City Plan Commission — Agenda Packet
City of Stevens Point · Portage County · City Plan Commission · meeting of Apr 6, 2026 · Agenda packets
Open the original document More from City of Stevens Point
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Our intention is to have in-person meetings going
forward. For the time being, we will hold the City
Committee Meetings, Plan Commission, Council and
most others at the Community Room at 933 Michigan
Avenue. This in-person location will meet the legal
requirement for our open meetings.
We will have a virtual option available, but the
technology for the hybrid style meeting may not be
reliable all of the time.
AGENDA
CITY PLAN COMMISSION
Members
• Mayor Wiza
• Alderperson Kneebone
• Commissioner Arntsen
• Commissioner Beacom
• Commissioner Rice
• Commissioner Schade Stroik
• Commissioner Schuler
Date
and
Time:
April 6, 2026
6:00 PM
Location:
Community Room
933 Michigan Avenue, Stevens Point, WI
OR
Zoom Teleconferencing
Meeting ID: 867 7628 5627
Passcode: 455417
By Computer:
https://us02web.zoom.us/j/86776285627?pwd=SOfu0Nprjrl7e36wBf
By Phone: +1-312-626-6799 (US Chicago)
Opening Section:
1. Roll Call
Discussion and Possible Action on:
2. Report of the March 2, 2026 meeting of the City Plan Commission.
3. Public Hearing and action on a request from the City of Stevens Point to amend Chapter
23, Zoning Ordinance, of the Revised Municipal Code of the City of Stevens Point. Said
request amends Section 23.02(4)(c) pertaining to general standards and land use
regulations within the “A-H” Airport Height Overlay District.
4. Public Hearing and action on a request from Mike Helmrick, representing the City of
Stevens Point, for a preliminary subdivision plat review on an unaddressed parcel bounded
by Maria Drive & Union Street North (Parcel ID 281240829240047) and an unaddressed
parcel bounded by Maria Drive (Parcel ID 281240829240033), consistent with Ch.
20.05(1).
5. Public Hearing and action on a request from Partnering Together of Portage County to
rezone portions of the property located at 2854 Church Street (Parcel ID
281230805101608) from the “R-2” Single-Family Residence District to the “B-4”
Commercial District.
6. Public Hearing and action on a request from Partnering Together of Portage County for a
Page 1 of 100
conditional use permit to operate a temporary housing facility on the property located at
2854 Church Street (Parcel ID 281230805101608), consistent with Ch. 23.02(1)(f)(3)(f).
7. A request from the City of Stevens Point to sell the property located at 281 Washington
Avenue (Parcel ID 281240830401306).
8. A request from the City of Stevens Point to acquire the property located at 809 Division
Street (Parcel ID 281240829401316).
9. Discussion on Zoning Code Rewrite:
• Review of performance standards for all base zoning districts.
• Review of supplemental regulations for the accessory land use table.
10. January - February 2026 Monthly Reports.
11. Director's Report.
Closing Section:
12. Adjourn
PLEASE TAKE NOTICE that any person who has special needs while attending these meetings or needs agenda materials for these meetings
should contact the City Clerk as soon as possible to ensure that a reasonable accommodation can be made. The City Clerk can be reached by
telephone at (715) 346-1569 or by mail at 1515 Strongs Avenue, Stevens Point, WI 54481.
Maps further defining the above area(s) may be obtained from the City of Stevens Point Department of Community Development, 1515
Strongs Avenue, Stevens Point, WI 54481, or by calling (715) 346-1567, during normal business hours.
PLEASE TAKE FURTHER NOTICE that a quorum of the Common Council may be in attendance at this meeting.
Page 2 of 100
Page 1 of 5
REPORT OF THE CITY PLAN COMMISSION
March 2, 2026 – 6:00 PM
933 Michigan Ave, Stevens Point, WI 54481
PRESENT: Alderperson Kneebone, Commissioner Arntsen, Commissioner Beacom, Commissioner
Schuler, Commissioner Schade Stroik
EXCUSED: Mayor Wiza, Commissioner Rice
ALSO PRESENT: Associate Planner / Zoning Administrator Kuhn, Community Development Director
Kivela, Neighborhood Planner / Economic Development Specialist Klesmith
INDEX:
Opening Section:
1. Roll Call
Discussion and Possible Action on the Following:
2. Report of the January 26 and February 2, 2026 meeting of the City Plan Commission.
3. A request from the City of Stevens Point to enter into an easement agreement with the
Wisconsin Public Service Corporation for portions of the properties located at 325 Division
Street (Parcel ID 281240829400210) and an unaddressed parcel bounded by Division Street
(Parcel ID 281240829400211).
4. A request from the City of Stevens Point to enter into a temporary limited easement with the
Wisconsin Department of Transportation for portions of properties along State Highway 66
(Parcel IDs 281240831101402, 281240832100501, 281240831101302, 281240831101401,
281240832202651, 281240832202629, 281240832103401, 281240832200911,
281240833200107, 281240834200601, 281240833100701 & 281240831101301).
5. A request from the City of Stevens Point to recommend the sale of properties along Water
Street (Parcel IDs 281240832201937 and 281240832201938).
6. Discussion on Zoning Code Rewrite:
• First review of draft land use table.
• Introduction of proposed overlay districts.
• First review of performance standards for the Light Industrial and Heavy Industrial Districts.
7. Director's Report.
Closing Section:
8. Adjourn
Opening Section:
Page 3 of 100
Page 2 of 5
1. Roll Call
Present: Kneebone, Arntsen, Beacom, Schuler, Schade Stroik
Excused: Wiza, Rice
2. Report of the January 26 and February 2, 2026 meeting of the City Plan Commission.
A motion was made to approve the City Plan Commission minutes from the January 26th meeting and
February 2nd meetings with an amendment. The amendment proposed that all split votes from the
February 2nd meeting and moving forward be recorded with the names of commissioners and how they
voted, while unanimous votes simply be recorded as unanimous. Members from the public also
commented in support of increased transparency in the recording of votes. It was also noted that
broader policy changes to amend this for other committees may require review by the Public Policy and
General Government Committee.
Motion by Commissioner Kneebone to approve with amendments, seconded by Commissioner
Arntsen.
Motion carried unanimously.
3. A request from the City of Stevens Point to enter into an easement agreement with the Wisconsin
Public Service Corporation for portions of the properties located at 325 Division Street (Parcel ID
281240829400210) and an unaddressed parcel bounded by Division Street (Parcel ID
281240829400211).
Associate Planner / Zoning Administrator Kuhn presented a request from the City of Stevens Point to
enter into an easement agreement with the Wisconsin Public Service Corporation for portions of the
properties located at 325 Division Street and an adjacent unaddressed parcel bounded by Division
Street. This would allow for the installation and ongoing of maintenance of underground utility
infrastructure. This request was brought forth by the Public Works Department, which recommend
approval of this agreement.
Motion by Commissioner Schuler to approve, seconded by Commissioner Beacom.
Motion carried unanimously.
4. A request from the City of Stevens Point to enter into a temporary limited easement with the
Wisconsin Department of Transportation for portions of properties along State Highway 66 (Parcel
Page 4 of 100
Page 3 of 5
IDs 281240831101402, 281240832100501, 281240831101302, 281240831101401,
281240832202651, 281240832202629, 281240832103401, 281240832200911, 281240833200107,
281240834200601, 281240833100701 & 281240831101301).
Associate Planner / Zoning Administrator Kuhn presented a request from the City of Stevens Point to
enter into an easement agreement with the Wisconsin Department of Transportation (DoT) for portions
of multiple City-owned parcels along the State Highway 66 corridor. This would allow the DoT to
complete curb ramp replacement work along the corridor. Kuhn also noted that this easement is
temporary and will disintegrate once construction is complete. This request was brought forth by the
Public Works Department, which recommend approval of this agreement.
Motion by Commissioner Arntsen to approve, seconded by Commissioner Schuler.
Motion carried unanimously.
5. A request from the City of Stevens Point to recommend the sale of properties along Water Street
(Parcel IDs 281240832201937 and 281240832201938).
Neighborhood Planner / Economic Development Specialist Klesmith presented a request from the City
to recommend the sale of two City-owned parcels along Water Street for redevelopment consistent
with the Downtown Targeted Area Master Plan. Klesmith explained that a request for proposals had
been issued for the former Edgewater Manor site and adjacent parcel which resulted in a proposal for a
two-phase condominium townhouse development consisting of approximately 63 owner-occupied
units. Additionally, it was noted that this project would maintain the Green Circle Trail along the
riverfront, with the City retaining ownership of the land immediately adjacent to the river.
The Commission discussed conceptual design, including density, parking configuration, architectural
character, access to the riverfront, and consistency with planning documents. Public comments were
heard expressing both support for additional housing downtown and concerns regarding design quality,
developer experience, long-term riverfront use, and the potential impact on public views and access.
City Staff and the City Attorney clarified that the action would not finalize the project but would allow
the developer to continue due diligence and work toward a development agreement, which would
return for further review.
Motion by Commissioner Arntsen to approve, seconded by Commissioner Schuler.
Motion carried 3-2. Voted to approve: Kneebone, Arntsen, Beacom. Voted to reject: Schuler, Schade
Stroik.
Page 5 of 100
Page 4 of 5
6. Discussion on Zoning Code Rewrite:
• First review of draft land use table.
• Introduction of proposed overlay districts.
• First review of performance standards for the Light Industrial and Heavy Industrial Districts.
Associate Planner / Zoning Administrator Kuhn provided an update regarding the ongoing zoning code
rewrite, including existing and proposed overlay districts and performance standards for industrial
zoning districts. The Height Overlay District for the areas around the Airport was reviewed and Kuhn
noted that there are no anticipated changes. Kuhn also introduced two potential new overlay districts
along the Stanley Street corridor and the Church Street corridor and noted that these areas may
incorporate limited form-based standards addressing building form, site design, and corridor character
while maintaining flexibility for development. The Commission discussed topics such as pedestrian and
bicycle accessibility, landscaping, and the overall character of the corridors. Kuhn then discussed
proposed updates to performance standards for light and heavy industrial districts which included minor
adjustments to minimum lot sizes and setbacks considerations based on existing parcel configurations
from the City. The Commission expressed concerns about reducing setbacks between industrial and
residential areas and suggested maintaining or potentially increasing setbacks, in addition to exploring
vegetative buffers where appropriate. Last, public comment was heard which included questions
regarding potential zoning changes near existing residential neighborhoods.
No action taken.
7. Director's Report.
Community Development Director Kivela provided a verbal report of significant updates for the
Community Development Department. Kivela discussed updates surrounding the Forest Creek
subdivision, the Business Park branding and signage initiative, as well as downtown updates pertaining
to upcoming seasonal events and developments with the Shopko site, updates on a second preliminary
housing proposal on the east side of the City being evaluated, and lastly report of the completion of the
demolition of the 1039 Ellis Street structure.
No action taken.
Closing Section:
Page 6 of 100
Page 5 of 5
8. Adjourn
Meeting adjourned at 8:16pm.
A recording of this meeting can be viewed/heard at: https://stevenspoint.com/365/AgendasMinutesVideos
Page 7 of 100
City of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481-3594
Department of Community Development
Adam Kuhn
Associate Planner
Zoning Administrator
Ph: (715) 346-1567
Fax: (715) 346-1498
www.stevenspoint.com
Open Records Rider: The City of Stevens Point is subject to Wisconsin Statutes relating to public records.
Communication, such as this document, sent or received by City employees are subject to these laws. Unless
otherwise exempted from the public records law, senders and receivers of City communication should
presume that the communications are subject to rel ease upon request, and to state record retention
requirements.
Page 1 of 1
MEMORANDUM
To: Plan Commission
From: Adam Kuhn, AICP
Associate Planner / Zoning Administrator
Date: April 6, 2026
RE: Zoning Ordinance Amendment – Airport Height Overlay
-------------------
Background: Enclosed in the agenda packet is a request to adopt several text
amendments for the Airport Height Overlay District. The District encompasses the
Stevens Point Municipal Airport and land over the runway paths in both directions.
The first substantive revision establishes general standards for all properties within the
District. Such standards identify regulations pertaining to glare, lighting, electrical
interference and visibility. While such standards are similarly mandated by the Federal
Aviation Administration, including these standards provide more weight for the City
when considering future land use and development requests.
The second substantive revision expands the list of permitted land uses that relate
specifically to the function, enhancement and operation of the Stevens Point Municipal
Airport. These changes are being proposed to ensure that existing and potential future
uses on Airport grounds aligns with the City’s land use regualtions.
Staff Recommendation: Staff recommends APPROVAL of the text amendment as
presented.
Page 8 of 100
ORDINANCE AMENDING THE REVISED MUNICIPAL CODE
OF THE CITY OF STEVENS POINT, WISCONSIN
[Chapter 23 of the Revised Municipal Code – Zoning Ordinance – Airport Height Overlay
District]
The Common Council of the City of Stevens Point, Portage County, Wisconsin, do
ordain as follows:
SECTION I: That Section 23.02(4)(c), Zoning Ordinance of the Revised Municipal Code of
the City of Stevens Point, shall be amended as follows:
c) "A-H" Airport Height Overlay
1) Intent. This overlay district is established to maintain navigable air space over
the aerial approaches in a condition best suited for the safe operation of
aircraft.
2) General Standards.
a) Glare. No glare-producing materials shall be used on the exterior of
any structure, including any metal building, which are hazardous to
aviation, or result in glare in the eyes of pilots using the Airport.
b) Lighting. There shall be neither display of signs or billboards which
produce a flashing or blinking effect that would interfere with aircraft or
a pilot’s ability to identify Airport lights, nor any lighting projecting
upward, or mimicking runway edge lighting, which would interfere with
aircraft or a pilot’s ability to identify Airport lights.
c) Electrical Interference. No structure or use on land or water shall create
electrical or electronic interference with navigational signals, or radio
or radar communications between the aircraft and a ground station.
d) Visibility. No structure or use shall impair the visibility in the vicinity of
the Airport, or otherwise endanger or interfere with the landing, taking
Page 9 of 100
off, or maneuvering of aircraft intending to use the Airport, including
the emission or discharge of smoke, steam or other obscuring
phenomena which would interfere with the health and safety of pilots
and the public in the use of the Airport, or which would otherwise be
detrimental or injurious to the health, safety, and general welfare of the
public in the use of the Airport.
3) Permitted Uses. Uses to the extent that they are not prohibited by any other
provisions of this chapter or any other ordinance as follows:
a) Uses which would not create electrical interference with radio
communication between the airport and aircraft, or make it difficult
for pilots to distinguish between airport lights and others, or result in
glare in the eyes of pilots using the airport, or impair visibility in the
vicinity of the airport or otherwise endanger the land, taking off, or
maneuvering of aircraft.
b) Filling of property
c) Uses and structures that are directly related to and necessary for the
function, enhancement, or operation of the Stevens Point Municipal
Airport, including but not limited to the following:
1) Air terminals
2) Aircraft hangers
3) Runways, taxiways, aprons, and related lighting and air support
apparatus
4) Airport administration and maintenance buildings and facilities
5) Airport security, rescue, and firefighting buildings and facilities
6) Aircraft repair and maintenance buildings and facilities
7) Fuel storage facilities and pumps
8) Commercial uses directly related to Airport and aeronautical
operations
9) Public gatherings in conjunction with an Airport related activity
sponsored or approved by the Airport
10) Air cargo facilities
11) Other related airport and municipal uses and structures
12) Municipal emergency response facilities
13) Agricultural uses provided it do not result in a concentration of
birds or other wildlife, which poses a threat to aviation
operations, or a visibility problem due to the height of
vegetation.
4) Conditional Uses.
Page 10 of 100
a) Uses that would create an electrical interference with radio
communication or result in glare.
b) The creation, expansion, or restoration of retention or detention ponds,
wetlands, or any other body of water, either natural or artificial provided
mitigation measures are taken to lessen the concern for wildlife hazards.
5) Minimum Performance Standards for the "A-H" District
6) Exception to height of structure: Approval for government structures to
exceed the Stevens Point airport height restriction may be granted by the
Common Council after first obtaining written approval from the Federal
Aviation Administration and/or the Wisconsin Department of Transportation,
Bureau of Aeronautics.
SECTION II: That this ordinance shall take effect upon passage and publication.
Approved: ________________________________
Mike Wiza, Mayor
Attest: ________________________________
Susan Pagel, City Clerk
Dated: April 6, 2026
Adopted: April 20, 2026
Committee: Plan Commission
Drafted by: Adam Kuhn
Return to: City Clerk
Page 11 of 100
Page 1 of 5
Administrative Staff Report
Department of Community
Development
Preliminary Subdivision Plat Review
Maria Drive
April 6, 2026
Applicant(s):
• Mike Helmrick, representing the
City of Stevens Point
Staff:
• Adam Kuhn, Associate Planner
akuhn@stevenspoint.com
Parcel Number(s):
• 281240829240047
• 281240829240033
Zone(s):
• “PD” Planned Development
• “R-2” Single-Family Residence
District
Master Plan:
• Commercial / Office / Multi-
Family
• Institutional / Government
Council District:
• District 4 – Ald. Broderick
Lot Information:
• 10 lots
Current Use:
• Vacant
Applicable Regulations:
• Ch. 20.05(1)
Request
1. Public Hearing and action on a request from Mike Helmrick,
representing the City of Stevens Point, for a preliminary subdivision
plat review on an unaddressed parcel bounded by Maria Drive &
Union Street North (Parcel ID 281240829240047) and an
unaddressed parcel bounded by Maria Drive (Parcel ID
281240829240033), consistent with Ch. 20.05(1).
Attachment(s)
1. Application
2. Plat
Findings of Fact
1. The applicant is requesting a preliminary subdivision plat review for
a proposed subdivision off of Maria Drive.
2. The land division would create nine developable lots, one outlot
intended to be used for stormwater management purposes, plus a
future extension of Third Street, Meadow Street and Academy
Avenue.
3. Lots 3-8 range from 5,850 sq ft to 6,500 sq ft in size and is intended
for single-family residential development. Lot 2 is intended for a
cottage court development, Lot 1 for a planned gathering lodge to
accompany Door2Dreams, and Lot 9 for future multi-family
residential development.
4. An extension of Third Street, Meadow Street and Academy Avenue is
intended to provide access to all developable parcels.
