Village Board — Agenda packet
Village of Park Ridge · Portage County · Village Board · meeting of Aug 19, 2024 · Agenda packets
Open the original document More from Village of Park Ridge
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
VILLAGE OF PARK RIDGE
BOARD MEETING MINUTES
July 15, 2024
************************************************************************************
MEETING CALLED TO ORDER – President Steve Menzel called the Park Ridge Village Board to order at 5:30 pm.
The Village Board meeting was held in person at the Village Hall. After the recitation of the Pledge of Allegiance by
members present, a roll call was taken. Trustees Barb Friedrich, Gordon Renfert, Kristin Paulson, Dan Holloway and
Steve Menzel, interim clerk Shanna Behrend were present.
AGENDA ITEM #1 - APPROVAL OF THE JULY AGENDA – Menzel asked the Board members if there were any
changes regarding the July agenda. Friedrich made a motion to approve, with no changes. Holloway seconded the
motion. Motion carried by voice vote, with no negative votes.
AGENDA ITEM #2 – PUBLIC COMMENT PERIOD - The public comment section was opened to anyone who wished
to speak on any agenda item. No comments were made.
AGENDA ITEM #3 – PUBLIC COMMENT PERIOD - The public comment section was opened to anyone who wished
to speak on any non-agenda item. Clerk Behrend stated that the Chief Election Inspector position had been filled by
both Joe Thompson and Meg Erler. They will share the duties.
AGENDA ITEM #4 – REVIEW & APPROVE BOARD MEETING MINUTES FROM JUNE 17, 2024 – Holloway had
some minor edits. Renfert motioned to approve the minutes with the edits mentioned. Seconded by Friedrich. Motion
carried by voice vote, with no negative votes.
AGENDA ITEM #5 – REVIEW AND ACCEPT JUNE TREASURER’S REPORT – There was a question about payroll
expenses. Friedrich had a question about state aid received. Friedrich made a motion to accept the treasurer’s
report. Seconded by Renfert. Roll call was taken; Friedrich – yes, Renfert – yes, Paulson – yes, Holloway – yes,
Menzel – yes.
AGENDA ITEM #6 – REVIEW AND APPROVE JUNE & JULY BILLS/PAYMENTS – Renfert made the motion to
approve the bills, seconded by Holloway. Roll call was taken; Renfert – yes, Paulson – yes, Holloway – yes, Friedrich
– yes, Menzel – yes.
AGENDA ITEM #7 – ACCEPT QUARTERLY REPORTS –
• Stevens Point Fire Department
• Building Permits
• Payroll
• Zoning – no activity to report
Holloway made the motion to accept the quarterly reports. Seconded by Paulson. Motion carried by voice vote, with
no negative votes.
DISCUSSION AND/OR POSSIBLE ACTION ON THE FOLLOWING ITEMS:
AGENDA ITEM #8 – PORTAGE COUNTY HAZARD MITIGATION PLAN – Commitment Form - Menzel explained
that the county would aid with creating this plan and all that is required to move forward is the approval from the
Village Board to sign the commitment form. Menzel made the motion to approve the commitment form, seconded by
Renfert. Motion carried by voice vote, with no negative votes.
AGENDA ITEM #9 – VILLAGE RIGHT- OF- WAY ORDINANCE – After some discussion, additions and suggestions
and edits, the board members hope to have the final draft ready for the August board meeting and to hold the public
hearing at the same time for resident feedback.
AGENDA ITEM #10 – APPROVE SNOWPLOW CONTRACT – Friedrich made the motion to approve the snowplow
contract for the 2024-2026 season. Seconded by Renfert. Roll call was taken; Friedrich – yes, Renfert – yes, Paulson
– yes, Holloway – yes, Menzel – yes.
AGENDA ITEM #11 – RESOLUTION 001.2024R - CMAR – Clerk Behrend explained that the files a report on our
sewer system with the DNR. Holloway made the motion to approve the ordinance. Seconded by Paulson. Motion
carried by voice vote, with no negative votes.
AGENDA ITEM #12 – REVIEW PORTAGE COUNTY OUTDOOR RECREATION PLAN (ORP) – Menzel explained
that this is to confirm any upcoming park or recreational plans the Village may have. Friedrich made the motion to
approve the ORP, seconded by Paulson. Motion carried by voice vote, with no negative votes.
AGENDA ITEM #13 – ELECTION SECURTIY – Clerk Behrend explained that the upcoming elections bring some
security risks and that the board members should be extra cautious when checking their emails.
AGENDA ITEM #14 – ROAD PROJECT UPDATE – Menzel updated the board about the progress of the road
projects. He and Holloway are meeting with the engineering firm, MSA, previously used, and Menzel has a meeting
scheduled with the city of Stevens Point about the water contract going forward.
