City Plan Commission — Agenda Packet
City of Stevens Point · Portage County · City Plan Commission · meeting of Jun 1, 2026 · Agenda packets
Open the original document More from City of Stevens Point
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Our intention is to have in-person meetings going
forward. For the time being, we will hold the City
Committee Meetings, Plan Commission, Council and
most others at the Community Room at 933 Michigan
Avenue. This in-person location will meet the legal
requirement for our open meetings.
We will have a virtual option available, but the
technology for the hybrid style meeting may not be
reliable all of the time.
AGENDA
CITY PLAN COMMISSION
Members
• Mayor Wiza
• Alderperson Kneebone
• Commissioner Arntsen
• Commissioner Beacom
• Commissioner Rice
• Commissioner Schade Stroik
• Commissioner Schuler
Date and
Time:
June 1, 2026
6:00 PM
Location:
Community Room
933 Michigan Avenue, Stevens Point, WI
OR
Zoom Teleconferencing
Meeting ID: 850 1874 9302
Passcode: 369331
Computer:
https://us02web.zoom.us/j/85018749302?pwd=WC03AtIpIz
Phone: +1-312-626-6799 (US Chicago)
Opening Section:
1. Roll Call
Discussion and Possible Action on:
2. Report of the May 4, 2026 meeting of the City Plan Commission.
3. Public Hearing and action on a request from Mylena Oliveira, representing 7B Stevens
Point 385, LLC, for a conditional use permit to construct a principal structure on the
property located at 532 Division Street (Parcel ID 281240829401025), consistent with Ch.
23.02(2)(f)(5)(a).
4. A request from Mylena Oliveira, representing 7B Stevens Point 385, LLC, for a site plan
review to construct a principal structure on the property located at 532 Division Street
(Parcel ID 281240829401025), consistent with 23.02(2)(f)(5)(b).
5. A request from the City of Stevens Point to enter into an easement agreement with the
Wisconsin Public Service Corporation for the property located at 4401 State Highway 66
(Parcel ID 281240823230001).
6. A request from the City of Stevens Point to recommend adoption of the Portage County
Bicycle & Pedestrian Plan.
7. April 2026 Monthly Report.
Page 1 of 58
8. Director's Report.
Closing Section:
9. Adjourn
PLEASE TAKE NOTICE that any person who has special needs while attending these meetings or needs agenda materials for these meetings
should contact the City Clerk as soon as possible to ensure that a reasonable accommodation can be made. The City Clerk can be reached by
telephone at (715) 346-1569 or by mail at 1515 Strongs Avenue, Stevens Point, WI 54481.
Maps further defining the above area(s) may be obtained from the City of Stevens Point Department of Community Development, 1515
Strongs Avenue, Stevens Point, WI 54481, or by calling (715) 346-1567, during normal business hours.
PLEASE TAKE FURTHER NOTICE that a quorum of the Common Council may be in attendance at this meeting.
Page 2 of 58
MINUTES
CITY PLAN COMMISSION
Members
• Mayor Wiza
• Alderperson Kneebone
• Commissioner Arntsen
• Commissioner Beacom
• Commissioner Rice
• Commissioner Schade Stroik
• Commissioner Schuler
Date and Time: May 4, 2026
6:00 PM
Location:
Community Room
933 Michigan Avenue, Stevens
Point, WI
OR
Zoom Teleconferencing
Opening Section:
1. Roll Call
• Meeting called to order at 6:00 P.M.
• Members present: Mayor Wiza, Alder Kneebone, Commissioners Arntsen,
Beacom, Rice, Schade Stroik, Schuler.
Discussion and Possible Action on:
2. Report of the April 6, 2026 meeting of the City Plan Commission.
• Background: Minutes of the April 6, 2026, meeting of the City Plan Commission
were included in the agenda packet.
• Motion: Arntsen moves to accept the meeting minutes.
• Second: Beacom seconds the motion.
• Vote: Unanimous approval.
3. A request from Bailey Voigt, representing I-39 Properties LLC, for a modified
sign variance request to install a freestanding sign on the property located
at 5101 Woodward Drive (Parcel ID 281240835300053), consistent with Ch.
25.14.
• Background: Associate Planner & Zoning Administrator gives an overview of the
request.
• Motion: Schuler moves approval with the conditions.
• Second: Schade Stroik seconds the motion.
• Vote: Unanimous approval.
4. Public Hearing and action on a request from Benjamin Nusz, representing
Mid-State Technical College, for conceptual plan approval of a proposed
Page 3 of 58
development on an unaddressed parcel bounded by Badger Avenue (Parcel
ID 281230801310002), consistent with Ch. 23.02(4)(b)(5).
• Background:
o Benjamin Nusz, representing Mid-State Technical College, gives an
overview of the request.
o Doctor Shelly Mondeik, Mid-State Technical College President, gives a
presentation on the request.
o Chief Moody provides additional information regarding the request.
o Associate Planner & Zoning Administrator Kuhn provides further overview
of the request.
• Public Hearing:
o Kurt Heuer, Law Enforcement and Jail Academy Director at Mid-State
Technical College, speaks about his history in the field and his excitement
for this project. He shares a statement from the Gamber Johnson CEO,
writing in favor of the project.
o Carrie Penovich, Aspirus Wisconsin Southeast Division President, shares
Aspirus's support of the project and the importance of well-trained
responders for a positive patient outcome.
o Andrea Olson, Fourth District Alderperson, speaks about the pros and
cons of the project.
• Discussion:
o Doctor Shelly Mondeik addresses concerns raised during the public
hearing.
o Chief Moody addresses concerns raised during the public hearing.
• Motion: Schuler moves to approve the conceptual plan.
• Second: Beacom seconds the motion.
• Discussion:
o Staff answers questions from the commission.
o Chief Moody answers questions from the commission.
o Doctor Shelly Mondeik answers questions from the commission.
• Vote: Unanimous approval.
5. Public Hearing and action on a request from Benjamin Nusz, representing
Mid-State Technical College, for a conditional use permit to operate a
technical college facility on an unaddressed parcel bounded by Badger
Avenue (Parcel ID 281230801310002), consistent with Ch. 23.02(1)(c)(3)(d).
• Public Hearing: Mayor Wiza declares the public hearing open. None wishing to
speak, public hearing closed.
• Motion: Kneebone moves to approve the conditional use permit to operate a
technical college facility on an unaddressed parcel bounded by Badger Avenue
with conditions included.
• Second: Schade Stroik seconds the motion.
• Vote: Unanimous approval.
6. Public Hearing and action on a request from Paul Gnan, representing the
Page 4 of 58
Central Wisconsin Lutheran High School, for a conditional use permit to
operate a parochial high school on the property located at 5225 Heffron
Court (Parcel ID 281230802200031), consistent with Ch. 23.02(1)(c)(3)(d).
• Background: Associate Planner & Zoning Administrator Kuhn provides an
overview of the request.
• Public Hearing:
o Paul Gnan, Central Wisconsin Lutheran High School Principal, gives an
overview of the request.
• Motion: Arntsen moves to approve the request with staff recommendations.
• Second: Rice seconds the motion.
• Vote: Unanimous approval.
7. Public Hearing and action on a request from Tyler Ignatowski, representing
Little Captain LLC, to rezone the property located at 2928 Stanley Street
(Parcel ID 281240828402021) from the “R-LD” Low-Density Residence
District to the “R-4” Multiple Family I Residence District.
• Background: Associate Planner & Zoning Administrator Kuhn provides an
overview of the request.
• Public Hearing: Mayor Wiza declares the public hearing open. None wishing to
speak, public hearing closed.
• Motion: Schuler moves to approve the request for rezoning.
• Second: Arntsen seconds the motion.
• Vote: Motion carries with 6 votes in favor and 1 against (Beacom).
8. Public Hearing and action on a request from Tyler Ignatowski, representing
Little Captain LLC, to apply a “PD” Planned Development Overlay District
designation to the property located at 2928 Stanley Street (Parcel ID
281240828402021), consistent with Ch. 23.02(4)(b)(5).
• Background: Associate Planner & Zoning Administrator Kuhn provides an
overview of the request.
• Public Hearing:
o Andrea Olson, Fourth District Alderperson, speaks about accessibility
concerns in new housing developments.
• Discussion:
o Staff answers questions from the commission.
o Tyler Ignatowski, representing Little Captain LLC, answers questions from
the commission.
o Sam Lang, Ninth District Alderperson, speaks about the landscaping
plans.
o Ginger Keymer, District Three Alderperson, speaks about the density of
the project and suggests a comparison of the density of other housing
projects.
o Andrea Olson, District Four Alderperson, speaks about the percentage of
green space needed and number of accessible units that could be
required in a Planned Development Overlay District.
Page 5 of 58
• Motion: Arntsen moves to postpone action pending staff review.
• Second: Schuler seconds the motion.
• Vote: Unanimous approval.
9. Public Hearing and action on a request from Tyler Ignatowski, representing
Little Captain LLC, for a conditional use permit to construct multi-family
residential buildings on the property located at 2928 Stanley Street (Parcel ID
281240828402021), consistent with Ch. 23.01(14)(f) and 23.02(1)(f)(3)(b).
This item was postponed. No action was taken.
10. A request from Tyler Ignatowski, representing Little Captain LLC, for a site
plan review to construct multi-family residential buildings on the property
located at 2928 Stanley Street (Parcel ID 281240828402021), consistent with
Ch. 23.02(4)(b)(1)(2).
This item was postponed. No action was taken.
11. A request from the City of Stevens Point to exercise a buy-back option —
Schertz Properties LLC (Doc. No. 706813) for PIN 281240832202963.
• Background: Mayor Wiza provides an overview of the request and answers
questions from the commission.
• Motion: Schuler moves to authorize the acquisition of the land.
• Second: Arntsen seconds the motion.
• Vote: Unanimous approval.
