment rate in Park Ridge (52.4%) is lower than the county
rate (63.8%). It's important to note that a higher-than-average portion of the population (13.4%) lives
with disabilities. The percentage of residents lacking health insurance coverage (1.9%) is slightly lower
than the county average (5.1%). According to The HHS em POWER Program, the 54481-zip code has
5,374 Medicare beneficiaries, 53 of them receive oxygen services, 11 of them receive dialysis services, 17
of them receive home health services, 11 of them receive at-home hospice, and 203 of them use
electricity dependent devices or durable medical equipment.
23.3.2 Climate
The National Environmental Modeling and Analysis Center (NEMAC) predicts potential changes in
Portage County's climate due to rising emissions. By 2050, average daily highs could increase by up to 3
degrees Fahrenheit, with lows potentially rising by 3 degrees. While total precipitation might stay
relatively stable, its distribution could change, leading to more intense rainfall events.
23.3.3 Development
Table 23-2 summarizes development trends in the performance period since the preparation of the
previous hazard mitigation plan, as well as expected future development trends.
T!ible 23_:_2. Rect!n_t and Expected Future Development Trends
• I Response
Has your jurisdiction annexed any - -i No
land since the preparation of the
previous hazard mitigation plan?
I/ yes, give the estimated area
annexed and estimated number of
parcels or structures.
Is your jurisdiction expected to No
annex any areas during the
performance period ofthis plan?
If yes, describe land areas and
dominant uses.
If yes, who currently has permitting
authority_ over these areas?
-
Are any areas targeted for ' A few lots remain to be developed in the residential Planned
d I t . Unit Development (Odessa Court and Angelo Court} on the eve opmen or maJor v·ii , rth b d • 1 ages no oun ary. redevelopment m the next five years?
If yes, briefly describe, including
whether any of the areas are in
known hazard risk areas
How many permits for new
construction were issued in your
jurisdiction since the preparation of
the previous hazard mitigation plan?
Provide the number of new
construction permits for each hazard
area or provide a qualitative
description of where development
has occurred.
Describe the level of buildout in the
jurisdiction, based on your
jurisdiction's buildable lands
inventory. If no such inventory exists,
provide a qualitative description.
2019' 2020 2021 20ZZ 2023
Single Family 3 1 3 2 0
Accessory Dwelling Unit N/A N/A N/A N/A N/A
Multi-Family N/A N/A N/A N/A N/A
Other (commercial, mixed N/A N/A N/A N/A N/A use, etc.)
Total 3 1 3 2 Ir 0
I N/A
The only new construction that has occurred in recent years in
the Village is the Planned Unit Development on Odessa Court
and Angelo Court.
23.4 Capability Assessment
This section describes an assessment of existing capabilities for implementing hazard mitigation
strategies. The base plan of the hazard mitigation plan describes the components included in the
capability assessment and their significance for hazard mitigation planning. This section summarizes the
following findings of the assessment:
• An assessment of planning and regulatory capabilities is presented in Table 23-3.
• Development and permitting capabilities are presented in Table 23-4.
• An assessment offiscal capabilities is presented in Table 23-5.
• An assessment of administrative and technical capabilities is presented in Table 23-6.
• An assessment of education and outreach capabilities is presented in Table 23-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table
23-8.
• Classifications under various community mitigation programs are presented in Table 23-9.
• The community's adaptive capacity for the impacts of climate change is presented in Table
23-10.
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or
integrate capabilities to further hazard mitigation goals and objectives .
Table 23-3. Planning and Regulatory Capability
Local Authority
Codes Ordinances, & Re(luirements
Other
Jurisdiction
Authority State Mandated
Integration 1
Opportunity? '
Building Code Yes 1----=-----------''---------'--------------~------
Comment: We have local permitting following State of Wisconsin Building Codes and enforced through
a Village Building Inspector.
Zoning Code Yes
Comment: We have local zoning codes, enforced by a Village Zoning Administrator.
Subdivisions No
Comment: N/A
Stormwater Management Yes ----------Comment: The Village adopted in 2024 a Village Right-of-Way Ordinance the calls for swales on
1 Village streets for stormwater management.
Post-Disaster Management No
Comment: The Village has no staff or specific plan for post-disaster management, and instead relying
on countywide resources to assist with this.
