Agenda for Regular Common Council Meeting
City of Superior · Douglas County · meeting of May 19, 2026 · Agendas
Open the original document More from City of Superior
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
1
Regular Council Meeting
May 19, 2026
AGENDA FOR REGULAR COMMON COUNCIL MEETING
CITY OF SUPERIOR, WISCONSIN
May 19, 2026 at 6:30 p.m.
Government Center, Board Room 201, 1316 N 14th Street, Superior, WI 54880
1. PLEDGE OF ALLEGIANCE
2. ROLL CALL
3. PRESENTATIONS AND PUBLIC HEARINGS
4. APPROVAL OF MINUTES
4.1. May 5, 2026 – Regular Common Council Meeting
5. CORRESPONDENCE TO BE FILED
6. MAYOR’S REPORT
6.1. Report from Mayor Paine
6.2. Committee, Board, and Commission Appointments
7. STANDING COMMITTEE REPORTS
7.1. Human Resources Committee (No meeting to report)
7.2. Public Works Committee (Meeting held May 7, 2026)
Report from the Chair.
RECOMMENDATIONS:
7.2.1. Award the Woodstock Sanitary Sewer Improvement Project contract to
Pember Companies, Inc. in the amount of $678,221.60.
7.2.2. Award the Sanitary Sewer Televising Services 2026 – District 1 & 2 contract
to Absolute Pipe, LLC in the amount of $37,488.00.
7.2.3. Award the 2026 Sidewalk Replacement contract to Duluth Concrete LLC in
the amount of $270,816.15.
7.2.4. Revised State Municipal Financial Agreement with the Wisconsin
Department of Transportation for the 2032 Tower Avenue Improvement project
from N 64th Street to Belknap Street.
[20260519R 1]
2
Regular Council Meeting
May 19, 2026
7.2.5. State Municipal Agreement with the Wisconsin Department of Transportation
for Carbon Reduction Program funding to support Emergency Vehicle
Preemption.
7.3. Finance Committee (Meeting held May 12, 2026)
Report from the Chair.
RECOMMENDATIONS
7.3.1. Amendment I to the Land Lease Agreement by and between the City of
Superior and the Board of Regents of the University of Wisconsin System dba
University of Wisconsin-Superior as it Relates to the Lake Superior National
Estuarian Research Reserve Staff Building on Barker’s Island.
7.3.2. Amendment I to the Services Agreement with EasyLiving Services, LLC for
Management Services of the Nemadji Mobile Home Park and Campground.
7.4. Licenses and Fees Committee (No meeting to report)
7.5. Public Safety Committee (No meeting to report)
7.5. Committee of the Whole Meeting (No meeting to report)
8. SPECIAL COMMITTEE REPORTS
8.1. REPORTS WITH RECOMMENDATIONS
8.2. REPORTS SANS RECOMMENDATION
8.2.1. Golf Course Committee (Meeting held April 23, 2026)
Report from the Chair.
8.2.2. Wisconsin Point Committee (Meeting held May 12, 2026)
Report from the Chair.
9. OLD BUSINESS
10. NEW BUSINESS
10.1. O26-4427, an ordinance introduced by the Public Works Department amending City
Code Chapter 112, Traffic Code, Schedule J, Accessible Parking Zones, to remove
parking signage at 1314 Birch Avenue and 2223 Banks Avenue.
10.2. Award the Environmental Services District Lawn Maintenance Service contract to
Vaughan Maintenance Services for an anticipated annual cost of $55,410.00.
[20260519R 2]
3
Regular Council Meeting
May 19, 2026
10.3. Award the Lead Service Line Midtown Phase 1 Project construction contract to
Hanco Utilities, Inc. in the amount of $3,889,795.00.
10.4. Wastewater Connection Cooperative Agreement with Enbridge Energy.
11. BUSINESS BY PUBLIC
Due to the requirements of the Wisconsin Open Meetings laws, only matters placed on this agenda may be approved
by the Council at this meeting.
Citizens who wish to address the council may do so during Business by Public by signing up with the city clerk and
indicating the agenda item they wish to address. All comments by members of the public shall be limited to three
minutes in length. Electioneering or personal attacks are not allowed.
The City of Superior complies with the Americans with Disabilities Act of 1990. If you need an accommodation to
participate in the public meeting process, please contact the City Clerk’s Office at (715) 395 -7200 (OR dial 711 for
Telecommunications Relay Se rvice) prior to the scheduled meeting. The city will attempt to accommodate any
reasonable request depending on the amount of notice received.
In compliance with Wisconsin Open Meetings Law, this agenda was posted on 05/15/2026 at the following locations:
Superior Government Center, Douglas County Courthouse, and online at https://www.superiorwi.gov/agendacenter.
It was also emailed to the Superior Telegram and the Superior Public Library.
[20260519R 3]
1
Regular Council Meeting
May 5, 2026
PROCEEDINGS OF THE REGULAR COMMON COUNCIL MEETING
CITY OF SUPERIOR, WISCONSIN
May 5, 2026 at 6:30 p.m.
Government Center, Board Room 201, 1316 N 14th Street, Superior, WI 54880
1. PLEDGE OF ALLEGIANCE
ROLL CALL
Present: Nick Ledin, Sarah Anderson, Garner Moffat, Joe Radtke, Tylor Elm, Karly Caven,
Mike Herrick, Rob Hering, Lindsey Graskey – 9
Virtual:
Absent: Jack Sweeney – 1
Also Present: Mayor Paine, City Attorney Prell, Chief of Staff Scherf, City Clerk Blunt,
Deputy City Clerk Bacon
2. PRESENTATIONS AND PUBLIC HEARINGS
3. APPROVAL OF MINUTES
3.1. April 21, 2026 – Regular Common Council Meeting
MOTION TO APPROVE, by Councilor Elm, was seconded by President Herrick
and carried.
4. CORRESPONDENCE TO BE FILED
5. MAYOR’S REPORT
5.1. Report from Mayor Paine
6. STANDING COMMITTEE REPORTS
6.1. Human Resources Committee (Meeting held April 20, 2026)
Report from Vice Chair Graskey.
6.2. Public Works Committee (No meeting to report)
7.3. Finance Committee (Meeting held April 30, 2026)
Report from Vice Chair Elm.
7.4. Licenses and Fees Committee (No meeting to report)
7.5. Public Safety Committee (No meeting to report)
[20260519R 4]
2
Regular Council Meeting
May 5, 2026
7.5. Committee of the Whole Meeting (No meeting to report)
8. SPECIAL COMMITTEE REPORTS
8.1. REPORTS WITH RECOMMENDATIONS
8.1.1. Plan Commission (Meeting held April 14, 2026)
Report from Mayor Paine.
8.1.1.1. Review and approve quit claim deed land purchases to the Wisconsin
Department of Transportation for land purchases related to the
Blatnik Bridge project.
8.1.1.2. Review and approve temporary easements to the Wisconsin
Department of Transportation related to the Blatnik Bridge project.
MOTION TO APPROVE 8.1.1.1 and 8.1.1.2, by Councilor
Graskey, was seconded by Vice President Moffat and carried.
8.2. REPORTS SANS RECOMMENDATION
8.2.1. Public Art Commission (Meeting held April 2, 2026)
Report from Councilor Graskey.
8.2.2. Urban Forestry Tree Board (Meeting held April 16, 2026)
Report from Mayor Paine.
9. OLD BUSINESS
10. NEW BUSINESS
10.1. R26-13871, a resolution in support of maintaining fish hatchery operations and fish
stocking levels in Wisconsin.
MOTION TO APPROVE, by Councilor Hering, was seconded by Vice President
Moffat.
There was no objection to opening public comment.
Tim Kotter from the Western Lake Superior Troller’s Association and Superior
Charter Dock at Barker’s Island spoke in favor of the resolution.
MOTION TO REFER to Parks and Recreation Committee by Councilor Radtke,
was seconded by Councilor Elm, and carried.
10.2. Committee, Board, and Commission appointments.
MOTION TO APPROVE, by President Herrick, was seconded by Vice President
Moffat.
Let the record reflect that Mayor Paine is withdrawing the Tourism Development
Commission from the appointments and will bring back to the next meeting.
[20260519R 5]
3
Regular Council Meeting
May 5, 2026
MOTION TO DIVIDE all appointments other than Standing Committees (com-
prised of the Human Resources Committee, Public Works Committee, Finance
Committee, Licenses and Fees Committee, and Public Safety Committee) ap-
pointments by Councilor Graskey.
MOTION TO APPROVE 20 Standing Committee appointments including:
• To the Human Resources Committee appoint Councilor Sweeney,
Councilor Graskey, and Vice President Moffat as members, with
Councilor Caven to serve as an alternate member;
• To the Public Works Committee appoint Councilor Elm, Councilor
Ledin, and Vice President Moffat as members, with Councilor Radtke as
an alternate member;
• To the Finance Committee appoint Councilor Sweeney, Councilor Elm,
and President Herrick as members, with Councilor Ledin as an alternate
member;
• To the Licenses and Fees Committee appoint Councilor Sweeney,
Councilor Graskey, and President Herrick as members, with Councilor
Hering to serve as an alternate member; and
• To the Public Safety Committee appoint Councilor Elm, President
Herrick, and Councilor Anderson as members, with Councilor Radtke as
an alternate member.
Appointments of Standing Committees carried via voice vote.
MOTION TO POSTPONE all of the appointments to the Special Committees and
Commissions appointments to the next regular Council meeting by Councilor
Graskey, was seconded by President Herrick.
MOTION TO DIVIDE by Councilor Elm the Metropolitan Interstate Council,
Parks & Recreation Commission, Plan Commission, and Douglas County
Historical Society.
MOTION TO POSTPONE the appointments to Special Committees and
Commissions EXCEPT the Metropolitan Interstate Council, Parks & Recreation
Commission, Plan Commission, and Douglas County Historical Society by
Councilor Graskey, was seconded by President Herrick and carried via voice
vote.
MOTION TO POSTPONE the appointments to the Metropolitan Interstate
Council, Parks & Recreation Commission, Plan Commission, and Douglas
County Historical Society failed by voice vote.
MOTION TO APPROVE the appointments of:
• To the Metropolitan Interstate Council appoint Councilor Ledin, Vice
President Moffat, and Councilor Elm;
• To the Parks & Recreation Commission appoint Councilor Ledin and
Councilor Radtke;
[20260519R 6]
4
Regular Council Meeting
May 5, 2026
• To the Plan Commission appoint Vice President Moffat, Councilor Elm
and Councilor Graskey; and
• To the Douglas County Historical Society appoint Councilor Caven.
Appointments carried via voice vote.
10.3. R26-13872, a resolution authorizing the allocation of funds from the Economic
Development Fund for Public Education and Community Engagement related to the
utility acquisition.
MOTION TO APPROVE, by Councilor Ledin, was seconded by Vice President
Moffat, and carried.
10.4. R26-13873, a resolution to set a public hearing for the 2026-2030 Community
Development Block Grant Consolidated Plan and the 2026 Action Plan.
MOTION TO APPROVE, by President Herrick, was seconded by Councilor
Elm, and carried.
10.5. Miscellaneous licenses pending department approvals.
MOTION TO APPROVE, by Councilor Graskey, was seconded by Vice
President Moffat, and carried.
11. BUSINESS BY PUBLIC
11.1 Dan Olson, representing the Northern Wisconsin Building & Construction Trades
Council thanked council and city staff for support and participation at the
Workers’ Memorial event.
Meeting adjourned at 7:21 p.m.
Respectfully submitted,
Heidi Blunt, City Clerk
Superior, Wisconsin
Approved this 19th day of May, 2026.
Attest:
____________________________________
Mayor
____________________________________
City Clerk
[20260519R 7]
May 19th , 2026 Council: 5/19/2026
MEMORANDUM
TO: Members of the Common Council
FROM: Mayor Jim Paine
RE: Committee Appointments
Community Development Block Grant Advisory Board
• Re-Appoint Mike Herrick for a 1-year term expiring May 2027.
I am re-appointing Mike Herrick due to his committed advocacy for people with low to
moderate incomes and people experiencing poverty. Mike Herrick has been a leader on
social advocacy and reform for years, especially in the areas of substance abuse prevention
and equitable access to transit.
Communication and Information Technology Committee
• Re-Appoint Councilor Tylor Elm for a 1-year term expiring May 2027.
I am reappointing Tylor Elm due to his years of experience, effective service, and passion for
technology policy. Tylor Elm now has 8 years of experience on the city council and has
served as President and Vice-President. He proposed the creation of the CIT, served as a
founding member and currently serves as chair. He owns an award-winning technology
business and volunteers for numerous civic organizations and boards.
• Appoint Councilor Karly Caven for a 1-year term expiring May 2027.
I am appointing Karly Caven due to her demonstrated passion and interest in Superior’s
fiber optic broadband network. In our early conversations, Councilor Caven has proven
that she has the sufficient technical knowledge and vision to effectively serve on this
committee.
Golf Course Committee
• Appoint Scott Gordon for a 1-year term expiring May 2027.
I am re-appointing Scott Gordon to a citizen seat on the golf course committee due to his
passion for the sport of golf, his commitment to the Nemadji Golf Course, and his innovative
and effective leadership during his past service to the City of Superior. Scott Gordon spent
most of his career with the Superior Fire Department, starting as a firefighter and retiring as
Office of the Mayor
Jim Paine, Mayor
Becky Scherf, Chief of Staff to the Mayor
Phone: (715) 395-7212
Fax: (715) 395-7590
TDD: (715) 395-7521
E-mail: mayor@ci.superior.wi.us
1316 North 14th Street, #301
Superior, WI 54880
Website:
www.ci.superior.wi.us
the Fire Chief. In addition to his many achievements in that role, he was known for building
positive relationships while pushing his colleagues to set ambitious goals.