5. Parcel ID 281240829240047 has a base zoning of “R-4” Multi-Family I
Residential with a “PD” Planned Development Overlay designation.
This zoning designation was approved in 2020. Parcel ID
281240829240033 is zoned “R-2” Single-Family Development.
6. Additional land use requests – a Comprehensive Plan amendment,
rezoning and conditional use permit – is slated for consideration at
the May Plan Commission meeting.
7. The creation of five or more lots requires the Common Council to
approve both a preliminary plat review and a final plat review.
Staff Recommendation
Approve the preliminary subdivision plat review on an unaddressed parcel
bounded by Maria Drive & Union Street North (Parcel ID 281240829240047)
Page 12 of 100
Page 2 of 5
and an unaddressed parcel bounded by Maria Drive (Parcel ID
281240829240033).
Vicinity Map
Background
The applicant is requesting a preliminary subdivision plat review for a proposed subdivision off of Maria Drive. The land
division would create nine developable lots, one outlot intended to be used for stormwater management purposes, plus
a future extension of Third Street, Meadow Street and Academy Avenue. Consistent with the City’s Subdivision
Ordinance, the subdividing of land creating five or more lots requires a preliminary and final subdivision plat to be
approved by the Plan Commission and Common Council.
Access: Access to the developable lots would be off of Maria Drive and a planned extension of Third Street, Meadow
Street and Union Street. All planned street extensions would be dedicated as public right-of-way. Academy Avenue and
Third Street North would have a right-of-way width of 60 feet, while the Meadow Street North Right-of-Way would be
50 feet in width. The City’s Public Works Department has reviewed the proposed street extensions and believe that
street capacity is adequate to handle the expected traffic generation.
Page 13 of 100
Page 3 of 5
Utilities: Utility infrastructure would be installed underneath the proposed public streets, servicing the 9 developable
lots.
Zoning and Land Use: If the subdivision plat is approved, the intention is to build single-family homes on Lots 3-8, a
cottage court on Lot 2, a gathering lodge on Lot 1 and future multi-family residential development on Lot 9. The City’s
Future Land Use Map identifies most of the subject area, with the exception of Parcel ID 281240829240047, for
institutional and governmental uses. A Future Land Use Map amendment would be needed to support residential
development, which is planned for consideration in May. Parcel ID 281240829240047 has a base zoning of “R-4” Multi-
Family I Residential with a “PD” Planned Development Overlay designation. This zoning designation was approved in
2020. Parcel ID 281240829240033 is zoned “R-2” Single-Family Development. A rezoning to the “R-4” Multi-Family I
Residence District is needed to support multi-family residential development and is planned for consideration in May.
Standards of Review
A preliminary plat or final plat of any major or minor subdivision in the City of Stevens Point or in the extraterritorial area
shall not be approved unless the Plan Commission and the Common Council determine that adequate public facilities and
public services are available to support and service the area of the proposed subdivision, unless the City finds the major
or minor plat are in an area not likely to be included in the City’s future growth zone. In considering the questions of
Preliminary Subdivision Plat
Page 14 of 100
Page 4 of 5
adequacy of public facilities and public services as set forth above, the Plan Commission and Common Council shall
consider but not be limited to:
1. The nature, extent and size of the proposed subdivision and its impact in terms of the estimated increase in
population expected to result.
Analysis: The subject area includes nine developable lots that are proposed for single-family, multi-family
residential and commercial development. Proposed lots range from 5,850 sq ft in size to over 118,000 sq ft in
size. Some of the proposed lots have further development restrictions, such as utility and drainage easements
that would prohibit development in those areas.
Findings: US Census household size in Stevens Point is 2.10 persons per household. An exact number of
residential units planned for Lot 9 is not determined. Given the smaller size of the lot (30,452 sq ft) and the
density restrictions for the “R-4” District, safeguards do exist to restrict significant population increases for
multi-family areas. Lots 3-8 are planned for single-family development, generating an estimated population
increase of 13 people. Based on the potential population increase for this area, existing public infrastructure,
along with the new street, utilities and fire hydrants, the City can reasonably handle this type of increase.
2. The present or projected state of development likely to result when said subdivision is developed with
projected densities as anticipated by adopted area Comprehensive Plans and currently approved subdivisions
in the immediate vicinity of the proposed subdivision.
Analysis: The proposed subdivision provides medium-density residential development on the city’s north side.
Findings: Long-term cost for the City does exist with the proposed subdivision having access via a public street.
Given the tax revenues tied to this development, staff believes that sufficient lot density exists so that revenues
are on par with expected expenditures, in part due to planned TIF incentives.
3. The avoidance of expenditures of public funds necessitated by the proposed subdivision which are not in
adopted capital or operating budgets. For subdivisions in the City of Stevens Point, the applicant shall furnish
data requested by the Director of Public Works, Water Utility Manager, Traffic Engineer and Director of
Planning and Development who will coordinate statements of adequacy for transportation, storm sewer,
sanitary sewer, water service, fire and police protection, parks, open space, and recreation and school
facilities for the Plan Commission and the Common Council.
Analysis: Planned street extensions would be handled by the City. Additional long-term expenditures with
maintenance costs for the street and multi-use path are anticipated; however, such expenditures will be
financed by the additional tax revenue coming from the created housing units.
Findings: Estimated infrastructure costs, projected property tax revenue, and utility users provide sufficient
financial capacity for the subdivision over the life of the proposed infrastructure.
Page 15 of 100
Page 5 of 5
Exhibits
Subject Area
Subject Area
Page 16 of 100
Page 17 of 100
Page 18 of 100
Page 19 of 100
Page 20 of 100
Page 1 of 11
Administrative Staff Report
Department of Community
Development
Rezone
Conditional Use Permit
2854 Church Street
April 6, 2026
Applicant(s):
• Partnering Together of Portage
County
Staff:
• Adam Kuhn, Associate Planner
akuhn@stevenspoint.com
Parcel Number(s):
• 281230805101608
Zone(s):
• Split Zoned “R-2” Single-Family
Residential and “B-4” Commercial
Master Plan:
• Commercial / Office / Multi-
Family
Council District:
• District 10 | Ald. Buse
Lot Information:
• Lot Size: 13,068 sq. ft. (0.30 ac.)
Current Use:
• Vacant
Applicable Regulations:
• 23.02(1)(f)(3)(f)
Request
1. Public Hearing and action on a request from Partnering Together of
Portage County to rezone portions of the property located at 2854
Church Street (Parcel ID 281230805101608) from the “R-2” Single-
Family Residence District to the “B-4” Commercial District.
2. Public Hearing and action on a request from Partnering Together of
Portage County for a conditional use permit to operate a temporary
housing facility on the property located at 2854 Church Street
(Parcel ID 281230805101608), consistent with Ch. 23.02(1)(f)(3)(f).
Attachment(s)
1. Application
2. Plans
Findings of Fact
1. Partnering Together of Portage County is seeking to operate a
temporary housing facility on the subject property.
2. The subject property is split zoned – the east half of the property is
zoned “B-4” Commercial, while the west half of the property is
zoned “R-2” Single-Family Residential.
3. Temporary housing is prohibited in the “R-2” District and is a
conditional use in the “B-4” District.
Staff Recommendation
Approve the request to rezone portions of the property located at 2854
Church Street (Parcel ID 281230805101608) from the “R-2” Single-Family
Residence District to the “B-4” Commercial District.
Approve the request for a conditional use permit to operate a temporary
housing facility on the property located at 2854 Church Street (Parcel ID
281230805101608), subject to the following conditions:
1. Maximum building occupancy shall be 35 persons.
2. Guest rules shall be created and administered as part of this
conditional use approval.
3. At least one professionally trained staff member shall provide
supervision of the facility at all times when in operation.
4. Staff shall have the ability to approve minor amendments to the
submitted plan set.
Page 21 of 100
Page 2 of 11
Vicinity Map
Background
Overview: Partnering Together of Portage County is seeking to operate an overnight temporary housing facility at 2854
Church Street. Interior renovations of the existing building are proposed to create sleeping areas for 22 beds, new
bathroom facilities, and other renovations to achieve Building Code compliance. Exterior improvements include the
creation of 11 parking spaces towards the rear of the property, bicycle parking, new six-foot-tall privacy fencing and
additional landscaping.
The subject property is split zoned “R-2” Single-Family Residential and “B-4” District. The east half of the property –
where the existing building is located – is zoned “B-4” Commercial, while the west half of the property is zoned “R-2”
Single-Family Residential. Temporary housing is a prohibited land use in the “R-2” District; however, it is a conditional
use within the “B-4” District. A rezoning of the west half of the property from the “R-2” District to the “B-4” District is
needed so that all of the subject property has a “B-4” District zoning designation. With temporary housing being a
conditional use in the “B-4” District, a conditional use permit is also being requested as part of this submittal.
Page 22 of 100
Page 3 of 11
Standards of Review – Rezone
1. Minimum performance standards are met with the proposed district.
Analysis: Performance standards for the “B-4” Commercial District are identified below:
Proposed First Floor Plan
Page 23 of 100
Page 4 of 11
Findings: The subject property is over 13,000 sq ft in size and meets minimum density restrictions for temporary
housing. Peak building height is 21 feet and meets maximum building height requirements. The principal
structure on the subject property meets minimum side and rear yard setback requirements. The minimum 25’
street setback requirement is not met; however, the building is grandfathered due to the current zoning
designation of “B-4” Commercial.
2. The change in zoning is consistent with the City’s Comprehensive Plan.
Analysis: The subject property is designated on the City’s Future Land Use Map for commercial, office, and
multi-family residential uses.
Findings: Staff believes that this standard is met. Temporary housing closely aligns with multi-family housing
given the multiple unrelated persons who would reside in the building at any given time.
3. The change in zoning will not create adjacent incompatible uses.
Analysis: The subject property exists near single-family residential uses to the north, south and west. A
scattering of commercial uses exists north and south of the subject property along Church Street.
“R-2” Single-Family Residence District
This district is established to provide the population density and used primarily for single family living,
which is expected to accommodate the numerous residential developments already at the density of this
district, and this district would accommodate other housing not on City sewer. This district is to be
located consistent with the City's Comprehensive Plan.
“B-4” Commercial District
This district is established to provide for retail, commercial, office, service and apartment uses in areas of
good accessibility along arterial streets consistent with the City's Comprehensive Plan. This district is
primarily intended to accommodate general commercial uses requiring on-site parking and arterial
access.
Findings: The segment of Church Street from the underpass to Heffron Street has historically had a scattering of
commercial and single-family residential development. The City’s Zoning Map and Future Land Use Map
identifies the desire for commercial and multi-family housing on properties directly abutting Church Street. The
proposal to have temporary housing on the subject property, in my opinion, would better meet the City’s long-
range land use plan for this segment of Church Street.
4. The impact of the proposed amendment, and potential subsequent amendment requests, will likely have on
area parking, street capacity, street access, neighborhood traffic levels, pedestrian mobility and other traffic-
related issues.
Analysis: 11 parking spaces are proposed with access off of Henrietta Street and Church Street. The parking area
is designed to accommodate for one-way traffic that enters the property off of Church Street and exits onto
Page 24 of 100
Page 5 of 11
Henrietta Street. While residents are not expected to have vehicles, 11 parking spaces are required per the City’s
Zoning Code based on the size of the building and proposed land use.
Findings: Staff believes that parking on the subject property, along with access and neighborhood traffic
circulation for all road users, will not be negatively impacted with the proposed rezoning request.
5. The impact the proposed amendment, and potential subsequent amendment requests, will likely have upon
area drainage, its impact on surrounding properties and the natural environment, and the capacity of public
systems to accommodate the drainage.
Analysis: On-site drainage is planned to be located along the side lot lines and within landscaped areas towards
the west property line. With the proposed parking lot, staff believes that adequate green space exists for
stormwater to be contained on the property.
Findings: This standard is met.
6. Population density changes.
Analysis: Social and protective services in the area can support the proposed use, even when at full capacity.
Findings: This standard is met.
7. School population changes.
Analysis: N/A
Findings: N/A
8. Costs to provide adequate sanitary and storm sewer and water to the area.
Analysis: Utility infrastructure currently exists to support the planned use.
Findings: This standard is met.
9. Adequacy of recreational facilities serving the proposed area.
Analysis: The subject property is located within 1/3-mile of Veteran’s Memorial Park. Social gathering spaces are
planned within the building for residents to utilize.
Findings: Staff believes that there are adequate recreational facilities serving the proposed area.
Standards of Review – Conditional Use Permit
1. The establishment, maintenance, or operation of the use will not be detrimental to, or endanger the public
health, safety, morals, comfort, or general welfare.
Analysis: The building currently exists and can support a maximum occupancy of 35 persons (including staff).
Sleeping areas will be located on the first floor, with access into the building off of Church Street.
Page 25 of 100
Page 6 of 11
Findings: A mix of land uses are located near the subject property, including single-family, commercial and
institutional uses. The proposed location is better suited to handle the requested land use given the site layout
and the ability to minimize activity for the land use within the public right-of-way. Businesses that are located
near the property typically operate only during business hours, typically when the shelter is not in use. While the
proposed use abuts single-family uses, safeguards have been built into the site design (e.g., landscaping and
privacy fencing) and operations to address potential dangers.
2. The use will not be injurious to the use and for the purpose already permitted, nor substantially diminish and
impair property values.
Analysis: The proposed use can accommodate a maximum occupancy of 35 people, which includes support
staff.
Findings: Temporary housing is identified as a conditional use within the “B-4” Commercial District, the zoning
designation of the subject property (contingent on rezoning approval). Based on the application and plan
submittal, staff believes that the use will not be injurious to the property or surrounding neighborhood.
3. The establishment of the use will not impede the normal and orderly development and improvement of the
surrounding property for uses permitted in the district.
Analysis: The respective area is in an established and developed area of the city.
Findings: See standards one and two above.
4. The exterior architectural appeal and function plan of any proposed structure will not be variance with either
the exterior architectural appeal and function plan, and scale of the structures already constructed or in the
course of construction in the immediate neighborhood or in the character of the applicable district so as to
result in a substantial or undue adverse effect on the neighborhood.
Analysis: The use will occupy an existing building. Minimal exterior renovations are proposed (e.g., light
fixtures).
Findings: The current building matches the surrounding area in terms of architectural appeal and general
function.
5. Adequate utilities, access roads, drainage and/or facilities have been, or are being, provided.
Analysis: The parking area is designed to accommodate for one-way traffic that enters the property off of
Church Street and exits onto Henrietta Street. On-site drainage is planned to be located along the side lot lines
and within landscaped areas towards the west property line. With the proposed parking lot, staff believes that
adequate green space exists for stormwater to be contained on the property.
Findings: This standard is met.
6. Adequate measures have been, or will be taken, to provide ingress and egress so designed to minimize traffic
congestion in the public streets.
Analysis: See standard #5 above.
Page 26 of 100
Page 7 of 11
Findings: Staff believes that safe access into and out of the subject property is provided with the proposed land
use.
7. The proposed use is not contrary to the objectives of any duly adopted land use plan for the City of Stevens
Point and any of its components.
Analysis: The subject property is zoned “B-4” Commercial (contingent on the rezoning request listed earlier) and
has a future land use designation of ‘Commercial/Office/Multi-Family.’ The “B-4” District is established to
“provide for retail,
commercial, office,
service and
apartment uses in
areas of good
accessibility along
arterial streets
consistent with the
City's Comprehensive
Plan. This district is
primarily intended to
accommodate
general
commercial
uses requiring
on-site parking
and arterial
access.”
Findings: Staff
believes that
the proposed
residential use
aligns with the
zoning and
future land use designation of the subject property.
8. The use shall, in all other respects, conform to the applicable regulations of the district in which it is located,
except as such regulations may, in each instance, be modified pursuant to the recommendations of the Plan
Commission.
Analysis: The property and use meets minimum performance standards in the “B-4” District. Several Building
Code requirements exist with the proposed land use. The applicant has been working with the selected architect
and City Commercial Building Inspector on identifying all regulations that need to be met. Applicable Building
Code standards would need to be fulfilled prior to being granted occupancy.
Subject
Property
Subject
Property
Page 27 of 100
Page 8 of 11
Findings: This standard is met provided that the above conditions of approval are applied.
9. The proposal will not result in result in an over-concentration of high-density living facilities in one area so as
to result in a substantial or undue adverse effect on the neighborhood, on the school system, and the social
and protective systems of the community.
Analysis: The proposal is to operate a temporary housing facility accommodating 22 beds.
Findings: The proposal should not result in an over-concentration of high-density living facilities as the property
is located along a commercial corridor designated as an arterial street.
10. Principal: Applications for exclusive multifamily residential uses: The view from the street should maintain a
residential character. The view should be dominated by the building and not by garages, parking, mechanical
equipment, garbage containers, or other storage.
Analysis: The use will occupy an existing building. Minimal exterior renovations are proposed (e.g., light
fixtures).
Findings: The current building matches the surrounding area in terms of architectural appeal and general
function.
11. Principal: Access to the site shall be safe.
a) All developments shall front on a public right-of-way unless recommended by the Public Works
Director.
Analysis: Access is proposed to be off of Church Street and Henrietta Street
Finding: This standard is met.
b) The driveway to the site shall be located so as not to be a danger to the street flow of traffic.
Analysis: The proposed access points maintains minimum spacing requirements as outlined in the City’s
Zoning Code.
Findings: This standard is met.
c) The driveway shall not be too close to neighboring intersections.
Analysis: Driveways serving multi-family residential and other non-residential land uses must be
separated at least 100 feet from a street intersection consisting of an arterial street. The proposed
driveways greatly exceed this 100’ separation requirement.
Findings: This standard is met.
Page 28 of 100
Page 9 of 11
d) Alignment of the driveway shall be coordinated with adjacent access points to avoid conflict or
confusion.
Analysis: Based on the amount of street frontage provided, the City’s Zoning Code permits a maximum
of four driveways. Two driveways are proposed and are proportionally located on the two street
frontages that would permit the creation of access points.
Findings: Staff believes that the proposed driveways are aligned appropriately to avoid conflict and
confusion.
e) Only one driveway shall be allowed per site unless recommended by the Public Works Director. Two
family units may be allowed more than one driveway if those driveways are separated by not less
than 10 feet. Maximum driveway openings shall be 20 feet (each).
