RecordWell Data

Village Board — Agenda packet

Village of Park Ridge · Portage County · Village Board · meeting of Mar 30, 2023 · Agenda packets

Open the original document More from Village of Park Ridge

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Resolution 002.2023R VILLAGE CONTRACT FOR CONCEPTUAL AND FINANCIAL PLANNING SERVICES FOR STREET R.O.W. IMPROVEMENTS THE VILLAGE BOARD OF THE VILLAGE OF PARK RIDGE DOES RESOLVE AS FOLLOWS: WHEREAS, the Village Board of Trustees formally adopted a Strategic Plan for the Village at its November 14, 2022 meeting, and WHEREAS, within that Strategic Plan, goal number 1(b) calls for the Village to “complete a study and/or conceptual plan detailing the prospects for functional fire hydrants, municipal water, storm water management, street lighting, telecommunications and improved streets - with a focus on infrastructure needs, opportunities and constraints”, and WHEREAS, in its 2023 Budget approved at its November 14, 2022 meeting, the Village Board of Trustees approved funding to hire an engineering consulting firm to provide conceptual and financial planning services to help guide the Village's capital improvement decisions within the street rights-of-way, and WHEREAS, the Village approved and distributed a Request for Proposals “seeking a consultant for street and right-of-way improvements” and reviewed all submitted proposals, NOW THEREFORE BE IT RESOLVED that the Village of Park Ridge Board of Trustees hereby agrees to accept the proposal submitted by MSA Professional Services, Inc., to contract for “conceptual and financial planning services for street, water main, stormwater, and lighting infrastructure capital improvement planning and estimating. Passed and adopted by the Village Board of the Village of Park Ridge on this thirtieth day of March 2023. s/ ___________________________ Steve Menzel Village President s/ ___________________________ Shanna Behrend Village Clerk Attest: s/ ___________________________ Shanna Behrend Village Clerk Prepared for: Village of ParkRidge, WI March 17,2023 PROPOSALTOPROVIDE Conceptual and Financial Planning Services: Street, Watermain, Stormwater, and Lighting Infrastructure Capital Improvement Planning and Estimating T ABLEOF CONTENTS LETTEROFINTEREST > Anintroduction to ourteam and qualifications FIRMSUMMARY 1 > Anoverview ofwhoweare andwhat wedo QUALIFICATIONS > Resumesforkeypersonnel and current availability 3 > Pastsuccessful projectslikeyoursthat we’vecompleted 6 > Ourplantocompleteyour project 9 SCHEDULEOFCOSTS ANDFEES 15 > Abreakdown ofanticipated costs March 17,2023 Steve Menzel, Village President Village of ParkRidge 512Sunset Avenue Stevens Point, WI 54481 Re: Letter of Interest to Provide Conceptual and Financial Planning Services for Improvements to the Village Street Rights of Way Dear Steve, The Village of ParkRidge has an exciting, transformative few years ahead. You’ve earmarked investments in infrastructure that will change the way residents and visitors travel in the Village, improving safety, connectivity and creating more opportunities for economic development. MSA Professional Services, Inc.(MSA)iseager to use this opportunity to reintroduce ourselves and our capabilities to the Village. While MSA may be new to Park Ridge, we know you have an understanding of our staff, our commitment to technical excellence and our dedication to top-tier client service. With 380+ employees across 17offices in the Upper Midwest, we have the bench strength to serve the Village’s multifaceted needs while still providing the prompt, personalized service you expect from a firm that serves asan extension of your staff. With in-house transportation and traffic engineers, water resources engineers, urban planners, lighting designers, GISanalysts, environmental professionals and funding experts, we’re positioned to build project teams that very precisely meet the needs of each project. This range of specialties also allows usto create cohesive support teams so your design solutions aren’t developed in silos.Welook at projects holistically, and then zero in on the specific tasks at hand to deliver the greatest value per dollar. Asyour main point of contact, Iwill be responsible for connecting the Village with the right internal experts to make your projects successful. Asyou’ll see in our enclosed project experience, we have a robust resume of projects that directly correlate to the projects planned for Park Ridge. Our wide range of project experience, combined with our 50+ years of serving municipal clients, makes uswell-positioned to serveyou. Projects come and go, but relationships last. At MSA,we believe in building honest, open relationships that go beyond the project to become a trusted source of expertise and support for immediate challenges and long-term goals. If you have further questions, please do not hesitate to contact me at (715) 304-0448 or dborchardt@msa-ps.com. Sincerely, MSA Professional Services,Inc. Daniel Borchardt, PE Project Manager CLIENTEXPERIENCE Aspartofourongoingqualityassuranceprogram,weperiodically requestfeedbackfromclientsandprojectstakeholderstocreate better project outcomes for you. These easy-to-complete surveys o ffer you the opportunity to comment on several areas of our performance throughout the duration of your project, which in turn helps us adapt our processes to your unique needs. Your feedback is specific to your project, and is returned directly to the people working with you. We pledge to respond to any issues you identify as the project proceeds. To the right, you’ll find the percentage of clients who say MSA met or exceeded their expectations based on the following categories. 