Resolution 002.2023R
VILLAGE CONTRACT FOR CONCEPTUAL AND
FINANCIAL PLANNING SERVICES FOR STREET R.O.W.
IMPROVEMENTS
THE VILLAGE BOARD OF THE VILLAGE OF PARK RIDGE DOES RESOLVE AS FOLLOWS:
WHEREAS, the Village Board of Trustees formally adopted a Strategic Plan for
the Village at its November 14, 2022 meeting, and
WHEREAS, within that Strategic Plan, goal number 1(b) calls for the Village to
“complete a study and/or conceptual plan detailing the prospects for functional fire
hydrants, municipal water, storm water management, street lighting, telecommunications
and improved streets - with a focus on infrastructure needs, opportunities and
constraints”, and
WHEREAS, in its 2023 Budget approved at its November 14, 2022 meeting, the
Village Board of Trustees approved funding to hire an engineering consulting firm to
provide conceptual and financial planning services to help guide the Village's capital
improvement decisions within the street rights-of-way, and
WHEREAS, the Village approved and distributed a Request for Proposals
“seeking a consultant for street and right-of-way improvements” and reviewed all
submitted proposals,
NOW THEREFORE BE IT RESOLVED that the Village of Park Ridge Board of
Trustees hereby agrees to accept the proposal submitted by MSA Professional Services,
Inc., to contract for “conceptual and financial planning services for street, water main,
stormwater, and lighting infrastructure capital improvement planning and estimating.
Passed and adopted by the Village Board of the Village of Park Ridge on this thirtieth
day of March 2023.
s/ ___________________________
Steve Menzel
Village President
s/ ___________________________
Shanna Behrend
Village Clerk
Attest: s/ ___________________________
Shanna Behrend
Village Clerk
Prepared for:
Village of ParkRidge, WI
March 17,2023
PROPOSALTOPROVIDE
Conceptual and Financial Planning Services:
Street, Watermain, Stormwater, and Lighting Infrastructure
Capital Improvement Planning and Estimating
T ABLEOF CONTENTS
LETTEROFINTEREST
> Anintroduction to ourteam and qualifications
FIRMSUMMARY 1
> Anoverview ofwhoweare andwhat wedo
QUALIFICATIONS
> Resumesforkeypersonnel and current availability 3
> Pastsuccessful projectslikeyoursthat we’vecompleted 6
> Ourplantocompleteyour project 9
SCHEDULEOFCOSTS ANDFEES 15
> Abreakdown ofanticipated costs
March 17,2023
Steve Menzel, Village President
Village of ParkRidge
512Sunset Avenue
Stevens Point, WI 54481
Re: Letter of Interest to Provide Conceptual and Financial Planning Services for Improvements to the Village Street
Rights of Way
Dear Steve,
The Village of ParkRidge has an exciting, transformative few years ahead. You’ve earmarked investments in infrastructure
that will change the way residents and visitors travel in the Village, improving safety, connectivity and creating more
opportunities for economic development. MSA Professional Services, Inc.(MSA)iseager to use this opportunity to
reintroduce ourselves and our capabilities to the Village.
While MSA may be new to Park Ridge, we know you have an understanding of our staff, our commitment to technical
excellence and our dedication to top-tier client service. With 380+ employees across 17offices in the Upper Midwest, we
have the bench strength to serve the Village’s multifaceted needs while still providing the prompt, personalized service
you expect from a firm that serves asan extension of your staff. With in-house transportation and traffic engineers, water
resources engineers, urban planners, lighting designers, GISanalysts, environmental professionals and funding experts,
we’re positioned to build project teams that very precisely meet the needs of each project. This range of specialties
also allows usto create cohesive support teams so your design solutions aren’t developed in silos.Welook at projects
holistically, and then zero in on the specific tasks at hand to deliver the greatest value per dollar.
Asyour main point of contact, Iwill be responsible for connecting the Village with the right internal experts to make your
projects successful.
Asyou’ll see in our enclosed project experience, we have a robust resume of projects that directly correlate to the
projects planned for Park Ridge. Our wide range of project experience, combined with our 50+ years of serving municipal
clients, makes uswell-positioned to serveyou. Projects come and go, but relationships last. At MSA,we believe in building
honest, open relationships that go beyond the project to become a trusted source of expertise and support for immediate
challenges and long-term goals. If you have further questions, please do not hesitate to contact me at (715) 304-0448 or
dborchardt@msa-ps.com.
Sincerely,
MSA Professional Services,Inc.
Daniel Borchardt, PE
Project Manager
CLIENTEXPERIENCE
Aspartofourongoingqualityassuranceprogram,weperiodically
requestfeedbackfromclientsandprojectstakeholderstocreate
better project outcomes for you.
These easy-to-complete surveys o ffer you the opportunity
to comment on several areas of our performance throughout
the duration of your project, which in turn helps us adapt our
processes to your unique needs. Your feedback is specific to
your project, and is returned directly to the people working with
you. We pledge to respond to any issues you identify as the
project proceeds.
To the right, you’ll find the percentage of clients who say MSA
met or exceeded their expectations based on the following
categories.
17
FIRM PROFILE.
MSAProfessional Services, Inc. (MSA) specializes in the sustainable development of communities. We achieve this by building honest,
open relationships that go beyond the project to become a trusted source of expertise and support for immediate challenges and long-
term goals. Big or small, we do whatever it takes to meet each need,working to make communities stronger in the process.It’smore
than aproject. It’sa commitment.
MSA’s rootsreach backto the1919. Oncea ruralland surveycompany, ourfirm nowconsists ofapproximately 380engineers, architects,
planners, funding experts, surveyors, GIS experts and environmental scientists. MSAexcels at helping clients identify grant and funding
sources and then delivering high-quality, cost-effective solutions.