• Appoint Councilor Rob Hering for a 1-year term expiring May 2027.
I am appointing Rob Hering to the Golf Course committee due to his passion for outdoor
recreation and his professional knowledge of the field of outdoor sports. His diverse
professional experiences will make him a valuable voice on the committee.
• Appoint Councilor Jack Sweeney as an alternate member for a 1-year term expiring May
2027.
I am appointing Jack Sweeney due to his long service on the city council and his
demonstrated aptitude for public finance, municipal operations, and the sport of golf. If
confirmed, Councilor Sweeney will be the most talented golfer on the golf course
committee.
Library Board
• Appoint Mary Johnson-Garay for a three year term expiring in 2029.
I am re-appointing Mary Johnson-Garay due to her lifelong commitment to education,
local volunteering, and the Superior Public Library. Her experience as a teacher and a
long time volunteer at the library have made her an effective voice on the board.
• Appoint Julie Tersteeg to a 3 year term expiring in 2029
I am appointing Julie Tersteeg because she currently serves on the board, but as a school
district representative. Following her retirement from public education, she will no longer
be eligible for that seat but her continued service will allow the board to retain her wealth
of knowledge and commitment to the library.
Marina Committee
• Appoint Councilor Rob Hering for a 1-year term expiring May 2027.
I am appointing Rob Hering to the Golf Course committee due to his passion for outdoor
recreation and his professional knowledge of the field of outdoor sports, particularly
recreational boating and fishing. His diverse professional experiences will make him a
valuable voice on the committee.
Mayor’s Commission on Disabilities
• Re-Appoint Councilor Sarah Anderson for a 1-year term expiring in May 2027.
I am appointing Sarah Anderson due to her long service as a mental health professional and
her stated goals of improving accessibility for all residents of the city. Sarah Anderson joined
the city council this spring and will serve on the public safety committee, allowing her the
opportunity to translate the goals and recommendations of the MCOD into formal city policy.
Redevelopment Authority
• Appoint Councilor Rob Hering for a 1-year term expiring May 2027.
I am appointing Rob Hering to the Redevelopment Authority because he has stated that
economic development and business growth are goals of his and his personal and
professional background will allow him to meaningfully participate in the work of the
RACS.
Superior Business Improvement District
• Re-appoint Natalie Harris to a 3-year term expiring in May of 2029.
I am re-appointing Natalie Harris due to her excellent service on the SBID board. Her
business, Superior Waffles, plays a vital role in the image and energy of Tower ave and
she serves as a mentor and leader for the surrounding neighborhood.
• Appoint Barb Peterson to a 3-year term expiring in May of 2029.
I am appointing Barb Peterson to the SBID on the recommendation of the Executive
Director. She is the owner and operator of Pioneer Abstract and Title, a business that has
served Superior’s downtown region for several years. Ms. Peterson will provide valuable
insight as one of very few professional service providers on the board.
Tourism Development Commission
• Appoint Councilor Nicholas Ledin to a 1-year term expiring May 2027
I am appointing Nicholas Ledin due to his long service on the Superior City Council, where
he has served as President, Vice-President, and the Chair of the Parks, Recreation, and
Forestry Commission. Mr. Ledin’s long experience with parks and outdoor recreation gives
him valuable insight into the attractions that make Superior an excellent place to visit. As a
lifelong resident, he also offers a valuable perspective on the brands and images that our city
should present to visitors.
• Re-Appoint Jenice Meyer for a 1-year term expiring May 2027.
I am appointing Jenice Meyer due to her experience with branding, marketing, and economic
development. Jenice Meyer currently works as an independent consultant advising the
Development Association and other community organizations and businesses. In her
previous role at UW-Superior, she played a major role in developing the university’s marking
and branding efforts and assisted the City of Superior in community engagement surveys and
forums that helped establish community priorities for economic and cultural development.
Her role with the Development Association will allow her to effectively speak on behalf of
the private sector in tourism planning and promotional decisions
• Re-Appoint Natalie Chin for a 1-year term expiring May 2027.
I am appointing Natalie Chin due to her experience as the Climate and Tourism Outreach
Specialist at the University of Wisconsin Sea Grant/Water Resources Institute. Chin has a
PhD in Philosophy from Perdue University and serves on the Wisconsin Council on Tourism.
• Re-Appoint Marquise Slay for a 1-year term expiring May 2027.
I am appointing Marquise Slay as the hotel-motel representative of the Tourism Commission
Slay works as the regional sales manager for Oliver Companies, Inc. Slay has a Bachelors
Degree in Business Administration from the University of Wisconsin Superior and serves on
the Douglas County Board of Trustees and is the District Assistant Governor for the area’s
Rotary.
• Appoint Councilor Joe Radtke for a 1-year term expiring May 2027.
I am appointing Joe Radtke to the Tourism Commission due to his long career with the
Superior Marina, working directly with tourists and visitors to Superior. His unique insight
into what attracts people to our city and the impressions they create once they arrive will
improve the perspective of the commission. His service within the community will allow him
to strengthen partnerships between the tourism commission and other community
organizations.
• Re-Appoint Councilor Lindsey Graskey for a 1-year term expiring May 2026.
I am reappointing Lindsey Graskey due to her extensive experience and passion for
promoting Superior and the surrounding region through municipal development and creative
marketing. Lindsey Graskey is a founding member and chair of the TDC.
Public Art Commission
• Re-Appoint Heidi Blunt for a 3 year term expiring May 2029
• Re-Appoint Paul Robinson for a 3 year term expiring May 2029
• Re-Appoint Carolyn Nelson-Kavajecz for a 3 year term expiring May 2029
Superior Housing Authority
• Appoint Joe Radtke for the remainder of a 5 year term expiring in May of 2027.
I am appointing Joe Radtke to the SHA due to his demonstrated commitment to
serving people in poverty and providing affordable housing in Superior. Mr. Radtke
has strong relationships with other members of the authority and the business
community which, combined with his role on the city council, allow him to facilitate
relationships and partnerships that can improve services to people that require
supportive housing and services.
Wisconsin Point Committee
• Appoint Councilor Mike Herrick for a 1-year term expiring May 2027.
• Appoint Mayor Jim Paine as an alternate member for a 1 year term expiring in
May 2027
Jim Paine is the Mayor of Superior and will advise the committee and vote in cases where
other members cannot attend.
Thank you.
jp
PUBLIC WORKS COMMITTEE – 5/07/2026 Meeting (Meets monthly on 1st Thursday at 5 p.m.) Page 1 of 4
*Attended virtually
PUBLIC WORKS COMMITTEE MINUTES
May 7, 2026 Regular Meeting
The meeting was called to order by Councilor Ledin at 5:04 p.m. on May 7, 2026, in Government
Center Room 204.
COMMITTEE MEMBERS: Nick Ledin, Garner Moffat, Tylor Elm, Joe Radtke (alt.)
1. ROLL CALL
Members Present: Nick Ledin, Garner Moffat, Tylor Elm, Joe Radtke
City Staff Present: Chris Carlson, Kara Czapinski, Jim Paine, Dave Pollock,
Others Present: Brent Gunderson, Shelley Nelson, Dan Olson, Bill Fennessy,
Jeff Goetzman
2. APPROVAL OF MINUTES
2.1. Public Works Committee (Meeting held April 2, 2026)
MOTION by Moffat, second by Elm and carried to approve the minutes from April 2,
2026.
3. OLD BUSINESS
3.1. Discussion of a report submitted by Raftelis Financial Consultants evaluating the acquisition
of utilities operated by Superior, Water, Light & Power.
Mayor Paine reported that there have been no major updates since the last meeting
concerning the evaluation by Raftelis Financial consultants on the acquisition of utilities,
and this topic will continue to be a regular agenda item for updates. He announced plans for
a series of public information sessions, including town halls and informal debates, to
communicate findings to the public, with an initial emphasis on the water utility due to the
complexities and incomplete nature of the electric and gas reports. Paine noted that the
acquisitions of electric and gas utilities are more intricate than that of water, citing factors
such as supply sources, the scale of the network, and infrastructure that extends beyond city
boundaries, which contribute to a longer timeline for the final reports. The committee
deliberated on whether to conduct joint or separate public meetings for all three utilities,
with Paine underscoring the importance of obtaining council input and additional
information before making any recommendations.
3.2. Recommendation to approve Chapter 58, Article IV Recyclable Waste Materials Ordinance
revisions.
Director Carlson indicated that the revisions to the ordinance clearly specify that
polystyrene foam is not recyclable and detail which plastic numbers are excluded, thereby
ensuring the city's recycling program complies with state regulations. These modifications
primarily serve to clarify existing documentation and do not change the current recycling
practices.
[20260519R 8]
PUBLIC WORKS COMMITTEE – 5/07/2026 Meeting (Meets monthly on 1st Thursday at 5 p.m.) Page 2 of 4
*Attended virtually
MOTION by Elm, second by Moffat and carried to approve Chapter 58, Article IV
Recyclable Waste Materials Ordinance revisions.
4. NEW BUSINESS
4.1. Election of Officers
4.1.1. Election of Chair
MOTION by Elm, second by Moffat and carried to nominate Nick Ledin as
Chair.
4.1.2. Election of Vice-Chair
MOTION by Ledin, second by Elm and carried to nominate Garner Moffat as
Vice-Chair.
4.2. Recommendation to award the Woodstock Sanitary Sewer Improvements project to Pember
Companies for $678,221.60.
Dave Pollock indicated that the project entails the replacement of approximately 1,800 linear
feet of deteriorating sanitary sewer across four segments. This initiative faces several
challenges, including narrow streets, limited right-of-way, and the need to maintain traffic
flow. MSA Professional Services has proposed a trenchless pipe bursting method, which is
advantageous for minimizing pavement disruption and is well-suited to the area's clay soils
and curved sewer alignments.
During discussions, members expressed concerns regarding the choice between patching
small pavement areas and implementing full overlays. Staff clarified that any patched
sections would be restored to meet city standards, with the possibility of future overlays if
necessary. The committee also reviewed competitive bids and noted that the chosen
contractor employs a different subcontractor for the pipe bursting process. Staff assured that
this subcontractor has a history of satisfactory performance, alleviating any concerns about
the selection. The new pipes are anticipated to have a lifespan of 50 years or more,
significantly improving upon the original infrastructure, which dates back to the 1920s, and
building on recent sewer replacements in the vicinity following previous collapses.
MOTION by Elm, second by Moffat and carried to award the Woodstock Sanitary
Sewer Improvements project to Pember Companies for $678,221.60.
Bill Fennessey left the meeting at 5:22 p.m.
4.3. Recommendation to award Sanitary Sewer Televising Services 2026 Sanitary District 1 & 2
to Absolute Pipe for $37,488.00.
Pollock indicated that the regulations set by the Wisconsin Department of Natural Resources
mandate an annual inspection of 7.2 miles of sewer lines, with a comprehensive review
required every ten years across all districts. This particular contract pertains to a section that
is due for inspection and is also affected by forthcoming bridge construction. The committee
[20260519R 9]
PUBLIC WORKS COMMITTEE – 5/07/2026 Meeting (Meets monthly on 1st Thursday at 5 p.m.) Page 3 of 4
*Attended virtually
deliberated on the possibility of conducting these inspections internally; however, staff
highlighted that only minor, reactive inspections are feasible in-house due to constraints
related to equipment and staffing.
MOTION by Moffat, second by Ledin and carried to award Sanitary Sewer Televising
Services 2026 Sanitary District 1 & 2 to Absolute Pipe for $ 37,488.00.
4.4. Recommendation to award the 2026 Sidewalk Replacement contract to Duluth Concrete
LLC. for $270,816.15.
Director Carlson announced that the contract encompasses sidewalk replacements
throughout the city, focusing on key connections at Hill Avenue and Henry Cohen Drive,
along with enhancements to bus stop accessibility. The selection of sidewalks for
replacement is based on their condition ratings, the need to close gaps, prioritization of high-
traffic areas, and feedback from the public. Residents are encouraged to report any sidewalk
issues for evaluation. Additionally, a separate initiative will tackle tripping hazards by
grinding down uneven sidewalk edges, particularly in the Tower Avenue vicinity, with a
contractor set to undertake this work during the summer.
MOTION by Elm, second by Moffat and carried to award the 2026 Sidewalk
Replacement contract to Duluth Concrete LLC. for $270,816.15.
Brett Gunderson left the meeting at 5:27 p.m.
4.5. Recommendation to approve the revised State Municipal Financial Agreement with the
Wisconsin Department of Transportation for the 2032 Tower Avenue Improvement project
from N64th Street to Belknap Street.
Director Carlson announced that the 2032 project encompasses a mill and overlay, concrete
repairs, sidewalk replacements, and upgrades to traffic signals, with the agreement subject
to ongoing modifications as design specifics are finalized. This state-managed initiative will
see the Department of Transportation oversee the bidding and construction phases, while the
city will bear certain expenses related to parking lanes, sidewalks, and landscaping, with
cost distributions being adjusted as the project evolves. Public feedback highlighted worries
about the worsening condition of roads and the possibility of accelerating repairs ahead of
bridge closures. City staff addressed these concerns, outlining the difficulties in hastening
the work and the potential for transferring financial burdens from the state to the city. Mayor
Paine acknowledged that an interim project could be feasible if conditions deteriorate
further, but emphasized that it would necessitate prioritization and budget adjustments from
the council, noting that the city has previously undertaken similar projects when required.