17 FIRM PROFILE. MSAProfessional Services, Inc. (MSA) specializes in the sustainable development of communities. We achieve this by building honest, open relationships that go beyond the project to become a trusted source of expertise and support for immediate challenges and long- term goals. Big or small, we do whatever it takes to meet each need,working to make communities stronger in the process.It’smore than aproject. It’sa commitment. MSA’s rootsreach backto the1919. Oncea ruralland surveycompany, ourfirm nowconsists ofapproximately 380engineers, architects, planners, funding experts, surveyors, GIS experts and environmental scientists. MSAexcels at helping clients identify grant and funding sources and then delivering high-quality, cost-effective solutions. ENABLING PEOPLETO POSITIVELYIMPACT THELIVESOF OTHERSSINCE1919 WE’REPROUD TO BE100% EMPLOYEE-OWNED $625+ MILLION GRANTS& LOW-INTERESTLOANS We’ve helped our clients secure to help offset the cost of infrastructure projects 33 INDUSTRY AWARDS EARNEDSINCE2017 380+ TEAMMEMBERS FIRM SUMMARY 17 OFFICE LOCATIONS 98 % ACCURACY HELPFULNESS RESPONSIVENESS SCHEDULE QUALITY 99 % 98% 98 % SCOPE &FEES 97 % 96 % 1 MSA1 MSA 2 MSA APPROACHTOPLANNING, ORGANIZINGAND MANAGEMENT OF PROJECTS As a full-service consulting firm, MSA’s client service approach is simple; we strive to be our client’s trusted partner. We understand thatParkRidge’sneedforourservicesmayebbandflow.Attimes, you may require a dedicated project team spending hundreds of hours to bring a complicated project from concept to completion. Atothertimes,wemayjustneedtostayintouchtomakesureyour planning, engineering and survey needs are being met. Although your needs may vary, MSA’s commitment to your community will not waver. At any giventime, our communicationlevels with yourstaff and elected officials will becommensurate with current projectneeds. Large projects will feature kick-off meetings, plan review meetings, status update emails, andwritten monthly updates tothe Village. Small projects maybe accomplished withjust a fewemails and phone calls. Our goalis for you toalways know how weare working on behalf of your community, and what the cost of that work will be. In addition to being available upon your request, MSA also proactively communicates opportunities and identifies potential issues, so small concerns do not grow into big problems. When new funding programs are announced, MSA shares that information withyou, andreviews theprograms withyour potential projects in mind. We do the same with new regulations that have potential to impact your community. And while we are happy to share information,professional advice,and recommendations,we recognize that you are the decision makers. Communication is crucial to becoming a trusted partner, and that starts with a lead engineer who is well versed in managing a range of municipal projects and who can effectively facilitate communication amongst all vested stakeholders. Dan Borchardt has both the tools and experience to be your lead engineer. TECHNOLOGY RESOURCES: High-quality information systems are critical to our firm’s operations. MSA equips employees with the latest technology, enabling core business relationshipswithotheremployees,clients,andadditionalexternal partners through digital networks. MSA’s use of Microsoft Teams and VPN enables our staff to remain connected to their clients and projects, even when they’re on the go. When needed, we bring thattechnology toyou, toallow forvirtual meetings,dynamic presentations and real-time collaboration. Advanced video conference technology empowers our team members to interact with other MSA employees, clients, agency officials, and contractors remotely, allowing us to consistently apply the knowledge of our strongest internal experts, regardless of their location. MSA’s commitment to technology enables our professionals to provide the highest level of service possible. Technology at MSA serves a multi-tiered purpose: cutting-edge technology enhances the quality of each project we deliver, while also allowing us to work more efficiently and effectively, saving our clients money. AGENCYCOORDINATION: MSA hasmore than60 yearsof experience coordinatingwith local,state andfederal agencies.We maintain excellent relationships with WDNR, DOA and WisDOT staff to assure we’re setting our clients’projects up for success. QUALITY ASSURANCEAND QUALITY CONTROL: We implement a robust quality control and quality assurance program on every project we work on. Each project is reviewed by an assigned QC Manager, and milestone reviews are part of each project’s Quality Management Plan and file. Our goals are to always provide quality design documents, avoid schedule delays, and minimize design issues during construction. INNOVATION: Ourlocalstrength,knowledge,andrelationships, coupled withour outstandingtechnical expertise,have allowedus to go anywhere tomeet our clients’ needsin more creative and personalized ways. Peoriadepends on itsconsultants to bringsmart solutions to each challenge faced. We suggest that an effective strategy for consulting servicesis to achieve “thebest of two worlds” byintegratinglocalprojectmanagementwithaward-winningtechnical experts. Inline with evidence-informedpractices in engineeringand management,ourproposedprojectapproachisdesignedwiththeaim of enhancing thequality of professionalservices with astreamlined experience and depth of technical expertise. CONSISTENCYIS KEY:Havingaclear,conciseandconsistent approach to engineering, planning and funding will be key to the success of each project for the Village. By partnering with MSA, you’ll receive just that. We know that consistency improves efficiency during the planning, design and review of construction processes. This also builds a sense of trust and comfortability with an individual or company — which cannot necessarily be explained on paperor quantified —but is crucialwhen it comesto community development. QUALIFICATIONS DanBorchardt, PE PROJECT MANAGER & VILLAGE’SSINGLEPOINT OF CONTACT 3 Dan will be responsible for project management and serve as the Village’s main point of contact for all projects. Hewill also act as the Village’s part-time engineer. Dan brings extensiveexperience asa design engineerand field engineer on several trail and transportation projects that have included utility coordination and complex construction staging. He has amplified his practical knowledge and leadership qualities necessary to help a project reach completion. His responsibilities have included managing, design and project development. This experience ensures all aspects of a project are thoroughly encompassed. Dan’s education, proficient skill level and