Board of Public Works — Agenda Packet
City of Stevens Point · Portage County · Board of Public Works · meeting of Apr 13, 2026 · Agenda packets
Open the original document More from City of Stevens Point
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Our intention is to have in-person meetings going forward. For the time being, we will hold the City
Committee Meetings, Plan Commission, Council and most others at the Community Room at 933 Michigan
Avenue. This in-person location will meet the legal requirement for our open meetings.
We will have a virtual option available, but the technology for the hybrid style meeting may not be reliable all
of the time.
CITY OF STEVENS POINT
BOARD OF PUBLIC WORKS MEETING
April 13, 2026 - 6:10 PM
(or immediately following previously scheduled meeting)
Community Room
933 Michigan Avenue, Stevens Point, WI
OR
Zoom Teleconferencing
Meeting ID: 849 7295 2905 | Passcode: 477177
By Computer: https://us02web.zoom.us/j/84972952905?pwd=lZvGRQPEDwYa9I49phrNqHwLcmMbHo.1
By Phone: +1-312-626-6799 (US Chicago)
(A quorum of the City Council may attend this meeting)
AGENDA
Roll Call
Informational
1. Director's Report
a. Division and Church Streets Reconstruction Projects.
b. 2025 Fall Paving Project.
c. Hoover Road Resurfacing Project.
d. City Hall
Discussion and Possible Action
2. Consideration of request for a one-day ATV/UTV use on portions of North
Reserve Street, DuBay Drive, and Second Street North for a special event.
3. Ordinance Amendment - Chapter 9, Section 9.19 to create ATV/UTV Routes.
4. Ordinance Amendment - Chapter 16, Section 16.15 to create a Right of Way,
Boulevards, and Swales section to accommodate the increasing number of
plantings within the right of way.
5. Ordinance Amendment - Chapter 7, Section 7.06 regarding the Collection of
Garbage and Recyclables to comply with recent revisions to State rules.
6. To award the 2026 Street Improvements - Michigan Avenue Underpass
Project #26-101 to Switlick & Sons, Inc. for an amount not to exceed
$2,647,627.18.
Page 1 of 39
7. To award the 2026 Resurfacing - Hoover Road Project #26-103 to American
Asphalt of Wisconsin in an amount not to exceed $792,706.50.
8. To award the 2026 Pavement Maintenance Project #26-104 to Fahrner
Asphalt Sealers, Inc. for the amount not to exceed $169,030.01.
9. To award the construction-related services for the North Segment of the
Business 51 Project to MSA for $1,007,319.00.
10. To enter into a State/Municipal Financial Agreement with the WisDOT for
pavement resurfacing of a portion of Connecting Highway 66.
11. Consideration of a proposal from Canadian National for safety improvements
regarding the 2007 alteration of the Patch Street Railroad Crossing.
Adjourn
Meeting Rider
Any person who has special needs while attending this meeting or needing agenda materials for this meeting should
contact the City Clerk as soon as possible to ensure a reasonable accommodation can be made. The City Clerk can
be reached by telephone at (715) 346-1569, TDD # 346-1556 or by mail at 1515 Strongs Ave., Stevens Point, WI
54481.
Copies of ordinances, resolutions, reports and minutes of the committee meetings are on file at the office of the City
Clerk for inspection during normal business hours from 7:30 a.m. to 4:00p.m.
Page 2 of 39
s t e v e n s p o i n t . c o m
April 8, 2026
DIRECTOR OF PUBLIC WORKS REPORT
Scott Beduhn
1. Engineering Division -
• Country Club Drive:
o All work is complete. The contractor will return this spring to address any warranty items.
• Division and Church Streets Reconstruction Project:
o The South Segment project bid opening was held on March 10, 2026.
▪ The low bidder was Chippewa Concrete Services, Inc. for $6,712,244.39.
▪ While the bidding was very tight, with all six bids separated by only $410,000 (approx.
6%), the low bid was 11.5 percent above the engineer's estimate.
▪ The State of Wisconsin has accepted the bid, and the project is moving forward.
o WPS is currently relocating above-ground utilities within the South Segment in anticipation
of the project.
o Staff has reviewed and commented on AECOM’s near-final plans for the North Segment.
▪ Real Estate continues in the North Segment with 34 of the 47 parcels having been
acquired. Based upon the anticipated dates of acquisition, the City should have the
necessary real estate acquired to begin construction by early June. Therefore, this
project will be bid in late April for a May contract award.
▪ WPS is anticipating relocation work to begin within the North Segment in late April or
early May.
▪ The City is working on the demolition of the structure at 1717 Fourth Avenue to clear the
way for WPS to relocate utilities and eventually the construction of the roundabout.
o Being a small structure, the demolition does not rise to the level of a biddable
project; therefore, staff will simply work directly with demolition contractors to have
the building removed.
o Staff submitted an STP-Urban application for the segment of Church Street between Rice
Street and Francis Street. Grant award notifications should be sent out this spring.
o An open house was held on April 1, 2026, to offer the public an opportunity to review the
final designs and ask questions about what to expect during construction and what
changes to expect after construction is complete, such as intersection changes, access
relocations, and removals.
o City staff has requested proposals for construction-related services for the North Segment
from several firms, including AECOM, JT Engineering, and MSA. Proposals were received on
March 27, 2026, from all three firms.
• 2024 Street Improvement Project (Northside):
o All work is complete. The contractor will return this spring to address any warranty items.
▪ Among the known warranty items are poorly riding manholes along Maria Drive.
City of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481
Public Works
Engineering Department:
Phone: 715-346-1561
Fax: 715-346-1650
Streets Department:
Phone: 715-346-1537
Fax: 715-346-1687
Page 3 of 39
s t e v e n s p o i n t . c o m
• 2025 Street Improvement Project (Washington Ave):
o All work is complete. The contractor will return this spring to address any warranty items.
• 2025 Street Improvement Project (Madison/Monroe):
o All work is complete. The contractor will return this spring to address any warranty items.
• Curb Gutter and Sidewalk Repair Project:
o Nothing new to report.
• Fall Paving Project:
o Green Avenue resurfacing will occur in the spring due to a lack of contractor availability to
complete the work this past fall. The work began on March 30, 2026, and is anticipated to
be complete by mid-June.
o An open house was held on March 5, 2026, for the residents impacted by the work. The
meeting provided an opportunity for residents to meet staff and ask questions regarding
the proposed work.
o With the work being completed in 2026, staff evaluated adding Green Court to this project
using the remaining 2025 and available 2026 capital dollars, and we believe there is
adequate funding to complete Green Court, which staff will change order into the Green
Avenue contract.
• Pavement Maintenance Project:
o A bid opening for the year’s pavement maintenance was held on April 7, 2026.
▪ The low bidder was Fahrner Asphalt Sealers, Inc. for $146,982.62.
o Unlike past years, Staff is intending to only complete chip seals and will not be applying any
rejuvenators as we have done in the past.
▪ A recent report released by the Minnesota Department of Transportation on
rejuvenators has staff reconsidering alternative products to what we have been using,
and will pause to reevaluate options before resuming this activity.
• Downtown Concrete Joint Repair Project:
▪ Staff is evaluating potential next phases of this project, looking at Water Street/Second
Street between Clark Street and Portage Street. While staff were anticipating completing
some of this work this spring, staff is currently pausing as we continue to evaluate
downtown transportation needs and discuss longer-term pavement solution options with
WisDOT.
• Michigan Avenue Underpass:
o The bid opening occurred on April 7, 2026.
▪ The low bid was submitted by Switlick & Sons in an amount of $2,302,284.50.
o An open house was held on March 5, 2026, for the residents impacted by the work. The
meeting provided an opportunity for residents to meet staff and ask questions regarding
the proposed work.
o Work on the underpass should begin in May, and the project should wrap up in September.
o As part of a larger effort to mitigate underpass flooding, the Utility Department will be
making additional storm sewer improvements in Patch Street this spring.
• Hoover Road Intersections Signalizations:
o All work is complete. The contractor will return this spring to address any warranty items.
• Traffic Signal Upgrade:
o Staff is working on a multi-year effort to modernize and upgrade the City’s traffic signal
systems. These upgrades include new controllers and communications, camera systems,
Page 4 of 39
s t e v e n s p o i n t . c o m
pedestrian pushbuttons, and emergency vehicle preemption.
o Some of the improvements will be done in conjunction with other planned projects, such as
Business 51and Michigan Avenue underpass, while others will be completed using the
annual signal improvement capital budget line item.
o Staff has applied for grants under WisDOT Signals and ITS Standalone Program (SISP). The
SISP program is for state-controlled intersections and extends to municipalities for
connecting highways. The grants cover up to 90 percent of all eligible costs.
• Hoover Road Resurfacing:
o Hoover Road is starting to exhibit a similar failure as was observed on Business Park Drive in
2023. The failure, known as stripping, is when the bonds between the asphalt binder and
aggregate break down and the pavement separates along weakened planes, resulting in
shallow potholes. To address the issue, staff is looking to mill the upper layer of asphalt and
then repave. This work will be done as part of the annual road maintenance budget.
o A bid opening for the Hoover Road Resurfacing was held on April 7, 2026
▪ The low bid was submitted by American Asphalt for $689,310.00.
• Park Street Railroad Crossing Closure Investigation:
o Staff is negotiating an incentive with Canadian National Railway. The process is moving
slowly as the Patch Street Crossing is becoming a part of the negotiation.
• Patch Street Railroad Crossing Alteration:
o OCR held a virtual public hearing on March 3, 2026.
o While the City will be financially responsible for safety improvements, no official order was
delivered at the public hearing, as the Administrative Law Judge is allowing the City and
CN to work together on a proposed solution, subject to OCR approval.
o CN has presented a proposal to staff combining the closure of Wood Street (in lieu of Park
Street) to reuse the existing signals at Wood Street at Patch Street. Any such proposal
would be subject to OCR approval.
• SS4A Grant:
o The second draft of the Safety Action Plan is currently being reviewed by staff. The Safety
Action Plan is intended to be a comprehensive plan designed to eliminate roadway
deaths and serious injuries throughout Portage County. After staff’s review has been
completed, the draft plan will be made available for public comment.
o Overall, the project is in the final stages of documentation and should wrap up later this
year.