12. Discussion on Forest Creek Subdivision - Phase 2 Development Strategy
and Proposed RFP Process
• Overview: Director Kivela gives an update on phase one of the Forest Creek
Subdivision, gives an overview of phase two, and shares information about the
RFP process.
• Discussion
o Jacqui Guthrie, District Two Alderperson, speaks about the values that
were able to be promoted in phase one and asks about a plan in case the
submissions for phase two are not up to those standards.
13. March 2026 Monthly Report.
• Background: Monthly reports are included in the agenda packet.
• Discussion:
o Ginger Keymer, District Three Alderperson, asks about annual
comparison dates.
14. Director's Report.
Page 6 of 58
• Background: Director’s report is included in the agenda packet.
Closing Section:
15. Adjourn
• Meeting adjourned at 8:20 P.M.
Page 7 of 58
Page 1 of 12
Administrative Staff Report
Department of Community
Development
Conditional Use Permit & Site Plan Review
532 Division Street
June 1, 2026
Applicant(s):
• Mylena Oliveira, representing 7B
Stevens Point 385, LLC
Staff:
• Adam Kuhn, Associate Planner
akuhn@stevenspoint.com
Parcel Number(s):
• 281240829401025
Zone(s):
• “B-4” Commercial District
• “B-TID5” Overlay District
Master Plan:
• Commercial / Office / Multi-
Family Residential
Council District:
• District 1 | Ald. Christianson
Lot Information:
• Lot Size: 51,510 sq ft (1.183 acres)
Current Use:
• Undeveloped
Applicable Regulations:
• 23.02(2)(f)(5)(a)
• 23.02(2)(f)(5)(b)
Request
1. Public Hearing and action on a request from Mylena Oliveira,
representing 7B Stevens Point 385, LLC, for a conditional use permit
to construct a principal structure on the property located at 532
Division Street (Parcel ID 281240829401025), consistent with Ch.
23.02(2)(f)(5)(a).
2. A request from Mylena Oliveira, representing 7B Stevens Point 385,
LLC, for a site plan review to construct a principal structure on the
property located at 532 Division Street (Parcel ID
281240829401025), consistent with 23.02(2)(f)(5)(b).
Attachment(s)
1. Application
2. Plans
Findings of Fact
1. 7 Brew is requesting to construct a drive-thru coffee establishment
at 532 Division Street.
2. Proposed site improvements include a 530 sq ft coffee shop, a 290
sq ft cooler, eight off-street parking spaces, and two drive-thru lanes.
3. The proposed development would utilize only a portion of the
subject property. Parcel boundaries of the subject parcel and the
two parcels immediately to the south would be reconfigured into
four developable lots. 7 Brew would be located on Lot 1 listed on the
proposed CSM, approximately 21,765 sq ft in lot size.
4. The subject property is zoned “B-4” Commercial and is located
within the “B-TID5” Overlay District. Drive-thru coffee uses are
permitted by right within both the “B-4” and “B-TID5” Districts.
5. The principal structure on the property is proposed to be set back 48
feet from Division Street. The “B-TID5” District allows a maximum
five-foot street setback off of Division Street. Proposed street
setbacks greater than five feet are considered through a conditional
use permit request.
6. New development within the “B-TID5” District requires a site plan
review.
7. The Plan Commission and Common Council may attach additional
conditions onto these requests as necessary.
Page 8 of 58
Page 2 of 12
Staff Recommendation
Approve the request for a conditional use permit to construct a principal
structure on the property located at 532 Division Street (Parcel ID
281240829401025).
Approve the request for a site plan review to construct a principal structure
on the property located at 532 Division Street (Parcel ID 281240829401025),
subject to the following conditions:
1. A shared access agreement shall be recorded with the property
located at 500 Division Street (Parcel ID 281240829401026) and Lot
2 on the preliminary certified survey map.
2. A building permit shall be obtained prior to the start of construction.
3. An erosion control permit shall be obtained prior to the start of
construction.
Vicinity Map
Background
Overview: 7 Brew is requesting to construct a drive-thru coffee establishment at 532 Division Street. Proposed site
improvements include a 530 sq ft coffee shop, a 290 sq ft cooler, eight off-street parking spaces, and two drive-thru
lanes. The proposed development would utilize only a portion of the subject property. Parcel boundaries of the subject
parcel and the two parcels immediately to the south would be reconfigured into four developable lots. 7 Brew would be
located on Lot 1 listed on the proposed CSM, approximately 21,765 sq ft in lot size.
The subject property is zoned “B-4” Commercial and is located within the “B-TID5” Overlay District. Drive-thru coffee
uses are permitted by right within both the “B-4” and “B-TID5” Districts. The principal structure on the property is
Page 9 of 58
Page 3 of 12
proposed to be set back 48 feet from Division Street. The “B-TID5” District allows a maximum five-foot street setback off
of Division Street. Proposed street setbacks greater than five feet are considered through a conditional use permit
request. A greater than five-foot street setback is being requested primarily due to where access off of Division Street is
allowed.
Access off of arterial roads – the road classification of Division Street – must be limited to preserve safe traffic flow to
and from the street. Based on this viewpoint, along with the ongoing Business 51 reconstruction plan, no new access
points are planned for the 7 Brew lot. Instead, access to the 7 Brew parcel would be off of a shared access agreement
with the existing lot to the north and proposed lot to the south. With no direct access for the proposed development off
of Division Street, a greater building setback is being proposed primarily to assist with the necessary turning radii of
delivery trucks that would provide products to and from the site.
Standards of Review – Conditional Use Permit
1. The establishment, maintenance, or operation of the use will not be detrimental to, or endanger the public
health, safety, morals, comfort, or general welfare.
Analysis: The proposed drive-thru coffee establishment would be built off of Division Street, classified as an
arterial street.
Findings: Drive-thru coffee uses are commonplace along arterial streets as such streets are built out to support
higher traffic volumes that are associated with drive-thru service uses. Given that traffic control is a major
consideration for the proposed development, adequate safeguards were built into the site design so that the
land use is not detrimental to the public. Such safeguards include having access points off of multiple streets
(Division Street and Vincent Street), consolidating access points off of Division Street with neighboring
developments, and having two drive-thru lanes with significant queuing space.
Proposed Site Plan
Page 10 of 58
Page 4 of 12
2. The use will not be injurious to the use and for the purpose already permitted, nor substantially diminish and
impair property values.
Analysis: Drive-thru restaurants are a permitted use within the “B-4” and “B-TID5” Districts. The conditional use
permit is requesting a larger building setback off of Division Street.
Findings: Having an increased building setback off of Division Street would be consistent with neighboring
buildings. Based on the application and plan submittal, staff believes that the use will not be injurious to the
property or surrounding neighborhood.
3. The establishment of the use will not impede the normal and orderly development and improvement of the
surrounding property for uses permitted in the district.
Analysis: The respective area is in an established and developed area of the city.
Findings: See standards one and two above.
4. The exterior architectural appeal and function plan of any proposed structure will not be variance with either
the exterior architectural appeal and function plan, and scale of the structures already constructed or in the
course of construction in the immediate neighborhood or in the character of the applicable district so as to
result in a substantial or undue adverse effect on the neighborhood.
Analysis: Cement board is the predominant siding material that would be used on the coffee shop building.
Other façade materials include aluminum around the doors, and windows along the east and west elevations.
Peak building height
is proposed to be
19’ 8’’. Please see
the site plan review
section below for
additional
architectural
standards tied to
the “B-TID5”
District.
Findings: Staff
believes that the
proposed
development is of a uniform design for the Division Street corridor. A variation in building height and façade
materials used provides contrast and ensures a complimentary feel to other retail uses along the street corridor.
5. Adequate utilities, access roads, drainage and/or facilities have been, or are being, provided.
Analysis: Utility connections are planned off of Division Street. Please note that as the development would be
under construction while Division Street is under reconstruction, utility connections will exist based both on
existing conditions and the final plan set for the road reconstruction. Adequate greenspace exists on the
Page 11 of 58
Page 5 of 12
property to handle anticipated drainage needs. As discussed earlier, access will be off of both Vincent Street and
Division Street (the latter via shared access agreements with adjacent properties.
Findings: Staff believes that access and traffic circulation for all road users will not be negatively impacted with
the proposed request.
6. Adequate measures have been, or will be taken, to provide ingress and egress so designed to minimize traffic
congestion in the public streets.
Analysis: See the ‘Background’ section above. The City’s stacking requirements outline a minimum of six
queuing spaces to be provided in the drive-thru lane, measured from the order box. Two drive-thru lanes are
proposed and can provide 10 stacking spaces per lane.
Findings: Staff believes that safe access into and out of the subject property is provided with the proposed land
use.
7. The proposed use
is not contrary to
the objectives of
any duly adopted
land use plan for
the City of
Stevens Point and
any of its
components.
Analysis: The
subject property
is zoned “B-4”
Commercial and has a future
land use designation of
‘Commercial/Office/High-
Density Residential.’ The “B-4”
District is established to
“provide for retail, commercial,
office, service and apartment
uses in areas of good
accessibility along arterial
streets consistent with the City's
Comprehensive Plan. This
district is primarily intended to
accommodate general
commercial uses requiring on-
site parking and arterial access.”
Subject Property
Subject Property
Page 12 of 58
Page 6 of 12
Findings: Staff believes that the proposed commercial use aligns with the zoning and future land use designation
of the subject property.
8. The use shall, in all other respects, conform to the applicable regulations of the district in which it is located,
except as such regulations may, in each instance, be modified pursuant to the recommendations of the Plan
Commission.
Analysis: The property and use meets minimum performance standards in the “B-4” District, and meets
minimum performance standards of the “B-TID5” District provided that this conditional use permit request is
granted. Several Building Code requirements exist with the proposed land use and would need to be met as a
condition for receiving temporary occupancy.
Findings: This standard is met provided.
9. The proposal will not result in result in an over-concentration of high-density living facilities in one area so as
to result in a substantial or undue adverse effect on the neighborhood, on the school system, and the social
and protective systems of the community.