experience in transportation and municipal engineering are a valuable contribution to our project team. Dan has coordinated with the railroad on several projects for utility, trail, and roadway crossings. Dan is experienced with trail and bridge structure feasibility studies and river hydrology modeling and has experience with trail layout and minimizing wetland impacts. SELECTEDPROJECT EXPERTISE Seven-YearCapital ImprovementPlan(CIP)2014-2020, Rothschild,WI Project manager and design engineer for process to identify, evaluate and prioritize CIP projects. Public streets and drainage, sanitary sewers and water mains projects were included in CIP process. Estimates of project cost were prepared for key municipal projects. The CIP provided a working document for the Village to budget appropriately for future projects and helped establish a means to prioritize projects accordingly. FrontageRoadDesign andConstruction Auburndale,WI Managed design and plan developmentfor a new street betweenOld US 10 through the Village and the US 10 bypass. Project site featured significant wetlands and required special roadway geometry to avoid or minimize impacts. Extensive coordination with businesses and the Village was required for this new street. SouthBironDriveReconstruction &Water DistributionImprovements,Biron, WI Project manager and design engineer for the basin and roadway cross-section layout, utility design calculations, client meetings, bidding administration, public meetings, shop drawing review and construction management. MountainViewRoad, Athens,WI Project manager for a $1.16-million rural road design including wetland permitting, stormwater pond design, culvert sizing, pavement design, signing plan and detour plan. Margaret Street and Military RoadReconstruction, Rothschild, WI Project manager for the full reconstruction of Margaret Street. The project included plat development, real estate acquisition, separated multi-use path accommodations, flood mitigation, and water and sanitary sewer utilities improvements. STH173Utilities, Nekoosa,WI Projectmanagerforthisurbanstreetandwater/sewerutilityprojectintheCityofNekoosa. This projectincluded reconstructionof watermain, sanitarysewer, stormsewer, curband gutter, sidewalk, andthe replacement oflead water services.It was fundedin part bythe Clean Water Fund Program and Safe Drinking Water Program. Sidewalk SafeRoutes toSchool/Spruce Street,Abbotsford, WI Provided design services for new sidewalks along Spruce Street (Business STH 29), newsidewalkalongFourthAvenueandcrosswalkimprovementsatseveralintersections. Work involved rail coordination and a rail crossing. Daniel Borchardt, PE,ENVSP,M.ASCE PROJECT MANAGER EDUCATION B.S.,Civil Engineering University of Wisconsin- Platteville CERTIFICATIONS Professional Engineer, WI Envision Sustainability Professional MEMBERSHIPS M. ASCE,Distinguished Membership of American Society of CivilEngineers (ASCE) AREAS OF EXPERTISE • Project Management • Project Estimating • Roadway Design • Utility Design • Construction Management • Construction Inspection • Construction Staking • Topographic Surveying MSA QUALIFICATIONS | KEYPERSONNEL MSA ChadGrundemann, PE PROJECTENGINEER Chad will serve as the lead design engineer. Chad brings extensive experience and knowledge of capital improvement conceptual planning and local street and utility design for municipalities. He is well versed in the needs of small communities and also has experience with a variety of funding programs and grants applicable to local street and utility projects. His experience includes serving as lead design and construction engineer for both urban and rural trail and park projects. Education B.S., Civil Engineering, Michigan Technological University Registration Professional Engineer, WI Selected Project Experience • Birch and DivisionStreet, Utilities, andStorm Sewer Reconstruction and RiverOutfall Improvements, Rothschild,WI • 1st Street and Monroe Street, Utilities, and Storm Sewer Improvements, Pittsville, WI • Military Rd. Street, Utilities, and Stormwater Improvements and Bioretention Basin, Rothschild, WI* • Margaret, Shorey, Reed, and Lambert Street, Utilities, and Drainage Improvements / Stormwater Ponds, Rothschild, WI • Becker, Peggy, Schmidt Street, Utilities, and Storm Sewer Reconstruction, Rothschild, WI • 7Year CapitalImprovement Planning, Rothschild,WI • WestonAve. CorridorPlanning, Weston, WI • LilacAve. CorridorPlanning, Rib Mountain,WI • BUS 51 BypassTrail Planning, Schofield,WI • RiverTrail CorridorStudy and Planning- GHT, EagleRiver, WI • 2022-2028 Capital ImprovementPlanning, Wautoma, WI • Five-Year Capital Improvement Plan, Pittsville, WI • Sandcrest, Valley View,and Green MeadowStorm Sewer Improvements and StormwaterPond Expansion, Wautoma,WI • Water St. Storm Sewer Improvements, Wautoma, WI • River St. Rehabilitation and Stormwater Ditching / Culvert Rehabilitation, Wautoma, WI • SwanAve. Rehabilitation and Drainage Improvements, Rib Mountain, WI • City Garage Parking Lot Reconstruction and Drainage Improvements, Wautoma, WI *Denotes experience prior to MSA. 4 Mark will provide lighting design services for the Village. Mark has diversified experience in electrical power, lighting, and systems related to the design of street lighting, municipal buildings, libraries, fire and EMS stations, police stations, public works garages, countyhighway garages buildings,park structures, schools, churches, and commercial projects consisting of new construction, additions, remodeling and roadway lighting. As ElectricalDesigner, heserves ascoordinator andcommunicator of the project’s lighting/electrical design in overall concept and in all parts. His prime responsibility of coordinating with the Lead Engineer for all phases of design, preparation of construction documents, and construction. His experience extends for 43 years in the building design industry. Education A.S., Electrical Engineering Technology, Purdue University Registration Designer of Engineering Services - Electrical, WI Selected Project Experience • RugarAvenue Roadway Lighting, Janesville, WI • RockwellAvenue Roadway Lighting, FortAtkinson, WI • STH 182 Lighting Design, Park Falls, WI • WIS 