Analysis: The applicant is requesting to use two driveways. The Public Works Director has recommended
the quantity and location of these driveways.
Findings: This standard is met.
f) The organization of traffic flow on-site and between the site and the street shall be organized in a
clear hierarchy of flow patterns. Internal and external areas where traffic flow changes directions or
creates intersections shall be organized at clear intersections and those intersections are spaced far
enough apart so as to not cause confusion or problems and to provide for adequate spacing for
waiting vehicles.
Analysis: The traffic flow on the site to the street is anticipated to flow smoothly. Traffic will enter the
site from Church Street and exit onto Henrietta Street.
Findings: This standard is met.
g) Intersections are visible and not visually screened.
Analysis: The intersections are not screened from view.
Findings: Vision obstructions should not be a concern.
h) Adequate drainage and snow storage is provided.
Analysis: Adequate drainage exists on the property, and snow storage is expected to be located towards
the west end of the property.
Findings: This standard is met.
i) Minimum size requirements are maintained for safe vehicle circulation.
Page 29 of 100
Page 10 of 11
Analysis: The lot provides for adequate traffic aisles, as required by the City’s Zoning Code.
Findings: This standard is met.
j) Parking areas shall be safe. They shall be adequately lit, sized to meet minimum standards, graded so
as to not be too steep, and paved with concrete, brick, or bituminous surfacing. The light source shall
not be visible from adjacent properties. Lighting shall be developed in such a way to minimize light
straying onto adjacent properties.
Analysis: Additional lighting is planned to be located on the exterior of the building to meet minimum
Building Code requirements. Existing landscaping should reduce light pollution generated from these
fixtures onto adjacent properties.
Findings: This standard is met.
k) Driveways shall be located to minimize the impact to adjacent properties.
Analysis: Please see above. The driveways should not cause a negative impact on the adjacent
properties.
Findings: This standard is met.
11. There shall be adequate utilities to serve the site.
a. The Public Works Director, Police Chief and Fire Chief shall determine whether there is adequate
sanitary sewer, portable water, storm drainage, street capacity, emergency access, public protection
services, and other utilities to serve the proposed development. They shall review the plan to ensure
safety and access for safety vehicles.
Analysis: Please see above. The property has the needed utilities and access to support the proposed
land use.
Findings: This standard is met.
13. The privacy of the neighboring development and the proposed development shall be maintained as much as
practical. Guidelines:
a. Mechanical equipment including refuse storage shall be screened from neighboring properties.
Analysis: Refuse storage is not proposed as part of this request.
Findings: This standard is met.
b. Lighting shall be located to minimize intrusion onto neighboring properties.
Page 30 of 100
Page 11 of 11
Analysis: Additional lighting is planned to be located on the exterior of the building to meet minimum
Building Code requirements. Existing landscaping should reduce light pollution generated from these
fixtures onto adjacent properties.
Findings: This standard is met.
c. Sources of noise shall be located in a manner that minimizes impact to neighboring properties.
Analysis: Any noise generated is expected to be located within the building.
Findings: This standard is met.
14. Principal – Applications for exclusive multi-family residential uses. Landscaping shall be provided, or existing
landscape elements shall be preserved to maintain a sense of residential character, define boundaries, and to
enhance the sense of enclosure and privacy.
Analysis: Landscaping is planned to be located along select areas of the parking lot.
Findings: This standard is met.
Based on the findings above, staff would recommend approval of the conditional use permit with the conditions
outlined on page one. Please keep in mind that State legislation has placed limitations on local jurisdictions regarding
the denial of conditional use permits. Conditional use permits shall be reviewed by a means to permit a use under
certain conditions applied to the use or property. For example, if a concern is raised regarding to a standard above, a
condition can be applied to the permit to address the concern and grant the permit.
Proposed Site Plan
Page 31 of 100
Page 32 of 100
Page 33 of 100
Page 34 of 100
Page 35 of 100
PARTNERING TOGETHER OF PORTAGE COUNTY
March 10, 2026
Alderperson Dustin Buse District #10
RE: CONVERTING THE FORMER ODD FELLOWS INTO AN OVERNIGHT SHELTER
2854
Church
St
Dear Alder Buse,
After much time and effort, Partnering Together of Portage County has reached the
point
where
we
are
requesting
re-zoning
and
conditional
use
of
the
property
located
at
2854
Church
St.
With the support and collaboration of the City Government and many partners, we will
be
purchasing
this
property
and
completing
renovations
illustrated
in
the
accompanying
plans
and
documents.
Upon completion of the renovations, the building will be a valuable asset to
our
community
addressing
the
housing
needs
of
unsheltered
neighbors.
If you should have any questions, I am available at 715-247-2116.
Sincerely,
Gregg Hansel
Page 36 of 100
Partnering Together of Portage County Chairperson
Page 37 of 100
CHURCH STREET
EXISTING A/C CONDENSER
20" WATER MANHOLE COVER
EXISTING ADA CONCRETE
RAMP TO REMAIN
EXISTING METAL GUARDRAIL.
CLEAN AND PAINT W/ RUST
BULLET BLACK SHELL
UP
UP
UP
DN
8" PRECAST CONCRETE ROOF
WITH INSULATION AND EPDM
RUBBER ROOFING
ROOF
67'-6"
ROOF
32'-0"
9'-3 1/2"
EXISTING GAS METER
16'-7"
4'-2"
11'-7 5/8"
7'-3"
9" OVERHANGS
BUILDING
66'-0"
225.00'
109.50'
110.00'
4.00'
60.00'
56.00'
ENTRANCE/ EXIT
TO FIRST FLOOR
ENTRANCE/ EXIT
TO BASEMENT
ENTRANCE/ EXIT
TO FIRST FLOOR
PROPERTY LINE
N
EXISTING P.V. SOLAR ARRAY
TO REMAIN
BUILDING30'-6"
REMOVE ALL
EXISTING
LANDSCAPE
W
W
EXISTING SIDEWALK TO
REMAIN
ADJACENT LOT
NEIGHBORING HOME
NEIGHBORING HOME
NEIGHBORING HOME
2
17'-2"
12'-4"
14'-2"
8'-0"
7'-9"
27'-6"
8'-6"
EXISTING LARGE SPRUCE TREES
ISLE 1
2
3
4
5
6
7
46'-0"
FIRE HYDRANT
HANDRAILS
MODIFIED
NEW FLOWERING
CRAB TREES
NEW FLOWERING
CRAB TREES
NEW FLOWERS
IRIS, DECORATIVE GRASSES
BACK OF CURB
5'-0" WIDE CITY SIDEWALK
REMOVE EXISTING
STONE WING WALL
EXISTING POWER POLE
W/ TRANSFORMER
EXISTING MAJOR WHITE
PINE DEFORMED BUT
HEALTHY. OVERHANGS
PROPERTY - TO BE
TRIMMED.
CLEAR DIRT AND
DEBRIS OFF OF
PAVEMENT
EXISTING SHRUBS
18'-0"
EXISTING
LIGHTING
GRASS
PRIOR TO STARTING PROJECT, THE
CORNERS OF THE PROPERTY NEED
TO BE LOCATED BY CERTIFIED
SURVEYOR.
NOTE:
VISION TRIANGLE
VISION TRIANGLE
NEW WHITE SPRUCE
NEW WHITE SPRUCE
SNOW PILE
10'-0"
10'-0"
HENRIETTA STREET
TYP
9'-0"
60.0°
VAN
ACCESSIBLE
PARKING
5'-0"
EXISTING DENSE SHRUBS
EXISTING DENSE SHRUBS
BICYCLE
RACK
NEW SIDEWALK
EXISTING DENSE SHRUBS
EGRESS LIGHTING
CONNECT TO
EMERGENCY
LIGHTING
EGRESS LIGHTING
CONNECT TO
EMERGENCY
LIGHTING
VISION TRIANGLE
VISION TRIANGLE
SNOW PILE
18'-0"
8
9
10
11
PARALLEL PARKING
GRANDFATHERED DRIVEWAY WIDTH
ONE WAY
SYSTEM
EVALUATE EXISTING
LANDSCAPE REPLACE IF
NECESSARY 9'-0"
17'-0"
20'-0"
23'-3"
A/C
CONDENSER
NEW 6'-0" HIGH FENCE
NEW 6'-0" HIGH FENCE
W
W
NEW WATER MAIN TO
SPRINKLER CODE FOR A NFPA
13 SYSTEM.
INSTALL AS STREET IS
REBUILD THIS SUMMER 2026
OWNER / CLIENT
Partnering Together of Portage County
c/o: Gregg Hansel
Stevens Point, WI
PROJECT LOCATION
2854 CHURCH STREET
STEVENS POINT, WI 54481
ARCHITECT OF RECORD
REVELATIONS ARCHITECTS/ BUILDERS CORPORATION
1309 DUBAY AVE
STEVENS POINT, WI 54482
CONTACT: WILLIAM YUDCHITZ - ARCHITECT
bill@revarch.com
715.341.5588
PARKING CALCULATION
•
•
•
•
•
•
1 STALL PER 300 SQ. FT.
3,540 SQ. FT. (BOTH FLOORS) / 300 = 11.8 STALLS
MINUS 15% IF 1/4 MILE FROM BUS STOP = -1.77 STALLS
STALLS REQUIRED = 10.03 ROUND UP TO 11
TOTAL REQUIRED = 11 STALLS
TOTAL PROVIDED = 11 STALLS
SHEET INDEX
REVISIONS
2 11/18/2025 •
•
•
•
•
CHANGES TO FIRST FLOOR BATHROOM.
ADDING STEEL MESH TO EXTERIOR GUARD RAILS.
CHANGES TO ACCESSIBLE KITCHENETTE.
CHANGE TO STORAGE ROOM SIZE, FOR ADA TURNING RADIUS
VAN ACCESSIBLE PARKING SPACE ALLOCATED.
1 11/03/2025 • MOVE/ CREATE NEW DOOR TO BATHROOM
10/31/2025 ORIGINAL PLAN ISSUED FOR PERMITTING
3 03/09/2026 • CHANGES TO SITE PLAN
CODE ANALYSIS
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
1.
2.
3.
4.
•
•
•
GOVERNING CODES - NOTE: PLANS SUBMITTED PRIOR TO CODE CHANGE.
2015 IBC, 2015 IEBC, 2018 WI COMMERCIAL CODE SPS 361-366
BUILDING TYPE OF CONSTRUCTION: IB
ALTERATIONS TO EXISTING BUILDING:
CHANGE OF USE: PER CHAPTER 10 OF IEBC
CURRENT USE: A-3 ASSEMBLY GATHERING
PROPOSED USE: R-1 BOARDING HOUSE (TRANSIENT)
ALTERNATIONS LEVEL 2 - RECONFIGURATION OF SPACE. WORK AREA LESS THAN
50% OF BUILDING'S AGGREGATE AREA.
IEBC 1004.1 FIRE PROTECTION - WILL COMPLY WITH CHAPTER 9 FOR THE NEW
USE.
FIRE SUPPRESSION - WILL BE ADDED PER NFPA 23R (MIN.)
FIRE ALARM - WILL BE ADDED PER NFPA 72
SMOKE DETECTION - WILL BE ADDED - AUTOMATIC/ INTERCONNECTED
FIRE EXTINGUISHERS - WILL BE UPDATED PER IBC+IFC
INTERIOR FINISH - WILL COMPLY WITH IBC CHAPTER 8 FOR NEW ELEMENTS
IEBC 1005.1 MEANS OF EGRESS
MINIMUM NUMBER OF EXITS REQUIRED FOR EACH STORY = 2
NUMBER OF OCCUPANTS = 30 + 5 STAFF
IEBC 1006.1 ACCESSIBILITY - WILL COMPLY WITH IEBC 1012.8
AT LEAST ONE ACCESSIBLE BUILDING ENTRANCE.
AT LEAST ONE ACCESSIBLE ROUTE FOR ACCESSIBLE ENTRANCE TO PRIMARY
FUNCTION AREAS.
EXISTING WARMING KITCHEN IN BASEMENT - NOT ACCESSIBLE, A NEW
KITCHENETTE WILL BE PROVIDED AT 1ST FLOOR.
EXISTING SEATING AREA (FELLOWSHIP) AT BASEMENT - NOT ACCESSIBLE, A NEW
SEATING AREA WILL BE PROVIDED AT 1ST FLOOR.
EXISTING RESTROOMS - NOT ACCESSIBLE, 2 EACH NEW SINGLE RESTROOMS W/
SHOWERS WILL BE PROVIDED AT 1ST FLOOR.
SIGNAGE - SIGNAGE COMPLYING W/ IBC CHAPTER 11 WILL BE PROVIDED AT:
ACCESSIBLE RESTROOMS
ACCESSIBLE LOCKERS
ACCESSIBLE PARKING
AT NON-ACCESSIBLE EXITS/ENTRANCES AND AT ACCESSIBLE EXIT/
ENTRANCES.
ACCESSIBLE PARKING - SEE SITE PLAN
LOADING ZONE - NON PROVIDED - NON REQUIRED TO BE ACCESSIBLE.
ACCESSIBLE ROUTE FROM PARKING TO ACCESSIBLE ENTRANCE.
IEBC 1007.1 GRAVITY LOADS - EXISTING OCCUPANCY REQUIRED HIGHER UNIFORM
LOADS THAN THE NRE OCCUPANCY PER IBC 1007.1
IEBC 1007.2 SNOW AND WIND LOADS - RISK CATEGORY OF NEW AND EXISTING USES
ARE CATEGORY II PER IBC 1604.5
NO STRUCTURAL REINFORCING REQUIRED
IEBC 1012.4.4 HANDRAILS - EXISTING STAIRS WILL COMPLY WITH IEBC 805.9
IEBC 1012.4.5 GUARDS - EXISTING GUARDS WILL COMPLY WITH IEBC 805.11
IEBC 1012.5 HEIGHTS AND AREAS - R-1 AND A-3 ARE SAME HAZARD CATEGORY = PER
1012.5.3 HEIGHTS AND AREAS SHALL BE DEEMED ACCEPTABLE.
IEBC 1012.6 EXTERIOR WALLS FIRE RESISTANCE RATING - R AND A ARE SAME
HAZARD CATEGORY = EXISTING WALLS AND OPENINGS SHALL BE ACCEPTED.
IEBC 1012.9 SEE 1006.1 ABOVE
SHEET
© COPYRIGHT 2026
Revelations
Architects/ Builders Corporation
1309 DuBay Avenue
Stevens Point, WI 54482 O: 715.341.5588
revarch.com
A100
SITE PLAN
ODD FELLOWS
2854 Church Street
Stevens Point, WI 54481 ISSUE DATE: 03.09.26
HOMELESS CONVERSION OF THE ODD FELLOWS BLDG.
SCALE: 1/8" = 1'-0"1 SITE PLAN
NUMBER SHEET NAME SHEET ISSUE DATE
A100 SITE PLAN 10/31/2025
A101 FIRST FLOOR PROPOSED 10/31/2025
A102 BASEMENT EXISTING 10/31/2025
A201 ELEVATIONS 10/31/2025
A202 ELEVATIONS 10/31/2025
M101 FIRST FLOOR HVAC PLAN 10/31/2025
M102 BASEMENT HVAC PLAN 10/31/2025
Page 38 of 100
A2022
A201
A202 1
2
A201
1
OVERALL BUILDING
66'-0"
30'-6"
7'-4 3/4" 7 5/8" 8'-0"
1'-4" 1'-6"
1'-6"
ø 5' - 0"
DN
DN
DN
5 R.@ 7 1/2"
DN
DN
RAMP
14 R.@ 7 1/4"
5 R.@ 7"
EXISTING BATH
NEW BATH
6'-0"
HEAT RECOVERY
VENTILATOR AND
TOILET PAPER
AND TOWEL
STORAGE
SHOWER
3'-9"
5 5/8"
6'-10 1/2"
PROTECT WINDOW
GRAB BARS IN SHOWER
MAX HEIGHT OF CONTROLS IS 48".
HAND HELD SHOWER CAN BE A SLIDE BAR
NEW BATH
TO REMAIN
UNCHANGED
EXISTING BATH FAN AND
DUCT/ HOOD TO EXTERIOR
NEW OFFICE
8'-10 3/8"
5 5/8"
3'-0" 3'-0" 3'-0"
9'-4"
12'-0"
NEW STORAGE
TO BASEMENT
OVERALL BUILDING
30'-6"
20" WATER MANHOLE COVER
N
EXISTING A/C CONDENSER
EXISTING GAS METER
EXISTING METAL GUARDRAIL.
CLEAN AND PAINT W/ RUST
BULLET BLACK SHELL
18" WIDE CONCRETE APRON
AT ASPALT
EXISTING SIDEWALK TO
REMAINSTORAGE/
HANGING OPEN
LOCKERS
REMOVE EXISTING
CABINETRY THIS END
REMOVE EXISTING
CABINETRY IN THIS CORNER
EXISTING ASPHALT DRIVE/
PARKING TO REMAIN
EXISTING ELECTRICAL METER
AND MAST SERVICE
EXISTING CONDUIT FOR
EXISTING SOLAR
EXISTING BRICKED IN WINDOW
OPENINGS
EXISTING ADA CONCRETE
RAMP TO REMAIN
EXISTING METAL GUARDRAIL.
CLEAN AND PAINT W/ RUST
BULLET BLACK SHELLREPAIR STEEL DOOR FRAME
ON DOOR TO BASEMENT
W
W
W
W
W
W
NEW 2" WATER SERVICE (PROTECT
WITH 2" EXTRUDED FOAM COVER)
HOOKS ON
WALL
6 X 24 RETURN DUCT FOR
MAIN SPACE TO REMAIN
PATCH BROKEN SUPPORTS
VERIFY EXIT PATH LIGHTING
VERIFY EXIT PATH LIGHTING
VERIFY EXIT PATH LIGHTING
ø 5' - 0" HOOKS ON
WALL
36" SQ. SHOWER
MODULE
1'-7 5/8"
ø 5' - 0"
5'-6"
3'-0 3/4"
3 5/8"
3'-0"
STORAGE
FOLD UP ADA
BENCH
FOLD UP ADA BENCH
REMOVE DOOR,
INFILL WITH
BLOCK TO MATCH
WALL
NEW 3/0 DOOR
DUCT CHASE
PROVIDE
CONDENSATE
DRAIN FOR
NEW HRV
A101
2
UNDER
COUNTER
REFRIDG.