AGENDA ITEM #15 – THE BOARD MAY CONSIDER A MOTION TO GO INTO CLOSED SESSION PURSUANT
TO WISCONSIN STATUTES SECT. 19.85(1) (C) CONSIDERING EMPLOYMENT, PROMOTION,
COMPENSATION OR PERFORMANCE EVALUATION DATA OF ANY PUBLIC EMPLOYEE OVER WHICH THE
GOVERNMENTAL BODY HAS JURISDICTION OR EXERCISES RESPONSIBILITY TO WIT: VILLAGE CLERK –
Friedrich made the motion to go into closed session, seconded by Holloway. Roll call was taken, Holloway – yes,
Friedrich – yes, Renfert – yes, Paulson – yes, Menzel – yes.
AGENDA ITEM #16 – THE BOARD WILL RECONVENE IN OPEN SESSION IMMEDIATELY FOLLOWING THE
CLOSED SESSION AND TAKE ACTION, IF ANY, ON MATTERS DISCLOSED IN CLOSED SESSION – Friedrich
Made the motion to come out of closed session. Renfert seconded the motion. Roll call was taken, Friedrich – yes,
Renfert – yes, Paulson – yes, Holloway – yes, Menzel – yes. No action was taken.
AGENDA ITEM #17 – SET DATE FOR NEXT BOARD MEETING – The date is set for August 19, 2024, at 5:30 pm.
AGENDA ITEM #18 - ADJOURN - The meeting adjourned at 7:15 PM
_______________________________ _____________________________
SHANNA BEHREND STEVE MENZEL
INTERIM VILLAGE CLERK VILLAGE PRESIDENT
VILLAGE OF PARK RIDGE
Balance Sheet
ASSETS
Current Assets
Checking/Savings
11110 • Checking
As of July 31, 2024
11310 • Operating Account
11340 • Reserve Account-Pineries
11341 • Reserve Account-Pineries (AR. ..
11340 • Reserve Account-Pineries - Ot ...
Total 11340 • Reserve Account-Pineries
11343 • Pineries MM# 8005-467-9
11345 • Reserve Account-Bank of Amhe ...
11350 • CD Account
11360 • Petty Cash
Total Checking/Savings
Other Current Assets
1210 • Due from Employee (cc misuse)
12100 • Taxes Receivable
Total Other Current Assets
Total Current Assets
TOTAL ASSETS
LIABILITIES & EQUITY
Liabilities
Current Liabilities
Other Current Liabilities
2100 • State W/H Tax
21511 • Federal W/H Tax
24700 • Due other taxing authorities
24800 • Due SP Utilities
Total Other Current Liabilities
Total Current Liabilities
Total Liabilities
Equity
3010 • Office Equipment Reserve
3018 • Street Reserve
3020 • Sewer Reserve
3025 • Reassessment Reserve
3060 • Disaster Reserve
3070 • Santa Visit Reserve
34100 • General Undesignated Fund Bal
3900 • Retained Earnings
Net Income
Total Equity
TOTAL LIABILITIES & EQUITY
Jul31,24
1,000.00
101,263.28
19,832.13
10,928.51
30,760.64
112,099.55
20,098.17
104,104.94
200.00
369,526.58
4,585.32
345,321.08
349,906.40
719,432.98
719,432.98
138.28
1,769.86
250,404.72
4,058.00
256,370 .86
256,370 .86
256,370.86
82.68
638.28
2,500.00
9,000.00
12,345.31
1,550.00
103,265.36
174,883.02
158,797.47
463,062.12
719,432.98
VILLAGE OF PARK RIDGE
Revenues & Expenses Budget vs. Actual
January through July 2024
Jan -Jul 24 Budget $ Over Budget
Ordinary Income/Expense
Income
41110 • Local Tax Levied 361 ,886.19 363,098.00 -1 ,211.81
41800 • Int & Penalties on Taxes Levied 1.74
4341 0 • Shared Revenues 7,750.01 12,676.00 -4,925.99
43420 • Fire Insurance 3,232.85 2,400.00 832.85
43430 • Exempt Computer Aid 462.47 462.47 0.00
43440 • Personal Property Aid 269.56 270.00 -0.44
43450 • State Video (Cable) Aid 1,700.20 1,700.00 0.20
43531 • Transportation Aid 10,005.63 13,338.87 -3,333.24
44110 • Liquor and Malt Beverage 930.00 1,000.00 -70.00
44120 • Cigarette/Bartender's Licenses 110.00 1,000.00 -890.00
44200 • Dog Licenses 148.00 350.00 -202.00
44300 • Building Permits/Inspections 2,323.78 2,000.00 323.78
44400 • ZoningNariance Fees 0.00 200.00 -200.00
44500 • Cable Franchise Fees 2,708.12 4,500.00 -1 ,791 .88
46100 • General Government 0.00 100.00 -100.00
48100 • Interest 618.85 2,000.00 -1,381.15
48200 • CD Interest 0.00 500.00 -500.00