42 (LincolnAvenue) Electrical and Lighting Design, Two Rivers, WI • 2020 5th Avenue: Superior Street to Lincoln Street Roadway Lighting,Antigo, WI • 2020 Trout Road Lighting Design, Wisconsin Dells, WI • 2022 Fitzgerald Road Lighting Design, Wisconsin Dells, WI • 2019 West MilwaukeeStreet Roadway Lighting,Janesville, WI • 2021 East Milwaukee Street Lighting, Janesville, WI • N. SecondAvenue Lighting, Park Falls, WI • LED Roadway Lighting Conversion Feasibility Study and Design, Stevens Point and Shawano, WI • USH 2 from Superior, WI to Duluth, MN, WisDOT and MnDOT • 2023 US 33 Roadway Lighting, West Baraboo, WI • 2022 Military Roadway Lighting, Fond du Lac, WI • 2022 STH 82 Roadway Lighting, Mauston, WI Mark Porlier,DES LIGHTING DESIGNSPECIALIST QUALIFICATIONS | KEYPERSONNEL 5MSA QUALIFICATIONS | KEYPERSONNEL Eric leads MSA’s water resources team. He has been involved in a wide range of stormwater management activities, including drainage design, flood reduction, water quality improvements, and stream, lake and wetland restoration. He has completed stormwater planning and design projects throughout the U.S., including Iowa, Wisconsin, Minnesota, Illinois, Ohio, Pennsylvania, Georgia and Texas. Eric is expert in the use of all the common hydrologic, hydraulic and water quality models used for stormwater design, including HEC-1, HEC-HMS, TR-20, TR-55, HEC-2, HEC-RAS, XP-SWMM, P8, WinSLAMM, MOUSE, and MIKEURBAN. He is very proficient in ArcMap and uses GIS daily in his regular duties. Education B.S. and M.S., Civil Engineering, University of Minnesota Registration |Certification Professional Engineer, WI, IA, MN, IL ASFPM Certified Floodplain Manager Selected Project Experience • StormwaterManagementPlan,RibMountain,WI • StormwaterMasterPlan,RibMountain,WI • MargaretStreet,Rothschild,WI • MountViewLaneReconstruction,Athens,WI • NeighborhoodDrainageandFloodReductionStudies,SunPrairie,WI PoliceStation,Davenport,IA Served as stormwater design engineer for the development of a new police station building. Final design was LEED-certified and received points forsustainable stormwatermanagement infrastructureby reducing peak rates and volumes of runoff by 25 percent by incorporating green roofs and sidewalk biofiltration devices. SouthernWisconsinRegionalAirport–DistributedGreenInfrastructure Assessment,Janesville,WI Served as project manager and lead engineer on the evaluationof green infrastructure practices on the Southern Wisconsin Regional Airport in support of a credit application from the City’s stormwater utility. GreenAlleyPerformanceStudy,Dubuque,IA Servedasprojectengineertoquantifytheeffectsofplannedreconstruction of 17miles ofdowntown alleysusing permeablepavements. Developeda one-off calculationtool toevaluate eachgreen alleysystem, incorporating variability of watershed development densities; alley length, width, and depths; different storage layers with different porosities; the presence or absence of drain tiles; and varying infiltration capacities of native soils. EricThompson,PE STORMWATERENGINEER WORKLOAD& AVAILABILITY MSA submits this SOQ with the commitment that ourstaff willbe availableto accomplishthe work insequence andaccording toestablished timetables.Ourteamhasthecapacitytohandle this project and provideexcellent service. MSA has a strong record of providing innovative and effective solutions for our clients. Based on our honest commitment to our clients, we immediately establish accountability of all personnel involved in a project’s completion. When our team starts a project, we analyze the proposed schedule and compare it to each team member’s potential workload. This approach helps to foster a team mentality and results in personal accountability of all team members involved. 6 MSA QUALIFICATIONS |WISDOT PROJECTEXPERIENCE FIRM’SSPECIFIC ABILITIES&EXPERTISE MUNICIPAL EXPERIENCE MSAis home toa widevariety ofskilled technicalteam members. In addition to our municipal, environmental, GIS and transportation engineers, our local o ffices house registered land surveyors and a deep bench of field technicians. These services are further complemented by the support of our 16 additional offices, including a full division of dedicated funding staff, architects, landscape architects and planners. Weunderstand thatyour projectsmay sometimesrequire the attention, knowledge, and manpower of disciplinary experts located elsewhere in MSA’s organization. In such instances, your dedicated MSA client liaison will act as the conduit between your community and MSA’s network of experts. STORMWATER EXPERIENCE In 2002, MSA recognized a need for a dedicated team of water resources specialists to deal with the increasing number of stormwater, flooding, drainage, and water quality issues that our clients are facing. Our water resources team has completed more than two dozen municipalstormwatermasterplansinthepast15years.Inaddition, our water resources team has prepared hundreds of designs for stormwater management facilities, delineated floodplain boundaries for hundreds of miles of streams, and routinely works with communities on the development and implementation of stormwater management ordinances. Our water resources team has developed a reputation for their passion and commitment to excellence, and forms the core of MSA’s Stormwater Community of Practice (CoP), which includes another 13 professionals outside of our water resources team. LOCAL ROADSIMPROVEMENT PROGRAM (LRIP) EXPERIENCE MSAisanestablishedleaderindeliveringprojectsthat are funded by the Local Roads Improvement Program (LRIP) and experienced in following WisDOT design methodologies, ranging from local road rehabilitation projects to larger-scale roadway reconstruction projects. The proposed project team, in particular, has played a role in many road projects that have been successfully completed through the LRIP program. In fact: • In the past five years, MSA’s project team has completed more than 30ruralroadwayimprovementprojects . • In the past seven years, MSA’s Marshfield project team alone has completed morethan15LocalRoadImprovement Program(LRIP)projects following the required WisDOT eligibility standards. • MSAistheleadingfirminWisconsintocompletethe