ENABLING PEOPLETO POSITIVELYIMPACT
THELIVESOF OTHERSSINCE1919
WE’REPROUD TO BE100%
EMPLOYEE-OWNED
$625+ MILLION
GRANTS& LOW-INTERESTLOANS
We’ve helped our clients
secure to help offset the cost
of infrastructure projects
33
INDUSTRY AWARDS
EARNEDSINCE2017
380+
TEAMMEMBERS
FIRM SUMMARY
17
OFFICE
LOCATIONS
98
%
ACCURACY HELPFULNESS
RESPONSIVENESS SCHEDULE
QUALITY
99
%
98% 98
%
SCOPE &FEES
97
%
96
%
1 MSA1 MSA
2 MSA
APPROACHTOPLANNING,
ORGANIZINGAND MANAGEMENT OF
PROJECTS
As a full-service consulting firm, MSA’s client service approach is
simple; we strive to be our client’s trusted partner. We understand
thatParkRidge’sneedforourservicesmayebbandflow.Attimes,
you may require a dedicated project team spending hundreds of
hours to bring a complicated project from concept to completion.
Atothertimes,wemayjustneedtostayintouchtomakesureyour
planning, engineering and survey needs are being met. Although
your needs may vary, MSA’s commitment to your community will
not waver.
At any giventime, our communicationlevels with yourstaff and
elected officials will becommensurate with current projectneeds.
Large projects will feature kick-off meetings, plan review meetings,
status update emails, andwritten monthly updates tothe Village.
Small projects maybe accomplished withjust a fewemails and
phone calls. Our goalis for you toalways know how weare working
on behalf of your community, and what the cost of that work will be.
In addition to being available upon your request, MSA also
proactively communicates opportunities and identifies potential
issues, so small concerns do not grow into big problems.
When new funding programs are announced, MSA shares that
information withyou, andreviews theprograms withyour potential
projects in mind. We do the same with new regulations that have
potential to impact your community. And while we are happy to
share information,professional advice,and recommendations,we
recognize that you are the decision makers.
Communication is crucial to becoming a trusted partner, and
that starts with a lead engineer who is well versed in managing
a range of municipal projects and who can effectively facilitate
communication amongst all vested stakeholders. Dan Borchardt
has both the tools and experience to be your lead engineer.
TECHNOLOGY RESOURCES: High-quality information
systems are critical to our firm’s operations. MSA equips
employees with the latest technology, enabling core business
relationshipswithotheremployees,clients,andadditionalexternal
partners through digital networks. MSA’s use of Microsoft Teams
and VPN enables our staff to remain connected to their clients
and projects, even when they’re on the go. When needed, we
bring thattechnology toyou, toallow forvirtual meetings,dynamic
presentations and real-time collaboration.
Advanced video conference technology empowers our team
members to interact with other MSA employees, clients, agency
officials, and contractors remotely, allowing us to consistently
apply the knowledge of our strongest internal experts, regardless
of their location.
MSA’s commitment to technology enables our professionals to
provide the highest level of service possible. Technology at MSA
serves a multi-tiered purpose: cutting-edge technology enhances
the quality of each project we deliver, while also allowing us to
work more efficiently and effectively, saving our clients money.
AGENCYCOORDINATION: MSA hasmore than60 yearsof
experience coordinatingwith local,state andfederal agencies.We
maintain excellent relationships with WDNR, DOA and WisDOT
staff to assure we’re setting our clients’projects up for success.
QUALITY ASSURANCEAND QUALITY CONTROL: We
implement a robust quality control and quality assurance program
on every project we work on. Each project is reviewed by an
assigned QC Manager, and milestone reviews are part of each
project’s Quality Management Plan and file. Our goals are to
always provide quality design documents, avoid schedule delays,
and minimize design issues during construction.
INNOVATION: Ourlocalstrength,knowledge,andrelationships,
coupled withour outstandingtechnical expertise,have allowedus
to go anywhere tomeet our clients’ needsin more creative and
personalized ways. Peoriadepends on itsconsultants to bringsmart
solutions to each challenge faced. We suggest that an effective
strategy for consulting servicesis to achieve “thebest of two worlds”
byintegratinglocalprojectmanagementwithaward-winningtechnical
experts. Inline with evidence-informedpractices in engineeringand
management,ourproposedprojectapproachisdesignedwiththeaim
of enhancing thequality of professionalservices with astreamlined
experience and depth of technical expertise.
CONSISTENCYIS KEY:Havingaclear,conciseandconsistent
approach to engineering, planning and funding will be key to the
success of each project for the Village. By partnering with MSA,
you’ll receive just that. We know that consistency improves
efficiency during the planning, design and review of construction
processes. This also builds a sense of trust and comfortability
with an individual or company — which cannot necessarily be
explained on paperor quantified —but is crucialwhen it comesto
community development.
QUALIFICATIONS
DanBorchardt, PE
PROJECT MANAGER &
VILLAGE’SSINGLEPOINT OF CONTACT
3
Dan will be responsible for project management and serve as the Village’s
main point of contact for all projects. Hewill also act as the Village’s part-time
engineer. Dan brings extensiveexperience asa design engineerand field engineer
on several trail and transportation projects that have included utility coordination and
complex construction staging. He has amplified his practical knowledge and leadership
qualities necessary to help a project reach completion. His responsibilities have
included managing, design and project development. This experience ensures all
aspects of a project are thoroughly encompassed. Dan’s education, proficient skill level
and experience in transportation and municipal engineering are a valuable contribution
to our project team. Dan has coordinated with the railroad on several projects for
utility, trail, and roadway crossings. Dan is experienced with trail and bridge structure
feasibility studies and river hydrology modeling and has experience with trail layout and
minimizing wetland impacts.
SELECTEDPROJECT EXPERTISE
Seven-YearCapital ImprovementPlan(CIP)2014-2020, Rothschild,WI
Project manager and design engineer for process to identify, evaluate and prioritize CIP
projects. Public streets and drainage, sanitary sewers and water mains projects were
included in CIP process. Estimates of project cost were prepared for key municipal
projects. The CIP provided a working document for the Village to budget appropriately
for future projects and helped establish a means to prioritize projects accordingly.