Real Estate Disclosure No
Comment:
Growth Management No
Comment:
Site Plan Review Yes
Comment: Administered through building permit process through Village Building Inspector and
I Zoning Administrator.
Environmental Protection No Yes
Comment: Village follows State DNR and US EPA guidelines.
Flood Damage Prevention Yes
Comment: The Village adopted in 2024 a Village Right-of-Way Ordinance the calls for swales on
Village streets for stormwater management.
Emergency Management Yes ,__ _____ ___._ ___ x ___ .___ _____ --1
Comment: Village complies with Wisconsin State Statutes 323.14(1)(b) . In addition, the Village
contracts with the City of Stevens Point for EMS and fire protection services.
Climate Change No ----- -=--------'---
Comment:
Other N/A N/A N/A N/A
Comment:
Planning Documents
Local Authority
Other
Jurisdiction
Authority
Comprehensive Plan Yes Yes
Is the plan compliant with the Comprehensive Planning Law (s. 66.1001}?
I Comment: Yes. Developed with help from Portage County staff Updated and adopted in 202_2.
, Capital Improvement Plan Yes
How often is the plan updated?
I Comment: The Village's first-ever CIP was adopted in 2023. To be updated every 5 years.
I Disaster Debris Manageme~t No No Plan
Comment:
Floodplain or Watershed P!an Yes
Comment: Countywide plan.
Stormwater Plan No
Comment:
Urban Water Management No Yes? Plan
Comment: Defer to State and Countywide groundwater protection plans.
Habitat Conservation Plan
Comment:
Economic Development Plan
Comment:
No
No N/A
I Shoreline Management P_la_n_.,__ __ N_o ___ .,___ _____ ____._ ____________ ---i
Comment:
Community Wildfire
Protection Plan
1
Comment:
No
Forest Management Plan Yes
Comment: Urban forest management plan developed by UWSP Forestry class in 2021 .
l Climate Acti~n ~lan ____ _..._ ___ N_o __ __,_ ______ ...,__ _____ __. ______ _.
I Comment:
Emergency Management Plan ' Yes
I
Comment: The Village of Park Ridge local emergency response guide.
Threat & Hazard .,, ____
Identification & Risk Yes ~- ·-·'kid'•.=""':-'-
Assessment (THIRA) .. ~·i.~:~~i~i-'.
Comment: Refer to this Village Hazard Mitigation Plan.
Post-Disaster Recovery Plan I No
Comment : The Village has no staff or specific plan for post-disaster management, and instead relying
on Countywide resources to assist with this.
Continuity of Operations Plan No
Comment:
Public Health Plan No
I Comment:
i Other
: Comment:
I N/A I N/A I N/A N/A
Table 23-4. Development and Permitting Capability
Does your jurisdiction issue development permits?
If no, who does? If yes, which department?
·---~-------~--------------
Yes.
Village Building Inspector
Does your jurisdiction have the ability to track permits
by hazard area? No
Does your jurisdiction have a buildable lands inventory? No ----------------~
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service Yes ---------------~-----i
Incur Debt through General Obligation Bonds Yes . ______________ ...._ __________ -!
Incur Debt through Special Tax Bonds ?
Incur Debt through Private Activity Bonds Yes
---'----------~-------'--------------1 Withhold Public Expenditures in Hazard-Prone Areas ? --~------,------------!
State-Sponsored Grant Programs Yes -----------------------------1
Development Impact Fees for Homebuyers or Develof)ers No __._ _____ _
Other
Table 23-6. Administrative and Technical Capability
Staff/Perso _nnel ~esource _ _ __ _ _ __ _
I Planners or engineers with knowledge of land , No development and land management practices
Engineers or professionals trained in building
or infrastructure construction practices Yes Contracted
Planners or engineers with an understanding of1 No
natural hazards
Staff with training in benefit/cost analysis No
Surveyors No
Personnel skilled or trained in GIS applications No
I Scientist familiar with natural hazards in local I
area 1 No
Emergency manager No
Grant writers
Other
Table 23-7. Education and Outreach Capability
I
Do you have a public information officer or communications
office?
If yes, briefly describe.
No
Do you have personnel skilled or trained in website development? No
Do you have hazard mitigation information available on your
website?
If yes, briefly describe.