CABINET
UNDER
COUNTER
IN FILL RAILING WITH 4" X 4" X
1/8" WELDED STEEL MESH. ALL
OPENINGS AND CLEARANCES
TO BE LESS THAN 4" TO MEET
CODE. WELD MESH TO STEEL
ANGLES AND BOLT TO
RAILING.
3'-0" 3'-0" 3'-0"
3/0 x 6/8
2
IN FILL RAILING WITH 4" X 4" X
1/8" WELDED STEEL MESH. ALL
OPENINGS AND CLEARANCES
TO BE LESS THAN 4" TO MEET
CODE. WELD MESH TO STEEL
ANGLES AND BOLT TO
RAILING.22
REMOVE EXISTING STONE
WING WALL
NEW SIDEWALK
SPRINKLER SYSTEM NOTES
SPRINKLER BOTH FLOORS OF THE BUILDING USING THE 13R NFPA CODE REQUIREMENTS.
FRESH AIR REQUIREMENTS
FRESH AIR REQUIREMENTS:
30 PEOPLE @ 7.5 CFM PER PERSON = 225 CFM REQUIRED
25 PEOPLE @ 7.5 CFM PER PERSON = 187.5 CFM REQUIRED
BATHROOM FIXTURES
BATHROOM AREAS ARE TO SUPPLY THE FOLLOWING:
MIRROR
SOAP DISPENSER
HOOKS
TOILET PAPER HOLDER
PAPER TOWEL HOLDER
WASTE PAPER CONTROL
GRAB BARS AT TOILETS, AND SHOWERS
INSTALL AS PER ADA HEIGHTS/ LOCATIONS AND CODES
FAUCETS AND PIPES TO MEET ADA STANDARDS
FIRST FLOOR
100' - 0"
FF CEILING
109' - 10 1/2"
7'-0"
1'-6 7/8"3'-2 3/4"2'-0"
6 X 24 RETURN DUCT FOR
MAIN SPACE TO REMAIN
NEW DOOR TO
BATHROOM
UNDERCOUNTER
REFRIGERATOR
ADA COMPLIANT SINK IN
COUNTER, WITH
PROTECTED TRAP. PLACE
TRAP AGAINST BACK WALL.
LAMINATE COUNTERTOP
2'-8 1/2"
1 1/2"
24" WIDE BASE CABINET
MAXIMUM
34"
MINIMUM
27"
42" 42"
2
2
SHEET
© COPYRIGHT 2026
Revelations
Architects/ Builders Corporation
1309 DuBay Avenue
Stevens Point, WI 54482 O: 715.341.5588
revarch.com
A101
FIRST FLOOR
PROPOSED
ODD FELLOWS
2854 Church Street
Stevens Point, WI 54481 ISSUE DATE: 03.09.26
HOMELESS CONVERSION OF THE ODD FELLOWS BLDG.
SCALE: 1/4" = 1'-0"1 PROPOSED FIRST FLOOR PLAN
SCALE: 1/2" = 1'-0"2 NEW KITCHENETTE
1
2
2
Page 39 of 100
REFRIG.
16"
30'-6"
49 5/8"
48 1/8"
9'-4"
56"
7 5/8"52 1/2"7 5/8"
16'-10"
144"
23 1/2" 40 1/4" 23 3/4" 120"
40"
28"
12"
12"
1'-4" 42'-0 5/8"
ELECTRICAL
PANELS
11 5/8" 27'-9 3/4"
11 5/8"
8" CMU BLOCK WALL
12" CMU BLOCK WALL
8" CMU BLOCK WALL
KITCHEN
FURNACE
ROOM
BATHROOM
BASEMENT
FELLOWSHIP
HALL
SERVING COUNTER
206 1/2"
63"
SINKSINK
3/4 DOOR
2/8 DOOR
UP
1/4" PANELING ONTOP 3/4"
FURRING
EXISTING WINDOW, 31" X 13"
OPERABLE AREA
96" 11 5/8"
PLUMBING STACK
WATER
HEATER
EXISTING CHIMNEY BLOCK.
CAPPED AT ROOF & BASEMENT
CARRIER 58MCB080-12116
GAS FURNACE
80,000 BTU/HR
1,750 CFM CAPACITY
RHEEM R951T1005A21M4SNAS
GAS FURNACE.
98,000 BTU/HR
48 7/8"
UP
UNDER RAMP
MECHANICAL
FOUNDATION
UNDER FRONT
STOOP
N
BASEMENT LEVEL TO REMAIN
JANITOR
SHEET
© COPYRIGHT 2026
Revelations
Architects/ Builders Corporation
1309 DuBay Avenue
Stevens Point, WI 54482 O: 715.341.5588
revarch.com
A102
BASEMENT
EXISTING
ODD FELLOWS
2854 Church Street
Stevens Point, WI 54481 ISSUE DATE: 03.09.26
HOMELESS CONVERSION OF THE ODD FELLOWS BLDG.
SCALE: 1/4" = 1'-0"1 EXISTING BASEMENT PLAN
SEE M102 FOR
DUCTWORK PLAN
Page 40 of 100
FIRST FLOOR
100' - 0"
FF CEILING
109' - 10 1/2"
BASEMENT
91' - 7 1/2"
BOTTOM OF STONE
96' - 8"
BECAUSE OF THE THICKNESS OF THE ROOF, IT IS ASSUMED THAT DURING ONE OF
THE RE-ROOFING PROJECTS OVER THE YEARS, INSULATION HAS BEEN ADDED.
COMCHECK WOULD BE IMPOSSIBLE WITHOUT CUTTING INTO THE ROOF.
EXISTING P.V. SOLAR ARRAY
TO REMAIN
EXISTING METAL GUARDRAIL.
CLEAN AND PAINT W/ RUST
BULLET BLACK SHELL
4 1/2" STONE VENEER
EXISTING WINDOW, 31" X 13"
OPERABLE AREA
NEW HRV EXHAUST NEW HRV INTAKE
FIRST FLOOR
100' - 0"
FF CEILING
109' - 10 1/2"
BASEMENT
91' - 7 1/2"
BOTTOM OF STONE
96' - 8"
4'-0"
EXISTING ELECTRICAL METER
AND MAST SERVICE
EXISTING CONDUIT FOR
EXISTING SOLAR
EXISTING BRICKED IN WINDOW
OPENINGS
BECAUSE OF THE THICKNESS OF THE ROOF, IT IS ASSUMED THAT DURING ONE OF
THE RE-ROOFING PROJECTS OVER THE YEARS, INSULATION HAS BEEN ADDED.
COMCHECK WOULD BE IMPOSSIBLE WITHOUT CUTTING INTO THE ROOF.
REPAIR BOTTOM OF RAILINGS
EXISTING METAL GUARDRAIL.
CLEAN AND PAINT W/ RUST
BULLET BLACK SHELL
EXISTING METAL GUARDRAIL.
CLEAN AND PAINT W/ RUST
BULLET BLACK SHELL
EXISTING BATHROOM EXHAUST HOOD
FURNACE ROOM INTAKE AND FRESH AIR
RO BASEMENT COUNTER FLOW
KITCHEN EXHAUST FAN
REPAIR STEEL DOOR FRAME
ON DOOR TO BASEMENT
IN FILL RAILING WITH 4" X 4" X
1/8" WELDED STEEL MESH. ALL
OPENINGS AND CLEARANCES
TO BE LESS THAN 4" TO MEET
CODE. WELD MESH TO STEEL
ANGLES AND BOLT TO
RAILING.
IN FILL RAILING WITH 4" X 4" X
1/8" WELDED STEEL MESH. ALL
OPENINGS AND CLEARANCES
TO BE LESS THAN 4" TO MEET
CODE. WELD MESH TO STEEL
ANGLES AND BOLT TO
RAILING.
2
2
REMOVE EXISTING
STONE WING WALL
SHEET
© COPYRIGHT 2026
Revelations
Architects/ Builders Corporation
1309 DuBay Avenue
Stevens Point, WI 54482 O: 715.341.5588
revarch.com
A201
ELEVATIONS
ODD FELLOWS
2854 Church Street
Stevens Point, WI 54481 ISSUE DATE: 03.09.26
HOMELESS CONVERSION OF THE ODD FELLOWS BLDG.
SCALE: 1/4" = 1'-0"2 SOUTH ELEVATION
SCALE: 1/4" = 1'-0"1 NORTH ELEVATION
EXISTING WINDOWS TO REMAIN
Page 41 of 100
FIRST FLOOR
100' - 0"
FF CEILING
109' - 10 1/2"
BASEMENT
91' - 7 1/2"
BOTTOM OF STONE
96' - 8"
REMOUNT
ELECTRICAL
EXISTING PARKING LOT LIGHT
EXISTING METAL GUARDRAIL.
CLEAN AND PAINT W/ RUST
BULLET BLACK SHELL
EXISTING P.V. SOLAR ARRAY
TO REMAIN
4 1/2" STONE VENEER
IN FILL RAILING WITH 4" X 4" X
1/8" WELDED STEEL MESH. ALL
OPENINGS AND CLEARANCES
TO BE LESS THAN 4" TO MEET
CODE. WELD MESH TO STEEL
ANGLES AND BOLT TO
RAILING.
2
FIRST FLOOR
100' - 0"
FF CEILING
109' - 10 1/2"
BASEMENT
91' - 7 1/2"
BOTTOM OF STONE
96' - 8"
EXISTING P.V. SOLAR ARRAY
TO REMAIN
EXISTING GAS METER
EXISTING A/C CONDENSER
CUT TREES AND SHRUBS SELECTIVELY
2' FOAM OVER NEW
WATER SERVICE
IN FILL RAILING WITH 4" X 4" X
1/8" WELDED STEEL MESH. ALL
OPENINGS AND CLEARANCES
TO BE LESS THAN 4" TO MEET
CODE. WELD MESH TO STEEL
ANGLES AND BOLT TO
RAILING.
HANDRAILS MODIFIED SIMILAR
TO NORTH SIDE
SHEET
© COPYRIGHT 2026
Revelations
Architects/ Builders Corporation
1309 DuBay Avenue
Stevens Point, WI 54482 O: 715.341.5588
revarch.com
A202
ELEVATIONS
ODD FELLOWS
2854 Church Street
Stevens Point, WI 54481 ISSUE DATE: 03.09.26
HOMELESS CONVERSION OF THE ODD FELLOWS BLDG.
SCALE: 1/4" = 1'-0"1 WEST ELEVATION
SCALE: 1/4" = 1'-0"2 EAST ELEVATION
Page 42 of 100
SPRINKLER SYSTEM NOTES
SPRINKLER BOTH FLOORS OF THE BUILDING USING THE 13R NFPA CODE REQUIREMENTS.
FRESH AIR REQUIREMENTS
FRESH AIR REQUIREMENTS:
30 PEOPLE @ 7.5 CFM PER PERSON = 225 CFM REQUIRED
25 PEOPLE @ 7.5 CFM PER PERSON = 187.5 CFM REQUIRED
BATHROOM FIXTURES
BATHROOM AREAS ARE TO SUPPLY THE FOLLOWING:
MIRROR
SOAP DISPENSER
HOOKS
TOILET PAPER HOLDER
PAPER TOWEL HOLDER
WASTE PAPER CONTROL
GRAB BARS AT TOILETS, AND SHOWERS
INSTALL AS PER ADA HEIGHTS/ LOCATIONS AND CODES
FAUCETS AND PIPES TO MEET ADA STANDARDS
EXISTING BATH FAN AND
DUCT/ HOOD TO EXTERIOR
HRV INTAKE,
INSULATE DUCT
HRV STALE AIR EXHAUST
10' MIN.
225 CFM HEAT
RECOVERY VENTILATOR
8" ROUND FRESH AIR
SUPPLY DUCT TIES INTO
EXISTING RETURN DUCT
200+ CFM
6" RND. 4" RND.
6 X 24 RETURN DUCT FOR
MAIN SPACE TO REMAIN
SUPPLY DUCT FROM
BASEMENT MECHANICAL
RETURN DUCT, FIRST FLOOR
SYSTEM
8X20 DUCT
10X24 SUPPLY GRILLE
APPROX 200 CFM, 8"
BELOW CEILING
10X24 SUPPLY GRILLE
APPROX 200 CFM, 8"
BELOW CEILING
SUPPLY GRILLE2X14
GRILLE
ON DUCT
16X14 GRILLE,
800 CFM+/-
12 X 16 DUCT,
1000CFM RETURN
2X14
GRILLE
ON DUCT
2X14
GRILLE
ON DUCT
RETURN GRILLE LOW TO
FLOOR
8X20 DUCT
700 CFM +/-
MAX PEOPLE = 30
FURNACE FOR FIRST FLOOR
HEATING PROVIDED = 98,000 BTU
1600 TO 1800 CFM PROVIDED
N
6" ROUND GRILLE
EXHAUSTING STALE
AIR FROM COMMON
ROOM
SHEET
© COPYRIGHT 2026
Revelations
Architects/ Builders Corporation
1309 DuBay Avenue
Stevens Point, WI 54482 O: 715.341.5588
revarch.com
M101
FIRST FLOOR
HVAC PLAN
ODD FELLOWS
2854 Church Street
Stevens Point, WI 54481 ISSUE DATE: 03.09.26
HOMELESS CONVERSION OF THE ODD FELLOWS BLDG.
SCALE: 1/4" = 1'-0"1 PROPOSED FIRST FLOOR HVAC PLAN
Page 43 of 100
REFRIG.
PLUMBING STACK
WATER
HEATER
EXISTING CHIMNEY BLOCK.
CAPPED AT ROOF
CARRIER 58MCB080-12116
GAS FURNACE
80,000 BTU/HR
1,750 CFM CAPACITY
COUNTER FLOW
RHEEM R951T1005A21M4SNAS
GAS FURNACE.
98,000 BTU/HR
30 X 8 RETURN DUCT
AT CEILING
40X8 GRILLE OVER DOOR
F.D.
FRESH & COMBUSTION AIR
(ORIGINAL)
KITCHEN EXHAUST
RETURN
14 X 16
400 CFM CAPABILITY TO BASEMENT
8X12 RIGHT INTO RETURN
24 X 12 GRILLES KITCHEN EXHAUST
WARMING
KITCHEN
FURNACE
ROOM
BATHROOM
3 X 12 GRILLE
ON END
ELECTRICAL
PANELS
EXISTING UNDER FLOOR DUCTWORK
EXISTING UNDER FLOOR DUCTWORK
EXISTING FLOOR REGISTERS
UP
UP
UNDER RAMP
MECHANICAL
N
FLOOR AREA PER PERSON 1004.1.1
IS 200 S.F. FOR RESIDENTIAL
1772 S.F. / 200 = 8.86 PEOPLE
WE HAVE 24/28 PEOPLE
EXISTING FLOOR REGISTERS
BASEMENT
FELLOWSHIP
HALL
SHEET
© COPYRIGHT 2026
Revelations
Architects/ Builders Corporation
1309 DuBay Avenue
Stevens Point, WI 54482 O: 715.341.5588
revarch.com
M102
BASEMENT
HVAC PLAN
ODD FELLOWS
2854 Church Street
Stevens Point, WI 54481 ISSUE DATE: 03.09.26
HOMELESS CONVERSION OF THE ODD FELLOWS BLDG.
SCALE: 1/4" = 1'-0"1 PROPOSED BASEMENT FLOOR HVAC PLAN
Page 44 of 100
City of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481-3594
Department of Community Development
Ph: (715) 346-1567
Fax: (715) 346-1498
stevenspoint.com
Ma
rch 23, 2026
Wi
lliam Yudchitz TYPE OF CONSTRUCTION IB – Sprinklered
Revelations Architects Occupancy – R1 – Change of Use
1309 Dubay Dr. Sprinkler System – 13R – Monitored By Fire Alarm System
Stevens Point, WI 54481 Alteration Level 2 – IEBC Ch. 7 & 8
Bill@revarch.com Area being altered 4,276 sq.ft.
Total building area 4,276 sq.ft.
Total number of occupants: 35 Includes Staff
Number of Occupants: 30 Plus 5 Staff
RE:
Conditional Approval
Homeless Shelter – 2854 Church St.
Change of Use A3 to R1 Boarding House Transient
Building & HVAC Review
Plan review # 20251432
SITE REQUIREMENTS and CONDITIONS:
• A full size of the approved plans, specifications and this letter shall be on site during construction.
• This approval will expire 12 months after the date of initial approval.
• A building permit is required prior to starting construction
KEY ITEMS:
1) IEBC 702.6 Materials and methods. All new work shall comply with the materials and methods requirements
in the International Building Code, International Energy Conservation Code, International Mechanical Code,
and International Plumbing Code, as applicable, that specify material standards, detail of installation and
connection, joints, penetrations, and continuity of any element, component, or system in the building.
2) New interior walls are required to be designed for minimum lateral loads to meet the requirements of IBC
1607.14 Interior walls and partitions. Interior walls and partitions that exceed 6 feet (1829 mm) in height,
including their finish materials, shall have adequate strength and stiffness to resist the loads to which they
are subjected but not less than a horizontal load of 5 psf (0.240 kN/m2).
3) 907.2.8 Group R-1. Fire alarm systems and smoke alarms shall be installed in Group R -1 occupancies as
required in Sections 907.2.8.1 through 907.2.8.3.
4) IEBC 702.2 Interior floor finish. New interior floor finish, including new carpeting used as interior floor
finish material, shall comply with Section 804 of the International Building Code.
5) IEBC 705.1 A facility that is altered shall comply with the provisions in this chapter and Chapter 11 of the IBC
unless it is technically infeasible.
6) IEBC 805.7.1 Artificial lighting required. Means of egress in all work areas shall be provided with
artificial lighting in accordance with the requirements of the International Building Code.
7) IEBC 805.8.1 Work areas. Means of egress in all work areas shall be provided with exit signs in accordance
Page 45 of 100
City of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481-3594
Department of Community Development
Ph: (715) 346-1567
Fax: (715) 346-1498
stevenspoint.com
8) IEBC 805.8.1 Work areas. Means of egress in all work areas shall be provided with exit signs in
accordance with the requirements of the International Building Code.