FrontageRoadDesign andConstruction Auburndale,WI
Managed design and plan developmentfor a new street betweenOld US 10 through the
Village and the US 10 bypass. Project site featured significant wetlands and required
special roadway geometry to avoid or minimize impacts. Extensive coordination with
businesses and the Village was required for this new street.
SouthBironDriveReconstruction &Water DistributionImprovements,Biron, WI
Project manager and design engineer for the basin and roadway cross-section layout,
utility design calculations, client meetings, bidding administration, public meetings, shop
drawing review and construction management.
MountainViewRoad, Athens,WI
Project manager for a $1.16-million rural road design including wetland permitting,
stormwater pond design, culvert sizing, pavement design, signing plan and detour plan.
Margaret Street and Military RoadReconstruction, Rothschild, WI
Project manager for the full reconstruction of Margaret Street. The project included plat
development, real estate acquisition, separated multi-use path accommodations, flood
mitigation, and water and sanitary sewer utilities improvements.
STH173Utilities, Nekoosa,WI
Projectmanagerforthisurbanstreetandwater/sewerutilityprojectintheCityofNekoosa.
This projectincluded reconstructionof watermain, sanitarysewer, stormsewer, curband
gutter, sidewalk, andthe replacement oflead water services.It was fundedin part bythe
Clean Water Fund Program and Safe Drinking Water Program.
Sidewalk SafeRoutes toSchool/Spruce Street,Abbotsford, WI
Provided design services for new sidewalks along Spruce Street (Business STH 29),
newsidewalkalongFourthAvenueandcrosswalkimprovementsatseveralintersections.
Work involved rail coordination and a rail crossing.
Daniel Borchardt, PE,ENVSP,M.ASCE
PROJECT MANAGER
EDUCATION
B.S.,Civil Engineering
University of Wisconsin-
Platteville
CERTIFICATIONS
Professional Engineer, WI
Envision Sustainability
Professional
MEMBERSHIPS
M. ASCE,Distinguished
Membership of American
Society of CivilEngineers
(ASCE)
AREAS OF EXPERTISE
• Project Management
• Project Estimating
• Roadway Design
• Utility Design
• Construction Management
• Construction Inspection
• Construction Staking
• Topographic Surveying
MSA
QUALIFICATIONS | KEYPERSONNEL
MSA
ChadGrundemann, PE
PROJECTENGINEER
Chad will serve as the lead design engineer.
Chad brings extensive experience and knowledge of capital
improvement conceptual planning and local street and utility
design for municipalities. He is well versed in the needs of small
communities and also has experience with a variety of funding
programs and grants applicable to local street and utility projects.
His experience includes serving as lead design and construction
engineer for both urban and rural trail and park projects.
Education
B.S., Civil Engineering, Michigan Technological University
Registration
Professional Engineer, WI
Selected Project Experience
• Birch and DivisionStreet, Utilities, andStorm Sewer
Reconstruction and RiverOutfall Improvements, Rothschild,WI
• 1st Street and Monroe Street, Utilities, and Storm Sewer
Improvements, Pittsville, WI
• Military Rd. Street, Utilities, and Stormwater Improvements
and Bioretention Basin, Rothschild, WI*
• Margaret, Shorey, Reed, and Lambert Street, Utilities, and
Drainage Improvements / Stormwater Ponds, Rothschild, WI
• Becker, Peggy, Schmidt Street, Utilities, and Storm Sewer
Reconstruction, Rothschild, WI
• 7Year CapitalImprovement Planning, Rothschild,WI
• WestonAve. CorridorPlanning, Weston, WI
• LilacAve. CorridorPlanning, Rib Mountain,WI
• BUS 51 BypassTrail Planning, Schofield,WI
• RiverTrail CorridorStudy and Planning- GHT, EagleRiver, WI
• 2022-2028 Capital ImprovementPlanning, Wautoma, WI
• Five-Year Capital Improvement Plan, Pittsville, WI
• Sandcrest, Valley View,and Green MeadowStorm Sewer
Improvements and StormwaterPond Expansion, Wautoma,WI
• Water St. Storm Sewer Improvements, Wautoma, WI
• River St. Rehabilitation and Stormwater Ditching / Culvert
Rehabilitation, Wautoma, WI
• SwanAve. Rehabilitation and Drainage Improvements, Rib
Mountain, WI
• City Garage Parking Lot Reconstruction and Drainage
Improvements, Wautoma, WI
*Denotes experience prior to MSA.
4
Mark will provide lighting design services for the Village.
Mark has diversified experience in electrical power, lighting,
and systems related to the design of street lighting, municipal
buildings, libraries, fire and EMS stations, police stations, public
works garages, countyhighway garages buildings,park structures,
schools, churches, and commercial projects consisting of new
construction, additions, remodeling and roadway lighting.
As ElectricalDesigner, heserves ascoordinator andcommunicator
of the project’s lighting/electrical design in overall concept and in
all parts. His prime responsibility of coordinating with the Lead
Engineer for all phases of design, preparation of construction
documents, and construction. His experience extends for 43 years
in the building design industry.
