RecordWell Data

Board of Water & Sewerage Commissioners — Minutes

City of Stevens Point · Portage County · Board of Water and Sewerage Commissioners · meeting of Oct 19, 2026 · Minutes

Open the original document More from City of Stevens Point

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

City of Stevens Point Board of Water and Sewerage Commissioners October 19, 2026 - 12:00 PM Stevens Point Public Utilities 300 Bliss Avenue, Stevens Point, WI OR Zoom Teleconferencing Meeting ID: 820 26885705 By Computer: Zoom Link By Phone: (303) 715-8592 MINUTES Discussion and Possible Action on: 1. Roll Call. PRESENT: Paul Adamski, Carl Rasmussen, Anna Haines, Ray Schmidt and Jeff Bushman ALSO PRESENT: Joel Lemke, Eric Southworth, Shane Kohnen, Jennifer Schmeiser, Jason Draheim, Jaime Zdroik, Natalie Rink, Ald. Shuda, and Liz/resident 2. Approval of Minutes Motion made by Carl Rasmussen, seconded by Jeff Bushman to approve the September 14, 2026 meeting minutes of the Board of Water & Sewerage Commission. Ayes all. Nays none. Motion carried. 3. Approval of Department Claims Motion made by Ray Schmidt, seconded by Jeff Bushman to approve the claims for the month of September as audited and read. Ayes all. Nays none. Motion carried. 4. Utility rate adjustments for water, wastewater, and stormwater - Joel Lemke Joel explained that the anticipated water rate increases are listed as a range between 38.19 - 53.96% because there are so many different rate adjustments/tariffs involved from industrial, public, commercial and residential. The final ruling from the PSC on water rates is included in the packet. The wastewater analysis was done by Baker Tilly with a rate of 29%. Stormwater didn't quite meet debt service coverage ratio that is required through our bonding of past and future debt. So an increase of 45% was determined by staff for that and also covers increased capital, inflation etc. We are hoping to have the rate increase and moving from quarterly billing to monthly billing effective January 1, 2027. Water rates were issued in two steps by the PSC. The first step and largest increase would occur on January 1, 2027 and the second small increase of approximately 2-7% would go into effect once Well 12 goes online. Paul Adamski explained that Joel provided the Commission a comparison of other municipalities, not included in the packet, showing their long-term debt, number of employees, # of customers, Total Utilities Plant, feet of mains etc. Joel did discuss the rate comparisons that were included in the packet of neighboring municipalities. With our current rate structure, we are below Wausau, Marshfield, Wisconsin Rapids and Plover. With the proposed rate increases, we would still be below Wausau and Marshfield and almost even with Wisconsin Rapids. These comparisons are for water and sewer, because not all municipalities have storm. Joel did include monthly averages for residential customers for water and sewer in the packet after both increases. Pointing out an average family of 4 using 2500 cubic feet of water, their bill monthly would average $100 and for 2 people using 1300 cubic feet their monthly bill would average $70 per month. Anna asked since the increase was approved by the PSC, what our relationship is with the PSC in regard to the Commission not approving the rate increase. Joel explained we would have to enter into a contested rate case. This has never been done in the City of Stevens Point. She is concerned because of how large the increases are. Joel explained his handout showing the feet of mains in the system from 2021 to 2025. Our replacement rate is close to averaging 1%. Since 2016, we have increased the replacement rate. If we are not at 1%, we would be implying our infrastructure would last more than 100 years. We have grown an average of 0.67% in terms of subdivisions, East Park Commerce Center etc. Our last full rate case was in 2018. When a full rate case is completed, the 5 years after that, you are allowed to do simplified rate cases. In 2025, we realized we were no longer eligible to do another simplified rate case, which is what prompted the full rate case. Since our last full rate increase, our total plant/assets have increased by ten million dollars. Jeff Bushman asked if we could do the rate increases over a three-year period of time? Joel stated we did make the request to the PSC and it was denied. We were asking to evenly distribute Step 1 and Step 2 and it was denied. Paul stated we did the best we could to make it less painful for the customers, but we can't really second guess the PSC. Motion made by Carl Rasmussen, seconded by Ray Schmidt to approve the rates for the water utility as described in Appendix C of the final decision issued by the PSC related to docket 5690-WR-110, approval of a sewer rate increase of 29% as supported by the Baker Tilly analysis provided, and a storm rate increase of 45% as determined is needed by staff to meet the debt service coverage ratio. Ayes all. Nays none. Motion carried. 5. To award the bid of Well 12 and Water Treatment Plant Upgrades - Joel Lemke Page 142 of the packet has a summary of the open bid results of the well 12 building and the treatment plant improvements at the former well 4 building. Low bid came in from Ellis Construction. Staff is recommending we award the bid with those deducts at $3,656,655.00 with the base bid plus the 15% contingency. Joel explained how we are using the additional generators from Well 11 for this project, and he also explained how the bidding is done all online now. Completion date is looking to be the end of 2027. Motion made by Ray Schmidt, seconded by Anna Haines, to approve Ellis Construction with both deducts in for an amount of $3,179,700.00 plus the 15% contingency with an amount not to exceed $3,656,655.00. Ayes all. Nays none. Motion carried. 6. Water Supply and Distribution Reports - Eric Southworth Eric stated our triannual lead and copper sampling program was completed at the end of September. We had no high lead and copper sample results. Eric will compile the results to share with the Commission at the November meeting. 7. Sewage Treatment Operations Report - Chris Lefebvre The Commission reviewed the letter and sewage treatment plant reports that were included in the packet. One of the two lift stations are almost complete. Anna asked why we went over the limit for suspended solids. Joel explained as part of the construction for the influent screw pumps, we had to use a different pump for awhile. They did anticipate that happening. 8. Construction and Maintenance Report - Shane Kohnen Shane had nothing else to add to the report included in the packet. 9. Directors Report - Joel Lemke Joel mentioned Items 4 and 5 of the agenda are on the agenda for Council tonight because of the timing of the meeting this month. Joel will be reading off the minutes with the action of Commission at Council. 10. Adjournment. Motion made by Ray Schmidt, seconded by Jeff Bushman to adjourn the meeting. Ayes all. Nays none. Motion carried. Time: 12:29 P.M.

Source: City of Stevens Point website. First collected Oct 21, 2026.