9) IEBC 808.1 New installations. All newly installed electrical equipment and wiring relating to work done in any
work area shall comply with all applicable requirements of NFPA 70.
10) IEBC 809.1 Reconfigured or converted spaces. All reconfigured spaces intended for occupancy and all spaces
converted to habitable or occupiable space in any work area shall be provided with natural or mechanical
ventilation in accordance with the International Mechanical Code.
10) IEBC 1004.1 General. Fire protection requirements of Section 1012 shall apply where a building or portions
thereof undergo a change of occupancy classification or where there is a change of occupancy within a
space where there is a different fire protection system threshold requirement in Chapter 9 of the
International Building.
11) IEBC 1008.4 Number of electrical outlets. Where the occupancy of an existing building or part of an existing
building is changed, the number of electrical outlets shall comply with NFPA 70 for the new occupancy.
12) Code.SPS 364.0403(5) Ventilation rate. (a) A ventilation system shall be designed to have the capacity to
supply a minimum outdoor air flow rate of 7.5 cfm per person as determined in accordance with Table
364.0403 based on the occupancy of the space and the occupant load.
13) IMC/SPS 364.0313(1) Every HVAC system shall be balanced upon installation. The air balancing test shall be
made available to the Department upon request.
14) IBC 906.1 Portable fire extinguishers shall be installed in all of the following locations:
1. In group A, B, F, F, H, I, M, R-1, R-2, R-4 and S occupancies and per table 906.3(1).
REMINDERS:
• In granting this approval, the City of Stevens Point as a Delegated Review Agency of the State of Wisconsin
Division of Industry Services reserves the right to require changes or additions, should conditions arise
making them necessary for code compliance. As per State Stats 101.12(2), nothing in this review shall
relieve the designer of the responsibility for designing a safe building, structure, or component. The
Division and the City do not take responsibility for the design or construction of the reviewed items.
• Per s. SPS 361.40(4) projects for buildings over 50,000 cubic feet total volume shall have a supervising
professional who file a compliance statement with the local code official prior to occupancy of the project.
Inquiries concerning this correspondence may be made to me at the telephone number or at the e-mail noted
below.
Page 46 of 100
City of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481-3594
Department of Community Development
Ph: (715) 346-1567
Fax: (715) 346-1498
stevenspoint.com
Si
ncerely,
Co
dy Hoffman
Building Inspector
Phone: 715-346-1566
choffman@stevenspoint.com
Page 47 of 100
From: Sherry Hughart
To: Adam Kuhn
Cc: dean.shudad8@gmail.com
Subject: Conditional Use Permit for Shelter
Date: Sunday, March 22, 2026 1:59:40 PM
Hello Adam
My name is Sherry Hughart and I am a resident of Stevens Point. I am writing to express my concern related to the
conditional use permit for the homeless shelter.
I have been very vocal about concerns related to the safety of this shelter not only for the residents in the
neighborhood but also the unhoused guests the shelter serves. The shelter is being operated by Michelle Strasser-
Goman under SPCO and not Partnering Together as it has been communicated to the residents. Michelle worked at
the shelter last year and started running the shelter this season. She is not qualified to run a shelter such as this. This
has been proven with staffing concerns and safety issues that came up this year. A serious safety concern was
addressed with Partnering Together as well as the City with absolutely no accountability or action.
The residents of the neighborhood directly impacted by this shelter showed up and voiced concerns related to safety,
impact on property values, and the damage the unhoused population leaves in the areas they congregate. Despite
this, the City has chosen to move forward.
Many residents have expressed frustration with the City not listening to their concerns and have indicated they will
take matters into their own hands. Some have stated they intend to call the police at every infraction. This has the
potential to overwhelm the police force and/or create a violent situation. I am personally concerned that if one of my
dogs happen to get loose and I am searching for them, I could be shot or assaulted by being mistaken as an unhoused
person. These statements make me afraid for the community and the unhoused guests.
I was contacted by a family who rented an apartment downtown. They were forced to move due to concerns
regarding their safety due to the unhoused. For those of us who own our homes, this may not be possible if the value
of our homes decrease because of this shelter. I’m concerned about the safety of my family and the value of my
property.
In the meeting in which the grant was approved the Mayor made a comment that Partnering Together plans to make
a nice outdoor area for the unhoused to hang out and spend time. If the shelter closes at 6am, who is going to
supervise this area?? We have seen first hand what they do at the public parks and now these activities will take
place in our neighborhood.
Despite talking to many neighbors, I’m concerned most won’t reach out as they feel their voices do not matter.
In the event something catastrophic happens, the City has been placed on notice regarding the concerns related to
safety and the inexperienced staff who is running the shelter. Unfortunately, I can see this turning into a legal matter
and I hope the City as well as the Shelter is prepared to respond. Please consider this a preservation of evidence
request to preserve all evidence including but not limited to all emails, telephonic communications, videos of all
meetings including the community discussion as it relates to the shelter and concerns brought forth by the
community that the City and Mayor has received regarding this shelter.
Please feel free to reach out if you have any questions or need any additional information from me.
Sherry Hughart
Cell Phone 309.826.7253
Sent from my iPhone
Page 48 of 100
Page 49 of 100
Memo
Chris Klesmith
Neighborhood Planner / Economic
Development Specialist
City of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481
(715) 341-4171 | cklesmith@stevenspoint.com
Page 1 of 2
To: City Plan Commission
From: Chris Klesmith
CC: Jarod Kivela, Adam Kuhn
Date: March 31, 2026
Subject: Request from the City of Stevens Point to sell the property located at 281 Washington
Avenue (Parcel ID 281240830401306)
Commissioners,
Parcel 281240830401306 is a 0.14-acre parcel that is currently zoned R-3 Single and Two Family
Residence District, and designated as Residential in the City’s Future Land Use Map. The City had
acquired Parcel 281240830401306 in 2019 to address blight and abate an unneeded storm water main
which had been completed during the reconstruction of Washington Avenue in 2025. The parcel is no
longer needed for City purposes.
Staff recommend selling Parcel 281240830401306 for an amount yet to be determined. Since the
Redevelopment Authority had published the Residential Infill program to encourage the reuse of parcels
such as Parcel 281240830401306, interest from local builders has increased and staff are currently
negotiating the sale of the parcel with one local builder. Attached to this memo is an aerial of the
subject property and Staff opinion of parcel value.
Recommendation to Plan Commission: Recommend the sale of Parcel 281240830401306 (281
Washington Avenue) for residential development.
Cheers,
Christopher Klesmith
Neighborhood Planner & Economic Development Specialist
City of Stevens Point
Page 50 of 100
Page 2 of 2
Figure 1.
Subject Property
Page 51 of 100
City of Stevens Point City Assessor’s Office
1515 Strongs Avenue assessors@stevenspoint.com
Stevens Point, WI 54481-3594 Phone: 715-346-1553
Friday, March 6, 2026
Chris Klesmith
Neighborhood Planner / Economic Development Specialist
1515 Strongs Ave
Stevens Point, WI 54481
RE: 281 Washington Ave
Planner Klesmith,
Estimated fair market value for this vacant parcel is $25,000-$28,000. This figure is based on sales
and market data, as well as information provided.
Subject Parcel #1 Site Address Owner(s) Acres Type
281240830401306 281 Washington Ave City of Stevens Point .143 (6,250 sq.ft.) RES
Legal: LOT 1 BLK 5 VETTER 1ST ADD .14A 187365;837347;851066
Zoning: R3 Two Family Note: Alley access.
Thank you,
Steven J Shepro
City of Stevens Point
Page 52 of 100
STEVENS POINT FIRE DEPARTMENT
1701 FRANKLIN STREET STEVENS POINT, WI 54481
715-344-1833 FAX: 715-346-1599
Jb D. Moody
FIRE CHIEF
March 27, 2026
To: City of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481
From: Jb D. Moody
Fire Chief
Stevens Point Fire Department
Subject: Acquisition of Property
I am writing to formally recommend the city’s acquisition of the subject property adjacent to our
current facilities located at 1701 Franklin Street. This site represents a rare, high-utility opportunity
to resolve immediate operational hurdles for Fire & Emergency Services in Stevens Point while
simultaneously securing a long-term financial asset for the city. This is a proactive move to
address infrastructure gaps and generate non-tax revenue.
Immediate Operational Benefits
The Fire Department is currently facing significant spatial constraints that impact our day-to-day
efficiency. This acquisition would provide:
Emergency Deployment Safety (Business 51 Impact): Due to the new Business 51 construction we
face, our standard deployment routes are heavily restricted. We are currently forced to exit the
station through the back, which is a personal parking lot, a process that is not standard and creates
significant safety risks for both the public and our personnel. This property would provide a
dedicated, controlled corridor for safer emergent apparatus deployment during this construction
phase.
Rapid Deployment Parking: Dedicated stalls for Command Staff, ensuring vehicles are positioned
for immediate response without obstructing heavy apparatus movement.
Station Expansion (2042 Horizon): As community demand scales, our current footprint is
insufficient. This land provides the necessary "elbow room" for future bay expansions and facility
upgrades required over the next two decades.
Page 53 of 100
STEVENS POINT FIRE DEPARTMENT
1701 FRANKLIN STREET STEVENS POINT, WI 54481
715-344-1833 FAX: 715-346-1599
Jb D. Moody
FIRE CHIEF
Long-Term Strategic Value
Beyond emergency operations, this property serves as a versatile asset for the city’s broader
municipal goals:
Non-Tax Revenue Generation: Given our proximity to the University, a portion of the site can be
developed into permit-based parking stalls for students and faculty. This creates a consistent, long-
term return on investment (ROI) that offsets the initial purchase cost.
Centralized High-Density Storage: We can utilize the north side of the property for high-density
storage facilities. This would house specialized emergency equipment and other city department
assets, reducing our reliance on third-party vendors or distant off-site locations.
Market Futureproofing: Real estate in this high-utility corridor is becoming increasingly scarce.
Securing this land now protects the city from escalating market prices and prevents the loss of
strategic space to private development that may not align with municipal needs.
In conclusion this property is more than just a lot; it is a strategic investment in the city’s safety
and fiscal health. By acting now, we ensure that our emergency services remain agile and that the
city gains a revenue-producing asset for years to come.
I look forward to discussing this proposal further at the next Council session.
Professionally,
Jb D. Moody
Fire Chief - Stevens Point Fire Department
1701 Franklin Street
Stevens Point, WI 54481
Office: 715-346-1441
Station #1: 715-344-1833
moodyjb@stevenspoint.com
Page 54 of 100
STEVENS POINT FIRE DEPARTMENT
1701 FRANKLIN STREET STEVENS POINT, WI 54481
715-344-1833 FAX: 715-346-1599
Jb D. Moody
FIRE CHIEF
Page 55 of 100
City of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481-3594
Department of Community Development
Adam Kuhn
Associate Planner
Zoning Administrator
Ph: (715) 346-1567
Fax: (715) 346-1498
www.stevenspoint.com
Open Records Rider: The City of Stevens Point is subject to Wisconsin Statutes relating to public records.
Communication, such as this document, sent or received by City employees are subject to these laws. Unless
otherwise exempted from the public records law, senders and receivers of City communication should
presume that the communications are subject to rel ease upon request, and to state record retention
requirements.
Page 1 of 2
MEMORANDUM
To: Plan Commission
From: Adam Kuhn, AICP
Associate Planner / Zoning Administrator
Date: April 6, 2026
RE: Zoning Code Rewrite – April 2026
-------------------
Background: Last month, the Commission reviewed the performance standards for the
proposed Light Industrial and Heavy Industrial zoning districts. This month, the
Commission will be tasked to review the performance standards for all proposed
performance standards and supplemental regulations for the accessory land use table.
Performance Standards – Base Zoning Districts: As discussed last month, the
performance standards up for discussion include the following: minimum lot size,
minimum lot width, building setbacks from the street, side and rear lot lines, and
maximum building height. As shown within the agenda packet, the proposed
performance standards for each district will be presented in a table as outlined below.
Table XXX: Zoning District Performance Standards
Lot Dimensional Standards
Minimum Lot Size (sq ft) X
Minimum Lot Width (ft) X
Building Standards
Minimum Street Setback (ft) X
Minimum Side Setback (ft) X
Minimum Rear Setback (ft) X
Maximum Height (ft) X
Notes
1 Supplemental Regulations Listed As Necessary
Page 56 of 100
stevenspoint.com
When reviewing the proposed performance standards, please be sure to reference the
draft zoning map.
Supplemental Regualtions for the Accessory Land Use Table: As discussed last month,
certain land uses within the principal and accessory land use table will contain
additional regulations unique to that land use. Enclosed in the agenda packet is the
proposed list of supplemental regulations for identified accessory uses. Please review
the proposed ordinance language and be prepared to provide comments.
Page 57 of 100
Section XX.XX: Zoning Districts
1.0 GENERAL PROVISIONS
1) Purpose. The purpose of this Section is to create base and overlay zoning districts of the
City including their purpose, lot standards and building standards.
2) Applicability. The zoning districts established in this Section shall apply to all parcels
within the City of Stevens Point’s corporate boundary as outlined on the City of Stevens
Point Zoning Map.
1.1 CREATION OF DISTRICTS
1) Base Zoning Districts. Base zoning districts as outlined below are created to identify
uniform development regulations for a defined geographic area.
Table XXX: Base Zoning Districts
A – Agriculture District
C – Conservancy District
P – Park District
NSR – Non-Sewered Residential District
SR-1 – Suburban Residential-1 District
SR-2 – Suburban Residential-2 District
TR-1 – Traditional Residential-1 District
TR-2 – Traditional Residential-2 District
UR – Urban Residential District
MH – Mobile Home District
MFR-L – Multi-Family Residential-Low Density District
MFR-H – Multi-Family Residential-High Density District
NC – Neighborhood Commercial District
GC – General Commercial District
CB – Central Business District
CC – Corridor Commercial District
HC – Highway Commercial District
LI – Light Industrial District
HI – Heavy Industrial District
I – Institutional District
Page 58 of 100
2) Overlay Zoning Districts. An overlay district establishes unique performance standards
on properties in a defined geographical area with one or more underlying base zoning
districts. Standards identified in an overlay district shall supersede the standards of all
other applicable districts for a property.
Table XXX: Overlay Zoning Districts
PD – Planned Development Overlay District
FP – Floodplain Overlay District
SW – Shoreland Wetlands Overlay District
AH – Airport Height Overlay District
DS – Division Street Overlay District
SS – Stanley Street Overlay District
CS – Church Street Overlay District
GP-A – Groundwater Protection Overlay District Zone A
GP-B – Groundwater Protection Overlay District Zone B
GP-C – Groundwater Protection Overlay District Zone C
2.0 BASE ZONING DISTRICTS
1) A – Agriculture District
a) Purpose. The Agriculture District is established to preserve agricultural and urban
forest lands, promote existing farm operations, and protect agricultural uses from
the encroachment of incompatible land uses. This district is also intended to allow
non-sewered single-family residential development used in conjunction with
agricultural operations.
b) Performance Standards. The performance standards for the Agriculture District is
established in Table XX.XX.
Table XXX: Agriculture District Performance Standards
Lot Dimensional Standards
Minimum Lot Size (sq ft) 0
Minimum Lot Width (ft) 0
Building Standards
Minimum Street Setback (ft) 50
Minimum Side Setback (ft) 50
Minimum Rear Setback (ft) 50
Maximum Height (ft) 35
Page 59 of 100
2) C – Conservancy District
a) Purpose. The Conservancy District is established to provide protection to
environmentally-sensitive lands such as floodplains, wetlands, shorelands, airport
fringe lands and fringe lands remote from City services and access.
b) Performance Standards. The performance standards for the Conservancy District is
established in Table XX.XX.
Table XXX: Conservancy District Performance Standards
Lot Dimensional Standards
Minimum Lot Size (sq ft) 0
Minimum Lot Width (ft) 0
Building Standards
Minimum Street Setback (ft) 50
Minimum Side Setback (ft) 30
Minimum Rear Setback (ft) 50
Maximum Height (ft) 40
3) P – Park District
a) Purpose. The Park District is established on land owned by the City of Stevens Point
containing activities administered by the Stevens Point Parks, Recreation & Forestry
Department.
b) Performance Standards. The performance standards for the Park District is
established in Table XX.XX.
Table XXX: Park District Performance Standards
Lot Dimensional Standards
Minimum Lot Size (sq ft) 0
Minimum Lot Width (ft) 0
Building Standards
Minimum Street Setback (ft) 25
Minimum Side Setback (ft) 20
Minimum Rear Setback (ft) 20
Maximum Height (ft) 30
Commented [AK1]: Comparable performance
standards under current code:
Lot size: min 8,000 sq ft
Lot width: 0’
Street setback: 50’
Side setback: 30’
Rear setback: 40’
Page 60 of 100
4) NSR – Non-Sewered Residential District
a) Purpose. The Non-Sewered Residential District is established to accommodate
single-family residential development that is not connected to public utilities and is
located in fringe areas of the City. This district is not intended to be applied to new
residential development beyond what exists at the effective date of this Ordinance.
b) Performance Standards. The performance standards for the Non-Sewered
Residential District is established in Table XX.XX.
Table XXX: Non-Sewered Residential District Performance Standards
Lot Dimensional Standards
Minimum Lot Size (acres) 2
Minimum Lot Width (ft) 130
Building Standards
Minimum Street Setback (ft) 40
Minimum Side Setback (ft) 30
Minimum Rear Setback (ft) 40
Maximum Height (ft) 35
5) SR-1 – Suburban Residential-1 District
a) Purpose. The Suburban Residential-1 District is established to accommodate existing
single-family residential uses located north of Interstate 39 and east of McDill Pond.
This district is further intended to accommodate new single-family residential
development that is sensitive to and intended to match or be compatible with an
adjacent, established residential neighborhood and development pattern.
b) Performance Standards. The performance standards for the Suburban Residential-1
District is established in Table XX.XX.