48900 • Miscellaneous Income 3,335.56 1,500.00 1,835.56
48905 • Late Fees 10.00
Total Income 395,492.96 407,095.34 -11 ,602.38
Expense
51100 • Village Board
5110001 • President Salary 2,625.00 3,768.00 -1 , 143.00
5110002 • Trustee Salary 2,400.00 3,445.00 -1,045.00
5110003 • Santa Visit 805.99 500.00 305.99
5110004 • League of Municipalities Dues 0.00 400.00 -400.00
5110006 • Board Expenses 15.82 1,900.00 -1 ,884.18
Total 51 100 • Village Board 5,846.81 10,013.00 -4,166 .19
51300 • Legal 2,452.50 4,000.00 -1,547.50
51410 • Clerk/Treasurer
5141001 • Clerk Compensation 23,232.92 40,685.00 -17,452.08
5141002 • Mileage and Expense 0.00 1,000.00 -1 ,000.00
5141006 • General Office Supplies 4,104.03 6,000.00 -1 ,895.97
5141007 • Training 0.00 1,500.00 -1 ,500.00
5141010 • Tax Collection Fee 1,450.56 1,500.00 -49.44
5141011 • Villagewide Mailing 0.00 1,000.00 -1 ,000.00
5141013 • Treasurer Bond 0.00 1,000.00 -1,000.00
5141014 • Pineries Bank Fees/Supplies 21.47
5141016 • Accounting Consultation 0.00 1,000.00 -1,000.00
51 41019 • Safe Deposit Box 0.00 50.00 -50.00
5141022 • Dues & Subscriptions 1,505.02 2,000.00 -494.98
5141025 • Background Checks 7.00 200.00 -193.00
5141026 • Treasurer Compensation 367.50 6,000.00 -5,632.50
5141027 • IT Services 750.00 1,500.00 -750.00
Total 51410 • Clerk/Treasurer 31,438.50 63,435.00 -31 ,996.50
51420 • Elections
5142001 • Inspectors 1,120.52 2,500.00 -1,379.48
5142002 • Election Expenses 76.02 500.00 -423.98
51 42006 • Election Equipment 154.40 1,000.00 -845.60
Total 51 420 • Elections 1,350.94 4,000.00 -2,649.06
51430 • Publication Fees 208.49 200.00 8.49
51510 • Accounting
5151001 • Reporting (Form C) 925.00 2,000.00 -1 ,075.00
51510 • Accounting - Other 111.16
Total 51510 • Accounting 1,036.16 2,000.00 -963.84
51530 • Assessment of Property
5153001 • Assessor Contract 5,220.00 5,800.00 -580.00
5153004 • Bd of Review Notice Publication 0.00 150.00 -150.00
Total 51530 · Assessment of Property 5,220.00 5,950.00 -730.00
% of Budget
99.7%
61 .1%
134.7%
100.0%
99.8%
100.0%
75.0%
93.0%
11 .0%
42.3%
116.2%
0.0%
60.2%
0.0%
30.9%
0.0%
222.4%
97.1%
69.7%
69.7%
161 .2%
0.0%
0.8%
58.4%
61 .3%
57.1%
0.0%
68.4%
0.0%
96.7%
0.0%
0.0%
0.0%
0.0%
75.3%
3.5%
6.1%
50.0%
49.6%
44.8%
15.2%
15.4%
33.8%
104.2%
46.3%
51 .8%
90.0%
0.0%
87.7%
Page 1
VILLAGE OF PARK RIDGE
Revenues & Expenses Budget vs. Actual
January through July 2024
Jan -Jul 24 Budget $ Over Budget % of Budget
51600 • Village Hall
5160001 • Maintenance Compensation 741.42 3,000.00 -2,258.58 24.7%
5160004 • Utilities 1,826.28 3,000.00 -1,173.72 60.9%
5160005 • Supplies and Equipment 312.41 2,500.00 -2, 187.59 12.5%
5160006 • Repairs & Maintenance 2,950.43 2,000.00 950.43 147.5%
Total 51600 · Village Hall 5,830.54 10,500.00 -4,669.46 55.5%
51910 • Uncollectible Taxes 0.00 200.00 -200.00 0.0%
51938 • Insurance
5193801 • General Liability 2,445.00 5,000.00 -2,555.00 48.9%
5193802 • Local Gov't Property 1,048.00 1,000.00 48.00 104.8%
5193803 • Worker's Compensation 1,645.00 2,000.00 -355.00 82.3%
Total 51938 • Insurance 5,138.00 8,000.00 -2,862.00 64.2%
52100 • Crossing Guard 3,136.50 3,500.00 -363.50 89.6%
52205 • Fire & EMS Protection
5220521 • Fire Protection & EMT Contract 52,034.98 101 ,ODO.DO -48,965.02 51 .5%
Total 52205 • Fire & EMS Protection 52,034.98 101,000.00 -48,965.02 51 .5%
52400 • Building Inspection 3,326.38 4,000.00 -673.62 83.2%
52450 • Zoning Administration 375.00 550.00 -175.00 68.2%
53311 • Street Maintenance
5331101 • Snow Plowing 17,166.00 27,000.00 -9,834.00 63.6%
5331103 • Street Maintenance 3,028.57 10,000.00 -6,971.43 30.3%