Education
A.S., Electrical Engineering Technology, Purdue University
Registration
Designer of Engineering Services - Electrical, WI
Selected Project Experience
• RugarAvenue Roadway Lighting, Janesville, WI
• RockwellAvenue Roadway Lighting, FortAtkinson, WI
• STH 182 Lighting Design, Park Falls, WI
• WIS 42 (LincolnAvenue) Electrical and Lighting Design, Two
Rivers, WI
• 2020 5th Avenue: Superior Street to Lincoln Street Roadway
Lighting,Antigo, WI
• 2020 Trout Road Lighting Design, Wisconsin Dells, WI
• 2022 Fitzgerald Road Lighting Design, Wisconsin Dells, WI
• 2019 West MilwaukeeStreet Roadway Lighting,Janesville, WI
• 2021 East Milwaukee Street Lighting, Janesville, WI
• N. SecondAvenue Lighting, Park Falls, WI
• LED Roadway Lighting Conversion Feasibility Study and
Design, Stevens Point and Shawano, WI
• USH 2 from Superior, WI to Duluth, MN, WisDOT and
MnDOT
• 2023 US 33 Roadway Lighting, West Baraboo, WI
• 2022 Military Roadway Lighting, Fond du Lac, WI
• 2022 STH 82 Roadway Lighting, Mauston, WI
Mark Porlier,DES
LIGHTING DESIGNSPECIALIST
QUALIFICATIONS | KEYPERSONNEL
5MSA
QUALIFICATIONS | KEYPERSONNEL
Eric leads MSA’s water resources team. He has been involved in a wide
range of stormwater management activities, including drainage design,
flood reduction, water quality improvements, and stream, lake and wetland
restoration. He has completed stormwater planning and design projects
throughout the U.S., including Iowa, Wisconsin, Minnesota, Illinois, Ohio,
Pennsylvania, Georgia and Texas. Eric is expert in the use of all the common
hydrologic, hydraulic and water quality models used for stormwater design,
including HEC-1, HEC-HMS, TR-20, TR-55, HEC-2, HEC-RAS, XP-SWMM,
P8, WinSLAMM, MOUSE, and MIKEURBAN. He is very proficient in ArcMap
and uses GIS daily in his regular duties.
Education
B.S. and M.S., Civil Engineering, University of Minnesota
Registration |Certification
Professional Engineer, WI, IA, MN, IL
ASFPM Certified Floodplain Manager
Selected Project Experience
• StormwaterManagementPlan,RibMountain,WI
• StormwaterMasterPlan,RibMountain,WI
• MargaretStreet,Rothschild,WI
• MountViewLaneReconstruction,Athens,WI
• NeighborhoodDrainageandFloodReductionStudies,SunPrairie,WI
PoliceStation,Davenport,IA
Served as stormwater design engineer for the development of a new
police station building. Final design was LEED-certified and received
points forsustainable stormwatermanagement infrastructureby reducing
peak rates and volumes of runoff by 25 percent by incorporating green
roofs and sidewalk biofiltration devices.
SouthernWisconsinRegionalAirport–DistributedGreenInfrastructure
Assessment,Janesville,WI
Served as project manager and lead engineer on the evaluationof green
infrastructure practices on the Southern Wisconsin Regional Airport in
support of a credit application from the City’s stormwater utility.
GreenAlleyPerformanceStudy,Dubuque,IA
Servedasprojectengineertoquantifytheeffectsofplannedreconstruction
of 17miles ofdowntown alleysusing permeablepavements. Developeda
one-off calculationtool toevaluate eachgreen alleysystem, incorporating
variability of watershed development densities; alley length, width, and
depths; different storage layers with different porosities; the presence or
absence of drain tiles; and varying infiltration capacities of native soils.
EricThompson,PE
STORMWATERENGINEER
WORKLOAD&
AVAILABILITY
MSA submits this SOQ with the commitment
that ourstaff willbe availableto accomplishthe
work insequence andaccording toestablished
timetables.Ourteamhasthecapacitytohandle
this project and provideexcellent service. MSA
has a strong record of providing innovative
and effective solutions for our clients. Based
on our honest commitment to our clients, we
immediately establish accountability of all
personnel involved in a project’s completion.
When our team starts a project, we analyze
the proposed schedule and compare it to
each team member’s potential workload. This
approach helps to foster a team mentality and
results in personal accountability of all team
members involved.
6 MSA
QUALIFICATIONS |WISDOT PROJECTEXPERIENCE
FIRM’SSPECIFIC ABILITIES&EXPERTISE
MUNICIPAL EXPERIENCE
MSAis home toa widevariety ofskilled technicalteam
members. In addition to our municipal, environmental,
GIS and transportation engineers, our local o ffices
house registered land surveyors and a deep bench of
field technicians. These services are further complemented by
the support of our 16 additional offices, including a full division
of dedicated funding staff, architects, landscape architects and
planners. Weunderstand thatyour projectsmay sometimesrequire
the attention, knowledge, and manpower of disciplinary experts
located elsewhere in MSA’s organization. In such instances, your
dedicated MSA client liaison will act as the conduit between your
community and MSA’s network of experts.
STORMWATER EXPERIENCE
In 2002, MSA recognized a need for a dedicated
team of water resources specialists to deal with the
increasing number of stormwater, flooding, drainage,
and water quality issues that our clients are facing.
Our water resources team has completed more than two dozen
municipalstormwatermasterplansinthepast15years.Inaddition,
our water resources team has prepared hundreds of designs
for stormwater management facilities, delineated floodplain
boundaries for hundreds of miles of streams, and routinely works
with communities on the development and implementation of
stormwater management ordinances.
Our water resources team has developed a reputation for their
passion and commitment to excellence, and forms the core of
MSA’s Stormwater Community of Practice (CoP), which includes
another 13 professionals outside of our water resources team.
LOCAL ROADSIMPROVEMENT PROGRAM
(LRIP) EXPERIENCE
MSAisanestablishedleaderindeliveringprojectsthat
are funded by the Local Roads Improvement Program
(LRIP) and experienced in following WisDOT design
methodologies, ranging from local road rehabilitation projects
to larger-scale roadway reconstruction projects. The proposed
project team, in particular, has played a role in many road projects
that have been successfully completed through the LRIP program.
In fact:
• In the past five years, MSA’s project team has completed
more than 30ruralroadwayimprovementprojects .
• In the past seven years, MSA’s Marshfield project team alone
has completed morethan15LocalRoadImprovement
Program(LRIP)projects following the required WisDOT
eligibility standards.
• MSAistheleadingfirminWisconsintocompletethe
mostLRIPprojectsinthestate.
• The project team is familiar with designing projects to Trans
Code 204 Standards.
• MSAhas completed similar reconstruction projects
with similar project sites, schedules, and environmental
constraints.