Do you use social media for hazard mitigation education and
outreach?
If yes, briefly describe.
No
No
Do you have any citizen boards or commissions that address issues No
related to hazard mitigation?
If yes, briefly describe.
Do you have any other programs already in place that could be
used to communicate hazard-related information?
If yes, briefly describe.
Yes
Website and Facebook page.
I Do you have any established warning systems for hazard events?
I If yes, briefly describe.
Yes
Siren and emergency generator.
Table 23-8. National Flood Insurance Program Compliance
~
What is your participation status in the National Flood Application in progress (March
Insurance Prog'-ra_m_ ? ____ ------------~ 2~0_2_5lc_.. __________ _
What local department is responsible for floodplain N/ A
management?
Who is your floodplain administrator? (department/position) N/ A
Are any certified floodplain managers on staff in your
·urisdiction?
What is the date that your flood damage prevention ordinance
was last amended?
Does your floodplain management program meet or exceed
minimum requirements set by NFIP? The DNR's model
floodplain ordinance meets NFIP's minimum standards.
If exceeds, in what ways?
---=--------------When was the most recent Community Assistance Visit or
Community Assistance Contact?
---------Does your jurisdiction have any outstanding NFIP compliance
violations that need to be addressed?
If so, state what they are.
No
N/A
TBD
N/A
No
What date was your latest Flood Insurance Rate Map adopted? ?
I ------- I·--~----------
Are any RiskMAP projects currently underway in your
jurisdiction?
If so, state what they are.
Do your flood hazard maps adequately address the flood risk
within your jurisdiction?
If no, state why.
?
?
Does your floodplain management staff need any assistance or ?
training to support its floodplain management program?
If so, what type of assistance/training is needed? It would be
helpful to have a certified floodl'_lain manager on staff,
Does your jurisdiction participate in the Community
1 Rating System (CRS)? I/yes, is your jurisdiction
interested in improving its CRS Classification? If no,
is your jurisdiction interested in joining the CRS
program?
How many flood insurance policies are in force in your
?
?
jurisdiction? ?
What is the insurance in
force? What is the
tJ.remium in force?
How many total loss claims have been filed in your jurisdiction? N/ A
What were the total payments for losses? N/ A __ .__ ____________ _
Please describe the implementation and enforcement of
floodplain management regulations to regulate and permit N/ A
development in Special Flood Hazard Areas.
Please describe the floodplain management programs and
activities that contribute to continued compliance with NFIP.
a. According to FEMA statistics as of [DATE]
N/A
I
Tabl~ 23-9. Community Classifications
?
Community Rating System ?
Building Code Effectiveness Grading Schedule ?
Public Protection ?
Storm Ready ?
Firewise ?
?
?
?
?
N/A
N/A
Table 23-10. Adaptive Capacity for Clim~te Change
Technical Cai:,aci!Y
Jurisdiction-level understanding of potential climate change impacts.
Comment:
Jurisdiction-level monitoring of climate change impacts
Comment:
Technical resources to assess proposed strategies for feasibility and externalities.
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory
Comment:
Capital planning and land use decisions informed by potential climate impacts.
Comment:
Participation in regional groups addressing climate risks.
Comment:
Implementation Cai:,ability
Clear authority/mandate to consider climate change impacts during public
decision-making processes.
Comment:
Identified strategies for greenhouse gas mitigation efforts.
Comment:
----
?
?
?
?
'
Jurisdiction
'
Ratinga
Low
Low
Low
Low
Low
Low
--
Low
Low
~
- -- --
Identified strategies for adaptation to impacts. Low Comment:
Champions for climate action in local government departments
I Comment: Low
1 Political support for implementing climate change adaptation strategies. Low Comment:
Financial resources devoted to climate change adaptation. Low Comment:
1 Local authority over sectors likely to be negative impacted. Low Comment:
Public Capability
Local residents knowledge of and understanding of climate risk.
Medium I
, Comment:
I
Local residents support of adaptation efforts
Comment: Medium
Local residents' capacity to adapt to climate impacts.
Medium Comment:
Local economy's current capacity to adapt to climate impacts.
Unsure Comment:
Local ecosystems' capacity to adapt to climate impacts.
