CENTRAL WISCONSIN JOINT AIRPORT BOARD — Agenda Packet
Portage County · Portage County · Central WI Joint Airport Board Meeting · meeting of May 12, 2026 · Agenda packets
Open the original document More from Portage County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Any person planning to attend this meeting who needs some type of special accommodation to participate should call the
County Clerk’s Office at 715-261-1500 or e-mail countyclerk@co.marathon.wi.us one business day before the meeting.
CENTRAL WISCONSIN JOINT AIRPORT BOARD MEETING AGENDA
Conference Room B – East Terminal Upper Level, Mosinee, Wisconsin
May 12, 2026 - 8:00 a.m.
2026-2028 Board Members: Chris Dickinson - Marathon County, Dave Ladick - Portage County, Tom Seubert -
Marathon County, Kurt Kluck - Marathon County, Rick Rettler - Portage County, Matt Krembs - Marathon
County, Robin Falk – Portage County
Mission Statement: Provide premier access to the world through aviation and be a catalyst for economic growth
i
n our communities. Vision Statement: To be the airport of choice for central and northern Wisconsin.
The monthly meeting of the Central Wisconsin Joint Airport Board will have the option for members and the
public to call-in via telephone conference. Airport Board members and the public may join the meeting by
calling 1-469-480-4192 and enter Conference ID 586 086 871#. The conference line will be open to calls five
(5) m
inutes prior to the meeting start time listed above.
1) Call to Order by Chair Dickinson at 8:00 a.m.
a) Pledge of Allegiance
2) A pproval of Minutes of the April 14, 2026 Board Meeting
3) Public Comment Period: 15-minute time limit
4) I
ntroduction of New Central Wisconsin Joint Airport Board Members Robin Falk and Matt Krembs
5) H
old Election of Officers of the Central Wisconsin Joint Airport Board
6) R
eview and Possible Action on Flightline Drive Construction Engineering Services Contract
7) S
taff Reports
a) D
irector Report
i) Air Service Update
ii) Statistical Report
iii) Flight Schedule
iv) Legislative Update
b) Financial Reports
i) Revenues and Expenses
ii) PFC Update
c) O perations and Project Reports
i) Update on Airport Projects
ii) Update on Airport Operations
iii) Triennial Full-Scale Emergency Exercise – May 21, 2026
8) Ovation
a) Fixed Base Operator Report
9) Next Scheduled Meeting Date: Proposed date - June 16, 2026 at 8:00 a.m.
10) Adjournment
01
CENTRAL WISCONSIN JOINT AIRPORT BOARD MEETING MINUTES
CENTRAL WISCONSIN AIRPORT TERMINAL
Conference Room B – East Terminal Upper Level, Mosinee, Wisconsin
April 14, 2026 - 8:00 a.m.
Airport Board: Chris Dickinson, Chair J ulie Morrow, Vice Chair - Excused
Dave Ladick Kurt Kluck
Rick Rettler Th omas Seubert - Excused
Nicholas Endres
Staff: Brian Grefe, Airport Director Mark Cihlar, Assistant Airport Director
Dave Drozd, Finance Director J ulie Ulrick, Badging Coordinator
Visitors: Karl Kemper, Becher Hoppe Josh Harris, Ovation
Collin Eiden, Ovation Marco Espinoza, GFO Aviation
Call to Order: Meeting called to order by Chair Dickinson at 8:00 a.m.
Approval of Minutes: Motion by Ladick, second by Kluck to approve the minutes of the March 10, 2026 board
meeting. Motion carried unanimously.
Public Comment Period: None.
Review and Possible Action on GA Apron Construction Engineering Services Contract:
The construction engineering services contract with Becher Hoppe for the GA apron project is up for approval and
has been negotiated in good faith. Total cost for the contract is $314,370.29 and is eligible for state and federal
funding. If approved, the contract cost would be included in the final grant application and work would begin after
the grant is awarded. Construction is anticipated to begin August of 2026. Motion by Kluck, second by Ladick to
approve the GA Apron Construction Engineering Services Contract with Becher Hoppe in the amount of
$314,370.29. Motion carried unanimously.
Review and Possible Action on Permanent Utility Easement with Wisconsin Public Service:
WPS has several permanent utility easements on airport property with another being requested to provide utilities to
the new transient hangar and GA terminal. WPS will schedule installation of the utilities as soon as they receive the
executed utility easement. A copy of the final easement will be recorded with the deed of the property. Motion by
Endres, second by Kluck to approve Resolution R-02-26 for the permanent utility easement with WPS. Motion
carried unanimously.
Staff Reports:
Director Report – Brian Grefe:
Air Service Update – Director Grefe recently attended the Mead & Hunt Air Service Development Conference and
was able to meet with various airlines. Delta indicated they are not planning to grow this year, but they are happy
operating out of CWA and are considering future capacity. United had to move their start date back due to the FAA
reducing capacity out of Chicago O’Hare, but they are still planning on three daily flights. American is also planning
to remain at three daily flights. Sun Country is still interested in CWA’s market, even after the merger with Allegiant.
Avelo recently placed an order for 50 E2 aircraft, with the option of an additional 50 jets. They remain interested in
returning to CWA.
Statistical Report – The March statistical report shows total operations down 0.8% on the month, up 2.4% on the
year. ATCT operations saw an increase of 17.8% for the month and an increase of 18.1% for the year. Enplanements
ended the month with a 3.5% increase, 16.3% increase on the year. Load factors ended with American at 79.6% and
Delta at 75.4%.
02
Flight Schedule – Delta remains at two daily flights and American has brought their third flight back. The spring
Never Forgotten Honor Flights have been announced and several casino charters are coming up.
Legislative Update – The White House unveiled a fiscal year 2027 budget request that proposes $4 billion for the
Airport Improvement Program along with funding to hire more air traffic controllers and advance plans for upgrading
the air traffic control system. The budget also includes: A proposal to require small airports to join the Screening
Partnership Program; an increase in defense spending from $1 trillion to $1.5 trillion; cutting non-defense
discretionary spending by $73 billion; a decrease in Essential Air Service funding by approximately $372 million; and
funding for the Rebuilding American Infrastructure with Sustainability and Equity (RAISE) grants program.
Financial Reports – Dave Drozd:
Revenues and Expenses – March revenues end at 19.82% of budget, with expenses ending at 18.26%. Materials and
supplies are high due to deicing supplies for above average ice and snow events this year. Marathon County’s
auditors Baker Tilly will be conducting their annual audit next week.
Budget Comparison – The year-to-date budget summary shows revenues $71,995 over expenses.
PFC Update – None.