MOTION by Moffat, second by Elm and carried to approve the revised State
Municipal Financial Agreement with the Wisconsin Department of Transportation for
the 2032 Tower Avenue Improvement project from N64th Street to Belknap Street.
[20260519R 10]
PUBLIC WORKS COMMITTEE – 5/07/2026 Meeting (Meets monthly on 1st Thursday at 5 p.m.) Page 4 of 4
*Attended virtually
4.6. Recommendation to approve the State Municipal Agreement with the Wisconsin
Department of Transportation for Carbon Reduction Program funding to support Emergency
Vehicle Preemption.
Director Carlson announced that the city has secured a grant from the Carbon Reduction
Program, which will cover the materials needed for Emergency Vehicle Preemption at 21
intersections. The city will finance the installation of the required signal equipment. This
arrangement will guarantee full preemption for police and fire vehicles, with secondary
priority access granted to transit and other eligible vehicles.
MOTION by Elm, second by Moffat and carried to approve the State Municipal
Agreement with the Wisconsin Department of Transportation for Carbon Reduction
Program funding to support Emergency Vehicle Preemption.
4.7. Notice of Surplus Equipment Auction Sales. – Received and filed.
5. RECURRING BUSINESS
5.1 ESD Director’s Update – Received and filed.
ESD successfully managed a significant rainfall event without any overflows, thanks to
efficient emergency operations and infrastructure management. The primary concern arose at
Elm St., where a deteriorating culvert led to localized flooding. Plans are in place to replace
this culvert in the upcoming budget cycle to mitigate future issues.
Director Update –
5.1.1 Bids for the replacement of lead service lines in the Midtown area are due May 8th.
This project operates under a tight schedule, necessitating direct approval from the
council by May 31st to meet grant stipulations.
5.1.2 Tower Avenue, situated between Belknap Street and North 28th Street, is progressing
well ahead of the planned overlay. The plan is to have the contractor address the lead
service line installation before proceeding with this work.
5.2 Future Agenda Items
5.2.1 Discuss Water Utility Acquisition
5.3 Confirm the next meeting date as June 4, 2026, at 5:00 p.m. in Room 204 of the
Government Center.
6 ADJOURNMENT
Councilor Ledin announced the meeting adjourned at 6:01 p.m.
Respectfully submitted by Kara Czapinski
[20260519R 11]
[20260519R 12]
[20260519R 13]
CONTRACT VOLUME &
BIDDING DOCUMENT- 2026
Woodstock Sanitary Sewer
Improvements
CITY OF SUPERIOR, WISCONSIN
Public Works Director
Chris Carlson – Director
Environmental Services Division of Public Works
Steve Roberts – Director
David Pollock – Collection Systems Engineering & Operations Manager
Bid #26-11-ESD
Project Code: 26WOOD
[20260519R 14]
Woodstock Sanitary Sewer Improvements 2
Table of Contents
1. ADVERTISEMENT TO BID .........................................................................................3
2. INSTRUCTIONS TO BIDDERS ....................................................................................4
3. BID PROPOSAL .............................................................................................................7
4. SUBCONTRACTORS AND SUPPLIERS LISTING - ................................................10
5. ADDENDA ACKNOWLEDGMENT ..........................................................................11
6. BID BOND ....................................................................................................................12
7. BIDDER'S PROOF OF RESPONSIBILITY ................................................................13
8. AFFIDAVIT OF ORGANIZATION AND AUTHORITY ..........................................15
9. AFFIDAVIT OF COMPLIANCE .................................................................................16
10. CONTRACT .................................................................................................................20
10.1 Preamble ....................................................................................................................... 20
10.2 Article I - Scope of Work ............................................................................................. 20
10.3 Article II - Contract Price ............................................................................................. 20
10.4 Article III - Component Parts of this Contract ............................................................. 21
10.7 Non-Discrimination ...................................................................................................... 22
10.8 Authority ...................................................................................................................... 22
10.9 Signatures ..................................................................................................................... 22
11. PERFORMANCE AND PAYMENT BOND ...............................................................23
12. GENERAL SPECIFICATIONS ....................................................................................24
12.1 GENERAL ................................................................................................................... 24
12.2 SUBSTITUTIONS ....................................................................................................... 24
12.3 INSURANCE REQUIREMENTS ................................................................................ 24
12.3.5 INDEMNIFICATION .................................................................................................. 26
12.4 PERFORMANCE AND PAYMENT BOND .............................................................. 27
12.5 LICENSES, PERMITS AND APPROVALS .............................................................. 27
12.6 OBSTRUCTION OF STREETS AND SIDEWALKS ................................................ 27
12.7 PROSECUTION AND PROGRESS ............................................................................ 27
12.8 COORDINATION OF CONTRACTORS ................................................................... 28
12.9 CHANGE ORDERS ..................................................................................................... 28
12.10 TIME PENALTIES ...................................................................................................... 28
12.11 GUARANTEE .............................................................................................................. 29
12.12 AS-BUILTS and WARRANTY DOCUMENTS ......................................................... 29
12.13 CONTROL OF THE WORK ....................................................................................... 29
12.14 SCOPE OF WORK ...................................................................................................... 30
12.15 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC ......................... 30
12.16 SAFETY AND SECURITY ......................................................................................... 30
12.17 PRE-CONSTRUCTION CONFERENCE ................................................................... 31
12.18 PROJECT DOCUMENT SUBMISSIONS .................................................................. 31
13. ENGINEER CERTIFICATION ....................................................................................32
14. SPECIAL PROVISIONS ..............................................................................................33
15. CONTRACT CHANGE ORDER ...............................................................................228
Project Plan Set dated March 23, 2026
[20260519R 15]
Woodstock Sanitary Sewer Improvements 3
1. ADVERTISEMENT TO BID
Woodstock Sanitary Sewer Improvements
Sealed bids will be received by the City of Superior, Public Works Department at 1316
North 14th Street - 2nd Floor (Suite 200), Superior, WI 54880. Bids will be publicly
opened and read aloud in the City offices as follows:
Virtual option: Microsoft Teams Meeting ID: 285 084 902 343 91 Passcode: XD37pX7v
Bid Opening: Tuesday, April 28, 2026 at 1:00 PM
Bid Project: Approximately 1,800 lineal feet of combined sewer replacement by
pneumatic pipe bursting and approximately 20 lineal feet of combined sewer and 80
lineal feet of storm sewer replacement by open-cut construction. Work includes sewer
utility structures, appurtenances, laterals, manhole rehabilitation, erosion control, traffic
control, asphalt and concrete pavement patching and turf restoration.
All bids must be prepared in the form provided and submitted in accordance with the Instructions
to Bidder.
Specifications may be obtained through the internet at www.DemandStar.com. Bidding
documents may be viewed at the City of Superior, 1316 North 14th Street - 2nd Floor, Superior,
Wisconsin (gundersonb@superiorwi.gov), at the Minnesota Builders Exchange (mbex.org),
Builders Exchange of Wisconsin (bxwi.com), Northwest Regional Builders Exchange
(nwrbx.com), and LaCrosse Builders Exchange (laxbx.com).
The contractor shall submit a list of their subcontractors as a part of their proposal, which list
shall not be added to or altered without the written consent of the City of Superior, and as
specified in 66.0901 Wisconsin Statutes.
The City of Superior encourages the participation of women and minority owned businesses.
The City of Superior reserves the right to reject any or all bids, to waive irregularities, or to
accept such bids, as in the opinion of the City, will be in its best interests.
Todd Janigo Steve Roberts
Director of Public Works Director of Environmental Services Division
Daily Telegram: Saturday March 28, 2026, Saturday April 4, 2026, Saturday April 11, 2026,
[20260519R 16]
Woodstock Sanitary Sewer Improvements 4
2. INSTRUCTIONS TO BIDDERS
2.1 Questions regarding this bid may be directed at the City of Superior as follows:
Project specifications: Jeff Goetzman, jgoetzman@msa-ps.com MSA Professional
Services, Inc. (218) 216-7281
Bidding documents: Jane Darwin, Contract Analyst, darwinj@superiorwi.gov.
2.2 Method of Bidding: The only acceptable method of bidding a contract with the City of
Superior, Wisconsin, is described as follows and must be strictly complied with. The City
reserves the right to determine the low Bidder on the basis of the Base Bid alone or the
Base Bid plus any alternates or combinations of alternates, at the City’s discretion.
2.3 Bid Packet Components: Each item listed must be included with the bid submission:
a) Bidders must file a PROPOSAL OR BID on the form the City has prepared. (See BID
PROPOSAL Section 3.) Bids shall be valid for 60 days.
b) Bidders shall be required to submit a list of SUBCONTRACTORS AND SUPPLIERS
with their proposal in accordance with Section 66.0901(7), Wisconsin Statutes, and
subsequent amendments. Such list shall not be added to nor altered without the written
consent of the City of Superior. (See SUBCONTRACTORS AND SUPPLIERS
LISTING Section 4.)
c) Bidders shall be required to submit an ADDENDA ACKNOWLEDGMENT with their
proposal. Such acknowledgment shall note acknowledgment of receipt of all addenda. If
no addenda were issued, the bidder shall so indicate and sign document. (See
ADDENDA ACKNOWLEDGMENT Section 5.)
d) The bidder must file, at the time of the opening of the bids, either a BID BOND or a
certified check in the amount of at least five percent (5%) of the total bid, conditioned
that if the bidder is successful bidder will, within the time allotted by the City, file a
properly executed contract and performance bond as per Wisconsin Statutes 62.15(3).
(See BID BOND Section 6.)
e) The bid proposal must have attached to it the BIDDER’S PROOF OF
RESPONSIBILITY identifying the bidder’s qualifications. (See BIDDER’S PROOF OF
RESPONSIBILITY Section 7.). Prospective bidders are required to furnish a statement
of financial ability, equipment and experience in the work prescribed in said public
contract in accordance with the provisions of Section 66.0901(2) of the Wisconsin
Statutes at the time of the opening of the bids. The object of the questionnaire and the
pre-qualification of bidders is to enable the City to have sufficient information regarding
financial ability, equipment and experience to reduce the risks involved in awarding
contracts to parties not qualified to perform them and to select those contractors qualified
to properly complete the work proposed.
f) The bid proposal must have attached to it the AFFIDAVIT OF ORGANIZATION
AND AUTHORITY identifying a corporation, partnership or sole trader. The affidavit
must contain a sworn statement that the bidder has examined and carefully prepared the
proposal from the plans and specifications and has checked the same in detail per Section
66.0901 (7), Wisconsin Statutes. (See AFFIDAVIT OF ORGANIZATION &
AUTHORITY Section 8.)
[20260519R 17]
Woodstock Sanitary Sewer Improvements 5
g) The bid proposal must have attached to it the AFFIDAVIT OF COMPLIANCE
swearing compliance with the criteria set forth in the Responsible Bidder Criteria in the
City Code of Ordinances, Chapter 2, Article XII from the Contractor and all sub-
contractors. (See AFFIDAVIT OF COMPLIANCE Section 8).
h) The bid proposal packet shall be placed in an envelope and shall be sealed. ON THE
ENVELOPE SHALL BE, plainly written: the DATE OF THE BID OPENING, the
TITLE OF THE PROJECT and THE NAME OF BIDDER. Such envelope shall be
addressed and delivered to: The City of Superior, 1316 North 14th Street - 2nd Floor
(Suite 200), Superior, Wisconsin, BEFORE the time and date specified for opening bids
as listed in the Advertisement to Bid.
i) Wisconsin’s Public Records Law creates a statutory presumption in favor of complete
access to public records and the City of Superior endeavors always to conduct its
municipal affairs in strict compliance with Wisconsin Statutes §§ 19.31-19.39. Any
entities or individuals who submit materials to the City of Superior in response to this
request should avoid submittal of any proprietary information.
2.4 Work Site and Contract Document Examination: Bidders must satisfy themselves, by
examination of the contract documents, the work site and the conditions and obstacles to
be encountered in the field, and by such other means as may be necessary, as to the
accuracy of the schedule of quantities of the work to be done and the intent of said
contract documents. After the submission of the proposal, no complaint or claim that
there was any misunderstanding as to the quantities, conditions or nature of the work will
be entertained and no extra compensation shall be allowed by reason of any matter or
thing concerning which such bidder might have informed himself prior to the bidding.
Upon award of bid, the Contractor must execute the required Performance and Payment
Bond in the total amount of the bid. (see PERFORMANCE AND PAYMENT BOND
Section 11.)
2.5 Time of Performance: When not otherwise specified, the bidder must state in the
proposal, the least number of calendar days (counting weekends and holidays), after date
to commence work given in the Notice to Proceed, in which bidder will start construction
and the number of calendar days (counting weekends and holidays), after date to
commence work given in the Notice to Proceed, in which bidder will fully complete the
work as specified. The bidder should make do allowance for all probable difficulties
which may be encountered. In the event of failure completing the work within the time
stated or otherwise specified, liquidated damages will be assessed as provided in the
specifications.
2.6 Quantities: The estimated quantities of the work are the result of careful calculations but
are not to be considered as final. Such estimates will be used as a basis for determining
the lowest bidder. After the contract is awarded, the quantity of work listed under any
item, or all items, may be increased or decreased according to the specifications at the
discretion of the City of Superior without in any way invalidating the bid price (see
CONTRACT CHANGE ORDER Section 15).
[20260519R 18]
Woodstock Sanitary Sewer Improvements 6
2.7 Bid Prices: Bidders must submit a bid price, in accordance with the specifications, for
each item of the job or branch, in compliance with the bidding units specified for the
quantities listed in the proposal. Bid prices must be written out in words and entered in
figures. In case of conflict, the written word prices will prevail. Totals must be shown
based on unit cost and quantity. In case figures do not match, the figure resulting in the
lower price shall be deemed the price intended and applicable.