HowWeHelp
• Planning and design for:
• Urban and rural
roadways
• Water distribution
systems
• Sanitary and storm
sewer conveyance
systems
• Recreational trails,
parks and boat
launches
• Trenchless methods for
utility projects
• Site and land development
civil design services
• Construction services
• Municipal engineer, zoning
administration and building
inspection
• Street Lighting
HowWeHelp
• Sustainable Site Design
• Master Planning
• Hydraulic Design
• Floodplain Studies
• Stormwater Utilities
• Educational Outreach
• Water Resource
Restoration
• Dam Inspections, Design
and Repair
EXPERIENCE& FAMILIARITY WITH WISDOT
MSA is an established leader in delivering projects following
WisDOT design methodologies, ranging from Local Program
bridge rehabilitationsto large-scaleroadway rehabilitationprojects.
We are actively involved with the WCHA and ACEC-Wisconsin
Transportation Committee, helping to establish standards and
focus on improvements to our transportation infrastructure across
the state of Wisconsin. This leadership role helps to keep MSA
surveyors at the forefront of new standards, requirements, and
innovations. The leadership mentality continues through to each
project and enhances the experience we provide.
MSA has been under a survey master contract with WisDOT for
morethaneightyears.Throughoutthistime,MSAstaffhaveutilized
WisDOT structuresfor numerouscontrol, propertyand topographic
surveys. MSA utilizes a WisDOT CADD platform to conform with
WisDOT standards and deliverables.
The team members featured within this proposal have specific
experience with providing all of the services identified in the
RFP for federally funded WisDOT TAP projects and have proven
themselves through years of workwith similar communities and on
similar projects.
FUNDING SERVICES
We turnevery stonein orderto findboth publicand privatesources
to help you fund your project. We know the ins and outs of a
wide variety of programs to help you maximize funding sources,
manage timelines, and take care of the details to satisfy the fund
requirements. With MSA’s support, you can complete the projects
you must, and deliver more of the projects you want, all while
getting closer to the balanced, sustainable community you’ve
always envisioned.
We understand that the Village of Park Ridge seeks a firm to
identify grant opportunities related to the Climate Action Plan
implementation and to solicit and manage grants as needed for
the Planning Department on an ongoing basis. MSA’s team of in-
house funding experts actively maintains a database of hundreds
of funding sources and programs ranging from services related
to public works (infrastructure, utilities, community facilities),
roadways, trails, land development, remediation and blight
elimination, parks and recreation, and housing, to Tax Increment
Districts, public safety, private sources and many more.
EXPERIENCEWITH GRANT-FUNDED PROGRAMS
Making the necessary upgrades toyour community’s infrastructure
is often costly and can put stress on your long-term planning
efforts. At MSA, we are here to help take that burden off of your
shoulders. Fornearly40 years,MSA’s teamof in-housefunding
specialistshave workedto putour client’sneeds andinterests
first. We’ve been onthe community’sside offunding projectsand
understand thecomplexities ofproject funding.Our long-standing
relationships with agencies allowsus to position yourprojects to
be more successful. Ourteamhashelpedsecure$625+million
and counting in grant funding and low-interest loans for our
clients.And with the historic investments that will come with the
Bipartisan Infrastructure Law distributions, our team is well
positioned to help advise the Village on how to optimize projects
for funding.
MAXIMIZING FUNDS
MSAhelps your communityexplore fundingoptions thatgo beyond
traditional public sources. Our dedicated funding specialists bring
to thetable abroad knowledgebase ofpublic fundingsources, and
are resourceful when it comes to identifying private, non-profit and
othersourcesoffunding.Financingmethodsandprogramssuchas
tax incremental financing (TIF), business districts, and local, state
and federal grants and loans can be packagedwith community
resources to complete the must-do projects as well as create or
enhance parks, recreational facilities, libraries and other projects
that improve the fabric of your community. We help you strategize
by combining our knowledge of a variety of funding sources with
our expertisein bundlingthem togetherto helpkeep yourcosts low.
COMMUNITY DEVELOPMENT BLOCKGRANT
MSA has extensive experience with the CDBG program. Since
1977, MSA has secured more than $120 million in CDBG
funding for our client communities. These have included projects
that incorporate improvements to public facilities for economic
development (PFED), housing and emergency assistance. In the
last five years alone, we’ve helped 44 Wisconsin communities
secure $41.2 million in CDBG funding.
PUBLIC ENGAGEMENT
From consulting on special assessments to creating the case for
support and leading crucial conversations, our public engagement
skills and capabilities go well beyond what you’d find from most
engineering and planning partners.
7MSA
QUALIFICATIONS |PROJECT EXPERIENCE
UNIVERSITYOF WISCONSIN-
STEVENSPOINT STEAM DAYS
MSAparticipated in two STEAMoutreach
events at UW-Stevens Point involving
712 middle-school students who were
exposed to a variety of STEAM activities
and career paths.
Events run by AET and MSA employees
included making edible asphalt cookies
and designing stormwater filters. The
problem of runoff was explained along
with how filters assist in cleaning both
stormwater and drinking water.
MUNICIPAL PLANNINGSTUDIES PROJECTS
8 MSA
PROJECT EXPERIENCE
GENERALSERVICES
PineCity,MN
MSA has been providing Pine City, Minnesota, with on-call
planning and engineering services. Our services to Pine City
have included a parks inventory and assessment, staff reports
and reviews for zoning applications and updated ordinances for
the City.
GENERALSERVICES
OakGrove, MN
MSA provides engineering and planning services to the City of
Oak Grove. MSA wrote the 2040 Comprehensive Plan, and has
assisted withimplementation ofthe planand itspolicies. Theplan
provided the City of Oak Grove a unique approach to growthand
development that fits the City’s goals and Metropolitan Council
guidelines. MSAalso provides on-call planning services.
PLANNING SERVICES
FlorenceTownship,MN
MSA’s Planning + Design Studio provides planning services to
Florence Township on an as-needed basis. This ranges from all
types of zoning application reviewand reporting to attendance at
Town Board of Supervisors and Planning Commission meetings.
GENERALSERVICES
Somerset,WI
MSA’s Planning + Design Studio provides planning services to
Somerset, Wisconsin, on an as-needed basis. This ranges from
all types of zoning application review and reporting to land use
planning, as well as attendance at City Council and Planning
Commission meetings as requested by the City.
