Village Board — Agenda packet
Village of Park Ridge · Portage County · Village Board · meeting of Nov 20, 2023 · Agenda packets
Open the original document More from Village of Park Ridge
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
VILLAGE OF PARK RIDGE
BOARD MEETING MINUTES
October 16, 2023
************************************************************************************
MEETING CALLED TO ORDER – President Steve Menzel called the Park Ridge Village Board to order at 5:30 pm.
The Village Board meeting was held in person at the Village Hall and via Zoom. After the recitation of the Pledge of
Allegiance by members present, a roll call was taken. Trustees Gordon Renfert, Dan Holloway and President Menzel
were present; Trustee Kristin Paulson and resident Daniel O’Neil was present via Zoom. Clerk Katie McKelvey and
Dan Knoeck from MSA was also present. Trustee Barb Friedrich was not in attendance at this meeting.
AGENDA ITEM #1 - APPROVAL OF THE OCTOBER AGENDA – Menzel asked the Board members if there were
any changes regarding the September agenda. Renfert made a motion to approve, with no changes. The motion was
seconded by Holloway. Motion carried by voice vote, with no negative votes.
AGENDA ITEM #2 – PUBLIC COMMENT PERIOD - The public comment section was opened to anyone who wished
to speak on any agenda item. No comments were made.
AGENDA ITEM #3 – PUBLIC COMMENT PERIOD - The public comment section was opened to anyone who wished
to speak on any non-agenda item. No comments were made.
AGENDA ITEM #4 – REVIEW & APPROVE BOARD MEETING MINUTES FROM SEPTEMBER 18, 2023 –
Holloway made a motion to approve the minutes, with no changes. Motion was seconded by Renfert. Motion carried
by voice vote, with no negative votes.
AGENDA ITEM #5 – REVIEW & APPROVE BOARD MEETING MINUTES FROM SEPTEMBER 25, 2023 – Renfert
made a motion to approve the minutes, with no changes. Motion was seconded by Menzel. Motion carried by voice
vote, with no negative votes
AGENDA ITEM #6 – REVIEW & APPROVE BOARD MEETING MINUTES FROM OCTOBER 3, 2023 – Menzel
made a motion to approve the minutes, with no changes. Motion was seconded by Holloway. Motion carried by voice
vote, with no negative votes
AGENDA ITEM #7 – REVIEW AND ACCEPT SEPTEMBER TREASURER’S REPORT – Menzel noted that our
income this year has already exceeded the budgeted amount, primarily because of the sale of fire department
equipment. Holloway made a motion to approve the Treasurer’s report. Motion seconded by Renfert. Motion carried
by voice vote, with no negative votes
AGENDA ITEM #8 – REVIEW AND APPROVE SEPTEMBER & OCTOBER BILLS/PAYMENTS – Holloway made
the motion to approve the payment of the bills. Seconded by Friedrich. Roll call was taken, Renfert – yes, Paulson –
yes, Holloway – yes, Friedrich – yes, Menzel – yes.
AGENDA ITEM #9 – REVIEW & APPROVE QUARTERLY REPORTS – Paulson moved to approve the quarterly
reports; Motion seconded by Renfert. Roll call was taken, Paulson – yes, Holloway – yes, Renfert – yes, Menzel –
yes.
• Building Permits
• Fire Department
• Zoning Committee – Variance granted for Margie & Gene Bell
• Payroll
DISCUSSION AND/OR POSSIBLE ACTION ON THE FOLLOWING ITEMS:
AGENDA ITEM #10 - REVIEW & APPROVE RESOLUTION 005.2023R TO INCREASE FEES FOR ANIMAL
LICENSES – Village of Park Ridge increases their fees based on the Portage County fees; Portage County approved
their fee increase in September. Effective January 1, 2024, fees will increase as follows: Neutered Male or Spayed
Female Dogs – fee increased from $15 to $17; Male or Female Dogs – fee increased from $25 to $27. Holloway
moved to approve the motion, seconded by Paulson. Roll call was taken, Holloway – yes, Renfert – yes, Paulson –
yes, Menzel – yes.
AGENDA ITEM #11 – CAPITAL IMPROVEMENT PLAN UPDATE– Total cost of 10 year project is $6.2 Million.
Possible grant totals $1.5 Million, leaving $4.6 Million needing to be borrowed. After discussion with the Village
Accountant, $2 Million would be the most we would want to borrow. Roll call, Paulson – yes, Holloway – yes, Renfert
– yes, Menzel – yes.
• Project #1: Street reconstructing and adding water main on Hillcrest from Sunset to Sunrise; Street
reconstruction and adding water main to Greenbriar and on Greenbriar and Hillcrest up to Park Ridge Drive.
Target 2024.
• Project #2: Similar loop on Ridgewood from West Village limit to Greenbriar and Greenbriar up to Hillcrest
• These two projects would cause the Village to borrow approximately $2.6 Million.
• President Menzel has reached out to League of Wisconsin Municipalities to find out what is typical for
municipalities to borrow.
• Board advised MSA that they would like to see a 20-year plan.
AGENDA ITEM #12 – 2024 BUDGET DISCUSSION – Yellow highlighted areas are waiting for additional
information. Many account have been removed or combined.
AGENDA ITEM #13 – FALL NEWSLETTER - To include advising residents that Affordable Tree Service will be
doing the Fall Street Right-of-Way;
AGENDA ITEM #14 – SET DATE AND TIME OF NEXT BOARD MEETING – Monday, November 20, 2023, 5:30pm
The meeting adjourned at 6:32 pm.
_______________________________ _____________________________
KATIE MCKELVEY STEVE MENZEL
VILLAGE CLERK VILLAGE PRESIDENT
VILLAGE OF PARK RIDGE
SPECIAL BOARD MEETING MINUTES
November 2, 2023
************************************************************************************
MEETING CALLED TO ORDER – President Steve Menzel called the Park Ridge Village Board to order at 5:30 pm.
The Village Board meeting was held at the Village Hall and via Zoom. After the recitation of the Pledge of Allegiance
by members present, a roll call was taken. Trustees Gordon Renfert, Dan Holloway, Barb Friedrich, and Steve
Menzel were present. Clerk Katie McKelvey was also present via Zoom. Trustee Kristin Peterson was not in
attendance.
AGENDA ITEM #1 - APPROVAL OF THE NOVEMBER SPECIAL MEETING AGENDA – Menzel asked the Board
members if there were any changes regarding the November Special agenda. Friedrich made a motion to approve,
with no changes. The motion was seconded by Renfert. Motion carried by voice vote, with no negative votes.
AGENDA ITEM #2 – PUBLIC COMMENT PERIOD - The public comment section was opened to anyone who wished
to speak on any agenda item. No comments were made.
AGENDA ITEM #3 – PUBLIC COMMENT PERIOD - The public comment section was opened to anyone who wished
to speak on any non-agenda item. No comments were made.
AGENDA ITEM #4 – REVIEW and APPROVE FINAL CAPITAL IMPROVEMENT PLAN – After some discussion, it
was decided to wait to approve until the November Board Meeting.
The meeting adjourned at 6:02 pm.
_______________________________ _____________________________
KATIE MCKELVEY STEVE MENZEL
VILLAGE CLERK VILLAGE PRESIDENT
Nov 16, 23
ASSETS
Current Assets
Checking/Savings
11110 · Checking -253.54
11310 · Operating Account 51,144.88
11340 · Reserve Account-Pineries
11341 · Reserve Account-Pineries (AR... 19,832.13
11340 · Reserve Account-Pineries - Ot... 10,767.84
Total 11340 · Reserve Account-Pineries 30,599.97
11343 · Pineries MM# 8005-467-9 141,394.13
11345 · Reserve Account-Bank of Amhe... 10,003.03
11350 · CD Account 104,104.94
11360 · Petty Cash 200.00
Total Checking/Savings 337,193.41
Accounts Receivable
1200 · Accounts Receivable -403.00
Total Accounts Receivable -403.00
Other Current Assets
12100 · Taxes Receivable 198,073.62
Total Other Current Assets 198,073.62
Total Current Assets 534,864.03
TOTAL ASSETS 534,864.03
LIABILITIES & EQUITY
Liabilities
Current Liabilities
Credit Cards
2037 · Village Credit Card-Shanna 1953 -322.46
2046 · Village Credit Card - Katie2258 194.72
Total Credit Cards -127.74
Other Current Liabilities
2100 · State W/H Tax 93.33
21511 · Federal W/H Tax 2.40
24700 · Due other taxing authorities 209,243.69
Total Other Current Liabilities 209,339.42
Total Current Liabilities 209,211.68
Total Liabilities 209,211.68
VILLAGE OF PARK RIDGE
Balance Sheet
As of November 16, 2023
Nov 16, 23
Equity
3010 · Office Equipment Reserve 82.68
3015 · Fire Department Reserve 5,892.66
3018 · Street Reserve 638.28
3020 · Sewer Reserve 2,500.00
3025 · Reassessment Reserve 9,000.00
3045 · FD Fundraising/Donation Reserve 6,952.65
3060 · Disaster Reserve 1,000.00
3070 · Santa Visit Reserve 150.00
34100 · General Undesignated Fund Bal 103,265.36
3900 · Retained Earnings 216,038.78
Net Income -19,868.06
Total Equity 325,652.35
TOTAL LIABILITIES & EQUITY 534,864.03
Jan 1 - Nov 16, 23 Budget $ Over Budget % of Budget
Ordinary Income/Expense
Income
41110 · Local Tax Levied 201,414.91 201,415.00 -0.09 100.0%
43410 · Shared Revenues 1,901.39 12,676.00 -10,774.61 15.0%
43420 · Fire Insurance 2,821.32 2,400.00 421.32 117.6%
43430 · Exempt Computer Aid 462.47 461.00 1.47 100.3%
43440 · Personal Property Aid 539.12 270.00 269.12 199.7%
43450 · State Video (Cable) Aid 3,192.97 1,700.00 1,492.97 187.8%
43531 · Transportation Aid 10,092.36 12,974.00 -2,881.64 77.8%
44110 · Liquor and Malt Beverage 915.00 1,000.00 -85.00 91.5%
44120 · Cigarette/Bartender's Licenses 1,150.00 1,000.00 150.00 115.0%
44200 · Dog Licenses 330.00 500.00 -170.00 66.0%
44300 · Building Permits/Inspections 2,272.84 0.00 2,272.84 100.0%
44400 · Zoning/Variance Fees 200.00 200.00 0.00 100.0%
44500 · Cable Franchise Fees 4,519.37 7,000.00 -2,480.63 64.6%
46100 · General Government 45.00 100.00 -55.00 45.0%
48100 · Interest 2,354.28 500.00 1,854.28 470.9%
48200 · CD Interest 0.00 500.00 -500.00 0.0%
48302 · Sale of Fire Equipment 36,850.36 0.00 36,850.36 100.0%
48900 · Miscellaneous Income 1,581.03 0.00 1,581.03 100.0%
48905 · Late Fees 5.00 0.00 5.00 100.0%
Total Income 270,647.42 242,696.00 27,951.42 111.5%
Expense
51100 · Village Board
5110001 · President Salary 2,758.88 3,768.00 -1,009.12 73.2%
5110002 · Trustee Salary 2,953.00 3,445.00 -492.00 85.7%
5110003 · Santa Visit 0.00 350.00 -350.00 0.0%
5110004 · League of Municipalities Dues 0.00 400.00 -400.00 0.0%
5110005 · Miscellaneous 0.00 900.00 -900.00 0.0%
5110006 · Board Expenses 106.93 1,850.00 -1,743.07 5.8%
Total 51100 · Village Board 5,818.81 10,713.00 -4,894.19 54.3%
51300 · Legal 4,800.00 4,000.00 800.00 120.0%
51410 · Clerk/Treasurer
5141001 · Clerk Compensation 33,908.51 39,500.00 -5,591.49 85.8%
5141002 · Mileage and Expense 617.66 0.00 617.66 100.0%
5141006 · General Office Supplies 3,947.36 6,000.00 -2,052.64 65.8%
5141007 · Training 500.00 1,500.00 -1,000.00 33.3%
5141010 · Tax Collection Fee 1,438.78 1,200.00 238.78 119.9%
5141011 · Villagewide Mailing 886.31 0.00 886.31 100.0%
5141013 · Treasurer Bond 1,407.00 0.00 1,407.00 100.0%
5141016 · Accounting Consultation 205.60 3,000.00 -2,794.40 6.9%
5141022 · Dues & Subscriptions 1,757.07 0.00 1,757.07 100.0%
5141025 · Background Checks 154.00 0.00 154.00 100.0%
5141026 · Treasurer Compensation 0.00 6,000.00 -6,000.00 0.0%
5141027 · IT Services 500.00 2,000.00 -1,500.00 25.0%
Total 51410 · Clerk/Treasurer 45,322.29 59,200.00 -13,877.71 76.6%
51420 · Elections
5142001 · Inspectors 1,021.75 2,000.00 -978.25 51.1%
5142002 · Election Expenses 49.50 0.00 49.50 100.0%
5142006 · Election Equipment 0.00 1,000.00 -1,000.00 0.0%
Total 51420 · Elections 1,071.25 3,000.00 -1,928.75 35.7%
51430 · Publication Fees 130.20 0.00 130.20 100.0%
51510 · Accounting
5151001 · Reporting (Form C) 1,850.00 750.00 1,100.00 246.7%
Total 51510 · Accounting 1,850.00 750.00 1,100.00 246.7%
51530 · Assessment of Property
5153001 · Assessor Contract 5,800.00 5,800.00 0.00 100.0%
5153004 · Bd of Review Notice Publication 128.35 0.00 128.35 100.0%
Total 51530 · Assessment of Property 5,928.35 5,800.00 128.35 102.2%
51600 · Village Hall
5160001 · Maintenance Compensation 1,430.00 3,000.00 -1,570.00 47.7%
5160004 · Utilities 1,972.21 3,000.00 -1,027.79 65.7%
5160005 · Supplies and Equipment 8,357.69 2,500.00 5,857.69 334.3%
5160006 · Repairs & Maintenance 1,407.90 0.00 1,407.90 100.0%
Total 51600 · Village Hall 13,167.80 8,500.00 4,667.80 154.9%
51910 · Uncollectible Taxes 152.03 0.00 152.03 100.0%
VILLAGE OF PARK RIDGE
Revenues & Expenses Budget vs. Actual
January 1 through November 16, 2023
Page 1
Jan 1 - Nov 16, 23 Budget $ Over Budget % of Budget
51938 · Insurance
5193801 · General Liability 6,831.00 1,300.00 5,531.00 525.5%
5193802 · Local Gov't Property 0.00 1,000.00 -1,000.00 0.0%
5193804 · Public Officials Liability 0.00 1,000.00 -1,000.00 0.0%
Total 51938 · Insurance 6,831.00 3,300.00 3,531.00 207.0%
52100 · Crossing Guard 2,455.23 3,500.00 -1,044.77 70.1%
52205 · Fire & EMS Protection
5220521 · Fire Protection & EMT Contract 74,366.49 1,500.00 72,866.49 4,957.8%
5220523 · Firefighter Compensation 0.00 97,200.00 -97,200.00 0.0%
52205 · Fire & EMS Protection - Other 802.00 0.00 802.00 100.0%
Total 52205 · Fire & EMS Protection 75,168.49 98,700.00 -23,531.51 76.2%
52400 · Building Inspection 3,893.19 800.00 3,093.19 486.6%
52450 · Zoning Administration 495.61 550.00 -54.39 90.1%
53311 · Street Maintenance
5331101 · Snow Plowing 21,219.56 27,000.00 -5,780.44 78.6%
5331102 · Grading 0.00 500.00 -500.00 0.0%
5331103 · Street Maintenance 6,004.12 2,000.00 4,004.12 300.2%
5331105 · Street Repair 0.00 10,000.00 -10,000.00 0.0%
5331107 · Tree & Branch Removal 0.00 2,500.00 -2,500.00 0.0%
5331110 · Flags & Banners 0.00 1,500.00 -1,500.00 0.0%
5331113 · Engineering 27,032.00 0.00 27,032.00 100.0%
Total 53311 · Street Maintenance 54,255.68 43,500.00 10,755.68 124.7%
53420 · Street Lighting
5342001 · Electric & Maintenance 11,405.19 11,000.00 405.19 103.7%
5342004 · Digger Requests 2,606.86 4,000.00 -1,393.14 65.2%
Total 53420 · Street Lighting 14,012.05 15,000.00 -987.95 93.4%
53620 · Garbage Collection
5362001 · Garbage Collection 28,950.92 29,000.00 -49.08 99.8%
5362002 · Fall Large Item Pick-up 0.00 800.00 -800.00 0.0%
53620 · Garbage Collection - Other 45.00 0.00 45.00 100.0%
Total 53620 · Garbage Collection 28,995.92 29,800.00 -804.08 97.3%
53635 · Recycling cost
5363501 · Recycling Collection 8,192.37 9,000.00 -807.63 91.0%
5363503 · Yard Waste Drop Off 5,200.00 5,200.00 0.00 100.0%
Total 53635 · Recycling cost 13,392.37 14,200.00 -807.63 94.3%
54100 · Humane Society Contract 1,230.04 800.00 430.04 153.8%
55200 · Parks Dept. Pledge ($5.50/per) 2,778.00 3,000.00 -222.00 92.6%
6560 · Payroll Expenses 517.17 0.00 517.17 100.0%
Total Expense 282,265.48 305,113.00 -22,847.52 92.5%
Net Ordinary Income -11,618.06 -62,417.00 50,798.94 18.6%
Other Income/Expense
Other Expense
58100 · Loan Principal 5,208.34 4,942.00 266.34 105.4%
58200 · Loan Interest 3,041.66 3,308.00 -266.34 91.9%
Total Other Expense 8,250.00 8,250.00 0.00 100.0%
Net Other Income -8,250.00 -8,250.00 0.00 100.0%
Net Income -19,868.06 -70,667.00 50,798.94 28.1%
VILLAGE OF PARK RIDGE
Revenues & Expenses Budget vs. Actual
January 1 through November 16, 2023
Page 2
Twenty Year Capital Improvement Plan
2024-2043
Village of Park Ridge
Portage County, Wisconsin
October 2023
Village of Park Ridge
Portage County
Wisconsin
09617000
Prepared by:
Dan Knoeck, PE & Dan Borchardt, PE
MSA Professional Services, Inc.