• WisDOT HWY 66/HWY 10 Improvements:
o Staff is working with WisDOT as they are planning several improvement projects for the
Highway 66 and Highway 10 corridors through Stevens Point over the next few years.
▪ In 2027, WisDOT is planning to complete a curb ramp replacement project through
both corridors. This project is intended to improve the pedestrian environment by
ensuring that curb ramps are ADA compliant.
▪ In 2028, WisDOT is planning to complete a joint repair project on Highway 10.
▪ In 2030, WisDOT is planning to complete a pavement replacement project on Highway
66 from the west City Limits to the CN Railroad crossing.
▪ In 2031, WisDOT is planning to complete a pavement overlay of Highway 66 between
Frontenac Avenue and Country Club Drive.
▪ In 2032, WisDOT is planning to complete a pavement replacement project on Highway
66 between West Karner Street and Division Street.
Page 5 of 39
s t e v e n s p o i n t . c o m
• City Hall:
o The architectural design is nearing completion, and the bidding process will soon be
underway. The bidding schedule for City Hall is anticipated to go as follows:
▪ Somerville will be presenting the final design for approval to the Council on April 20th.
▪ Public notices will be published on April 23rd and 30th.
▪ Mandatory pre-bid meetings will be held on April 27th and 28th.
▪ The bid opening will be held on May 19th
▪ Special Finance and Common Council meeting will be held on May 26th for the award
consideration.
o Given the compressed timeline no Board of Public Works meeting is anticipated.
• Additional Miscellaneous Projects:
o Engineering Staff continues working on proposed 2026 and 2027 roadway projects,
including gathering survey data, researching right of way, and preparing bidding
documents.
o Engineering staff have been working with university staff on several fronts to improve the
University environment. These include:
▪ Discussions in conjunction with Community Development on the future of the old
Maytag lot.
▪ Discussions regarding the reconstruction of Fourth Avenue through campus, which is
tentatively scheduled for reconstruction in 2027.
o Staff continue to work with the Utility Department on various water, sanitary, stormwater,
and fiber projects.
o Staff continue to work with the Community Development Department on various projects.
These projects include:
▪ Shopko redevelopment.
▪ Convent redevelopment.
o Garbage and Recycling ordinance revisions. These include:
▪ Ordinance changes required to comply with recent revisions to the State recycling rules
found in Wisconsin Administrative Code NR500, 502, 520, 532, and 544.
▪ While there are specific ordinance changes to be made, staff is taking the opportunity
to also review the entirety of the City’s ordinance language pertaining to Chapter 7 of
the Revised Municipal Code, Section 7.06 Solid Waste Disposal, Yard Waste, and City of
Stevens Point Drop-off.
▪ The State’s deadline for adoption of the new ordinance language is April 30, 2026. The
ordinance changes are included for approval in this month’s agenda.
STREETS SUPERINTENDENT REPORT
Chris Johnson
2. Streets Division- March
• Continued Operations:
o Garbage and Recycling
o Street Sign Compliance and replacement
o Street Light Maintenance
o Street Patching/Trumbull
o Drop off Site Operations
• Staffing:
o We currently have an opening for a Streets Maintenance Worker due to a resignation in
March, as the employee is relocating outside the area.
Page 6 of 39
s t e v e n s p o i n t . c o m
• Winter Crews/Work:
o March 2026 Blizzard: Between March 14–16, the City received just under 30 inches of
snow. This storm had a significant impact on both our crews and residents. The event
resulted in approximately 300 hours of overtime and an additional 250 hours of shift
differential for post-storm snow picking operations. There were no major operational
issues during the storm.
o April 2026 Ice Storm: In early April, the City experienced a major ice storm that resulted
in numerous downed trees and power outages. The department primarily focused on
clearing trees from roadways and placing barricades around downed power lines. One
challenge during the storm was the number of traffic signals experiencing intermittent
power, which created the potential for conflicting signal indications while temporary
stop signs were in place.
• Patching:
o With the recent snowstorm, ice storm, and continued freeze-thaw cycles, potholes are
prevalent throughout the city. Crews, including our night crew, are actively working to
address them. We have also begun using the infrared patcher for the season. Trumbull,
hot patching, infrared, and cold patching efforts are ongoing citywide. It is worth
noting that, due to the recent weather conditions, some temporary patches have not
held and require rework.
• Salt Shed:
o The fabric salt shed experienced a tear along a seam late last year. The issue was
addressed under warranty, with the City bearing partial cost. The repair project was
completed at the end of March.
• Library:
o The City owns the Portage County Library – Stevens Point Branch building. County staff
reported several maintenance concerns, including water intrusion and a potential
structural issue along the Main Street wall. A structural engineer has evaluated the
building and provided recommendations.
o Due to ongoing issues with the main entrance doors, including a reported injury,
replacement of the doors is on the Finance Committee agenda, with cost sharing
between the City and County. Staff continue to work with the County under the lease
agreement to address remaining items.
• Equipment maintenance/Garage :
o Most equipment included in the 2026 capital budget has been ordered. Collective
Data was on site in March to provide additional training and assist staff in fully utilizing
the system.
Page 7 of 39
City of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481-3594
Fax 715-346-1530
Department of
Administrative Services
Ph: 715-346-1594
StevensPoint.com
April 6, 2026
MEMORANDUM
TO: Stevens Point Public Works Committee and Common Council
FROM: Mayor Wiza
RE: Request for one day ATV/UTV access on a portion of City roadway.
The Pok-A-Snoz ATV/Snowmobile Club has requested that ATV/UTV access be allowed on
portions on N Reserve St, DuBay Ave and Second St N from 2:00 pm until 10:00 pm on Saturday, August
29th for a fundraiser event at the Moose Family Center 1025 Second St N.
The request was forwarded to the Police Department and the Department of Public Works and both are
comfortable will allowing the use for that limited time frame as long as all current laws are followed.
The request from the secretary is below and the route map is on the following page:
We voted last night at our meeting, and our steak feed will be moving to locations this year. It
will be held at the Moose Lodge on 8/29. If possible, could we get some roads opened on the
north end of town. I attached a picture from the most recent UTV map that was printed and put
the roads in red. It would be the north end of North Second, north of the Moose Lodge to the
Moose Lodge. We would also like to have Dubay open for those coming from North Reserve.
Please let me know if you have any questions. Thank you so much.
Malayna Polum
Secretary Pok A Snoz Snowmobile/ATV Club
Your consideration on this request is appreciated.
Mike Wiza
Mayor of the City of Stevens Point
Page 8 of 39
Page 9 of 39
s t e v e n s p o i n t . c o m
April 9, 2026
To: Board of Public Works
From: Scott Beduhn, Director of Public Works
Re: Ordinance Amendments
The ordinance amendment of Sections 9.19(1)viii and 9.19(1)ix, creating ATV/UTV
Routes, was brought forward by the Mayor in response to Alder and resident requests.
If you have any questions, please don't hesitate to contact me.
Thank you,
City of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481
Public Works
Engineering Department:
Phone: 715-346-1561
Fax: 715-346-1650
Streets Department:
Phone: 715-346-1537
Fax: 715-346-1687
Page 10 of 39
Page 11 of 39
ORDINANCE AMENDING THE REVISED MUNICIPAL CODE OF THE CITY OF STEVENS
POINT, WISCONSIN
The Common Council of the City of Stevens Point do ordain as follows:
SECTION I: That subsection viii of Section 9.19(1) of the Revised Municipal Code,
ATV/UTV Routes is hereby created to read as follows:
9.19(1) viii. Rocky Run Road from Little Chicago Road to West River Drive.
SECTION II: That subsection ix of Section 9.19(1) of the Revised Municipal Code,
ATV/UTV Routes is hereby created to read as follows:
9.19(1) ix. West River Drive from Rocky Run Road to River View Avenue (County
Road HH.)
SECTION III: These Ordinance changes shall take effect upon passage and
publication.
APPROVED:
Mike Wiza, Mayor
ATTEST:
Susan Pagel, City Clerk
Dated: April 9, 2026
Approved: April 20, 2026
Published: April 30, 2026
Page 12 of 39
s t e v e n s p o i n t . c o m
April 8, 2026
To: Board of Public Works
From: Scott Beduhn, Director of Public Works
Re: Ordinance Amendments
The ordinance amendment to Section 16.15, creating Right of Way, Boulevards and
Swales, is the result of staff’s ongoing effort to address an increasing number of private
plantings within the public right of way. The attached ordinance language reflects
the collaborative efforts of Community Development, Forestry, and Public Works along
with input from the public and alderpersons and is intended to establish some basic
rules for plantings within the right of way.
If you have any questions, please don't hesitate to contact me.
Thank you,
City of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481
Public Works
Engineering Department:
Phone: 715-346-1561
Fax: 715-346-1650
Streets Department:
Phone: 715-346-1537
Fax: 715-346-1687
Page 13 of 39
ORDINANCE AMENDING THE REVISED MUNICIPAL CODE OF THE
CITY OF STEVENS POINT, WISCONSIN
The Common Council of the City of Stevens Point do ordain as follows:
SECTION I: That Chapter 16, Section 16.15 of the Revised Municipal Code, Right of
Way, Boulevards and Swales is hereby created to read as follows:
16.15 1) Definitions: As used in this ordinance, or where terms are not defined
in chapters 11, 13, 21 and 23 of the City of Stevens Point Revised
Municipal Codes, such terms shall have the meanings ascribed to
them in a standard dictionary, unless the context otherwise indicates,
the following definitions apply:
a) “Noxious weeds” and " invasive plants” shall mean any plant so
defined in Chapter 21 of the City of Stevens Point Revised
Municipal Codes.
b) “Swale” – shall mean a created vegetated depression designed
retain and/or convey stormwater for the purpose of natural
infiltration, flood reduction, and erosion control. This is considered
part of the City’s stormwater management infrastructure, lying
between the property line and the edge of the roadway, where
no curb exists.
c) “Boulevard also known as a Terrace” – shall mean the public
right of way lying between the property line and sidewalk, and
between the sidewalk and the edge of curb, or where no
sidewalk or swale exists, between the property line and the edge
of the public roadway.