Table XXX: Suburban Residential-1 District Performance Standards
Lot Dimensional Standards
Minimum Lot Size (sq ft) 13,000
Minimum Lot Width (ft) 95
Building Standards
Minimum Street Setback (ft) 25
Minimum Side Setback (ft) 12
Minimum Rear Setback (ft) 30
Maximum Height (ft) 35
Commented [AK2]: Comparable performance
standards under current code:
Lot size: two acres
Lot width: 130’
Street setback: 50’
Side setback: 30’
Rear setback: 50’
Commented [AK3]: Comparable performance
standards under current code:
Lot size: min 16,500 sq ft
Lot width: 105’
Street setback: 30’
Side setback: total 25; (one side not less than 12’)
Rear setback: 30’
Commented [AK4]: Makes 107 lots conforming
compared to current lot size requirement.
Page 61 of 100
6) SR-2 – Suburban Residential-2 District
a) Purpose. The Suburban Residential-2 District is established to accommodate existing
single- and two-family residential uses located north of Interstate 39 and east of
McDill Pond. This district is further intended to accommodate new single-family and
duplex development that allows for an increase in density that is sensitive and
compatible with an adjacent, established residential neighborhood and development
pattern. Land in this district is intended to be located adjacent to high-density
residential neighborhoods, serve as a transition between single-family and
nonresidential development, and be located along residential and collector streets.
b) Performance Standards. The performance standards for the Suburban Residential-2
District is established in Table XX.XX.
Table XXX: Suburban Residential-2 District Performance Standards
Lot Dimensional Standards
Minimum Lot Size (sq ft) 8,000
Minimum Lot Width (ft) 55’ for a zero-lot-line dwelling
100’ for a single-family dwelling
Building Standards
Minimum Street Setback (ft) 25
Minimum Side Setback (ft) 10
Minimum Rear Setback (ft) 20
Maximum Height (ft) 35
Commented [AK5]: No directly comparable current
zoning districts - includes lots currently zoned R-1, R-2 &
R-3.
Page 62 of 100
7) TR-1 – Traditional Residential-1 District
a) Purpose. The Traditional Residential-1 District is established to provide for single-
family and zero-lot-line duplex development intended to serve as a transition district
between lower intensity uses permitted in the Suburban Residential-1 District and
higher intensity land uses found in the Traditional Residential-2 District. This district
is intended to accommodate existing single-family neighborhoods, and allow for
slight density increases in new neighborhoods that is compact, pedestrian focused,
and offers a range of housing types.
b) Performance Standards. The performance standards for the Traditional Residential-1
District is established in Table XX.XX.
Table XXX: Traditional Residential-1 District Performance Standards
Lot Dimensional Standards
Minimum Lot Size (sq ft) 6,000
Minimum Lot Width (ft) 50
Building Standards
Minimum Street Setback (ft) 20
Minimum Side Setback (ft) 10
Minimum Rear Setback (ft) 20
Maximum Height (ft) 35
Commented [AK6]: Comparable performance
standards under current code:
Lot size: min 8,000 sq ft
Lot width: 60’ (80’ for corner lots)
Street setback: 25’
Side setback: Total 20’ (one side not less than 8’)
Rear setback: 20% of lot depth (min 15’ , max 30’)
Commented [AK7]: Makes 379 lots conforming
compared to current lot size requirement.
Page 63 of 100
8) TR-2 – Traditional Residential-2 District
a) Purpose. The Traditional Residential-2 District is established to accommodate
existing residential neighborhoods that are compact, pedestrian focused, and
consistent with design principles of traditional neighborhoods. A traditional
neighborhood is compact, designed for the human scale, and characterized by larger
homes on smaller lots with smaller setbacks from the property lines. This district is
further established to accommodate mid-density infill development that prioritizes
single-family buildings and house-scale multi-unit residential buildings that are
compatible in scale with single-family homes that addresses the established
neighborhood character.
b) Performance Standards. The performance standards for the Traditional Residential-2
District is established in Table XX.XX.
Table XXX: Traditional Residential-2 District Performance Standards
Lot Dimensional Standards
Minimum Lot Size (sq ft) 4,000
Minimum Lot Width (ft) 45
Building Standards
Minimum Street Setback (ft) 15
Minimum Side Setback (ft) 5
Minimum Rear Setback (ft) 15
Maximum Height (ft) 35
Commented [AK8]: Comparable performance
standards under current code:
Lot size: min 4,000 sq ft
Lot width: 45’
Street setback: 25’
Side setback: 7’ 6’’
Rear setback: 20% of lot depth (min 15’ , max 30’)
Page 64 of 100
9) UR – Urban Residential District
a) Purpose. The Urban Residential District is established to accommodate existing
residential neighborhoods and infill development that is higher density, pedestrian
focused, and serves as a transition zone between the Downtown Central Business
District and mid-density traditional neighborhoods. A range of housing types is
intended in this district, including single-family homes, duplexes, cottage courts, and
other house-scale multi-unit residential buildings that are compatible in scale with
single-family homes.
b) Performance Standards. The performance standards for the Urban Residential
District is established in Table XX.XX.
Table XXX: Urban Residential District Performance Standards
Lot Dimensional Standards
Minimum Lot Size (sq ft) 3,500
Minimum Lot Width (ft) 45
Building Standards
Minimum Street Setback (ft) 10
Minimum Side Setback (ft) 5
Minimum Rear Setback (ft) 15
Maximum Height (ft) 35
10) MH – Mobile Home District
a) Purpose. The Mobile Home District is established to create and preserve
neighborhoods solely for manufactured and mobile home developments.
b) Performance Standards. The performance standards for the Mobile Home District is
established in Table XX.XX.
Table XXX: Mobile Home District Performance Standards
Lot Dimensional Standards
Minimum Lot Size (acre) 4
Minimum Lot Width (ft) 90
Building Standards
Minimum Street Setback (ft) 20
Minimum Side Setback (ft) 10
Minimum Rear Setback (ft) 20
Maximum Height (ft) 20
Commented [AK9]: Comparable performance
standards under current code:
Lot size: min 4,000 sq ft
Lot width: 45’
Street setback: 25’
Side setback: 7’ 6’’
Rear setback: 20% of lot depth (min 15’ , max 30’)
Page 65 of 100
11) MFR-L – Multi-Family Residential-Low Density District
a) Purpose. The Multi-Family Residential-Low Density District is established to support
apartments, townhomes, and other multi-family residential developments with a
gross density of 20 dwelling units per acre or less. This district is intended to serve as
a buffer between lower density residential uses and commercial/industrial uses, and
in areas capable of handling higher traffic volumes.
b) Performance Standards. The performance standards for the Multi-Family
Residential-Low Density District is established in Table XX.XX.
Table XXX: Multi-Family Residential-Low Density District Performance Standards
Lot Dimensional Standards
Minimum Lot Size (sq ft) 5,000 sq ft + 2,000 sq ft per unit
Minimum Lot Width (ft) 60
Building Standards
Minimum Street Setback (ft) 20
Minimum Side Setback (ft) 10
Minimum Rear Setback (ft) 25
Maximum Height (ft) 45
Commented [AK10]: Comparable performance
standards under current code:
Lot size: One Unit Dwelling: 8,000 s.f. Min. Two Unit
Dwelling: 8,000 s.f. Min. 3-4 Unit Dwelling: 15,000 s.f.
Min. 2,000 s.f. of lot area per person not a member of
resident family in development with 1-4 units. 5-9 Units:
Ground floor - 3,500 s.f. /1st fl. +100 s.f./bdrm. Above gr .
fl. - 2,600 sq. Ft. + 100s.f./bdrm. 10-23 Units: Ground
floor - 3,700 s.f. + 100s.f./bdrm. Above gr . fl. - 2,900 s.f. +
100 s.f./bdrm. 24+ Units: Ground floor - 4,100 s.f. + 100
s.f./bdrm. Above gr . fl. - 3,300 s.f. + 100 s.f./bdrm.
Lot width: 60’ (80’ for corner lots)
Street setback: 25’
Side setback: 10’
Rear setback: 20% of lot depth (min 15’ , max 30’)
Page 66 of 100
12) MFR-H – Multi-Family Residential-High Density District
a) Purpose. The Multi-Family Residential-High Density District is established to support
apartments, townhomes, and other multi-family residential developments with a
gross density exceeding 20 dwelling units per acre. This district is intended to serve
as a buffer between lower density residential uses and commercial/industrial uses,
and in areas capable of handling higher traffic volumes.
b) Performance Standards. The performance standards for the Multi-Family
Residential-High Density District is established in Table XX.XX.
Table XXX: Multi-Family Residential-High Density District Performance Standards
Lot Dimensional Standards
Minimum Lot Size (sq ft) 5,000 sq ft + 1,000 sq ft per unit
Minimum Lot Width (ft) 60
Building Standards
Minimum Street Setback (ft) 20
Minimum Side Setback (ft) 10
Minimum Rear Setback (ft) 20
Maximum Height (ft) 45 without a fire prevention system
85 with a fire prevention system
Commented [AK11]: Same comparables to current
code as shown in the preceding subsection.
Page 67 of 100
13) NC – Neighborhood Commercial District
a) Purpose. The Neighborhood Commercial District is established to support
commercial and office uses, small in operation and of building footprint, that serves
nearby residents with products and services. New construction in this district should
be small in mass, including a mixture of standalone commercial and mixed-use
developments that provide pedestrian, bicycle, or public transportation
accommodations.
b) Performance Standards. The performance standards for the Neighborhood
Commercial District is established in Table XX.XX.
Table XXX: Neighborhood Commercial District Performance Standards
Lot Dimensional Standards
Minimum Lot Size (sq ft) 6,000 for commercial uses
5,000 per ground floor commercial use + 3,000 per housing unit
Minimum Lot Width (ft) 50
Building Standards
Minimum Street Setback (ft) 10
Minimum Side Setback (ft) 10
Minimum Rear Setback (ft) 20
Maximum Height (ft) 35
Commented [AK12]: Comparable performance
standards under current code:
Lot size: 2650 sq.ft. Lot area per ground floor unit plus an
additional 50 sq.ft. Per bedroom; 770 sq. Ft. lot area/unit
above 2nd floor having balcony plus an additional 50
sq.ft. Per bedroom; 8,000 sq ft for all other permitted
uses
Lot width: 60’ (80’ for corner lots)
Street setback: 20’
Side setback: 10’
Rear setback: 20’
Page 68 of 100
14) GC – General Commercial District
a) Purpose. The General Commercial District is established to support commercial,
office and multi-family residential uses, large in operation and of building footprint,
serving the community at large, in areas that can accommodate both vehicular and
pedestrian access. This district is intended to serve as a transition between large-
scale commercial and industrial uses, with adjacent residential uses. Development in
this district should be located along collector and arterial streets, and be capable of
handling higher traffic volumes.
b) Performance Standards. The performance standards for the General Commercial
District is established in Table XX.XX.
Table XXX: General Commercial District Performance Standards
Lot Dimensional Standards
Minimum Lot Size (sq ft) 7,000 for commercial uses
5,000 per ground floor commercial use + 2,000 per housing unit
Minimum Lot Width (ft) 60
Building Standards
Minimum Street Setback (ft) 20
Minimum Side Setback (ft) 10
Minimum Rear Setback (ft) 20
Maximum Height (ft) 35 without a fire prevention system
85 with a fire prevention system
Commented [AK13]: No direct comparable to current
code - mixture of residential and commercial zoning.
Page 69 of 100
15) CB – Central Business District
a) Purpose. The Central Business District is established to provide a single contiguous
district encompassing the central business district or downtown area which will
encourage primarily retail uses and a variety of supporting uses. This district is
intended to help implement the Downtown Targeted Area Master Plan, particularly
the development and maintenance of the Downtown area as a specialized
pedestrian-oriented shopping and community center .
b) Performance Standards. The performance standards for the Central Business District
is established in Table XX.XX.
Table XXX: Central Business District Performance Standards
Lot Dimensional Standards
Minimum Lot Size (sq ft) 0 for commercial uses
2,500 per ground floor commercial use + 600 per housing unit
Minimum Lot Width (ft) 0
Building Standards
Minimum Street Setback (ft) 0
Minimum Side Setback (ft) 0
Minimum Rear Setback (ft) 0
Maximum Height (ft) 35 without a fire prevention system
85 with a fire prevention system
Commented [AK14]: Comparable performance
standards under current code:
Lot size: 2650 sq.ft. Lot area per ground floor unit plus an
additional 50 sq.ft. Per bedroom; 770 sq. Ft. lot area/unit
above 2nd floor having balcony plus an additional 50
sq.ft. Per bedroom; 0 sq ft for all other permitted uses
Lot width: 60’ (80’ for corner lots)
Street setback: 0’
Side setback: 0’
Rear setback: 0’
Page 70 of 100
16) CC – Corridor Commercial District
a) Purpose. The Corridor Commercial District is established to support high-intensity
commercial, office and multi-family residential uses, large in operation and of
building footprint, serving the community at large, that can accommodate high
vehicular traffic volumes. Development in this district is intended to be located along
arterial streets for safe access and reduced traffic congestion, be highly visible along
arterial roadways, and can support pedestrian, bicycle and public transportation
surrounding the property.
b) Performance Standards. The performance standards for the Corridor Commercial
District is established in Table XX.XX.
Table XXX: Corridor Commercial District Performance Standards
Lot Dimensional Standards
Minimum Lot Size (sq ft) 0 for commercial uses
2,500 per ground floor commercial use + 500 per housing unit
Minimum Lot Width (ft) 70
Building Standards
Minimum Street Setback (ft) 20
Minimum Side Setback (ft) 10
Minimum Rear Setback (ft) 20
Maximum Height (ft) 35 without a fire prevention system
125 with a fire prevention system
Commented [AK15]: Comparable performance
standards under current code:
Lot size: 2650 sq.ft. Lot area per ground floor unit plus an
additional 50 sq.ft. Per bedroom; 770 sq. Ft. lot area/unit
above 2nd floor having balcony plus an additional 50
sq.ft. Per bedroom; 0 sq ft for all other permitted uses
Lot width: 60’ (80’ for corner lots)
Street setback: 25’
Side setback: 0’ (5’ abutting residential uses)
Rear setback: 10’
Page 71 of 100
17) HC – Highway Commercial District
a) Purpose. The Highway Commercial District is established to provide for larger retail,
commercial, office, service, and multi-family residential uses which depend upon
access to U.S. Highway 10 East. It is the intent of this district to prevent traffic
congestion, provide safe access along U.S. Highway 10 East, and to create a
convenient and safe commercial area.
b) Performance Standards. The performance standards for the Highway Commercial
District is established in Table XX.XX.
Table XXX: Highway Commercial District Performance Standards
Lot Dimensional Standards
Minimum Lot Size (sq ft) 35,000 for commercial uses
2,500 per ground floor commercial use + 1,000 per housing unit
Minimum Lot Width (ft) 150
Building Standards
Minimum Street Setback (ft) 40 off of U.S. Highway 10 East
25 off of other streets
Minimum Side Setback (ft) 15
Minimum Rear Setback (ft) 40
Maximum Height (ft) 35 without a fire prevention system
125 with a fire prevention system
Commented [AK16]: Comparable performance
standards under current code:
Lot size: 35,000 sq ft
Lot width: 125’
Street setback: 40’ off of Highway 10; 25’ off of other
streets
Side setback: 10’
Rear setback: 20’
Page 72 of 100
18) LI – Light Industrial District
a) Purpose. The Light Industrial District is established to provide for those
manufacturing or other industrial uses having the least obnoxious or nuisance
impacts and having a lower scale of activity as compared with permitted uses of the
Heavy Industrial District. It is intended that this district be located as a buffer
between heavy manufacturing uses and commercial or multi-family residential uses.
New development in this district should be concentrated in campus-style parks
located along collector and arterial streets.
b) Performance Standards. The performance standards for the Light Industrial District
is established in Table XX.XX.
Table XXX: Light Industrial District Performance Standards
Lot Dimensional Standards
Minimum Lot Size (sq ft) 7,000
Minimum Lot Width (ft) 60
Building Standards
Minimum Street Setback (ft) 20
Minimum Side Setback (ft) 10
15 if adjacent to a residential use
Minimum Rear Setback (ft) 25
Maximum Height (ft) 50 without a fire prevention system
125 with a fire prevention system
Commented [AK17]: Comparable performance
standards under current code:
Lot size: 8,000 sq ft
Lot width: 80’
Street setback: 30’ (reduction available via CUP)
Side setback: 10’ (20’ if adjacent to residential use)
Rear setback: 20’
Page 73 of 100
19) HI – Heavy Industrial District
a) Purpose. The Heavy Industrial District is established to provide for those
manufacturing or other industrial uses having more obnoxious or nuisance impacts,
such as light, noise, traffic or vibration concerns. It is intended that this district be
located as a buffer between heavy manufacturing uses and commercial or multi-
family residential uses. New development in this district should be concentrated in
campus-style parks located along collector and arterial streets.
b) Performance Standards. The performance standards for the Heavy Industrial District
is established in Table XX.XX.
Table XXX: Heavy Industrial District Performance Standards
Lot Dimensional Standards
Minimum Lot Size (sq ft) 20,000
Minimum Lot Width (ft) 100
Building Standards
Minimum Street Setback (ft) 30
Minimum Side Setback (ft) 20
30 if adjacent to a residential use
Minimum Rear Setback (ft) 25
Maximum Height (ft) 50 without a fire prevention system
125 with a fire prevention system
Commented [AK18]: Comparable performance
standards under current code:
Lot size: 21,780 sq ft
Lot width: 100’
Street setback: 40’ (reduction available via CUP)
Side setback: 20’ (30’ if adjacent to residential use)
Rear setback: 20’
Page 74 of 100
20) I – Institutional District
a) Purpose. The Institutional District is established to support higher-intensity
institutional and civic uses, educational facilities, religious institutions, and other
noncommercial places of assembly. This district is further established to support
facilities operated by the City of Stevens Point, Portage County, State of Wisconsin,
United States of America, and other government agencies. Institutional land should
be prioritized near residential uses with a road network that can handle expected
traffic volume, support safe access and limit traffic congestion.
b) Performance Standards. The performance standards for the Institutional District is
established in Table XX.XX.
Table XXX: Institutional District Performance Standards
Lot Dimensional Standards
Minimum Lot Size (sq ft) 0
Minimum Lot Width (ft) 0
Building Standards
Minimum Street Setback (ft) 20
Minimum Side Setback (ft) 10
Minimum Rear Setback (ft) 30
Maximum Height (ft) 35 without a fire prevention system
85 with a fire prevention system
Page 75 of 100
Section XX.XX: Land Use Standards
1.0 GENERAL PROVISIONS
1) The purpose of this Section is to outline principal and accessory land uses that are
allowed within each zoning district, how each land use is regulated (i.e., permitted,
conditional and prohibited), and supplemental regulations unique to a particular land
use. The land uses and land use regulations identified in this Section shall apply to all
lots within the City of Stevens Point as outlined in the City of Stevens Point Zoning Map.