mostLRIPprojectsinthestate. • The project team is familiar with designing projects to Trans Code 204 Standards. • MSAhas completed similar reconstruction projects with similar project sites, schedules, and environmental constraints. HowWeHelp • Planning and design for: • Urban and rural roadways • Water distribution systems • Sanitary and storm sewer conveyance systems • Recreational trails, parks and boat launches • Trenchless methods for utility projects • Site and land development civil design services • Construction services • Municipal engineer, zoning administration and building inspection • Street Lighting HowWeHelp • Sustainable Site Design • Master Planning • Hydraulic Design • Floodplain Studies • Stormwater Utilities • Educational Outreach • Water Resource Restoration • Dam Inspections, Design and Repair EXPERIENCE& FAMILIARITY WITH WISDOT MSA is an established leader in delivering projects following WisDOT design methodologies, ranging from Local Program bridge rehabilitationsto large-scaleroadway rehabilitationprojects. We are actively involved with the WCHA and ACEC-Wisconsin Transportation Committee, helping to establish standards and focus on improvements to our transportation infrastructure across the state of Wisconsin. This leadership role helps to keep MSA surveyors at the forefront of new standards, requirements, and innovations. The leadership mentality continues through to each project and enhances the experience we provide. MSA has been under a survey master contract with WisDOT for morethaneightyears.Throughoutthistime,MSAstaffhaveutilized WisDOT structuresfor numerouscontrol, propertyand topographic surveys. MSA utilizes a WisDOT CADD platform to conform with WisDOT standards and deliverables. The team members featured within this proposal have specific experience with providing all of the services identified in the RFP for federally funded WisDOT TAP projects and have proven themselves through years of workwith similar communities and on similar projects. FUNDING SERVICES We turnevery stonein orderto findboth publicand privatesources to help you fund your project. We know the ins and outs of a wide variety of programs to help you maximize funding sources, manage timelines, and take care of the details to satisfy the fund requirements. With MSA’s support, you can complete the projects you must, and deliver more of the projects you want, all while getting closer to the balanced, sustainable community you’ve always envisioned. We understand that the Village of Park Ridge seeks a firm to identify grant opportunities related to the Climate Action Plan implementation and to solicit and manage grants as needed for the Planning Department on an ongoing basis. MSA’s team of in- house funding experts actively maintains a database of hundreds of funding sources and programs ranging from services related to public works (infrastructure, utilities, community facilities), roadways, trails, land development, remediation and blight elimination, parks and recreation, and housing, to Tax Increment Districts, public safety, private sources and many more. EXPERIENCEWITH GRANT-FUNDED PROGRAMS Making the necessary upgrades toyour community’s infrastructure is often costly and can put stress on your long-term planning efforts. At MSA, we are here to help take that burden off of your shoulders. Fornearly40 years,MSA’s teamof in-housefunding specialistshave workedto putour client’sneeds andinterests first. We’ve been onthe community’sside offunding projectsand understand thecomplexities ofproject funding.Our long-standing relationships with agencies allowsus to position yourprojects to be more successful. Ourteamhashelpedsecure$625+million and counting in grant funding and low-interest loans for our clients.And with the historic investments that will come with the Bipartisan Infrastructure Law distributions, our team is well positioned to help advise the Village on how to optimize projects for funding. MAXIMIZING FUNDS MSAhelps your communityexplore fundingoptions thatgo beyond traditional public sources. Our dedicated funding specialists bring to thetable abroad knowledgebase ofpublic fundingsources, and are resourceful when it comes to identifying private, non-profit and othersourcesoffunding.Financingmethodsandprogramssuchas tax incremental financing (TIF), business districts, and local, state and federal grants and loans can be packagedwith community resources to complete the must-do projects as well as create or enhance parks, recreational facilities, libraries and other projects that improve the fabric of your community. We help you strategize by combining our knowledge of a variety of funding sources with our expertisein bundlingthem togetherto helpkeep yourcosts low. COMMUNITY DEVELOPMENT BLOCKGRANT MSA has extensive experience with the CDBG program. Since 1977, MSA has secured more than $120 million in CDBG funding for our client communities. These have included projects that incorporate improvements to public facilities for economic development (PFED), housing and emergency assistance. In the last five years alone, we’ve helped 44 Wisconsin communities secure $41.2 million in CDBG funding. PUBLIC ENGAGEMENT From consulting on special assessments to creating the case for support and leading crucial conversations, our public engagement skills and capabilities go well beyond what you’d find from most engineering and planning partners. 