2) Plantings Permitted within the Boulevard, Swales or Undeveloped
Right of Way Areas:
a) A property owner in the City shall be permitted to plant, care for,
and maintain gardens within the Boulevard or undeveloped right
of way areas adjacent to their property, subject to the
restrictions set forth below:
1) No part of any planting shall exceed forty-eight (48)
inches during peak flowering height. Plantings shall not
exceed twenty-four (24) inches in height along any
intersection of roads, driveways and/or alleys within a
vision triangle within the clearview requirements as
identified in Chapter 23 of the City of Stevens Point
Revised Municipal Code. No planting over 12” in height is
allowed within a three (3) foot radius around fire hydrants.
Page 14 of 39
2) All plantings and/or seeded gardens such as native or turf
grasses may be planted up to the sidewalk, curb, or
shoulder, provided they are maintained and do not
encroach or overhang onto the adjacent sidewalk, curb,
or street.
3) No plantings, or associated work may cause damage to
an existing street tree roots located within the Boulevard.
Soil levels shall not be altered to the extent where they
exceed the height of either sidewalk or curb, if present.
Any tree planting or excessive soil disturbance work within
the dripline of existing boulevard trees shall require prior
approval of the City Forestry Department.
4) Plantings may include flowers, native plants, herbs or turf
grasses, and other decorative plants, but in no event shall
any invasive plant or noxious weed be allowed.
5) Plantings which may create and/or are deemed to be a
nuisance are prohibited within the public sidewalk or
street, such as those with thorns, spines, or sharp-edged
appendages.
b) A property owner in the City shall be permitted to plant, care for,
and maintain plants within the swales adjacent to their property,
subject to the restrictions set forth below:
1) No changes to the established grades are allowed.
Depth or grade of swales cannot be altered. Plants or
plant types may not impede the intended function of the
swale.
2) Stone (such as river rock or similar aggregate material)
may not be used. Mulch may not be used within swales
but is permissible in other areas. Rocks, boulders and
structures such as retaining walls, planters, raised garden
beds, fences and steps are prohibited.
3) Woody vegetation or a terrace garden may not be
planted within any stormwater management feature
intended to convey water such as roadside ditches.
c) The property owner shall be solely responsible for the
maintenance of the terrace garden or swale. Maintenance at a
minimum shall include:
1) Removal of noxious weeds or invasive plants.
Page 15 of 39
2) Removal of all woody plants from swale areas except for
approved street trees. Swales must be mowed no less
than annually to prevent the establishment of trees,
bushes, and shrubs, or as otherwise dictated under
stormwater Best Management Practices.
3) Removal of accumulated sediment.
4) Removal of trash, leaves, grass clippings, or other debris.
5) Repairing areas of bare soil or erosion.
6) Removal of any plant material, soil, mulch, or stone from
the sidewalk, curb and gutter, or roadway inclusive of any
paved or gravel shoulder.
d) A permit shall not be required for a terrace garden which
complies with the standards within this ordinance, a constructed
raised bed garden within the boulevard, if allowed, would require
a permit.
3) Public Works and Utilities:
a) Notwithstanding the foregoing, all such boulevards remain
public property and subject to the right of the City and
private utility companies to perform necessary work, to plant,
trim and otherwise maintain trees, to access utilities and store
excess snow. In the event the City disturbs terrace plantings
or gardens in the course of such work, it shall restore the
terrace to a grassy state. In no event shall the City or private
utility company be liable for any damage to, disruption of, or
removal of plantings, either direct or indirect, as a result of
the City or private utility company, their employees, agents or
contractors performing any installation, maintenance or
repairs. Further, the City shall have the right to remove or
restrict any plantings that are deemed to be a public
nuisance or interfere with the safety of pedestrians and
motorists, without notice.
4) Violations:
a) If the Code Official determines that circumstances warrant
code enforcement and/or abatement, the property owner
shall be notified and given 30 days to correct the violation. If
the property owner does not correct the violation(s) within
30 days, the City will take corrective action (abate) and bill
the owner for all related costs. The cost of abatement shall
be collected from the owner, including all applicable service
fees being assessed against the real estate as a special
Page 16 of 39
charge. Failure to pay any of these related charges within
thirty (30) days will result in the charges being transferred onto
the tax roll as a special charge against said property
pursuant to the provisions of Section 66.0627 of the Wisconsin
Statutes for collection and settlement under Chapter 74 of
the Wisconsin Statutes.
SECTION II: This ordinance change shall take effect upon passage and
publication:
Approved:
Mike Wiza, Mayor
Attest:
Susan Pagel, City Clerk
Dated: March 5, 2026
Approved: April 20, 2026
Published: April 30, 2026
Page 17 of 39
s t e v e n s p o i n t . c o m
April 7, 2026
To: Board of Public Works
From: Christopher Johnson, Streets Superintendent
Re: Recycling Ordnance Update
The DNR has updated statutes pertaining to NR 500, 502, 520, 542, and 544. Based on the DNR
presentation and sample recycling ordinance, several minor updates were required. The DNR
has requested these changes be adopted by the end of April for responsible units.
The revisions are straightforward and primarily include adding requirements for multi-family
properties and non-residential tenants within the ordinance language. These updates define
the responsibilities of commercial and multiple family property owners or designated agents to
provide adequate and separate containers for trash and recycling.
Other small revisions include language from the DNR sample ordinance into the City’s current
Section 7.06. Definitions were also updated to better align with DNR language. Most remaining
components are already consistent with the existing ordinance.
These revisions have been reviewed by the City Attorney.
Respectfully,
Superintendent Johnson
Attachments: Revised Ordnance 7.06
City of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481
Public Works
Engineering Department:
Phone: 715-346-1561
Fax: 715-346-1650
Streets Department:
Phone: 715-346-1537
Fax: 715-346-1687
Page 18 of 39
ORDINANCE AMENDING THE REVISED MUNICIPAL CODE OF THE CITY OF
STEVENS POINT, WISCONSIN
The Common Council of the City of Stevens Point do ordain as follows:
SECTION I: That subsection 7.06 (4) of the Revised Municipal Code, Solid Waste
Disposal, Recycling, Yard Waste, and City of Stevens Point drop -off operations Definitions, is
hereby amended to read as follows:
7.06 Solid Waste Disposal, Recycling, Yard Waste and City of Stevens Point Drop-off
(4) Definitions. For the purpose of this chapter, the following words and
phrases shall be defined as follows:shall have the meanings ascribed to them in this
section:
(a) Aluminum cans shall include used beverage cans only.
(b) Aseptic boxes and paper cartons includes soup, milk, broth, orange juice,
soymilk, etc.
(c) Ashes shall mean the residue from the burning of combustible materials,
(d) Bimetal container means a container for carbonated or malt beverages
that are made primarily of a combination of steel and aluminum.
(e) Brush means clean woody vegetative material not greater than six inches
in diameter and shrubs without root balls attached.
(f) Bulk item means any item that is too large to fit in your garbage/refuse
cart with the lid closed. Bulk item classification excludes the following items:
appliances, demolition material, electronic waste, hazardous waste, recyclables,
tires, wet paint and yard waste.
HEALTH AND SANITATION Sec. 7.06 (g) Container glass shall include
container glass only. The term "container glass" does not include ceramic cups,
dishes, ovenware, plate glass, safety and window glass, heat-resistant glass such as
Pyrex, lead-based glass such as crystal or TV tubes.
(h) Corrugated cardboard shall include corrugated cardboard only and does
not include waxed cardboard or chipboard such as cereal boxes, shoeboxes and
similar materials.
(i) Demolition Material means materials produced in the process of
construction, renovation and/or demolition of structures. Demolition material
typically include concrete, asphalt, wood, gypsum wallboard, glass, rubble, and
roofing materials.
Page 19 of 39
(j) E -cycle Electronics means computers, televisions, desktops printers,
computer peripherals, DVD players, VCR’s, digital video recorders, fax machines
and telephones with video displays.
(k) Garbage means waste products and refuse not identified as recyclable
under current or future Wisconsin recycling law or otherwise identified in this
ordinance, and which are not otherwise prohibited from being disposed of in any
State of Wisconsin funded landfill or transfer facility by this ordinance.
(l) Household hazardous waste shall fall into one of four categories, which
will be noted on the container. (1) Flammable – Ignites easily and burns rapidly (2)
Corrosive – May cause deterioration of body tissues or erosion of material at the
site of contact (3) Explosive – Contents may explode if incinerated or stored above
820 F (4) Toxic/Poison – Harmful or deadly upon contact, ingestion or inhalation
(m) Lead acid batteries means lead acid batteries from trucks, motorcycles
and automobiles. (n) Magazines means magazines and other materials printed on
similar paper.
HEALTH AND SANITATION Sec. 7.06 (o) Major appliances means a
residential or commercial air conditioner, clothes dryer, clothes washer, dishwasher,
freezer, oven, microwave oven, refrigerator, furnace, boiler, dehumidifier, water
heater or stove. Otherwise known as white goods.
(p) Medical waste means medical needles/syringes or other sharps items.
(q) Medicine shall mean prescription and over-the-counter pharmaceuticals.
Not to include nebulizers (inhalers), empty medicine containers, radioactive
medicines, syringes, needles or sharps.
(r) Mixed papers shall include all grades of papers including white, colored,
ledger, shiny, coated, carbonless or NCR papers; envelopes including window,
labeled and kraft; magazines; catalogs; phone books; computer printout paper;
glued pads and tablets; file folders; keypunch cards; spiral notebooks; cereal boxes;
shoe boxes; etc., and can include clips and staples, but may not include hand towels
or other paper products from restrooms or soiled napkins and paper plates. The term
"mixed papers" also does not include carbon paper, cellophane or any waxed paper.
(s) Motor oil (automotive) shall mean any of the well-developed lubrication
for automotive engines only. (t) Multiple -family dwelling means a property
containing five or more residential units, including those, which are occupied
seasonally.
(u) Newspapers shall include newspapers and newspaper advertisements
only. The term "newspapers" does not include mixed paper as defined in this
subsection.
(v) Nonresidential facilities and properties mean commercial, retail,
industrial, institutional and governmental facilities and properties. The term
"nonresidential facilities and properties" does not include multiple -family
dwellings.
Page 20 of 39
(w) Office paper means high-grade printing and writing paper.
(x) Oil filters means used automotive oil filters.
(y) Other recyclable materials (not collected curbside), includes lead acid
batteries, large plastic items, waste oil, E-cycle HEALTH AND SANITATION Sec.
7.06 electronics, waste tires, major appliances, used engine oil filters and absorbent
materials.