Unsure Comment: --
a. High = Capacity exists and is in use; Medium= Capacity may exist but is not used or could use some
improvement; Low= Capacity does not exist or could use substantial improvement; Unsure= Not
enough information is known to assign a rating.
23.5 Integration Review
For hazard mitigation planning, "integration" means that hazard mitigation information is used in other
relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant
information from those sources is used in hazard mitigation. This section identifies where such
integration is already in place, and where there are opportunities for further integration in the future .
The resources listed at the end of this annex were used to provide information on integration.
23.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
N/A
23.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do
not currently integrate hazard mitigation information but provide opportunities to do so in the future:
• Village Comprehensive Plan
• Village Strategic Plan
• Village Capital Improvement Plan
23.6 Risk Assessment
23.6.1 Jurisdiction-Specific Hazard Event History
Table 23-11 lists past occurrences of hazards for which specific damage was recorded in the Village of
Park Ridge. Other hazard events that broadly affected the entire planning area, including Portage County,
are listed in the risk assessments in the base plan of this hazard mitigation plan.
Type of Event
1 Straight Line Wind Storm
Flash flood
Table 23-11. Past Hazard Events
FEMA
Disaster#
N/A
N/A
Date
Assessed Damage (monetary,
1
fatalities, injuries, structures
destroyed or damaged)
June 2018 1 Large trees downed, damage to
homes.
February 2021 Heavy rain on frozen ground
caused temporary flooding on
Village streets and in some
residential basements.
---
Identified strategies for adaptation to impacts. Low Comment:
Champions for climate action in local government departments
I comment: Low
1
Political support for implementing climate change adaptation strategies.
Low I Comment:
I Financial resources devoted to climate change adaptation.
, Comment: Low
1 Local authority over sectors likely to be negative impacted.
Low Comment:
Public Capability
I Local residents knowledge of and understanding of climate risk.
, Comment: Medium
I Local residents support of adaptation efforts
1 Comment: Medium
• Local residents' capacity to adapt to climate impacts.
Medium Comment:
Local economy's current capacity to adapt to climate impacts.
Unsure Comment:
Local ecosystems' capacity to adapt to climate impacts.
Unsure Comment:
a. High= Capacity exists and is in use; Medium= Capacity may exist but is not used or could use some
improvement; Low= Capacity does not exist or could use substantial improvement; Unsure= Not
enough information is known to assign a rating.
23.6.2 Hazard Risk and Vulnerability Summary
Table 23-12 presents a summary of all hazards of concern for this jurisdiction including their location,
extent, and probability. IF YOUR JURISDICTION IS NOT AFFECTED BY A HAZARD, STATE SO IN THE RISK
SUMMARY AND LEAVE THE VULNERABILTY/IMPACT SUMMARIES BLANK.
Tornadoes, high winds, 28 species of trees Severe Weather - including
tornadoes, high winds, hail,
and lightning I
hail and lightning averaging 14.9 inches in
diameters (mature};
Flooding - including Dam
Failure
Wildfire
Drought
I
Residential and
commercial property
damage, loss of
mature trees.
Most vulnerable are
mature trees,
residential homes and
the business district
with 50 businesses.
Not at significant risk.
The Village of Park
I
Ridge has considerable
urban forest cover,
especially on its south
border with the
Canadian National
railway tracks. This
presents a significant
wildfire risk to
residential homes in
the Village.
Adding to this risk is
the recent discovery of
a few unhoused
encampments on the
railroad land.
Severe drought could
have a major impact
on the Village, which is
characterized by dry,
well-drained, sandy
soils. In addition most
250 residential homes;
business district with 50
businesses
Most homes in the
Village are well
maintained but range
from 40-90 years old,
possibly making them
more susceptible to
storm damage. The
Village's large, mature
trees are older and
more susceptible to
wind damage and less
adaptable to climate
change.
The forested land on
the south border of
the Village is mostly
pine, balsam and
spruce trees growing
on dry, well-drained,
sandy soil. Even a small
fire could quickly grow
out of control and
threaten residential
homes to the north
and Iverson Park and
the Green Circle Trail
to the east.
Drought threatens the
Village's considerable
urban forest cover as
well as residential
gardens and
shrubber , which rely
Potential property
damage in the millions
of dollars (Village's
equalized valuation is
over $80 million}, loss
of life, and economic
disruption.