Operations & Project Reports – Mark Cihlar:
Update on Airport Operations – The recent icing event caused some cancelations due to icing on the aircraft, but no
deicing chemicals had to be used on runways. Chicago had significant weather around that time causing additional
cancelations. Staff are gearing up for summer maintenance. The new ARFF vehicle has been put into service and
staff are fully trained.
Update on Airport Projects – A kick-off meeting for planning and goal setting was held with the FAA Airport’s District
Office for the upcoming ARFF/SRE facility project. The GA access road project was put out for bid, with bid opening
scheduled for next week. Construction has started on the GA Terminal project. Crews finished removal of old
foundation and are now digging for the new foundation. A groundbreaking ceremony will be held Apr. 29
th and
board members are welcome to attend. Construction should resume next week on the GA transient hangar project.
Triennial Full-Scale Emergency Exercise – May 21, 2026 – The triennial full-scale emergency exercise has been
scheduled for May 21
st, which will include participation from local emergency response teams. Last week a planning
meeting was held for the full-scale exercise. Approximately 15 regional hospitals were included in the event, as well
as Marathon County Emergency Management and local fire and police departments.
Ovation – Fixed Base Operator Report:
Ovation’s new A&P mechanic has started and they are hoping to start scheduling service in May.
Next Scheduled Meeting Date: May 12, 2026 at 8:00 a.m.
Adjournment: 8:47 a.m. Motion by Kluck, second by Rettler to adjourn. Motion carried unanimously.
_______________________________________
Julie Ulrick, Recording Secretary
03
Age
nda Item Summary
Airport Board Meeting Date: May 12, 2026
Agenda Item Title: #6) Review and Possible Action on Flightline Drive Construction Engineering Services Contract
Staff Responsible: Mark Cihlar, Assistant Airport Director
Background: Flightline Drive is the access road that serves the fuel farm, the GFO Hangar facility, and remaining GA
development sites along Taxilane E. It is also located in a position that limits the development opportunity west of the
fuel farm. This was studied during the 2023 Terminal Area Master Plan (TAMP), and a project was identified to relocate
this road to the north in order to maximize the development opportunity for this site. The existing access road has
degraded severely over the years and has reached the end of useful life. Below is an exhibit depicting the project area.
The rest of flightline drive was reconstructed in 2021.
In M
ay of 2025, the Central Wisconsin Joint Airport Board approved this project by resolution, contingent on state and
local funding. On February 10, 2026, the Central Wisconsin Joint Airport Board approved a design contract for this
project. The project has been bid out and is ready to move into the construction phase of the project.
Airpo
rt staff worked with Becher Hoppe to scope and negotiate a contract for the necessary engineering oversight
required during construction of the project. The recommended contract with Becher Hoppe has been negotiated in good
faith in accordance with FAA AC 150/5100-14E. A statement of cost reasonableness for this contract is attached to this
Agenda Item Summary.
The
Wisconsin DOT Bureau of Aeronautics (BOA) opened bids for the project on April 23, 2026 and is now working on the
State Aid Finding for the project.
Tim
eline: If approved by the board, the contract cost will be awarded by the BOA after the State Aid Finding is approved
by the Governor. Construction is anticipated to begin in June of 2026.
04
Agenda Item Summary
Financial Impact: This contract, along with the previously approved design contract and construction contract for this
project, are eligible for State Aid Funding on an 80% State and 20% Sponsor (CWA) proration. This construction
engineering services contract has a total cost of $35,679.33.
Six bids were received for the project. The low bid on the project was submitted by Riverview Construction, with a total
construction cost of $234,444.00. This puts the total cost of the project at $336,697.26. This amount includes design,
construction, construction engineering services, and BOA administrative expenses. This total cost will be funded 80%
with State funding, and CWA’s 20% share of the project will be $67,339.45.
Contributions to Airport Goals: This construction engineering contract supports the 2025 Airport Goals to Enhance
General Aviation and Improve and Maintain Facilities, and is consistent with the 2023 Terminal Area Master Plan.
Recommended Action: Airport staff recommend approval of the Construction Engineering Services contract with Becher
Hoppe Associates.
Attachments: Construction Engineering Services Contract, Scope of Work, Fee Proposal, and Statement of Cost
Reasonableness
05
606dev/r.11/18/2025 Page 1 of 2 BOA Project No. CWA1023
CONTRACT FOR CONSTRUCTION CONSULTANT
SERVICES
AIRPORT NAME Central Wisconsin Airport (CWA)
BOA PROJECT NUMBER CWA1023
Between the
OWNER: Central Wisconsin Joint Airport Board, Wisconsin
Represented by: SECRETARY OF TRANSPORTATION, agent for the owner
and
CONSULTANT: Becher-Hoppe Associates, Inc.
330 North 4th Street
Wausau, WI 54403
This contract made and entered into by and be tween the Central Wisconsin Joint Airport Board,
Wisconsin represented by its duly authori zed agent, WISCONSIN DEPARTMENT OF
TRANSPORTATION SECRETARY, Bureau of Aeronautics (BOA), in accordance with Wis. Stat.
§114.32(1) (1993), hereinafter called the owner a nd Becher-Hoppe Associates, Inc., hereinafter
referred to as the consultant.
The owner proposes to: Conduct engineering services associated with the construction of Flightline
Drive Relocation at Central Wisconsin Airport (CWA).
ALL SERVICES
The consultant represents it is in compliance with the laws and regulations relating to the profession of
engineering and is willing and able to do the cons ultant services required in the proposed work in
accordance with this contract.
It is expressly understood and agreed that th e lump sum amount totals $ 11,184.61, the actual costs
shall not exceed $24,494.72 and in no event will the total compensation and reimbursement paid
hereunder exceed the maximum combined sum of $35,679.33 for all of the services required under this
contract except by amendment to this contract.
The consultant representative is Karl Kemper whose telephone number is 715-551-5507.
The owner representative is Mark Cihlar whose telephone number is 715-693-2147.
The Disadvantaged Business Enterprise goal on this contract is N/A.
Attached and made part of this construction c ontract are the “General Provisions: and “Special
Provisions.” This contract incorporates and the parties agree to all of the CONSULTANT SERVICES
06
606dev/r.11/18/2025 Page 2 of 2 BOA Project No. CWA1023
GENERAL PROVISIONS DATED July 10, 2014. The consultant acknowledges receipt of a copy
of these “General Provisions.”
This contract has been agreed to and signed on the dates shown. Effective date of the contract is the
latter of the two dates.
AS AGENT FOR OWNER CONSULTANT
By: _____________________________ By: _________________________________
Karla Knorr, P.E., Director Karl R. Kemper, P.E.