146 North Central Ave, Suite 201
Marshfield, WI 54449
Phone: (715) 304-0305
www.msa-ps.com
Project No. 09617000
© October 2023 MSA Professional Services, Inc.
THIS PAGE INTENTIONALLY LEFT BLANK
VILLAGE OF PARK RIDGE
RESOLUTION NO.
CAPITAL IMPROVEMENT PLAN 2024-2043
OF THE VILLAGE OF PARK RIDGE, PORTAGE COUNTY,
WISCONSIN
WHEREAS, a formal capital budget provides elected officials with a tool for
evaluating and prioritizing projects on the basis of merit and urgency; and,
WHEREAS, a formal capital budget assists administration with providing
recommendations to elected officials for financing capital projects; and,
WHEREAS, the cornerstone for the capital budget is the Capital Improvement Plan
(CIP); and,
WHEREAS, a Capital Improvement Plan for the years 2024- 2043 has been
developed and reviewed by the Village Board of Trustees;
NOW, THEREFORE BE IT RESOLVED, that the Village Board of the
Village of Park Ridge, Portage County, Wisconsin, by a majority vote, hereby
recommends adoption of the Village of Park Ridge Capital Improvement Plan
2024-2043, a copy of which is attached to this Resolution.
This resolution adopted by action of the Village Board of the Village of Park Ridge and
dated this ____ day of _____________, 2023.
______________________________
Steve Menzel, Village President
Attest
Katie McKelvey, Clerk
THIS PAGE INTENTIONALLY LEFT BLANK
© October 2023 MSA Professional Services, Inc. \\msa-ps.com\fs\Project\09\09617\09617000\Documents\CIP Report (Narrative)\09617000 Park Ridge CIP STREETS, WATER 10.25.2023.docx
Village of Park Ridge 20-Year Capital Improvement Plan
TABLE OF CONTENTS
Page
EXECUTIVE SUMMARY ................................ ................................ ................................ ............. i
CHAPTER 1 - INTRODUCTION ................................ ................................ ................................ 2
CHAPTER 2 - EXISTING CONDITIONS ................................ ................................ ................... 3
CHAPTER 3 - CIP PROCESS ................................ ................................ ................................ ... 6
CHAPTER 4 - ESTIMATING PROCEDURES ................................ ................................ ............ 8
CHAPTER 5 - PROPOSED IMPROVEMENTS ................................ ................................ .........10
CHAPTER 6 - FUNDING SOURCES ................................ ................................ ........................11
LIST OF FIGURES
FIGURE 1 20-Year CIP Project Map ................................ ................................ .........................13
FIGURE 2 Existing Streetlight System ................................ ................................ ......................14
FIGURE 3 Proposed Street Reconstruction Typical Section Detail ................................ ...........15
FIGURE 4 Proposed Watermain And Fire Hydrant Layout ................................ ........................16
FIGURE 5 Proposed Streetlight System................................ ................................ ....................17
LIST OF APPENDICES
APPENDIX A Project Summary Sheets
• Projects by Category 2024-2033
• Projects by Category 2034-2043
• Projects by Funding Source 2024-2033
• Projects by Funding Source 2034-2043
• Projects by Funding Source & Category 2024-2033
• Projects by Funding Source & Category 2034-2043
APPENDIX B
• Project Descriptions 2024-2033
• Project Descriptions 2034-2043
APPENDIX C Detailed Project Cost Estimates
THIS PAGE INTENTIONALLY LEFT BLANK
20 -Year Capital Improvement Plan Executive Summary
Village Of Park Ridge, Portage County, WI October 2023
Project No. 09617000 Page i
© October 2023 MSA Professional Services, Inc. \\msa-ps.com\fs\Project\09\09617\09617000\Documents\CIP Report (Narrative)\09617000 Park Ridge CIP STREETS, WATER
10.25.2023.docx
EXECUTIVE SUMMARY
The Village of Park Ridge has committed to developing a long -range Capital Improvement Plan
(CIP) to maintain and improve its existing infrastructure. The recently adopted Comprehensive
Plan and Strategic Plan for the Village both emphasize the need for re newed focus on
infrastructure. Residents are ready and willing to make needed investments in infrastructure
improvements. In April of 2023, Village residents passed a referendum by a margin of 2 to 1, to
allow the Village to exceed its levy limit by over 50% for enhanced fire protection and capital
improvement debt service. The primary areas of need are street and drainage improvements,
watermain and fire hydrants, and streetlight replacement. Existing conditions are further described
in Chapter 2.
Chapter 3 describes the process used to identify, evaluate, and prioritize CIP projects. Most of
the public street improvements in the CIP include a public utility improvement component because
the proposed watermain system will be located beneath existing roadway s. The 20-Year CIP
includes four ( 4) street reconstruction projects, which also include stormwater drainage
improvements. There are four (4) watermain projects to be completed concurrently with street
work, three (3) streetlighting projects to coincide with street projects to the extent possible, two
(2) resurfacing projects, and one (1) on-going pavement maintenance project. Figure 1 depicts
the proposed projects identified in this CIP, and the proposed year of construction. It should be
noted that typical capital improvement plans range from 5 to 10 years. In this case, due to the
high level of need and limited ability of the Village to fund infrastructure improvements, the plan
has been extended to 20 years. The plan should be reviewed annually and updated as costs and
priorities change.
Summary Tables are provided in Appendix A, identifying year-by-year costs for the 20-Year CIP.
The following pie chart provides a breakdown of the Summary Tables based on various elements
of the proposed 20-Year CIP. Appendix B contains the individual project descriptions used to
report each project, its projected cost and timeline for construction.
P
reliminary project cost estimates which are included Appendix C , were prepared for each
project, and include construction, engineering, administration, construction contingencies,
environmental and land acquisition costs where appropriate as well as cost of inflation for projects
proposed in later years.
20 -Year Capital Improvement Plan Executive Summary
Village Of Park Ridge, Portage County, Wisconsin October 2023
Project No. 09617000 Page 1
© October 2023 MSA Professional Services, Inc. \\msa-ps.com\fs\Project\09\09617\09617000\Documents\CIP Report (Narrative)\09617000 Park Ridge CIP STREETS, WATER
10.25.2023.docx
STREETS
$3,307,000
WATERMAIN
$2,433,000
STREET LIGHTING
$879,000
PROJECT CATEGORY
STREETS WATER MAIN STREET LIGHTING
GENERAL FUND
$205,000
LOCAL ROAD
IMPROVEMENT
PROGRAM
$904,500
LONG TERM DEBT
$4,658,300
STP URBAN PROGRAM
$851,200
FUNDING SOURCE
GENERAL FUND LOCAL ROAD IMPROVEMENT PROGRAM LONG TERM DEBT STP URBAN PROGRAM
20 -Year Capital Improvement Plan Chapter 1 - Introduction
Village Of Park Ridge, Portage County, Wisconsin October 2023
Project No. 09617000 Page 2
© October 2023 MSA Professional Services, Inc. \\msa-ps.com\fs\Project\09\09617\09617000\Documents\CIP Report (Narrative)\09617000 Park Ridge CIP STREETS, WATER
10.25.2023.docx
CHAPTER 1 - INTRODUCTION
Communities today are faced with the difficult task of allocating limited resources among a
seemingly unlimited number of demands and needs for public services. In many instances, local
officials must determine the merits of one project over another without the benefit of comparison,
which may result in misjudgment and further limit the community's ability to act precisely on major
budget allocation decisions. One method available to local units of government to help manage
and systematize the capital budget allocation process is a Capital Improvement Program.
Capital Improvement Programming (CIP) is simply an ongoing, systematic approach to identify,
schedule, and efficiently allocate public dollars to needed capital projects. Typically, a CIP
schedules needed municipal projects over a period of five years. P rojects, including cost
estimates and funding sources, are assigned a target date for completion based on community
needs and revenues. Each year the program is updated and extended one year to stay
responsive to the community's changing needs. CIP striv es to eliminate “crisis” or reactive
financial management.
A carefully developed CIP allows a community to anticipate its facility needs and to schedule
improvements according to project ed needs and local financial capabilities. The CIP process
offers several additional benefits to a community, including:
1. Aiding in the task of effectively allocating limited resources among a seemingly unlimited
number of demands and needs for public service;
2. Improving communication and cooperation among
various interests in the community.
3. Providing continuity in financial decisions by
linking long-term planning to the programming and
budgeting of major projects;
4. Providing transparent and accountable
government;
5. Allowing for coordination with external partners;
6. Supporting the annual budget process;
7. Stabilizing local tax rates by more effectively
relating expenditures to financial capacity in a
given time frame; and
8. Improving local ability to use state and federal
grant-in-aid programs.
THIS PAGE INTENTIONALLY LEFT BLANK
20 -Year Capital Improvement Plan Chapter 2 - Existing Conditions
Village Of Park Ridge, Portage County, Wisconsin October 2023
Project No. 09617000 Page 3
© October 2023 MSA Professional Services, Inc. \\msa-ps.com\fs\Project\09\09617\09617000\Documents\CIP Report (Narrative)\09617000 Park Ridge CIP STREETS, WATER
10.25.2023.docx
CHAPTER 2 - EXISTING CONDITIONS
Public Streets and Drainage
The Village was incorporated in 1938 and since that time, streets have evolved from gravel
surfaces with swales to oiled gravel to cold mix and chip seals. Only the most recent street
improvements have included hot -mix asphalt paving. Pavements are rated using WisDOT’s
PASER system. Ratings range from 3 to 5 on a scale of 1 to 10, with 10 being a brand -new
surface. Ratings of 4 or less typically require resurfacing, rehabilitation or reconstruction to restore
the pavement. Recent pavement cores show tha t many of the streets have little or no base
course. Considering the age of most streets, their minimal construction and limited maintenance
over the years, they have held up remarkably well. However, it is time for more significant
improvements. A contributing factor to the longevity of the existing streets is the underlying sandy
soils. These soils are well drained and generally not susceptible to annual frost cycles and hold
up better than streets with underlying clay soils. The sandy soils have also allowed the Village to
develop without a defined drainage system within its public rights -of-way. Although ditches or
swales have been constructed adjacent to roadways over the years, they have typically relied on
stormwater to infiltrate the existing sandy soils vertically rather than be conveyed horizontally via
pipes or ditches with culverts. This system works satisfactorily in most situations, however when
heavy rainfall or rapid snowmelt exceeds the rate of infiltration or storage available in the swales,
surface water can migrate to outside of the public rights -of-way where it can cause property
damage or at the very least, nuisance flooding. The Village Strategic Plan 2022-2026 recognizes
the need to plan for and coordinate stormwater management with street improvement projects.
20 -Year Capital Improvement Plan Chapter 2 - Existing Conditions
Village Of Park Ridge, Portage County, Wisconsin October 2023
Project No. 09617000 Page 4
© October 2023 MSA Professional Services, Inc. \\msa-ps.com\fs\Project\09\09617\09617000\Documents\CIP Report (Narrative)\09617000 Park Ridge CIP STREETS, WATER
10.25.2023.docx
Municipal Water Supply and Fire Protection
The Village does not have a municipal water system. Generally, residents south of STH 66/Park
Ridge Drive rely on individual, on -site wells. The City of Stevens Point water utility provides
municipal water supply for a limited number of addresses on Park Ridge Drive, Sunrise Avenue
and Sunset Avenue, as well as newer residential subdivisions on Angelo Court and Odessa Court,
north of Park Ridge Drive. Municipal water service provided by the City of Stevens Point is
established by a Municipal Agreement and defined in Chapter 13 of the Stevens Point Municipal
Code, although the list of served properties in the ordinance has become outdated.
There is only one fire hydrant within the Village limits south of Park Ridge Drive, located near the
intersection of Hillcrest Drive and Sunset Avenue. This hydrant is supplied by the Stevens Point
water system and was installed for use by the Village Fir e Department. In 2022, the Village
entered in an agreement with the City of Stevens Point Fire Department for Village fire protection.
In order to adequately serve the Village, additional fire hydrants are needed. The Village Strategic
Plan 2022 -2026 identifies the following objectives related to municipal water supply and fire
protection:
• Expand access to municipal water by installing mains in coordination with street
improvements.
• Develop a 10 -year plan that incorporates access to municipal water to enhance fire
protection and for drinking water.
20 -Year Capital Improvement Plan Chapter 2 - Existing Conditions
Village Of Park Ridge, Portage County, Wisconsin October 2023
Project No. 09617000 Page 5
© October 2023 MSA Professional Services, Inc. \\msa-ps.com\fs\Project\09\09617\09617000\Documents\CIP Report (Narrative)\09617000 Park Ridge CIP STREETS, WATER
10.25.2023.docx
Street Lighting
The Village owns and maintains approximately 50 streetlights throughout the community. Most
consist of a standard fixture on a wooden, direct bury pole (no concrete base). Fiberglass poles
have been used to replace wood poles as needed due to knockdowns or pole failure. In addition,
the new subdivisions on Angello Court and Odessa Court have slightly different poles and fixtures
than other areas. Unmetered power supply is provided by Wisconsin Public Service Corporation
(WPS) at four locations south of STH 66/Park Ridge Drive and two locations north of Park Ridge
Drive, as shown in Figure 2. Monthly billing is based on calculated consumption rather than
metered use. The Village has converted the non -metered light fixtures to LED, however it is
believed that WPS has not updated the streetlight rates to reflect the lower consumption. The
lights on Angello Court and Odessa Court are metered, with only the actual consumption billed to
the Village. The underground wiring and unmetered streetlights are beyond their useful life and
should be planned for replacement. The Village Strategic Plan 2022-2026 recognizes the need to
plan for and coordinate streetlight replacement with street improvements.
Other Village Infrastructure
While outside the scope of this initial Capital Improvement Plan, the Village does have additional
infrastructure that should be inventoried, and any needed improvements prioritized in future CIP
plans.
1. Sanitary Sewer System – the Village does not have its own sewage treatment facility but
is responsible for maintenance of a sanitary sewer system. The City of Stevens Point
provides routine maintenance such as cleaning and televising, however the Village is
responsible for other maintenance and improvements. The sanitary sewer system was
not evaluated as part of this plan, however, should be considered in future plans.
2. Village Hall – the Village owns a municipal building at 24 Crestwood Drive. The Village
Hall contains the Clerk’s office and a small conference area for public meetings. It also
has garage space previously used by the volunteer fire department. The Village Hall was
not evaluated as part of this plan; however, any needed improvements should be
considered in future plans.
3. Other Village Infrastructure – planning for replacement or purchase of new Village assets
can also be included in the CIP to aid in prioritization. Items to consider include warning
sirens, vehicles, equipment, trails, sidewalks, signs, tree planting program, and other
future initiatives.
THIS PAGE INTENTIONALLY LEFT BLANK
20 -Year Capital Improvement Plan Chapter 3 – CIP Process
Village Of Park Ridge, Portage County, Wisconsin October 2023
Project No. 09617000 Page 6
© October 2023 MSA Professional Services, Inc. \\msa-ps.com\fs\Project\09\09617\09617000\Documents\CIP Report (Narrative)\09617000 Park Ridge CIP STREETS, WATER
10.25.2023.docx
CHAPTER 3 - CIP PROCESS
A capital improvement project is defined as a major expenditure that includes one or
more of the following:
1. Street and utility reconstruction or
extension;
2. Construction or renovation of public
buildings and grounds or major
repair of part of a building, provided
that the cost is $10,000 or more and
the improvement will have a useful
life of 5 years or more;
3. Purchase of major equipment with a
cost of $10,000 or more, which has
a useful life of five years or more;
4. Any acquisition of land for a public
purpose;
5. Any planning, feasibility, engineering, or capital design study related to an individual
capital improvement project or to a program that is implemented through individual capital
improvement projects
While the process may vary from community to community, a typical CIP procedure will include
the following steps:
1. Analyze Community Facility Needs
2. Prepare Project Descriptions
3. Analyze Fiscal Capacity
4. Set Project Priorities
5. Develop and Adopt CIP
6. Update CIP Annually
Analyze Community Facility Needs
A community begins by analyzing its community facilities and the services it provides with an
emphasis on its adequacy to serve the people and identify future capital improvement needs. The
analysis will typically include municipal facilities such as public water and sewer systems, streets
and sidewalks, municipal protection facilities, recreational facilities, and certain economic
development related interests of the community.
Prepare Project Descriptions
After determining the need for capital improvements, it is necessary to collect details on the project
so that its implementation priority can be accurately and equitably assigned. Cost estimates,
project schedule, locations, and potential funding sources are listed for each project.
20 -Year Capital Improvement Plan Chapter 3 – CIP Process
Village Of Park Ridge, Portage County, Wisconsin October 2023
Project No. 09617000 Page 7
© October 2023 MSA Professional Services, Inc. \\msa-ps.com\fs\Project\09\09617\09617000\Documents\CIP Report (Narrative)\09617000 Park Ridge CIP STREETS, WATER
10.25.2023.docx
Analyze Fiscal Capacity
The next step is to analyze the community's financial capacity to fund capital improvements. The
financial analysis examines projected operating revenues and expenses for each year of the
programming period. The surplus of projected operating revenues ov er expenditures can be
applied to finance capital projects. The analysis should also consider debt service as a form of
financing, as well as grant opportunities.