Because of the
Village's relatively
small footprint (140
acres} and high
concentration of
residential homes
{250}, the impact of a
single storm could be
catastrophic.
Wildfire, especially
along the Villag's
south border, presents
a significant risk of
property damage, loss
of life, displacement
and economic
disruption.
Ten residential homes
located along the
Village's southern
border are especially
at high risk for wildfire,
representing at least
$4 million in total
property value. The
impact on the Village
could be major. '---1
Severe drought could
have a major impact
on the Village, which is
characterized by dry,
well-drained, sandy
soils. In addition, most
of the Village is served largely on rainfall to of the Village is served
primarily by private survive and thrive. primarily by private
wells rather than a Drought also raises the wells rather than a
municipal water risk of fire, threatening municipal water
system, extending the residential homes in system, extending the
potential risk to the Village. potential risk to
residents' access to residents' access to
clean drinking water. clean drinking water .
Severe drought also Severe drought also
poses a major risk to poses a major risk to
the Village's urban the Village's urban
forest cover, increasing forest cover, increasing
the chance of tree the chance of tree
mortality and fire mortality and fire
damage. damage.
Extreme Temperatures (Cold, Extreme temperatures [Assets at risk include I Potential loss of life
Heat) present a significant residential and for elderly or at-risk
health threat, commercial water individuals.
especially to the pipes (cold), heating j
elderly and other at- and cooling equipment There is minor to risk individuals who (overuse), street moderate risk of I live in the Village and pavement (heat). property damage to are not monitored by residential and family and friends. Climate change brings commercial buildings,
increased threats to primarily from broken
In addition, extreme assets that were not built water pipes (cold) in
temperatures could for such extremes. older structures and
cause high power ones that are mostly
demands for heating vacant or
and/or cooling, risking unmonitored. If the
utility failures, damage is widespread,
extended power it could disrupt living
outages, broken water conditions and the
pipes in older homes I Village economy.
(cold), damage to I street pavement I (heat), etc. I
Severe Winter Weather - Severe winter weather Exposed assets Severe winter storms
including blizzards is a significant threat include: trees; streets; can result in major
to the Village from right-of-way street damage to trees,
November through signage, plantings and structures as well as a
March. The primary structures; homes and high risk for vehicle
threats are heavy commercial buildings, damage and public
snowfall, ice storms, especially rooftops and safety concerns due to
and high winds. older buildings. hazardous driving
conditions .
All three present risks
to homes and
commercial properties
and to RUblic safety. - ·-Pest Infestation Pest infestations pose Exposed assets Potential major impact
a potential risk to the include: a large urban on the damage or loss
Village's relatively tree canopy and of hundreds of Village
large urban tree cover residential garden trees, especially in
and residential plantings that could be forested areas that
gardens. There may damaged by insect have limited diversity
also be a risk to older infestations; older of species. This
homes and commercial homes and commercial includes large stands
I buildings that are not buildings with cracks of pine trees along the
well-sealed or serviced and openings that Village's southern
by an exterminator . allow pests to enter border .
and damage the
interior. A major loss of trees in
the Village would have
a large impact on the
character and
aesthetics of the
Village, possibly even
impacting property
values and quality of
I life in the Village. --
Power Outage Power outages in the Primarily residential Buildings are at risk of
Village have rarely homes and commercial water pipe damage
lasted more than a few buildings. due to loss of winter
days, but a lengthy and heating.
widespread outage Loss of street lighting could threaten heating could pose a safety risk Loss of street lighting and cooling of in Village streets, could pose a safety risk residential homes and threatening vehicles in Village streets, commerc ial buildings. and pedestrians. threatening vehicles Loss of winter heating, and pedestrians. especially, could be
damaging and
dangerous.
Solar Weather - including Low risk.
solar flares and coronal mass
ejections
Electromagnetic Pulse Low risk.
Terrorism/Sabotage/Weapon ! With no schools,
I of Mass Destruction churches or large
I
public gathering
1 places, the Village is at
relatively low risk for
these threats.
Cyber Incident With no large
employers and a
residential and
business district that
are serviced by a fairly
diverse range of
networks , including
TDS, Spectrum and
various cell providers,
the Village is at
relatively low risk of
cyber attacks.