(z) Person includes any individual, corporation, partnership, association, or
local governmental unit as defined in § 66.0825(3)
(f) Wis. Stats., state agency or authority or federal agency.
(aa) Plastic bottles shall include only plastic bottles clearly marked with the
recycling emblem, encircling the #1
(PET or PETE) or the #2
(HDPE). This does not include motor oil bottles, even if they are labeled #1
or #2.
(ab) Plastic containers or bottles made of #3, #4, #5, #6 and mixed or other
plastic resin types #7.
(ac) Recyclable materials shall include all items deemed collectable by the
director of public works for the City of Stevens Point. Such recyclables my include
the following: aluminum cans, container glass, corrugated cardboard, mixed
papers, newspapers, # 1 through #7 plastics, aerosol cans, aseptic boxes, tin and
steel cans.
(ad) Refuse shall mean all putrescible and nonputrescible solids including
garbage, solid waste, ashes and dead animals. (ae) Residential means City of
Stevens Point residents from improved and occupied residential tax parcels of
single-family dwellings up to four (4) units.
(af) Solid waste shall mean garbage, refuse and all other discarded or
unsalvageable solid materials, but does not include solids or dissolved materials in
wastewater effluents or other water pollutants.
(ag) Solid waste facility means a facility for solid waste treatment, solid
waste storage or solid waste disposal and includes commercial, industrial,
municipal, state and federal establishments or operations such as, without limitation
because of enumeration, sanitary landfills, dumps, land disposal sites, incinerators,
transfer stations, storage facilities, collection and transportation services and
processing treatment and recovery facilities using large machines to produce a
principal product of scrap metal for sale or use for remelting purposes. The term
"solid waste facility" includes the land where the facility is located. The term "solid
waste facility" does not include a facility for the processing of scrap iron, steel or
nonferrous metal. The term "solid waste facility" does not include a facility which
uses large machines to sort, grade, compact or bale clean wastepaper fibers or
plastics, not mixed with other solid waste, for sale or used for recycling purposes.
Page 21 of 39
The term "solid waste facility" does not include an auto junkyard or scrap salvage
yard.
(ah) Tin cans include tin-coated metal cans and steel containers.
HEALTH AND SANITATION Sec. 7.06 (ai) Tires means a tire that is no
longer suitable for its original purpose because of wear, damage or defect. This term
“Waste tires” does not include bicycle tires.
(aj) Waste material means any garbage, recyclables, putrescible and non -
putrescible solids and discarded or salvageable materials.
(ak) Yard waste means leaves, grass clippings, yard and garden debris. The
term "yard waste" does not include brush, including clean woody vegetative
material no greater than six inches in diameter, stumps, roots or shrubs with intact
root balls.
1) “Bi-metal container” means a container for carbonated or malt beverages that is made
primarily of a combination of steel and aluminum.
2) “Container board” means corrugated paperboard used in the manufacture of shipping
containers and related products.
3) “Foam polystyrene packaging” means packaging made primarily from foam
polystyrene that satisfies one of the following criteria:
a) Is designed for serving food or beverages.
b) Consists of loose particles intended to fill space and cushion the packaged article
in a shipping container.
c) Consists of rigid materials shaped to hold and cushion the packaged article in a
shipping container.
4) “Glass Container” means a glass bottle, jar or other packaging container used to
contain a product that is the subject of a retail sale and does not include ceramic cups,
dishes, oven ware, plate glass, safety and window glass, heat -resistant glass such as
pyrex, lead based glass such as crystal, or TV tubes.
5) “HDPE” means high density polyethylene, labeled by the resin code # 2.
6) “LDPE” means low density polyethylene, labeled by the resin code # 4.
7) “Magazines” means magazines and other materials printed on similar paper.
8) “Major appliance” means a residential or commercial air conditioner, clothes dryer,
clothes washer, dishwasher, freezer, microwave oven, oven, refrigerator, furnace,
boiler, dehumidifier, water heater or stove.
9) “Multiple-family dwelling” means a structure containing 5 or more residential units,
including units that are occupied seasonally.
10) “Newspaper” means a newspaper and other materials printed on newsprint.
11) “Non-residential facilities and properties” means commercial, retail, industrial,
institutional and government facilities and properties. Non -residential facilities and
properties includes any location at which goods or services are provided or
manufactured, including locations under construction, demolition, or remodeling, or
used for special events such as fairs, festivals, sport venues, conferences, and
exhibits. This term does not include multiple family dwellings.
12) “Office paper” means a variety of high-grade printing and writing papers. This term
does not include industrial process waste, newspaper or packaging.
Page 22 of 39
13) “Other resins or multiple resins” mean plastic resins labeled by the resin code # 7.
14) “Person” includes any individual, corporation, limited liability company, partnership,
association, local government unit, as defined in s. 66.0131(1)(a), Wis. Stats., state
agency or authority or federal agency.
1)15) “PETE” or “PET” means polyethylene terephthalate, labeled by the resin code # 1.
16) Plastic container” means an individual, separate, rigid plastic bottle, can, jar or carton,
except for a blister pack, that is originally used to contain a product that is the subject
of a retail sale.
17) “Postconsumer waste” means solid waste other than solid waste generated in the
production of goods, hazardous waste, as defined in s. 291.01(7) Wis. Stats., waste
from construction and demolition of structures, scrap automobiles, or high-volume
industrial waste, as defined in s. 289.01(17)., Wis. Stats.
18) “PP” means polypropylene, labeled by the resin code # 5.
19) “PS” means polystyrene, labeled by the resin code # 6.
20) “PVC” means polyvinyl chloride, labeled by the resin code # 3.
21) “Recyclable materials” includes lead acid batteries; major appliances; waste oil; yard
waste; aluminum containers; corrugated paper or other container board; foam
polystyrene packaging; glass containers; magazines; newspaper; office paper; rigid
plastic containers, including those made of PETE, HDPE, PVC, LDPE, PP, PS and
other resins or multiple resins; steel containers; waste tires; and bi-metal containers.
22) “Solid waste” has the meaning specified in s. 289.01(33), Wis. Stats.
23) “Solid waste facility” has the meaning specified in s. 289.01(35), Wis. Stats.
24) “Solid waste treatment” means any method, technique or process which is designed to
change the physical, chemical or biological character or composition of solid waste.
“Treatment” includes incineration.
25) “Waste tire” means a tire that is no longer suitable for its original purpose because of
wear, damage or defect.
2)26) “Yard waste” means leaves, grass clippings, yard and garden debris and brush,
including clean woody vegetative material no greater than 6 inches in diameter. This
term does not include stumps, roots or shrubs with intact root balls.
SECTION II: That subsection 7.06(13) of the Revised Municipal Code, Responsibilities of
Owners or Designated Agents of Multiple-Family Dwellings, is hereby created to read as follows:
(13) Responsibilities of Owners or Designated Agents of Multiple -Family Dwellings.
Owners or designated agents of multiple-family dwellings shall do all of the following to recycle
the materials specified in RMC 8(a)(1) to 8(a)(25).
(a) Provide adequate, separate containers for the recycling program established in
compliance with the ordinance. The number of recycling containers shall equal or be
greater than the number of trash containers and at least one of the following shall be met:
1. The minimum total volume of recycling container space is equal to 20 gallons
per week per dwelling unit.
Page 23 of 39
2. The ratio of trash container volume to recycling container volume is at most 2:1.
3. An alternative method that does not result in the overflow of a recycling container
during the time period between collection of materials and delivery to a recycling
facility.
(b) Notify tenants in writing at the time of renting or leasing the dwelling and at least semi-
annually thereafter about the established recycling program.
(c) Provide for the collection of the materials separated from the solid waste by the tenants
and the delivery of the materials to a recycling facility.
(d) Notify tenants which materials are collected, how to prepare the materials in order to
meet the processing requirements, collection methods or sites, and locations of drop -off
collection sites to recycle materials not collected on-site.
(e) The requirements specified in 1) do not apply to the owners or designated agents of
multiple-family dwellings if the postconsumer waste generated within the dwelling is
treated at a processing facility licensed by the Department of Natural Resources th at
recovers for recycling the materials specified in RMC 8(a)(1) to 8(a)(25) from solid waste
in as pure a form as is technically feasible.
SECTION III: That subsection 7.06(14) of the Revised Municipal Code, Responsibilities of
Owners or Designated Agents of Non-Residential Facilities and Properties, is hereby created
to read as follows:
(14) Responsibilities of Owners or Designated Agents of Non-Residential Facilities and Properties.
(a) Owners or designated agents of non -residential facilities and properties shall do all of
the following to recycle the materials specified in RMC section 8(a)(1) to 8(a)(25):
1. Provide adequate, separate containers for the recycling program established
under this section. The total volume of recycling containers shall be sufficient to
avoid overflow during the time period between collection of materials and delivery
to a recycling facility.
2. Notify in writing, at least semi -annually, all users, tenants and occupants of the
properties about the established recycling program.
3. Provide for the collection of the materials separated from the solid waste by the
users, tenants and occupants and the delivery of the materials to a recycling facility.
4. Notify users, tenants and occupants which materials are collected, how to prepare
materials in order to meet the processing requirements, collection methods or sites,
and locations of drop-off collection sites to recycle materials not collected on-site.
(b) The requirements specified in (a) do not apply to the owners or designated agents of
non-residential facilities and properties if the postconsumer waste generated within the
Page 24 of 39
facility or property is treated at a processing facility licensed by the Department of Natural
Resources that recovers for recycling the materials specified in RMCf8(a)(1) to 8(a)( 25)
from solid waste in as pure a form as is technically feasible.
SECTION IV: This ordinance shall take effect upon passage and publication, as provided
by law.
APPROVED:_________________________
Mike Wiza, Mayor
ATTEST: _________________________
Susan Pagel, City Clerk
Dated: April 7, 2026
Approved: April 20, 2026
Published: April 24, 2026
Page 25 of 39
s t e v e n s p o i n t . c o m
April 8, 2026
To: Board of Public Works
From: Scott Beduhn, Director of Public Works
Re: Contract Award Recommendation
2026 Street Improvements – Michigan Avenue Underpass, Project 26-101
Bids for the 2026 Street Improvements – Michigan Avenue Underpass Project were received on
April 7, 2026. A total of five bids were received ranging from approximately $2.3 million to $3.2
million. The bids are summarized in the attached bid tabulation.