Set Project Priorities
Since a community will often identify more projects than can be funded, priorities must be
established. By doing so, limited financial resources are allocated efficiently. To accomplish this
task, criteria are set to provide some objective standards in e stablishing priorities. There are
many ways to establish ranking criteria and often, a simple method is preferable. The following
criteria have been used to evaluate capital improvement priorities in this plan. It should be noted
that since this is the first CIP for the Village, the majority of projects will be ranked as high priority.
High
• Project is mandated by local, state, or federal regulations.
• Project addresses an immediate risk to public health or safety.
• Project prevents irreparable damage to existing facilities.
• Project is a priority of the Village Board based on the most current Strategic Plan,
Comprehensive Plan, or other subsidiary plans.
• Project leverages local funding with other non-local funding sources.
Medium
• Project maintains existing service levels.
• Project results in increased efficiency.
• Project reduces operational costs.
• Project provides for significantly increased revenues or reduces revenue losses.
Low
• Project provides an expanded level of service or new public facility.
• Project is deferrable.
Develop and Adopt CIP
The final CIP combines the individual project descriptions, priorities, and financial analyses into a
recommended schedule of capital projects. Upon consensus of local officials, the CIP should be
adopted by resolution supporting the recommended program.
Update CIP Annually
It should be emphasized that the CIP is a flexible and dynamic document that is updated
periodically (typically annually) to reflect changing needs and new priorities. Each year the
community will identify new projects, monitor fiscal capacity, and set ne w priorities for the
upcoming years. Through systematic review and updating, the CIP will reflect the most current
goals and priorities of the community.
20 -Year Capital Improvement Plan Chapter 4 - Estimating Procedures
Village Of Park Ridge, Portage County, Wisconsin October 2023
Project No. 09617000 Page 8
© October 2023 MSA Professional Services, Inc. \\msa-ps.com\fs\Project\09\09617\09617000\Documents\CIP Report (Narrative)\09617000 Park Ridge CIP STREETS, WATER
10.25.2023.docx
CHAPTER 4 - ESTIMATING PROCEDURES
Estimated Cost of Recommended Improvements
Cost estimates will t ypically include components such as construction cost, contingency,
engineering cost, legal and administrative costs, land acquisition, and inflation. Each of the cost
components is discussed in this section. The cost estimates presented in this Capital
Improvement Plan include five components: construction, contingency, engineering, legal and
administrative costs, and inflation. The estimates presented herein are preliminary and are based
on the level and detail of planning presented in this study. All street lengths and watermain
quantities are scaled from mapping. As projects proceed and as site-specific information becomes
available, the estimates will require updating.
Construction Costs
The estimated construction costs in this Capital Improvement Plan are based on actual recent
construction bidding results from similar work, published cost guides, other construction cost
experience, and current material prices. Quantities were extracted from the GIS system mapping
of existing facilities provided by the City of Stevens Point. Where required, estimates are based
on preliminary layouts of the proposed improvements. Cost estimates for this Capital
Improvement Plan were primarily based on costs compiled from 2023 construction data. Detailed
construction cost estimates for major items of work associated with the recommendations are
shown in Appendix C.
Contingencies
In recognition that the cost estimates presented are based on conceptual planning, allowances
must be made for variations in final quantities, bidding , market conditions, adverse construction
conditions, unanticipated specialized studies, and other difficulties, which cannot be foreseen at
this time but may tend to increase final costs. Contingencies are built into each of the project
budgets. Contingencies are generally used for the following purposes:
• Project Scope Unknowns: In planning, it is typical to plan a project around a major function
without necessarily picking up minor issues in that same area. The contingency accounts
for growth in the project scope to address minor issues near the main projects.
• Technical Unknowns: Planning analyses also do not develop sufficient detail to know if a
project will encounter technical challenges. Alternatives that are more expensive must
sometimes be adopted as the understanding of the project grows.
• Bid Unknowns: The bid results are dependent on construction market conditions that are
often uncertain.
• Site Condition Unknowns: The contingency must also address the potential for unknowns
in the actual site condition.
For the purposes of this CIP, a planning level contingency factor equal to 15% of the estimated
construction cost has been added to each project.
20 -Year Capital Improvement Plan Chapter 4 - Estimating Procedures
Village Of Park Ridge, Portage County, Wisconsin October 2023
Project No. 09617000 Page 9
© October 2023 MSA Professional Services, Inc. \\msa-ps.com\fs\Project\09\09617\09617000\Documents\CIP Report (Narrative)\09617000 Park Ridge CIP STREETS, WATER
10.25.2023.docx
Engineering
The cost of engineering services for major projects typically includes special investigations, a pre-
design report, surveying, geotechnical exploration, preparation of contract drawings and record
drawings, permitting, bidding services, construction manage ment, inspection, construction
staking, and start-up services. Depending on the size and type of project, engineering costs may
range from 15% to 25% of construction cost when all the above services are provided. The lower
percentage applies to large projects without complicating factors. The higher percentage applies
to smaller projects or projects with complicated elements.
Additional engineering services may be required for specialized projects. This could include more
extensive geotechnical exploration and evaluations, structural evaluations, and other specialized
consulting activities.
Legal and Administrative
This allowance is intended to include internal project planning and budgeting, grant writing, grant
administration, legal services, contract review, permit fees, legal advertising, and other related
expenses associated with the project. An allowance of two percent of construction cost has been
added for legal and administrative services.
Land Acquisition
Some projects may require the acquisition of additional right-of-way or easements for construction
of a specific improvement. The need and cost for such expenditures is difficult to predict and must
be reviewed as a project is developed. It is assumed that all work will be done in existing right -
of-way, so estimates do not include costs for land acquisition or easements.
Inflation
Cost estimates include an inflationary escalation of 3% per year. Future plan updates should
include an evaluation of current inflationary trends in the cost of construction and updates to the
cost estimates presented herein. It should be noted that with a 20 -year plan, cost estimates for
projects in later years can be impacted significantly by the inflationary adjustment. With that in
mind, inflationary adjustments in this plan have been capped after 10 years.
20 -Year Capital Improvement Plan Chapter 5 - Proposed Improvements
Village Of Park Ridge, Portage County, Wisconsin November 2023
Project No. 09617000 Page 10
© November 2023 MSA Professional Services, Inc. \\msa-ps.com\fs\Project\09\09617\09617000\Documents\CIP Report (Narrative)\09617000 Park Ridge CIP STREETS, WATER
10.25.2023.docx
CHAPTER 5 - PROPOSED IMPROVEMENTS
Public Streets and Drainage
This capital plan utilizes three strategies for street and drainage improvements.
First, streets where watermain will be installed will undergo complete reconstruction consisting of
4-inches of asphalt pavement over 12 -inches of new base course. Street pavement widths will
measure 20 feet wide with 2-foot gravel shoulders on each side. Drainage swales will be added
between driveways to aid in stormwater storage and infiltration. A typical street section is shown
in Figure 3.
Second, streets that require no underground utility work will be resurfaced by pulverizing the
existing pavement structure in-place, reshaping the resulting base material, and paving a new 3-
inch asphalt surface. Street pavement widths will measure 20 feet wide with 2 -foot gravel
shoulders on each side. Drainage swales will be added between driveways to aid in stormwater
storage and infiltration
Third, streets that are not planned for reconstruction or resurfacing should be considered for chip
seal. In addition, as new pavements age, they should be scheduled for crack filling and chip
sealing. A multi-year project for these maintenance activities has been included to account for
these expenditures in future years.
Evaluation of the existing sanitary sewer system was not part of this CIP process but should be
included in all future preliminary engineering completed for street improvement projects.
Municipal Water Supply and Fire Protection
New watermain and fire hydrants have been laid out as shown in Figure 4 to meet the
requirements of the Wisconsin Administrative Code NR 811.71, Stevens Point Fire Department
and the Public Utilities Department. All streets that receive watermain will have hydrants located
at each intersection. Approximately 24 fire hydrants will be added within the Village. In addition,
water services will be stubbed from the main to the property line for all parcels adjacent to new
watermain. The expansion of the Stevens Point water system further into the Village will require
an update to municipal agreements and the Stevens Point Municipal Code. It is recommended
that discussions begin immediately so agreements can be in place prior to project bidding.
S
treet Lighting
The proposed streetlight layout is shown in Figure 5 and depicts four circuits fed from
a central control cabinet on Hillcrest Drive between Linwood Avenue and Greenbriar
Avenue. New streetlights will replace existing at the same general location.
Installation of the new system will coincide with street improvements to the
extent possible. Since not all streets will be improved within the initial 20
year planning period, full streetlight build-out will also extend beyond 20
years. Cost estimates are based on a caged acorn fixture A14LED Roadway and an
ornamental base 3900 Richmond, both by Sternberg Lighting, as shown in the
adjacent photos. The new control cabinet will be metered to allow for charges based
on actual consumption rather than calculated use, which will provide annual savings
over current streetlight charges. Final design of the streetlight system should include
analysis of these savings to aid in annual budgeting.
THIS PAGE INTENTIONALLY LEFT BLANK
20 -Year Capital Improvement Plan Chapter 6 - Funding Sources
Village Of Park Ridge, Portage County, Wisconsin October 2023
Project No. 09617000 Page 11
© October 2023 MSA Professional Services, Inc. \\msa-ps.com\fs\Project\09\09617\09617000\Documents\CIP Report (Narrative)\09617000 Park Ridge CIP STREETS, WATER
10.25.2023.docx
CHAPTER 6 - FUNDING SOURCES
Long Term Debt
Debt financing is usually considered to be essential for funding major capital improvements. Debt
also helps to distribute project costs with long term benefits amongst existing and future
taxpayers. The Village should consult it’s financial advisor to identify annual borrowing targets
that can be applied to capital projects while maintaining manageable debt levels. For the
purposes of this plan, the Village has targeted a maximum outstanding debt load of $2.0 to $2.5
million at any one time. Review of outstanding debt service and projected future debt payments
should be part of the annual CIP review process.
General Fund
Occasionally general fund revenues that exceed expenses can result in an annual surplus. After
fund balance reserve targets are met, excess revenue can be applied to capital projects.
However, the current status of levy limits prohibits most communities from deriving significant
capital project funding from general fund surpluses. The funding referendum approved by voters
in April of 2023 will generate approximately $130,000 each fiscal year, a portion of which will be
allocated to enhanced fire protection and capital improvement debt service.
Local Road Improvement Program (LRIP)
This program, managed by the Wisconsin Department of Transportation (WisDOT), is a
reimbursement program that can provide up to 50% of eligible street improvement costs. The
program operates on a 2 -year cycle with applications typically due in the fall of odd numbered
years. The program has three
components, one for Counties (CHI
–County Highway Improvement),
one for Towns (TRI – Town Road
Improvement) and one for Cities
and Villages (MSI – Municipal
Street Improvement). Each
component has sub -components
for entitlement or discretionary
funding. The MSI entitlement
component allocates funding in
each cycle based on municipality’s
population and street mileage.
Applications are submitted to the
Portage County Highway
Commissioner and funds are
distributed by a committee made up
of local municipal officials. The
Village could be eligible for up to $12,000 per cycle based on population and mileage. The Village
last received MSI entitlement funds in the 2020-2021 cycle.
20 -Year Capital Improvement Plan Chapter 6 - Funding Sources
Village Of Park Ridge, Portage County, Wisconsin October 2023
Project No. 09617000 Page 12
© October 2023 MSA Professional Services, Inc. \\msa-ps.com\fs\Project\09\09617\09617000\Documents\CIP Report (Narrative)\09617000 Park Ridge CIP STREETS, WATER
10.25.2023.docx
The MSI discretionary component provides funding for high -cost projects and has additional
eligibility requirements. Projects are also submitted to the County Highway Commissioner,
prioritized and approved by the local committee and forwarded to the WisDOT Secretary for
approval. Projects compete statewide and are selected based on defined criteria with a goal of
fair geographic distribution. The 2024 – 2025 LRIP Cycle also includes an MSI – Supplemental
component which provides greater opportunity for funding local projects. A link to more
information on the WisDOT LRIP program is included here: https://wisconsindot.gov/pages/doing-
bus/local-gov/astnce-pgms/highway/lrip.aspx
Surface Transportation Program Urban (STP-U)
This WisDOT administered program allocates federal funds to federal -aid eligible roads and
streets in urban areas. Eligible streets are those functionally classified as urban collectors or
higher, which include Hillcrest Drive, Ridgewood Drive and Greenbriar Avenue within the Village.
The program provides up to 80% federal funding with a 20% local match. Projects must follow
the WisDOT project development process and are bid through the state letting process. STP
projects typically require a longer development timeline to get to construction. For the 2024-2029
cycle, total funds available are anticipated to be significantly greater than previous program
cycles. Final applications are due by October 27, 2023. A link to more information on the STP
Urban program is included here: https://wisconsindot.gov/Pages/doing-bus/local-gov/astnce-
pgms/highway/stp-urban.aspx
Project No. 09617000 Page 13
© October 2023 MSA Professional Services, Inc. \\msa-ps.com\fs\Project\09\09617\09617000\Documents\CIP Report (Narrative)\09617000 Park Ridge CIP STREETS, WATER
10.25.2023.docx
FIGURE 1
20-Year CIP Project Map
THIS PAGE INTENTIONALLY LEFT BLANK
2025
2040
20422035
2043 2025
2028
Esri Canada, Esri, HERE, Garmin, INCREMENT P, USGS, EPA, USDA
2025 - Hillcrest Dr & Greenbriar Ave
2028 - Ridgewood Dr & Greenbriar Ave
2035 - Fieldcrest Ave
2040 - Ferndale Dr
2042 - Linwood Ave
2043 - Sunset Ave
Park Ridge Boundary
0 275 550 Feet
Printed By: cwong, File: C:\Users\cwong\Desktop\Projects\Park Ridge\DataExploratin\DataExploratin.aprx, 20 Year Project Print Date: 10/19/2023
Data Sources:
City of Stevens Point
Village of Park Ridge
Portage County, WI
20 Year Project Map
THIS PAGE INTENTIONALLY LEFT BLANK
Project No. 09617000 Page 14
© October 2023 MSA Professional Services, Inc. \\msa-ps.com\fs\Project\09\09617\09617000\Documents\CIP Report (Narrative)\09617000 Park Ridge CIP STREETS, WATER
10.25.2023.docx
FIGURE 2
Existing Streetlight System
THIS PAGE INTENTIONALLY LEFT BLANK
W
i
l
s
h
i
r
e
B
l
v
d
T
e
x
a
s
A
v
e
G u a r d i a n A n g e l
C e m e t e r y
T
e
x
a
s
A
v
e
6 6
S
u
n
s
e
t
A
v
e
A n g e l o C t
G
r
e
e
n
b
r
i
a
r
A
v
e
Fi
e
l
d
c
r
e
s
t
A
v
e
R
i
d
g
e
R
d
S u
n
s
e
t
F
r
k
S
u
n
r
i
s
e
A
v
e
F e r n d a l e D r
C r e s t w o o d D r
W o o d l a w n D r
O d e s s a C t
M a i n S t
G r e
e
n
A
v
e
P a r k R i d g e D r
I v e r s o n P a r k
P
l
o
v
e
r
R
i
v
e
r
Sun
s
e
t
A
v
e
R i d g e w o o d D r
H i l l c r e s t D r
G
r
e
e
n
b
r
i
a
r
A
v
e
Fie
l
d
c
r
e
s
t
A
v
e
S
u
n
r
i
s
e
A
v
e
M a p l e w o o d D r
O a k c r e s t D r
H a z e l w o o d D r
Maxar, Microsoft, Esri Community Maps Contributors, © OpenStreetMap,
Microsoft, Esri, HERE, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA,
USGS, EPA, NPS, US Census Bureau, USDA
Power Source
Existing Light Poles
Park Ridge Boundary
Electric Lines
Circuit
0 240 480 Feet
Printed By: cwong, File: C:\Users\cwong\Desktop\Projects\Park Ridge\DataExploratin\DataExploratin.aprx, Existing Streetlights Print Date: 8/10/2023
Data Sources:
City of Stevens Point
Village of Park Ridge
Portage County, WI
Existing Streetlight System
Park Ridge CIP Project
THIS PAGE INTENTIONALLY LEFT BLANK
Project No. 09617000 Page 15
© October 2023 MSA Professional Services, Inc. \\msa-ps.com\fs\Project\09\09617\09617000\Documents\CIP Report (Narrative)\09617000 Park Ridge CIP STREETS, WATER
10.25.2023.docx
FIGURE 3
Proposed Street Reconstruction Typical Section Details
THIS PAGE INTENTIONALLY LEFT BLANK
THIS PAGE INTENTIONALLY LEFT BLANK
Project No. 09617000 Page 16
© October 2023 MSA Professional Services, Inc. \\msa-ps.com\fs\Project\09\09617\09617000\Documents\CIP Report (Narrative)\09617000 Park Ridge CIP STREETS, WATER
10.25.2023.docx
FIGURE 4
Proposed Watermain and Fire Hydrant Layout
THIS PAGE INTENTIONALLY LEFT BLANK
W
ilshire
Blvd
Texas
Ave
Guardian Angel
Cemetery
Texas
Ave
G
reenbriarAveSunsetAve
Linw
ood
Ave
Sunrise
Ave
FieldcrestAve
Cr estwood Dr
Woodlawn Dr
Ridge
Rd
Odessa Ct
Angelo Ct
M ain StPar k Ridge Dr
66
YY
Iverson Park
Plover River
G
reenbriarAveOakcr est Dr
SunsetAve
M aplewood Dr
Sunrise
Ave
Hillcr est Dr
Ridgewood Dr
FieldcrestAve
Hazelwood Dr
G!.