The Village Hall
follows best practices
to prevent cyber
attacks, including
multi-factor
authentication for its
email and website
accounts.
Internet & Communications Relatively low risk. The
Failure Village Hall is serviced -
by a 70 kW Generac I
generator, powered by
I
natural gas. It also
follows best practices
to protect its network,
including multi-factor
authentication for its
email and website
accounts.
Water Failure The risk of sudden Approximately 200 Though the risk is low
{Water/Wastewater) widespread water private wells in the to moderate, the
failure is relatively low, Village, which rely on impact could be major,
due to the Village clean groundwater, are potentially effecting
being primarily at moderate risk of the vast majority of
serviced by private contamination from residential homes in
wells. However, the industrial accidents, the Village. Finding
safety and industrial waste, and alternate sources of
effectiveness of those surface pollutants drinking water would,
private wells depends (road salt, herbicides, at minimum, cause
heavily on access to etc.). In case of severe significant hardship
clean groundwater. damage to the and inconvenience for
Being surrounded by groundwater resource, residents for months
Stevens Point, Portage these private wells or years. At its worst,
County's urban center, would no longer be it would require a
the Village's functional, and many massive effort to
groundwater supply is homes would need to install municipal water
at moderate risk of resort to bottled water mains and laterals
contamination from for their drinking under every Village
industrial accidents, water. street, costing an
industrial waste and estimated $10 million.
surface pollutants
(road salt, herbicides,
etc.)
Infrastructure Failure Although Village
(bridges, roads, etc.) streets are in need of
upgrades and repairs,
the risk of
infrastructure failure is
low.
Hazardous Materials I The Village is at Exposed assets include The impact of a
moderate risk of groundwater and chemical spill or toxic
hazardous materials human health. gas release could be
primarily due to its severe, since sources
proximity to the are very close to dense
Canadian National residential areas.
Railroad tracks along
its southern border, Damage to and to Sheridan goundwater could be Publishing Company significant, lasting and along its western expensive (see Water border. Both Failure above). enterprises use, store
or transport hazardous
Damage to human materials, which could
result in spills of health by direct
harmful chemicals or exposure to hazardous
the release of toxic materials could be
gases. immediate and
catastrophic for
nearby residents.
-
Public Health Emergency
I
The Village is at Primarily elderly Emerging diseases and
(emerging diseases, etc.) relatively low to residents. pandemics pose a
moderate risk of a serious threat to the
I
public health Village's elderly
emergency. Of primary population. The
concern is any impact on some
exposure to the residents and their
Village's elderly families could be
I
residents, a significant major, including
population within the serious illness, long
Village. term symptoms , or
I
even death .
A pandemic could
result in loss of life,
significant lifestyle
changes and economic
disruption throughout
the Village.
Food Related/ Agricultural Low risk.
Threats (food contamination,
etc,)
L___ Other l N/A L --
23.6.3 Jurisdiction-Specific Vulnerabilities
The base plan of this hazard mitigation plan provides complete risk assessments for each identified
hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction.
Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex.
The Village of Park Ridge's Hazard Mitigation Planning Team identified the following jurisdiction-specific
vulnerabilities:
Each of these vulnerabilities is described in greater detail below.
Repetitive Loss Properties
Repetitive loss records are as follows :
• Number of Repetitive-Loss Properties: NONE KNOWN
• Number of Severe-Repetitive-Loss Properties: NONE KNOWN
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have
been mitigated: NONE KNOWN
Other Noted Vulnerabilities
• N/A
23.7 Status of Previous Plan Actions
Table 23-13 summarizes the actions that were recommended in the previous version of the hazard
mitigation plan (Portage County Hazard Mitigation Plan) and their implementation status at the time this
update was prepared.
Table 23-13. Status of Previous Plan Actions
I . . . . .
I Completed !
Removed;
No longer
Action Item Feasible
.. -- . . ---·
. . .. .
I I • •
Develop a Stormwater Management Plan and
integrate with Community Plans, Zones, and
Ordinances.
□ X □ Comment: Stormwater management is primarily
being addressed in the Village's Capital Improvement
Plan (2023) with street reconstruction and swales.