The lowest bid was submitted by Switlick & Sons Inc. out of Athens, WI. The City worked with
Switlick for the first time in 2025 on the Madison Street project. Based upon their past
performance staff believe that Switlick is a responsible bidder and is qualified and capable of
performing the work.
It is staff’s recommendation that the project be awarded to Switlick & Sons, Inc. in an amount
not to exceed $2,647,627.18, including a 15 percent contingency.
If there are any questions, please do not hesitate to contact me.
Thank you.
Z:\90 - MEETINGS\2026 - MEETINGS\04 - April\Board of Public Works\Memo - Award Street Improvements - Michigan Avenue Underpass - Project 26-101.doc
City of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481
Public Works
Engineering Department:
Phone: 715-346-1561
Fax: 715-346-1650
Streets Department:
Phone: 715-346-1537
Fax: 715-346-1687
Page 26 of 39
2026 Street Improvements - Michigan Avenue Underpass Project #26-101
City of Stevens Point, WI
04/07/2026 11:00 AM CDT
Line
Item &
Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension
1 Mobilization LS 1 $190,000.00 $190,000.00 $297,000.00 $297,000.00 $293,024.01 $293,024.01 $231,370.00 $231,370.00 $375,000.00 $375,000.00
2 Common Excavation LS 1 $80,000.00 $80,000.00 $60,600.00 $60,600.00 $55,381.47 $55,381.47 $128,000.00 $128,000.00 $120,000.00 $120,000.00
3 Utility Demolition LS 1 $40,000.00 $40,000.00 $35,000.00 $35,000.00 $63,236.58 $63,236.58 $77,700.00 $77,700.00 $58,000.00 $58,000.00
4 Transite Pipe Removal LF 161 $20.00 $3,220.00 $15.00 $2,415.00 $102.77 $16,545.97 $30.00 $4,830.00 $60.00 $9,660.00
5 Concrete Sidewalk Removal SF 15,450 $0.50 $7,725.00 $1.05 $16,222.50 $0.86 $13,287.00 $1.00 $15,450.00 $1.50 $23,175.00
6 Curb and Gutter Removal LF 2,480 $3.00 $7,440.00 $3.50 $8,680.00 $3.49 $8,655.20 $4.00 $9,920.00 $6.00 $14,880.00
7 Excavation Below Subgrade CY 365 $28.00 $10,220.00 $15.00 $5,475.00 $20.78 $7,584.70 $22.00 $8,030.00 $28.00 $10,220.00
8 Biaxial Geogrid SY 1,250 $3.00 $3,750.00 $3.40 $4,250.00 $2.58 $3,225.00 $2.50 $3,125.00 $5.00 $6,250.00
9 Clear Stone, 1-IN T 1,800 $23.00 $41,400.00 $42.15 $75,870.00 $39.58 $71,244.00 $33.00 $59,400.00 $36.00 $64,800.00
10 Dense Graded Base, 1 1/4-IN T 3,000 $23.00 $69,000.00 $15.00 $45,000.00 $19.71 $59,130.00 $21.00 $63,000.00 $28.00 $84,000.00
11 Compacted Fill - Elevated Paths LS 1 $30,000.00 $30,000.00 $7,500.00 $7,500.00 $3,115.19 $3,115.19 $10,000.00 $10,000.00 $12,000.00 $12,000.00
12 Prepare Foundation for Asphaltic Pavement LS 1 $30,000.00 $30,000.00 $2,700.00 $2,700.00 $2,729.70 $2,729.70 $3,200.00 $3,200.00 $5,000.00 $5,000.00
13 HMA Pavement 3MT 58-34S TON 6 $400.00 $2,400.00 $256.40 $1,538.40 $259.22 $1,555.32 $310.00 $1,860.00 $300.00 $1,800.00
14 HMA Pavement 4MT 58-34S TON 5 $450.00 $2,250.00 $275.10 $1,375.50 $278.13 $1,390.65 $330.00 $1,650.00 $325.00 $1,625.00
15 HMA Pavement, 4LT 58-34S - Multi-Use Path TON 165 $180.00 $29,700.00 $146.10 $24,106.50 $147.71 $24,372.15 $169.00 $27,885.00 $160.00 $26,400.00
16 Concrete Pavement, 8.5-IN SY 4,385 $90.00 $394,650.00 $73.64 $322,911.40 $81.14 $355,798.90 $82.00 $359,570.00 $75.00 $328,875.00
17 Concrete Sidewalk, 4-IN SF 3,850 $6.50 $25,025.00 $7.01 $26,988.50 $7.51 $28,913.50 $8.00 $30,800.00 $7.50 $28,875.00
18 Concrete Sidewalk, 6-IN SF 2,300 $7.50 $17,250.00 $7.91 $18,193.00 $8.36 $19,228.00 $9.00 $20,700.00 $8.00 $18,400.00
19 Concrete Multiuse Path, 6-IN SF 4,675 $7.50 $35,062.50 $8.06 $37,680.50 $8.36 $39,083.00 $9.00 $42,075.00 $8.00 $37,400.00
20 Concrete Driveway, 6-IN SF 3,100 $7.50 $23,250.00 $8.48 $26,288.00 $8.36 $25,916.00 $9.00 $27,900.00 $8.00 $24,800.00
21 24-IN Curb and Gutter LF 2,480 $18.00 $44,640.00 $15.60 $38,688.00 $18.93 $46,946.40 $19.00 $47,120.00 $16.40 $40,672.00
22 4-IN Concrete Slope Paving SF 3,380 $14.00 $47,320.00 $7.20 $24,336.00 $7.51 $25,383.80 $11.00 $37,180.00 $7.00 $23,660.00
23 Concrete Ribbon, 12-IN SF 1,410 $16.00 $22,560.00 $18.35 $25,873.50 $12.51 $17,639.10 $12.00 $16,920.00 $20.00 $28,200.00
24 Railing Pipe LF 565 $115.00 $64,975.00 $221.24 $125,000.60 $202.42 $114,367.30 $250.00 $141,250.00 $251.00 $141,815.00
25 Drain Basin W/ Casting, 24-IN EA 4 $3,500.00 $14,000.00 $6,100.00 $24,400.00 $4,834.55 $19,338.20 $7,920.00 $31,680.00 $5,500.00 $22,000.00
26 Drain Basin W/ Casting, 30-IN EA 20 $4,000.00 $80,000.00 $7,550.00 $151,000.00 $6,112.66 $122,253.20 $10,000.00 $200,000.00 $6,300.00 $126,000.00
27 Storm Sewer Pipe, Corrugated HDPE, Class III-A, 12-IN LF 250 $52.00 $13,000.00 $148.00 $37,000.00 $120.81 $30,202.50 $147.00 $36,750.00 $72.00 $18,000.00
28 Storm Sewer Pipe, Perforated, Corrugated HDPE, 15-IN LF 160 $56.00 $8,960.00 $110.00 $17,600.00 $51.66 $8,265.60 $141.00 $22,560.00 $178.00 $28,480.00
29 Storm Sewer Pipe, Corrugated HDPE, Class III-A, 18-IN LF 20 $63.00 $1,260.00 $142.00 $2,840.00 $138.36 $2,767.20 $142.00 $2,840.00 $80.00 $1,600.00
30 Storm Sewer Pipe, Perforated, Corrugated HDPE, 18-IN LF 95 $63.00 $5,985.00 $151.50 $14,392.50 $67.13 $6,377.35 $149.00 $14,155.00 $180.00 $17,100.00
31 Storm Sewer Pipe, Corrugated HDPE, Class III-A, 24-IN LF 420 $77.00 $32,340.00 $108.00 $45,360.00 $73.15 $30,723.00 $139.00 $58,380.00 $92.00 $38,640.00
32 Storm Sewer Pipe, Corrugated HDPE, Class III-A, 30-IN LF 35 $83.00 $2,905.00 $284.00 $9,940.00 $131.94 $4,617.90 $253.00 $8,855.00 $450.00 $15,750.00
33 PVC Storm Force Main, C900, 10-IN LF 340 $74.00 $25,160.00 $100.00 $34,000.00 $89.02 $30,266.80 $163.00 $55,420.00 $85.00 $28,900.00
34 Trench Drain LF 18 $100.00 $1,800.00 $495.00 $8,910.00 $435.74 $7,843.32 $1,000.00 $18,000.00 $300.00 $5,400.00
35 Drain Pipe, Schedule 40, 8-IN LF 21 $52.00 $1,092.00 $86.00 $1,806.00 $67.18 $1,410.78 $93.00 $1,953.00 $90.00 $1,890.00
36 Pipe Underdrain 8-IN LF 90 $52.00 $4,680.00 $55.00 $4,950.00 $79.92 $7,192.80 $48.00 $4,320.00 $60.00 $5,400.00
37 Pipe Underdrain 12-IN LF 1,110 $56.00 $62,160.00 $40.00 $44,400.00 $27.09 $30,069.90 $39.00 $43,290.00 $75.00 $83,250.00
38 Storm Sewer Manhole With Casting, 48-IN DIA EA 4 $4,000.00 $16,000.00 $5,300.00 $21,200.00 $4,430.81 $17,723.24 $6,200.00 $24,800.00 $7,800.00 $31,200.00
39 Storm Sewer Manhole With Casting, 60-IN DIA EA 1 $6,000.00 $6,000.00 $11,500.00 $11,500.00 $10,244.97 $10,244.97 $12,420.00 $12,420.00 $22,000.00 $22,000.00
40 PVC Sanitary Lateral, SDR 35, 6-IN LF 500 $64.00 $32,000.00 $58.50 $29,250.00 $81.44 $40,720.00 $119.00 $59,500.00 $80.00 $40,000.00
41 PVC Sanitary Sewer, SDR 35, 8-IN LF 665 $64.00 $42,560.00 $60.75 $40,398.75 $52.37 $34,826.05 $159.00 $105,735.00 $110.00 $73,150.00
42 PVC Sanitary Sewer, SDR 35, 15-IN LF 5 $150.00 $750.00 $267.50 $1,337.50 $414.06 $2,070.30 $339.00 $1,695.00 $500.00 $2,500.00
43 PVC Sanitary Sewer, SDR 35, 24-IN LF 145 $145.00 $21,025.00 $116.50 $16,892.50 $134.46 $19,496.70 $259.00 $37,555.00 $450.00 $65,250.00
44 Sanitary Sewer Manhole With Casting, 48-IN DIA EA 3 $5,000.00 $15,000.00 $7,000.00 $21,000.00 $7,118.05 $21,354.15 $8,550.00 $25,650.00 $11,500.00 $34,500.00
45 Sanitary Sewer Manhole With Casting, 60-IN DIA EA 1 $10,000.00 $10,000.00 $11,050.00 $11,050.00 $11,051.90 $11,051.90 $13,160.00 $13,160.00 $18,800.00 $18,800.00
46 Sanitary Sewer Manhole With Casting, 72-IN DIA EA 2 $7,500.00 $15,000.00 $15,000.00 $30,000.00 $65,150.15 $130,300.30 $17,000.00 $34,000.00 $24,000.00 $48,000.00