G!.
G!. G!.
G!.G!.
G!.
G!. G!.
G!.G!.G!.
G!. G!.
G!.
G!.
G!.
G!.
G!.
G!.
G!. G!. G!.
G!.
G!.
G!.
G!.
G!.
G!.
G!. G!.
G!.
G!.
G!.
G!.
G!.
G!.
G!.
G!.
G!. G!.
G!.
G!.
G!. G!.G!.
Esri Canada, Esri, HERE, Garmin, INCREMENT P, USGS, EPA, USDA, Esri
Community Maps Contributors, © OpenStreetMap, Microsoft, Esri, HERE,
Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, EPA, NPS, US
Census Bureau, USDA
G!. Proposed Hydrant
Proposed Water Main
8"
12"
Park Ridge Boundary
G!. Existing Hydrants
Existing Water Main
0 250 500 Feet
Printed By: cwong, File: C:\Users\cwong\Desktop\Projects\Park Ridge\DataExploratin\DataExploratin.aprx, WaterMainHydrants Print Date: 10/19/2023
Data Sources:
City of Stevens Point
Village of Park Ridge
Portage County, WI
Proposed Water Main and Hydrants
Park Ridge CIP Project
THIS PAGE INTENTIONALLY LEFT BLANK
Project No. 09617000 Page 17
© October 2023 MSA Professional Services, Inc. \\msa-ps.com\fs\Project\09\09617\09617000\Documents\CIP Report (Narrative)\09617000 Park Ridge CIP STREETS, WATER
10.25.2023.docx
FIGURE 5
Proposed Streetlight System
THIS PAGE INTENTIONALLY LEFT BLANK
W
i
l
s
h
i
r
e
B
l
v
d
T
e
x
a
s
A
v
e
G u a r d i a n A n g e l
C e m e t e r y
T
e
x
a
s
A
v
e
6 6
G
r
e
e
n
b
r
i
a
r
A
v
e
S u
n
s
e
t
F
r
k
S
u
n
s
e
t
A
v
e
L
i
n
w
o
o
d
A
v
e
S
u
n
r
i
s
e
A
v
e
F
i
e
l
d
c
r
e
s
t
A
v
e
C r e s t w o o d D r
W o o d l a w n D r
R
i
d
g
e
R
d
O d e s s a C t
A n g e l o C t
M a i n S t
G r e
e
n
A
v
e
P a r k R i d g e D r
I v e r s o n P a r k
P
l
o
v
e
r
R
i
v
e
r
G
r
e
e
n
b
r
i
a
r
A
v
eO a k c r e s t D r
S
u
n
s
e
t
A
v
e
M a p l e w o o d D r
S
u
n
r
i
s
e
A
v
e
H i l l c r e s t D r
R i d g e w o o d D r
F
i
e
l
d
c
r
e
s
t
A
v
e
H a z e l w o o d D r
Maxar, Microsoft, Esri Community Maps Contributors, © OpenStreetMap,
Microsoft, Esri, HERE, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA,
USGS, EPA, NPS, US Census Bureau, USDA
New Streetlight and Pole
Proposed Lighting Control Cabinet
Proposed Pull Box
Park Ridge Boundary
Proposed Circuit
Yellow 1,3
Blue 2,4
Purple 5,7
Orange 6,8
0 240 480 Feet
Printed By: cwong, File: C:\Users\cwong\Desktop\Projects\Park Ridge\DataExploratin\DataExploratin.aprx, Proposed Streetlights Print Date: 10/19/2023
Data Sources:
City of Stevens Point
Village of Park Ridge
Portage County, WI
Proposed Streetlight System
Park Ridge CIP Project
THIS PAGE INTENTIONALLY LEFT BLANK
\\msa-ps.com\fs\Project\09\09617\09617000\Documents\CIP Report (Narrative)\09617000 Park Ridge CIP STREETS, WATER 10.25.2023.docx
APPENDIX A
Project Summary Sheets
• Projects by Category 2024-2033
• Projects by Category 2034-2043
• Projects by Funding Source 2024-2033
• Projects by Funding Source 2034-2043
• Projects by Funding Source & Category 2024-2033
• Projects by Funding Source & Category 2034-2043
THIS PAGE INTENTIONALLY LEFT BLANK
Capital Improvement PlanVillage of Park Ridge, WIPROJECTS BY CATEGORY2024 2033thruTotal2024 2025 2026 2027 2028Category# Priority2029 2030 2031 2032 2033Street Improvements601 910,00075,000 835,000Hillcrest & Greenbriar Reconstruction1602 891,000128,000 763,000Ridgewood & Greenbriar Reconstruction1625 80,00020,000Annual Seal Coat and Crack Filling1 20,000 20,000 20,0001,881,00075,000 835,000 128,000 20,000 763,000Street Improvements Total20,000 20,000 20,000Streetlighting701 300,00030,000 270,000Hillcrest & Greenbriar Streetlighting2702 208,00035,000 173,000Ridgewood & Greenbriar Streetlighting2 508,00030,000 270,000 35,000 173,000Streetlighting TotalWater Distribution901 782,00068,000 714,000Hillcrest Dr & Greenbriar Ave - Watermain1902 895,00086,000 809,000Ridgewood Dr & Greenbriar Dr - Watermain1 1,677,00068,000 714,000 86,000 809,000Water Distribution TotalGRAND TOTAL4,066,000173,000 1,819,000 249,000 20,000 1,745,000 20,000 20,000 20,000P
roduced Using the Plan-It CIP Software Tuesday, October 24, 2023
Capital Improvement PlanVillage of Park Ridge, WIPROJECTS BY CATEGORY2034 2043thruTotal2034 2035 2036 2037 2038Category# Priority2039 2040 2041 2042 2043Street Improvements603 406,00040,000 366,000Fieldcrest Ave Reconstruction1604 393,000Ferndale Drive Reconstruction1 32,000 361,000605 253,000Linwood Ave (Ridgewood to Hillcrest) Resurface1 15,000 238,000606 249,000Sunset Ave (Hillcrest to Parkridge Dr)-Resurface1 13,000 236,000625 125,00025,000 25,000Annual Seal Coat and Crack Filling1 25,000 25,000 25,0001,426,00040,000 391,000 25,000Street Improvements Total57,000 361,000 40,000 251,000 261,000Streetlighting703 176,00015,000 161,000Fieldcrest Ave Streetlighting2705 108,000Linwood Ave Streetlighting2 7,000 101,000706 87,000Sunset Ave Streetlighting2 5,000 82,000371,00015,000 161,000Streetlighting Total7,000 106,000 82,000Water Distribution903 370,00030,000 340,000Fieldcrest Avenue - Watermain1904 386,000Ferndale Drive - Watermain1 32,000 354,000756,00030,000 340,000Water Distribution Total32,000 354,000GRAND TOTAL2,553,00085,000 892,000 25,000 89,000 715,000 47,000 357,000 343,000P
roduced Using the Plan-It CIP Software Tuesday, October 24, 2023
Capital Improvement PlanVillage of Park Ridge, WIPROJECTS BY FUNDING SOURCE2024 2033thruTotal2024 2025 2026 2027 2028Source2029 2030 2031 2032 2033 # PriorityGeneral Fund80,00020,000 20,000 20,00020,000Annual Seal Coat and Crack Filling6251General Fund Total80,00020,000 20,000 20,000 20,000Local Road Improvement Program455,00037,500 417,500Hillcrest & Greenbriar Reconstruction6011Local Road Improvement Program Total455,00037,500 417,500Long Term Debt455,00037,500 417,500Hillcrest & Greenbriar Reconstruction6011 178,20025,600 152,600Ridgewood & Greenbriar Reconstruction6021 300,00030,000 270,000Hillcrest & Greenbriar Streetlighting7012 69,60035,000 34,600Ridgewood & Greenbriar Streetlighting7022 782,00068,000 714,000Hillcrest Dr & Greenbriar Ave - Watermain9011 895,00086,000 809,000Ridgewood Dr & Greenbriar Dr - Watermain9021Long Term Debt Total2,679,800135,500 1,401,500 146,600 996,200STP Urban Program712,800102,400 610,400Ridgewood & Greenbriar Reconstruction6021 138,400138,400Ridgewood & Greenbriar Streetlighting7022STP Urban Program Total851,200102,400 748,800173,000 1,819,000 249,000 20,000 1,745,0004,066,000GRAND TOTAL20,000 20,000 20,000P
roduced Using the Plan-It CIP Software Tuesday, October 24, 2023
Capital Improvement PlanVillage of Park Ridge, WIPROJECTS BY FUNDING SOURCE2034 2043thruTotal2034 2035 2036 2037 2038Source2039 2040 2041 2042 2043 # PriorityGeneral Fund125,00025,000 25,000 25,000 25,00025,000Annual Seal Coat and Crack Filling6251General Fund Total125,00025,000 25,000 25,000 25,000 25,000Local Road Improvement Program203,00020,000 183,000Fieldcrest Ave Reconstruction6031 196,50016,000 180,500Ferndale Drive Reconstruction6041 22,00022,000Linwood Ave (Ridgewood to Hillcrest) Resurface6051 28,00028,000Sunset Ave (Hillcrest to Parkridge Dr)-Resurface6061Local Road Improvement Program Total449,50020,000 183,000 16,000 180,500 22,000 28,000Long Term Debt203,00020,000 183,000Fieldcrest Ave Reconstruction6031 196,50016,000 180,500Ferndale Drive Reconstruction6041 231,00015,000 216,000Linwood Ave (Ridgewood to Hillcrest) Resurface6051 221,00013,000208,000Sunset Ave (Hillcrest to Parkridge Dr)-Resurface6061 176,00015,000 161,000Fieldcrest Ave Streetlighting7032 108,0007,000 101,000Linwood Ave Streetlighting7052 87,0005,00082,000Sunset Ave Streetlighting7062 370,00030,000 340,000Fieldcrest Avenue - Watermain9031 386,00032,000 354,000Ferndale Drive - Watermain9041Long Term Debt Total1,978,50065,000 684,000 48,000 534,500 22,000 335,000 290,00085,000 892,000 25,0002,553,000GRAND TOTAL89,000 715,000 47,000 357,000 343,000P
roduced Using the Plan-It CIP Software Tuesday, October 24, 2023
Capital Improvement PlanVillage of Park Ridge, WIPROJECTS & FUNDING SOURCES BY CATEGORY2024 2033thruTotal2024 2025 2026 2027 2028Category2029 2030 2031 2032 2033Project #Street Improvements60175,000 835,000Hillcrest & Greenbriar Reconstruction910,000455,00037,500 417,500Local Road Improvement Program455,00037,500 417,500Long Term Debt602763,000Ridgewood & Greenbriar Reconstruction891,000128,000178,20025,600 152,600Long Term Debt712,800102,400 610,400STP Urban Program62520,000Annual Seal Coat and Crack Filling80,00020,000 20,00020,00080,00020,000General Fund 20,000 20,000 20,0001,881,00075,000 835,000 128,000 20,000 763,000Street Improvements Total20,000 20,000 20,000Streetlighting70130,000 270,000Hillcrest & Greenbriar Streetlighting300,000300,00030,000 270,000Long Term Debt702173,000Ridgewood & Greenbriar Streetlighting208,00035,00069,60035,000 34,600Long Term Debt138,400138,400STP Urban Program508,00030,000 270,000 35,000 173,000Streetlighting TotalWater Distribution90168,000 714,000Hillcrest Dr & Greenbriar Ave - Watermain782,000782,00068,000 714,000Long Term Debt902809,000Ridgewood Dr & Greenbriar Dr - Watermain895,00086,000895,00086,000 809,000Long Term Debt1,677,00068,000 714,000 86,000 809,000Water Distribution Total4,066,000173,000 1,819,000 249,000 20,000 1,745,000GRAND TOTAL20,000 20,000 20,000P
roduced Using the Plan-It CIP Software Tuesday, October 24, 2023
Capital Improvement PlanVillage of Park Ridge, WIPROJECTS & FUNDING SOURCES BY CATEGORY2034 2043thruTotal2034 2035 2036 2037 2038Category2039 2040 2041 2042 2043Project #Street Improvements60340,000 366,000Fieldcrest Ave Reconstruction406,000203,00020,000 183,000Local Road Improvement Program203,00020,000 183,000Long Term Debt604Ferndale Drive Reconstruction393,00032,000 361,000196,500Local Road Improvement Program 16,000 180,500196,500Long Term Debt 16,000 180,500605Linwood Ave (Ridgewood to Hillcrest) Resurface253,000238,00015,00022,000Local Road Improvement Program 22,000231,000Long Term Debt 15,000 216,000606Sunset Ave (Hillcrest to Parkridge Dr)-Resurface249,00013,000 236,00028,000Local Road Improvement Program 28,000221,000Long Term Debt 13,000 208,00062525,000 25,000Annual Seal Coat and Crack Filling125,00025,000 25,00025,000125,00025,000 25,000General Fund 25,000 25,000 25,0001,426,00040,000 391,000 25,000Street Improvements Total57,000 361,000 40,000 251,000 261,000Streetlighting70315,000 161,000Fieldcrest Ave Streetlighting176,000176,00015,000 161,000Long Term Debt705Linwood Ave Streetlighting108,000101,0007,000108,000Long Term Debt 7,000 101,000706Sunset Ave Streetlighting87,0005,000 82,00087,000Long Term Debt 5,000 82,000371,00015,000 161,000Streetlighting Total7,000 106,000 82,000Water Distribution90330,000 340,000Fieldcrest Avenue - Watermain370,000370,00030,000 340,000Long Term Debt904Ferndale Drive - Watermain386,00032,000 354,000P
roduced Using the Plan-It CIP Software Tuesday, October 24, 2023
Total2034 2035 2036 2037 2038Category2039 2040 2041 2042 2043Project #386,000Long Term Debt 32,000 354,000756,00030,000 340,000Water Distribution Total32,000 354,0002,553,00085,000 892,000 25,000GRAND TOTAL89,000 715,000 47,000 357,000 343,000P
roduced Using the Plan-It CIP Software Tuesday, October 24, 2023
\\msa-ps.com\fs\Project\09\09617\09617000\Documents\CIP Report (Narrative)\09617000 Park Ridge CIP STREETS, WATER 10.25.2023.docx
APPENDIX B
• Project Descriptions 2024-2033
• Project Descriptions 2034-2043
THIS PAGE INTENTIONALLY LEFT BLANK
Capital Improvement PlanVillage of Park Ridge, WI2024 2033thru
Description
Reconstruction of Hillcrest Drive from just east of Pinecrest Drive to the Iverson Park entrance and Greenbriar Avenue from Hillcrest Drive to Park Ridge Drive. The proposed street section is 20
feet of asphaltpavement with 2 foot gravel shoulders. Work includes grading, 12 inches of new base and 4 inches of asphalt. Work will also include grading of gradual swales or shallow ditches
between driveways to provide for positive drainage off the new pavement surface. Enhanced stormwater infiltration or bio swales may be needed at some locations.
Companion project No. 701 will install intersection streetlighting along Hillcrest and Greenbriar and would be completed at the same time as the street reconstruction.
Companion project No. 901 will install watermain, hydrants, and water services in the Hillcrest and Greenbriar rights-of-way and would be completed at the same time as the street reconstruction.
Project #601Priority1 High JustificationThe existing street surfaces are in poor condition with a PASER rating of 3 to 4 out of 10. Ratings near the bottom of the scale generally require complete reconstruction. In addiiton, the proposed companion water main project will require removel of existing pavement, so complete reconstruction is preferred as opposed to simply patching the water main trenches. Budget Impact/OtherProject funding is anticipated through the Local Road Improvement Progam (LRIP), a WISDOT managed reimbursement program that provides up to 50% of the project cost with the balance funded locally. The program operates on a 2 year cycle with applications typpically due in the fall. It is recommended that this project get submitted in the 2024-2025 Cycle under the Muncipal Street Improvement - Discretionary (MSID) component of the program, which targets high cost municipal street improvements. Both design and construction costs are eligable with the earliest possible design starting in 2024 and the earliest possible construction in 2025. Initally, the annual operating street maintenance budget for pothole patching will decrease, however future financial planning should account for crackfilling and surface treatment at industry
Useful Life30 yearsProject NameHillcrest & Greenbriar ReconstructionCategoryStreet ImprovementsTypePrimary ProjectTotal Cost$910,000ContactVillage PresidentDepartmentGeneralTotal2024 2025 2026 2027 2028Expenditures2029 2030 2031 2032 203375,00075,000Planning/Design/Engineering 774,000774,000Construction61,00061,000Construction Phase Engineering75,000 835,000 910,000TotalTotal2024 2025 2026 2027 2028Funding Sources2029 2030 2031 2032 2033455,00037,500 417,500Long Term Debt455,00037,500 417,500Local Road Improvement Program75,000 835,000 910,000TotalP
roduced Using the Plan-It CIP Software Tuesday, October 24, 2023
Capital Improvement PlanVillage of Park Ridge, WI2024 2033thru
Description
Reconstruction of Ridgewood Drive from the west Village limits to Greenbriar Avenue and Greenbriar Avenue from Ridgewood Drive to Hillcrest Drive. The proposed street section is 20 feet of
asphaltpavement with 2 foot gravel shoulders. Work includes grading, 12 inches of new base and 4 inches of asphalt. Work will also include grading of gradual swales or shallow ditches between
driveways to provide for positive drainage off the new pavement surface. Enhanced stormwater infiltration or bio swales may be needed at some locations.