7MSA QUALIFICATIONS |PROJECT EXPERIENCE UNIVERSITYOF WISCONSIN- STEVENSPOINT STEAM DAYS MSAparticipated in two STEAMoutreach events at UW-Stevens Point involving 712 middle-school students who were exposed to a variety of STEAM activities and career paths. Events run by AET and MSA employees included making edible asphalt cookies and designing stormwater filters. The problem of runoff was explained along with how filters assist in cleaning both stormwater and drinking water. MUNICIPAL PLANNINGSTUDIES PROJECTS 8 MSA PROJECT EXPERIENCE GENERALSERVICES PineCity,MN MSA has been providing Pine City, Minnesota, with on-call planning and engineering services. Our services to Pine City have included a parks inventory and assessment, staff reports and reviews for zoning applications and updated ordinances for the City. GENERALSERVICES OakGrove, MN MSA provides engineering and planning services to the City of Oak Grove. MSA wrote the 2040 Comprehensive Plan, and has assisted withimplementation ofthe planand itspolicies. Theplan provided the City of Oak Grove a unique approach to growthand development that fits the City’s goals and Metropolitan Council guidelines. MSAalso provides on-call planning services. PLANNING SERVICES FlorenceTownship,MN MSA’s Planning + Design Studio provides planning services to Florence Township on an as-needed basis. This ranges from all types of zoning application reviewand reporting to attendance at Town Board of Supervisors and Planning Commission meetings. GENERALSERVICES Somerset,WI MSA’s Planning + Design Studio provides planning services to Somerset, Wisconsin, on an as-needed basis. This ranges from all types of zoning application review and reporting to land use planning, as well as attendance at City Council and Planning Commission meetings as requested by the City. SEVEN-YEARCAPITAL IMPROVEMENTPLAN Rothschild,WI MSA prepared the Village of Rothschild’s Seven-Year Capital Improvement Plan (CIP) 2014-2020 for three primary public infrastructure components: • Public Streets, Sidewalks and Drainage Improvements. • Public Utility Improvements (Water System and Sanitary Sewer System). • Pavilion Marketplace Redevelopment and Pavilion Park Master Plan Improvements. QUALIFICATIONS |PROJECT SCOPE 9MSA PROJECTSCOPEOFSERVICES Communities today are faced with the difficult task of allocating limited resources among a seemingly unlimited number of demands and needs for public services. In many instances, local officials must determine the merits of one project over another without thebenefit ofcomparison, whichmay resultin misjudgment and further limit the community’s ability to act precisely on major budget allocationdecisions. One methodavailable tolocal unitsof government tohelp manageand systematizethe budgetallocation process is a Capital Improvement Program. Capital Improvement Programming (CIP) is simply an ongoing, systematic approach to identify, schedule, and efficiently allocate publicdollarstoneededcapitalprojects. Typically,aCIPschedules needed village projects over a period of five years. Projects, including cost estimates and funding sources, are assigned a date for completion based on community needs and revenues. Each year the program is updated and extended one year to stay responsible to the community’s changing needs. A CIP will help eliminate “crisis” or reactive financial management actions. A carefully developed CIP allows a community to anticipate its facility needs and to schedule improvements according to project needs and local financial capabilities. The CIP process o ffers several additional benefits to a community: 1. Aids in the task of effectively allocating limited resources among a seemingly unlimited number of demands and needs for public service; 2. Improves communications and cooperation among various interests in the community; 3. Provides continuity in financial decisions by linking long- term planning to the programming and budgeting of major projects; 4. Stabilizes local tax rates by more effectively relating expenditures to financial capacity in a given time frame; 5. Improves local ability to use state and federal grant-in-aid programs. THECIPPROCESS While the process may vary from community to community, a typical CIP procedure will include the following steps: A. Analyze Community Facility Needs B. Prepare Project Descriptions C. Estimate Project Costs D. Analyze Fiscal Capacity E. Set Project Priorities F. Develop andAdopt CIP G. Update CIPAnnually 1. Analyze Community Facility Needs -Acommunity begins by analyzing its community facilities and the services it provides with an emphasis on its adequacy to serve the people and identify future capital improvement needs. The analysis will typically include Village facilities such as public water and sewer systems, streets and sidewalks, Village protection facilities, recreational facilities, and certain economic development-related interests of the community. 2. Prepare Project Descriptions -After determining the need for capital improvements, it is necessary to collect details on the project so that its implementation priority can be accurately and equitably assigned. Cost estimates, project schedule, locations, and potential funding sources are listed for each project. 3. Estimate Project Costs: Prepare planning level conceptual estimates that are street specific accounting for public utilities, roadway characteristics and includes inflationary values for the anticipated year of construction. MSAwill provide the resolution to the Village board to finalize and adopt the CIP. 4. Analyze Fiscal Capacity - The next step is to analyze the community’s financial capacity to fund capital improvements. The financial analyses examine projected operating revenues and expenses for each year of the programming period. The amount of financing available for capital projects equals the surplus of projected operating revenues over expenditures. The analysis must also consider debt servicing as an alternate form of financing. 5. Set Project Priorities - Since a community will often identify more projects than can be funded, priorities must be established. By doing so, priorities can be established so that limited financial resources are allocated efficiently. To accomplish this task, criteria are set to provide some objective standards in establishing priorities. 6. Develop andAdopt CIP - The final CIP combines the individual project descriptions, priorities, and financial analyses into a recommended schedule of capital projects. Upon general consensus of local officials, the CIPshould be adopted by resolution supporting the recommended program. 