47 Special Bedding LF 600 $15.00 $9,000.00 $0.01 $6.00 $24.37 $14,622.00 $1.00 $600.00 $16.00 $9,600.00
48 Class "B" Bedding LF 3,300 $7.00 $23,100.00 $0.01 $33.00 $14.41 $47,553.00 $1.00 $3,300.00 $14.00 $46,200.00
49 Adjust Existing Structure EA 2 $400.00 $800.00 $1,400.00 $2,800.00 $868.75 $1,737.50 $900.00 $1,800.00 $2,500.00 $5,000.00
50 PVC Water Main, C900, 6-IN LF 10 $67.00 $670.00 $223.00 $2,230.00 $151.04 $1,510.40 $188.00 $1,880.00 $150.00 $1,500.00
51 PVC Water Main, C900, 8-IN LF 785 $67.00 $52,595.00 $110.50 $86,742.50 $98.27 $77,141.95 $155.00 $121,675.00 $127.00 $99,695.00
52 1-IN Polyethylene Water Service Lateral LF 580 $67.00 $38,860.00 $85.75 $49,735.00 $76.89 $44,596.20 $117.00 $67,860.00 $106.00 $61,480.00
53 Fire Hydrant Assembly EA 1 $6,500.00 $6,500.00 $10,200.00 $10,200.00 $9,892.53 $9,892.53 $10,720.00 $10,720.00 $12,000.00 $12,000.00
54 Insulation, 4-IN SF 500 $5.00 $2,500.00 $3.65 $1,825.00 $5.11 $2,555.00 $8.00 $4,000.00 $14.00 $7,000.00
55 Temporary Water Service LS 1 $17,000.00 $17,000.00 $11,000.00 $11,000.00 $20,442.77 $20,442.77 $15,000.00 $15,000.00 $20,000.00 $20,000.00
56 Temporary Mailboxes EA 15 $100.00 $1,500.00 $100.00 $1,500.00 $75.83 $1,137.45 $600.00 $9,000.00 $200.00 $3,000.00
57 Fiber Conduit Duct LF 460 $42.00 $19,320.00 $37.80 $17,388.00 $38.22 $17,581.20 $43.00 $19,780.00 $40.00 $18,400.00
58 Subsurface Exploration EA 5 $200.00 $1,000.00 $950.00 $4,750.00 $1,275.88 $6,379.40 $500.00 $2,500.00 $1,600.00 $8,000.00
59 Seed Restoration SY 1,250 $11.00 $13,750.00 $12.00 $15,000.00 $21.99 $27,487.50 $7.00 $8,750.00 $15.00 $18,750.00
60 Water for Seeded Areas MGAL 75 $1.00 $75.00 $60.00 $4,500.00 $35.08 $2,631.00 $60.00 $4,500.00 $50.00 $3,750.00
61 Clearing and Grubbing ID 20 $55.00 $1,100.00 $40.00 $800.00 $69.81 $1,396.20 $60.00 $1,200.00 $100.00 $2,000.00
62 Erosion Control LS 1 $3,000.00 $3,000.00 $2,160.00 $2,160.00 $10,624.60 $10,624.60 $4,000.00 $4,000.00 $10,000.00 $10,000.00
63 Traffic Control LS 1 $12,000.00 $12,000.00 $6,120.00 $6,120.00 $6,187.32 $6,187.32 $11,200.00 $11,200.00 $20,000.00 $20,000.00
64 Dewatering LS 1 $48,000.00 $48,000.00 $114,000.00 $114,000.00 $140,154.63 $140,154.63 $259,000.00 $259,000.00 $125,000.00 $125,000.00
65 Staking LS 1 $22,000.00 $22,000.00 $15,000.00 $15,000.00 $14,566.49 $14,566.49 $17,500.00 $17,500.00 $25,000.00 $25,000.00
66 Pavement Markings LS 1 $14,000.00 $14,000.00 $13,650.00 $13,650.00 $13,800.15 $13,800.15 $15,650.00 $15,650.00 $16,000.00 $16,000.00
67 Flood Monitoring System LS 1 $108,000.00 $108,000.00 $101,795.00 $101,795.00 $102,914.75 $102,914.75 $107,000.00 $107,000.00 $104,000.00 $104,000.00
68 Vehicular Video Detection System Michigan Ave. and Patch St. EA 1 $51,000.00 $51,000.00 $50,930.00 $50,930.00 $51,490.23 $51,490.23 $53,000.00 $53,000.00 $53,000.00 $53,000.00
69 Vehicular Video Detection System Michigan Ave. and Dixon St. EA 1 $51,000.00 $51,000.00 $50,930.00 $50,930.00 $51,490.23 $51,490.23 $52,500.00 $52,500.00 $53,000.00 $53,000.00
70 Traffic Signal Cabinet and Controller Michigan Ave. and Patch St. EA 1 $49,000.00 $49,000.00 $47,625.00 $47,625.00 $48,148.88 $48,148.88 $50,000.00 $50,000.00 $49,000.00 $49,000.00
71 Traffic Signal Cabinet and Controller Michigan Ave. and Dixon St. EA 1 $48,000.00 $48,000.00 $47,625.00 $47,625.00 $48,148.88 $48,148.88 $50,000.00 $50,000.00 $49,000.00 $49,000.00
72 Canadian National Railway Flagging LS 1 $75,000.00 $75,000.00 $98,600.00 $98,600.00 $131,526.04 $131,526.04 $10,000.00 $10,000.00 $150,000.00 $150,000.00
Base Bid Total: $2,302,284.50 $2,569,864.15 $2,782,585.40 $3,084,068.00 $3,183,692.00
Base Bid with Contingency: $2,647,627.18 $2,955,343.77 $3,199,973.21 $3,546,678.20 $3,661,245.80
Switlick & Sons Inc. Haas Sons, Inc. Chippewa Concrete A-1 Excavating LLC Earth Inc.
Page 27 of 39
s t e v e n s p o i n t . c o m
April 8, 2026
To: Board of Public Works
From: Scott Beduhn, Director of Public Works
Re: Contract Award Recommendation
2026 Resurfacing – Hoover Road, Project 26-103
Bids for the 2026 Resurfacing – Hoover Road Project were received on April 7, 2026. One bid
was received for the project, submitted by American Asphalt. Due to the nature of the work
and the lack of qualified contractors available locally to perform the work, receiving one bid
for this project was not unexpected. The bid is summarized in the attached bid tabulation.
The bid was slightly above the opinion of probable cost developed for this project, but was
within an acceptable range. Our project documents required the successful contractor to
maintain north and southbound traffic along Hoover Road for the duration of the work, which
drove traffic control costs slightly higher than staff anticipated.
The City has worked with American Asphalt in the past on almost every project requiring
asphalt paving. Based upon their past performance, staff believes that American Asphalt is a
responsible bidder and is qualified and capable of performing the work.
It is staff’s recommendation that the project be awarded to American Asphalt in an amount
not to exceed $792,706.50, including a 15 percent contingency.
If there are any questions, please do not hesitate to contact me.
Thank you.
Z:\90 - MEETINGS\2026 - MEETINGS\04 - April\Board of Public Works\Memo - Award 2026 Resurfacing - Hoover Road - Project 26-103.doc
City of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481
Public Works
Engineering Department:
Phone: 715-346-1561
Fax: 715-346-1650
Streets Department:
Phone: 715-346-1537
Fax: 715-346-1687
Page 28 of 39
2026 Resurfacing - Hoover Road Project #26-103
City of Stevens Point, WI
04/07/2026 10:00 AM CDT
Line Item Item Code Item Description UofM Quantity Unit Price Extension
1 SPV.0105.01 Mobilization L.S. 1 $21,675.00 $21,675.00
2 SPV.0105.02 Traffic Control L.S. 1 $26,110.00 $26,110.00
3 SPV.0105.03 Remove and Replace Pavement Markings L.S. 1 $42,940.00 $42,940.00
4 SPV.0180.01 Removing Asphaltic Surface Milling (2-Inch) S.Y. 33,300 $2.78 $92,574.00
5 SPV.0180.02 Base Asphaltic Patching S.Y. 1,500 $39.72 $59,580.00
6 SPV.0195.01 HMA Pavement 4MT58-28S Asphaltic Overlaywith Fiber (2-Inch) TON 4,000 $109.54 $438,160.00
7 SPV. 0195.02 Base Aggregate Dense 3/4-Inch (Shoulder) TON 150 $55.14 $8,271.00
Base Bid Total: $689,310.00
Base Bid with Contingency: $792,706.50
American Asphalt of WI
Page 29 of 39
s t e v e n s p o i n t . c o m
April 8, 2026
To: Board of Public Works
From: Scott Beduhn, Director of Public Works
Re: Contract Award Recommendation
2026 Pavement Maintenance, Project 26-104
Bids for the annual Pavement Maintenance Project were received on April 7, 2026. One bid
was received for this project. Due to the unique nature of the work, receiving one bid for this
project was not unexpected. The bid is summarized in the attached bid tabulation.
The bid, submitted by Fahrner Asphalt Sealers, LLC out of Plover, was within the engineer’s
estimate for the work. The City has regularly worked with Fahrner on asphalt maintenance and
repair issues, and staff believes they are qualified and capable of performing the work.
It is staff’s recommendation that the project be awarded to Fahrner Asphalt Sealers, LLC in an
amount not to exceed $169,030.01, including a 15 percent contingency.
If there are any questions, please do not hesitate to contact me.
Thank you.