Companion project No. 702 will install intersection streetlighting along Ridgewood and Greenbriar and would be completed at the same time as the street reconstruction.
Companion project No. 902 will install watermain, hydrants, and water services in the Ridgewood Drive and Greenbriar rights-of-way and would be completed at the same time as the street
reconstruction.
Project #602Priority1 High JustificationThe existing street surfaces are in fair to poor condition with a PASER rating of 4 to 5 out of 10. Ratings near the bottom of the scale generally require complete reconstruction. In addiiton, the proposed companion water main project will require removel of existing pavement, so complete reconstruction is preferred as opposed to simply patching the water main trenches. Budget Impact/OtherProject funding is anticipated through the STP-Urban Progam, a WISDOT administered program of federal funds that provides 80% of the project cost with a 20% local macth. Applications are due by October 27, 2023. Both design and construction costs are eligable with design proposed to start in 2026 and construction in 2028. Initally, the annual operating street maintenance budget for pothole patching will decrease, however future financial planning should account for crackfilling and surface treatment at industry standard intervals.
Useful Life30 yearsProject NameRidgewood & Greenbriar ReconstructionCategoryStreet ImprovementsTypePrimary ProjectTotal Cost$891,000ContactVillage PresidentDepartmentGeneralTotal2024 2025 2026 2027 2028Expenditures2029 2030 2031 2032 2033128,000128,000Planning/Design/Engineering 677,000677,000Construction86,00086,000Construction Phase Engineering128,000 763,000 891,000TotalTotal2024 2025 2026 2027 2028Funding Sources2029 2030 2031 2032 2033178,20025,600 152,600Long Term Debt712,800102,400 610,400STP Urban Program128,000 763,000 891,000TotalP
roduced Using the Plan-It CIP Software Tuesday, October 24, 2023
Capital Improvement PlanVillage of Park Ridge, WI2024 2033thru DescriptionAnnuall crackfilling on new asphalt pavements. Seal coat or chip seal on asphalt pavements as they age.It is recommended that all new asphalt pavements get crack filled each year. Seal coating should be completed in the first 5 years of pavement life and re-applied every 8 to 10 yeasr thereafter.Actual projects to be determined annually.Project #625Priority1 High JustificationAnnual maintenance is necessary to maximize the life expectancy of new asphalt pavements. Budget Impact/OtherAnnual operating budgets should account for ongoing asphalt pavement maintenance
Useful Life10 YearsProject NameAnnual Seal Coat and Crack FillingCategoryStreet ImprovementsTypePrimary ProjectTotal Cost$205,000ContactVillage PresidentDepartmentGeneralTotal2024 2025 2026 2027 2028Expenditures2029 2030 2031 2032 203380,00020,000Construction20,000 20,000 20,00020,000 80,000Total20,000 20,000 20,000Total2024 2025 2026 2027 2028Funding Sources2029 2030 2031 2032 203380,00020,000General Fund20,000 20,000 20,00020,000 80,000Total20,000 20,000 20,000P
roduced Using the Plan-It CIP Software Tuesday, October 24, 2023
Capital Improvement PlanVillage of Park Ridge, WI2024 2033thru DescriptionReplace existing poles, fixtures and underground wiring south of Park Ridge Drive/STH 66 on Hillcrest Drive from Sunset to Sunsrise and on Greenbriar Avenue from Hillcrest to Park Ridge Drive with a new streetlight system.Pricing is based on Sterberg Lighting components as follows:Fixture - 1430LED Caged AcornPole - 3900 Richmond Direct Bury 16 footompanion project No. 601 will reconstruct Hillcrest Drive from the west Village limits to Greenbriar Avenue and Greenbriar Avenue Hillcrest Drive to Park Ridge Drive.Companion project No. 901 will install watermain, hydrants, and water services in the Hillcrest Drive and Greenbriar rights-of-way and would be completed at the same time as the street reconstruction.Project #701Priority2 Medium JustificationThe existing system consists of approximatly 42 fixtures on wooden poles, located primarily at intersections with a few mid-block locations. Unmetered power supply is provided at 4 locations. The Village has upgraded to LED fixtures, however the rate charged by Wisconsin Public Service has not been adjusted to reflect the reduced energy consumption. A new metered system fed from a central location would allow for charges based on actual consumption rather than a calculated rate and would likely offer on-going savings in the annual street light budget. Budget Impact/OtherProject funding is likely long term debt secured by the Village. On-going energy costs will be reduced with a metered street light system. Streetlight maintenance willcontinue to be the reposnibility of the Village.
Useful Life30 yearsProject NameHillcrest & Greenbriar StreetlightingCategoryStreetlightingTypePrimary ProjectTotal Cost$300,000ContactVillage PresidentDepartmentGeneral
Total2024 2025 2026 2027 2028Expenditures2029 2030 2031 2032 203330,00030,000Planning/Design/Engineering 255,000255,000Construction15,00015,000Construction Phase Engineering30,000 270,000 300,000TotalTotal2024 2025 2026 2027 2028Funding Sources 2029 2030 2031 2032 2033300,00030,000 270,000Long Term Debt30,000 270,000 300,000TotalP
roduced Using the Plan-It CIP Software Tuesday, October 24, 2023
Capital Improvement PlanVillage of Park Ridge, WI2024 2033thru DescriptionReplace existing poles, fixtures and underground wiring south of Park Ridge Drive/STH 66 on Ridgewood Drive from Sunset to Greenbriar and on Greenbriar Avenue from Ridgewood to Hillcrest with a new streetlight system.Pricing is based on Sterberg Lighting components as follows:Fixture - 1430LED Caged AcornPole - 3900 Richmond Direct Bury 16 footCompanion project No. 602 will reconstruct Ridgewood Drive from the west Village limits to Greenbriar Avenue and Greenbriar Avenue Ridgewood Drive to Hillcrest Drive.Companion project No. 902 will install watermain, hydrants, and water services in the Ridgewood Drive and Greenbriar rights-of-way and would be completed at the same time as the street reconstruction.Project #702Priority2 Medium JustificationThe existing system consists of approximatly 42 fixtures on wooden poles, located primarily at intersections with a few mid-block locations. Unmetered power supply is provided at 4 locations. The Village has upgraded to LED fixtures, however the rate charged by Wisconsin Public Service has not been adjusted to reflect the reduced energy consumption. A new metered system fed from a central location would allow for charges based on actual consumption rather than a calculated rate and would likely offer on-going savings in the annual street light budget. Budget Impact/OtherProject funding is likely long term debt secured by the Village. On-going energy costs will be reduced with a metered street light system. Streetlight maintenance willcontinue to be the reposnibility of the Village.
Useful Life30 yearsProject NameRidgewood & Greenbriar StreetlightingCategoryStreetlightingTypePrimary ProjectTotal Cost$208,000ContactVillage PresidentDepartmentGeneral
Total2024 2025 2026 2027 2028Expenditures2029 2030 2031 2032 203335,00035,000Planning/Design/Engineering 158,000158,000Construction15,00015,000Construction Phase Engineering35,000 173,000 208,000TotalTotal2024 2025 2026 2027 2028Funding Sources 2029 2030 2031 2032 203369,60035,000 34,600Long Term Debt138,400138,400STP Urban Program35,000 173,000 208,000TotalP
roduced Using the Plan-It CIP Software Tuesday, October 24, 2023
Capital Improvement PlanVillage of Park Ridge, WI2024 2033thru DescriptionInstallation of water main in Hillcrest Drive from Sunset Avenue to east of Sunrise Aveune and in Greenbriar Avenue from Hillcrest Drive to Park Ridge Drive. Work will also include installation of fire hydrants at each intersection and 1-inch water services stubbed into all properties adjacent to the new watermain.Companion project No. 601 will reconstruct Hillcrest Drive from just east of Pinecrest Ave to the entrance to Iverson Park and Greenbriar Avenue fromHillcrest Drive to Park Ridge Drive.Companion project No. 701 will install new intersection streetlighting along Hillcrest and Greenbriar and would be completed at the same time as the street reconstruction.Project #901Priority1 High JustificationAdditional fire hydrants for fire protection and access to municipal water supply are both objectives of the Villages 2022-2026 Strategic Plan. The Village has recently contracted with the City of Stevens Point for fire protection and additional hydrants are needed to provide the desired level of service. Since the streets will be reconstructed after watermain installation, it is desireable to have water services stubbed in to adjacent lots prior to paving to avoid pavment damage and/or road patches in the future. Budget Impact/OtherProject funding is likely long term debt secured by the Village.It is likely that the water system will be owned by the City of Stevens Point. Future financial planning should account for on-going maintenance payments to the City.
Useful Life75 yearsProject NameHillcrest Dr & Greenbriar Ave - WatermainCategoryWater DistributionTypeCompanion ProjectTotal Cost$782,000ContactVillage PresidentDepartmentGeneralTotal2024 2025 2026 2027 2028Expenditures2029 2030 2031 2032 203368,00068,000Planning/Design/Engineering 664,000664,000Construction50,00050,000Construction Phase Engineering68,000 714,000 782,000TotalTotal2024 2025 2026 2027 2028Funding Sources2029 2030 2031 2032 2033782,00068,000 714,000Long Term Debt68,000 714,000 782,000TotalP
roduced Using the Plan-It CIP Software Tuesday, October 24, 2023
Capital Improvement PlanVillage of Park Ridge, WI2024 2033thru DescriptionInstallation of water main in Ridgewood Drive from west of Sunset Avenue to Greenbriar Aveune and in Greenbriar Avenue fromRidgewood Drive to Hillcrest Drive. Work will also include installation of fire hydrants at each intersection and 1-inch water services stubbed into all properties adjacent to the new watermain.Companion project No. 602 will reconstruct Ridgewood Drive from the west Village limits to Greenbriar Avenue and Greenbriar Avenue Ridgewood Drive to Hillcrest Drive.Companion project No. 702 will install intersection streetlighting along Ridgewood and Greenbriar and would be completed at the same time as the street reconstruction.Project #902Priority1 High JustificationAdditional fire hydrants for fire protection and access to municipal water supply are both objectives of the Villages 2022-2026 Strategic Plan. The Village has recently contracted with the City of Stevens Point for fire protection and additional hydrants are needed to provide the desired level of service. Since the streets will be reconstructed after watermain installation, it is desireable to have water services stubbed in to adjacent lots prior to paving to avoid pavment damage and/or road patches in the future. Budget Impact/OtherProject funding is likely long term debt secured by the Village.It is likely that the water system will be owned by the City of Stevens Point. Future financial planning should account for on-going maintenance payments to the City.
Useful Life75 yearsProject NameRidgewood Dr & Greenbriar Dr - WatermainCategoryWater DistributionTypeCompanion ProjectTotal Cost$895,000ContactVillage PresidentDepartmentGeneralTotal2024 2025 2026 2027 2028Expenditures2029 2030 2031 2032 203386,00086,000Planning/Design/Engineering 723,000723,000Construction86,00086,000Construction Phase Engineering86,000 809,000 895,000TotalTotal2024 2025 2026 2027 2028Funding Sources2029 2030 2031 2032 2033895,00086,000 809,000Long Term Debt86,000 809,000 895,000TotalP
roduced Using the Plan-It CIP Software Tuesday, October 24, 2023
Capital Improvement PlanVillage of Park Ridge, WI2034 2043thru
Description
Reconstruction of Fieldcrest Avenue from Ridgewood Drive to Hillcrest Drive. The proposed street section is 20 feet of asphaltpavement with 2 foot gravel shoulders. Work includes grading, 12
inches of new base and 4 inches of asphalt. Work will also include grading of gradual swales or shallow ditches between driveways to provide for positive drainage off the new pavement surface.
Enhanced stormwater infiltration or bio swales may be needed at some locations.
Companion project No. 703 will install intersection streetlighting along Fieldcrest and would be completed at the same time as the street reconstruction.
Companion project No. 903 will install watermain, hydrants, and water services in the Fieldcrest Avenue rights-of-way and would be completed at the same time as the street reconstruction.
Project #603Priority1 High JustificationThe existing street surfaces are in poor condition with a PASER rating of 3 to 4 out of 10. Ratings near the bottom of the scale generally require complete reconstruction. In addiiton, the proposed companion water main project will require removel of existing pavement, so complete reconstruction is preferred as opposed to simply patching the water main trenches. Budget Impact/OtherProject funding is anticipated through the Local Road Improvement Progam (LRIP), a WISDOT managed reimbursement program that provides up to 50% of the project cost with the balance funded locally. The program operates on a 2 year cycle with applications typpically due in the fall. It is recommended that this project get submitted under the Muncipal Street Improvement - Discretionary (MSID) component of the program, which targets high cost municipal street improvements. Both design and construction costs are eligable. Initally, the annual operating street maintenance budget for pothole patching will decrease, however future financial planning should account for crackfilling and surface treatment at industry
Useful Life30 yearsProject NameFieldcrest Ave ReconstructionCategoryStreet ImprovementsTypePrimary ProjectTotal Cost$406,000ContactVillage PresidentDepartmentGeneralTotal2034 2035 2036 2037 2038Expenditures2039 2040 2041 2042 204340,00040,000Planning/Design/Engineering 333,000333,000Construction33,00033,000Construction Phase Engineering40,000 366,000 406,000TotalTotal2034 2035 2036 2037 2038Funding Sources2039 2040 2041 2042 2043203,00020,000 183,000Long Term Debt203,00020,000 183,000Local Road Improvement Program40,000 366,000 406,000TotalP
roduced Using the Plan-It CIP Software Tuesday, October 24, 2023
Capital Improvement PlanVillage of Park Ridge, WI2034 2043thru
Description
Reconstruction of Ferndale from Sunset Avenue to Sunrise Avenue. The proposed street section is 20 feet of asphaltpavement with 2 foot gravel shoulders. Work includes grading, 12 inches of
new base and 4 inches of asphalt. Work will also include grading of gradual swales or shallow ditches between driveways to provide for positive drainage off the new pavement surface.
Enhanced stormwater infiltration or bio swales may be needed at some locations.
Companion project No. 904 will install watermain, hydrants, and water services in the Fieldcrest Avenue rights-of-way and would be completed at the same time as the street reconstruction.
Project #604Priority1 High JustificationThe existing street surfaces are in poor condition with a PASER rating of 3 to 4 out of 10. Ratings near the bottom of the scale generally require complete reconstruction. In addiiton, the proposed companion water main project will require removel of existing pavement, so complete reconstruction is preferred as opposed to simply patching the water main trenches. Budget Impact/OtherProject funding is anticipated through the Local Road Improvement Progam (LRIP), a WISDOT managed reimbursement program that provides up to 50% of the project cost with the balance funded locally. The program operates on a 2 year cycle with applications typpically due in the fall. It is recommended that this project get submitted under the Muncipal Street Improvement - Discretionary (MSID) component of the program, which targets high cost municipal street improvements. Both design and construction costs are eligabe. Initally, the annual operating street maintenance budget for pothole patching will decrease, however future financial planning should account for crackfilling and surface treatment at industry standard intervals.
Useful Life30 yearsProject NameFerndale Drive ReconstructionCategoryStreet ImprovementsTypePrimary ProjectTotal Cost$393,000ContactVillage PresidentDepartmentGeneralTotal2034 2035 2036 2037 2038Expenditures2039 2040 2041 2042 204332,000Planning/Design/Engineering32,000334,000Construction334,00027,000Construction Phase Engineering27,000393,000Total32,000 361,000Total2034 2035 2036 2037 2038Funding Sources2039 2040 2041 2042 2043196,500Long Term Debt16,000 180,500196,500Local Road Improvement Program16,000 180,500393,000Total32,000 361,000P
roduced Using the Plan-It CIP Software Tuesday, October 24, 2023
Capital Improvement PlanVillage of Park Ridge, WI2034 2043thru DescriptionResurfacing existing pavement on Linwood Avenue from Ridgewood Drive to Hillcrest Drive Work incluses pulverizing existing pavement, regrading existing base and paving a new 3-inch asphalt surface. The proposed street section is 20 foot wide asphalt pavement with 2 foot gravel shoulders. Work will also include grading of gradual swales or shallow ditches between driveways to provide for positive drainage off the new pavement surface. Enhanced stormwater infiltration or bio swales may be needed at some locations.Companion project No. 705 will install intersection streetlighting along Linwood and would be completed at the same time as the street reconstruction.Project #605Priority1 High JustificationThe existing street surface is in poor condition with a PASER rating of 4 out of 10. Ratings near the bottom of the scale generally require resuracing or complete reconstruction. Budget Impact/OtherProject funding is anticipated through the Local Road Improvement Progam (LRIP), a WISDOT managed reimbursement program that provides up to 50% of the project cost with the balance funded locally. The program operates on a 2 year cycle with applications typpically due in the fall. The Muncipal Street Improvement - Entitlement component of the program allocates funding in each cycle base on a municipalities population and street mileage. The Village is currently elligable for approximately $11,000 each cycle. Funding from more than on cycle can be combined. It is recommended that this project get submitted in consecutive cycles for a total of $22,000 for this project.Initally, the annual operating street maintenance budget for pothole patching will decrease, however future financial planning should account for crackfilling and surface treatment at industry standard intervals.