5331105 • Street Repair 0.00 1,000.00 -1 ,000.00 0.0%
5331113 • Engineering 14,968.00 31 ,000.00 -16,032.00 48.3%
Total 53311 • Street Maintenance 35,162.57 69,000.00 -33,837.43 51 .0%
53315 • Sewers 53.48
53420 • Street Lighting
5342001 • Electric & Maintenance 7,057.04 13,500.00 -6,442.96 52.3%
5342004 • Digger Requests 2,060.37 4,000.00 -1,939.63 51 .5%
Total 53420 • Street Lighting 9, 11 7.41 17,500.00 -8,382 .59 52.1%
53620 • Garbage Collection
5362001 • Garbage Collection 18,658.68 32,520.00 -13,861.32 57.4%
5362002 • Fall Large Item Pick-up 832.00 800.00 32.00 104.0%
Total 53620 • Garbage Collection 19,490.68 33,320.00 -13,829.32 58.5%
53635 • Recycling cost
5363501 • Recycling Collection 4,665.30 9,000.00 -4,334.70 51 .8%
5363503 • Yard Waste Drop Off 5,300.00 5,200.00 100.00 101 .9%
Total 53635 • Recycling cost 9,965.30 14,200.00 -4,234.70 70.2%
54100 • Humane Society Contract 1,356.02 1,500.00 -143.98 90.4%
55200 • Parks Dept. Pledge ($5.50/per) 2,915.00 3,000.00 -85.00 97.2%
6560 • Payroll Expenses 3,990.23
Total Expense 199,445.49 355,868.00 -156,422 .51 56.0%
Net Ordinary Income 196,047.47 51 ,227.34 144,820.13 382.7%
Other Income/Expense
Other Expense.
58100 • Loan Principal 37,250.00 16,252.05 20,997.95 229.2%
58200 • Loan Interest 0.00 12,747.95 -12,747.95 0.0%
Total Other Expense 37,250.00 29,000.00 8,250.00 128.4%
Net Other Income -37,250.00 -29,000.00 -8,250.00 128.4%
Net Income 158,797.47 22,227.34 136,570.13 714.4%
Page 2
DRAFT
Ordinance 17.17 Village of Park Ridge Street Right-Of-Way, Driveways
and Parking Ordinance
STATE OF WISCONSIN, VILLAGE OF PARK RIDGE, PORTAGE COUNTY
The Village Board of Trustees does hereby ordain as follows:
Purpose:
In order to provide for the health, safety and welfare of the Village with respect to street safety, and
pursuant to Wis. Stat., § 61.36, § 66.1031 through § 66.1037, and § 83.06, the Village Board of
Trustees does hereby pass the following ordinance for publishing and inclusion in the Village of Park
Ridge Code of Ordinances as follows:
Ordinance 17.17
Section I. Grading and Swales
A) The right-of-way area between the edge of street pavement and the right-of-way line shall
include a ditch/swale that meets the dimensions and details exhibited by the Typical Street
Section as set forth in FIGURE 1, which diagram is incorporated by reference into this
Ordinance (see FIGURE 1 below). Rights-of-way in the Village that do not have a swale
currently may be regraded by the Village as street improvement projects occur. Any new
grading initiated by a private property owner shall require a grading permit and include a
Village-approved swale as detailed in the Typical Street Section.
B) Parking pads (widened shoulder parking areas), either paved or graveled, are prohibited on
Village right-of-way. Existing parking pads may remain but shall be removed if any new
grading or shaping of the street or private property occurs, or if a street construction project
includes work that extends outside the street pavement/shoulder.
Section II. Driveways
A) Each Village lot is allowed no more than one (1) driveway for ingress and egress onto Village
streets. If multiple driveways currently exist, they may remain, providing they do not pose a
safety concern, in the discretion of the Village Board. When a street construction project occurs,
driveways of more than one (1) will be considered for removal by the Village Board. When
construction occurs on private property that affects ingress and egress onto Village streets, then
any additional driveways more than one (1) per lot will be considered for elimination and
closure by the Village Board.