Analysis: N/A
Findings: N/A
10. Principal: Applications for exclusive multifamily residential uses: The view from the street should maintain a
residential character. The view should be dominated by the building and not by garages, parking, mechanical
equipment, garbage containers, or other storage.
Analysis: N/A
Findings: N/A
11. Principal: Access to the site shall be safe.
a) All developments shall front on a public right-of-way unless recommended by the Public Works
Director.
Analysis: Access is proposed to be off of Division Street and Vincent Street.
Finding: This standard is met.
b) The driveway to the site shall be located so as not to be a danger to the street flow of traffic.
Analysis: Division Street access will be off of existing shared access aprons.
Findings: This standard is met.
Page 13 of 58
Page 7 of 12
c) The driveway shall not be too close to neighboring intersections.
Analysis: Driveways serving multi-family residential and other non-residential land uses must be
separated at least 100 feet from a street intersection consisting of an arterial street. The proposed
driveways greatly exceed this 100’ separation requirement.
Findings: This standard is met.
d) Alignment of the driveway shall be coordinated with adjacent access points to avoid conflict or
confusion.
Analysis: Based on the amount of street frontage provided, the City’s Zoning Code permits a maximum
of one driveway per street frontage. As stated earlier, access off of Division Street is being planned with
neighboring lots.
Findings: Staff believes that the proposed driveway is located appropriately to avoid conflict and
confusion.
e) Only one driveway shall be allowed per site unless recommended by the Public Works Director. Two
family units may be allowed more than one driveway if those driveways are separated by not less
than 10 feet. Maximum driveway openings shall be 20 feet (each).
Analysis: The applicant is requesting to use one driveway per street frontage. The Public Works Director
has recommended the quantity and location of these driveways.
Findings: This standard is met.
f) The organization of traffic flow on-site and between the site and the street shall be organized in a
clear hierarchy of flow patterns. Internal and external areas where traffic flow changes directions or
creates intersections shall be organized at clear intersections and those intersections are spaced far
enough apart so as to not cause confusion or problems and to provide for adequate spacing for
waiting vehicles.
Analysis: The traffic flow on the site to the street is anticipated to flow smoothly. Access can occur off of
both Division Street and Vincent Street, with most traffic expected to come from the former.
Findings: This standard is met.
g) Intersections are visible and not visually screened.
Analysis: The intersections are not screened from view.
Findings: Vision obstructions should not be a concern.
h) Adequate drainage and snow storage is provided.
Page 14 of 58
Page 8 of 12
Analysis: Adequate drainage exists on the property, and snow storage is expected to be located towards
the west end of the property.
Findings: This standard is met.
i) Minimum size requirements are maintained for safe vehicle circulation.
Analysis: The lot provides for adequate traffic aisles, as required by the City’s Zoning Code.
Findings: This standard is met.
j) Parking areas shall be safe. They shall be adequately lit, sized to meet minimum standards, graded so
as to not be too steep, and paved with concrete, brick, or bituminous surfacing. The light source shall
not be visible from adjacent properties. Lighting shall be developed in such a way to minimize light
straying onto adjacent properties.
Analysis: Additional lighting is planned to be located on the exterior of the building and site to meet
minimum Building Code requirements.
Findings: This standard is met.
k) Driveways shall be located to minimize the impact to adjacent properties.
Analysis: Please see above. The driveways should not cause a negative impact on the adjacent
properties.
Findings: This standard is met.
12. There shall be adequate utilities to serve the site.
a. The Public Works Director, Police Chief and Fire Chief shall determine whether there is adequate
sanitary sewer, portable water, storm drainage, street capacity, emergency access, public protection
services, and other utilities to serve the proposed development. They shall review the plan to ensure
safety and access for safety vehicles.
Analysis: Please see above. The property has the needed utilities and access to support the proposed
land use.
Findings: This standard is met.
13. The privacy of the neighboring development and the proposed development shall be maintained as much as
practical. Guidelines:
a. Mechanical equipment including refuse storage shall be screened from neighboring properties.
Page 15 of 58
Page 9 of 12
Analysis: Refuse storage is proposed on the west end of the subject property. The storage area will be
screened from public view.
Findings: This standard is met.
b. Lighting shall be located to minimize intrusion onto neighboring properties.
Analysis: Additional lighting is planned to be located on the exterior of the building and site to meet
minimum Building Code requirements.
Findings: This standard is met.
c. Sources of noise shall be located in a manner that minimizes impact to neighboring properties.
Analysis: Any noise generated is expected to be located within the building and site.
Findings: This standard is met.
14. Principal – Applications for exclusive multi-family residential uses. Landscaping shall be provided, or existing
landscape elements shall be preserved to maintain a sense of residential character, define boundaries, and to
enhance the sense of enclosure and privacy.
Analysis: N/A
Findings: N/A
Based on the findings above, staff would recommend approval of the conditional use permit. Please keep in mind that
State legislation has placed limitations on local jurisdictions regarding the denial of conditional use permits. Conditional
use permits shall be reviewed by a means to permit a use under certain conditions applied to the use or property. For
example, if a concern is raised regarding to a standard above, a condition can be applied to the permit to address the
concern and grant the permit.
Standards of Review – Site Plan Review
1. Buildings are aligned and close to the street. Buildings form the space of the street.
Analysis: The proposed development is 48 feet from Division Street. While the conditional use request is seeking
to allow a setback off of Division Street greater than the five feet that is allowed, staff believes that both
structures are positioned as close to the street as possible given the proposed use. For example, all off-street
parking spaces are provided behind the proposed structures to better shield it from public view. Likewise, the
drive-thru lanes are uniquely positioned to span almost the entirety of the lot’s width to utilize a greater portion
of the property’s front yard.
Findings: This standard is met.
2. Buildings oversee the street with active fronts as opposed to blank fronts. The first floor and upper floors should
include windows as well as entrances. Wider entrances, door framing, canopies, and other techniques should
be used to identify the entrance.
Page 16 of 58
Page 10 of 12
Analysis: Each structure is one story in height.
Findings: Cement board is the predominant siding material that would be used on the coffee shop building.
Other façade materials include aluminum around the doors, and windows along the east and west elevations.
Peak building height is proposed to be 19’ 8’’. The height of the principal structure varies along the building
width to provide greater contrast and be consistent with other structures built along Division Street.
3. Property lines are physically defined by buildings or street walls.
Analysis: A street setback of 48’ is proposed off of Division Street. At its closest point, 22’ 6’’ of side yard setback
is proposed, and over 155’ of setback is proposed from the rear lot line.
Findings: Although the proposed street setbacks are larger than other projects recently approved in the “B-TID5”
District, staff believes that the orientation of the two structures and its corresponding drive -in lanes better
achieves the goal of having property lines being defined by the buildings and use that exists within. For example,
while the coffee shop is set back 48 feet from Division Street North, the drive -in lanes are roughly 15 feet from
the street lot line and better achieve this objective.
4. Building facades facing the street shall exhibit a high level of architectural design. In no case shall the front
facade of the building consist of a blank wall or a series of garage doors. Windows should play a prominent role
in the facade design. All bui lding materials to be used shall express their specific properties. For example,
heavier more permanent materials (masonry) support lighter materials (wood).
Analysis: Windows play a prominent role on the coffee shop as large window panels are oriented on the primary
elevations of the building. These window panels complement the adjacent dark brown masonry façade and the
cement board and aluminum siding.
Findings: This standard is met.
5. Two or more story buildings are preferred over one story buildings.
Analysis: Both structures are one story in height.
Findings: The proposed coffee shop would be 19’ 8’’ in height . Although both structures are not two stories in
height, the height of the coffee shop is arguably taller than other one-story commercial uses and better achieves
the goal of having taller structures line the Division Street Corridor.
6. Landscaping shall be of high quality and installed at a rate that is appropriate that enhances the proposed site
and surrounding properties.
Analysis: A landscaping plan has been provided by the applicant. Alternating plantings of trees and shrubs line the
off-street parking area. With the layout of both parking lots, terminal islands are also proposed to be landscaped
with a mixture of spirea’s and birc h trees. Other shrubs and perennials line the exterior perimeter of the coffee
ship and along the internal sidewalk connecting the coffee shop with Division Street.
Page 17 of 58
Page 11 of 12
Findings: Based on the variety of landscaping proposed) and its location throughout the parking lot, staff believes
that planned landscaping enhances the proposed site and surrounding properties.
7. Vehicle storage, garbage, and mechanical equipment are kept away from the street and screened from public
view.
Analysis: The proposed off-street parking area is screened from public view with the proposed structures. While
the parking area would be visible off of Vincent Street, trees have been purposely located in the westernmost
terminal island to provide additional screening. Additionally, a trash enclosure is proposed near the west lot line
and is screen from public view via high-rise shrubs.
Findings: This standard is met.
8. Parking (not including on-street parking) should be away from the street and screened from public view.
Analysis: The proposed off-street parking area is screened from public view with the proposed structures. While
the parking area would be visible off of Vincent Street, trees have been purposely located in the westernmost
terminal island to provide additional screening.
Findings: This standard is met.
9. The building design is coordinated with the street space. The city may require the improvement of the
streetscape adjacent to the property including installation of trees, paving, sidewalk, lighting, street furniture,
etc. Street trees are limited to a list approved by the City Forester.
Analysis: The developer has been consulting with City staff as it relates to positioning both structures
appropriately with planned improvements on Business 51. Staff believes that the proposed development would
not interfere with the planned street design of Division Street.
Page 18 of 58
Page 12 of 12
Findings: This standard is met.
10. Safety: Buildings should be close to the street but should acknowledge their neighboring building setbacks.
Safety of entrances as well as vision around corners should be addressed in the review process.
Analysis: The proposed buildings meet setback requirements in the “B -TID5” District either by right or via the
conditional use process. Sufficient access exists to and within the property for fire/EMS vehicles.