2.8 Inadequacies and Omissions: The City of Superior will not be responsible for verbal
information or statements made by representatives of the Engineering Department, or any
other department for which work will be performed. Bidders shall bring any
inadequacies, omissions or conflicts to the attention of the City of Superior before the due
date for bids. Prompt written clarification will be immediately supplied to all bidders by
Addenda before the due date for bids and each Addendum shall be acknowledged on the
Addenda Acknowledgment form. Failure to so request clarification of any inadequacy,
omission or conflict will not relieve the Contractor of responsibility.
2.9 No Double Bidding: Two (2) or more proposals under different names will not be
accepted from one firm or association.
2.10 Partial Bidding: Bidders must quote on all items appearing on the bid forms unless
specific directions in the advertisement, on the bid form, or in the special specifications
allow for partial bids. Failure to quote on all items, unless specifically exempted as set
forth above, shall disqualify the bid. When quotations on all items are not required,
bidders shall insert the words "no bid" where appropriate.
2.11 Right of Waiver or Rejection: The City reserves the right to reject any or all bids or
waive any defects found in bids or proposals submitted.
2.12 Wage Rates: This Project is not subject to Prevailing Wage Rates.
2.13 Pre-Bid Conference: Non-mandatory scheduled for Thursday, April 16, 2026, 10:00
A.M. at The City of Superior, 1316 North 14th Street - 2nd Floor (Suite 217) or virtually.
https://teams.microsoft.com/meet/28508490234391?p=9jnJKyBqoDkQCNaTaP
Meeting ID: 219 358 557 159 34 Passcode: kv3tc2Wt
Deadline for questions is Tuesday, April 21st, 12pm. All questions should be emailed
to the City of Superior at: gundersonb@superiorwi.gov. The final addendum(s) will be
issued by Wednesday, March 22nd, 2pm.
2.14 Contract Documents: Upon award of the bid the contract documents will consist of the
Advertisement to Bid, Instructions to Bidders, Bid Proposal, Subcontractors & Suppliers
Listing, Addenda Acknowledgment, Bid Bond, Bidder's Proof of Responsibility,
Affidavit of Organization & Authority, Contract, Affidavit of Compliance(s),
Performance and Payment Bond, Certificate of Insurance as required, General
Specifications, Special Provisions, Plan Set dated 3/23/26, and include all other herein
bound attachments and modifications thereof incorporated in the documents as prepared
by the City of Superior.
[20260519R 19]
[20260519R 20]
[20260519R 21]
[20260519R 22]
[20260519R 23]
[20260519R 24]
[20260519R 25]
[20260519R 26]
[20260519R 27]
[20260519R 28]
[20260519R 29]
[20260519R 30]
[20260519R 31]
[20260519R 32]
[20260519R 33]
Woodstock Sanitary Sewer Improvements 17
ORDINANCE #O20-4178
ORDINANCE INTRODUCED BY MAYOR JIM PAINE REPEALING SECTION 2,
ARTICLE XII PUBLIC WORKS PROJECTS AND RECREATING SECTION 2,
ARTICLE XII RESPONSIBLE CONTRACTOR CRITERIA
The Common Council of the City of Superior, Wisconsin, does ordain as follows:
SECTION 1. Chapter 2, Article XII, Public Works Projects of the City Code of Ordinances is
hereby repealed and recreated as follows:
ARTICLE XII. RESPONSIBLE CONTRACTOR CRITERIA
Section 2-468. Purpose. Pursuant to Wis. Stats. § 66.0901, whenever the city lets public work by
contract, the contract must be awarded to the lowest qualified responsible contractor. What
constitutes a qualified responsible contractor is a determination that requires the exercise of
discretion by the city and its departments, officials or employees under reasonably consistent
responsible contractor criteria when exercising its discretion.
Section 2 -469. Definitions. In this section, the following definitions shall apply.
“Contractor” means a person, corporation, partnership or any other business entity that performs
work on a public works contract as a general contractor, prime contractor or subcontractor at any
tier.
“Apprenticeship program” means an apprenticeship program that is currently approved by the U.S.
Department of Labor or a state apprenticeship agency and has graduated apprentices to
journeyperson status for three years.
“Public works contract” means a contract for the construction, alteration, execution, repair,
remodeling or improvement of a public work or building, where the contract is in excess of
$25,000 and is require d to be bid pursuant to Wis. Stats. § 59.52(29).
“Qualified contractor (Bidder)” means a person, corporation, partnership or any other business
entity that meets the requirements specified in this ordinance as well as the criteria specified in
Wis. Stats. 16.855 (9m) (b) (1) (a & b)
Section 2-470 Responsible Contractor Criteria. In order to be a qualified responsible
contractor for purposes of being awarded a public works contract, the contractor must meet the
following criteria.
a) The contractor maintains a permanent place of business.
b) The contractor is authorized to do business in the State of Wisconsin.
c) The contractor, or agent, partner, employee or officer of the contractor, is not
debarred, suspended, proposed for debarment or declared ineligible from
contracting with any unit of federal, state or local government.
d) The contractor is in compliance with provisions of Section 2000e of Chapter 21,
Title 42 of the United States Code and Federal Executive Order No. 11246 as
amended by Executive Order No. 11375 (known as the Equal Opportunity
Employer provisions).
[20260519R 34]
Woodstock Sanitary Sewer Improvements 18
e) The contractor has general liability, workers’ compensation, automobile insurance
and unemployment insurance.
f) The contractor has complied with all provisions of any prevailing wage laws and
federal Davis-Bacon related Acts, and the rules and regulations therein, for
projects undertaken by the contractor that are covered by these laws, for the past
five (5) years.
g) The contractor participates in an apprenticeship program as referred in section 2-
46 9, if the contractor employs more than two (2) employees.
h) The contractor has a written substance abuse prevention program meeting the
requirements of Wis. Stat. §103.503.
i) The employees who will perform work on the project are properly classified as
employees or independent contractors under all applicable state and federal laws.
j) The contractor has not been the subject to any investigation, order or judgement
regarding the construction industry from a state or federal agency or court
concerning an employment practice, including but not limited to, classification of
employees, unemployment insurance, discrimination or payroll fraud. If the
contractor has been the subject of any of the aforementioned, the contractor
must provide copies of the investigation, order or judgement and may be
disqualified.
k) The contractor’s employees who will perform work on the project are:
1) Covered under a current workers’ compensation policy; and properly
classified under such policy.
2) Covered under a current health insurance policy as required by federal or
state law.
l) The contractor possesses all applicable professional and trade licenses required
for performing the public works.
m) The contractor has adequate financial resources to complete the public works
contract, as well as all other work the bidder is presently under contract to
complete.
n) The contractor is bondable for the terms of the proposed public works contract.
o) The contractor has a record of meeting the criteria which will be considered in
determining satisfactory completion of projects and may include, but are not
limited to:
1) Completion of contracts in accordance with drawings and specifications.
2) Diligent execution of the work and completed contracts according to the
established time schedules unless extensions are granted by the owner; and
3) Fulfilled guarantee requirements of the contract documents.
p) The contractor has, and diligently maintains, a written safety program.
[20260519R 35]
Woodstock Sanitary Sewer Improvements 19
Section 2-471. No Restriction on Discretion. If information other than what was disclosed by
the contractor in section 2-470 is discovered by the city or the department, official or employee
responsible for awarding the public works contract, and such information calls into question the
contractor’s abilities or competence to faithfully and responsibly comply with the terms of a
public works contract, that information shall be considered in determining whether the contractor
is a qualified responsible contractor.
Section 2-472. Affidavit of Compliance.
In the event a construction management company is to administer the said contract with
general contractors, prime contractors or subcontractors of any tier, the construction
management firm shall ensure all the rules and regulations contained in this Responsible
Contractors Ordinance are followed by all contractors of any tier.
The general, prime contractor, or sub-contractor of any tier bidding on a public works
project must include in its sealed bid:
a) Its own affidavit swearing compliance with the criteria set forth in section 2-
470 on the form required by city; and
b) An affidavit swearing compliance with the criteria set forth in section 2-
470 on the form required by the city from every subcontractor at any tier
who will perform work on the project.
Failure to submit the required affidavit, or providing incorrect, false, or misleading information
may disqualify the contractor’s bid.
SECTION 2. All ordinances and parts of ordinances conflicting with this ordinance are hereby
repealed.
SECTION 3. This ordinance shall be in full force and effect from and after its passage and
publication.
[20260519R 36]
Woodstock Sanitary Sewer Improvements 20
10. CONTRACT (to be finalized after the bid)
Woodstock Sanitary Sewer Improvements
10.1 Preamble
This contract made this ___ day of ____ 2026, by and between ______, a _____
corporation, herein called "Contractor", and the City of Superior, a municipal corporation,
located in Douglas County, Wisconsin, herein called "Owner".
WITNESSETH, that the Contractor and Owner for the consideration stated herein, agree
as follows:
10.2 Article I - Scope of Work
The Contractor shall perform everything required to be performed and shall provide and
furnish all the applicable labor, materials, equipment, necessary tools, expendable equipment,
insurance provided by the specifications, contributions to social security and all utility and
transportation services required to perform and complete in a workmanlike manner the following
work:
Project Description: Approximately 1,800 lineal feet of combined sewer replacement by
pneumatic pipe bursting and approximately 20 lineal feet of combined sewer and 80
lineal feet of storm sewer replacement by open-cut construction. Work includes sewer
utility structures, appurtenances, laterals, manhole rehabilitation, erosion control, traffic
control, asphalt and concrete pavement patching and turf restoration.
All work shall be in strict compliance with the Contractor's proposal and other contract
documents, herein mentioned as component parts of this contract.
10.3 Article II - Contract Price
The Owner shall pay the Contractor for the performance of this contract an amount based
upon the unit prices contained in the proposal for the actual measured quantities of work done or
lump sum as proposed.
Contractor shall not be entitled to payment for work found deficient or failing to conform
to the requirements set forth in this agreement and is not entitled to further payments until
corrected to the satisfaction of the Director of Public Works at the cost of the Contractor. The
City will inform the Contractor of any deficiencies and/or items that do not conform to this
contract within thirty (30) days of receipt.
Unless otherwise provided in the special provisions, payments are to be made to the
Contractor within 30 days of receipt of an approved payment application/invoice on the basis of
written approval of estimates by the Owner of the value of the work performed during the
preceding billing period. However, in accordance with 66.0901(9) Wisconsin Statutes, owner
will retain five percent (5%) of the amount of each such estimate, until the work has been
completed. This retainage will be held until completion and acceptance of all work included in
this contract.
Submission of a final payment application/invoice shall be accompanied by applicable
payroll reports and final unconditional lien waivers (from all sub-contractors and suppliers) to
[20260519R 37]
Woodstock Sanitary Sewer Improvements 21
the Owner. Prior to release of final payment, the Public Works Department shall review project
documents, submitted by Contractor to determine the satisfaction thereof; it will be at the Public
Works Department’s sole discretion when the final payment is made. Final payment will be
made to Contractor within thirty (30) days of the City’s acceptance of services as complete.
The Owner, in case the work under this contract is not completed within the time required
or within an extended time approved in writing by the Owner, is authorized to take charge of the
work and finish it at the expense of the Contractor and his sureties, and to apply the amount
retained from estimates to the completion of the work.
10.4 Article III - Component Parts of this Contract
This contract consists of the following component parts, all of which are as fully a part of
it as if verbatim is set out herein, or if not attached, as if the same were hereto attached:
1. Advertisement to Bid
2. Instructions to Bidders
3. Bid Proposal
4. Subcontractors & Suppliers Listing
5 Addenda Acknowledgment
6. Bid Bond
7. Bidder's Proof of Responsibility
8. Affidavit of Organization and Authority
9. Affidavit of Compliance from Contractor and all Sub-Contractors
10 Contract
11. Certificate of Insurance
12. Performance and Payment Bond
13. General Specifications
14. Engineer’s Certificate (as applicable)
15. Special Provisions (as applicable)
16. Contract Change Order
17. Additional Attachments per Index (as applicable)
The contract documents form a complete unit and requirements called for by one are as
binding as if called for by all. In cases of conflict between plans and specifications, the
specifications shall govern. Special Provisions shall control General Specifications.
10.5 Article IV - Payment for Labor & Materials
The Contractor specifically agrees to pay for all claims for labor performed for this
project and materials furnished, used and consumed in completing the foregoing contract,
together with all items enumerated in Section 779.035, of the Wisconsin Statutes, as the
obligation of the Contractor. No assignment, modification or change in the contract, or change in
the work covered thereby, or any extension of time for completion of the contract shall release
the sureties on the bond.
10.6 Article V – Insurance
[20260519R 38]
Woodstock Sanitary Sewer Improvements 22
Within ten (10) days after the execution of the contract, and prior to commencement of
any work, the Contractor shall file with the Owner, satisfactory evidence of having adequate
worker’s compensation insurance and public liability insurance, both personal and property, as
outlined in the General Specifications, section 12.3.
10.7 Non-Discrimination
Upon execution of this Agreement, Contractor agrees as follows:
Contractor and all Subcontractors do not discriminate against any employee, applicant for
employment, independent contractor, or any other persons because of race, color, religion, sex,
sexual orientation, gender identity, or national origin.
10.8 Authority
The Contractor represents that it has the authority to enter into this Agreement. If the
Contractor is not an individual, the person(s) signing on behalf of the Contractor represents and
warrants that they have been duly authorized to bind the Contractor and sign this Agreement on
the Contractor's behalf.