SEVEN-YEARCAPITAL IMPROVEMENTPLAN
Rothschild,WI
MSA prepared the Village of Rothschild’s Seven-Year Capital
Improvement Plan (CIP) 2014-2020 for three primary public
infrastructure components:
• Public Streets, Sidewalks and Drainage Improvements.
• Public Utility Improvements (Water System and Sanitary
Sewer System).
• Pavilion Marketplace Redevelopment and Pavilion Park
Master Plan Improvements.
QUALIFICATIONS |PROJECT SCOPE
9MSA
PROJECTSCOPEOFSERVICES
Communities today are faced with the difficult task of allocating
limited resources among a seemingly unlimited number of
demands and needs for public services. In many instances, local
officials must determine the merits of one project over another
without thebenefit ofcomparison, whichmay resultin misjudgment
and further limit the community’s ability to act precisely on major
budget allocationdecisions. One methodavailable tolocal unitsof
government tohelp manageand systematizethe budgetallocation
process is a Capital Improvement Program.
Capital Improvement Programming (CIP) is simply an ongoing,
systematic approach to identify, schedule, and efficiently allocate
publicdollarstoneededcapitalprojects. Typically,aCIPschedules
needed village projects over a period of five years. Projects,
including cost estimates and funding sources, are assigned a
date for completion based on community needs and revenues.
Each year the program is updated and extended one year to stay
responsible to the community’s changing needs. A CIP will help
eliminate “crisis” or reactive financial management actions.
A carefully developed CIP allows a community to anticipate its
facility needs and to schedule improvements according to project
needs and local financial capabilities. The CIP process o ffers
several additional benefits to a community:
1. Aids in the task of effectively allocating limited resources
among a seemingly unlimited number of demands and needs
for public service;
2. Improves communications and cooperation among various
interests in the community;
3. Provides continuity in financial decisions by linking long-
term planning to the programming and budgeting of major
projects;
4. Stabilizes local tax rates by more effectively relating
expenditures to financial capacity in a given time frame;
5. Improves local ability to use state and federal grant-in-aid
programs.
THECIPPROCESS
While the process may vary from community to community, a
typical CIP procedure will include the following steps:
A. Analyze Community Facility Needs
B. Prepare Project Descriptions
C. Estimate Project Costs
D. Analyze Fiscal Capacity
E. Set Project Priorities
F. Develop andAdopt CIP
G. Update CIPAnnually
1. Analyze Community Facility Needs -Acommunity begins by
analyzing its community facilities and the services it provides
with an emphasis on its adequacy to serve the people and
identify future capital improvement needs. The analysis will
typically include Village facilities such as public water and
sewer systems, streets and sidewalks, Village protection
facilities, recreational facilities, and certain economic
development-related interests of the community.
2. Prepare Project Descriptions -After determining the need for
capital improvements, it is necessary to collect details on the
project so that its implementation priority can be accurately
and equitably assigned. Cost estimates, project schedule,
locations, and potential funding sources are listed for each
project.
3. Estimate Project Costs: Prepare planning level conceptual
estimates that are street specific accounting for public
utilities, roadway characteristics and includes inflationary
values for the anticipated year of construction. MSAwill
provide the resolution to the Village board to finalize and
adopt the CIP.
4. Analyze Fiscal Capacity - The next step is to analyze the
community’s financial capacity to fund capital improvements.
The financial analyses examine projected operating revenues
and expenses for each year of the programming period. The
amount of financing available for capital projects equals the
surplus of projected operating revenues over expenditures.
The analysis must also consider debt servicing as an
alternate form of financing.
5. Set Project Priorities - Since a community will often identify
more projects than can be funded, priorities must be
established. By doing so, priorities can be established so
that limited financial resources are allocated efficiently.
To accomplish this task, criteria are set to provide some
objective standards in establishing priorities.
6. Develop andAdopt CIP - The final CIP combines the
individual project descriptions, priorities, and financial
analyses into a recommended schedule of capital projects.
Upon general consensus of local officials, the CIPshould be
adopted by resolution supporting the recommended program.
7. Implementation and Updating - It should be emphasized that
the CIP is a flexible and dynamic document that is updated
annually to reflect changing needs and new priorities. Each
year the community will identify new projects, monitor
fiscal capacity and set new priorities for the upcoming year.
Through annual review and updating, the CIP will reflect the
most current goals and priorities of the community.
VILLAGEOFPARK RIDGE’SCAPITAL
IMPROVEMENTPLAN
The Village of Park Ridge’s Capital Improvement Plan will be
prepared to determine the need for future capital improvements
in the Village over a five-year period of time. The plan identifies
anticipated capital improvements, potential funding sources, and
ranks the relative priority for such improvements over the five-year
period. The capital improvements will be presented by the Village
Public Works Department and include projects pertaining to water,
sewer, streets, and Village aesthetics. Only capital expenditures in
excess of $20,000 will be outlined.
The Village is currently seeking areferendum from the residents to
increase funding for infrastructure. The sanitary sewer is primarily
lined, but the Village will review the need for current televising and
provide up-to-date knowledge of the system for MSA to review
and prioritization recommendation. The Village feels that the
WISLR data is not current and they would like to have it updated
as part of this planning process, which will be necessary to apply
for LRIP grant funding. The Village is looking to replace the entire
lighting system of about 40 poles — all wire and lights — within
the Village and seeks a phased approach to align with street work
and adjacent areas. The Village would like to maintain ownership
of the lightingsystem. The Villageroutinely uses DaveBushman at
Bushman Electric to replace poles — (715) 340-8541 — and John
Kraft — (715) 498-7700 or krafty605@charter.net — to assist with
locating theelectrical wiringin thesystem. TheVillage islooking for
mapping of the system,estimates for replacement andalternatives
for lighting fixtures options.
About 12 years ago, the Village had a functioning ditching and
swale system to capture stormwater. Over time, the ditches and
swales have filled in with sedimentation. The Village would like to
re-establish a swale system and promote rain garden solutions
(that can be maintained by residents) along newly reconstructed
streets while meeting the DNR’s stormwater requirements.