7. Implementation and Updating - It should be emphasized that the CIP is a flexible and dynamic document that is updated annually to reflect changing needs and new priorities. Each year the community will identify new projects, monitor fiscal capacity and set new priorities for the upcoming year. Through annual review and updating, the CIP will reflect the most current goals and priorities of the community. VILLAGEOFPARK RIDGE’SCAPITAL IMPROVEMENTPLAN The Village of Park Ridge’s Capital Improvement Plan will be prepared to determine the need for future capital improvements in the Village over a five-year period of time. The plan identifies anticipated capital improvements, potential funding sources, and ranks the relative priority for such improvements over the five-year period. The capital improvements will be presented by the Village Public Works Department and include projects pertaining to water, sewer, streets, and Village aesthetics. Only capital expenditures in excess of $20,000 will be outlined. The Village is currently seeking areferendum from the residents to increase funding for infrastructure. The sanitary sewer is primarily lined, but the Village will review the need for current televising and provide up-to-date knowledge of the system for MSA to review and prioritization recommendation. The Village feels that the WISLR data is not current and they would like to have it updated as part of this planning process, which will be necessary to apply for LRIP grant funding. The Village is looking to replace the entire lighting system of about 40 poles — all wire and lights — within the Village and seeks a phased approach to align with street work and adjacent areas. The Village would like to maintain ownership of the lightingsystem. The Villageroutinely uses DaveBushman at Bushman Electric to replace poles — (715) 340-8541 — and John Kraft — (715) 498-7700 or krafty605@charter.net — to assist with locating theelectrical wiringin thesystem. TheVillage islooking for mapping of the system,estimates for replacement andalternatives for lighting fixtures options. About 12 years ago, the Village had a functioning ditching and swale system to capture stormwater. Over time, the ditches and swales have filled in with sedimentation. The Village would like to re-establish a swale system and promote rain garden solutions (that can be maintained by residents) along newly reconstructed streets while meeting the DNR’s stormwater requirements. Currently, Park Ridge is eligible for 15% Principal Forgiveness for Safe Drinking Water Loan (SDW) and Clean Water Fund (CWF) and thisnumber canfluctuate monthlybased onDNR criteria. The Village of Park Ridge is 21.05% LMI (Low to Moderate Income) so the Village is not community wide eligible for Community Development Block Grant (CDBG) and would need to survey a service area to become eligible. SCOPEOFWORK MSAwillprepareaVillageofParkRidge5-YearCapitalImprovement Plan that prioritizes (years) and estimates about 22,160 feet (4.20 miles) ofstreet workincluding possiblefunding strategiesto meeta Village budgetfor averageyear expenditures. Estimates willfollow the FDM recommendations for collector streets and conceptual typical sections will be provided. Street work will be prioritized based on the functional classification of the roadway, PASER ratings based on WISLR and consultant review, and televising condition of sewer utilities. MSA will propose “green” stormwater solutions that meet the Village’s needs for adhering to regulatory requirements. MSA will recommend low-maintenance, energy efficient lighting solutions and phasing plans for replacement of system wiring/fixtures. 1. MSAwill prepare a 2024-2028 Capital Improvement Streets Plan including lighting, stormwater and fire protection and streets. 2. MSAwill work with the Village on a preliminary List of Capital Improvement Projects (this will be based on the “Wish List” identified with the Village). 3. Preliminary cost estimates will be prepared for five (5) newly identified projects planned between years 2024-2028. 4. MSAwill prepare a CIP map and identify projects visually including lighting, stormwater and water systems. 5. MSAwill meet three (3) times (Kick-off, Draft Review Meeting and Final Meeting with the Village) with Village officials or staff to eliminate and/or add projects, discuss prioritization, and present the plan. We will coordinate with project stakeholders such as the City of Stevens Point Public Utilities Department’s Joel Lemke, Stevens Point Fire Department’s J.B. Moody, and Scott Beduhn with the City of Stevens Point Engineering. MSAwill also coordinate with the PSC to understand what they would allow for fire protection in the Village for fire protection with or without hookups and the potential rates associated with hookups. The ISO rating for Park Ridge was rated a ‘4’ and the Stevens Point Fire Chief is seeking to improve it to a ‘2’ with improved fire protection to match the rest of the service area. Based on discussion with the fire chief, he stated that the biggest need for fire protection is in the SE corner of the Village and about 16 properties north of Hillcrest, where he would like to see an 8-inch watermain with 6-inch hydrant looped between Ridgewood Drive and Hillcrest Drive. The fire department 10 MSA QUALIFICATIONS |PROJECT SCOPE QUALIFICATIONS |PROJECT SCOPE|PROJECT SCHEDULE 11MSA DATE MILESTONE April 2023 MSA performs site evaluations May 2023 Meeting with the Village to discuss roadway parameters June 2023 MSA prepares preliminary project cost estimates August 2023 Draft CIP for Village review, and project prioritization, grant funding strategies, meeting with the Village September 2023 Final CIPdeliverable would like to see hydrants spaced every 500 feet to be able to meet the 3,500-gallon-per-minute ISO capacity requirements. 6. MSAwill prepare and submit a draft copy of the CIP for Village review. 