10.9 Signatures
In Witness Whereof, the parties intending to be legally bound have executed this
agreement the day and year set forth above.
SIGNED AND SEALED: COMPANY:
ADDRESS:
PHONE:
President Vice President/Secretary
(two corporate signers)
ATTEST: CITY OF SUPERIOR, WISCONSIN
City Clerk Mayor
Finance Director City Attorney
Provision has been made to
pay the liability that will
accrue under this contract.
Approved at by the Superior Common Council on:
[20260519R 39]
Woodstock Sanitary Sewer Improvements 23
11. PERFORMANCE AND PAYMENT BOND (Sample)
AIA Document A312™ - 2010 Performance and Payment Bond is the preferred document.
All other bonds must be approved by the City.
KNOW ALL MEN BY THESE PRESENTS THAT
of , and as
principal, and of , a corporation
and existing under the laws of the State of Wisconsin (hereinafter called Asurety@), as surety are held and
firmly bound unto the City of Superior, a municipal corporation, of the State of Wisconsin, in the penal sum
of $ Dollars, good and lawful money of the United States of America, to be paid to the City
of Superior, Wisconsin, its duly authorized attorneys, agents, officers, successors and assigns for which
payment, well and truly to be made, we bind ourselves, our heirs, administrators, executors, successors and
assigns, jointly and severally firmly by these presents.
WHEREAS, the above bound principal has entered into a certain written contract with the City of
Superior, Wisconsin, dated this day of , 20___, which contract is hereby
referred to and made a part hereof as fully and to the same extent as if copied at length herein.
NOW, THEREFORE, the condition of the above obligation is such that if the above bound principal
shall well and truly keep, do and perform each and every matter and thing in said contract set forth and
specified to be by the said principal kept, done and performed at the time and in the manner in said contract
specified, and shall pay over, make good and reimburse to the aforenamed City, all loss and damage which
said City may sustain by reason of failure or default on the part of said principal and shall pay to every person
entitled thereto all claims for labor performed and materials furnished, used or consumed in performing the
work provided in said contract including, without limitation because of enumeration, fuel, lumber, building
materials, machinery, vehicles, tractors, equipment, fixtures, apparatus, tools, appliances, supplies, electric
energy, gasoline, motor oil, lubricating oil, greases, state imposed taxes, premiums for worker’s compensation
insurance and contributions for unemployment compensation, then this obligation shall be void; otherwise, it
shall be and remain in full force and effect.
Contractor
Representative
Title
Insurance Company
Representative
Attest:
[20260519R 40]
Woodstock Sanitary Sewer Improvements 24
12. GENERAL SPECIFICATIONS
12.1 GENERAL
Unless otherwise stated, all work and conditions of this contract shall be performed in
accordance with the State of Wisconsin Department of Transportation (WisDOT), Standard
Specifications for Highway and Structure Construction ( including erosion control), 2026
Edition and current Supplemental Spe cifications, or in accordance with the Wisconsin
Department of Safety and Public Services.
State, Federal and/or grant funds may be used to fund all or part of this contract. The
City will not be held liable for any damages incurred due to changes in State, Federal or
grant funding, including (but not limited to) a reduction or cancellation of the project.
12.2 SUBSTITUTIONS
The following terms shall be substituted in the specifications:
a. “Owner” or “City” is the City of Superior.
b. “Engineer” is the Contracted Engineer/Architect for the City of Superior or the City
Engineer assigned to the project.
12.3 INSURANCE REQUIREMENTS
The Contractor shall not commence work on contract until proof of insurance required has
been provided to the applicable department before the contract or purchase order is considered
for approval by the City.
It is hereby agreed and understood that the insurance required by the City is primary coverage
and that any insurance or self-insurance maintained by the City, its officers, council members,
agents, employees or authorized volunteers will not contribute to a loss. All insurance shall be
in full force prior to commencing work and remain in force until the entire job is completed
and the length of time that is specified, if any, in the contract or listed below whichever is
longer.
CONTRACTOR—LIABILITY
A. Commercial General Liability coverage at least as broad as Insurance Services Office
Commercial General Liability Form, including coverage for Products Liability, Completed
Operations, Contractual Liability, and Explosion, Collapse, Underground coverage with the
following minimum limits and coverage:
1. Each Occurrence limit $1,000,000
2. Personal and Advertising Injury limit $1,000,000
3. General aggregate limit (other than Products-Completed
Operations) per project $2,000,000
4. Products-Completed Operations aggregate $2,000,000
5. Fire Damage limit — any one fire $50,000
[20260519R 41]
Woodstock Sanitary Sewer Improvements 25
6. Medical Expense limit — any one person $5,000
7. Products - Completed Operations coverage must be carried for two years after
acceptance of completed work.
B. Automobile Liability coverage at least as broad as Insurance Services Office Business
Automobile Form, with minimum limits of $1,000,000 combined single limit per accident for
Bodily Injury and Property Damage, provided on a Symbol #1- "Any Auto" basis.
C. Workers' Compensation as required by the State of Wisconsin, and Employers Liability
insurance with sufficient limits to meet underlying Umbrella Liability insurance requirements. If
applicable for the work coverage must include Maritime (Jones Act) or Longshoremen's and
Harbor Workers Act coverage.
Provide a waiver of subrogation in favor of the City for the workers’ compensation and
liability insurances.
D. Umbrella Liability providing coverage at least as broad as the underlying Commercial
General Liability, Automobile Liability and Employers Liability, with a minimum limit of
$2,000,000 each occurrence and $2,000,000 aggregate, and a maximum self-insured retention
of $10,000. The umbrella must be primary and non-contributory to any insurance or self-
insurance carried by the City.
F. Builder's Risk / Contractor's Equipment or Property - The contractor is responsible for loss
and coverage for these exposures. City will not assume responsibility for loss, including loss of
use, for damage to property, materials, tools, equipment, and items of a similar nature which
are being either used in the work being performed by the contractor or its subcontractors or
are to be built, installed, or erected by the contractor or its subcontractors.
INSURANCE REQUIREMENTS FOR SUBCONTRACTOR
All subcontractors shall be required to obtain Commercial General Liability (if applicable
Watercraft liability), Automobile Liability, Workers' Compensation and Employers Liability,
(if applicable Aircraft liability) insurance. This insurance shall be as broad and with the same
limits as those required per Contractor requirements, excluding Umbrella Liability, contained
in Section 1 above.
APPLICABLE TO CONTRACTORS / SUBCONTRACTORS /
SUB-SUB CONTRACTORS
A. Primary and Non-contributory requirement - all insurance must be primary and non-
contributory to any insurance or self-insurance carried by City.
B. Acceptability of Insurers - Insurance is to be placed with insurers who have an A.M. Best
rating of no less than A- and a Financial Size Category of no less than Class VII, and who
are authorized as an admitted insurance company in the state of Wisconsin.
C. Additional Insured Requirements - The following must be named as additional
insureds on all Liability Policies for liability arising out of project work – City of
Superior, and its officers, council members, agents, employees and authorized volunteers.
On the Commercial General Liability Policy, the additional insured coverage must be ISO
[20260519R 42]
Woodstock Sanitary Sewer Improvements 26
form CG 20 10 07 04 and also include Products - Completed Operations additional
insured coverage per ISO form CG 20 37 07 04 or their equivalents for a minimum of 2
years after acceptance of work. This does not apply to Workers Compensation Policies.
D. Deductibles and Self-Insured Retentions - Any deductible or self-insured retention must
be declared to and approved by the City.
E. Evidences of Insurance - Prior to execution of the agreement, the Contractor shall file
with the City a certificate of insurance (Accord Form 25-S or equivalent) signed by the
insurer's representative evidencing the coverage required by this agreement. In addition
form CG 20 10 07 04 for ongoing work exposure and form CG 20 37 07 04 for products-
completed operations exposure must also be provided or its equivalent.
Such liability policies shall contain a provision or endorsement covering any contingent
liability of the City of Superior. The City is to be shown as “additionally insured” and
the project is to be listed on the certificate. The naming of said entities as Certificate
Holders will not be acceptable. Certificates of worker's compensation and personal and
public liabilities, along with the provision indemnifying the City of Superior must be
submitted by the successful bidder.
12.3.5 INDEMNIFICATION
Contractor hereby agrees to indemnify, defend and hold harmless the City its elected and
appointed officials, officers, employees, agents, representatives and volunteers, and each of
them, from and against any and all suits, actions, legal or administrative proceedings, claims,
demands, damages, liabilities, interest, attorneys' fees, costs, and expenses of whatsoever kind
or nature in any manner directly or indirectly caused, occasioned, or contributed to in whole or
in part or claimed to be caused, occasioned, or contributed to in whole or in part, by reason of
any act, omission, fault, or negligence, whether active or passive, of Contractor or of anyone
acting under its direction or control or on its behalf, even if liability is also sought to be
imposed on the City, its elected and appointed officials, officers, employees, agents,
representatives and volunteers.
The obligation to indemnify, defend and hold harmless the City, its elected and appointed
officials, officers, employees, agents, representatives and volunteers, and each of them, shall be
applicable unless liability results from the sole negligence of the City, its elected and appointed
officials, officers, employees, agents, representatives and volunteers.
Contractor shall reimburse the City, its elected and appointed officials, officers, employees,
agent or authorized representatives or volunteers for any and all legal expenses and costs
incurred by each of them in connection therewith or in enforcing the indemnity herein
provided. In the event that Contractor employs other persons, firms, corporations or entities
(subcontractor) or volunteers as part of the work covered by this Agreement, it shall be
responsibility of the contractor to require and confirm that each sub-contractor enters into an
Indemnity Agreement in favor of the City, its elected and appointed officials, officers,
employees, agents, representatives and volunteers, which is identical to this Indemnity
Agreement.
[20260519R 43]
Woodstock Sanitary Sewer Improvements 27
This indemnity provision shall survive the termination or expiration of this Agreement.
12.4 PERFORMANCE AND PAYMENT BOND
Contractor shall execute and furnish a completed PERFORMANCE AND PAYMENT
BOND in the total amount of the approved bid, to be supplied to the Owner along with the
required signed contract documents . AIA Document A312 ™ - 2010 is the preferred
Performance and Payment Bond document.
12.5 LICENSES, PERMITS AND APPROVALS
The Contractor warrants that he is properly licensed and possesses all the necessary
qualifications as required by the federal, state and local laws, ordinances, regulations, etc.
prior to commencing work, and shall remain in good standing for the duration of the project.
The Contractor is responsible for all local, state and federal permits and approvals which
may apply to this project. City of Superior Excavation Permit Application is attached for
your convenience. The fees for local permits will be waived upon receipt of application of
such permits and it is noted that the permit late fee of $750.00 per permit, will be the
financial responsibility of contractor. Normal local inspections will be required, including
final inspection of the project by the applicable local departments. The Contractor shall give
all notices required by law and comply with all laws, statutes, ordinances, rules and
regulations that affect the conduct and prosecution of the project. The Contractor shall be
liable for all violation of the law in connection with work furnished by the Contractor. If
Contractor performs any work that it knew or should have known to be contrary to such
laws, statutes, ordinances, rules and regulations and without giving notice to the City, the
Contractor shall be responsible for all costs arising therefrom.
The City will consider no plea of misunderstanding or ignorance of these requirements.
12.6 OBSTRUCTION OF STREETS AND SIDEWALKS
The Contractor shall promptly remove any dirt or debris which is caused by its performance
of this contract and clean all streets, sidewalks, alleys and public property which are soiled
by Contractor’s actions or omissions. If the Contractor shall, in any manner, obstruct a street
or sidewalk or other public grounds, they shall erect, install, maintain and pay for barriers
and lights to prevent accidents and shall be liable for damages caused by the obstruction and
for any damage or disruption to streets, alleys or public grounds which may result from the
Contractor’s carelessness in the prosecution of such work in accordance with Section 62.15
(11) of the Wisconsin Statutes. The Contractor shall also be bound by any further
requirements of the specifications on this point.
12.7 PROSECUTION AND PROGRESS
Prosecution and Progress shall be accomplished in accordance with WisDOT Standard
Specifications 2026, Section 108, unless otherwise set forth in the Special Provisions.
Upon receipt of "Notice to Proceed" from the Owner, Contractor shall plan operations such
[20260519R 44]
Woodstock Sanitary Sewer Improvements 28
that work under this contract shall be substantially complete within 45 calendar days of
initiation of construction and shall achieve final completion no later than November 6, 2026.
12.8 COORDINATION OF CONTRACTORS
The City may award or may contract for additional work outside the scope of this contract.
The Contractor shall fully cooperate with any other Contractor, City employee, Engineer or
designated representative of the City, by scheduling its own work with that to be performed
under other Contracts as may be directed by the City. The Contractor shall not commit or
permit any act which will interfere with the performance of any other Contractor, agent, City
employee, engineer or designated representative as scheduled.
Employees of the Contractor must be able to work within a public setting without
creating a disruption and conform to all policies, rules and regulations. Contractor shall
require that their employees be courteous at all times, not to use loud or profane
language, and to work as quietly as possible. Contractor shall require that its employees
shall not trespass, loiter, cross property to adjoining premises, or tamper with property
not covered by the contract.
Contractor agrees to observe and obey all applicable laws, ordinances, rules and
regulations promulgated and enforced by the City and by any other proper authority
having jurisdiction over the work performed herein.
Special Conditions Where special conditions or special purposes require the
consideration of deviations from these specifications, any such deviations must be
authorized by the Owner.