Bureau of Aeronautics
Title: President
SS#/FEIN: 39-0875123
Date: _____________________________ Date: _________________________________
Airport: Central Wisconsin Airport (CWA)
CENTRAL WISCONSIN JOINT AIRPORT BOARD
By:
Title:
Date:
CONSULTANT BILLING ADDRESS:
Becher-Hoppe Associates, Inc.
330 North 4
th Street
Wausau, WI 54403
07
606dev/r. 11/18/2025 Page 1 of 8 Project No. CWA1023
SPECIAL PROVISIONS FOR CONSTRUCTION CONTRACT
Part I. Payment/Scope of Services
Section A. Payment
1. Lump Sum
2. Actual Costs
Section B. Scope of Services
1. General
2. Pre Construction
3. Construction Inspection Management and Reporting Program
4. Airport Layout Plan
Part II. Other Provisions
Section A. Management Engineering Services
Section B. Resident Engineer Services
Part III. Special Attachments (As Required)
Attachment A – Scope of Services
Attachment B – Fee Estimate
08
606dev/r. 11/18/2025 Page 2 of 8 Project No. CWA1023
Part I. Payment/Scope of Services
Attached to and made a part of the Consultant Construction Services Contract:
Airport Name: Central Wisconsin Airport (CWA)
BOA Project Number: CWA1023
Section A. Payments
1. Lump Sum - The owner agrees to pay the consultant as compensation for professional services
furnished under Section B and in accordance with the “General and Special Provisions,” a lump
sum for each unit of work performed as follows:
Item
No.
Description Fee
1. Pre Construction $7,542.56 Lump Sum
2. Construction Inspection Management and
Reporting Program Yes No
$ Lump Sum
3. Airport Layout Plan Package
Yes No
$ Lump Sum
4. Initial Construction Layout
$2,967.03 Lump Sum
5. Provide project Record Drawings
(As-Builts)
$675.02 Lump Sum
TOTAL LUMP SUM AMOUNT $11,184.61
2. Actual Costs
The consultant agrees to provide necessary ma nagement engineering, re sident engineering,
testing, and inspection services including staking as required fo r the execution of the project
construction as defined in the contractor’s c onstruction contract and as set forth in this
consultant’s contract provisions.
The owner agrees to pay the consultant for fu ll compensation on services rendered under this
section an actual cost to the consultant up to $22,383.15 plus a fixed fee of $2,111.57 except
by an amendment to this contract.
The overhead rate to be applied to this contract is ____________. (Optional)
Total Actual Cost Amount - $ 24,494.72
Maximum Combined Amount (Lump Sum and Actual Costs) - $ 35,679.33
09
606dev/r. 11/18/2025 Page 3 of 8 Project No. CWA1023
Section B. Scope of Services. The consultant agrees to perform the following services:
1. General
a. The Wisconsin Department of Tran sportation - Bureau of Aeronautics Standard Specification
for Airport Construction, 1998 edition plus all supplemental sp ecifications pertaining to Part
I - general requirements and covenants which relate to consultant’s responsibilities is part of this
contract.
b. Reimbursement for actual costs will be limite d to those which are allowable under 48 C.F.R.
§31.103 (2007). Payment is intend ed as full compensation for work performed or services
rendered and for all labor, material, supplies, eq uipment and incidentals necessary to complete
the work.
c. The reimbursement of expenses in the actual cost s section of this contract will be in accordance
with the consultant’s written policy. The owner reserves the right to deny payment of expenses
on reasonableness. Any expenses that the consultants have in the determination of their
overhead rate are not eligible fo r reimbursement. The owner has th e right to request receipts.
In the absence of the consultant’s written policy, the State of Wisconsin written policy on
reimbursement of expenses for consultant employees will be used as guidelines.
d. The consultant agrees that ma nagement engineering services furnished shall be to the extent
necessary to determine complian ce with plans and specifications , including necessary general
supervision of resident engineer ing services that may be required under this contract. The
consultant further agrees to furnish record drawings in the format specified by the bureau upon
completion of the project. Nothing herein shall be construed as imposing upon the consultant’s
responsibility for the construction means, methods, techniques, sequences, safety programs, and
procedures used by contractors. The services involved with management engineering are
described in Part II, Section A.
e. The consultant agrees that resident engineering services furnished under this contract shall be to
the extent necessary to inspect the work a nd to determine compliance with the plans and
specifications, including representing the owner in coordination of construction activities among
contractors and between contractors and utilities, and to accommodate the reasonable
requirements of the owner on and around areas of construction. Documentation of construction
progress and delays, quantities and percentages of work, tests performed, inspections made and
work accepted, problems encountered and instructi ons given to contractors, field changes and
adjustments approved, and other records required or otherwise necessary to maintain a record of
the work, will be maintained on the project site. Nothing herein shall be construed as imposing
upon the consultant’s responsibility for the construction means, methods, techniques, sequences,
safety programs and procedures used by contr actors. The services involved with resident
engineering services are described in Part II, Section B.
f. The resident engineer shall maintain a daily diary to record the cons truction history of the
project. The diary will be made available to the FAA or owner for review upon request during
inspections or visits. The project diary shou ld include, but not be limited to the following
information; weather conditions, job site conditions, work in progress and general location,
equipment in use, contractors work force and hours worked, material delivered, tests performed,
tests failing and action taken, instru ctions to the contractors, reco rd of officials visiting project
and verbal or written instruc tions given, telephone conversati ons and verbal instructions
10
606dev/r. 11/18/2025 Page 4 of 8 Project No. CWA1023
received, or authorization granted, engineering field force activity and hours worked, delays to
construction and reason. The diary should be in a bound book of good qua lity, easily handled
and carried.
g. Any orders issued by the owner/owner representative will be transmitted through the consultant
representative to the construction contractor.
h. In the event of a controversy, the consultant Representative shall first confer with the owner
Representative and then transmit the agreed course of action to the contractor. In the event the
consultant Representatives and owner Representatives cannot agree, the owner Representative
will promptly contact the Airport Engineering Section Chief or their delegate who will determine
the necessary course of action. The determinati on will then be transmitted to the contractor
through the consultant Representative.
i. Perform consultant field operations in accord ance with OSHA regulations and accepted safety
practices.
j. Provide both the owner and the bureau a hard c opy of the project record drawings. In addition,
an electronic copy of the record drawings shall be sent to the bureau in accordance with the latest
bureau “as-built guidelines” which can be found on the bureau website.
k. The owner will notify the consulta nt by certified mail that final billing for all services on this
contract must be submitted within 14 days, after which no further payment will be made.