B) Driveway pavements shall be a maximum of 24 feet wide at the right-of-way line, excluding
radii and tapers where the driveway meets the street. Radii or tapers shall extend no greater than
an additional 5 feet on each side of the driveway.
Section III. Parking – For vehicles and trailers
A) Short term parking - less than 12 hours
DRAFT
(1) Short term parking is allowed along all Village streets unless otherwise restricted according
to Village signage. Parking is prohibited along all Village streets and rights-of-way when a
snowfall of 1 inch or more is forecast, or if 1 inch or more of snow cover exists. Vehicles
shall be parked partially off the paved portion of the roadway as much as possible, with at
least two (2) vehicle wheels on the shoulder or yard. Vehicles may be parked entirely on
private property outside of driveway areas for twelve (12) hours or less. Vehicles may not be
parked entirely off of a driveway on private property for more than 12 hours in a 24-hour
period. Vehicles shall not be parked outside of driveway areas on a recurring basis, subject
to limitations described in Ordinance 10.06, Sect. 1, Sect. E.
(2) Recreational vehicles, campers and other trailers – The above restriction in Section III.4.a)
shall pertain similarly for all recreational vehicles, including but not limited to campers and
any other trailers.
B) Long term parking – more than twelve (12) hours
(1) Long term parking is not allowed along Village streets. Long term and regular recurring
parking shall be entirely on the portion of a driveway that lies entirely on a private lot, or in
a garage or car port. No more than four (4) cars will be allowed to park in driveways outside
of a garage or car port. Recreational vehicles, campers and other trailers must be parked in
accordance with limitations described in Ordinance 10.06, Sect. 1, Sect. E.
Section IV . Right-Of-Way Encroachments
A) Vision triangles
(1) On corner lots, vegetation shall be maintained by lot owners to allow vision triangles that
will provide clear vision in both directions when a vehicle is stopped near the edge of the
crossing street. Trees and bushes and other vegetation shall not exceed a height of thirty-six
(36) inches above centerline street grade in such vision triangles areas. A 40-foot by 40-foot
vision triangle is required for lots abutting all Village cross-streets, except for those lots that
intersect with the following streets, which require a 50-foot by 50-foot vision triangle (see
FIGURE 2 of vision triangles, attached and incorporated by reference):
• Park Ridge Drive
• Hillcrest Drive
• Odessa Court at Green Avenue
• Angelo Court at Green Avenue
Existing landscaping that encroaches into the vision triangle may remain but will be
considered for removal if it poses a safety concern, or with any new street improvement or
maintenance project. B) Trees
(1) Large species trees -- those that are expected to have a mature height greater than twelve
(12) feet -- shall not be planted closer than ten (10) feet from the edge of pavement, or
within vision triangles. Existing trees that are within these areas may remain unless the
Village determines they pose a threat to public safety. Trees may be considered for removal
by the Village if issues develop, or if a Village street improvement project requires removal.
Any overhanging branches shall be kept trimmed to provide a travel vision window of at
least sixteen (16) feet above the centerline of the street pavement, five (5) feet measured
horizontally from the edge of the street pavement, and eight (8) feet above the surface of a
public sidewalk.
DRAFT
(2) Small species trees/bushes -- those that are expected to have a mature height less than twelve
(12) feet -- may be planted on Village right-of-way. These plantings shall not be located with
the trunk closer than ten (10) feet from the street pavement edge, and the mature crown area
shall not extend closer than five (5) feet from of the edge of street pavement.
a) Trees, bushes, or other plantings exceeding thirty-six (36) inches in height above the
street pavement are prohibited within any vision triangle.
C) Garden plantings
(1) Garden plantings, including rain gardens, shall not be located closer than twenty-four (24)
inches from the edge of the street pavement. Garden plants shall not exceed thirty-six (36)
inches in height above the centerline of the street pavement within the vision triangle at
intersections (see Sect. A(1) above), or into the travel vision window (sixteen (16) feet
above the centerline of the street pavement and five (5) feet measured horizontally from the
edge of the street pavement).
D) Structures
(1) Retaining walls and landscape structures
a) Retaining walls or landscape structures (walls, borders fencing, etc., regardless of
material type) are prohibited within the Village right-of-way or vision triangles. Existing
retaining walls or landscape structures that encroach on right-of-way may remain but
shall be considered for removal if the Village determines they are a safety hazard, if any
new grading or shaping of the right-of-way occurs, or if a street construction project
includes work that extends outside the street pavement/shoulder.