12.9 CHANGE ORDERS
Any change to the signed contract must be approved by Owner, in writing, prior to t he
commencement of the change (see C ONTRACT CHANGE ORDER, Section 15 ). All
changes/amendments/addition/ deletions to the original contract must be described on the
Contract Change Order form with necessary increase/decrease in contract price indicated.
Change orders will need to include any invoices and supporting documents. These changes
will include applicable project extension time requests. Form is to be numbered sequentially
and is to be signed by the Contractor and approved by the Owner before proceeding to
execute the work. Verbal directions, approvals, conversations or agreements are not
permitted in lieu of a written Change Order.
Any work conducted outside of the scope of the contract, or in addition to the contract
and not authorized through a written Change Order is at the Contractor’s sole cost and
expense.
12.10 TIME PENALTIES
Should the Contractor fail to complete the work within the time agreed upon under section
12.7 above, or within such extra time as may be allowed by extensions at the discretion of
the Owner , there shall be deducted from any monies due or that may become due the
[20260519R 45]
Woodstock Sanitary Sewer Improvements 29
Contractor, for each and every calendar day that the work shall remain uncompleted, a sum
assessed as specified in WisDOT Standard Specifications 2026, 108.11 Liquidated
Damages of the State of Wisconsin Department of Transportation (WisDOT), Standard
Specifications for Highway and Structure Construction ( including erosion control), 2026
Edition and current Supplemental Specifications, except that this sum shall be considered a
penalty, a fixed and agreed -to-sum due the City from the Contractor by reason of
inconvenience to the public, added cost of engineering and supervision, maintenance of
detours and other items resulting from the Contractor’s failure to complete the work within
the time specified in the contract. If the penalties exceed the balance of monies that would
otherwise have been due the contractor, the Contractor or the Contractor’s Surety shall be
responsible for payment of all such penalties to the Owner as liquidated damages.
12.11 GUARANTEE
The Contractor shall assume responsibility for all defects which may develop in any part of
the bid project caused by faulty workmanship, material or equipment and agrees to replace
any such faulty workmanship, material and equipment, during the period of two (2) years
from date of final acceptance of the work without cost to the Owner. Contractor shall
coordinate any manufacture’s warrantees for the Owner during the two-year period, without
any cost to the Owner.
Acceptance of the plan shall not waive this guarantee. Final acceptance shall be determined
as date of letter from Owner or Engineer approving final payment. Contractor is responsible
for coordinating manufacturer warrantee replacements should problems arise in the
guarantee period. Warrantee period shall begin upon cont ractor receipt of final payment,
unless otherwise agreed upon in writing by the Owner.
12.12 AS-BUILTS and WARRANTY DOCUMENTS – as applicable
Within ten (10) days of substantial completion and prior to final payment by the Owner, the
Contractor is to supply the Owner with project “as-builts” and all product warranty
information. As-builts must be submitted in CAD, GIS or adobe file format or other format
agreed upon by Owner.
12.13 CONTROL OF THE WORK – as applicable
Control of the work shall be accomplished in accordance with WisDOT Standard
Specifications 2026, Section 105 except as modified below:
Construction staking and providing grade and line is the responsibility of the Contractor.
Contractor shall use a Laser Beam to control and maintain line and grade of pipe. Grade
boards, banjo strings, etc. will not be acceptable. The Contractor shall furnish the engineer a
complete set of surveyor’s notes showing as-built flow lines.
The Contractor shall, before proceeding to another phase of construction, have approval of
the engineer. The phases shall be: excavation, grade and line, la ying of storm pipe,
backfilling, surface replacement and site restoration, as applicable.
[20260519R 46]
Woodstock Sanitary Sewer Improvements 30
MANY UTILITY OWNERS HAVE EXISTING FACILITIES NEAR OR AT THE
LOCATION OF THE WORK REQUIRED UNDER THIS CONTRACT. The Contractor
shall contact Diggers Hotline at 1-800-242-8511 to determine locations are safe and will
make any adjustments recommended by the locator prior to performing any excavation
operations under this contract.
12.14 SCOPE OF WORK
The scope of work for this project shall be in accordance with WisDOT Standard
Specifications 2026, Section 104, unless otherwise set forth in the Special Provisions.
The Contractor shall be responsible for the maintenance of traffic. The Contractor shall
provide, erect and maintain all barricades.
12.15 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
The Contractor shall fulfill all legal relations and responsibilities to the public in accordance
with WisDOT Standard Specifications 2026, Section 107 and as follows:
The Contractor shall work in cooperation with utility companies in the protection of water
and gas mains and other utilities that may be within the limits of construction. It shall be the
duty of the Contractor to notify the utility company or companies involved before starting
work on this project.
All necessary work of adjus ting any underground relocation will be performed by their
owners, unless otherwise shown on the plans. The work to maintain and/or adjust these
utilities shall be considered incidental to the project.
The Superior Water, Light and Power Company will relocate any power poles or fire
hydrants during construction operations, unless otherwise noted in the special provisions or
if a cooperative agreement is established with Superior Water, Light and Power Company.
The City of Superior has authority over all sanitary and storm sewers. The Superior Water,
Light and Power Company will adjust all water shutoffs and gas shutoffs during
construction.
12.16 SAFETY AND SECURITY
The Contractor shall at all times perform in a safe and workmanlike manner to avoid injury
or damage to any person or property. The Contractor shall comply with all requirements and
specifications relating to the safety, health and sanitation measures applicable to the project.
The Contractor shall exercise all necessary precautions for the safety of its employees, and
be in compliance with all applicable federal, state and local laws, statutes, ordinances, rules
and regulations, including , but not limited to, the Wisconsin Labor Code, The U.S.
Department of Transportation Omnibus Transportation Employee Testing Act, and OSHA
standards.
The contractor shall provide all necessary safeguards, devices and protective equipment,
including but not limited to ad equate life protection and life saving equipment, and shall
ensure the proper inspection and maintenance of safety measures are current and in
[20260519R 47]
Woodstock Sanitary Sewer Improvements 31
compliance.
The City may halt construction on any project where appropriate safety measures and
equipment are not being used or any safety regulations are not being followed. Work will
not be permitted to resume until required safety provisions have been made and delays as a
result of this provision will not be considered a basis for an increase in the contract price or
an extension of the completion deadline.
12.17 PRE-CONSTRUCTION CONFERENCE
A preconstruction conference will be scheduled by the Owner or the Engineer prior to work
commencing.
12.18 PROJECT DOCUMENT SUBMISSIONS
As a condition of final payment, the following documents must be submitted and accepted
by the City:
a. Lien waivers – final unconditional lien waives from each sub-contractor and/or
supplier must be submitted to the City.
b. As-builts & product warranties – as noted in Section 12.12, these documents must
be submitted to City.
c. Retainage – Contractor’s final invoice is to indicate the balance of work
completed and/or the total amount of retainage due the Contractor.
d. Local inspections – final inspection reports must be submitted to the City.
e. Project completion documentation – written documentation from the project
engineer confirming the completion of the project.
[20260519R 48]
Woodstock Sanitary Sewer Improvements 32
13. ENGINEER CERTIFICATION
Drawing for
Woodstock Sanitary Sewer Improvements
Prepared for:
CITY OF SUPERIOR, WISCONSIN
PUBLIC WORKS DEPARTMENT
See page 00 01 07-1 of the Project Manual
[20260519R 49]
Woodstock Sanitary Sewer Improvements 33
14. SPECIAL PROVISION
[20260519R 50]
00 01 01-1
PROJECT MANUAL FOR
WOODSTOCK SANITARY SEWER IMPROVEMENTS
CITY OF SUPERIOR
DOUGLAS COUNTY, WI
March 2026
Project #00628072
Prepared By:
MSA Professional Services, Inc.
332 W Superior St.
Duluth, MN 55802
[20260519R 51]
Project #00628072 00 01 07-1 Seals
© 2026 MSA Professional Services, Inc.
WOODSTOCK SANITARY SEWER
IMPROVEMENTS
City of Superior, Douglas County, WI
Project #00628072
Seals Page
GENERAL/PROCESS ENGINEER:
MSA Professional Services, Inc.
[20260519R 52]
Project #00628072 00 01 10-1 Contents and Project Manual Index
© 2026 MSA Professional Services, Inc.
PROJECT MANUAL FOR
WOODSTOCK SANITARY SEWER IMPROVEMENTS
CITY OF SUPERIOR
DOUGLAS COUNTY, WI
CONTENTS AND PROJECT MANUAL INDEX
DESCRIPTION PAGE
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
Title Page 00 01 01-1
Seals Page 00 01 07-1
Contents and Project Manual Index 00 01 10-1 - 2
DIVISION 01 - GENERAL REQUIREMENTS
Section 01 11 00 Summary of Work 01 11 00 - 1
Section 01 14 00 Work Restrictions and Provisions 01 14 00 - 1 - 5
Section 01 31 13 Project Coordination 01 31 13 - 1 - 2
Section 01 31 19 Project Meetings 01 31 19 - 1
Section 01 32 16 Construction Progress Schedule 01 32 16 - 1 - 3
Section 01 32 23 Survey and Layout Data 01 32 23 - 1 - 3
Section 01 33 00 Submittals 01 33 00 - 1 - 3
Section 01 33 23 Shop Drawings, Product Data, and Samples
(Submittal Log)
01 33 23 - 1 - 2
Section 01 35 00 Special Procedures 01 35 00 - 1 - 6
Section 01 45 16.11 Concrete Quality Control 01 45 16.11 - 1 - 4
Section 01 55 26 Traffic Control 01 55 26 - 1 - 2
DIVISION 02 - EXISTING CONDITIONS
Section 02 01 00 Maintenance of Existing Conditions 02 01 00 - 1 - 3
Section 02 42 00 Removal Salvage and Abandonment 02 42 00 - 1 - 5
DIVISION 03 - CONCRETE
Section 03 15 00 Concrete Accessories 03 15 00 - 1 - 6
Section 03 30 00 Cast-In-Place Concrete 03 30 00 - 1 - 16
DIVISION 31 - EARTHWORK
Section 31 05 19.13 Geosynthetics for Earthwork 31 05 19.13 - 1 - 4
Section 31 11 00 Clearing and Grubbing 31 11 00 - 1 - 2
Section 31 23 13 Subgrade Preparation 31 23 13 - 1 - 3
Section 31 23 33 Trenching and Backfilling 31 23 33 - 1 - 6
Section 31 25 00 Erosion and Sedimentation Controls 31 25 00 - 1 - 16
DIVISION 32 - EXTERIOR IMPROVEMENTS
Section 32 11 23 Aggregate Base and Subbase 32 11 23 - 1 - 3
Section 32 12 13.16 Asphaltic Tack Coat 32 12 13.16 - 1 - 2
[20260519R 53]
Project #00628072 00 01 10-2 Contents and Project Manual Index
© 2026 MSA Professional Services, Inc.
Section 32 12 16 Asphaltic Concrete Pavement 32 12 16 - 1 - 4
Section 32 13 10 Concrete Sidewalk, Steps and Driveways 32 13 10 - 1 - 4
Section 32 91 19.13 Topsoil Placement and Grading 32 91 19.13 - 1 - 4
Section 32 92 19 Seeding 32 92 19 - 1 - 3
DIVISION 33 - UTILITIES
Section 33 01 30.16 Sanitary Sewer Televising 33 01 30.16 - 1 - 5
Section 33 01 30.82 Epoxy Lining for Concrete Manholes 33 01 30.83 - 1 - 6
Section 33 01 30.83 Polyurea Lining for Concrete Manholes 33 01 30.83 - 1 -
Section 33 01 30.85 GeoPolymer Lining for Concrete Manholes 33 01 30.83 - 1 -
Section 33 01 31 Sewer Bypass Pumping 33 01 31 - 1 - 3
Section 33 05 23.30 Pipe Bursting 33 05 23.30 - 1 - 5
Section 33 31 13 Public Sanitary Utility Sewerage Pipe 33 31 13 - 1 - 7
Section 33 39 13 Sanitary Sewer Manholes 33 39 13 - 1 - 6
Section 33 41 13 Public Storm Utility Drainage Piping 33 41 13 - 1 - 5
Section 33 49 13 Storm Drainage Manholes, Frames and Covers 33 49 13 - 1 - 4
[20260519R 54]
Project #00628072 00 41 00-3 Bid Form
© 2026 MSA Professional Services, Inc.
BID
WOODSTOCK SANITARY SEWER IMPROVEMENTS
CITY OF SUPERIOR
DOUGLAS COUNTY, WI
PROJECT #00628072
ARTICLE 1 - ATTACHMENTS TO THIS BID
1.01 The following documents are submitted with and made a condition of this Bid:
A. Lobbying Certification from the Contractor/Subcontractor;
B. Disclosure of Lobbying Activities:
C. The following form is required if Build America, Buy America (BABA) applies;
1. Build America, Buy America (BABA) Act – Construction Contract Language
ARTICLE 2 - BASIS OF BID – UNIT PRICES
2.01 Unit Price Bids
A. Bidder will perform the following Work at the indicated unit prices:
ITEM
NO.