2. Pre-Construction Work
The consultant services in this item include:
a. Prepare, coordinate and sc hedule the pre-construction conference, after the construction
contracts are awarded.
b. Obtain and review the project construction schedules from the contractor or contractors prior to
presentation at the pre-constr uction conference. The owner s hould be provided copies of all
construction schedules.
c. Prior to pre-construction conference, furnis h the names of the proj ect management person,
resident engineer (and inspectors upon request) with qualifications for approval by the owner.
d. Preside at the pre-construction conference, prep are a detailed record of the conference, submit
to the owner for review and comment, and distribute the final record.
3. Construction Inspection Management and Report Program
a. This provision applies only to federally funded projects for pavement costs over $250,000.
b. A construction inspection management program de tailing the measures and procedures to be
used to comply with the quality control provisions of the construction contract including, but not
limited to, all quality control provisions and tests required by the federal specifications, federal
approved state specifications or federal approved deviations from these specifications.
11
606dev/r. 11/18/2025 Page 5 of 8 Project No. CWA1023
Pavement refers to the total pavement structure including sub-grade, base and sub-base courses,
and surface course.
c. The consultant shall provide the following in formation before the start of construction:
(1) The name of the person representing the sponsor who has overall responsibility for contract
construction inspection administration for the pr oject and the authority to take necessary
actions to comply with the contract.
(2) Names of testing laborato ries and consulting engineer firms with quality control
responsibilities on the project, together with a description of the services to be provided.
(3) Procedures for assuring that testing labor atories meet the require ments of the American
Society of Testing and Material’s Standards on laboratory evaluation referenced in the
contract specifications. (The testing contract shall state that the laboratory complies with
ASTM D3666 -11 and C1077-13).
(4) Qualifications of engineering superv ision and construction inspection personnel.
(5) A listing of all tests required by the contract specifications, including the type and frequency
of tests to be taken, the method of sampling, the applicable test standard, and the acceptance
criteria or tolerances permitted for each type of test.
(6) Procedures for ensuring that the tests are taken in accordance with the program, that they
are documented daily, that the proper correct ive actions, where necessary, are undertaken,
and that the quality of materials used is adequate.
d. The consultant shall provide the following information upon completion of the project:
(1) An interim test and quality control report shall be submitted, if requested by the owner.
(2) A final test and quality control report doc umenting the results of all tests performed,
highlighting those tests that failed or did not meet the applicable test standard. The report
shall include the pay reductions applied a nd reasons for accepting any out-of-tolerance
material.
4. Airport Layout Plan Package
a. The ALP package will be prepared in acco rdance with the current AC 150/5300-13 and
BOA ALP Development Guide/checklist.
b. List of ALP sheets as checked will be included in this contract.
Title sheet Yes No
Airport layout sheet Yes No
Terminal area sheets (number ) Yes No
Approach sheets (Rwy's , , , , , ) Yes No
Airport property map (Land inventory map) Yes No
Land use plan Yes No
Land acquisition plan Yes No
Airport airspace drawing Yes No
ALP to be prepared using CADDS Yes No
12
606dev/r. 11/18/2025 Page 6 of 8 Project No. CWA1023
c. ALP Narrative Report Yes No
d. Transmittal Letter to FAA Yes No
PART II. OTHER PROVISIONS
Section A. Management Engineering Services
The consultant agrees to provide management engin eering services required for the execution of the
work. These services shall include, but are not limited to the following:
1. Check construction activities to obtain compliance with plans and specifications.
2. Provide interpretation of plans and specifications.
3. Supervise and coordinate sub-consultant contracts for field inspection and testing.
4. Review shop drawings and certificates submit ted by contractors for compliance with design
concepts.
5. Review all final pay estimates and explanation of variation between contract and final
quantities prepared by resident engineer.
6. Review weekly progress reports as prepared by resident engineer.
7. Review “Contractors Request for Extension of Contract Time” analysis made by the
resident engineer and make recommendation to the owner.
8. Prepare and recommend a pproval of change orders.
9. Meet with the owner for consulta tion and advice during construction.
10. Schedule final inspection of al l contracts and send notifications. Attend final inspection of
construction. Make recommendations for acceptance of work.
11. Monitor that all testing required by the specif ications is performed. Review and approve
all materials reports prepared by the resident engineer.
12. Certify that all project work completed under inspection of the resident engineer is in
substantial compliance with the plans, specifications and contract documents including any
modifications by change order or otherwise, that all required tests were performed, and that
such work is recommended for acceptance.
13. Maintain record drawings from redline or work ing drawings prepared by resident engineer
as accumulated during the course of construction to show “as-built” conditions.
Section B. Resident Engineer Services
13
606dev/r. 11/18/2025 Page 7 of 8 Project No. CWA1023
The consultant agrees to provide resident engineering, testing, and inspection services including
construction staking required by the owner in the execution of the project work.
The consultant is authorized to employ the resident engineer on other work during periods of temporary
job shutdown if such services are not required by the project. Normally, the resident engineer will give
continuous service on the project wh en construction is in progress to include temporary interruptions
due to weather or mechanical failure; however, on some projects, these services may be intermittent in
accordance with project requirements.
Resident services shall include, but are not limited to the following:
1. Construction staking shall be in accordance with “General Requirements and Covenants for
Airport Construction,” Section 50-06.
2. Check construction activities to monitor co mpliance with the plans and specifications.
3. Check contractor’s equipment and review proposed methods of construction. Notify
contractor of equipment and methods which do not comply with the contract requirements.
The resident engineer shall no tify the owner in the event th at the contractor elects to
continue the use of questioned equipment and methods.
4. The resident engineer shall monitor the c ontractor’s compliance with the approved DBE
plan (i.e., determine that the firms on the job ar e as stated in the plan. Determine that the
volume of work and equipment used complies with the plan.). Deviations should be
reported to the owner.
5. Make necessary tests in accordance with the cited standard methods of ASTM; record all
test results on the appropriate “Field Inspection of Material” forms; prepare a summary and
disposition of all testing a nd materials inspection on the “Test Report Record” form; and
record all deviating tests on a “Materials Specification Deviation Report” form.
6. The resident engineer shall notify the contractor of any failure of the work or materials to
conform to the requirements of the contract, plans or specifications. The resident engineer
may reject non-conforming materi als and notify the contractor to suspend any work in
question until such issues can be referred to the owner for a final decision.
7. Maintain daily records of th e contractor’s progress and acti vities during the course of
construction, to include progress of all wor k. These records document work in progress,
quality and quantity of materials delivered, test locations and results, instructions provided
the contractor, weather, equipment use, labor requirements, safety problems, and changes
required.
8. Prepare and submit weekly progress report, working day weekly statement, contract time
status, and other reports as required by this contract. A concise report of the daily services
performed by the resident staff shall be inco rporated in progress reports. Working day
weekly statement and weekly progress reports shall be submitted to the owner within three
calendar days of the end of the contractor’s wo rk week. All failed tests and re-tests must
be reported with the weekly progress reports. A summary of out-of-tolerance material, any
corrective action, and material subject to pay reduction is also required.