(2) Mailboxes
a) Location
1. Mailboxes shall be installed such that the front face of the box is no closer than
eighteen (18) inches and no greater than thirty-six (36) inches from the edge of the
street pavement, with a box floor height of forty-two (42) to forty-eight (48) inches
above the street pavement edge (see FIGURE 3, incorporated into this Ordinance by
reference).
b) Type
1. Mailboxes shall be standard size and shape and may be small or large version of the
USPS standard. Non-standard or custom-built mailboxes will be allowed if they are
within the typical size range, are not deemed a hazard by the Village. Stone or
concrete mailbox posts are prohibited.
c) Existing allowances
1. Existing mailboxes that do not meet location or type requirements may remain but
shall be considered for modification or relocation if the Village determines they are a
hazard, if any new grading or shaping occurs, or if a street construction project
includes work that extends outside the street pavement/shoulder. Mailboxes that are
deemed a safety hazard by the Village Board shall be replaced within ten (10) days
after notification from the Village or will be removed by the Village at the owner’s
expense, which may include placing the costs on the property tax roll.
(3) Underground sprinkler systems
a) Location
DRAFT
1. Sprinkler lines and heads are allowed on Village right-of-way. Heads shall be
installed no closer than two (2) feet from the edge of any street pavement.
2. Sprinkler heads shall be adjusted such that spray into the street pavement areas is
minimized.
b) Damage, repair and replacement
1. The cost of repairing or replacing sprinkler lines and heads located within the
Village right-of-way that are damaged or destroyed for any reason is the sole
responsibility of the property owner and not the Village under any circumstances.
(see Section V . below)
c) Type
1. Sprinkler heads located within right-of-way shall be flush or below grade. Head type
or brand is not regulated by this Ordinance, providing it meets this grade restriction.
d) Control Boxes (Manifold and valve units)
1. Placement of sprinkler control boxes within the Village right-of-way is prohibited.
(4) Snow plowing markers (“snow sticks”)
a) Materials
1. Markers shall be made of a “breakaway” material and shall be no greater than one-
half (½) inch in diameter and not exceed four (4) feet in height above the street
pavement.
b) Location
1. Markers shall be installed no closer than two (2) feet from the edge of the street
pavement.
Section V . Liability
A) All liability of private property installed, erected or maintained on any Village right-of-way,
including plantings, landscaping, mailboxes, sprinkler systems, structures, walls, snowplow
markers, or other personal property; is the sole responsibility of the property owner if damage
occurs. This includes damage that occurs as a result of Village projects or maintenance
operations.
Section VI. Enforcement.
A) Enforcement of this Ordinance shall be pursuant to any remedy allowed at law or in equity,
including but not limited to Ordinance No. 17.41.
EFFECTIVE DATE
This ordinance is effective upon publication. The Village Clerk shall properly post or publish this
ordinance as required under § 61.50, Wis. Stat.
Adopted this day of August, 2024.
DRAFT
Steve Menzel – Village President
Gordon Renfert – Village Trustee
Kristin Paulson – Village Trustee
Barbara Friedrich – Village Trustee
Dan Holloway – Village Trustee
ATTESTED BY:
Shanna Behrend – Interim Village Clerk
ADDENDUM
FIGURE 1 (TBD)
FIGURE 2 (TBD)
FIGURE 3 (TBD)
`
May 7, 2024
Mayor Mike Wiza
Ci
ty of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481
cc: Scott Beduhn, D irector of Public Works
Mary
Kneebone, District 7 Alder
Dean Shuda, District 8 Alder
Dear
Mayor Wiza,
On be
half of the trustees and concerned residents of the Village of Park
Ridge, I am writing to offer for your consideration a recommendation
regarding vehicle speed limits on Park Ridge Drive (Highway 66). This
recommendation is based upon our understanding that, while nearly one-
half mile of this street bisects the Village of Park Ridge, the City of Stevens
Point is primarily responsible for setting speed limits along the entire
Highway 66 corridor that lies within the City.
Spec
ifically, our recommendation is as follows:
• Reduc
e the speed limit between Country Club Drive and Ridge
Road from 40 mph to 35 mph.
• Reduce the speed limit between Ridge Road and Frontenac
Avenue from 35 mph to 25 mph.
We bel
ieve this recommendation is in the best interest of safety for vehicle
drivers, pedestrians, bicyclists, e-bikers, school crossing guards,
schoolchildren and their parents, and businesses along this section of
Highway 66. This area has become increasingly urbanized over the
decades, suggesting the need for reduced speeds along this corridor.
Specifically, here are some developments in recent decades that
demonstrate how this area has changed:
BOARD MEMBERS
Stev
e Menzel
President
Barb
ara Friedrich
Trustee
Dan
Holloway
Trustee
Kris
tin Paulson
Trustee
Gord
on Renfert
Trustee
VILLAGE OF PARK RIDGE
PORTAGE COUNTY
WISCONSIN
24 Crestwood Drive ESTABLISHED 1938 Telephone: (715) 343-1590
Stevens Point, WI 54481 www.vi.parkridge.wi.gov E-Mail: clerk@vi.parkridge.wi.gov
• T
he addition of traffic-generating businesses, including Metro
Market (the area’s busiest grocery store), Walgreen’s, Pineries Bank,
Nice As New consignment shop, The Store/Subway, Crow Family
Dental, Emy J’s Coffee Vault, and Fiternal Fitness.