ITEM DESCRIPTION EST. QTY UNITS UNIT PRICE TOTAL PRICE
GENERAL
1. Mobilization, Bonds and Insurance 1 LS $_________ $____________
2. Traffic Control 1 LS $_________ $____________
3. Erosion Control 1 LS $_________ $____________
4. Construction Staking 1 LS $_________ $____________
RESTORATION
5. Clearing and Grubbing 1 LS $_________ $____________
6. Turf Restoration 440 SY $_________ $____________
7. Remove Concrete Driveway 60 SY $_________ $____________
8. Remove Asphalt Pavement 490 SY $_________ $____________
9. Sawcut Asphalt 700 LF $_________ $____________
10. Sawcut Concrete, Full Depth 30 LF $_________ $____________
11. Imported Granular Backfill 250 CY $_________ $____________
12. Excavation Below Subgrade with Breaker Run
and Geogrid
20 CY $_________ $____________
13. Geotextile Fabric 490 SY $_________ $____________
14. Dense Graded Base, 1-1/4" 240 TON $_________ $____________
15. Select Crushed Material 325 TON $_________ $____________
16. Asphaltic Concrete Pavement, 4-Inch 115 TON $_________ $____________
17. Concrete Driveway 6-Inch 510 SF $_________ $____________
[20260519R 55]
Project #00628072 00 41 00-4 Bid Form
© 2026 MSA Professional Services, Inc.
COMBINED SEWER
18. Manhole Adjustment 6 EA $_________ $____________
19. New Casting 8 EA $_________ $____________
20. Exterior Chimney Seal (Visco Wrap) 8 EA $_________ $____________
21. Sewer Manhole Liner 4 EA $_________ $____________
22. Flowline & Bench Rehabilitation 3 EA $_________ $____________
23. Connect to Existing Manhole 5 EA $_________ $____________
24. Combined Sewer Manhole 48-Inch 5 EA $_________ $____________
25. 8-Inch VCP to 10-Inch HDPE Sewer, Pipe Burst 194 LF $_________ $____________
26. 10-Inch VCP to 12-Inch HDPE Sewer, Pipe Burst 532 LF $_________ $____________
27. 12-Inch VCP to 14-Inch HDPE Sewer, Pipe Burst 1,100 LF $_________ $____________
28. Sewer PVC 12-Inch, Open Cut 21 LF $_________ $____________
29. Sanitary Lateral PVC 6-Inch, Open Cut 170 LF $_________ $____________
30. Utility Line Opening 14 EA $_________ $____________
31. 6-Inch Inserta Tee Lateral Connection to HDPE 17 EA $_________ $____________
32. Flow Management/Bypass Pumping 1 LS $_________ $____________
STORM SEWER
33. Catch Basin 36-Inch 6 EA $_________ $____________
34. Connect to Existing Storm Structure 1 EA $_________ $____________
35. Storm Sewer PVC 8-Inch, Open Cut 73 LF $_________ $____________
36. Storm Sewer PVC 10-Inch, Open Cut 18 LF $_________ $____________
37. 8-Inch Inserta Tee Storm Sewer Connection to
HDPE
3 EA $_________ $____________
TOTAL: Items #1-#37
$________________________
B. Bidder acknowledges that:
1. Each Bid Unit Price includes an amount considered by Bidder to be adequate to cover
Contractor’s overhead and profit for each separately identified item, and
2. Estimated quantities are not guaranteed, are solely for the purpose of comparison of Bids,
and final payment for all Unit Price Work will be based on actual quantities, determined
as provided in the Contract Documents.
[20260519R 56]
Project #00628072 01 11 00-1 Summary of Work
© 2026 MSA Professional Services, Inc.
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.01 APPLICABLE PROVISIONS
A. Applicable provisions of Division 01 shall govern Work of this section.
1.02 APPLICABLE PUBLICATIONS (NONE)
1.03 DESCRIPTION OF WORK
A. Work consists of sewer utility work within the Woodstock division of Sanitary Sewer District 6 in the City of
Superior. The project locations are as follows:
1. St. Albans Road from the cul-da-sac to west of Billings Drive
a. The work at this project location consists of replacing existing 10-inch vitrified clay pipe
(VCP) combined sewer and upsizing to 12-inch high-density polyurethane (HDPE)
combined sewer by pneumatic pipe bursting with manhole entry method to minimize
surface disturbance.
2. Newton Lane from the southwest end to St. Albans
a. The work at this project location consists of replacing existing 8-inch vitrified clay pipe
(VCP) combined sewer and upsizing to 10-inch high-density polyurethane (HDPE)
combined sewer by pneumatic pipe bursting to minimize surface disturbance.
3. Within a utility easement starting west of Royalton Road to west of Windsor Street
a. The work at this project location consists of replacing existing 12-inch vitrified clay pipe
(VCP) combined sewer and upsizing to 14-inch high-density polyurethane (HDPE)
combined sewer by pneumatic pipe bursting with manhole entry method to minimize
surface disturbance.
B. Work at all locations includes the addition of manholes, replacement of storm inlets, and reconnection of
laterals. Work also includes manhole rehabilitation, traffic control, erosion control, related concrete and
asphalt pavement and turf restoration.
C. It is the intent of the Owner to minimize pavement and concrete removals by utilizing trenchless
technologies to greatest extent possible
END OF SECTION
[20260519R 57]
THIS PAGE I NTENTIONALLY LEFT BLANK
[20260519R 58]
Project #00628072 01 14 00-1 Work Restrictions and Provisions
© 2026 MSA Professional Services, Inc.
SECTION 01 14 00
WORK RESTRICTIONS AND PROVISIONS
GENERAL
APPLICABLE PROVISIONS
Applicable provisions of Division 01 shall govern work of this section.
APPLICABLE PUBLICATIONS
Perform the work under this construction contract for the Woodstock Sanitary Sewer Improvements, City
of Superior, Douglas County, Wisconsin as the plans show and execute the work as specified in the State
of Wisconsin, Department of Transportation, Standard Specifications for Highway and Structure
Construction, Current Edition (2017), as published by the department, and these special provisions.
In case of conflict, the first listed standard shall take precedence.
Comply with all applicable Sections of “Standard Specifications for Sewer & Water Construction in
Wisconsin, Sixth Edition with Addendum No.1 and No.2”. Requests for copies of the “Standard
Specifications” should be forwarded to: Public Works Industry Improvement Program, 2835 North Mayfair
Road, Milwaukee, Wisconsin 53222 or requested by telephone at (414) 778-1050.
Comply with all applicable Sections of “State of Wisconsin, Department of Transportation (WI DOT),
Standard Specifications for Highway and Structure Construction, Current Edition.
Comply with all applicable Sections of Wisconsin Administrative Code.
Comply with all applicable Sections of City of Superior Administrative Code.
If all or a portion of the plans and special provisions are developed in the SI metric system and the schedule
of prices is developed in the US standard measure system, the City of Superior will pay for the work as bid
in the US standard system
The following publications of the issues listed below, but referred to thereafter by basic designation only,
form a part of this specification to the extent indicated by the reference thereto.
Manual on Uniform Traffic Control Devices (MUTCD) for Streets and Highways, current edition.
State of Wisconsin, Department of Transportation, Standard Specifications for Highway and
Structure Construction, Current Edition at time of bid opening.
DESCRIPTION OF WORK (N/A)
RELATED WORK ELSEWHERE
Procurement and Contracting Requirements - Division 00 (All Sections)
SUBMITTALS (N/A)
OPERATION/MAINTENANCE MANUALS AND INSTRUCTIONS (N/A)
PRODUCTS AND MATERIALS (N/A)
EXECUTION
EXAMINATIONS
Contractor shall obtain complete data at the site and inspect surfaces that are to receive the work before
proceeding with assembling, fitting or erecting his work under this contract. The Contractor shall notify
[20260519R 59]
Project #00628072 01 14 00-2 Work Restrictions and Provisions
© 2026 MSA Professional Services, Inc.
the Engineer in writing in the case of discrepancies between existing work and drawings, and of any defects
in surfaces that are to receive the Contractor’s work. The Engineer will direct the remedy of applicable
surfaces.
Information pertaining to existing conditions that appear on the drawings is based on available records.
While such data has been collected with reasonable care, there is no expressed or implied guarantee that
conditions so indicated are entirely representative of those actually existing or that unexpected
developments may not occur. All data included was provided to assist the Contractor in the investigation
of conditions. The Contractor is responsible for the interpretation of the data provided.
The Contractor shall become acquainted with the location of underground service, utilities, structures, etc.,
which may be encountered or be affected by the Contractor’s work, and shall be responsible for any damage
caused by neglect to provide proper precautions or protection.
Utility Locations. Contractor shall be responsible for locating and verifying all utilities on the project and
also all relocations where necessary. Typically the utilities require the request for locate be made a
minimum of three working days before the Contractor begins work in the area. The utilities shown on the
contract drawings are approximate in location, depth, number, and type.
Contractor shall verify grades, lines, levels, locations, and dimensions as shown on drawings and report
any errors or inconsistencies to the Engineer before commencing work. Starting of work by the Contractor
shall imply acceptance of existing conditions.
STORAGE AND HANDLING
Contractor or the Contractor’s authorized representative must be present to accept delivery of all equipment
and material shipments. The Owner’s employees will not knowingly accept, unload, or store anything
delivered to the site for the Contractor’s use. Inadvertent acceptance of delivered items by any
representative of the Owner shall not constitute acceptance or responsibility to assume all liability for any
equipment or material delivered to the job site.
Any material or equipment removed from the present construction shall be the property of the Owner and
disposition shall be as directed by the Owner or stockpiled at locations shown on the contract drawings.
All salvaged materials shall be removed in a wo rkmanlike manner and carefully transported to Owner’s
storage area. The Contractor shall coordinate the salvaging of items with the Owner.
Contractor shall confine all operations, equipment, apparatus, and storage of materials to the immediate
area of work to the greatest possible extent. Contractor shall ascertain, observe, and comply with all rules
and regulations in effect on the project site, including, but not limited to parking and traffic regulations,
use of walks, security restrictions and hours of allowable ingress and egress.
The storage of materials on the grounds shall be in strict accordance with the instructions of the Owner.
All materials affected by moisture shall be stored on platforms and protected from the weather in
accordance with manufacturer recommendations.
Should it be necessary at any time to move material storage platforms, the Contractors shall move
same at the Contractor’s expense, when directed by the Owner.
Areas used for storage of materials shall be repaired and restored by the Contractor.
The Owner assumes no responsibility for materials stored on the site. The Contractor shall assume full
responsibility for damage due to the storage of materials.
During the construction of this project, materials, storage areas, and earth stockpiles shall be located so as
not to interfere with the installation of the utilities nor cause damage to existing structures or utilities.
WORK RESTRICTIONS AND PROVISIONS
[20260519R 60]
Project #00628072 01 14 00-3 Work Restrictions and Provisions
© 2026 MSA Professional Services, Inc.
Notification. The Contractor shall notify the Owner and the Engineer 72 hours in advance of beginning
work. Notice must also be given to the Owner and the Engineer for each subsequent day the Contractor
will be working.
Operation During Construction. The existing facilities shall remain completely operational during
construction. The Contractor shall be responsible to see that the facilities are operating as they should.
Sequence of operations or place of commencement may be determined by the Engineer as deemed to best
serve the needs and convenience of the Owner, or as necessity of occasion requires.
Starting of work implies acceptance of the work of others. Removal and replacement of work applied to
defective surfaces, in order to correct defects, shall be done at the expense of the Contractor who applied
work to defective surfaces.
Access to Work. Representatives of the State and Federal Regulatory Agencies and Owner shall have
access to the work and on-site records at all times.
Project Log. A project log shall be maintained showing daily progress of work. Engineer and Owner shall
have access to this logbook and the project schedule at all times.
Existing pipes, electrical work, and all other utilities encountered, which may interfere with new work, shall
be rerouted, capped, cut off, or replaced by the Contractor.
Dust and Noise. Contractor shall make an effort to keep dust and noise to a minimum during construction.
The dispersion of dust from construction related activities shall, until acceptance of work, be minimized by
the application of water or other acceptable materials or covers. Noise from any construction activities
shall only be allowed during approved working hours. This includes preparation, organizational and clean-
up work. Work hours ar e limited to weekdays between 7 a.m. and 7 p.m. unless specifically stated
elsewhere in these specifications or approved during construction by the Owner and Engineer in writing.
Only maintenance of traffic and/or erosion control activities are allowed outside of these times.
Contractor shall confine equipment, apparatus, storage of materials and operations to limits by specific
direction of the Owner or Engineer and shall not bring material onto the site until they are needed for the
progress of the work.
Cleaning. Contractor shall be responsible for all cleaning required within the technical sections of the
specifications governing work under the Contractor’s jurisdiction as well as for keeping all work areas,
passageways, and all other areas of the premises free of rubbish, debris and scrap which may be caused
by the Contractor’s operations or that of the Subcontractors.
Remove rubbish, debris, and scrap promptly upon its accumulation and in no event later than the
end of each week.
Combustible waste shall be removed immediately or stored in fire resistive containers until disposed
of in an approved manner.
Spillage of oil, grease, or other liquids which could cause a slippery or otherwise hazardous situation
or stain a finished surface, shall be cleaned up immediately.
Dust, dirt, and other foreign matter shall be removed completely from all internal surfaces of all
mechanical and electrical units, cabinets, ducts, pipes, etc.
Dirt, soil, fingerprints, stains and the like, shall be completely removed from all exposed finished
surfaces.
If rubbish and debris is not removed, or surfaces cleaned as specified above, the Owner reserves
the right to have said work done by others and the related cost(s) will be deducted from monies
due the Contractor.
Disposal of Demolished Materials. Remove from the site all debris, rubbish, and other materials resulting
from demolition operations. Storage of removed materials will not be permitted on the site. If burning is
allowed, the Contractor shall obtain all required permits.
Mail Service.
[20260519R 61]
Project #00628072 01 14 00-4 Work Restrictions and Provisions
© 2026 MSA Professional Services, Inc.