14
606dev/r. 11/18/2025 Page 8 of 8 Project No. CWA1023
9. Determine that each contractor of subcontractor on the project is submitting the required
payroll reports. Review payroll reports for completeness and compare with published state
and/or federal wage rates for compliance. Where payroll reports are found to be incomplete
or inaccurate, make the initial contact with the contractor and refer to the bureau for further
action if necessary. Submit the first payroll repo rt of each contractor and subcontractor to
the owner (except on state aid contracts). Retain all payroll reports on the project for review
for a period of not less than five (5) years.
Affirm that the prime contractor has posted th e prevailing wage rates at the job shack (or
other conspicuous location approved by the engineer).
Assist the bureau in the conduct of random wage compliance interviews with workman on
the project as requested.
10. Perform other services as reasonably require d by the owner and as outlined in the Standard
Specifications for Airport Construction, 1998 edition.
11. Review and evaluate “Contractor’s Request for Extension of Contract Time,” submit
recommendation to the consultant’s project management person.
12. Measure and compute quantities of all materials incorporated in the work and items of work
completed, and maintain an item record account.
13. Prepare “Periodic Cost Estimat es” and submit to the owner.
14. Prepare change orders which include a cost estimate, cost/price an alysis and record of
negotiations. Notify the contractor that no work on change orders can start until approval
is obtained from the owner.
15. Prior to the final inspection, prepare and distribute to the contractor and owner a semi-final
inspection report including a list of uncompleted items.
16. When work included in a construction contra ct is complete, notif y consultant project
management person to coordinate and schedule a final inspection.
15
Page 1 of 5
ATTACHMENT A
Scope of Services
Central Wisconsin Airport
Mosinee, WI
Flightline Drive Relocation
CWA1023
Construction Engineering Services
April 22, 2026
PROJECT DESCRIPTION
This project includes improvements to the Central Wisconsin Airport in Mosinee,
Wisconsin. The project consists of relocation of Flightline Drive between the fuel farm
and the GFO Aviation hangar.
This scope is for engineering services associated with the construction phase of the
project. Construction is anticipated to start in July 2026. The specified time for
construction substantial completion is 30 working days. However, as requested by
CWA, our scope of services and fee proposal for this project assumes that the
contractor will complete the project within 20 working days. Based on the WisDOT
Federal Development Manual (FDM), the percentage factor for probable working days is
~85% of possible working days for the majority of the project work. Using this
percentage, it is probable that 20 working days would be expired after 24 possible
working days. From these estimates, our level of effort is based on a minimum of 24
weekdays (5 weeks) of part-time on-site construction oversight. 4-hour working days
are included for our RPR for 20 of the 24 days. 1-hour working days are included for
our RPR for 4 of the 24 days.
The following scope of services has been developed to accomplish the goals for this
project:
16
Page 2 of 5
SCOPE OF SERVICES
I. LUMP SUM ITEMS
1. Pre-Construction Tasks
a. Scoping/Preliminary Coordination: Consultant will coordinate with the
BOA, contractor, sub-consultants, and internally to estimate scoping items
such as timeline, required tasks, and appropriate staffing for the project.
b. Erosion Control Implementati on Plan (ECIP) Coordination: Consultant
will review the ECIP and coordinate with the contractor to develop the
ECIP to the point where it’s ready for DNR and BOA review and comment.
Consultant will follow up with contractor to ensure that DNR and BOA
comments are addressed..
c. Obtain/Review Construction Schedule: Consultant will review the
contractor’s initial schedule for compliance with project specifications and
airport operations. Consultant will coordinate with contractor and airport
manager to modify schedule as required to meet project specifications and
accommodate airport operations.
d. Coordinate, Prepare, Conduct, Document Pre-Construction Meeting:
Consultant will coordinate, prepare for, conduct, and document a pre-
construction meeting at the airport.
e. Safety Plan Compliance Do cument (SPCD) Coordination: Consultant
will review the contractor’s SPCD and coordinate with the contractor to
develop the SPCD to the point where it’s ready for BOA review and
approval/comment. Consultant will follow up with contractor and BOA to
ensure that the SPCD approval is formalized.
f. Prepare Digital Terrain Models (DTM): Consultant will prepare and
provide DTMs to the contractor to be used for GPS machine grading.
2. Construction Management Program (CMP): Not included in scope.
3. Airport Layout Plan Package: Not included in scope.
4. Initial Constructi on Layout and Control: Consultant will provide slope staking
and control prior to start of construction items of work. Setting control involves
setting irons around the perimeter of the project at ~400’ intervals with horizontal
coordinate information, then running a level loop through all of the control points.
Slope staking involves providing stakes near the slope intercept at each station,
and providing cut/fill information to station features as requested by the
contractor.
17
Page 3 of 5
5. Record Drawings: Consultant will prepare record drawings in Adobe (.pdf)
format to represent as-built conditions of the project.
II. COST PLUS FIXED FEE ITEMS
1. Management Engineering:
a. Project Preparation: Consultant will prepare templates for the
documents and tools utilized during construction, including:
Pay estimates
Daily progress reports
Weekly progress reports
Submittal log
Material submittal checklist
Weekly meeting agendas
Item record account worksheets
Erosion control inspection worksheets
Construction GPS setup
b. Project Coordination: Consultant will provide professional engineering
services as required to monitor project progress and resolve issues.
c. Interpret Plans and Specifications: Consultant will assist contractor with
interpreting plans and specifications. Internally, the project manager will
introduce resident project engineers/representatives to the project.
d. Supervise Sub-Consultants: Consultant will supervise and coordinate
with sub-consultants.
e. Review Shop Drawings, Submittals, and Quality Control Plans:
Consultant will review submittals for all materials incorporated into the
project for general conformance with project specifications.
f. Pay Estimates/Variation in Quantities: Consultant will tabulate quantities
during construction and review with the Contractor weekly. Consultant will
prepare periodic pay estimates duri ng construction, provide to the
contractor for approval, present to Sponsor for approval, and submit to BOA
for payment. Consultant will also submit any requested variation in
quantities information after the project is completed.
g. Weekly Progress Reports: Consultant will complete weekly progress
reports to include:
Weekly dollar amount of work completed
Progress of major items
Engineering daily labor amounts
Daily summary of work , personnel, and equipment.