• An increase in the number of vehicles, pedestrians and cyclists
entering or exiting the Highway 66 traffic flow.
• An increase in the number of younger families with children
moving into these neighborhoods, many of whom cross Highway 66
to attend classes or activities at Washington School.
• A large increase in the use of the Green Circle Trail (per the Green
Circle’s own trail counter data), which extends from Iverson Park
through Park Ridge, crossing Highway 66 at the intersection of
Sunset Avenue/Boulevard.
• Increasing usage of Iverson Park -- one of the City’s busiest parks,
with 200-500 visitors per day from May to October -- which has a
main entrance on Highway 66.
Ou
r concern for safety along this corridor is consistent with the spirit of the
Safe Streets and Roads for All (SS4A) grant project and intergovernmental
agreement that you, I and other municipal leaders in the County are
pursuing. As you know, the agreement will guide the development of an
action plan aiming to reduce or eliminate roadway fatalities and serious
injuries over the next two decades.
T
hanks to you, the Common Council, and your city staff for considering
this recommendation in the interest of building a safe future for our
citizens and neighborhoods. As always, please don’t hesitate to contact me
if you have any questions or concerns.
S
incerely,
S
teve Menzel
President/Trustee
Village of Park Ridge
Email: smenzel@vi.parkridge.wi.gov
City of Stevens Point
1515 Strongs Avenue
Stevens Point , WI 54481-3594
Fax:715-346-1530
Steve Menzel
Village of Park Ridge
24 Crestwood Dr
Stevens Point, WI 54481
President Menzel,
Mike Wiza
Mayor
mwiza@stevenspoint.com
715-346-1570
7/24/2024
Thank you for your letter received on July 11t h. We take the Village's concerns about speed on Park Ridge
Dr/ Highway 66 very seriously.
Before we make any changes, we' re going to need to collect some data, so we will be doing the following:
1. The City will start collecting t raffic data. (which we began last week. We will gather a couple weeks
of traffic data in each speed zone.)
2. As the latest edition of the MUTCD (December 2023) now allows for more context consideration
when setting speeds our Director will be researching the MUTCD to learn more about the changes
and what is permissible in setting speeds.
3. Assuming that the changes are not too technical , and that staff can conduct the speed study, we
would plan do that study later this fall (see below)
Also, the State Traffic Safety Engineer reached out to us and a few other communities just yesterday
regarding some available seats at an upcoming FWHA speed zone setting workshops. Our Directo r has
signed up for the workshop , however, it is not until October 23, 2024. Therefore , we would prefer to
complete the workshop prior to conducting the speed study which means it would be done later in the fall.
District 7 Alderperson Kneebone
District 8 Alderperson Shuda
stevenspo nt.com
2024 PARTISAN PRIMARY ELECTION RESULTS
FOR PARK RIDGE
STATE OF WISCONSIN DELEGATION OF APPROPRIATION POWER REFERENDUM
QUESTION 1
YES 62
N0 183
STATE OF WISCONSIN ALLOCATION OF FEDERAL MONEYS REFERENDUM
YES 64
NO 181
UNITED STATES SENATOR – Democratic
TAMMY BALDWIN 191
SCATTERING 0
REPRESENTATIVE IN CONGRESS DISTRICT 3 - Democratic
REBECCA COOKE 18
KATRINA SHANKLAND 173
ERIC WILSON 1
SCATTERING 0
STATE SENATOR DISTRICT 24 - Democratic
COLLIN MCNAMARA 176
SCATTERING 1
REPRESENTATIVE TO THE ASSEMBLY DISTRICT 71 - Democratic
VINNIE MIRESSE 178
SCATTERING 1
PORTAGE COUNTY DISTRICT ATTORNEY
CASS COUSINS 177
SCATTERING 0
PORTAGE COUNTY CLERK - Democratic
MARIA DAVIS 179
SCATTERING 0
PORTAGE COUNTY TREASURER - Democratic
P AMELA R. PRZYBELSKI 182
SCATTERING 0
PORTAGE COUNTY REGISTER O F DEEDS - Democratic
CYNTHIA A. WISINSKI 183
SCATTERING 78
UNITED STATES SENATOR - Rep ublican
ERIC HOVDE 44
CHARLES E. BARMAN 1
REJANI RAVEENDRAN 10
SCATTERING 0
REPRESENTATIVE IN CONGRESS DISTRICT 3 – Republican
DERRICK VAN ORDEN 51
SCATTERING 0
STATE SENATOR DISTRICT 24 – Rep ublican
PATRICK TESTIN 53
SCATTERING 0
REPRESENTATIVE TO THE ASSEMBLY DISTRICT 71 – Rep ublican
BOB PAHMEIER 53
SCATTERING 0
PORTAGE COUNTY DISTRICT ATTORNEY – Rep ublican
SCATTERING 0
PORTAGE COUNTY CLERK – Rep ublican
SCATTERING 0
PORTAGE COUNTY TREASURER -R epublican
SCATTERING 0
PORTAGE COUNTY REGISTER OF DEEDS – Rep ublican
SCATTERING 0
CONSTITUTION PARTY- ALL CONTESTS
SCATTERING 0
LIBERTARIAN P ARTY – ALL CONTESTS
SCATTERING 0
WISCONSIN GREEN PARTY – ALL CONTESTS
SCATTERING 0
Th
e Village of Park Ridge has 436 registered voters. 250 – 57% of the registered voters
completed a ballot for the 2024 Partisan Primary.