Useful Life20 yearsProject NameLinwood Ave (Ridgewood to Hillcrest) ResurfaceCategoryStreet ImprovementsTypePrimary ProjectTotal Cost$253,000ContactVillage PresidentDepartmentGeneralTotal2034 2035 2036 2037 2038Expenditures2039 2040 2041 2042 204315,000Planning/Design/Engineering 15,000228,000Construction228,00010,000Construction Phase Engineering10,000253,000Total15,000 238,000Total2034 2035 2036 2037 2038Funding Sources2039 2040 2041 2042 2043231,000Long Term Debt15,000 216,00022,000Local Road Improvement Program22,000253,000Total15,000 238,000P
roduced Using the Plan-It CIP Software Tuesday, October 24, 2023
Capital Improvement PlanVillage of Park Ridge, WI2034 2043thru DescriptionResurfacing existing pavement on Sunset Avenue from Hillcrest Drive to Park Ridge Drive. Work incluses pulverizing existing pavement, regrading existing base and paving a new 3-inch asphalt surface. The proposed street section is 20 foot wide asphalt pavement with 2 foot gravel shoulders. Work will also include grading of gradual swales or shallow ditches between driveways to provide for positive drainage off the new pavement surface. Enhanced stormwater infiltration or bio swales may be needed at some locations.Companion project No. 706 will install intersection streetlighting along Fieldcrest and would be completed at the same time as the street reconstruction.Project #606Priority1 High JustificationThe existing street surface is in poor condition with a PASER rating of 4 out of 10. Ratings near the bottom of the scale generally require resuracing or complete reconstruction. Budget Impact/OtherProject funding is anticipated through the Local Road Improvement Progam (LRIP), a WISDOT managed reimbursement program that provides up to 50% of the project cost with the balance funded locally. The program operates on a 2 year cycle with applications typpically due in the fall. The Muncipal Street Improvement - Entitlement component of the program allocates funding in each cycle base on a municipalities population and street mileage. The Village is currently elligable for approximately $11,000 each cycle. Funding from more than on cycle can be combined. It is recommended that this project get submitted in the 2028-2029 and the 2029-2030 Cycles for a total of $28,000 for this project.Initally, the annual operating street maintenance budget for pothole patching will decrease, however future financial planning should account for crackfilling and surface treatment at industry standard intervals.
Useful Life20 yearsProject NameSunset Ave (Hillcrest to Parkridge Dr)-ResurfaceCategoryStreet ImprovementsTypePrimary ProjectTotal Cost$249,000ContactVillage PresidentDepartmentGeneralTotal2034 2035 2036 2037 2038Expenditures2039 2040 2041 2042 204313,000Planning/Design/Engineering 13,000226,000Construction226,00010,000Construction Phase Engineering10,000249,000Total13,000 236,000Total2034 2035 2036 2037 2038Funding Sources2039 2040 2041 2042 2043221,000Long Term Debt13,000 208,00028,000Local Road Improvement Program28,000249,000Total13,000 236,000P
roduced Using the Plan-It CIP Software Tuesday, October 24, 2023
Capital Improvement PlanVillage of Park Ridge, WI2034 2043thru DescriptionAnnuall crackfilling on new asphalt pavements. Seal coat or chip seal on asphalt pavements as they age.It is recommended that all new asphalt pavements get crack filled each year. Seal coating should be completed in the first 5 years of pavement life and re-applied every 8 to 10 yeasr thereafter.Actual projects to be determined annually.Project #625Priority1 High JustificationAnnual maintenance is necessary to maximize the life expectancy of new asphalt pavements. Budget Impact/OtherAnnual operating budgets should account for ongoing asphalt pavement maintenance
Useful Life10 YearsProject NameAnnual Seal Coat and Crack FillingCategoryStreet ImprovementsTypePrimary ProjectTotal Cost$205,000ContactVillage PresidentDepartmentGeneralTotal2034 2035 2036 2037 2038Expenditures2039 2040 2041 2042 2043125,00025,000 25,000Construction25,000 25,000 25,00025,000 25,000 125,000Total25,000 25,000 25,000Total2034 2035 2036 2037 2038Funding Sources2039 2040 2041 2042 2043125,00025,000 25,000General Fund25,000 25,000 25,00025,000 25,000 125,000Total25,000 25,000 25,000P
roduced Using the Plan-It CIP Software Tuesday, October 24, 2023
Capital Improvement PlanVillage of Park Ridge, WI2034 2043thru DescriptionReplace existing poles, fixtures and underground wiring south of Park Ridge Drive/STH 66 on Fieldcrest Avenue from Ridgewood to Hillcrest with a new streetlight system.Pricing is based on Sterberg Lighting components as follows:Fixture - 1430LED Caged AcornPole - 3900 Richmond Direct Bury 16 footCompanion project No. 603 will reconstruct Fieldcrest Avenue from Ridgewood Drive to Hillcrest Drive.Companion project No. 903 will install watermain, hydrants, and water services in the Fieldcrest Avenue right-of-way and would be completed at the same time as the street reconstruction.Project #703Priority2 Medium JustificationThe existing system consists of approximatly 42 fixtures on wooden poles, located primarily at intersections with a few mid-block locations. Unmetered power supply is provided at 4 locations. The Village has upgraded to LED fixtures, however the rate charged by Wisconsin Public Service has not been adjusted to reflect the reduced energy consumption. A new metered system fed from a central location would allow for charges based on actual consumption rather than a calculated rate and would likely offer on-going savings in the annual street light budget. Budget Impact/OtherProject funding is likely long term debt secured by the Village. On-going energy costs will be reduced with a metered street light system. Streetlight maintenance willcontinue to be the reposnibility of the Village.
Useful Life30 yearsProject NameFieldcrest Ave StreetlightingCategoryStreetlightingTypePrimary ProjectTotal Cost$176,000ContactVillage PresidentDepartmentGeneralTotal2034 2035 2036 2037 2038Expenditures2039 2040 2041 2042 204315,00015,000Planning/Design/Engineering 150,000150,000Construction11,00011,000Construction Phase Engineering15,000 161,000 176,000TotalTotal2034 2035 2036 2037 2038Funding Sources2039 2040 2041 2042 2043176,00015,000 161,000Long Term Debt15,000 161,000 176,000TotalP
roduced Using the Plan-It CIP Software Tuesday, October 24, 2023
Capital Improvement PlanVillage of Park Ridge, WI2034 2043thru DescriptionReplace existing poles, fixtures and underground wiring south of Park Ridge Drive/STH 66 on Linwood Avenue from Ridgewood Drive to Hillcrest Drive with a new streetlight system.Pricing is based on Sterberg Lighting components as follows:Fixture - 1430LED Caged AcornPole - 3900 Richmond Direct Bury 16 footCompanion project No. 605 will reconstruct Linwood Avenue from Ridgewood Drive to Hillcrest Drive.Project #705Priority2 Medium JustificationThe existing system consists of approximatly 42 fixtures on wooden poles, located primarily at intersections with a few mid-block locations. Unmetered power supply is provided at 4 locations. The Village has upgraded to LED fistures, however the rate charged by Wisconsin Public Service has not been adjusted to reflect the reduced energy consumption. A new metered system fed from a central location would allow for charges based on actual consumption rather than a calculated rate and would likely offer on-going savings in the annual street light budget. Budget Impact/OtherProject funding is likely long term debt secured by the Village. On-going energy costs will be reduced with a metered street light system. Streetlight maintenance willcontinue to be the reposnibility of the Village.
Useful Life30 yearsProject NameLinwood Ave StreetlightingCategoryStreetlightingTypePrimary ProjectTotal Cost$108,000ContactVillage PresidentDepartmentGeneralTotal2034 2035 2036 2037 2038Expenditures2039 2040 2041 2042 20437,000Planning/Design/Engineering 7,00097,000Construction97,0004,000Construction Phase Engineering4,000108,000Total7,000 101,000Total2034 2035 2036 2037 2038Funding Sources2039 2040 2041 2042 2043108,000Long Term Debt7,000 101,000108,000Total7,000 101,000P
roduced Using the Plan-It CIP Software Tuesday, October 24, 2023
Capital Improvement PlanVillage of Park Ridge, WI2034 2043thru DescriptionReplace existing poles, fixtures and underground wiring south of Park Ridge Drive/STH 66 on Sunset Avenue from Hillcrest Drive to Park Ridge Drive with a new streetlight system.Pricing is based on Sterberg Lighting components as follows:Fixture - 1430LED Caged AcornPole - 3900 Richmond Direct Bury 16 footCompanion project No. 606 will reconstruct Sunset Avenue from Hillcrest Drive to Park Ridge Drive.Project #706Priority2 Medium JustificationThe existing system consists of approximatly 42 fixtures on wooden poles, located primarily at intersections with a few mid-block locations. Unmetered power supply is provided at 4 locations. The Village has upgraded to LED fistures, however the rate charged by Wisconsin Public Service has not been adjusted to reflect the reduced energy consumption. A new metered system fed from a central location would allow for charges based on actual consumption rather than a calculated rate and would likely offer on-going savings in the annual street light budget. Budget Impact/OtherProject funding is likely long term debt secured by the Village. On-going energy costs will be reduced with a metered street light system. Streetlight maintenance willcontinue to be the reposnibility of the Village.
Useful Life30 yearsProject NameSunset Ave StreetlightingCategoryStreetlightingTypePrimary ProjectTotal Cost$87,000ContactVillage PresidentDepartmentGeneralTotal2034 2035 2036 2037 2038Expenditures2039 2040 2041 2042 20435,000Planning/Design/Engineering 5,00079,000Construction79,0003,000Construction Phase Engineering3,00087,000Total5,000 82,000Total2034 2035 2036 2037 2038Funding Sources2039 2040 2041 2042 204387,000Long Term Debt5,000 82,00087,000Total5,000 82,000P
roduced Using the Plan-It CIP Software Tuesday, October 24, 2023
Capital Improvement PlanVillage of Park Ridge, WI2034 2043thru DescriptionInstallation of water main in Fieldcrest Avenue from Ridgewood Drive to to Hillcrest Drive. Work will also include installation of fire hydrants ateach intersection and 1-inch water services stubbed into all properties adjacent to the new watermain.Companion project No. 603 will reconstruct Fieldcrest Avenue from Ridgewood Drive to Hillcrest Drive.Companion project No. 703 will install intersection streetlighting along Fieldcrest and would be completed at the same time as the street reconstruction.Project #903Priority1 High JustificationAdditional fire hydrants for fire protection and access to municipal water supply are both objectives of the Villages 2022-2026 Strategic Plan. The Village has recently contracted with the City of Stevens Point for fire protection and additional hydrants are needed to provide the desired level of service. Since the streets will be reconstructed after watermain installation, it is desireable to have water services stubbed in to adjacent lots prior to paving to avoid pavment damage and/or road patches in the future. Budget Impact/OtherProject funding is likely long term debt secured by the Village.It is likely that the water system will be owned by the City of Stevens Point. Future financial planning should account for on-going maintenance payments to the City.
Useful Life75 yearsProject NameFieldcrest Avenue - WatermainCategoryWater DistributionTypeCompanion ProjectTotal Cost$370,000ContactVillage PresidentDepartmentGeneralTotal2034 2035 2036 2037 2038Expenditures2039 2040 2041 2042 204330,00030,000Planning/Design/Engineering 314,000314,000Construction26,00026,000Construction Phase Engineering30,000 340,000 370,000TotalTotal2034 2035 2036 2037 2038Funding Sources2039 2040 2041 2042 2043370,00030,000 340,000Long Term Debt30,000 340,000 370,000TotalP
roduced Using the Plan-It CIP Software Tuesday, October 24, 2023
Capital Improvement PlanVillage of Park Ridge, WI2034 2043thru DescriptionInstallation of water main in Ferndale Drive from Sunset Avenue to Sunrise Avenue, and along Ferndale extended to Pinecrest Avenue. Work will also include installation of fire hydrants at each intersection and 1-inch water services stubbed into all properties adjacent to the new watermain.Companion project No. 604 will reconstruct Ferndale Drivee from Sunset Avenue to Sunrise Avenue.Project #904Priority1 High JustificationAdditional fire hydrants for fire protection and access to municipal water supply are both objectives of the Villages 2022-2026 Strategic Plan. The Village has recently contracted with the City of Stevens Point for fire protection and additional hydrants are needed to provide the desired level of service. Since the streets will be reconstructed after watermain installation, it is desireable to have water services stubbed in to adjacent lots prior to paving to avoid pavment damage and/or road patches in the future. Budget Impact/OtherProject funding is likely long term debt secured by the Village.It is likely that the water system will be owned by the City of Stevens Point. Future financial planning should account for on-going maintenance payments to the City.
Useful Life75 yearsProject NameFerndale Drive - WatermainCategoryWater DistributionTypeCompanion ProjectTotal Cost$386,000ContactVillage PresidentDepartmentGeneralTotal2034 2035 2036 2037 2038Expenditures2039 2040 2041 2042 204332,000Planning/Design/Engineering32,000328,000Construction328,00026,000Construction Phase Engineering26,000386,000Total32,000 354,000Total2034 2035 2036 2037 2038Funding Sources2039 2040 2041 2042 2043386,000Long Term Debt32,000 354,000386,000Total32,000 354,000P
roduced Using the Plan-It CIP Software Tuesday, October 24, 2023
\\msa-ps.com\fs\Project\09\09617\09617000\Documents\CIP Report (Narrative)\09617000 Park Ridge CIP STREETS, WATER 10.25.2023.docx
APPENDIX C
Detailed Project Cost Estimates
THIS PAGE INTENTIONALLY LEFT BLANK
Village of Park Ridge, Portage County, Wisconsin
Hillcrest Drive - Pinecrest Drive to Sunrise Avenue and
Greeenbriar Avenue - Hillcrest Drive to Park Ridge Drive
Watermain Installation and Street Reconstruction
Reconstruction Length (Hillcrest =1,784 LF; Greenbriar=1,321 LF) 3105
Reconstruction Width 20
Hydrants (Hillcrest - 4; Greenbriar - 4) 8
Water Services (Hillcrest = 19, Greenbriar=17) 36
Driveways (Hillcrest - 2 Gravel, 7 Asphalt, 3 Concrete; Greenbriar - 1 Gravel, 8 Asphalt, 8 Concrete) 29
ROW Width (Hillcrest = 66 Ft; Greenbriar = 60Ft) 66
ITEM ITEM ESTIMATED UNIT TOTAL
NO. DESCRIPTION QUANTITY UNITS PRICE PRICE
Base Bid
1 Mobilization, Bonds, and Insurance 1 LS $ 75,400.00 $ 75,400.00
2 Traffic Control 1 LS $ 12,600.00 $ 12,600.00
3 Erosion and Sedimentation Controls 1 LS $ 18,900.00 $ 18,900.00
4 Site Maintenance and Restoration 1 LS $ 37,700.00 $ 37,700.00
5 Clearing and Grubbing 1 LS $ 25,200.00 $ 25,200.00
Subtotal 169,800.00$
Watermain
6 6-Inch PVC Water Main 200 LF 70.00$ 14,000.00$
7 8-Inch PVC Water Main 1,696 LF 75.00$ 127,200.00$
8 12-Inch PVC Water Main (on Hillcrest) 1,140 LF 120.00$ 136,800.00$
9 Hydrant Complete 8 EA 6,500.00$ 52,000.00$
10 6-Inch Gate Valve & Box 8 EA 2,600.00$ 20,800.00$
11 8-Inch Gate Valve & Box 6 EA 3,300.00$ 19,800.00$
12 12-Inch Gate Valve & Box 3 EA 4,950.00$ 14,850.00$
13 12-Inch X 8-Inch Tee 2 EA 2,000.00$ 4,000.00$
14 Bends, Plugs, Reducers 4 EA 750.00$ 3,000.00$
15 1-Inch Corp., Tap, Curb Stop & Box 36 EA 1,500.00$ 54,000.00$
16 1-Inch HDPE Water Service 900 LF 45.00$ 40,500.00$
17 Connect To Existing Water Main 2 EA 3,200.00$ 6,400.00$
Subtotal 493,350.00$
Streetlighting
18 Lighting Contol Cabinet and Base 1 EA 15,000.00$ 15,000.00$
19 A14 LED Fixtures 9 EA 2,587.00$ 23,283.00$
20 3900 Richmond Poles - Direct Bury 9 EA 2,742.00$ 24,678.00$
21 Pull Boxes 7 EA 1,700.00$ 11,900.00$
22 2-inch HDPE Duct 3,473 LF 27.00$ 93,771.00$
23 #6 Wire (3 x 3,473 LF) 10,419 LF 2.00$ 20,838.00$
Subtotal 189,470.00$
Street Reconstruction
24 Excavation Common 3,416 LF 25.00$ 85,387.50$
25 Rock Excavation 0 CY 150.00$ -$
26 Excavation Below Subgrade (EBS) 0 CY 35.00$ -$
27 Swale Grading & Restoration 5,514 LF 19.00$ 104,766.00$
28 Bio-swale with Engineered Soil 100 SY 25.00$ 2,500.00$
29 Base Aggregate Dense 1 1/4-Inch (12-Inch Depth) 9,867 SY 11.00$ 108,537.00$
30 4-Inch Thick Asphalt Pavement 7,590 SY 27.25$ 206,827.50$
31 4 -Inch Thick Asphalt Shoulder (3 feet wide) 1,189 SY 27.25$ 32,409.33$
32 2-Foot Gravel Shoulders (4-Inch Depth) 1,380 SY 7.25 $ 10,005.00$
33 Driveway, Asphalt 2-Inch w/ 8-Inch Base 200 SY 45.00 $ 9,000.00$
34 6-Inch Thick Concrete Driveway /Sidewalk w/6-Inch Base 147 SY 95.00$ 13,933.33$
35 Gravel Driveway - 12-Inch Thick 3/4 Aggregate Base 40 CY 11.00$ 440.00$
Subtotal 573,805.67$
1,256,625.67$
169,800.00$
1,426,425.67$
CONTINGENCIES (15%) 213,963.85 $
ENGINEERING (15%) 246,058.43 $
GEOTECHNICAL INVESTIGATIONS ALLOWANCE 5,000.00 $
LEGAL AND ADMINISTRATIVE ALLOWANCE (2%) 14,264.26$
LAND AND EASEMENT ACQUISITION ALLOWANCE -$
COST ESCALATION (INFLATION 3% per annum for 2 years) 86,000.00$
PROJECT TOTAL 1,991,712.20$
SUBTOTAL WATER IMPROVEMENTS 781,944.25$
SUBTOTAL STREET LIGHTING IMPROVEMENTS 300,304.00$
SUBTOTAL STREET RECONSTRUCTION 909,463.95$
1,991,712.20$
Subtoal of Watermain Installation, Streetlighting, and Street Reconstruction
Base Bid Items
Total Street Improvement S
cope of Work: Install 1,140 feet of 12-inch and 380 feet of 8-inch watermain on Hillcrest and 1,316 feet of 8-inch watermain on Greenbrier to connect to existing at Park Ridge Drive. Add fire hydrants at all intersections and
water services stubbed into each adjacent residential lot. Reconstruct both streets with 20 foot wide, 4-inch asphalt surface over 12 inches of base aggregate dense. Add 4 foot shoulder, 3 foot paved on Hillcrest and 2 foot wide
gravel shoulders on Greenbriar. Add 1 foot deep swales with 5:1 side slopes along each side of the road. Anticipate 5 foot of driveway replacment in-kind at each driveway using an averqage width of 24 feet. Replace
streetlighting at intersections.