Reconstruct all village streets to include the
addition of swales
Comment: Primarily being addressed through the
□ □ Village's Capital Improvement Plan (2023) with street X VPRHHl
reconstruction and swales. Hillcrest/Greenbriar
(2025) and Ridgewood Greenbriar (2027)
reconstructions are examples.
Continued Compliance in NFIP
□ □ X
I
Comment: Initiated application process to enlist in
I
VPRHP3
NFIP participation in March 2025
23.8 Hazard Mitigation Action Plan and Evaluation of Recommended
Actions
Additional Goals:
1 Action Item Summary:
Action Item Description:
1
Hazard(s):
Lead Party Responsible:
! Supporting Parties:
Estimated Cost:
~~------ ....
This action also addresses potential hazards within the Property and
Environment category
Reconstruct village streets to include the addition of swales.
Some swales were added during the reconstruction of the north half of Linwood
Avenue in 2019. The need for more swales is primarily being addressed through
the Village's Capital Improvement Plan (2023) with street reconstruction and
swales. Hillcrest/Greenbriar (2025) and Ridgewood Greenbriar (2027)
reconstructions are examples.
Urban flash flooding
~~---~~~-~~-~---~-------
Village of Park Ridge
------
Medium, although swale construction typically is linked to street
reconstruction, which has a high cost.
Funding Method: Village street maintenance and repair budget and grants.
-----------~---~- --------
Benefits: High --~---
Benefits New or Existing
Assets:
Implementation
Schedule:
Year Initiated:
Priority:
I Benefit primarily to maintenance and longevity of street assets.
~~--~~~
20 years (per Capital Improvement Plan, 2024-2043)
I 2024
High
VPRHH2 Mitigation Action: Village of Park Ridge
l Category: Health and Safety
~-~...c......,~-----
A d di ti on a I Goals: This action also addresses potential hazards within the Property and
Action Item Summary:
Action Item Description:
Environment and Intergovernmental Relationships categories. ~~~ -~------i
Add municipal water mains for fire hydrants
As part of the Village's Capital Improvement Plan and its agreement with the
Stevens Point Fire Department for fire protection and EMS services, the
Village plans to add water mains and fire hydrants on streets that are
scheduled for reconstruction. Initial projects include Hillcrest
Drive/Greenbriar Avenue North (2025) and Ridgewood Drive/Greenbriar
Avenue North (2027).
------------1 Hazard(s): Fire; the risk is particularly high with forestland adjacent to the Canadian
National railroad tracks south of Ridgewood Drive. -----------1
Lead Pal"!Y Resi>onsible: Village of Park Ridge
1 Supporting Parties: City of Stevens Point (Public Utilities; Fire Department)
High
I
Estimated Cost:
Funding Method: Village operating and capital budget; state and federal grants __ ...__ ---=----------,!
Benefits: High ----
Benefits New or Existing I Adding water mains and hydrants concurrent with street reconstruction is
Assets: more cost effective than adding them after the pavement has already been
installed.
~ mplementation
Schedule:
Year Initiated:
Priori!'{:
Ongoing
2024
High
VPRHP3 Mitigation Action: Village of Park Ridge
Goal: Property and Environment ----
Additional Goals:
1 Action Item Summary: Continued Compliance in NFIP
Action Item Description: Actively J:>ursuing J)articipation in NFIP as of March 2025
1
.H~zard(s): ---~f;.1~ H~zar9s ___ ___ ____ _ ______ _
l Lead Party Responsible: Local EM and Floodplain Specialist
Supporting Parties: r
Estimated Cost: Low
, Funding Method: 1 Grants - HMA, Public Assistance, other federal and state grants
Benefits: High
i Benefits New or Existing
Assets:
Implementation Ongoing
Schedule:
Year Initiated: 2025
Priority: High
23.9 Public Outreach
23.9.1 Public Outreach Events/Activities
Table 23-15. Public Outreach Events/ Activities
~
Adoption of the Village's
Comprehensive Plan
Adoption of the Village's Strategic
Plan
Adoption of the Village's Capital
Improvement Plan
Public input opportunity
Nov. 14 2022
Nov.14,2022
Nov.20,2023
February 1-15,
2025
Summary Attendees
The development of the All Village
Village's updated state- residents were
mandated Comprehensive invited to
Plan encouraged citizen committee
engagement through meetings and
committee meetings and public hearings
ublic hearings. rior to ado tion. ,___ ___ _.__ ___ _,__--I
The development of the All Village
Village's Strategic Plan residents were
encouraged citizen input and invited to
engagement through committee
committee meetings and meetings and
public hearings, and included public hearings
a village-wide survey (Oct. prior to adoption.