2) The following shall be used in administering Table XXX: Principal Land Uses and Table
XXX: Accessory Land Uses
a) The following abbreviations in this Ordinance are intended to have the following
meanings:
Abbreviation Meaning
P Permitted Land Use
C Conditional Land Use
Blank Cell Prohibited Land Use
* Supplemental Regulations for the
Corresponding Land Use
1.1 PRINCIPAL LAND USES
1) Supplemental Regulations – Principal Land Uses
The following outlines supplemental regulations for the corresponding land use. These
supplemental regulations shall apply regardless of the land use being listed as permitted
or conditional within a respective zoning district.
Commented [AK1]: This section will be completed at a
later date.
Page 76 of 100
Table XX.XX:
Principal Uses
Districts Supplemental
Regulations
A C P NSR SR-1 SR-2 TR-1 TR-2 UR MH MFR-L MFR-H NC GC CB CC HC LI HI I
RESIDENTIAL A C P NSR SR-1 SR-2 TR-1 TR-2 UR MH MFR-L MFR-H NC GC CB CC HC LI HI I
Adult Family Home P P P P P P P P P P P P P
Accessory Building
Assisted Living
Facility
P P P P P P
Community Based
Residential Facility
P P P P P P P P P P P P
Cottage Court P P
Dwelling, One Unit P P P P P P P P
Dwelling, Two Unit P P P P P
Dwelling, Two Unit
Zero Lot Line
P P P P
Dwelling, Three
Unit
C P P P P P P
Dwelling, Four Unit P P P P P P
Dwelling, 5-8 Unit P P P P P
Dwelling, 9-12 Unit C C C C P P P
Dwelling, 13+ Unit C C C C C
Dwelling, Mixed-
Use
C C C C C
Dwelling, Live
Work
P P P P P P P P
Foster Home P P P P P P
Mobile Home Park P
Overnight Shelter C C C C
Residence Hall P
COMMERICAL A C P NSR SR-1 SR-2 TR-1 TR-2 UR MH MFR-L MFR-H NC GC CB CC HC LI HI I
Page 77 of 100
Adult
Entertainment
Establishment
C C
Animal Services,
Boarding/Groomin
g/Veterinary
P P P P P
Auditoriums,
arena, icedromes
and similar
facilities
C C C
Bank, Credit
Union, Financial
Services, Saving &
Loans
C P P P P
Bar/Nightclub C P P P
Bed and Breakfast C C C
Bridal Shops P P P P P
Bowling Alley C C C
Cemetery
Monument Sales
P P P P
Construction
Equipment Sales
P P
Crematorium P P
Day Care Facility C P P P P P
Food Truck and
Food Court
P P P
Funeral Home P P
Gas Station P C P C P P
General
Commercial and
Professional
P P P P P P
Page 78 of 100
Services: less than
5,000 sq ft
General
Commercial and
Professional
Services: between
5,000 and 15,000
sq ft
C P P P P P
General
Commercial and
Professional
Services: greater
than 15,000 sq ft
P P P P
Hotel/Motel C C P P
Landscape Services P P P
Medical Clinic P P P P P P
Meeting and Event
Facility
C P P P C P
Micro-Brewery /
Brewery / Winery
/ Distillery
P P P P
Off-Site Parking
Lot
P P P P P P
Off-Premise
Signage
C C C C C
On-Site
Agricultural Retail
C
Park-and-Ride Lot P P
Parking Structure P P P P P P P
Personal Services P P P P P
Page 79 of 100
Professional
Services: less than
5,000 sq ft
P P P P P P
Professional
Services: between
5,000 and 15,000
sq ft
C P P P P P
Professional
Services: greater
than 15,000 sq ft
P P P P
Restaurant P P P P P
Shooting Range,
Indoor and
Outdoor
C C C C
Tobacco Sales C C
Tourist Rooming
House
P P P P P P P P P P P P P P
Vehicle Renting /
Leasing / Sales
P P
INDUSTRIAL A C P NSR SR-1 SR-2 TR-1 TR-2 UR MH MFR-L MFR-H NC GC CB CC HC LI HI I
Artisan
Shop/Manufacturi
ng
P P P P P P
Asphalt/Concrete/
Cement
Manufacturing
C
Boat/RV Storage P P
Bulk Fuel Storage C C
Bus Storage
Facility
P P
Car Wash C C C
Commercial
Kitchen
P P P
Page 80 of 100
Composting, Yard
Waste
P P
Construction
Equipment Repair
P P
Contractor Yard C C C
Data Center C
Electric Vehicle
Charging Station
P P P P P P P
Industry, Heavy C
Industry, Light P P
Junk/Salvage Yard C C
Laboratory P P P P
Mass Transit and
Trucking Terminal
P P P P
Miniature Golf
Courses
P P
Mining
Railroad Use P
Recycling Center P P
Sand or Mineral
Processing
Self-Service
Storage
P P
Solid Waste
Transfer Station
C C
Solar Energy Farm
or Plant
C C C
Storage /
Distribution
Warehouse
P P
Page 81 of 100
Vehicle Services,
Maintenance &
Repair
P P P
Wholesale P P
PUBLIC &
INSTITUTIONAL
A C P NSR SR-1 SR-2 TR-1 TR-2 UR MH MFR-L MFR-H NC GC CB CC HC LI HI I
Campground
Cemetery P
Club/Lodge P P P P
College/University P
Community Center P P P P P P P
Government
Building
P
Hospital P P P P P P
Library P P
Parks and
Recreation
P P P
Post Office P P
Religious & Non-
Secular Assembly
P P P P P P P P P P P P P P P P P
Safety Service P P P P P P P P
School, K-12 C
School, Vocational
or Technical
P
AGRICULTURE &
RESOURCE-BASED
USES
A C P NSR SR-1 SR-2 TR-1 TR-2 UR MH MFR-L MFR-H NC GC CB CC HC LI HI I
Agriculture,
Animal
Agriculture, Crop P
Agritourism
Related Uses
P P P
Page 82 of 100
Community
Garden
P P P P P P P P P P P P P P P P P P
Nursery or Garden
Center
P P P P P
PARKS &
RECREATION
A C P NSR SR-1 SR-2 TR-1 TR-2 UR MH MFR-L MFR-H NC GC CB CC HC LI HI I
Driving Range C C
Golf Course C C
Indoor
Entertainment/Rec
reation
C C C C C
Outdoor
Entertainment/Rec
reation
C C C
Park P P
Recreation Trail P P P
UTILITY &
INFRASTRUCTURE
A C P NSR SR-1 SR-2 TR-1 TR-2 UR MH MFR-L MFR-H NC GC CB CC HC LI HI I
Airport or Heliport P
Solar Energy Farm C C C C
Wireless
Telecommunicatio
ns Equipment
P P P P P P P P P P P P P P P P P P P P
Wireless
Telecommunicatio
ns Tower
C C C C C C C C C C C C C C C C C C C C
Wind Energy Farm C C C C
Page 83 of 100
1.2 ACCESSORY LAND USES
Page 84 of 100
Table ###:
Accessory Uses
Districts Supplemental
Regulations
A C P NSR SR-1 SR-2 TR-1 TR-2 UR MH MFR-L MFR-H NC GC CB CC HC LI HI I
Accessory Structure P P P P P P P P P P P P P P P P P P P P *
Accessory Dwelling Unit
(ADU)
P P P P P P *
Accessory Commercial
Unit
P P P P P P *
Accessory
Retail/Restaurant
ATM P P P P P *
Boat Dock P P P
Boathouse P P P
Cemetery P
Electric Vehicle Charging P P P P P P P P P P P P P P P P P P P P *
Family Day Care Home P P P P P P *
Food Truck P P P P P P P P
Garden P P P P P P P P P P P P P P P P P P
Home Occupation P P P P P P P P P P P P P P *
Outdoor Seating /
Display
P P P P P P *
Public Art P P P P P P P P P P P P P P P P P P P P
Retaining Wall P P P P P P P P P P P P P P P P P P P P
Solar Energy System,
building-mounted
P P P P P P P P P P P P P P P P P P P P
Solar Energy System,
ground-mounted
P P P P P P P P P P P P P P P P P P P P *
Shipping Container
Page 85 of 100
Swimming Pools, Hot
Tubs, Saunas, and similar
installations
P P P P P P P P P P P P P P *
Wind Energy System,
building-mounted
C C C C C C C C C C C C C C C C C C C C *
Wind Energy System,
ground-mounted
C C C C C C C C C C C C C C C C C C C C *
Page 86 of 100
1) Supplemental Regulations – Accessory Land Uses
The following outlines supplemental regulations for the corresponding land use. These
supplemental regulations shall apply regardless of the land use being listed as permitted
or conditional within a respective zoning district.
a) Accessory Structure
1) Maximum Size. The maximum cumulative size of all accessory structures on a
parcel shall not exceed 1,050 square feet.
2) Number. An unlimited number of accessory structures may be located on one
parcel, provided that it does not exceed the maximum cumulative size
referenced in this Section.
3) Exemptions. Gazebos and pergolas shall not be counts towards maximum size
requirements for accessory structures, but must meet all other applicable
provisions of this Ordinance.
4) Height. Accessory structures shall not exceed 15 feet in height, measured from
grade to halfway up the structure’s truss.
5) Location. Accessory structures shall meet the setback requirements of a parcel’s
base zoning designation, unless the following are met:
a) Accessory structures that maintain ten feet of separation from the principal
structure on the same parcel shall have a side yard and rear yard setback of
three feet. Building street setback shall remain the same as the base zoning
designation of the parcel.
6) Use. Recreational vehicles, campers, travel trailers and other similar apparatuses
are prohibited to be used as an accessory structure.
7) Principal structure required. An accessory structure shall be located on the same
parcel or immediately across the street from the principal structure that it is
serving.
b) Accessory Dwelling Unit
1) Allowed Uses. An accessory dwelling unit shall be accessory only to single-family
and two-family residential uses.
2) Maximum Number Allowed. A maximum of one accessory dwelling unit is
permitted per parcel.
Commented [AK2]: Current = 900 sq ft
Commented [AK3]: Currently counts towards the 900
sq ft max.
Page 87 of 100
3) Minimum Lot Size. Accessory dwelling units are permitted on parcels that meet
the minimum lot size requirement for one-unit dwellings for its base zoning
designation.
4) Tourist Rooming House Prohibited. An accessory dwelling unit is prohibited from
being used as a tourist rooming house.
5) Owner Occupancy. The owner of the property in which the accessory dwelling
unit is created must continue to occupy the principal residential use on the site
as their primary residence for a period of at least ten months in a calendar year .
A restrictive agreement between the property owner and the City shall be
recorded prior to occupancy being granted.
6) Internal and Attached Accessory Dwelling Units. Accessory dwelling units that
are within or attached to a principal structure shall be permitted only on parcels
where two-unit dwellings are permitted, provided that the following are met:
a) No more than 40% of the principal structure’s floor area is being used.
b) The entirety of a basement is being used.
7) Detached Accessory Dwelling Units.
a) Detached accessory units shall adhere to the building size and building
location requirements for accessory structures as outlined in this Ordinance.
b) Detached accessory units shall not exceed 20 feet in height, measured from
grade to halfway up the structure’s truss.
c) Accessory Commercial Unit
1) Allowed Uses. An accessory commercial unit shall be accessory only to
single-family and two-family residential uses.
2) Maximum Number Allowed. A maximum of one accessory commercial unit is
permitted per parcel.
3) Minimum Lot Size. Accessory commercial units are permitted on parcels that
meet the minimum lot size requirement for one-unit dwellings for its base
zoning designation.
4) Home Occupation. An accessory dwelling unit shall adhere to all
requirements to operate a home occupation, as outlined in this Ordinance.
d) ATM
Page 88 of 100
1) Location. ATM’s are permitted to be located within a drive-thru facility,
integrated within a principal structure’s façade, and when located within a
principal structure.
e) Electric Vehicle Charging
1) Charging station equipment shall be separated in a parking lot by bollards,
wheel stops, curbing or other protective devices as approved by the
Administrator .
2) All electrical connections shall be located underground.
3) Charging equipment must be decommissioned within 90 days from no longer
being considered functional.
f) Family Day Care Home
1) Family day care homes shall operate in accordance with applicable
regulations from the Wisconsin Department of Children and Families.
g) Home Occupation
1) Prohibited home occupations. The following uses are prohibited as part of a
home occupation:
a) Any occupation involving the purchase and resale, exchange, production,
refinement, packaging or handling of explosives, or hazardous materials
or substances, as defined pursuant to the Comprehensive Environmental
Response Compensation and Liability Act.
b) Adult stores
c) Dance or night clubs
d) The service, repair, or painting of any motorized vehicle including, but not
limited to, motor vehicles, trailers, boats, personal watercraft, recreation
vehicles and snowmobiles
e) Automobile sales, excluding the sale of the residents’ personal vehicle(s)
f) Pet boarding exceeding three animals on the premises at any one time
g) Automotive towing and wrecking services
Commented [AK4]: Identical to existing ordinance
adopted a couple of years ago.
Page 89 of 100
h) For dwellings located within the Groundwater Protection Zones A, B and
C, no use listed as ‘prohibited’ within their respective groundwater
protection zone is allowed as a home occupation.
2) The owner or proprietor of a home occupation shall reside in the dwelling
from which the home occupation is being conducted.
3) No more than two employees who do not permanently reside in the dwelling
from which the home occupation is being conducted may be employed in
said home occupation. For the purpose of this Section, ‘employee’ shall refer
to a person for whom the property where the home occupation is taking
place is their place of work.
4) Signage is permitted on the property in accordance with Chapter 25, Sign
Ordinance of the City of Stevens Point.
5) The residential dwelling shall remain in character and appearance that is
typical and customary for dwellings located in the zoning district within which
the home occupation is located. Alterations that make the dwelling, building
and/or site appear or function similar to a commercial operation are
prohibited.
6) Exterior entryways that are created solely for conducting a home occupation
are permitted along the interior side and rear elevation of the residence. This
provision shall not apply for the construction of an accessory commercial
unit.
7) There shall be no exterior storage of materials to operate a home occupation
that is visible from a public right-of-way. Machinery and trailers permitted for
lawful operation upon a public road, as defined within Section 21.03, shall be
exempt from this provision.
8) The home occupation shall not result in a public nuisance as defined in
Chapter 21.15(1) of the City of Stevens Point Revised Municipal Code.
Examples of a public nuisance include, but are not limited to, noise, smoke,
dust, odor, heat, glare or electronic disturbance.
9) There shall be no commodities sold or services rendered that require regular
receipt and delivery of merchandise, goods or equipment by other than
passenger motor vehicle, the United States Mail Service, UPS, FedEx and
similar delivery services. Deliveries by hydraulic lift gate vehicles shall be
limited to twice monthly. The use of a semi-trailer for a home occupation is
prohibited.
10) The home occupation shall not involve the storage of more than two
commercial vehicles on the property for the delivery of materials to or from
Page 90 of 100
the premises. For the purpose of this Section, a commercial vehicle shall be
defined as a vehicle not exceeding 2.5 tons in capacity.
11) No more than four visitors on the premises for the sole purpose of the home
occupation shall be permitted. This provision shall not apply for in-home day
care uses.
h) Outdoor Seating
1) When outdoor seating areas are adjacent to a public sidewalk, it must be
located at least five feet away from fire hydrants, crosswalks and alleys.
2) When outdoor seating areas are located within a parking lot, it shall:
a) Not use more than 15% of required off-street parking stalls as required in
this Ordinance.
b) Be surrounded by a barrier, or other protective device as approved by the
Administrator, that is at least two feet in height.
i) Solar Energy System, Ground Mounted.
1) Location. Ground-mounted solar energy systems shall meet the same setback
requirements for accessory structures, as outlined in this Ordinance.
2) Height. Peak height of a ground-mounted solar energy system shall be 20
feet.
3) Impervious Surfacing Exemption. Where parcels have maximum impervious
surface limits, ground-mounted solar energy systems shall be exempt
provided that the ground underneath the panel is comprised of previous
surfacing.
4) Lot Size. When ground-mounted solar energy systems are installed on lots
ranging from 1-5 acres in size, the following shall be met:
a) Decommissioning. When a ground-mounted solar energy system is not
operational for a period exceeding 12 consecutive months, the system
operator shall have nine months to decommission the energy system.
Decommissioning shall include the removal of all panels, structures, poles
and other accessory equipment related to the function of said system.
Page 91 of 100
A decommissioning plan shall be required prior to receiving a building
permit to begin construction. Said plan shall identify the following,
subject to the review and approval of the Administrator:
1) Decommissioning of the system must occur in the event the project is
not in use for 12 consecutive months.
2) The plan shall include provisions for removal of all structures and
foundations, restoration of soil and vegetation and assurances that
financial resources will be available to fully decommission the site.
j) Swimming Pools, Hot Tubs, Saunas and Similar Installations
1) Location. Swimming pools, hot tubs, saunas and similar installations on
residential lots shall be located behind the rear elevation of the principal
structure. Said installations shall meet the side yard setback requirements for
principal structures and be exempt from meeting the rear yard setback
requirement for principal structures.
k) Wind Energy Systems, Building and Ground Mounted
1) Maximum Height. The height of a wind energy system, including the peak
height of a rotor, shall not exceed the maximum height for principal
structures as allowed on a parcel’s base zoning designation.
2) Setbacks. The base of a wind energy system shall meet building setback
requirements for principal structures as allowed on a parcel’s base zoning
designation.
3) Agreements Required. Maintenance and decommissioning agreements shall
be executed prior to receiving a building permit to begin construction.
4) Liability Insurance Required. Prior to receiving a building permit to begin
construction, the operator of a wind energy system shall obtain and maintain
liability insurance covering system construction and operation. Minimum
single limit liability coverage shall be $300,000.
Commented [AK5]: Identical to existing ordinance.