18
Page 4 of 5
h. Weekly Meeting Agendas & Minutes: Consultant will prepare and transmit
the previous week’s meeting minutes and the following week’s meeting
agenda each week.
i. Prepare Change Orders: Consultant will pr epare change orders as
necessary. One change order is included in the effort estimate.
j. Consultation with Owner: Consultant will keep the Airport informed
throughout the project and answer questions from the Airport as requested.
k. Final Inspection/Acceptance: Consultant will organize and provide record
of a final project inspection, and coordinate acceptance. After the
inspection, Consultant will transmit mi nutes of the final inspection meeting
and verify completion of any remaining punchlist items.
l. Monitor/Review Testing Work: Not included in scope.
m. Project Acceptance and Closeout: Consultant will work with the Airport,
BOA, and contractor to resolve outstanding issues and close out the project.
2. Construction Engineering
a. Construction Staking: Consultant will perform all layout and staking per
project specifications. Anticipated staking tasks include:
i. Removals/sawcuts
ii. Erosion control
iii. Culverts
iv. Base course/asphalt
b. Construction Oversight
i. On-Site Representatives: Consultant will provide full-time
construction observation as de scribed above in the Project
Description. The main tasks perfo rmed by the representatives will
include:
Observe and photograph construction operations
Verify compliance with project specifications
Coordinate miscellaneous field adjustments
Measure quantities
Conduct traffic control inspections
Conduct erosion control inspections
Coordinate testing
Prepare daily progress reports
Prepare weekly progress reports
Prepare pay estimates
Stakeholder coordination
19
Page 5 of 5
ii. Project Manager Site Visits/Meetings: The project manager and/or
assistant project manager will typically visit the site at least weekly
to observe construction progress and conduct weekly progress
meetings.
c. Testing: Not included in scope.
Project Manager: Karl Kemper, PE will be the project manager. Kevin Hahn, PE will
be the assistant project manager.
Resident Project Representative(s): Kelli Petrick is anticipated to be the on-site RPR
on a part-time basis.
DBE Goal: The DBE goal is N/A for this project.
Wage Rates: We have used our 2026 wage rates and 2026 IRS mileage and per diem
rates to prepare the fee proposal. If construction occurs after 2026, updated rates will
need to be accounted for in the contract.
Overhead & Profit: We have used our audited 2024 overhead rate of 179.14% and an
11% profit factor to prepare this proposal.
If additional effort is required for construction services, any amendment for additional
services will include additional fixed fee.
P:\2026\2026.004 - BOA - CWA Flightline Dr Relocation\Admin\Contracts - Working\Construction\CWA Flightline Drive_Construction
Services_Attachment A_Scope.docx
20
Becher‐Hoppe Associates, Inc.
COST PRICE ANALYSIS WORKSHEET
ATTACHMENT B ‐ FEE ESTIMATE
CONSTRUCTION ENGINEERING SERVICES
Page 1 of 1
WisBOA/FAA Funded Projects AIRPORT: Central Wisconsin Airport
2026 Wage Rates PROJECT NUMBER : CWA1023 PREPARED BY: KRK
2024 DOT O/H Rates PROJECT DESCRIPTION: Flightline Drive Relocation CHECKED BY:
DATE: 4/22/26 APPROVED BY:
E S T I M A T E D H O U R S
STAFF Project Project RPR RPR Surv Surv Resource Tech. Direct Direct + Mat'ls Vehicle Drone Robotic GPS Total CONSULTANT PROFIT ON SUM OF PROPOSED
CLASSIFICATION Engr. III Engr. I Crew Crew Manager Assist TOTAL Labor G&A Overhead Supplies miles Total (hr) Actual COSTS ITEMS 1& 2 ALL COST CONTRACT
& WAGE RATES =======> (Karl) (Kevin H) (Kelli) (Kevin B) Chief Asst (Matt) (Jodi) HOURS Costs 179.1400% 0.725 $ $100 $40 $40 Lodging Meals Costs 11% ITEMS AMOUNT
No. WORK ELEMENT 12 3 4 a 4 b 4 c 4 d 4 e 4 f 45 6 1 ‐6 NO.
I. LUMP SUM ITEMS
1 PRE‐CONSTRUCTION TASKS:
a Scoping/Prelim Coord 14 2 4 20 hr. 1,193.18$ 2,137.46$ ‐$ 366.37$ 3,697.01$
b ECIP Coord 41 5 hr. 215.72$ 386.44$ ‐$ 66.24$ 668.40$
c Obtain/Review Constr Schedule 2 2 hr. 97.86$ 175.31$ ‐$ 30.05$ 303.22$
d Prepare, Conduct, Doc't Pre‐Con Mtg 283 13 hr. 586.20$ 1,050.12$ 40 57.00$ 86.00$ 180.00$ 1,902.32$
e SPCD Review and Coordination 21 3 hr. 117.86$ 211.13$ ‐$ 36.19$ 365.18$
f Prepare DTMs 4 4 hr. 195.72$ 350.61$ ‐$ 60.10$ 606.43$
Pre‐Construction Subtotal 16.0 22.0 5.0 ‐ ‐ ‐ ‐ 4.0 47 hr. 2,406.54$ 4,311.07$ ‐$ 40 mi. ‐ ‐ 0 hr. ‐$ 57.00$ 86.00$ $0.00 738.95$ 7,542.56$
2 CONST INSPCT MGMT & REPT PRGRM: 0 hr. ‐$ ‐$ ‐$ ‐$ ‐$
Const Insp Mgmt Subtotal ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 0 hr. ‐$ ‐$ ‐$ 0 mi. ‐ ‐ 0 hr. ‐$ ‐$ ‐$ ‐$ ‐$ ‐$
3 AIRPORT LAYOUT PLAN PACKAGE: 0 ‐$ ‐$ ‐$ ‐$ ‐$