Findings: This standard is met.
Page 19 of 58
Page 20 of 58
Page 21 of 58
Page 22 of 58
Page 23 of 58
1
Mylena Oliveira
From: noreply@civicplus.com
Sent: Wednesday, December 10, 2025 3:46 PM
To: Mylena Oliveira
Subject: Online Form Submittal: Contact Alderperson - District 1
Categories: Jurisdiction
Contact Alderperson - District 1
First and Last Name: Mylena Oliveira
Street Address: 532 Division St
City Stevens Point
State: WI
Zip: 54481
Phone Number: 8164062667
Email Address:
Please enter your
questions or comments
below:
Seven Brew Coffee - Notification
Pa
rcel ID: 281240829401025
Address: A portion of 532 Division St, Stevens Point, WI 54481
Alderperson: Ald. Marc Christianson
Good afternoon Ald. Christianson,
I am reaching out on behalf of 7B Stevens Point 385, LLC, to
propose a free-standing Seven Brew Co
ffee for a parcel of land
containing approximately 0.58 acres in a portion of 532 Division
St, currently vacant land. The current parcel will be split into
two.
This parcel is zoned B-4” Commercial and is located within the
“B-TID5” Overlay District. As part of our entitlement process,
we attended the Pre-App meeting on 10/23 and received
preliminary feedback from staff.
I can provide a preliminary site plan and elevations via email
for your reference.
Page 24 of 58
2
We are happy to partner with the operator to expand their
brand in the Stevens Point area!
Please let me know if you have any questions or need any
additional information.
Thank you
Page 25 of 58
3400 College Blvd, Suite 200, Leawood, KS 66211 I www.plazastreetpartners.com
May 4th, 2026
City of Stevens Point
Community Development Department
1515 Strongs Avenue, Stevens Point, WI 54481
P: (715) 346-1567
communitydevelopment@stevenspoint.com
RE: 7-Brew – Portion of 532 Division St, Stevens Point, WI 54481– Parcel #
281240829401025
Project Narrative
To Whom it May Concern:
Please accept this Project Narrative for the Conditional Use Permit (“CUP”), Site Plan (“SP”) and
CSM Applications for the proposed 7-Brew development.
A. Project Description
Explain the land use and the development proposed for the subject property. Include the time
schedule (if any) for development.
7B Stevens Point 385, LLC, doing business as Plaza Street Partners, LLC, is proposing a CUP
and SP for a parcel of land containing approximately 0.5 acres located at the west side of US-51
BUS/Division St. in the City of Stevens Point, Wisconsin (“City”) for the construction of a new
Seven Brew Coffee kiosk with a drive-thru, walk-in cooler, and a dumpster enclosure. The
property is situated in the Lot 1, CSM No. 824-3-182 & part of the SW ¼ of the SE ¼, located in
the NW ¼ & SW ¼ of the SE 1/4 , Section 29, Township 24 North, Range 8 East, City of
Stevens Point, Portage County, Wisconsin, and currently exists as vacant land. The intent is to
split the existing parcel into two and develop the northern portion. The remainder of the parcels
will be developed by others at a different timeline. Parcels 3 and 4 areas are also being updated in
the proposed CSM and will also be developed by others at a different time.
The Site is bound on the north by a Strip Mall, east by Michele's Restaurant & Catering, on the
south by the remainder of the vacant parcel and Old National Bank, and to the west by
Residences. A vicinity map is included in Appendix A for reference. The proposed CUP/SP
comprises a 530 sq. ft. building, an accessory cooler structure, two drive-through lanes and 8
Page 26 of 58
3400 College Blvd, Suite 200, Leawood, KS 66211 I www.plazastreetpartners.com
parking spaces to provide drive-through only coffee service to City customers.
7 Brew is anticipating starting construction upon permit approval by the City, which is currently
being estimated by Sept/2026. The total length of construction is estimated to be between 75 and
120 days, depending on the weather. The goal is to have the Site ready for the 7 Brew opening in
December of 2026. The 7 Brew construction timeline aligns well with the redevelopment of
Business 51 proposed by the City.
B. Public Benefit
The Site is located along a major commercial corridor of the City and the proposed
improvements will greatly improve the appearance and use of the property to better serve the
surrounding community. The future business created by the proposed CUP/SP will also result in
the creation of a minimum of 40 jobs and sales tax benefits for the City. The annual unit volume
(“AUV”) of a 7 Brew is between $1.8M and $3.4M.
C. Project Compliance, Compatibility, and Impact
How will the proposed development reinforce the existing or planned character of the
neighborhood?
The Site is designated as B4 (Commercial District) with “B-TID5” Tax Increment District 5
per Chapter 23 of the Zoning Code of the City of Stevens Point. A link to the code is included
in Appendix A.
Although the proposed 7 Brew is a standalone drive-thru building, the project aligns with the
intent and overarching goals of the Division Street TID 5 zoning district by supporting safe,
efficient redevelopment, protecting the character of the commercial corridor, and promoting
public health, safety, and general welfare. As discussed during the Pre-Application meeting,
the building was intentionally set back beyond the maximum allowed setback to
accommodate a cross-access connection to the strip mall to the north and remaining parcel to
the south, supporting safe circulation and coordinated development within the area. We have
contacted the neighboring property owner, who is agreeable to this connection. In addition,
the increased setback is necessary to safely accommodate delivery vehicles and fire apparatus
circulation. To further cooperate with B51 reconstruction, we propose the curb cut to be
further south and shared between the overall development.
While traditional commercial design along Division Street emphasizes compact development
and minimal setbacks, additional distance from the right-of-way is necessary in this case to
safely accommodate delivery vehicles and fire truck circulation. This adjustment maintains
functional safety and operational viability while still meeting the broader zoning objectives of
coordinated redevelopment, infrastructure adequacy, and a stable, well-functioning
commercial environment.
The proposed development complies with City code requirements by coordinating the
building design with the surrounding street space through the installation of new trees,
paving, lighting, sidewalks, and bike racks that enhance interconnectivity and pedestrian
Page 27 of 58
3400 College Blvd, Suite 200, Leawood, KS 66211 I www.plazastreetpartners.com
comfort. Building façades facing the street incorporate a high level of architectural design
with no blank walls and utilize high-quality, durable materials—including two-tone Nichiha
brick and glazing—that reinforce a permanent, high-quality character consistent with the
City’s design objectives. Although the building does not provide interior public access or
restrooms, pedestrians are accommodated through a walk-up ordering window and covered
canopy with patio seating, supporting its role as an informal “third place” along the corridor.
The site layout also acknowledges adjacent building setbacks while prioritizing safe
entrances, clear sightlines, and visibility around corners, ensuring the development promotes
safety, functionality, and a cohesive streetscape consistent with City standards.
It is not anticipated that the Site will have any adverse impacts on public facilities, including
fire, police, sanitation, roads, parks, or schools.
There are no known water features, wetlands, or wildlife habitats located within the Site.
7 Brew and their development team will adhere to the City’s Code and specific requirements
applicable to the subject site. 7 Brew and their development team intend to fully cooperate with
City staff to ensure all comments are addressed for the CUP/SP and any other future applications.
D. Operations
Employees greet customers in their vehicles and take orders using iPads, allowing service to begin
before cars reach the window. The two drive-thru lanes and this ordering system create an efficient
flow that minimizes wait times and reduces vehicle stacking. Although the City requires a lower
minimum stacking length, 7 Brew is providing a longer stacking area to accommodate peak-hour
demand on site and to prevent spillover or interference with adjacent businesses.
• Hours of Operation: Su-Th: 5:30 am – 10 pm / Fr-Sa: 5:30 am – 11 pm
• Peak hours: 7 am - 10 am (busier on Friday-Saturday-Sunday)
• Service time: under 4min from order to pick up
E. Summary
Based on the proposed design and site layout, the following steps will be taken to reduce
potential impacts on adjacent properties:
1. Coordinated Site Layout and Setbacks
The building placement and circulation are designed to respect neighboring building
setbacks while maintaining safe vehicle and pedestrian movement. Clear sightlines
around corners and well-defined access points will minimize conflicts and enhance
overall safety.
2. Shared Access and Connectivity
A cross-access connection to the adjacent properties has been incorporated to promote
shared circulation, reduce redundant curb cuts, and improve traffic flow for both sites.
3. High-Quality Architecture and Materials
Façades are fully articulated with durable, permanent materials such as Nichiha brick and
Page 28 of 58
3400 College Blvd, Suite 200, Leawood, KS 66211 I www.plazastreetpartners.com
glazing, avoiding blank walls and reducing visual impacts on adjacent properties.
4. Landscaping and Streetscape Enhancements
New trees, paving, lighting, and landscape elements will be installed to buffer the site
edges, soften views from adjacent properties, and enhance the overall streetscape
character.
5. Pedestrian-Oriented Design
Sidewalks, bike racks, and a walk-up ordering window with canopy seating support
pedestrian activity without generating additional building access conflicts or impacts to
neighboring sites.
6. Operational Safety Measures
Entrances, circulation routes, and service areas are designed to safely accommodate
deliveries and emergency vehicles, reducing the potential for spillover traffic, congestion,
or operational conflicts on adjacent properties.
7. Lighting and Visibility Controls
Site lighting will be designed to provide adequate illumination for safety while
minimizing glare and light spillover onto neighboring properties.
Together, these measures ensure the project integrates sensitively with surrounding properties
while meeting City code requirements and supporting safe, orderly redevelopment.
7 Brew and their development team are committed to providing a suitable development that
upholds the vision and guidelines set forth in the City of Stevens Point Zoning Code. The
proposed development is compatible with the surrounding community and the proposed
improvements enhance the current state of the Site, as well as promote future employment
opportunities and long-term economic growth.