Page 92 of 100
Community Development Report, January 2026
Abandoned Vehicle on Property 0
1 5516 Forest Creek Rd $1,163.00 Bulk Waste at Curb Early 3
1 5565 Forest Creek Rd $1,163.00 Commercial Building Violation 1
Two‐Family 1 3117 Starling Court $2,242.50 Construction Work Without Permits 1
Multi‐Family N/A N/A N/A Debris on Property 1
Commercial/Industrial N/A N/A N/A Exterior Violations on House 2
Illegal Pets or Livestock 0
Infestation 0
Interior Housing Violations 1
Residential 55 $4,767.25 Native Lawn Plan 0 ++
Commercial 25 $12,795.28 Potholes 0 +
Property Encumbrance 0
Monthly Permits Monthly Valuation Monthly Fees YTD Permits YTD Valuation YTD Fees Public Works Violation 0 +
83 $3,809,421.67 $22,131.03 83 $3,809,421.67 $22,131.03 Snow & Ice Removal ‐ Sidewalk 90
Tall Grass or Noxious Weeds 0
2025 79 $7,696,852.34 $9,963.60 Trash Containers Improperly Stored 0
2024 105 $7,632,094.13 $50,615.99 Vacant Building/Home 0
2023 87 $2,531,467.76 $14,071.83 Vehicle Parked on Grass 1
Vision Obstruction in Roadway or Intersection 0
Zoning Violations 2
Total Violations / Total Service Fees Billed 102 $3,600
Voluntary Compliance Rate for Tagged/Verbal 0/3 0%
+ Referred to another department
++ Perpetual
Violation ReportConstruction Report
New Construction Fees# of Permits Location Declared Valuation
Additions or Alterations # of Permits
$2,213,674.01
$337,199.53
Declared Valuation Fees
Single Family $318,000.00
$560,548.13
$380,000.00
N/A
N/A
Page 93 of 100
Community Development Report, February 2026
Abandoned Vehicle on Property 0
1 5596 Forest Creek Rd $1,163.00 Bulk Waste at Curb Early 2
1 5589 Forest Creek Rd $1,172.00 Commercial Building Violation 0
1 5542 Golla Rd $1,163.00 Construction Work Without Permits 2
1 5526 Golla Rd $1,163.00 Debris on Property 7
1 223 Evelyn Ct $1,181.50 Exterior Violations on House 0
1 5508 Golla Rd $1,163.00 Illegal Pets or Livestock 0
Two‐Family N/A N/A N/A Infestation 1
Multi‐Family N/A N/A N/A Interior Housing Violations 3
Cross Roads Health ‐ Facility (HVAC) Native Lawn Plan 0 ++
5609 Carrie Frost Dr Potholes 0 +
Property Encumbrance 0
Public Works Violation 1 +
Snow & Ice Removal ‐ Sidewalk 67
Residential 55 $4,671.94 Tall Grass or Noxious Weeds 0
Commercial 18 $1,634.34 Trash Containers Improperly Stored 9
Vacant Building/Home 0
Monthly Permits Monthly Valuation Monthly Fees YTD Permits YTD Valuation YTD Fees Vehicle Parked on Grass 0
80 $2,608,339.59 $14,003.87 163 $6,417,761.26 $36,134.90 Vision Obstruction in Roadway or Intersection 1
Zoning Violations 0
2025 154 $10,767,599.25 $23,455.70 Total Violations / Total Service Fees Billed 93 $2,200
2024 183 $10,723,442.93 $62,087.51 Voluntary Compliance Rate for Tagged/Verbal 2/3 67%
2023 165 $4,561,358.66 $29,278.20 + Referred to another department
++ Perpetual
Single Family
Commercial/Industrial 1 $206,900.00 $692.09
$218,525.00
*
N/A
N/A
*HVAC portion only. BLD portion issued in October 2025.
Additions or Alterations # of Permits
$219,490.72
$692,423.87
Declared Valuation Fees
Violation ReportConstruction Report
New Construction Fees# of Permits Location Declared Valuation
$217,950.00
$283,700.00
$236,250.00
$236,250.00
$296,850.00
Page 94 of 100
City of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481-3594
Department of Community Development
& Redevelopment Authority
Jarod Kivela, Director
Ph: (715) 346-1567
Fax: (715) 346-1498
www.stevenspoint.com
Open Records Information: The City of Stevens Point is subject to Wisconsin Statutes relating to public records.
Communication, such as this document, sent or received by City employees are subject to these laws. Unless otherwise
exempted from the public records law, senders and receivers of City communication should presume that the
communications are subject to release upon request, and to state record retention requirements.
Page 1 of 6
DIRECTORS REPORT
To: City Plan Commission
From: Jarod Kivela, Director of Community Development
Date: April 1, 2026
RE: Directors Report
----------------------
Development Updates
• Portage County Business Park BID/Downtown BID:
o Business Park:
▪ Staff and the BID continue to proceed through the review process of the DRPC’s via
a working group. Recommendations for possible changes, additions, and deletions
will be brought forward by the working group to the BID Board for comments before
any final decisions are made.
▪ Staff and the BID have created a work group and have started brainstorming names
and marketing plan for the Park’s signage and branding. The BID is using the same
consulting company that the City used for its wayfinding branding and signage.
▪ Staff and the BID board are approving the maintenance contracts for the
landscaping and pond services for the park and are also identifying other
maintenance items that may need to be addressing in the future.
▪ Staff and the BID are creating a better communication database for members in the
park to transmit BID information to the business owners.
o Downtown:
▪ Staff and the BID has secured an MOU with the Farmers Market Assoc. to contract
with a UWSP-Pointers Connect Internship Program for a part-time summer intern to
assist with marketing and other related tasks to increase usership of the market and
Page 95 of 100
stevenspoint.com
BID events. The job has been posted and the application period will close on April
27.
▪ Staff and the BID's Economic Vitality work group are looking into pursuing a grant to
assist with a business accelerator project/incubator in a currently vacant downtown
commercial space.
▪ Staff and the BID's Design work group continue to meet with the key stakeholders for
the Library Alley Activation Project so they are best prepared to move in the
spring. The grant they applying for to assist with the funding of this project has
moved to the underwriting stage but they are still waiting for the final approval.
▪ Staff and the BID's Organization work group has been working with a WEDC
appointment consulting firm, Kennari, to create a marketing strategy specifically for
funding a non-profit main street organization and are finalizing all the documents
and projects requested by the firm. We are also hosting a information session and
social at the end of April to highlight the City's grant and loan programs as well as
other financial resources and the newly revised Business Resource guide developed
by the BID.
▪ Staff are the BID's Promotions work group are working on their full event schedule for
the year and have done some small popup events to stimulate the downtown traffic
but will have their first large event at the beginning of May. We are also updating
the website to include all the updated documents and events.
NOTE: For additional information and updates, please see the Executive Director Reports on the
Business Park and Downtown BID meeting packets or listen to the meetings.
• Forest Creek Subdivision: Sales Tracker (below).
Address Lot
Number Sale Date Purchase
Price
Construction
Status (2/26)
0 GOLLA RD STEVENS POINT WI
54482
1 PENDING OFFER $60,000.00
0 GOLLA RD STEVENS POINT WI
54482
2 4/10/2026 $56,000.00
0 GOLLA RD STEVENS POINT WI
54482
3 7/22/2026 $56,000.00
0 EVELYN CT STEVENS POINT WI
54482
4 7/22/2026 $60,000.00
0 EVELYN CT STEVENS POINT WI
54482
5 7/22/2026 $65,000.00
0 EVELYN CT STEVENS POINT WI
54482
6 7/22/2026 $60,000.00
172 EVELYN CT STEVENS POINT
WI 54482
7 11/12/2025 $55,000.00 Under Construction
0 EVELYN CT STEVENS POINT WI
54482
8 PENDING OFFER $55,000.00
Page 96 of 100
stevenspoint.com
0 EVELYN CT STEVENS POINT WI
54482
9 PENDING OFFER $58,000.00
0 EVELYN CT STEVENS POINT WI
54482
10 7/22/2026 $52,000.00
0 FOREST CREEK RD STEVENS
POINT WI 54482
11 7/22/2026 $55,000.00
5486 FOREST CREEK RD
STEVENS POINT WI 54482
12 11/14/2025 $60,000.00 Under Construction
0 FOREST CREEK RD STEVENS
POINT WI 54482
13 4/10/2026 $55,000.00
5516 FOREST CREEK RD
STEVENS POINT WI 54482
15 5/6/2025 $65,000.00 Permit Issued
0 JOE ST STEVENS POINT WI
54482
16 PENDING OFFER $55,000.00
5534 FOREST CREEK RD
STEVENS POINT WI 54482
17 6/27/2025 $55,000.00 Completed
5542 FOREST CREEK RD
STEVENS POINT WI 54482
18 7/3/2025 $55,000.00 Completed
0 FOREST CREEK RD STEVENS
POINT WI 54482
19 7/22/2026 $55,000.00
0 FOREST CREEK RD STEVENS
POINT WI 54482
20 7/22/2026 $55,000.00
5572 FOREST CREEK RD
STEVENS POINT WI 54482
21 10/31/2025 $55,000.00 Under Construction
5580 FOREST CREEK RD
STEVENS POINT WI 54482
22 10/15/2025 $55,000.00 Under Construction
5588 FOREST CREEK RD
STEVENS POINT WI 54482
23 10/31/2025 $55,000.00 Permit Issued
5596 FOREST CREEK RD
STEVENS POINT WI 54482
24 2/10/2026 $50,000.00 Permit Issued
5589 FOREST CREEK RD
STEVENS POINT WI 54482
26 2/10/2026 $50,000.00 Permit Issued
5581 FOREST CREEK RD
STEVENS POINT WI 54482
27 4/9/2025 $22,000.00 Completed
5573 FOREST CREEK RD
STEVENS POINT WI 54482
28 4/9/2025 $22,000.00 Completed
5565 FOREST CREEK RD
STEVENS POINT WI 54482
29 12/5/2025 $34,000.00 Permit Issued
30 12/5/2025
5572 GOLLA RD, STEVENS
POINT, WI 54482
34 4/9/2025 $45,000.00 Completed
5566 GOLLA RD, STEVENS
POINT, WI 54482
35 4/9/2025 $45,000.00 Completed
5542 GOLLA RD STEVENS
POINT WI 54482
36 2/10/2026 $50,000.00 Permit Issued
220 LEONARD ST STEVENS
POINT WI 54482
37 5/23/2025 $50,000.00 Completed
212 LEONARD ST, STEVENS
POINT, WI 54482
38 4/9/2025 $50,000.00 Completed
204 LEONARD ST. STEVENS
POINT WI 54482
39 10/10/2025 $50,000.00 Under Construction
Page 97 of 100
stevenspoint.com
203 JOE ST. STEVENS POINT WI
54482
40 9/11/2025 $50,000.00 Completed
211 JOE ST, STEVENS POINT, WI
54482
41 4/9/2025 $50,000.00 Completed
219 JOE ST STEVENS POINT WI
54482
42 5/23/2025 $50,000.00 Completed
5526 GOLLA RD STEVENS
POINT WI 54482
43 2/10/2026 $50,000.00 Permit Issued
0 GOLLA RD STEVENS POINT WI
54482
44 PENDING OFFER $52,000.00
0 JOE ST STEVENS POINT WI
54482
45 PENDING OFFER $56,000.00
0 JOE ST STEVENS POINT WI
54482
46 PENDING OFFER $55,000.00
0 FOREST CREEK RD STEVENS
POINT WI 54482
49 9/11/2025 $25,000.00
0 FOREST CREEK RD STEVENS
POINT WI 54482
50 9/11/2025 $25,000.00
0 FOREST CREEK RD STEVENS
POINT WI 54482
51 9/11/2025 $25,000.00
0 FOREST CREEK RD STEVENS
POINT WI 54482
52 9/11/2025 $25,000.00
0 FOREST CREEK RD STEVENS
POINT WI 54482
53 9/11/2025 $25,000.00
0 FOREST CREEK RD STEVENS
POINT WI 54482
54 9/11/2025 $25,000.00
5469 FOREST CREEK RD
STEVENS POINT WI 54482
55 4/9/2025 $25,000.00 Completed
223 EVELYN CT STEVENS POINT
WI 54482
57 2/10/2026 $60,000.00 Permit Issued
0 EVELYN CT STEVENS POINT WI
54482
58 2/10/2026 $65,000.00
5508 GOLLA RD STEVENS
POINT WI 54482
59 2/10/2026 $52,000.00 Permit Issued
0 GOLLA RD STEVENS POINT WI
54482
60 2/10/2026 $52,000.00
52/60
• Staff has begun preliminary design work on Phase 2 of this subdivision. Road layouts have been
largely predetermined, as utilities were stubbed into two areas of Phase 2 during Phase 1
construction. Drawing on lot sales performance in Phase 1, the layout will be calibrated to balance
density with lot marketability. As currently sketched, Phase 2 could yield approximately 50 lots
across 20 acres (compared to 60 lots in 25 acres in Phase 1).
However, rather than continuing to advance an internal plat, Staff is recommending a shift in
approach, issuing an RFP to sell the land to a private developer. Phase 1 has demonstrated market
viability and generated interest in the area, and Staff believes the time is right to transition
development responsibility to the private sector. The goal is to have an RFP prepared and issued in
April or May.
Page 98 of 100
stevenspoint.com
• Neighborhood Housing Programs: On March 25th, the City hosted a community information session
to outline available housing grants and loan programs, as well as a new partnership with Habitat
for Humanity. The session, held from 6–7 PM, was designed to connect residents with resources that
can support home repair, rehabilitation, and ownership opportunities throughout the city. Staff will
continue to promote these programs and work with Habitat for Humanity to identify eligible
households and properties. Several grant and loan applications have come in since the meeting.
• TID 14: (No changes since last month) Staff continues to pursue leads for new business prospects
and respond to Requests for Information (RFIs) received through WEDC. City staff are actively
evaluating strategies to increase the competitiveness of the district and position it for long-term
success. However, the City’s new industrial park site in TID 14 (Badger Avenue area) continues to
be passed over by prospective users due to the lack of high-pressure gas service and rail access—
two features that many industrial prospects expect to be in place or have a guaranteed
installation timeline.
In partnership with Burlington Junction Railway, staff have begun identifying local and regional
businesses that could benefit from rail access within the park. These discussions are in the early
stages, but they represent an important step in building the foundation needed to justify and
pursue rail installation. By combining potential local interest with continued business recruitment
efforts, staff remain confident that a viable path forward can be established to support rail
installation and demonstrate a strong financial rationale for the investment.
• Shopko Site: The Common Council and RDA have formally approved a Development Agreement
with Commonwealth Development for a 50-unit Low Income Housing Tax Credit (LIHTC) project on
a portion of the Shopko site. The project will address the community's need for affordable housing
while also providing a new home for the UWSP Childcare facility, which must relocate due to
space constraints associated with upcoming university construction.
With the Development Agreement in place, Commonwealth submitted its full WHEDA tax credit
application on March 20, 2026. Award announcements are expected in May. If tax credits are
awarded, the project will still require additional grant funding before construction can begin.
Assuming all financing is secured, construction could begin as early as Q3 2026.
• City Hall: The design phase is now coming to a close. Staff and the architects completed a final
review of the plans on March 31st, and the full submittal documents will be going out to
department heads and the City around April 6th. The architectural plans will be shared with alders,
included in the Council packet, and posted on the City website for the public to view. Internal
systems plans covering electrical, plumbing, and HVAC will not be made publicly available at this
time. A presentation to the Council is scheduled for April 20th, with bids going out the following
day. Contractors will be required to attend a bid walkthrough, with options on April 27th and 28th.
The public bid opening is set for May 19th, followed by a special Finance and Council meeting
anticipated the week of May 25th or June 1st. Construction is expected to begin shortly after that.
A webpage has been created if you would like to follow along with the progress or review the
history of the process: https://stevenspoint.com/1499/New-City-Hall-Project
• Lot 8/Eagle Plumbing (Third and Portage): The Redevelopment Authority, City, and Arc Central, LLC
have entered into a Development Agreement for the Eagle Plumbing parcel (Lot 8) on Third Street.
Page 99 of 100
stevenspoint.com
The developer is proposing a 6-unit, 3-story condominium building as a first phase, with the
potential for three additional 6-unit buildings on an adjacent parcel in a second phase, totaling up
to 24 owner-occupied units. To bridge the gap between construction costs and market value, the
City's support package includes a nominal land sale of $1,000, a $200,000 upfront incentive, and
up to $18,500 in environmental investigation work. The project is anticipated to generate a positive
TID balance of approximately $89,000 over the life of the district, even accounting for the
incentives provided.
• Comprehensive Plan: The City has contracted with the North Central Wisconsin Regional Planning
Commission to assist with the Comprehensive Plan rewrite. After a period of slower progress due to
competing priorities, including active development proposals on the Shopko site, Edgewater, and
Lot 8, staff have been able to redirect additional time and attention to this effort. Updated
chapters and revisions to the Goals, Objectives, and Policies are expected to be brought forward
in the coming months. We appreciate your continued patience as staff works to advance this and
the other significant planning initiatives currently underway.
• Doors 2 Dreams and Sisters Meadow Subdivision: Staff have been working closely with the Doors 2
Dreams development team and Rettler Corp on right-of-way infrastructure design for this area,
including a planned extension of Academy Avenue, Meadow Street, and potentially Third Street.
Rettler Corp is wrapping up the ROW design and expects to take it to bid this spring, as road base
installation will need to be completed prior to construction of the gathering lodge beginning.
Doors 2 Dreams is hoping to break ground on the lodge in late summer, followed by a series of
small homes and townhomes.
In the meantime, Doors 2 Dreams representatives have been proactively engaging the surrounding
neighborhood, including door-to-door outreach to nearby residents and a public viewing session
held at CREATE where the team shared project visuals and answered questions from the
community.
Since the street infrastructure is being constructed to serve this development, staff is taking the
opportunity to plan the broader area so that additional single-family and multi-family builders can
be recruited to fill out the neighborhood. Once that planning is in place and a builder is
committed, the focus will shift to a trail system connecting the natural area to the north and the
high school. There are already interested parties exploring partnerships for a community garden,
community orchard, and outdoor classroom within that conservation area.
Page 100 of 100
Source: City of Stevens Point website. First collected Oct 21, 2026.