Assumptions: Construction year 2025. Local Road Improvement Program funding with local bid letting. Unit prices based on 2023 bid data.
Village of Park Ridge, Portage County, Wisconsin
Ridgewood Drive - Sunset Avenue to Greenbriar Avenue
Greenbriar Avenue - Ridgewood Drive to Hillcrest Drive
Watermain Installation and Street ReconstructionR
econstruction Length (Ridgewood - 1,267 LF; Greenbriar - 1,321 LF)2588
Reconstruction Width 20
Hydrants (4 on Ridgewood, 3 on Greenbriar) 7
Water Services (Ridgewood - 18, Greenbriar - 14) 32
Driveways (Ridgewood - 1 Gravel, 19 Asphalt, 1 Concrete; Greenbriar - 1 Gravel, 8 Asphalt, 4 Concrete) 34
ROW Width 60
ITEM ITEM ESTIMATED UNIT TOTAL
NO. DESCRIPTION QUANTITY UNITS PRICE PRICE
Base Bid
1 Mobilization, Bonds, and Insurance 1 LS $ 58,600.00 $ 58,600.00
2 Traffic Control 1 LS $ 9,800.00 $ 9,800.00
3 Erosion and Sedimentation Controls 1 LS $ 14,700.00 $ 14,700.00
4 Site Maintenance and Restoration 1 LS $ 29,300.00 $ 29,300.00
5 Clearing and Grubbing 1 LS $ 19,600.00 $ 19,600.00
Subtotal 132,000.00$
Watermain
6 6-Inch PVC Water Main 175 LF 70.00$ 12,250.00$
7 8-Inch PVC Water Main 2,260 LF 75.00$ 169,500.00$
8 12-Inch PVC Water Main 600 LF 120.00$ 72,000.00$
9 Hydrant Complete 7 EA 6,500.00$ 45,500.00$
10 6-Inch Gate Valve & Box 7 EA 2,600.00$ 18,200.00$
11 8-Inch Gate Valve & Box 4 EA 3,300.00$ 13,200.00$
12 12-Inch Gate Valve & Box 1 EA 4,950.00$ 4,950.00$
13 8-Inch X 6-Inch Tee 7 EA 1,000.00$ 7,000.00$
14 12-Inch X 6-Inch Tee 1 EA 1,800.00$ 1,800.00$
15 Bends, Plugs, Reducers 4 EA 750.00$ 3,000.00$
16 1-Inch Corp., Tap, Curb Stop & Box 32 EA 1,500.00$ 48,000.00$
17 1-Inch HDPE Water Service 800 LF 45.00$ 36,000.00$
18 Connect To Existing Water Main 2 EA 3,200.00$ 6,400.00$
Subtotal 437,800.00$
Streetlighting
19 A14 LED Fixtures 6 EA 2,587.00$ 15,522.00$
20 3900 Richmond Poles - Direct Bury 6 EA 2,742.00$ 16,452.00$
21 Pull Boxes 1 EA 1,700.00$ 1,700.00$
22 2-inch HDPE Duct 2,060 LF 27.00$ 55,620.00$
23 #6 Wire (3 x 2,060 LF) 6,180 LF 2.00$ 12,360.00$
Subtotal 101,654.00$
Street Reconstruction
24 Excavation Common 2,588 LF 25.00$ 64,700.00$
25 Rock Excavation 0 CY 150.00$ -$
26 Excavation Below Subgrade (EBS) 0 CY 35.00$ -$
27 Swale Grading & Restoration 4,360 LF 19.00$ 82,840.00$
28 Bio-swale with Engineered Soil 100 SY 25.00$ 2,500.00$
29 Base Aggregate Dense 1 1/4-Inch (12-Inch Depth) 7,476 SY 11.00$ 82,240.89$
30 4-Inch Thick Asphalt Pavement 6,326 SY 27.25$ 172,389.56$
31 2-Foot Gravel Shoulders (4-Inch Depth) 1,150 SY 7.25 $ 8,339.11$
32 Driveway, Asphalt 2-Inch w/ 8-Inch Base 360 SY 45.00 $ 16,200.00$
33 6-Inch Thick Concrete Driveway /Sidewalk w/6-Inch Base 67 SY 95.00$ 6,333.33$
34 Gravel Driveway - 12-Inch Thick 3/4 Aggregate Base 27 CY 11.00$ 293.33$
Subtotal 435,836.22$
975,290.22$
132,000.00$
1,107,290.22$
CONTINGENCIES (30% - includes additional contingency for WisDOT administered project) 276,822.56 $
ENGINEERING (30% - includes additional engineering and State review for WisDOT administered project)) 415,233.83$
GEOTECHNICAL INVESTIGATIONS ALLOWANCE 5,000.00 $
LEGAL AND ADMINISTRATIVE ALLOWANCE (2%) 22,145.80$
LAND AND EASEMENT ACQUISITION ALLOWANCE -$
COST ESCALATION (INFLATION 3% per annum for 5 years) 167,000.00$
PROJECT TOTAL 1,993,492.42$
SUBTOTAL WATER IMPROVEMENTS 894,862.84 $
SUBTOTAL STREETLIGHT IMPROVEMENTS 207,780.69 $
SUBTOTAL STREETING RECONSTRUCTION 890,848.88 $
1,993,492.42$
Subtoal of Watermain Installation and Street Reconstruction
Base Bid
Total Street Improvement
Scope of Work: Install 600 feet of 12-inch and 940 feet of 8-inch watermain on Ridgewood and 1,321 feet of 8-inch watermain on Greenbrier. Add fire hydrants at all intersections and water services stubbed into each adjacent
residential lot. Reconstruct both streets with 20 foot wide, 4-inch asphalt surface over 12 inches of base aggregate dense. Add 2 foot wide gravel shoulders and 1 foot deep swales with 5:1 side slopes along each side of the road.
Anticipate 5 foot of driveway replacment in-kind at each driveway using an averqage width of 24 feet. Replace streetlighting at intersections.
Assumptions: Construction year 2028. STP Urban Program funding with WisDOT design process and state bid letting which is reflected in additional engineering and contingency cost. Unit prices based on 2023 bid data.
Village of Park Ridge, Portage County, Wisconsin
Fieldcrest Avenue - Ridgewood Drive to Hillcrest Drive
Watermain Installation and Street Reconstruction
Reconstruction Length 1321
Reconstruction Width 20
Hydrants 3
Water Services 18
Driveways (0 Gravel, 11 Asphalt, 2 Concrete) 13
ROW Width 50
ITEM ITEM ESTIMATED UNIT TOTAL
NO. DESCRIPTION QUANTITYUNITS PRICE PRICE
Base Bid
1 Mobilization, Bonds, and Insurance 1 LS 29,900.00$ 29,900.00$
2 Traffic Control 1 LS 5,000.00$ 5,000.00$
3 Erosion and Sedimentation Controls 1 LS 7,500.00$ 7,500.00$
4 Site Maintenance and Restoration 1 LS 15,000.00$ 15,000.00$
5 Clearing and Grubbing 1 LS 10,000.00$ 10,000.00$
Subtotal 67,400.00$
Watermain
6 6-Inch PVC Water Main 75 LF 70.00$ 5,250.00$
7 8-Inch PVC Water Main 1,321 LF 75.00$ 99,075.00$
8 Hydrant Complete 3 EA 6,500.00$ 19,500.00$
9 6-Inch Gate Valve & Box 3 EA 2,600.00$ 7,800.00$
10 8-Inch Gate Valve & Box 2 EA 3,300.00$ 6,600.00$
11 8-Inch X 6-Inch Tee 3 EA 1,000.00$ 3,000.00$
12 Bends, Plugs, Reducers 3 EA 750.00$ 2,250.00$
13 1-Inch Corp., Tap, Curb Stop & Box 18 EA 1,500.00$ 27,000.00$
14 1-Inch HDPE Water Service 360 LF 45.00$ 16,200.00$
15 Connect To Existing Water Main 2 EA 3,200.00$ 6,400.00$
Subtotal 193,075.00$
Streetlighting
16 A14 LED Fixtures 5 EA 2,587.00$ 12,935.00$
17 3900 Richmond Poles - Direct Bury 5 EA 2,742.00$ 13,710.00$
18 Pull Boxes 2 EA 1,700.00$ 3,400.00$
19 2-inch HDPE Duct 1,875 LF 27.00$ 50,625.00$
20 #6 Wire (3 x 1,875 LF) 5,625 LF 2.00$ 11,250.00$
Subtotal 91,920.00$
Street Reconstruction
21 Excavation Common 1,321 LF 25.00$ 33,025.00$
22 Rock Excavation 0 CY 150.00$ -$
23 Excavation Below Subgrade (EBS) 0 CY 35.00$ -$
24 Swale Grading & Restoration 2,330 LF 19.00$ 44,270.00$
25 Bio-swale with Engineered Soil 100 SY 25.00$ 2,500.00$
26 Base Aggregate Dense 1 1/4-Inch (12-Inch Depth) 3,523 SY 11.00$ 38,749.33$
27 4-Inch Thick Asphalt Pavement 2,936 SY 27.25$ 79,993.89$
28 2-Foot Gravel Shoulders (4-Inch Depth) 587 SY 7.25 $ 4,256.56$
29 Driveway, Asphalt 2-Inch w/ 8-Inch Base 147 SY 45.00 $ 6,600.00$
30 6-Inch Thick Concrete Driveway /Sidewalk w/6-Inch Base 27 SY 95.00$ 2,533.33$
31 Gravel Driveway - 12-Inch Thick 3/4 Aggregate Base 0 CY 11.00$ -$
Subtotal 211,928.11$
496,923.11$
67,400.00$
564,323.11$
CONTINGENCIES (15%) 84,648.47 $
ENGINEERING (18%) 116,814.88$
GEOTECHNICAL INVESTIGATIONS ALLOWANCE 5,000.00 $
LEGAL AND ADMINISTRATIVE ALLOWANCE (2%) 11,286.46$
LAND AND EASEMENT ACQUISITION ALLOWANCE -$
COST ESCALATION (INFLATION 3% per annum, capped at 10 years) 170,000.00$
PROJECT TOTAL 952,072.92$
SUBTOTAL WATER IMPROVEMENTS 369,919.36 $
SUBTOTAL STREETLIGHTING IMPROVEMENTS 176,112.85 $
SUBTOTAL STREET RECONSTRUCTION 406,040.72 $
952,072.92$
Subtoal of Watermain Installation, Streetlighting and Street Reconstruction
Base Bid
Total Street Improvement
Scope of Work: Install 1,321 feet of 8-inch watermain on Fieldcrest. Add fire hydrants at all intersections and water services stubbed into each adjacent residential lot. Reconstruct street with 20 foot wide, 4-inch asphalt surface
over 12 inches of base aggregate dense. Add 2 foot wide gravel shoulders and 1 foot deep swales with 5:1 side slopes along each side of the road. Anticipate 5 foot of driveway replacment in-kind at each driveway using an averqage
width of 24 feet. Replace streetlighting at intersections.
Assumptions: Construction year 2035. Local Road Improvement Program funding with local bid letting. Unit prices base on 2023 bid data.
Village of Park Ridge, Portage County, Wisconsin
Ferndale Drive - Sunset Avenue to Sunrise Avenue
Watermain Installation and Street Reconstruction
Reconstruction Length 1300
Reconstruction Width 20
Hydrants 6
Water Services 16
Driveways (0 Gravel, 11 Asphalt, 2 Concrete) 8
ROW Width 60
ITEM ITEM ESTIMATED UNIT TOTAL
NO. DESCRIPTION QUANTITYUNITS PRICE PRICE
Base Bid
1 Mobilization, Bonds, and Insurance 1 LS 24,900.00$ 24,900.00$
2 Traffic Control 1 LS 4,200.00$ 4,200.00$
3 Erosion and Sedimentation Controls 1 LS 6,300.00$ 6,300.00$
4 Site Maintenance and Restoration 1 LS 12,500.00$ 12,500.00$
5 Clearing and Grubbing 1 LS 8,300.00$ 8,300.00$
Subtotal 56,200.00$
Watermain
6 6-Inch PVC Water Main 150 LF 70.00$ 10,500.00$
7 8-Inch PVC Water Main 1,017 LF 75.00$ 76,275.00$
8 Hydrant Complete 6 EA 6,500.00$ 39,000.00$
9 6-Inch Gate Valve & Box 6 EA 2,600.00$ 15,600.00$
10 8-Inch Gate Valve & Box 2 EA 3,300.00$ 6,600.00$
11 8-Inch X 6-Inch Tee 6 EA 1,000.00$ 6,000.00$
12 Bends, Plugs, Reducers 3 EA 750.00$ 2,250.00$
13 1-Inch Corp., Tap, Curb Stop & Box 16 EA 1,500.00$ 24,000.00$
14 1-Inch HDPE Water Service 400 LF 45.00$ 18,000.00$
15 Connect To Existing Water Main 2 EA 3,200.00$ 6,400.00$
Subtotal 204,625.00$
Street Reconstruction
16 Excavation Common 1,300 LF 25.00$ 32,500.00$
17 Rock Excavation 0 CY 150.00$ -$
18 Excavation Below Subgrade (EBS) 0 CY 35.00$ -$
19 Swale Grading & Restoration 2,408 LF 19.00$ 45,752.00$
20 Bio-swale with Engineered Soil 100 CY 25.00$ 2,500.00$
21 Base Aggregate Dense 1 1/4-Inch (12-Inch Depth) 3,467 SY 11.00$ 38,133.33$
22 4-Inch Thick Asphalt Pavement 2,889 SY 27.25$ 78,722.22$
23 2-Foot Gravel Shoulders (4-Inch Depth) 578 SY 7.25 $ 4,188.89$
24 Driveway, Asphalt 2-Inch w/ 8-Inch Base 40 SY 45.00 $ 1,800.00$
25 6-Inch Thick Concrete Driveway /Sidewalk w/6-Inch Base 53 SY 95.00$ 5,066.67$
26 Gravel Driveway - 12-Inch Thick 3/4 Aggregate Base 13 CY 11.00$ 146.67$
Subtotal 208,809.78$
413,434.78$
56,200.00$
469,634.78$
CONTINGENCIES (15%) 70,445.22 $
ENGINEERING (18%) 97,214.40$
GEOTECHNICAL INVESTIGATIONS ALLOWANCE 5,000.00 $
LEGAL AND ADMINISTRATIVE ALLOWANCE (2%) 9,392.70$
LAND AND EASEMENT ACQUISITION ALLOWANCE -$
COST ESCALATION (INFLATION 3% per annum capped at 10 years) 127,000.00$
PROJECT TOTAL 778,687.09$
SUBTOTAL WATER IMPROVEMENTS 385,402.62 $
SUBTOTAL STREET RECONSTRUCTION 393,284.47 $
778,687.09$
Subtoal of Watermain Installation and Street Reconstruction
Base Bid
Total Street Improvement
Scope of Work: Install 1,590 feet of 8-inch watermain on Ferndale and Ferndale extended fromPince Crest to Sunrise. Add fire hydrants at all intersections, including 1 at Sunset and Parkridge Drive, and water services stubbed into
each adjacent residential lot. Reconstruct street with 22 foot wide, 4-inch asphalt surface over 12 inches of base aggregate dense. Add 2 foot wide gravel shoulders and 1 foot deep swales with 5:1 side slopes along each side of the
road. Anticipate 5 foot of driveway replacment in-kind at each driveway using an averqage width of 24 feet.
Assumptions: Construction year 2040. Local Road Improvement Program funding with local bid letting. Unit prices based on 2023 bid data.