Currently, Park Ridge is eligible for 15% Principal Forgiveness for
Safe Drinking Water Loan (SDW) and Clean Water Fund (CWF)
and thisnumber canfluctuate monthlybased onDNR criteria. The
Village of Park Ridge is 21.05% LMI (Low to Moderate Income)
so the Village is not community wide eligible for Community
Development Block Grant (CDBG) and would need to survey a
service area to become eligible.
SCOPEOFWORK
MSAwillprepareaVillageofParkRidge5-YearCapitalImprovement
Plan that prioritizes (years) and estimates about 22,160 feet (4.20
miles) ofstreet workincluding possiblefunding strategiesto meeta
Village budgetfor averageyear expenditures. Estimates willfollow
the FDM recommendations for collector streets and conceptual
typical sections will be provided. Street work will be prioritized
based on the functional classification of the roadway, PASER
ratings based on WISLR and consultant review, and televising
condition of sewer utilities. MSA will propose “green” stormwater
solutions that meet the Village’s needs for adhering to regulatory
requirements. MSA will recommend low-maintenance, energy
efficient lighting solutions and phasing plans for replacement of
system wiring/fixtures.
1. MSAwill prepare a 2024-2028 Capital Improvement Streets
Plan including lighting, stormwater and fire protection and
streets.
2. MSAwill work with the Village on a preliminary List of Capital
Improvement Projects (this will be based on the “Wish List”
identified with the Village).
3. Preliminary cost estimates will be prepared for five (5) newly
identified projects planned between years 2024-2028.
4. MSAwill prepare a CIP map and identify projects visually
including lighting, stormwater and water systems.
5. MSAwill meet three (3) times (Kick-off, Draft Review Meeting
and Final Meeting with the Village) with Village officials or
staff to eliminate and/or add projects, discuss prioritization,
and present the plan. We will coordinate with project
stakeholders such as the City of Stevens Point Public Utilities
Department’s Joel Lemke, Stevens Point Fire Department’s
J.B. Moody, and Scott Beduhn with the City of Stevens
Point Engineering. MSAwill also coordinate with the PSC to
understand what they would allow for fire protection in the
Village for fire protection with or without hookups and the
potential rates associated with hookups. The ISO rating for
Park Ridge was rated a ‘4’ and the Stevens Point Fire Chief
is seeking to improve it to a ‘2’ with improved fire protection
to match the rest of the service area. Based on discussion
with the fire chief, he stated that the biggest need for fire
protection is in the SE corner of the Village and about 16
properties north of Hillcrest, where he would like to see
an 8-inch watermain with 6-inch hydrant looped between
Ridgewood Drive and Hillcrest Drive. The fire department
10 MSA
QUALIFICATIONS |PROJECT SCOPE
QUALIFICATIONS |PROJECT SCOPE|PROJECT SCHEDULE
11MSA
DATE MILESTONE
April 2023 MSA performs site evaluations
May 2023 Meeting with the Village to discuss
roadway parameters
June 2023 MSA prepares preliminary project
cost estimates
August 2023 Draft CIP for Village review, and
project prioritization, grant funding
strategies, meeting with the Village
September
2023
Final CIPdeliverable
would like to see hydrants spaced every 500 feet to be
able to meet the 3,500-gallon-per-minute ISO capacity
requirements.
6. MSAwill prepare and submit a draft copy of the CIP for
Village review.
7. MSAwill recommend grants, funding and strategies for
projects listed in the CIP.
8. MSAwill provide the resolution to the Village board to finalize
and adopt the CIP.
MSA will coordinate with the Village to ensure that this list is
complete and accurate. Using this list as a basis, MSAwill prepare
a 5-Year Capital Improvement Plan that lists all proposed projects
and includes information on prioritization, cost, and scheduling.
Once MSAand the Village have solidified the list, MSAwill provide
a matrix of possible funding sources.
DELIVERABLES
MSAwill provide the Village of ParkRidge with two (2) hard copies
of theCIP plan,a PDFand Word/Excelversion ofthe final,adopted
CIP.
• The Village will be responsible for confirming its “Wish List”
of projects, as well as applicable plans, studies and existing
cost estimates.
• The Village will be responsible for printing and dispensing the
draft copy of the CIP for review.
• The Village will be responsible for collecting feedback after
the draft review and sending it to MSA.
• MSAwill take on one or more of these responsibilities if
requested and funded by the Village.
PROJECTSCHEDULE
LIMITS
PROJECT FUNCTIONAL
CLASSIFICATION
FROM TO LENGTH (FT) ANTICIPATED
CONSTRUCTION YR.
1 Ridgewood Dr. Collector Dixon St.
(Village Limits)