2021), Public Participation
Event (Oct. 27, 2021) and a
Public Hearing and Input
Session on Jul 19,._2_0_2_2_. --1--------1
The was developed with
consultants MSA Professional
Services, Inc., and the process
encouraged citizen input and
involvement through a public
hearings on Nov. 2, 2023 and
Nov. 20, 2023.
Draft Hazard Mitigation Plan
available for public inspection
and comments at the Village
Hall and on the Village
website.
All Village
residents were
invited to public
hearings prior to
adoption.
All Village
residents invited to
share comments
on the draft plan.
Adoption of updated Hazard February 17, . Plan adoption at the Village's All Village residents
Mitigation Plan for the Village of ~ __ 2_02_5 ____ r_e_gular month I meeting~. ~ __ ar_e_i_nv_i_te_d_t_o_~
I Park Ridge
23.9.2 Continued Public Participation
I
comment on the
draft plan prior to
I adoption, since it is
J_i ano • . ----- --- -~-~ ---~ ~
The Village of Park Ridge actively maintains a web page (https://vi.parkridge .wi.gov/) that includes:
• A feedback/contact form for public inquiries (https://vi.parkridge .wi.gov/contact-us/l
• A sign-up page to subscribe to notifications about Village meetings and notices via email or text
message ( https://vi.pa rkridge .wi .gov /subscribe /)
In addition , the Village mails newsletters during the year to all households.
23.1 O Plan Monitoring, Implementation, and Future Updates
As a participant in the 2025 update to the Portage County Mitigation Plan, The Village of Park Ridge
agrees to convene their internal planning team at least annually to review their progress on hazard
mitigation strategies and to update the plan based on new data or recent disasters.
When Portage County sends federal notices of funding opportunity for the Hazard Mitigation Assistance
Grant Program, the village will evaluate the viability of projects eligible for such grants and submit grant
applications if appropriate to align with the priorities of the Hazard Mitigation Plan. This will be a key
strategy to implement the plan.
23.11 Information Sources Used for This Annex
The following technical reports, plans, and regulatory mechanisms were reviewed for th is annex.
• Village of Park Ridge Comprehensive Plan (2022)
• Village of Park Ridge Strategic Plan (2022) - pgs. 24-69
• Village of Park Ridge Capital Improvement Plan (2023)
The following outside resources and references were reviewed:
• Portage County Emergency Management Office
• Portage County Planning & Zoning Department
RESOLUTION TO APPLY TO PARTICIPATE IN THE NATIONAL FLOOD
INSURANCE PROGRAM
RESOLUTION NUMBER 002.2025R
WHEREAS , certain areas of the Village of Park Ridge, Wisconsin_are subject to periodic
flooding or flood-related erosion , causing serious damages to properties within these areas; and
WHEREAS , relief is available in the form of federally subsidized flood insurance as authorized
by the National Flood Insurance Act of 1968; and
WHEREAS, it is the intent of the Village Board of Trustees to require the recognition and
evaluation of flood or flood-related erosion hazards in all official actions relating to land use in
areas having these hazards; and
WHEREAS , this body has the legal authority to adopt land use and control measures to reduce
future flood losses pursuant to Wisconsin Statutes 62.35,
NOW, THEREFORE , BE IT RESOLVED , that the Village of Park Ridge, Wisconsin Board of
Trustees hereby:
1. Assures the Federal Emergency Management Agency that it will enact as necessary in
those areas having flood or flood-related erosion hazards, adequate land use and
control measures with effective enforcement provisions, including:
a. Require permits for all proposed construction or other development in the
community so that it may determine whether such construction or other
development is proposed with the floodplain .
b. Review proposed development to assure that all necessary permits have been
received from those governmental agencies from which approval is required by
Federal or State law.
c. Review and maintain all permit applications to determine whether proposed
building sites will be reasonably safe from flooding .
d. Review
Text truncated. Open the original for the full document.
Source: Village of Park Ridge website. First collected Oct 21, 2026.