Page 29 of 58
3400 College Blvd, Suite 200, Leawood, KS 66211 I www.plazastreetpartners.com
References:
1. CHAPTER 23 ZONING CODE CITY OF STEVENS POINT
APPENDIX A
VICINITY MAP
FEMA FLOOD MAP
SITE DATA/OWNER INFORMATION
SUMMARY TABLE
Page 30 of 58
3400 College Blvd, Suite 200, Leawood, KS 66211 I www.plazastreetpartners.com
APPENDIX A
FEMA FLOOD MAP
Page 31 of 58
APPENDIX A
SITE DATA/OWNER
INFORMATION SUMMARY TABLE
CURRENT PROPERTY OWNER Pointmed Properties, LLC
520 Vincent Street
Stevens Point, WI 54481
Attn: Todd Fairchild
fairchta@yahoo.com
ADDRESS 532 Division St, Stevens Point, WI 54481
PARCEL ID 281240829401025
SITE AREA 0.5 acres
ZONING B4 (Commercial District) with “B-TID5” Tax
Increment District 5
FUTURE LAND USE Commercial
Page 32 of 58
Page 33 of 58
Page 34 of 58
Page 35 of 58
Page 36 of 58
Page 37 of 58
Page 38 of 58
Page 39 of 58
Page 40 of 58
Page 41 of 58
Page 42 of 58
Page 43 of 58
Page 44 of 58
FIRST FLOOR
100'-0"
B.O. CANOPY
108'-10 13/16"
T.O. WALL
111'-0"
ATTIC FLOOR
109'-10 1/2"
1
A3.0
_________
T.O. ROOF
119'-8"
2
1
2
6 6
1
11 3
5
7
17
E
C
C C
A
B
B
2
1
T.O. PARAPET
112'-0"
7
13
13
101a
2
4
8 8
14
2
H H
F
J
B
F
201
FIRST FLOOR
100'-0"
B.O. CANOPY
108'-10 13/16"
ATTIC FLOOR
109'-10 1/2"
1
A3.0
_________
T.O. ROOF
119'-8"
DRIVE THRU COFFEE
A
B
C
DD
8 88
14
2
E
X X X
9
2
1 1
17
3'-0" 5'-0"
B
EQ. 6'-0" EQ.
G
T.O. PARAPET
112'-0"
14
15 15
16
G J
J
104 AL -1
1. CANOPY.
• REFER TO THE STRUCTURAL DRAWINGS.
2. SURFACE -MOUNTED LED NEON FLEX LIGHTING, SHOWN DASHED.
• REFER TO THE ELECTRICAL DRAWINGS.
3. ELECTRICAL EQUIPMENT.
• REFER TO THE ELECTRICAL DRAWINGS.
4. FROST PROOF HOSE BIB.
• REFER TO THE PLUMBING DRAWINGS.
5. EXTERIOR WEATHER -PROOF OUTLET.
• REFER TO THE ELECTRICAL DRAWINGS.
6. THROUGH WALL SCUPPER ROOF DRAIN.
7. OVERFLOW SCUPPER ROOF DRAIN.
8. STOREFRONT SIGN, SUPPLIED AND INSTALLED BY SIGN CONTRACTOR.
9. ADDRESS NUMBERS TO BE 8" TALL x 2" BRUSH STROKE.
10. OUTLINE OF MECHANICAL UNIT BEYOND.
• REFER TO THE MECHANICAL DRAWINGS.
11. KEY KNOX BOX.
12. 1/4" THICK ACRYLIC SIGNAGE APPLIED TO SIDING WITH VH DOUBLE SIDE
TAPE.
13. EXPOSED DOWNSPOUT, GALVANIZED, PAINTED. CONNECT TO SUB -GRADE
STORM WATER COLLECTION SYSTEM.
• REFER TO THE CIVIL DRAWINGS.
14. STRUCTURAL CANOPY COLUMN; RAINWATER DOWNSPOUT WITHIN;
CONNECT BASE OF CANOPY COLUMN DOWNSPOUT TO STORMWATER
MANAGEMENT SYSTEM.
• REFER TO THE CIVIL DRAWINGS.
15. TUBE LIGHT MOUNTED TO COLUMN AT 6" A.F.F.
• REFER TO THE ELECTRICAL DRAWINGS.
16. 1" INSULATED TEMPERED THERMAL WINDOWS w/ LOW -E GLASS. CLEAR.
• REFER TO SHEET A4.1 FOR ENERGY COMPLIANCE INFORMATION.
17. REMOTE COOLER.
• COORDINATE LOCATION WITH CIVIL DRAWINGS.
18. ICE MACHINE CONDENSER BEYOND, PROVIDED BY OWNER.
EXTERIOR ELEVATION KEYNOTES XX
A. ARCHITECTURAL CEMENT BOARD SIDING (PL -2).
B. ARCHITECTURAL CEMENT BOARD SIDING (PL -1).
C. BRAKE METAL FASCIA (MP -2)
D. SOFFIT PANELS (MP -3).
E. STANDING SEAM ROOF PANELS (MP -2).
F. BRAKE METAL CAP (MP -3).
G. CLEAR ANODIZED ALUMINUM (MP -5).
H. BRAKE METAL CAP (MP -4).
J. BRAKE METAL TUBE COLUMN (MP -2).
EXTERIOR ELEVATION MATERIALS XX
FINISH MATERIALS SCHEDULE NOTES:
a. PROVIDE COMPLETE ARCHITECTURAL SIDING SYSTEM AND ACCESSORIES, INCLUDING MATCHING
MANUFACTURER FABRICATED CORNERS, FLASHINGS, AND TRIMS. SIDING INSTALLATION PER MANUFACTURER
INSTALLATION INSTRUCTIONS.
FINISH MATERIALS SCHEDULE
PL-1
SYMBOL ITEM DESCRIPTION REMARKS
WA1
MP-2
MP-3
BRAKE METAL
MP-4 BRAKE METAL
GL-1 GALVALUME METAL PANEL
F-1 RESILIENT VINYL FLOORING
BRAKE METAL
B-1 METAL COVE BASE
ABET LAMINATI
"STRATIFICATION"
PL-2
DECORATIVE PANEL BRAND: NICHIHA MODERNBRICK
COLOR: MIDNIGHT
FIBER CEMENT PANEL
EXTERIOR WAINSCOT AND REAR WALL
DECORATIVE PANEL EXTERIOR WALLS ABOVE WAINSCOT AND ATTIC REAR BRAND: NICHIHA CANYONBRICK
COLOR: SHALE BROWN
FIBER CEMENT PANEL
INTERIOR WALL FINISH - CLASS A 8MM 405 WHITE 63 X 165
METAL ROOF, COPING AND CANOPY COLUMNS COLOR: PACIFIC BLUE
FINISH: SMOOTH
METAL SOFFIT AND METAL COPING COLOR: ONYX
FINISH: SMOOTH
METAL COPING AT SIDE WALLS COLOR: SANDSTONE
FINISH: SMOOTH
DRY STORAGE WALLS AND CEILING FINISH - CLASS A CEILING AND WALL FINISH
COLOR: FACTORY FINISH
SERVICE AREA AND TOILET METAL BASE
COLOR: WHITE
MAIN BUILDING AND DRY STORAGE FLOOR FINISH PROTECT-ALL FLOORING
COLOR: LIGHT GRAY
MP-5 BRAKE METAL TRIM AT STOREFRONT COLOR: CLEAR ANODIZED
FINISH: SMOOTH
MP-1 METAL PANEL & BRAKE METAL TRASH ENCLOSURE GATE AND TRIM BRAND: PAC-CLAD
16" METAL WALL PANEL
COLOR: CITYSCAPE
C-1 ACOUSTIC CEILING TILE MAIN BUILDING CEILING FINISH - CLASS A VINYLROCK
2x4 CEILING TILE
VINYL FACED
SCALE: 3/8" = 1'-0" A2.0
SOUTH ELEVATION 1
SCALE: 3/8" = 1'-0" A2.0
NORTH ELEVATION 2
1/8/2026 12:54:46 PM
C:\Revit Local\250431900_Arch_Central_25_kelly.hCFUB6.rvt
ARCHITECTURAL EXTERIOR ELEVATIONS
NOTE:
SIGNAGE SHOWN IS FOR REPRESENTATION
AND COORDINATION ONLY. REFER TO
PERMITTED SIGN PACKAGE FOR PRECISE
LOCATION AND SIGNAGE QUANTITY.
Page 45 of 58
FIRST FLOOR
100'-0"
B.O. CANOPY
108'-10 13/16"
T.O. WALL
111'-0"
1
A3.1
_________
ATTIC FLOOR
109'-10 1/2"
T.O. ROOF
119'-8"
2'-7 1/2"
2
8
2
1
8
A
A
G
A
B
B B B
C
10
1
3'-0"
T.O. PARAPET
112'-0"
10'-0" 2'-10"
HEIGHT OF #7
3'-2"
2
JJ
14
16
18 F H
H
F
13
C
D
101b
AL -2
FIRST FLOOR
100'-0"
B.O. CANOPY
108'-10 13/16"
T.O. WALL
111'-0"
1
A3.1
_________
ATTIC FLOOR
109'-10 1/2"
T.O. ROOF
119'-8"
2
8
2
1
14
DRIVE THRU COFFEE 1
3'-0"
A
B
B
GG
B
A
12
18 10
C
2'-10" 10'-0"
G
T.O. PARAPET
112'-0"
HEIGHT OF #7
3'-2"
2'-7 1/2"
H F
H
2
13
8
14
16 16
J
J
F
D
C
101c 101d
AL -3AL -2
1. CANOPY.
• REFER TO THE STRUCTURAL DRAWINGS.
2. SURFACE -MOUNTED LED NEON FLEX LIGHTING, SHOWN DASHED.
• REFER TO THE ELECTRICAL DRAWINGS.
3. ELECTRICAL EQUIPMENT.
• REFER TO THE ELECTRICAL DRAWINGS.