ALP Package Subtotal ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 0 hr. ‐$ ‐$ ‐$ 0 mi. ‐ ‐ 0 hr. ‐$ ‐$ ‐$ ‐$ ‐$ ‐$
OTHER TASKS:
4 Initial Construction Layout/Control/Slope Staking 11 2 12 25 hr. 824.13$ 1,476.35$ 25.00 $ 100 4 2 76.00$ 388.50$ 253.05$ 2,967.03$
5 Record Drawings 26 8 hr. 217.86$ 390.27$ ‐$ 66.89$ 675.02$
Other Tasks Subtotal ‐ 3.0 6.0 ‐ 12.0 12.0 ‐ ‐ 33 hr. 1,041.99$ 1,866.62$ 25.00 $ 100 mi. ‐ 4 2 hr. ‐$ 76.00$ 388.50$ ‐$ 319.94$ 3,642.05$
TOTAL LUMP SUM AMOUNT 16.00 25.00 11.00 0.00 12.00 12.00 0.00 4.00 80.00 hr. 3,448.53$ 6,177.69$ 25.00 $ 140 mi. ‐ 4 2 hr. ‐$ 133.00$ 474.50$ ‐$ 1,058.89$ 11,184.61$ 11,184.61$
% OF TOTAL HOURS 20.0% 31.3% 13.8% 0.0% 15.0% 15.0% 0.0% 5.0% 100.0% cross check 11,184.61$
II. ACTUAL COST ITEMS
1 MANAGEMENT ENGINEERING:
a Project Preparation 28 10 hr. 257.86$ 461.93$ ‐$ 79.18$ 798.97$
b Project Coordination 28 10 hr. 526.20$ 942.63$ ‐$ 161.57$ 1,630.40$
c Interpret plans and specifications 24 6 hr. 177.86$ 318.62$ ‐$ 54.61$ 551.09$
d Supervise Sub‐Consultants 0 hr. ‐$ ‐$ ‐$ ‐$ ‐$
e Review shop dwgs/submittals 48 12 hr. 355.72$ 637.24$ ‐$ 109.23$ 1,102.19$
f Pay estimates/ variation in quantities 24 6 hr. 177.86$ 318.62$ ‐$ 54.61$ 551.09$
g Weekly Progress Reports 5 5 hr. 244.65$ 438.27$ ‐$ 75.12$ 758.04$
h Weekly Meeting Agendas and Minutes 5 5 hr. 244.65$ 438.27$ ‐$ 75.12$ 758.04$
i Prepare change orders 16 7 hr. 360.96$ 646.62$ ‐$ 110.83$ 1,118.41$
j Consultation w/ Owner 5 5 hr. 244.65$ 438.27$ ‐$ 75.12$ 758.04$
k Final inspection/acceptance 284 14 hr. 606.20$ 1,085.95$ 40 57.00$ 86.00$ 186.14$ 1,964.29$
l Monitor/review testing work 0 hr. ‐$ ‐$ ‐$ ‐$ ‐$
m Project Acceptance and Closeout 24 6 hr. 177.86$ 318.62$ 80 58.00$ 54.61$ 609.09$
Construction Management Subtotal 5.0 49.0 32.0 ‐ ‐ ‐ ‐ ‐ 86 hr. 3,374.47$ 6,045.04$ ‐$ 120 mi. ‐ ‐ 0 hr. ‐$ 57.00$ 144.00$ ‐$ 1,036.14$ 10,599.65$
2 CONST. ENGINEERING:
a CONSTRUCTION STAKING:
iii Sawcuts/Removals 13 2 6 hr. 212.73$ 381.08$ 25.00 $ 40 1 69.00$ 65.32$ 753.13$
iv Erosion Control 13 2 6 hr. 212.73$ 381.08$ 25.00 $ 40 1 69.00$ 65.32$ 753.13$
xi Culverts 13 2 6 hr. 212.73$ 381.08$ 25.00 $ 40 1 69.00$ 65.32$ 753.13$
xiii Base course/asphalt 11 0 10 21 hr. 694.93$ 1,244.90$ 25.00 $ 40 8 38.00$ 387.00$ 213.38$ 2,565.21$
Construction
Staking sub‐total ‐ 4.0 ‐ ‐ 19.0 16.0 ‐ ‐ 39 hr. 1,333.12$ 2,388.14$ 100.00 $ 160 mi. ‐ 11.0 0 hr. ‐$ 38.00$ 594.00$ ‐$ 409.34$ 4,824.60$
b CONSTRUCTION OVERSIGHT:
i Resident Project Representatives 84 84 hr. 1,680.00$ 3,009.55$ 100.00 $ 960 20 456.00$ 1,952.00$ 515.85$ 7,257.40$
ii Project Manager Site Visits/Weekly Meetings 10 10 hr. 489.30$ 876.53$ 200 152.00$ 297.00$ 150.24$ 1,813.07$
Construction Engineering Subtotal ‐ 10.0 84.0 ‐ ‐ ‐ ‐ ‐ 94 hr. 2,169.30$ 3,886.08$ 100.00 $ 1160 mi. ‐ ‐ 20 hr. ‐$ 608.00$ 2,249.00$ ‐$ 666.09$ 9,070.47$
c TESTING:
American Engineering Testing (AET) 0 hr. ‐$ ‐$ ‐$ ‐$ ‐$
Testing Subtotal ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 0 hr. ‐$ ‐$ ‐$ 0 mi. ‐ ‐ 0 hr. ‐$ ‐$ ‐$ ‐$ ‐$ ‐$
TOTAL ACTUAL COST AMOUNT 5.00 63.00 116.00 0.00 19.00 16.00 0.00 0.00 219.00 hr. 6,876.89$ 12,319.26$ 200.00 $ 1440 mi. 0 11 20 hr. ‐$ 703.00$ 2,987.00$ ‐$ 2,111.57$ 24,494.72$ 24,494.72$
% OF TOTAL HOURS 2.3% 28.8% 53.0% 0.0% 8.7% 7.3% 0.0% 0.0% 100.0% cross check Fixed Fee 24,494.72$
LUMP SUM AMOUNT = 11,184.61$
ACTUAL COST AMOUNT = 22,383.15$
FIXED FEE AMOUNT = 2,111.57$
MAXIMUM COMBINED SUM = 35,679.33$
LABOR, OVERHEAD & PROFIT ACTUAL COSTS ‐ TRAVEL, MEALS, FIELD SUPPLIES, ETC.
P:\2026\2026.004 - BOA - CWA Flightline Dr Relocation\Admin\Contracts - Working\Construction\CWA Flightline Drive_Construction Services_Attachment B_Fee 20 WORKING DAYS at 4 hours per day
BOA CONSTRUCTION PROPOSAL new
REV 4-08 Printed on 4/22/2026
21
Mailing Address:
100 CWA Drive, Suite 227
Mosinee, WI 54455
Phone: 715-693-2147
Visit us at www.fly-cwa.org
Statement of Cost Reasonableness:
Central Wisconsin Airport
Construction Engineering Services
Date: May 5, 2026
Contract Title: Construction Engineering Services – Flightline Drive
Location: Central Wisconsin Airport
Anticipated AIP Grant: None – State Aid Only
1. In January of 2026, the Central Wisconsin Airport (CWA) completed a competitive solicitation for
Airport Engineering Services through a Request for Qualifications (RFQ) in accordance with FAA
Advisory Circular 150/5100- 14E. This solicitation resulted in a five- year on- call engineering
agreement with Becher Hoppe Associates, inc., for projects beginning prior to January 12, 2031.
2. On February 10, 2026, CWA entered into a design contract with Becher Hoppe to reconstruct
Flightline Drive. That work is complete, the project is bid out, and the project is ready to move
into the construction phase.