Z:\90 - MEETINGS\2026 - MEETINGS\04 - April\Board of Public Works\Memo - Award Pavement Maintenance Project 26-104.doc
City of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481
Public Works
Engineering Department:
Phone: 715-346-1561
Fax: 715-346-1650
Streets Department:
Phone: 715-346-1537
Fax: 715-346-1687
Page 30 of 39
2026 Pavement Maintenance Project #26-104
City of Stevens Point, WI
04/07/2026 10:30 AM CDT
Line
Item Item Code Item Description UofM Quantity Unit Price Extension
1 SPV.0090.01 Removing Asphaltic Surface Butt Joints L.F. 90 $20.94 $1,884.60
2 SPV.0105.01 Supplemental Traffic Control L.S. 1 $10,000.00 $10,000.00
3 SPV.0105.02 Remove and Replace Pavement Markings L.S. 1 $23,250.00 $23,250.00
4 SPV.0180.01 Seal Coat S.Y. 34,750 $2.47 $85,832.50
5 SPV.0108.02 Seal Coat Special (Fog Seal) S.Y. 34,750 $0.52 $18,070.00
6 SPV.0195.01 HMA Pavement Wedging 5LT58-28S (Wedging) TON 44 $180.58 $7,945.52
Base Bid Total: $146,982.62
Base Bid with Contingency: $169,030.01
Fahrner Asphalt Sealers
Page 31 of 39
s t e v e n s p o i n t . c o m
April 8, 2026
To: Board of Public Works
From: Scott Beduhn, Director of Public Works
Re: Contract Award Recommendation
Construction Related Services
Business 51 North Segment, Project 26-105
Due to the large scale of the Business 51 North Segment reconstruction project and the City’s
limited staffing, proposals were solicited from consulting firms for the project’s construction-
related services. By utilizing a contracted service to oversee the day-to-day construction
activities, City staff can then concentrate on the more important and impactful items across
all construction projects this summer. With major work not only on Division Street, but also
Church Street and Michigan Avenue, along with other smaller projects, there simply isn’t
enough staff time to cover all the anticipated city’s roadway construction this summer.
A total of three proposals were received. The firms included AECOM, JT Engineering, and MSA.
All three firms’ base proposal prices varied by less than three percent and are all under the
budget estimate of $1,000,000. A summary of the proposals is included in the table below.
Summary of Proposals
Constructed Related Services
Business 51 North Segment, Project 26-105
Firm Base Bid Hours Base Bid Price Additional Services
AECOM 7,256 $975,400.20 N/A
JT Engineering 6,907 $989,176.00 N/A
MSA 7,273 $967,000.00 $40,319.00
In response to staff’s request for each firm to consider additional services that may provide
value to the project, only MSA provided a fee for additional efforts to assist the City with public
relations. These items could include attending additional construction-related meetings,
preparing press releases, creating handouts/flyers/mailers, social media posts, and website
updates, and GIS assistance. These services would be performed at an hourly rate, so the City
would only pay for the services used.
It is staff’s recommendation that the project be awarded to MSA for a total of $1,007,319.00,
including the proposed additional services.
If there are any questions, please do not hesitate to contact me.
Thank you.
Z:\90 - MEETINGS\2026 - MEETINGS\04 - April\Board of Public Works\Memo - Award CRS for Bus 51 North Segment.doc
City of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481
Public Works
Engineering Department:
Phone: 715-346-1561
Fax: 715-346-1650
Streets Department:
Phone: 715-346-1537
Fax: 715-346-1687
Page 32 of 39
s t e v e n s p o i n t . c o m
April 7, 2026
To: Board of Public Works
From: Scott Beduhn, Director of Public Works
Re: State Municipality Financial Agreement
STH 66 Pavement Overlay
The State of Wisconsin Department of Transportation (WisDOT) is planning several improvement
projects for the State Trunk Highway 66 (STH 66) corridor in the next 5 to 6 years. Among the
projects WisDOT is working towards is the resurfacing of Main Street/Park Ridge Drive between
Frontenac Avenue and Country Club Drive. To initiate the project WisDOT is asking that the
City execute the attached State Municipal Financial Agreement (SMFA).
WisDOT is currently proposing to mill the existing concrete pavement and overlay the
pavement with asphalt. This project is intended to extend the life of the existing pavement.
The estimated life of an asphalt overlay is 10 to 15 years. At this time no geometrical changes
are being proposed, but as part of the planning and design, WisDOT will conduct safety
intersection evaluations which could change the scope of work to include low-cost safety
improvements.
As a connecting highway, the City of Stevens Point and the State of Wisconsin share the
responsibilities for roadway maintenance and improvements. In very simple terms, general
pavement maintenance is handled by the City and the State of Wisconsin provides financial
aid based upon the number of lane miles of connecting highway within the municipal limits.
Larger improvement projects are completed by the State of Wisconsin and the City shares in
the cost of design. As identified in the attached SMFA the State of Wisconsin will cover the cost
of construction for the resurfacing. However, there are some exclusions and cost share items
which are also identified in the SMFA.
Staff recommends approving the attached SMFA for the resurfacing. The total estimated cost
share for the City of Stevens Point is $64,750. The design work is anticipated to be completed
over the next couple of state fiscal years beginning in July of 2026. To cover the cost, staff will
allocate existing roadway improvement capital funds for 2026 and include any remaining
need in future roadway improvement capital budget requests.
If you have any questions, please don't hesitate to contact me.
Thank you.
Z:\90 - MEETINGS\2026 - MEETINGS\04 - April\Board of Public Works\Memo - STH 66 SMFA - Frontenac to Coutry Club.doc
City of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481
Public Works
Engineering Department:
Phone: 715-346-1561
Fax: 715-346-1650
Streets Department:
Phone: 715-346-1537
Fax: 715-346-1687
Page 33 of 39
Central File: Planning\Project Agreement\Portage County Page 1 of 5 ID 6280-00-02 – NC Region
STATE/MUNICIPAL
FINANCIAL
AGREEMENT
Date: March 23, 2026
I.D.: 6280-00-02/72
Road Name: STH 66
Title: C Stevens Point, Main Street
Limits: Frontenac Ave to Country Club Drive
County: Portage
Roadway Length: 1.21 Miles
The signatory City of Stevens Point , hereinafter called the Municipality, through its undersigned duly authorized
officers or officials, hereby requests the State of Wisconsin Department of Transportation, hereinafter called the
State, to initiate and affect the highway or street improvement hereinafter described.
The authority for the Municipality to enter into this agreement with the State is provided by Section 86.25(1), (2),
and (3) of the Statutes.
NEEDS AND ESTIMATE SUMMARY:
Existing Facility - Describe and give reason for request : The existing roadway is an urban template which consists
of concrete pavement, curb and gutter, grass terrac e, sidewalk, storm sewer, and street lighting. The existing
pavement shows signs of deterioration in the form o f joint failure and panel distress cracking. The ex isting
crosswalk curb ramps may not meet current Americans with Disabilities Act (ADA) Standards.
Proposed Improvement - Nature of work : The proposed improvement is a resurfacing. Work will consist of an
asphaltic overlay over the existing concrete pavement to extend the service life of the roadway. The project will
include spot curb and gutter replacement and storm sewer adjustments. The project will also include sanitary and
water service adjustments as requested by the Municipality.
Describe non-participating work included in the pro ject and other work necessary to finish the project
completely which will be undertaken independently by the municipality : Costs to cover items in paragraph 3 are
not currently included but can be added at the request of the municipality.
Page 34 of 39
Central File: Planning\Project Agreement\Portage County Page 2 of 5 ID 6280-00-02 – NC Region
TABLE 1: SUMMARY OF COSTS
Total Federal/State Municipal
Phase Est. Cost Funds % Funds %
6280-00-02
Preliminary Engineering: 259,000 $ 194, 250 $ 75% 64,750 $ 25%
6280-00-72
1Construction:
Roadway (cat 0010) 3,745,000 $ 3,745,000 $ 100% - $ 0%
Subtotal: 3,745,000 $ 3,745,000 $ - $
Non-Participating - $ - $ 0% - $ 100%
Total Cost Distribution 4,004,000 $ 3,939, 250 $ 64,750 $
1Estimates include construction engineering
See # 8 of terms and Conditions
This request shall constitute agreement between the Municipality and the State; is subject to the term s and
conditions that follow (pages 2 – 5); is made by the undersigned under proper authority to make such request for
the designated Municipality, upon signature by the State, and delivery to the Municipality. The initia tion and
accomplishment of the improvement will be subject t o the applicable federal and state regulations. No term or
provision of neither the State/Municipal Financial Agreement nor any of its attachments may be changed, waived
or terminated orally but only by an instrument in writing executed by both parties to the State/Municipal Financial
Agreement.
Signed for and in behalf of the City of Stevens Point (please sign in blue ink)
Name (print) Title
Signature Date
Signed for and in behalf of the State (please sign in blue ink)
Name Shannon P Riley Title WisDOT North Central Region Planning Chief
Signature Date
TERMS AND CONDITIONS:
1. The Municipality shall pay to the State all costs incurred by the State in connection with the improvement which
exceeds federal/state financing commitments or are ineligible for federal/state financing. Local participation
shall be limited to the items and percentages set forth in the Summary of Costs table, which shows Municipal
funding participation. In order to guarantee the Mu nicipality’s foregoing agreements to pay the State, the
Municipality, through its above duly authorized officers or officials, agrees and authorizes the State to set off
and withhold the required reimbursement amount as d etermined by the State from General Transportation
Aids or any moneys otherwise due and payable by the State to the Municipality.
2. Funding of each project phase is subject to inclusi on in an approved program and per the State’s Facil ity
Development Manual (FDM) standards. Federal aid and/or state transportation fund financing will be limited
to participation in the costs of the following items as specified in the Summary of Costs:
Page 35 of 39
Central File: Planning\Project Agreement\Portage County Page 3 of 5 ID 6280-00-02 – NC Region
(a) Design engineering and state review services.
(b) Real Estate necessitated for the improvement.
(c) Compensable utility adjustment and railroad force work necessitated for the project.
(d) The grading, base, pavement, curb and gutter, and structure costs to State standards, excluding the cost of
parking areas.
(e) Storm sewer mains, culverts, laterals, manholes, in lets, catch basins, and connections for surface wat er
drainage of the improvement; including replacement and/or adjustments of existing storm sewer manhole
covers and inlet grates as needed.