I’ve attached a layout of what a revised version might look like. We would first refurbish the original
sign by sanding off all the old stains on both sides, along with any paint that was flaking off. We
would then rout out a rectangle where the “&” and “Fire Department” words are currently located.
You can see the outline of the rectangle on the layout. It would be sized approximately 40.2” wide by
14” high. We would cut a new piece of cedar approximately 1”-thick to fit the rectangle space, glue
it in, and sand it down flush with the existing sign. We would probably need to add some fill around
the edges of the rectangle as well. We would then rout the new words “24 Crestwood Dr. ” and a line
above (based on the current design) on the new rectangle pieces on both sides. The new letters and
lines would be primed. Then, all the letters, lines, and borders (old and new) would be painted with
exterior latex paint. The remaining wood would be finished with an exterior penetrating stain (PPG
ProLuxe Log and Siding).
H
ere is the cost estimate for the project:
• Refurbish the original 4”-thick double-sided sign (top two lines of letters, border, lines,
stain): $400
• Construct and integrate two smaller rectangle signs to cover up the existing “&” and “Fire
Department” lines: $575
• Two new treated 6x6x10 posts, crowned on top, sanded and stained to match the sign: $290
(does not include brackets to install… did you want to use the existing ones?)
• TOTAL: $1,265
T
his is all under the assumption that the original sign is still in good shape structurally. If not, we
may need to consider constructing a new sign from scratch. We wouldn’t be able to determine the
structural integrity of the sign until it is in our shop.
J
ust for comparison and as another option, if we were to construct a new 4”-thick double-sided
cedar sign using the attached design (obviously, we wouldn’t be inserting a smaller rectangle board,
but would just rout everything on the surface of new 4”-thick boards), the cost would come to
$1,490 + $290 for posts = $1,780.
VILLAGE OF PARK RIDGE
PORTAGE COUNTY
WISCONSIN
24 Crestwood Drive
Stevens Point, WI 54481
ESTABLISHED 1938 Telephone: (715) 343-1590
www.vi.parkridge.wi.gov
E-Mail:clerk@vi.parkridge.wi.gov
___________________________________________________
Village of Park Ridge Public Records Notice
Pursuant to Wis. Stat. § 19.34
Public records of the Village of Park Ridge's Office shall be available during normal business
hours, Monday through Thursday from 9:00 a.m. to 2:00 p.m. (except for holidays). The
Village Clerk’s
Office will respond to a public records request as soon as practical and
without delay. With
expansive requests, the Clerk’s response to the request is expected to
take more time.
The law permits the Village Clerk’s Office to impose fees for certain “actual, necessary and
direct” costs associated with the responded to public records requests. Requests which exceed a
total cost of $5.00 may require prepayment and may be required to be made in writing. The
Village Clerk’s Office will determine
how records will be copied. Due to security concerns,
we will not accept flash drives provided by the requestor.
Copying a paper record or printing
an electronic record
* In rare instances, specialized skills, equipment, technology, or other requirements may result
in additional or different costs. Such costs will be communicated prior to being incurred.
Actual Cost
$3.00 per page
Actual Cost of Flash Drive
Total time for locating the
records at the rate of hourly pay
(including fringe benefits) of
the lowest paid person capable
of locating the records.
Electronic Copies
Maps/Other large records
$0.07 per page
Shipment of Hard Copies or
Electronic Copies
Shipping Charges
$0.25 per page
Digital to Flash Drive
Hard Copies
Digital to Digital Fee waived
The actual, necessary, and direct
costs of locating records if it
exceeds $50
Public Records Request Fee Schedule*:
Paper to Digital
Location Fees
Cash or check are the only payment methods accepted by the Village Clerk’s Office.
Dated
this 19 day of August 2024.
ShannaBehrend
Village Clerk
Source: Village of Park Ridge website. First collected Oct 21, 2026.