3. On April 20 , 2026, CWA requested Becher Hoppe Prepare a scope of work for construction
engineering services for the project.
4. On April 22, 2026, Becher Hoppe provided CWA a scope of work for construction engineering
services for the project along with a detailed breakdown of varying levels of engineering oversight
that could be included in the scope of work . This effort ranged from assuming 30 working days
with 12hrs oversight each day, to 20 working days with 4 hrs oversight each day. After discussing
the details of the project, given its lack of complexity and using state specs instead of FAA
specifications, it was agreed that the lower amount of construction oversight would be acceptable
for this project. Becher Hoppe provided a fee proposal for the scope of work with a total fee of
$36,679.33. The amount of effort included in the proposal was reasonable for the scope of work.
5. On April 30, 2026, after discussing the proposal with the DOT Bureau of Aeronautics (BOA),
CWA informed Becher Hoppe that the fee was acceptable, and asked Becher Hoppe to prepare
the BOA contract for consideration by the Central Wisconsin Joint Airport Board.
6. On May 12 , 202 6, CWA will recommend approval of the construction engineering services
contract with Becher Hoppe, negotiated in good faith, to the Central Wisconsin Joint Airport Board
_____________________________
Mark Cihlar, AAE
Assistant Airport Director
22
Central Wisconsin Airport – Flight Schedule
May 12, 2026
Arrivals – Delta
4982 15: 52 from MSP CRJ-900
4934 20: 58 from MSP CRJ-900
Departures – Delta
5384
06:58 to MSP CRJ-900
4982 16:32 to MSP CRJ-900
Arrivals – American
3557 13:43 from ORD E170
3556 18:02 from ORD E170
3350 23:48 from ORD E170
Departures – American
3346 05:40 to ORD
E170
3987 14:13 to ORD E170
3556 18:32 to ORD E170
Arrivals – United
Service begins October 25, 2026
Departures – United
Service begins October 25, 2026
MSP = Minneapolis
ORD = Chicago O’Hare
Total CWA Flights Daily = 5
Upcoming Charter Schedule
May 4th – Never Forgotten Honor Flight
June 1st – Never Forgotten Honor Flight
July 30th – Sun Country to Caesar’s Omaha
23
CWA Legislative Update – May 2026
Kirby confirms American merger approach, rejection
(Source: Airline Industry Report Smart Brief)
April 27, 2026
United Airlines CEO Scott Kirby confirmed that he initiated merger talks with American Airlines, aiming
to create what he described as an airline capable of delivering exceptional value to customers and
competing with foreign carriers. Despite Kirby's efforts, including discussions with the Trump
administration regarding regulatory approval, American Airlines rejected the proposal outright. The talks
did not progress, as American's leadership publicly declined to engage in negotiations, effectively
shutting down any possibility of a merger in the near future.
A4A Statement on the End of DHS Shutdown
(Source: airlines.org)
April 30, 2026
The following is attributable to Airlines for America (A4A) President and CEO Chris Sununu:
“U.S. airlines are relieved that lawmakers have finally come to an agreement to fund the Department of
Homeland Security, ensuring TSA agents and Customs officers at airports are paid for their hard work to
keep our airports and skies secure. In just a few weeks, the United States will welcome visitors from
around the globe for FIFA World Cup and America 250 celebrations. These federal resources are critical
to ensuring a smooth and successful summer. We urge President Trump to swiftly sign this legislation
into law so tens of thousands of TSA agents and Customs officers can have confidence that they will be
paid on time for the important job they do.
“Congress must now turn to the important task of ensuring that the agencies on the frontlines of
aviation security are never again used as leverage during future government shutdowns. Federal
aviation workers need to have paycheck predictability and financial stability so they can put food on the
table, pay their rent and put gas in their cars. And the traveling public should never again be asked to
bear the brunt of Congress’s inaction.
“Without a regular cadence of appropriations packages and with government shutdowns becoming
more frequent, Congress should now ensure that the federal workers who make aviation successful are
paid for their essential work in the event of any future government shutdowns.”
24
FIN - Budget vs Actual for Organization
Company County of Marathon
Organization Cost Center: 53510 CWA Operations
Period FY2026 - April
Ledger Account Original Budget Actuals (Current Period) Actuals (YTD) Budget Remaining Budget Used (%) Actuals (PY Current
Period)
Actuals (PY YTD)
Revenues
Federal Grants 0 0 0 0 8,248
Parking Fees 1,150,000 100,368 380,849 86,433 319,803
Airport Fees 2,373,000 82,220 713,880 148,733 783,939
Advertising 60,000 0 15,039 10,607 25,359
Local Departments 0 4,268 4,268 0 0
Interest on Investments 45,000 0 0 28,482 108,988
Property Sales 0 0 0 0 18,872
Other Miscellaneous Revenues 100,000 0 0 0 0
Transfer In from Other Funds 398,205 0 0 0 0
Gain/Loss Sales of Fixed Assets 490,000 0 0 0 0
Total Revenues 4,616,205 186,856 1,114,037 3,502,168 24.13% 274,255 1,265,208
Expenditures
Personnel 2,153,029 162,848 668,835 1,484,194 31.06% 141,961 599,898
Salaries and Wages 111,786 480,650
Employee Benefits 963 5,004
Employer Contributions 50,099 183,182
Contractual Services 966,500 22,800 228,890 737,610 23.68% 79,261 302,119
Professional Services 12,417 81,567
Utility Services 5,020 96,890
Repair and Maintenance Services - Other 2,876 12,434
Special Services - IT 1,484 33,349
Other Contractual Services 1,003 4,649
Materials and Supplies 513,500 3,812 213,335 300,165 41.55% 18,443 149,761
Office Supplies 265 2,414
Publications, Subscriptions and Dues 209 12,755
Travel 258 1,918
Operating Supplies 2,131 6,413
Repair and Maintenance Supplies 773 52,137
Other Repairs and Maintenance Supplies 176 11,754
Other Supplies and Expense 0 125,943
Building Materials 38,000 115 379 37,621 1.00% 4,043 4,263
Concrete and Clay Products 0 0
Metal Products 0 265
Wood Products 0 0
Raw Materials 46 46
Fabricated Materials 69 69
Fixed Charges 120,000 0 26,919 93,081 22.43% 925 25,005
Insurance 0 26,248
Other Permits and Regulatory Fees 0 671
Capital Outlay 380,000 104,915 124,022 255,978 32.64% 125,497 363,430
Debt Service 445,176 0 0 445,176 0.00% 0 0
Total Expenditures 4,616,205 294,490 1,262,380 3,353,825 27.35% 370,131 1,444,475
Net Change (107,633) (148,343) (95,876) (179,267)
25