Village of Park Ridge, Portage County, Wisconsin
Linwood Avenue - Ridgewood Drive to Hillcrest Drive
Street Resurfacing
Resurfacing Length 1321
Resurfacing Width 20
Water Services 0
Driveways (1 Gravel, 5 Asphalt, 6 Concrete) 12
ROW Width 60
ITEM ITEM ESTIMATED UNIT TOTAL
NO. DESCRIPTION QUANTITYUNITS PRICE PRICE
Base Bid
1 Mobilization, Bonds, and Insurance 1 LS 15,800.00$ 15,800.00$
2 Traffic Control 1 LS 2,000.00$ 2,000.00$
3 Erosion and Sedimentation Controls 1 LS 3,000.00$ 3,000.00$
4 Site Maintenance and Restoration 1 LS 5,900.00$ 5,900.00$
5 Clearing and Grubbing 1 LS 4,000.00$ 4,000.00$
Subtotal 30,700.00$
Streetlighting
6 A14 LED Fixtures 4 EA 2,587.00$ 10,348.00$
7 3900 Richmond Poles - Direct Bury 4 EA 2,742.00$ 10,968.00$
8 Pull Boxes 0 EA 1,700.00$ -$
9 2-inch HDPE Duct 1,130 LF 27.00$ 30,510.00$
10 #6 Wire (3 x 1,130 LF) 3,390 LF 2.00$ 6,780.00$
Subtotal 58,606.00$
Street Reconstruction
11 Swale Grading & Restoration 2,354 LF 19.00$ 44,726.00$
12 Bio-swale with Engineered Soil 100 SY 25.00$ 2,500.00$
13 Pulverizing 2,936 SY 1.30$ 3,816.22$
14 Shaping/Fine Grading 2,936 SY 2.25$ 6,605.00$
15 3-Inch Thick Asphalt Pavement 2,936 SY 22.00$ 64,582.22$
16 2-Foot Gravel Shoulders (3-Inch Depth) 587 SY 8.50 $ 4,990.44$
17 Driveway, Asphalt 2-Inch w/ 8-Inch Base 67 SY 45.00 $ 3,000.00$
18 6-Inch Thick Concrete Driveway /Sidewalk w/6-Inch Base 80 SY 95.00$ 7,600.00$
19 Gravel Driveway - 12-Inch Thick 3/4 Aggregate Base 13 CY 11.00$ 146.67$
Subtotal 137,966.56$
196,572.56$
30,700.00$
227,272.56$
CONTINGENCIES (15%) 34,090.88 $
ENGINEERING (10%) 26,136.34$
GEOTECHNICAL INVESTIGATIONS ALLOWANCE - $
LEGAL AND ADMINISTRATIVE ALLOWANCE (2%) 4,545.45$
LAND AND EASEMENT ACQUISITION ALLOWANCE -$
COST ESCALATION (INFLATION 3% per annum capped at 10 years) 69,000.00$
PROJECT TOTAL 361,045.23$
SUBTOTAL STREET LIGHTING 107,641.77$
SUBTOTAL STREET RECONSTRUCTION 253,403.47$
Subtoal Streetlighting and Street Reconstruction
Base Bid
Total Street Improvement
Scope of Work: Pulverize existing asphalt in place, reshape base and pave with 20 foot wide, 3-inch asphalt surface. Add 2 foot wide gravel shoulders and 1 foot deep swales with 5:1 side slopes along each side of the road.
Anticipate 5 foot of driveway replacment in-kind at each driveway using an averqage width of 24 feet. Replace streetlighting at intersections.
Assumptions: Construction year 2042. Local Road Improvement Program funding with local bid letting.
Village of Park Ridge, Portage County, Wisconsin
Sunset Avenue - Hillcrest Drive to Park Ridge Drive
Street Resurfacing
Resurfacing Length 1321
Resurfacing Width 20
Water Services 0
Driveways (0 Gravel, 13 Asphalt, 3 Concrete) 16
ROW Width 50
ITEM ITEM ESTIMATED UNIT TOTAL
NO. DESCRIPTION QUANTITYUNITS PRICE PRICE
Base Bid
1 Mobilization, Bonds, and Insurance 1 LS 14,700.00$ 14,700.00$
2 Traffic Control 1 LS 1,900.00$ 1,900.00$
3 Erosion and Sedimentation Controls 1 LS 2,800.00$ 2,800.00$
4 Site Maintenance and Restoration 1 LS 5,500.00$ 5,500.00$
5 Clearing and Grubbing 1 LS 3,700.00$ 3,700.00$
Subtotal 28,600.00$
Streetlighting
6 A14 LED Fixtures 3 EA 2,587.00$ 7,761.00$
7 3900 Richmond Poles - Direct Bury 3 EA 2,742.00$ 8,226.00$
8 Pull Boxes 0 EA 1,700.00$ -$
9 2-inch HDPE Duct 955 LF 27.00$ 25,785.00$
10 #6 Wire (3 x 955 LF) 2,865 LF 2.00$ 5,730.00$
Subtotal 47,502.00$
Street Reconstruction
11 Swale Grading & Restoration 2,258 LF 19.00$ 42,902.00$
12 Bio-swale with Engineered Soil 100 SY 25.00$ 2,500.00$
13 Pulverizing 2,936 SY 1.30$ 3,816.22$
14 Shaping/Fine Grading 2,936 SY 2.25$ 6,605.00$
15 3-Inch Thick Asphalt Pavement 2,936 SY 22.00$ 64,582.22$
16 2-Foot Gravel Shoulders (3-Inch Depth) 587 SY 6.00 $ 3,522.67$
17 Driveway, Asphalt 2-Inch w/ 8-Inch Base 173 SY 45.00 $ 7,800.00$
18 6-Inch Thick Concrete Driveway /Sidewalk w/6-Inch Base 40 SY 95.00$ 3,800.00$
19 Gravel Driveway - 12-Inch Thick 3/4 Aggregate Base 0 SY 11.00$ -$
Subtotal 0 135,528.11 $
183,030.11$
28,600.00$
211,630.11$
CONTINGENCIES (15%) 31,744.52 $
ENGINEERING (10%) 24,337.46$
GEOTECHNICAL INVESTIGATIONS ALLOWANCE - $
LEGAL AND ADMINISTRATIVE ALLOWANCE (2%) 4,232.60$
LAND AND EASEMENT ACQUISITION ALLOWANCE -$
COST ESCALATION (INFLATION 3% per annum capped at 10 years) 64,000.00$
PROJECT TOTAL 335,944.69$
SUBTOTAL STREETLIGHTING IMPROVEMENTS 87,188.08 $
SUBTOTAL STREET RECONSTRUCTION 248,756.61 $
Subtoal of Streetlighting and Street Reconstruction
Base Bid
Total Street Improvement
Scope of Work: Pulverize existing asphalt in place, reshape base and pave with 20 foot wide, 3-inch asphalt surface. Add 2 foot wide gravel shoulders and 1 foot deep swales with 5:1 side slopes along each side of the road.
Anticipate 5 foot of driveway replacment in-kind at each driveway using an averqage width of 24 feet. Replace streetlighting at intersections.
Assumptions: Construction year 2043. Local Road Improvement Program funding with local bid letting.
THIS PAGE INTENTIONALLY LEFT BLANK
Notice is hereby given that on Monday, December 11, 2023 at 5:30 p.m. at the Park Ridge Village
Hall located at 24 Crestwood Drive, a PUBLIC HEARING on the PROPOSED 2024 BUDGET of the
Village of Park Ridge will be held. The proposed budget in detail is available for inspection at the
Village Hall Office at 24 Crestwood Dr. The Village has met the requirements of Wisconsin Statute
65.90(3)(a) by posting this notice in three public places. This notice is being published as a
supplement to the notice requirement. The following is a summary of the proposed 2024 budget.
2023
2023 2024 INCREASE/
GENERAL FUND BUDGET ESTIMATED BUDGET DECREASE
REVENUES
General Property Taxes 201,415 201,415 363,098 161,683
Intergovernmental Revenues 30,481 33,000 30,847 366
Licenses 2,500 2,395 2,350 (150)
Public Charges for Services 300 2,500 2,300 2,000
Cable Franchise Fees 7,000 5,000 4,500 (2,500)
Miscellaneous Revenues 1,000 41,000 3,500 2,500
Proceeds of long-term debt 200,000 - - (200,000)
TOTAL REVENUES 442,696 285,310 406,595 (36,101)
EXPENDITURES
General Government 95,263 90,000 104,248 8,985
Public Safety 103,550 105,600 109,050 5,500
Public Works 102,500 90,000 103,020 520
Health & Human Services 800 1,230 1,500 700
Culture, Recreation & Education 3,000 2,778 3,000 -
Urban Planning 30,000 30,000 31,000 1,000
Debt Service 8,250 8,250 37,250 29,000
TOTAL EXPENDITURES 343,363 327,858 389,068 45,705
Designated Reserves
26,217$
Undesignated Reserves 319,236
General Fund Balance Jan 1, 2023 345,453
Total Estimated Revenues 285,310
Total Estimated Expenditures 327,858
Estimated General Fund Balance Jan 1, 2023 302,905
Estimated Designated Reserves 75,000
Estimated Undesignated Reserves 227,905
Dated this 20th day of November, 2023
Published November 24, 2023
Katie McKelvey, Clerk/Treasurer, Village of Park Ridge
VILLAGE OF PARK RIDGE
NOTICE OF PUBLIC HEARING
VILLAGE OF PARK RIDGE
Revenues & Expenses Budget vs. Actual
Jan 1 - Oct 12, 23 Budget $ Over Budget 2024 BUDGET
Ordinary Income/Expense
Income
41110 · Local Tax Levied 201,414.91 201,415.00 -0.09 363,098.00
43410 · Shared Revenues 1,901.39 12,676.00 -10,774.61 12,675.83
43420 · Fire Insurance 2,821.32 2,400.00 421.32 2,400.00
43430 · Exempt Computer Aid 462.47 461.00 1.47 462.47
43440 · Personal Property Aid 539.12 270.00 269.12 269.56
43450 · State Video (Cable) Aid 3,192.97 1,700.00 1,492.97 1,700.20
43531 · Transportation Aid 10,092.36 12,974.00 -2,881.64 13,338.87
44110 · Liquor and Malt Beverage 915.00 1,000.00 -85.00 1,000.00
44120 · Cigarette/Bartender's Licenses 1,150.00 1,000.00 150.00 1,000.00
44200 · Dog Licenses 330.00 500.00 -170.00 350.00
44300 · Building Permits/Inspections 2,272.84 0.00 2,272.84 2,000.00
44400 · Zoning/Variance Fees 200.00 200.00 0.00 200.00
44500 · Cable Franchise Fees 4,519.37 7,000.00 -2,480.63 4,500.00
46100 · General Government 45.00 100.00 -55.00 100.00
48100 · Interest 2,354.28 500.00 1,854.28 2,000.00
48200 · CD Interest 0.00 500.00 -500.00 0.00
48302 · Sale of Fire Equipment 36,850.36 0.00 36,850.36 0.00
48900 · Miscellaneous Income 1,581.03 0.00 1,581.03 1,500.00
48905 · Late Fees 5.00 0.00 5.00 0.00
Total Income 270,647.42 242,696.00 27,951.42 406,594.93
Expense
51100 · Village Board
5110001 · President Salary 2,758.88 3,768.00 -1,009.12 3,768.00
5110002 · Trustee Salary 2,953.00 3,445.00 -492.00 3,445.00
5110003 · Santa Visit 0.00 350.00 -350.00 500.00
5110004 · League of Municipalities
Dues 0.00 400.00 -400.00 400.00
5110005 · Miscellaneous 0.00 900.00 -900.00 900.00
5110006 · Board Expenses 106.93 1,850.00 -1,743.07 1,000.00
Total 51100 · Village Board 5,818.81 10,713.00 -4,894.19 10,013.00
51300 · Legal 4,800.00 4,000.00 800.00
51410 · Clerk/Treasurer
5141001 · Clerk Compensation 31,268.51 39,500.00 -8,231.49 40,685.00
5141002 · Mileage and Expense 617.66 0.00 617.66 1,000.00
5141006 · General Office Supplies 3,862.39 6,000.00 -2,137.61 6,000.00
5141007 · Training 500.00 1,500.00 -1,000.00 1,500.00
5141010 · Tax Collection Fee 1,438.78 1,200.00 238.78 1,500.00
5141011 · Villagewide Mailing 886.31 0.00 886.31 1,000.00
5141013 · Treasurer Bond 1,407.00 0.00 1,407.00 1,000.00
5141016 · Accounting Consultation 205.60 3,000.00 -2,794.40 1,000.00
5141022 · Dues & Subscriptions 1,757.07 0.00 1,757.07 2,000.00
5141025 · Background Checks 154.00 0.00 154.00 200.00
5141026 · Treasurer Compensation 0.00 6,000.00 -6,000.00 6,000.00
5141027 · IT Services 500.00 2,000.00 -1,500.00 1,500.00
Total 51410 · Clerk/Treasurer 42,597.32 59,200.00 -16,602.68 63,385.00
51420 · Elections
5142001 · Inspectors 1,021.75 2,000.00 -978.25 2,500.00
5142002 · Election Expenses 49.50 0.00 49.50 500.00
5142006 · Election Equipment 0.00 1,000.00 -1,000.00 1,000.00
Total 51420 · Elections 1,071.25 3,000.00 -1,928.75 4,000.00
51430 · Publication Fees 130.20 0.00 130.20 200.00
51510 · Accounting
5151001 · Reporting (Form C) 1,850.00 750.00 1,100.00 2,000.00
Total 51510 · Accounting 1,850.00 750.00 1,100.00 2,000.00
51530 · Assessment of Property
5153001 · Assessor Contract 5,220.00 5,800.00 -580.00 5,800.00
5153004 · Bd of Review Notice
Publication 128.35 0.00 128.35 150.00
Total 51530 · Assessment of Property 5,348.35 5,800.00 -451.65 5,950.00
51600 · Village Hall
5160001 · Maintenance Compensation 1,430.00 3,000.00 -1,570.00 3,000.00
5160004 · Utilities 1,870.99 3,000.00 -1,129.01 3,000.00
5160005 · Supplies and Equipment 8,345.97 2,500.00 5,845.97 2,500.00
5160006 · Repairs & Maintenance 1,257.90 0.00 1,257.90 2,000.00
Total 51600 · Village Hall 12,904.86 8,500.00 4,404.86 10,500.00
51910 · Uncollectible Taxes 152.03 0.00 152.03 200.00
51938 · Insurance
5193801 · General Liability 6,831.00 1,300.00 5,531.00 5,000.00
5193802 · Local Gov't Property 0.00 1,000.00 -1,000.00 1,000.00
XXXXXXX - Worker's Compensation 2,000.00
5193804 · Public Officials Liability 0.00 1,000.00 -1,000.00
Total 51938 · Insurance 6,831.00 3,300.00 3,531.00 8,000.00
52100 · Crossing Guard 2,455.23 3,500.00 -1,044.77 3,500.00
52205 · Fire & EMS Protection
5220521 · Fire Protection & EMT
Contract 79,566.49 1,500.00 78,066.49 101,000.00
5220523 · Firefighter Compensation 0.00 97,200.00 -97,200.00 0.00
52205 · Fire & EMS Protection - Other 802.00 0.00 802.00
Total 52205 · Fire & EMS Protection 80,368.49 98,700.00 -18,331.51 101,000.00
52400 · Building Inspection 3,893.19 800.00 3,093.19 4,000.00
52450 · Zoning Administration 495.61 550.00 -54.39 550.00
53311 · Street Maintenance
5331101 · Snow Plowing 16,419.56 27,000.00 -10,580.44 27,000.00
5331102 · Grading 0.00 500.00 -500.00
5331103 · Street Maintenance 6,004.12 2,000.00 4,004.12 10,000.00
5331105 · Street Repair 0.00 10,000.00 -10,000.00 1,000.00
5331107 · Tree & Branch Removal 0.00 2,500.00 -2,500.00
5331110 · Flags & Banners 0.00 1,500.00 -1,500.00
5331113 · Engineering 26,798.00 0.00 26,798.00 31,000.00
Total 53311 · Street Maintenance 49,221.68 43,500.00 5,721.68 69,000.00
53420 · Street Lighting
5342001 · Electric & Maintenance 10,409.15 11,000.00 -590.85 13,500.00
5342004 · Digger Requests 2,549.15 4,000.00 -1,450.85 4,000.00
Total 53420 · Street Lighting 12,958.30 15,000.00 -2,041.70 17,500.00
53620 · Garbage Collection
5362001 · Garbage Collection 26,319.82 29,000.00 -2,680.18 32,520.00
5362002 · Fall Large Item Pick-up 0.00 800.00 -800.00 800.00
Total 53620 · Garbage Collection 26,319.82 29,800.00 -3,480.18 33,320.00
53635 · Recycling cost
5363501 · Recycling Collection 7,533.95 9,000.00 -1,466.05 9,000.00
5363503 · Yard Waste Drop Off 5,200.00 5,200.00 0.00 5,200.00
Total 53635 · Recycling cost 12,733.95 14,200.00 -1,466.05 14,200.00
54100 · Humane Society Contract 1,230.04 800.00 430.04 1,500.00
55200 · Parks Dept. Pledge ($5.50/per) 2,778.00 3,000.00 -222.00 3,000.00
6560 · Payroll Expenses 416.19 0.00 416.19
Total Expense 274,374.32 305,113.00 -30,738.68 351,818.00
Net Ordinary Income -3,726.90 -62,417.00 58,690.10
Other Income/Expense
Other Expense
58100 · Loan Principal 5,208.34 4,942.00 266.34 21,194.05
58200 · Loan Interest 3,041.66 3,308.00 -266.34 16,055.95
Total Other Expense 8,250.00 8,250.00 0.00 37,250.00
Net Other Income -8,250.00 -8,250.00 0.00 (37,250.00)
Net Income -11,976.90 -70,667.00 58,690.10 (37,250.00)
2024 Elec�on Dates
January 17, 2024 – Village Caucus – All Purpose Lodge at Iverson Park
February 20, 2024 – Spring Primary (If Necessary)
April 2, 2024 – Spring Elec�on & Presiden�al Preference Primary
August 13, 2024 – Primary Elec�on
November 5, 2024 – General Elec�on
** Up for Re-elec�on in April of 2024
Dan Holloway
Barb Friedrich
Source: Village of Park Ridge website. First collected Oct 21, 2026.