7. MSAwill recommend grants, funding and strategies for projects listed in the CIP. 8. MSAwill provide the resolution to the Village board to finalize and adopt the CIP. MSA will coordinate with the Village to ensure that this list is complete and accurate. Using this list as a basis, MSAwill prepare a 5-Year Capital Improvement Plan that lists all proposed projects and includes information on prioritization, cost, and scheduling. Once MSAand the Village have solidified the list, MSAwill provide a matrix of possible funding sources. DELIVERABLES MSAwill provide the Village of ParkRidge with two (2) hard copies of theCIP plan,a PDFand Word/Excelversion ofthe final,adopted CIP. • The Village will be responsible for confirming its “Wish List” of projects, as well as applicable plans, studies and existing cost estimates. • The Village will be responsible for printing and dispensing the draft copy of the CIP for review. • The Village will be responsible for collecting feedback after the draft review and sending it to MSA. • MSAwill take on one or more of these responsibilities if requested and funded by the Village. PROJECTSCHEDULE LIMITS PROJECT FUNCTIONAL CLASSIFICATION FROM TO LENGTH (FT) ANTICIPATED CONSTRUCTION YR. 1 Ridgewood Dr. Collector Dixon St. (Village Limits) Greenbriar Ave. 1,300 TBD 2 Hillcrest Dr. Collector Jefferson St. (Village Limits) SunriseAve. 1,700 TBD 3 Greenbriar Ave. Collector (AADT340) Ridgewood Dr. Park Ridge Drive (STH66) 2,600 TBD 4 Hazelwood Dr. Local Sunset Ave. Greenbriar Ave. 1,130 TBD 5 Maplewood Dr. Local Sunset Ave. SunriseAve 1,450 TBD 6 Oakcrest Dr. Local Sunset Ave. Greenbriar Ave. 1,130 TBD 7 Woodlawn Dr. Local Sunset Ave. Greenbriar Ave. 960 TBD 8 Ferndale Dr. Local Sunset Ave. SunriseAve. 1,280 TBD 9 Crestwood Dr. Local Sunset Ave. Greenbriar Ave. 960 TBD 10 Sunset Ave. Local Ridgewood Dr. Hillcrest Dr. 1,270 TBD Hillcrest Dr. Park Ridge Drive (STH66) 1,280 TBD 11 Fieldcrest Ave. Local Ridgewood Dr Park Ridge Drive (STH66) 2,550 TBD 12 Linwood Ave. Local Ridgewood Dr Park Ridge Drive (STH66) 2,550 TBD 13 Leroy Street Local Maplewood Dr. Park Ridge Drive (STH66) 2,000 TBD 14 Watermain Improvement N/A TBD TBD TBD TBD 15 Stormwater Improvements N/A TBD TBD TBD TBD 16 Lighting Im- provements N/A TBD TBD TBD TBD CIPANALYSIS: POTENTIALSTREETPROJECTSFOR5-YEAR CIPPLANNING QUALIFICATIONS |PROJECT SCOPE 12 MSA LRIP,MSID, ANDTRIDPROJECT EXPERIENCELIST PROJECT LOCATION PROJECT DATE Weston AveReconstruction ( $733,463 LRIPAwarded) Village of Rothschild and Weston Joint Application 2024 Monarch and Jasper Streets ($240,000 LRIPAwarded) City of Stratford, WI 2024 Lilac Avenue ($1,133,262LRIPAwarded) Town of Rib Mountain, WI 2024 16th Avenue ($332,900 LRIPAwarded) City of Wautoma, WI 2023 Burma Road TRIDand Spring Brook Road Rehabilitation Town of Mosinee,WI 2022 W.Miller Street LRIPApplication City of Greenwood, WI 2021 Old Highway B Town of Springvale,WI 2021 St.Wenceslaus Street LRIP-D City ofRipon, WI 2021 Weston Avenue Reconstruction Planning Village of Weston/ Rothschild, WI 2021 ECougar Drive / Bobcat Street Village of Oakdale, WI 2019 Ember Drive LRIPSurvey Project between 16thDrive and 17thDrive Town ofQuincy, WI 2019 2019 LRIPStaking Assistance Village of Kendall, WI 2019 Plum LakeDrive Eng. Certification LRIP Town of Plum Lake,WI 2018 Bo Di Lac Drive TRIDProject Town of Minocqua, WI 2018 Bond and Burnett Street MSID - 2019 City of Eagle River,WI 2018 Main Street Construction Village of Boyceville, WI 2017 Hancock Downtown Revitalization Village of Hancock, WI 2016 Ladysmith - 8th & 9th Street Construction City of Ladysmith, WI 2014 MSAhasalonghistoryofworkingonboththeapplicationanddesign side of the Local Roads Improvement Program (LRIP). After the application has been submittedand approved, our roadwaydesign teams become involved. To meet the requirements of the funding, the project must follow the WisDOT process for design, letting and construction. Withour teamof morethan 60engineers dedicatedto the WisDOT process, we are well suited and experienced in every type of project that utilizes LRIP funding. In just the last few years, the followingprojects weredesigned byMSAutilizing LRIP funding. QUALIFICATIONS |LRIPMSID AND TRID PROJECT EXPERIENCE 13MSA QUALIFICATIONS |CIPPROJECT EXPERIENCE 14 MSA PROJECT |LOCATION PROJECT DATE Lake Delton, WI - 2017General Services 2017 Barron, WI - Capital Improvement Plan 2017 Port Byron, IL- 2019-2024 Capital Improvement & Budget Implementation Plan 2017 Rothschild, WI - 2018-2024 CIP Updates 2017 Arcadis U.S.,Inc.- Hilliard, CIPT-84 Cosgray Road Improvements 2017 Sumner, IA- Capital Improvement Planning 2017 Lake Delton, WI - 2018 GeneralServices 2018 Stoughton, WI - GISServices 2022 2018 Barron, WI - CIPUpdate Assistance 2018 Forest County Potawatomi Community Stone Lake and Carter - Public Water Supply and Distribution System 2018 Lake Delton, WI - 2019 GeneralServices 2019 Janesville, IA- Capital Improvement Plan 2019 Lexington, MN - CIP Water System 2019 Merrillan, WI - Capital Improvement Plan 2019 Dorchester, WI - Capital Improvement Plan 2019 Cleveland, WI - 2020 CIP 2019 Elroy,WI - 2019CIPUpdate 2019 Grafton, WI - WWTFCIPPlanning 2019 Lake Delton, WI - 2020 General Services 2020 Urbandale, IA - Stormwater Drainage Study 2020 Suring, WI - Capital Improvement Plan 2020 Arena, WI - CIPUpdate 2020 Springville, IA - Strategic/CIP 2020 Eleva, WI - 2021CDBG-PF Application 2021 Lake Delton, WI - 2021General Services 2021 Auburndale, WI - CIPUpdate 2021 Riverdale,IA - BelmontRoad Urban RenewalPlan 2021 Mosinee, WI - Abbreviated CIP 2021 Brodhead, WI - CIPPlanning & UserRate Analysis 2021 Wautoma, WI - 2022-2028 CIP 2021 Reedsburg Utility Commission, WI- CIPEstimates 2022-2025 2021 RECENTCIPPROJECT EXPERIENCELIST PROJECT |LOCATION PROJECT DATE Lake Delton, WI - 2022 General Services 2022 Tigerton, WI - Wastewater Facility Plan 2022 Duluth North ShoreSanitary District,MN - 5-year CIP 2022 Luck, WI - CIPAssistance 2021 2022 Monona, WI - PhVSanitary Sewer I/I GIS 2022 Rothschild, WI - 2022-2029 CIPUpdate 2022 Waupun Municipal Well & Pump, WI - Yard Expansion Project 2022 Carlock, IL- Strategic Plan and CIP 2022 Story City, IA- CIPPConstruction Permit 2022 Corydon, IA- Transportation CIP Update 2022 Ripon, WI - GISServices 2023 2022 Lake Delton, WI - 2023 General Services 2023 Bluffview Sanitary District CIPDevelopment 2023 Eureka, IL- CIP,CMOM and Street Analysis 2023 15MSA COSTSANDFEES LumpSumFee$23,400 Pavementcores: $2,900 (Village to contract directly with AET) NOTE: All lump sum costs include travel time and equipment costs. We are available to begin work on this project immediately upon your approval and look forward to assisting the Village of Park Ridge. COSTSAND FEES

Source: Village of Park Ridge website. First collected Oct 21, 2026.