4. FROST PROOF HOSE BIB.
• REFER TO THE PLUMBING DRAWINGS.
5. EXTERIOR WEATHER -PROOF OUTLET.
• REFER TO THE ELECTRICAL DRAWINGS.
6. THROUGH WALL SCUPPER ROOF DRAIN.
7. OVERFLOW SCUPPER ROOF DRAIN.
8. STOREFRONT SIGN, SUPPLIED AND INSTALLED BY SIGN CONTRACTOR.
9. ADDRESS NUMBERS TO BE 8" TALL x 2" BRUSH STROKE.
10. OUTLINE OF MECHANICAL UNIT BEYOND.
• REFER TO THE MECHANICAL DRAWINGS.
11. KEY KNOX BOX.
12. 1/4" THICK ACRYLIC SIGNAGE APPLIED TO SIDING WITH VH DOUBLE SIDE
TAPE.
13. EXPOSED DOWNSPOUT, GALVANIZED, PAINTED. CONNECT TO SUB -GRADE
STORM WATER COLLECTION SYSTEM.
• REFER TO THE CIVIL DRAWINGS.
14. STRUCTURAL CANOPY COLUMN; RAINWATER DOWNSPOUT WITHIN;
CONNECT BASE OF CANOPY COLUMN DOWNSPOUT TO STORMWATER
MANAGEMENT SYSTEM.
• REFER TO THE CIVIL DRAWINGS.
15. TUBE LIGHT MOUNTED TO COLUMN AT 6" A.F.F.
• REFER TO THE ELECTRICAL DRAWINGS.
16. 1" INSULATED TEMPERED THERMAL WINDOWS w/ LOW -E GLASS. CLEAR.
• REFER TO SHEET A4.1 FOR ENERGY COMPLIANCE INFORMATION.
17. REMOTE COOLER.
• COORDINATE LOCATION WITH CIVIL DRAWINGS.
18. ICE MACHINE CONDENSER BEYOND, PROVIDED BY OWNER.
EXTERIOR ELEVATION KEYNOTES XX
A. ARCHITECTURAL CEMENT BOARD SIDING (PL -2).
B. ARCHITECTURAL CEMENT BOARD SIDING (PL -1).
C. BRAKE METAL FASCIA (MP -2)
D. SOFFIT PANELS (MP -3).
E. STANDING SEAM ROOF PANELS (MP -2).
F. BRAKE METAL CAP (MP -3).
G. CLEAR ANODIZED ALUMINUM (MP -5).
H. BRAKE METAL CAP (MP -4).
J. BRAKE METAL TUBE COLUMN (MP -2).
EXTERIOR ELEVATION MATERIALS XX
FINISH MATERIALS SCHEDULE NOTES:
a. PROVIDE COMPLETE ARCHITECTURAL SIDING SYSTEM AND ACCESSORIES, INCLUDING MATCHING
MANUFACTURER FABRICATED CORNERS, FLASHINGS, AND TRIMS. SIDING INSTALLATION PER MANUFACTURER
INSTALLATION INSTRUCTIONS.
FINISH MATERIALS SCHEDULE
PL-1
SYMBOL ITEM DESCRIPTION REMARKS
WA1
MP-2
MP-3
BRAKE METAL
MP-4 BRAKE METAL
GL-1 GALVALUME METAL PANEL
F-1 RESILIENT VINYL FLOORING
BRAKE METAL
B-1 METAL COVE BASE
ABET LAMINATI
"STRATIFICATION"
PL-2
DECORATIVE PANEL BRAND: NICHIHA MODERNBRICK
COLOR: MIDNIGHT
FIBER CEMENT PANEL
EXTERIOR WAINSCOT AND REAR WALL
DECORATIVE PANEL EXTERIOR WALLS ABOVE WAINSCOT AND ATTIC REAR BRAND: NICHIHA CANYONBRICK
COLOR: SHALE BROWN
FIBER CEMENT PANEL
INTERIOR WALL FINISH - CLASS A 8MM 405 WHITE 63 X 165
METAL ROOF, COPING AND CANOPY COLUMNS COLOR: PACIFIC BLUE
FINISH: SMOOTH
METAL SOFFIT AND METAL COPING COLOR: ONYX
FINISH: SMOOTH
METAL COPING AT SIDE WALLS COLOR: SANDSTONE
FINISH: SMOOTH
DRY STORAGE WALLS AND CEILING FINISH - CLASS A CEILING AND WALL FINISH
COLOR: FACTORY FINISH
SERVICE AREA AND TOILET METAL BASE
COLOR: WHITE
MAIN BUILDING AND DRY STORAGE FLOOR FINISH PROTECT-ALL FLOORING
COLOR: LIGHT GRAY
MP-5 BRAKE METAL TRIM AT STOREFRONT COLOR: CLEAR ANODIZED
FINISH: SMOOTH
MP-1 METAL PANEL & BRAKE METAL TRASH ENCLOSURE GATE AND TRIM BRAND: PAC-CLAD
16" METAL WALL PANEL
COLOR: CITYSCAPE
C-1 ACOUSTIC CEILING TILE MAIN BUILDING CEILING FINISH - CLASS A VINYLROCK
2x4 CEILING TILE
VINYL FACED
SCALE: 3/8" = 1'-0" A2.1
EAST ELEVATION 1
SCALE: 3/8" = 1'-0" A2.1
WEST ELEVATION 2
1/8/2026 12:54:46 PM
C:\Revit Local\250431900_Arch_Central_25_kelly.hCFUB6.rvt
ARCHITECTURAL EXTERIOR ELEVATIONS
NOTE:
SIGNAGE SHOWN IS FOR REPRESENTATION
AND COORDINATION ONLY. REFER TO
PERMITTED SIGN PACKAGE FOR PRECISE
LOCATION AND SIGNAGE QUANTITY.
Page 46 of 58
FIRST FLOOR
100'-0"
T.O. COOLER
111'-0"
17
H
3'-0"
2'-7 1/2"
F F
A
B
B
B
106
2'-7 1/2"
1. CANOPY.
• REFER TO THE STRUCTURAL DRAWINGS.
2. SURFACE -MOUNTED LED NEON FLEX LIGHTING, SHOWN DASHED.
• REFER TO THE ELECTRICAL DRAWINGS.
3. ELECTRICAL EQUIPMENT.
• REFER TO THE ELECTRICAL DRAWINGS.
4. FROST PROOF HOSE BIB.
• REFER TO THE PLUMBING DRAWINGS.
5. EXTERIOR WEATHER -PROOF OUTLET.
• REFER TO THE ELECTRICAL DRAWINGS.
6. THROUGH WALL SCUPPER ROOF DRAIN.
7. OVERFLOW SCUPPER ROOF DRAIN.
8. STOREFRONT SIGN, SUPPLIED AND INSTALLED BY SIGN CONTRACTOR.
9. ADDRESS NUMBERS TO BE 8" TALL x 2" BRUSH STROKE.
10. OUTLINE OF MECHANICAL UNIT BEYOND.
• REFER TO THE MECHANICAL DRAWINGS.
11. KEY KNOX BOX.
12. 1/4" THICK ACRYLIC SIGNAGE APPLIED TO SIDING WITH VH DOUBLE SIDE
TAPE.
13. EXPOSED DOWNSPOUT, GALVANIZED, PAINTED. CONNECT TO SUB -GRADE
STORM WATER COLLECTION SYSTEM.
• REFER TO THE CIVIL DRAWINGS.
14. STRUCTURAL CANOPY COLUMN; RAINWATER DOWNSPOUT WITHIN;
CONNECT BASE OF CANOPY COLUMN DOWNSPOUT TO STORMWATER
MANAGEMENT SYSTEM.
• REFER TO THE CIVIL DRAWINGS.
15. TUBE LIGHT MOUNTED TO COLUMN AT 6" A.F.F.
• REFER TO THE ELECTRICAL DRAWINGS.
16. 1" INSULATED TEMPERED THERMAL WINDOWS w/ LOW -E GLASS. CLEAR.
• REFER TO SHEET A4.1 FOR ENERGY COMPLIANCE INFORMATION.
17. REMOTE COOLER.
• COORDINATE LOCATION WITH CIVIL DRAWINGS.
18. ICE MACHINE CONDENSER BEYOND, PROVIDED BY OWNER.
EXTERIOR ELEVATION KEYNOTES XX
A. ARCHITECTURAL CEMENT BOARD SIDING (PL -2).
B. ARCHITECTURAL CEMENT BOARD SIDING (PL -1).
C. BRAKE METAL FASCIA (MP -2)
D. SOFFIT PANELS (MP -3).
E. STANDING SEAM ROOF PANELS (MP -2).
F. BRAKE METAL CAP (MP -3).
G. CLEAR ANODIZED ALUMINUM (MP -5).
H. BRAKE METAL CAP (MP -4).
J. BRAKE METAL TUBE COLUMN (MP -2).
EXTERIOR ELEVATION MATERIALS XX
FINISH MATERIALS SCHEDULE NOTES:
a. PROVIDE COMPLETE ARCHITECTURAL SIDING SYSTEM AND ACCESSORIES, INCLUDING MATCHING
MANUFACTURER FABRICATED CORNERS, FLASHINGS, AND TRIMS. SIDING INSTALLATION PER MANUFACTURER
INSTALLATION INSTRUCTIONS.