(f) Construction engineering incidental to inspection and supervision of actual construction work, except for
inspection, staking, and testing of sanitary sewer and water main.
(g) Signing and pavement marking necessitated for the safe and efficient flow of traffic, including detour routes.
(h) Replacement of existing sidewalks necessitated by c onstruction and construction of new sidewalk at the
time of construction. Sidewalk is considered to be new if it’s constructed in a location where it has not
existed before.
(i) Replacement of existing driveways, in kind, necessitated by the project.
(j) New installations or alteration resulting from road way construction of standard State street lighting and
traffic signals or devices. Alteration may include salvaging and replacement of existing components.
3. Work necessary to complete the improvement to be fi nanced entirely by the Municipality or other utilit y or
facility owner includes the following items:
(a) New installations of or alteration of sanitary sewe rs and connections, water, gas, electric, telephone ,
telegraph, fire or police alarm facilities, parking meters, and similar utilities.
(b) New installation or alteration of signs not necessary for the safe and efficient flow of traffic.
(c) Roadway and bridge width in excess of standards.
(d) Construction inspection, staking, and material test ing and acceptance for construction of sanitary
sewer and water main.
(e) Provide complete plans, specifications, and estimat es for sanitary sewer and water main work. The
Municipality assumes full responsibility for the design, installation, inspection, testing, and operation of
the sanitary sewer and water system. This relieves the State and all of its employees from the liability for
all suits, actions, or claims resulting from the sanitary sewer and water system construction.
(f) Parking lane costs.
(g) Coordinate, clean up, and fund any hazardous materi als encountered during construction. All
hazardous material cleanup work shall be performed in accordance to state and federal regulations.
(h) Damages to abutting property due to change in street or sidewalk widths, grades, or drainage.
(i) Conditioning, if required, and maintenance of detour routes.
(j) Repair of damages to roads or streets caused by reason of their use in hauling materials incidental to
the improvement.
4. As the work progresses, the Municipality will be bi lled for work completed which is not chargeable to
federal/state funds. Upon completion of the project, a final audit will be made to determine the final division of
costs.
Page 36 of 39
Central File: Planning\Project Agreement\Portage County Page 4 of 5 ID 6280-00-02 – NC Region
5. If the Municipality should withdraw the project, it shall reimburse the State for any costs incurred by the State
in behalf of the project.
6. The work will be administered by the State and may include items not eligible for federal/state participation.
7. The Municipality shall assume general responsibilit y for all public information and public relations f or the
project and to make a fitting announcement to the press and such outlets as would generally alert the affected
property owners and the community of the nature, ex tent, and timing of the project and arrangements fo r
handling traffic within and around the projects.
8. Basis for local participation:
a) Preliminary Engineering – 6280-00-02: In accordance with the State's Local Cost Sharing Policy of the
Program Management Manual, the State is responsible for 75% and the Municipality is responsible for
25% of all design engineering costs necessary for the state construction project on a connecting highway.
b) Participating Construction – 6280-00-72:
1. Roadway Items (Cat 0010): In accordance with the State's Local Cost Sharing Policy of the Program
Management Manual, the State is responsible for 100 % of the costs necessitated by the roadway
project (grading, paving, etc.) unless otherwise noted in the sections below.
Driveways: In accordance with the State's Local Cost Sharing Policy of the Program Management
Manual, the State is responsible for 100% of replac ement driveways necessitated by roadway
construction as follows: where there is no sidewalk , replacement in kind beyond the curb; where
there is a sidewalk, concrete from curb to sidewalk and replacement in kind beyond the sidewalk.
New driveways are not eligible for Federal/State funding.
Replacement Sidewalks: In accordance with the State's Local Cost Sharing Policy of the Program
Management Manual, the State is responsible for 100 % of replacement sidewalks costs, in kind,
necessitated by roadway construction if the Municip ality agrees to accept responsibility for
sidewalk maintenance and repair per the SMMA, if applicable. The Municipality is responsible for
100% of any alternate design, over and above State standards and acceptable to the State.
New Sidewalks: In accordance with the State's Loca l Cost Sharing Policy of the Program
Management Manual, the State is responsible for 100 % of continuous new sidewalk costs only if
they are installed to WisDOT standards at the time of project construction, required through
WisDOT design process and if the Municipality agree s to accept responsibility for sidewalk
maintenance and repair per the SMMA, if applicable.
If the new sidewalk is NOT required through WisDOT design process; the Municipality is
responsible for 100% of continuous new sidewalk cos ts only if they are installed to WisDOT
standards at the time of project construction and if the Municipality agrees to accept responsibility
for sidewalk maintenance and repair per the SMMA, if applicable. The Municipality is responsible
for 100% of any alternate design, over and above State standards and acceptable to the State.
Bicycle Accommodations: In accordance with the State's Local Cost Sharing Policy of the
Program Management Manual, the State is responsible for 100% of the costs for bicycle
accommodations, where recommended by the State’s Facility’s Development Manual.
Replacement Street Lighting: In accordance with the State's Local Cost Sharing Policy of the
Program Management Manual, the State is responsible for 100% of replacement lighting costs, in
kind, necessitated by roadway construction if the M unicipality agrees to accept responsibility for
the energy, operation, maintenance and replacement of the lighting system per the SMMA, if
Page 37 of 39
Central File: Planning\Project Agreement\Portage County Page 5 of 5 ID 6280-00-02 – NC Region
applicable. The Municipality is responsible for 100% of any alternate design, over and above State
standards and acceptable to the State.
New Street Lighting: In accordance with the State's Local Cost Sharing Policy of the Program
Management Manual, the State is responsible for 50% and the Municipality agrees to pay 50% of
continuous new street lighting costs if necessitate d by the project and only if they are installed to
WisDOT standards at the time of project constructio n and if the Municipality agrees to accept
responsibility for the energy, operation, maintenance and replacement of the lighting system per the
SMMA, if applicable. The Municipality is responsibl e for 100% of any alternate design, over and
above state standards and acceptable to the State.
Storm Sewers: In accordance with the State's Local Cost Sharing Policy of the Program
Management Manual, the State is responsible for 100 % of costs necessary to construct a storm
sewer system that accommodates roadway drainage, and surface water naturally flowing to the state
trunk highway. The Municipality is responsible for 100% of the cost to over-size the storm sewer
system to accommodate all additional local storm water caused by existing or future developments,
and the Municipality agrees to pay these costs.
Traffic Signals: In accordance with the State's Loc al Cost Sharing Policy of the Program
Management Manual, the State is responsible for 100 % of traffic signals necessary and warranted
for the safety and efficient flow of traffic within the construction limits.
Parking Policy: In accordance with State statute 8 6.32(4), the Municipality is required to pay the
actual construction costs and any associated costs (if applicable) of that part of the state trunk
highway on which parking is permitted. The local cost share is the amount of the total project cost
that represents the construction cost of the parking lane(s).
Detour: In accordance with State statute 84.20 and 84.02(10) Wis. Stats., the State is responsible
for 100% repair of any damage to any local road cau sed by its use as a detour designated by the
department as the official detour route. Such highw ay or street shall also be maintained by the
department during such use.
c) Non-Participating Construction Local Utilities : In accordance with the State's Local Cost Sharing
Policy of the Program Management Manual, the Munici pality is responsible for 100% of all costs
associated with Municipal owned utilities or appurtenances, including but not limited to, new installation
or alteration of sanitary sewer and water, includin g service connections. The Municipality is also
responsible for 100% of all costs caused by changes to Municipal owned utilities related to other utilities
(gas, electric, telephone, fire, or police alarm fa cilities, parking meters, irrigation systems and si milar
utilities).
Hazmat: In accordance with the State's Local Cost S haring Policy of the Program Management Manual, the
Municipality agrees to pay 100% of the costs associated with excavating and transporting hazardous material for
which the Municipality has been identified as the responsibly party. The Municipality is responsible for securing
a suitable site to store the material.
Comments and Clarification: This agreement is an active agreement that may need to be amended as the project
is designed. It is understood that these amendments may be needed as some issues have not been fully evaluated
or resolved. The purpose of this agreement is to specify the local and state involvement in funding the project. A
signed agreement is required before the State will prepare or participate in the preparation of detail ed designs,
acquire right of way, or participate in construction of a project that merits local involvement.
Page 38 of 39
s t e v e n s p o i n t . c o m
April 8, 2026
To: Board of Public Works
From: Scott Beduhn, Director of Public Works
Re: Proposed Rail Crossing Safety Improvements
Patch Street Railroad Crossing
Currently, the City has two pending actions with the Office of the Commissioner of Railroads
(OCR). Those actions are the potential closure of the Park Street railroad crossing and safety
improvements related to an unauthorized alteration of the Patch Street railroad crossing back
in 2007.
In short, OCR has indicated that the City will be responsible for the replacement of the signal
lights at the Patch Street crossing. While we do not have a detailed estimate, the cost to
replace the existing signals is anticipated to be several hundred thousand dollars. Although
the City will be responsible for the replacement of the existing signals, the Administrative Law
Judge is allowing the City and Canadian National (CN) to collaborate on a proposed solution
to address the signal light replacement.
In communications with CN, they have formulated an idea that they believe may satisfy
OCR’s requirements at Patch Street, while at the same time satisfying their concerns related to
the Park Street Crossing. However, any proposal will be subject to OCR approval.
CN is proposing that both CN and the City of Stevens Point petition OCR to allow for the
closure of Wood Street in lieu of Park Street and then relocate the existing [newer] signals from
Wood Street to Patch Street. As an incentive for the closure of Wood Street, CN would pay for
the relocation of the signals to Patch Street.
Based upon many comments received from local businesses and residents, staff believes that
the closure of Wood Street would be less impactful and more accepted by the public.
Therefore, staff is requesting permission to work with CN to make a formal proposal to OCR.
If you have any questions, please don't hesitate to contact me.
Thank you.
Z:\90 - MEETINGS\2026 - MEETINGS\04 - April\Board of Public Works\Memo - Patch Street.doc
City of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481
Public Works
Engineering Department:
Phone: 715-346-1561
Fax: 715-346-1650
Streets Department:
Phone: 715-346-1537
Fax: 715-346-1687
Page 39 of 39
Source: City of Stevens Point website. First collected Oct 21, 2026.