Greenbriar Ave. 1,300 TBD
2 Hillcrest Dr. Collector Jefferson St.
(Village Limits)
SunriseAve. 1,700 TBD
3 Greenbriar Ave. Collector
(AADT340)
Ridgewood Dr. Park Ridge
Drive (STH66)
2,600 TBD
4 Hazelwood Dr. Local Sunset Ave. Greenbriar Ave. 1,130 TBD
5 Maplewood Dr. Local Sunset Ave. SunriseAve 1,450 TBD
6 Oakcrest Dr. Local Sunset Ave. Greenbriar Ave. 1,130 TBD
7 Woodlawn Dr. Local Sunset Ave. Greenbriar Ave. 960 TBD
8 Ferndale Dr. Local Sunset Ave. SunriseAve. 1,280 TBD
9 Crestwood Dr. Local Sunset Ave. Greenbriar Ave. 960 TBD
10 Sunset Ave. Local Ridgewood Dr. Hillcrest Dr. 1,270 TBD
Hillcrest Dr. Park Ridge
Drive (STH66)
1,280 TBD
11 Fieldcrest Ave. Local Ridgewood Dr Park Ridge
Drive (STH66)
2,550 TBD
12 Linwood Ave. Local Ridgewood Dr Park Ridge
Drive (STH66)
2,550 TBD
13 Leroy Street Local Maplewood Dr. Park Ridge
Drive (STH66)
2,000 TBD
14 Watermain
Improvement
N/A TBD TBD TBD TBD
15 Stormwater
Improvements
N/A TBD TBD TBD TBD
16 Lighting Im-
provements
N/A TBD TBD TBD TBD
CIPANALYSIS: POTENTIALSTREETPROJECTSFOR5-YEAR CIPPLANNING
QUALIFICATIONS |PROJECT SCOPE
12 MSA
LRIP,MSID, ANDTRIDPROJECT EXPERIENCELIST
PROJECT LOCATION PROJECT
DATE
Weston AveReconstruction ( $733,463 LRIPAwarded) Village of Rothschild and Weston
Joint Application 2024
Monarch and Jasper Streets ($240,000 LRIPAwarded) City of Stratford, WI 2024
Lilac Avenue ($1,133,262LRIPAwarded) Town of Rib Mountain, WI 2024
16th Avenue ($332,900 LRIPAwarded) City of Wautoma, WI 2023
Burma Road TRIDand Spring Brook Road Rehabilitation Town of Mosinee,WI 2022
W.Miller Street LRIPApplication City of Greenwood, WI 2021
Old Highway B Town of Springvale,WI 2021
St.Wenceslaus Street LRIP-D City ofRipon, WI 2021
Weston Avenue Reconstruction Planning Village of Weston/ Rothschild, WI 2021
ECougar Drive / Bobcat Street Village of Oakdale, WI 2019
Ember Drive LRIPSurvey Project between 16thDrive and 17thDrive Town ofQuincy, WI 2019
2019 LRIPStaking Assistance Village of Kendall, WI 2019
Plum LakeDrive Eng. Certification LRIP Town of Plum Lake,WI 2018
Bo Di Lac Drive TRIDProject Town of Minocqua, WI 2018
Bond and Burnett Street MSID - 2019 City of Eagle River,WI 2018
Main Street Construction Village of Boyceville, WI 2017
Hancock Downtown Revitalization Village of Hancock, WI 2016
Ladysmith - 8th & 9th Street Construction City of Ladysmith, WI 2014
MSAhasalonghistoryofworkingonboththeapplicationanddesign
side of the Local Roads Improvement Program (LRIP). After the
application has been submittedand approved, our roadwaydesign
teams become involved. To meet the requirements of the funding,
the project must follow the WisDOT process for design, letting and
construction. Withour teamof morethan 60engineers dedicatedto
the WisDOT process, we are well suited and experienced in every
type of project that utilizes LRIP funding. In just the last few years,
the followingprojects weredesigned byMSAutilizing LRIP funding.
QUALIFICATIONS |LRIPMSID AND TRID PROJECT EXPERIENCE
13MSA
QUALIFICATIONS |CIPPROJECT EXPERIENCE
14 MSA
PROJECT |LOCATION PROJECT
DATE
Lake Delton, WI - 2017General Services 2017
Barron, WI - Capital Improvement Plan 2017
Port Byron, IL- 2019-2024 Capital Improvement
& Budget Implementation Plan 2017
Rothschild, WI - 2018-2024 CIP Updates 2017
Arcadis U.S.,Inc.- Hilliard, CIPT-84 Cosgray Road
Improvements 2017
Sumner, IA- Capital Improvement Planning 2017
Lake Delton, WI - 2018 GeneralServices 2018
Stoughton, WI - GISServices 2022 2018
Barron, WI - CIPUpdate Assistance 2018
Forest County Potawatomi Community Stone
Lake and Carter - Public Water Supply and
Distribution System
2018
Lake Delton, WI - 2019 GeneralServices 2019
Janesville, IA- Capital Improvement Plan 2019
Lexington, MN - CIP Water System 2019
Merrillan, WI - Capital Improvement Plan 2019
Dorchester, WI - Capital Improvement Plan 2019
Cleveland, WI - 2020 CIP 2019
Elroy,WI - 2019CIPUpdate 2019
Grafton, WI - WWTFCIPPlanning 2019
Lake Delton, WI - 2020 General Services 2020
Urbandale, IA - Stormwater Drainage Study 2020
Suring, WI - Capital Improvement Plan 2020
Arena, WI - CIPUpdate 2020
Springville, IA - Strategic/CIP 2020
Eleva, WI - 2021CDBG-PF Application 2021
Lake Delton, WI - 2021General Services 2021
Auburndale, WI - CIPUpdate 2021
Riverdale,IA - BelmontRoad Urban RenewalPlan 2021
Mosinee, WI - Abbreviated CIP 2021
Brodhead, WI - CIPPlanning & UserRate Analysis 2021
Wautoma, WI - 2022-2028 CIP 2021
Reedsburg Utility Commission, WI- CIPEstimates
2022-2025 2021
RECENTCIPPROJECT EXPERIENCELIST
PROJECT |LOCATION PROJECT
DATE
Lake Delton, WI - 2022 General Services 2022
Tigerton, WI - Wastewater Facility Plan 2022
Duluth North ShoreSanitary District,MN -
5-year CIP 2022
Luck, WI - CIPAssistance 2021 2022
Monona, WI - PhVSanitary Sewer I/I GIS 2022
Rothschild, WI - 2022-2029 CIPUpdate 2022
Waupun Municipal Well & Pump, WI - Yard
Expansion Project 2022
Carlock, IL- Strategic Plan and CIP 2022
Story City, IA- CIPPConstruction Permit 2022
Corydon, IA- Transportation CIP Update 2022
Ripon, WI - GISServices 2023 2022
Lake Delton, WI - 2023 General Services 2023
Bluffview Sanitary District CIPDevelopment 2023
Eureka, IL- CIP,CMOM and Street Analysis 2023
15MSA
COSTSANDFEES
LumpSumFee$23,400
Pavementcores: $2,900 (Village to contract directly with AET)
NOTE: All lump sum costs include travel time and equipment costs.
We are available to begin work on this project immediately upon your approval and look forward to assisting the Village of Park Ridge.
COSTSAND FEES