FINISH MATERIALS SCHEDULE
PL-1
SYMBOL ITEM DESCRIPTION REMARKS
WA1
MP-2
MP-3
BRAKE METAL
MP-4 BRAKE METAL
GL-1 GALVALUME METAL PANEL
F-1 RESILIENT VINYL FLOORING
BRAKE METAL
B-1 METAL COVE BASE
ABET LAMINATI
"STRATIFICATION"
PL-2
DECORATIVE PANEL BRAND: NICHIHA MODERNBRICK
COLOR: MIDNIGHT
FIBER CEMENT PANEL
EXTERIOR WAINSCOT AND REAR WALL
DECORATIVE PANEL EXTERIOR WALLS ABOVE WAINSCOT AND ATTIC REAR BRAND: NICHIHA CANYONBRICK
COLOR: SHALE BROWN
FIBER CEMENT PANEL
INTERIOR WALL FINISH - CLASS A 8MM 405 WHITE 63 X 165
METAL ROOF, COPING AND CANOPY COLUMNS COLOR: PACIFIC BLUE
FINISH: SMOOTH
METAL SOFFIT AND METAL COPING COLOR: ONYX
FINISH: SMOOTH
METAL COPING AT SIDE WALLS COLOR: SANDSTONE
FINISH: SMOOTH
DRY STORAGE WALLS AND CEILING FINISH - CLASS A CEILING AND WALL FINISH
COLOR: FACTORY FINISH
SERVICE AREA AND TOILET METAL BASE
COLOR: WHITE
MAIN BUILDING AND DRY STORAGE FLOOR FINISH PROTECT-ALL FLOORING
COLOR: LIGHT GRAY
MP-5 BRAKE METAL TRIM AT STOREFRONT COLOR: CLEAR ANODIZED
FINISH: SMOOTH
MP-1 METAL PANEL & BRAKE METAL TRASH ENCLOSURE GATE AND TRIM BRAND: PAC-CLAD
16" METAL WALL PANEL
COLOR: CITYSCAPE
C-1 ACOUSTIC CEILING TILE MAIN BUILDING CEILING FINISH - CLASS A VINYLROCK
2x4 CEILING TILE
VINYL FACED FIRST FLOOR
100'-0"
T.O. COOLER
111'-0"
17
H
13
DRIVE THRU COFFEE
2'-7 1/2" 2'-7 1/2"
3'-0"
F F
A B
BB
MAIN BUILDING BEYOND
12
1/8/2026 12:54:45 PM
C:\Revit Local\250431900_Arch_Central_25_kelly.hCFUB6.rvt
ARCHITECTURAL EXTERIOR ELEVATIONS
SCALE: 3/8" = 1'-0" A2.2
WEST COOLER ELEVATION 2
SCALE: 3/8" = 1'-0" A2.2
EAST COOLER ELEVATION 1
NOTE:
SIGNAGE SHOWN IS FOR REPRESENTATION
AND COORDINATION ONLY. REFER TO
PERMITTED SIGN PACKAGE FOR PRECISE
LOCATION AND SIGNAGE QUANTITY.
Page 47 of 58
TOTAL AREA2.171 ACRES94,571 SQ. FT.
ARCHITECTS ● ENGINEERS ● SURVEYORSAlways aBetter Plan100 Camelot DriveFond Du Lac, WI 54935Phone: (920) 926-9800www.EXCELENGINEER.comJOB NO. 250360200
Page 48 of 58
SHEET 2 OF 3 SHEETS
CERTIFIED SURVEY MAP
LOT 1, CSM NO. 824-3-182 & PART OF THE SW 1/4 OF
THE SE 1/4, LOCATED IN THE NW 1/4 & SW 1/4 OF THE
SE 1/4, SECTION 29, TOWNSHIP 24 NORTH, RANGE 8 EAST,
CITY OF STEVENS POINT, PORTAGE COUNTY, WISCONSIN.
SURVEYOR'S CERTIFICATE
I, Ryan Wilgreen, Professional Land Surveyor, hereby certify:
That I have surveyed, divided and mapped a parcel of land described below.
That I have made such Certified Survey under the direction of Pointmed Properties, LLC bounded
and described as follows:
Lot 1 of Certified Survey Map No. 824-3-182, recorded in Volume 3 of Certified Survey Maps on
Page 182 in the Portage County Register of Deeds Office as Document No. 308498 and part of the
Southwest 1/4 of the Southeast 1/4, being located in the Northwest 1/4 and Southwest 1/4 of the Southeast
1/4 of Section 29, Township 24 North, Range 8 East, City of Stevens Point, Portage County, Wisconsin
being more particularly described as follows:
Commencing at Northeast corner of the Southeast 1/4 of said Section 29; thence South 00°-04’-23”
West along the East line of said Southeast 1/4, a distance of 1,276.70 feet; thence South 89°-31’-53” West,
a distance of 1,407.45 feet to the Northeast corner of said Lot 1, said point being the point of beginning;
thence South 01°-31’-04” East along the West right-of-way line of Division Street, a distance of 371.13 feet;
thence South 89°-50’-55” West along the North line of Lot 1 of Certified Survey Map No. 4817-17-72,
recorded in Volume 17 on Page 72 in the Portage County Register of Deeds Office as Document No.
442380, a distance of 274.24 feet; thence North 84°-00’-51” West, a distance of 19.25 feet to the Easterly
right-of-way line of Vincent Street; thence Northeasterly 125.63 feet along said Easterly line on a curve to
the left having a radius of 50.00 feet, the chord of said curve bears North 18°-27’-45” East, a chord distance
of 95.10 feet; thence North 00°-08’-50” East along the East right-of-way line of Vincent Street, a distance of
277.45 feet to the Northwest corner of said Lot 1; thence North 89°-31’-53” East along the North line of said
Lot 1, a distance of 252.73 feet to the point of beginning and containing 2.171 acres (94,571 sq. ft.) of land
more or less.
That such is a correct representation of all the exterior boundaries of the land surveyed and the land
division thereof made.
That I have fully complied with the provisions of Section 236.34 of the Wisconsin Statutes and the
Subdivision Ordinance of the City of Stevens Point in surveying, dividing and mapping the same.
______________________________
Ryan Wilgreen, P.L.S. No. S-2647
ryan.wilgreen@excelengineer.com
Excel Engineering, Inc.
Fond du Lac, Wisconsin 54935
Project Number: 250360200
Page 49 of 58
SHEET 3 OF 3 SHEETS
CERTIFIED SURVEY MAP
LOT 1, CSM NO. 824-3-182 & PART OF THE SW 1/4 OF
THE SE 1/4, LOCATED IN THE NW 1/4 & SW 1/4 OF THE
SE 1/4, SECTION 29, TOWNSHIP 24 NORTH, RANGE 8 EAST,
CITY OF STEVENS POINT, PORTAGE COUNTY, WISCONSIN.
OWNER'S CERTIFICATE
Pointmed Properties, LLC, a limited liability company duly organized and existing under and by
virtue of the laws of the State of Wisconsin, as owner, does hereby certify that said limited liability company
caused the land described on this map to be surveyed, divided and mapped as represented on this map.
Pointmed Properties, LLC does further certify that this map is required by s.236.10 or s.236.12 to be
submitted to the following for approval or objection:
1. City of Stevens Point
WITNESS the hand and seal of said owner this _______ day of _________________, 20__.
Pointmed Properties, LLC
______________________________________________________
___________________________, __________________________
(Print) (Title)
STATE OF ____________________ )
______________________COUNTY )SS
Personally, came before me this ______ day of ______________, 20___, the above named
_______________________ to me known to be the person who executed the foregoing instrument and
acknowledged the same.
______________________________________
Notary Public, _______________ County, ____
My Commission Expires:__________________
CITY OF STEVENS POINT ACCEPTANCE CERTIFICATE
I hereby certify that this map and the accompanying information is hereby (approved) (conditionally
approved) pursuant to the building and safety ordinances of Stevens Point on the basis of the following
(facts)(conditions)
___________________________________________________________
___________________________________________________________
Community Development Office (Date)
Page 50 of 58
5/13/2026
CITY OF STEVENS POINT AIRPORT
1515 Strong Ave
Stevens Point, Wisconsin, 54481
Dear Customer:
In an effort to provide improved service and reliability Wisconsin Public Service Corporation is
planning on rebuilding the electric facilities on your property at 4435A State Highway 66, in the
City of Stevens Point, County of Portage, State of Wisconsin. This work involves replacing
underground electric cables and above-ground equipment, such as pedestals and transformers on
your property in locations shown on the attached easement which, when executed, would grant
us the right to install and maintain the necessary facilities.
I have enclosed two copies of the easement for your review. The exhibit is only temporary until
the final one can be completed. When the final exhibit is complete, we will send it along with a
copy of the easement for your review. After you review the exhibit, the document will be
recorded with the Office of the Register of Deeds. Signing this document will allow Wisconsin
Public Service Corporation to install facilities on your property in the location described in the
easement.
Please note that the Public Service Commission entitles you to a minimum of five days to
examine the materials provided. However, you have the option to waive the five-day review
period and sign and return the easement at any time.
You will note that the documents require you to sign them in the presence of a Notary Public.
Please make the necessary arrangements to meet with a Notary Public in your vicinity and have
the Notary sign the documents where indicated. All signatures and blanks filled in must be
completed in BLACK INK to be accepted by the Register of Deeds for recording.
Please return one of the documents to me in the pre-paid envelope provided at your earliest
convenience. The second document is for your records. Installation cannot be scheduled until
the completed document has been received.
Please contact me if you have any questions regarding the easement. Please refer to Work
Request WMIS-3499030.
Ana Rivera-Groe- Right of Way Agent
Wisconsin Public Service Corporation
(920) 433-1151
Ana.RiveraGroe@wisconsinpublicservice.com
Enclosed
Page 51 of 58
3343983 Easement
THIS INDENTURE is made this ______ day of ______________,
______, by and between CITY OF STEVENS POINT AIRPORT
("Grantor") and WISCONSIN PUBLIC SERVICE
CORPORATION, a Wisconsin Corporation, along with its
successors and assigns (collectively, "Grantee") for good and valuable
consideration, the receipt and sufficiency of which are hereby
acknowledged, Grantor, owner of land, hereby grants and warrants to,
Grantee, a permanent easement upon, within, beneath, over and across
a part of Grantor’s land hereinafter referred to as "easement area"
more particularly described as follows:
Part of Lot 1 of Certified Survey Map No. 10340 Recorded
in the Portage County Register of Deeds Volume 46 of
Certified Survey Maps on Page 70 as Document 781619,
being part of the Southeast Quarter of the Southwest
Quarter (SE ¼ - SW ¼) and the Southwest Quarter of the
Southeast Quarter (SW ¼ - SE ¼) of Section 22 Township
24 North, Range 8 East, in the City of Stevens Point,
County of Portage, State of Wisconsin, as shown on the
attached Exhibit “A”.
Return to:
Wisconsin Public Service Corp.
Real Estate Dept.
P.O. Box 19001
Green Bay, WI 54307-9001
Tax Parcel Identification Number
(PIN)
281-24-0823230001
1. Purpose: ELECTRIC UNDERGROUND - The purpose of this easement is to construct, install, operate,
maintain, repair, replace and extend underground utility facilities, conduit and cables, electric pad-mounted
transformers, manhole, electric pad-mounted switch-fuse units, electric pad-mounted vacuum fault interrupter,
concrete slabs, power pedestals, riser equipment, terminals and markers, together with all necessary and
appurtenant equipment under and above ground as deemed necessary by Grantee, all to transmit electric energy,
signals, television and telecommunication services, including the customary growth and replacement
thereof. Trees, bushes, branches and roots may be trimmed or removed so as not to interfere with Grantee's use
of the easement area.
2. Access: Grantee shall have the right to enter on and across any of the Grantor’s property outside of the
easement area as may be reasonably necessary to gain access to the easement area and as may be reasonably
necessary for the construction, installation, operation, maintenance, inspection, removal or replacement of the
Grantee’s facilities.
3. Buildings or Other Structures: Grantor agrees that no structures will be erected in the easement area or in
such close proximity to Grantee's facilities as to create a violation of all applicable State of Wisconsin electric
and gas codes or any amendments thereto.
4. Elevation: Grantor agrees that the elevation of the ground surface existing as of the date of the initial
installation of Grantee's facilities within the easement area will not be altered by more than 4 inches without
the written consent of Grantee.
Page 52 of 58
5. Restoration: Grantee agrees to restore or cause to have restored Grantor's land, as nearly as is reasonably
possible, to the condition existing prior to such entry by Grantee or its agents. This restoration, however, does
not apply to any trees, bushes, branches or roots which may interfere with Grantee's use of the easement area.
6. Exercise of Rights: It is agreed that the complete exercise of the rights herein conveyed may be gradual and
not fully exercised until sometime in the future, and that none of the rights herein granted shall be lost by non-
use.
7. Binding on Future Parties: This grant of easement shall be binding upon and inure to the benefit of the
heirs, successors and assigns of all parties hereto.
8. Easement Review: Grantor acknowledges receipt of materials which describe Grantor’s rights and options
in the easement negotiation process and furthermore acknowledges that Grantor has had at least 5 days to
review this easement document or voluntarily waives the five day review period.
[REMAINDER OF PAGE LEFT BLANK]
Page 53 of 58
WITNESS the hand and seal of the Grantor the day and year first above written
CITY OF STEVENS POINT AIRPORT
Organization name
Sign Name
Print name & title
Sign Name
Print name & title
STATE
OF
)
)SS
COUNTY
OF
)
This instrument was acknowledged before me this _______ day of ___________________, _______, by the
above-named_________________________________________________________ CITY OF STEVENS
POINT AIRPORT, to me known to be the Grantor(s) who executed the foregoing instrument on behalf of said
Grantor(s) and acknowledged the same
Sign Name
Print Name
Notary Public, State of
My Commission expires:
This instrument drafted by: Ana Rivera-Groe
Wisconsin Public Service Corporation
REMS Entity ID WR Number Document ID REMS Formatted Number
1494285 WMIS-3499030 3343983 INT11-494-285
Page 54 of 58
Temporary Exhibit "A"
Not to Scale - For Reference Only
Doc ID: 3343983 County: Portage
WR Number WMIS-3499030 Tax Parcel Number: 281-24-0823230001
Date: 4/29/2026
**Temporary Exhibit**
**Final Exhibit will be sent for approval at a later date**
Page 55 of 58
City of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481-3594
Department of Community Development
Adam Kuhn
Associate Planner
Zoning Administrator
Ph: (715) 346-1567
Fax: (715) 346-1498
www.stevenspoint.com
Open Records Rider: The City of Stevens Point is subject to Wisconsin Statutes relating to public records.
Communication, such as this document, sent or received by City employees are subject to these laws. Unless
otherwise exempted from the public records law, senders and receivers of City communication should
presume that the communications are subject to rel ease upon request, and to state record retention
requirements.
Page 1 of 2
MEMORANDUM
To: Plan Commission
From: Adam Kuhn, AICP
Associate Planner / Zoning Administrator
Date: June 1, 2026
RE: Review of Portage County Bicycle & Pedestrian Plan
-------------------
Bicycle & Pedestrian Plan: In January, the Commission reviewed the draft Portage
County Bicycle & Pedestrian Plan. Feedback received by this Commission, along with
the governing bodies of our partnering communities through the SS4A Program, have
been sent to the contracted consultant to edit the Plan accordingly. Such edits include
the following:
• Improved Figures 4.1 and 4.2 (page 30). Communities have been reordered
based on highest biking/walking rates.
• Added High Injury Network map from the Comprehensive Safety Action Plan
(page 34).
• Expanded bicycle and pedestrian facility types in Chapter 5:
o Added image of a one-way protected bike lane (page 41)
o Added definition and image of a Raised Bike Lane (page 42)
o Added definition and image of a Protected Transit Stop (page 42)
o Removed sharrows on collector/arterial streets (page 44)
o Added Raised Crosswalks & Speed Tables (page 52)
• Updated Vision for 2045 (page 54). Included the SS4A grant goal of reducing
traffic fatalities and serious injuries to zero by 2045.
• Revised and expanded action items (bullet points) under Strategies (pages 55 to
58), including:
o Expanded strategy #3 under Goal A to emphasize rural villages and
school areas as well (page 55)
o Added employer incentives for bicycle commuting (page 56 – bullet point
3 of Strategy 3, Goal B)
Page 56 of 58
stevenspoint.com
o Added requirement for bicycle training as part of driver’s education
(page 57 – bullet point 4 of Strategy 1, Goal D)
o Added adoption of “20 is Plenty” policy recommendation (page 57 –
bullet point 3 of Strategy 3, Goal D)
o Added incorporation of multilingual educational materials (page 57 –
bullet point 3 of Strategy 4, Goal D)
• Updated “Other Program and Policy Recommendations” (pages 71-72),
including
o Added to page 71: Provide bicycle parking at popular transit stops
o Added to page 71: Continue providing bicycle racks on all transit uses
o Added to page 71: Improve prompt snow removal from sidewalks and
trails
o Removed from page 72: Conduct a bike share feasibility study to
determine the potential for a small scale bike share system in Stevens
Point
• Added a new figure 9.1 (page 92), which illustrates safety benefits of protected
bike lanes to support their use as traffic-calming measures.
• Added two general urban area bikeway recommendations (page 93):
o Include protected bike lanes in reconstructed streets in downtown
Stevens Point
o Use temporary demonstration activities to evaluate permanent
treatments
• Added new recommendation for crosswalk visibility enhancements (page 104)
• Updated Table 9.16 (page 105) to improve location descriptions of
recommended pedestrian crossing enhancements
With the above changes, staff is ready to go through the approval process of adopting
the Plan. For the City, this Commission and the Bicycle & Pedestrian Street Safety
Commission will make a recommendation to the Common Council whether or not to
recommend adoption of the Plan. The Bicycle & Pedestrian Street Safety Commission
recommended approval of the Plan during their May 13, 2026 meeting. All other
partnering communities are going through their approval process, with the goal of the
Portage County Board taking final action during their July or August meeting.
Please review the proposed Plan and be ready to provide comments. If you have any
questions, please let me know.
View County Bicycle & Pedestrian Plan here.
Page 57 of 58
Community Development Report, April 2026
Abandoned Vehicle on Property 4
1 433 Forest St N $1,807.00 Bulk Waste at Curb Early 10
1 5500 Forest Creek Rd $1,163.00 Commercial Building Violation 1
1 5526 Forest Creek Rd $1,163.00 Construction Work Without Permits 1
1 5492 Golla Rd $1,163.00 Debris on Property 10
Two‐Family N/A N/A N/A Exterior Violations on House 1
Multi‐Family N/A N/A N/A Illegal Pets or Livestock 1
Commercial/Industrial N/A N/A N/A Infestation 0
Interior Housing Violations 2
Native Lawn Plan 0 ++
Potholes 0 +
Residential 105 $8,189.19 Property Encumbrance 0
Commercial 26 $4,373.90 Public Works Violation 4 +
Snow & Ice Removal ‐ Sidewalk 0
Monthly Permits Monthly Valuation Monthly Fees YTD Permits YTD Valuation YTD Fees Tall Grass or Noxious Weeds 2
135 $3,312,024.40 $17,859.09 391 $11,271,462.99 $67,931.19 Trash Containers Improperly Stored 1
Vacant Building/Home 0
2025 359 $15,737,889.08 $59,421.69 Vehicle Parked on Grass 2
2024 415 $20,227,514.37 $103,946.45 Vision Obstruction in Roadway or Intersection 1
2023 440 $25,106,655.62 $91,252.55 Zoning Violations 4
Total Violations / Total Service Fees Billed 44 $950
Voluntary Compliance Rate for Tagged/Verbal 0/0 0%
+ Referred to another department
++ Perpetual
N/A
N/A
Single Family
Additions or Alterations # of Permits
$607,387.25
$961,917.15
Declared Valuation Fees
N/A
$573,720.00
$405,000.00
$354,000.00
$410,000.00
Violation ReportConstruction Report
New Construction Fees# of Permits Location Declared Valuation
Page 58 of 58
Source: City of Stevens Point website. First collected Oct 21, 2026.