1. Temporary r elocation of mailboxes. If the Postal Carrier cannot deliver mail to the properties
affected by the construction of utilities or roadway, the Contractor shall provide temporary
mailboxes or shall relocate existing mailboxes to an accessible site. Contractor shall relocate
mailboxes to their new location and set to proper height, as directed by an authorized
representative of the US Postal Service. Mailboxes shall be reset as close to original location as
possible, unless otherwise noted, while maintaining proper height and location requirements of the
US Postal Service, upon restoration of regular postal service. If mailboxes, bases or posts are
damaged during removal, it shall be the Contractor’s responsibility to replace the damaged part
prior to reinstallation. Contractor shall not be responsible for correction of existing deficient
mailboxes, bases, or posts. Owner and Engineer shall be notified of such instances immediately.
2. Final relocation of mailboxes. If the Postal Carrier can deliver mail to affected properties during
construction, Contractor shall maintain reasonable access to said mailboxes. Upon completion of
the project, Contractor shall relocate mailboxes to a location and height that meets the US Posta l
Service requirements along affected roadways.
Street Signs. The Contractor shall salvage and reinstall all signs affected by construction. All signs to be
removed shall be done in a workmanlike manner and carefully transported to Owner’s storage area. If
signs, sign bases or posts are damaged during removal, it shall be the Contractor’s responsibility to replace
said sign, base or post prior to reinstallation.
Garbage Collection. Garbage and/or recycling collection will continue throughout the project. Contractor
shall provide temporary access to garbage vehicles throughout the project area or assist with garbage
collection in areas inaccessible to vehicular traffic during the project.
OPERATION AND PROTECTION
Contractor shall schedule his work as to minimize the inconvenience to the Owner and residents adjacent
to the project.
Traffic Control. The Contractor shall meet the requirements for traffic control in accordance with the Manual
on Uniform Traffic Control Devices. All structures and equipment shall be constructed, installed, and
operated with guards, controls, and other devices in place.
The Contractor shall provide protection as follows:
Protection. The Contractor shall provide and maintain proper barricades, fences, signal lights, or
watchmen to properly protect the work, persons, animal and property against injury. The cost of
protection shall be incidental to the contract and no extra payment will be allowed therefore.
Provide, erect, and maintain all required barricades, guard rails, temporary walkways, etc., of
sufficient size and strength necessary for protection of stored material and equipment; adjacent to
or within project area; adjoining property and the building(s) as well as to prevent accidents to the
public and the workmen at the job site.
Provide and maintain proper shoring and bracing for existing underground utilities encountered
during excavation work, to protect them from collapse or other type of damage until such time as
they are to be removed, incorporated into the new work, or can b e properly backfilled upon
completion of new work.
Provide protection against rain, snow, wind, ice, storms or heat so as to maintain all work,
materials, apparatus, and fixtures, incorporated in the work or stored on the site, free from injury
or damage. At the end of the day’s work, cover all new work likely to be damaged. Remove snow
and ice as necessary for safety and proper execution of the work.
Protect the building and foundations from damage at all times from rain and groundwater. Provide
all equipment and enclosures as necessary to provide this protection.
Damaged property shall be repaired or replaced in order to return it to preconstruction conditions.
Protect materials, work, and equipment, not normally covered by above protection, until
construction proceeds to a point where the general building protection of the area where located,
dispenses with the necessity therefore. Protect work outside of the building lines such as trenches
and open excavations, as specified above.
[20260519R 62]
Project #00628072 01 14 00-5 Work Restrictions and Provisions
© 2026 MSA Professional Services, Inc.
Take any and all necessary precautions to protect Owner’s property as well as adjacent property,
including trees, shrubs, buildings, sanitary sewers, water piping, gas piping, electric conduit or
cable, etc., from any and all damage which may result due to work on this project.
Repair work outside of property line in accordance with the requirements of the authority having
jurisdiction.
Repair any work damaged by failure to provide proper and adequate protection to its original state
to the satisfaction of the Owner or remove and replace with new work at the Contractor’s expense.
Tree Protection. Trees shall be protected from damage and scarring. Do not injure trunks,
branches, or roots of trees that are to remain. No trees shall be removed without the approval of
the Owner. Tree branches in the way of construction operations shall be carefully pruned prior to
construction. Do cutting and trimming only as approved and as directed by the Owner. Do not
operate equipment or vehicles within the drip line of a tree to be preserved. Any roots exposed
during construction shall be cut clean. Ripping of the roots with excavation equipment shall not
be allowed.
All survey monuments, property stakes, etc., which are encountered during the construction are to
be preserved and undisturbed. The Engineer shall be notified of all such items immediately upon
discovery. Failure to preserve such monuments will not be al lowed and replacement shall be at
the Contractor’s expense.
MEASUREMENT AND PAYMENT
GENERAL
Work restrictions and provisions shall be paid for at the bid price in accordance with one of the following
methods, unless indicated otherwise in the Bid Schedule or Special Procedures - Division 01.
All work specified herein shall be considered in each of the measurement and payment method(s)
stipulated, unless indicated otherwise in the Bid Schedule or Special Procedures - Division 01.
WORK RESTRICTIONS AND PROVISIONS
Work Restrictions and Provisions, Inclusive. The cost associated with work restrictions and provisions shall
be considered inclusive to payment for work related to the associated construction item, unless indicated
otherwise in the Bid Schedule or Special Procedures - Division 01.
END OF SECTION
[20260519R 63]
THIS PAGE I NTENTIONALLY LEFT BLANK
[20260519R 64]
Project #00628072 01 31 13-1 Project Coordination
© 2026 MSA Professional Services, Inc.
SECTION 01 31 13
PROJECT COORDINATION
GENERAL
APPLICABLE PROVISIONS
Applicable provisions of Division 01 shall govern work of this section.
APPLICABLE PUBLICATIONS (NONE)
DESCRIPTION OF WORK
The General Contractor or his appointed representative shall act as the project coordinator. He shall
generally be charged with all duties of a project coordinator including, but not limited to, being responsible
for conditions of the contract, administrative requirements, subcontractor’s scheduling and cooperation,
compliance with specifications and drawings, and all other work related requirements.
Contractor shall coordinate the work with adjacent work and shall cooperate with all other Contractors so
as to facilitate the general progress of the work. Each Contractor shall afford all other Contractors every
reasonable opportunity for the installation of their work and for the storage of their material. In no case
will any Contractor be permitted to exclude from the premises or work, any other Contractor or employees
thereof, or interfere with any Contractor in the executing or installation of the work.
Each Contractor shall perform its work in proper sequence in relation to that of other Contractors and as
approved by the Engineer. Any cost caused by defective or ill-timed work shall be borne by the Contractors
responsible therefore.
Contractor shall arrange the work and dispose of materials so as not to interfere with the work or storage
of materials of others and each shall join their work to that of others in accordance with the intent of the
drawings and specifications.
All Contractors shall work in cooperation with each other and fit their work into the structure as job
conditions may demand. All final decisions as to right- of-way and run of pipes and ducts, etc., shall be
made by the Engineer or the Owner.
It shall be the responsibility of the Contractor to keep constant check on the progress of the work so that
each particular trade can insure proper preparation for installation of that Contractor’s work and not cause
delay in the progress of the work. It shall further be the responsibility of the Contractor to periodically
make inspections of work in progress and to notify the Engineer when work is complete in compliance with
specifications and drawings.
A project log shall be maintained showing daily progress of work. The Engineer and Owner shall have
access to this log book and the project schedule at all times.
RELATED WORK ELSEWHERE
Procurement and Contracting Requirements - Division 00 (All Sections)
SUBMITTALS (NONE)
OPERATION/MAINTENANCE MANUALS AND INSTRUCTIONS (NONE)
PRODUCTS AND MATERIALS (N/A)
EXECUTION (N/A)
[20260519R 65]
Project #00628072 01 31 13-2 Project Coordination
© 2026 MSA Professional Services, Inc.
MEASUREMENT AND PAYMENT (N/A)
END OF SECTION
[20260519R 66]
Project #00628072 01 31 19-1 Project Meetings
© 2026 MSA Professional Services, Inc.
SECTION 01 31 19
PROJECT MEETINGS
GENERAL
APPLICABLE PROVISIONS
Applicable provisions of Division 01 shall govern work of this section.
APPLICABLE PUBLICATIONS (NONE)
DESCRIPTION OF WORK
Preconstruction Meeting. A Preconstruction Meeting will be scheduled and conducted by the Engineer and
shall be attended by representatives of the Owner, Contractor and all subcontractors as deemed required
by the Engineer. The purpose of the meeting will be to identify all project participants, review project
requirements and specifications, establish the method of making pay requests and other matters that may
be deemed necessary to be discussed. At this meeting, the Contractor shall submit the proposed
construction schedule for review, consensus by the parties and approval. The Contractor shall also submit
a schedule of values for the work to be used as the accounting format for all progress payments.
Public Information Meeting. At least one week prior to commencing construction, the Contractor, or
representative, shall attend an evening Public Informat ional Meeting with emergency services
representatives, business owners, and interested residents to be heldon site or at the Owner’s designation.
Construction Progress Meetings. Brief weekly meetings, as deemed necessary by the Engineer, will be held
and shall be attended by all Contractors. The purpose of the meeting will be to coordinate work schedules,
review the project progress and other matters that may be deemed necessary to be discussed.
A construction progress meeting agenda shall be prepared as deemed necessary to the Engineer.
All construction progress meeting attendees shall be fully prepared prior to the meeting and shall
be ready to discuss issues raised as they relate to their work. This shall include, but not be limited
to, providing revised schedules, milestone activities , specific requirements for subordinate
construction and any proposed or completed changes required for their work.
RELATED WORK ELSEWHERE
Procurement and Contracting Requirements - Division 00 (All Sections)
SUBMITTALS (NONE)
OPERATION/MAINTENANCE MANUALS AND INSTRUCTIONS (NONE)
PRODUCTS AND MATERIALS (N/A)
EXECUTION (N/A)
MEASUREMENT AND PAYMENT (N/A)
END OF SECTION
[20260519R 67]
THIS PAGE I NTENTIONALLY LEFT BLANK
[20260519R 68]
Project #00628072 01 32 16-1 Construction Progress Schedule
© 2026 MSA Professional Services, Inc.
SECTION 01 32 16
CONSTRUCTION PROGRESS SCHEDULE
GENERAL
APPLICABLE PROVISIONS
Applicable provisions of Division 01 shall govern work of this section.
APPLICABLE PUBLICATIONS (NONE)
DESCRIPTION OF WORK
Submit preliminary Construction Progress Schedule in accordance with General Conditions prior to pre-
construction conference.
The Contractor shall comply with and the Work shall be completed in accordance with the following
construction schedule:
Award Contract (May 19, 2026 – Tentative)
Notice to Proceed (May 22, 2026 – Tentative)
Substantial Completion. Construction work shall be achieved within 45 calendar days of initiation
with Substantial Completion no later than October 23, 2026. Substantial completion shall include
all work as shown on the Contract Drawings and detailed in these specifications excluding punch
list items.
Final Completion. The project shall be completed by November 6, 2026. Final Completion shall
include all work as shown on the Contract Drawings and detailed in these specifications, including
items addressed in final project closeout punch list.
Within 30 days of final completion, submit final project closeout documentation inclusive of lien
waivers, affidavit of compliance with prevailing wage rate determination, and final pay request.
RELATED WORK ELSEWHERE
Procurement and Contracting Requirements - Division 00 (All Sections)
SUBMITTALS
Furnish one (1) copy of the preliminary schedule, and subsequent revisions thereof, to Engineer three (3)
days before each progress meeting.
Within three (3) days after monthly progress meetings, furnish one (1) copy of the revised schedule to
Engineer. Furnish revised schedule to Subcontractors as appropriate.
Failure to submit schedules on a timely basis shall be considered cause for withholding progress payments.
OPERATION/MAINTENANCE MANUALS AND INSTRUCTIONS (NONE)
PRODUCTS AND MATERIALS (N/A)
EXECUTION
FORM OF SCHEDULE
Prepare schedule in form of horizontal bar chart.
Provide separate horizontal bar for each trade, activity or operation.
Provide continuous vertical line to identify first working day of each week.
Scale and space to allow for notations and future revisions.
CONTENT OF SCHEDULE
[20260519R 69]
Project #00628072 01 32 16-2 Construction Progress Schedule
© 2026 MSA Professional Services, Inc.
Show complete sequence of construction by activity or operation.
Show dates for beginning and completion of each major element of construction and installation dates for
major equipment items. Include:
Each individual task of construction.
Procurement of equipment and systems including Shop Drawing submittals, Engineer’s review of
submittals, shop tests, and delivery dates.
Identification of Work that will affect existing plant operations.
Services of manufactures’ representatives.
Startup dates for major equipment.
Field tests.
Dates of Substantial and Final completion.
Subcontractor Work items.
MBE, WBE, and SBE activities.
O&M data activities
Contractor-provided training.
Show projected percentage of completion for each activity as of first day of each month.
REVISIONS TO SCHEDULE
Each month Contractor shall receive update information from Subcontractors and Suppliers that shall be
included in current schedule. Revised schedule shall indicate changes such as:
Major changes in scope.
Activities modified since previous submittal.
Revised projections of progress and completion.
Other identifiable changes.
Provide narrative report to define following:
Problem area and anticipated delays and their impact on schedule.
Corrective action recommended and its effect.
MONTHLY PROGRESS MEETINGS
Once each month Construction Progress Schedule will be reviewed. Progress will be reviewed:
To identify those activities started and completed during previous period.
For remaining duration required to complete each activity started, but not completed.
For durations of selected activities not yet started.
For effect of Change Orders and proposed sequencing.
Update schedule accordingly.
DELAYS AND RECOVERY
If, at any time during the Project, Contractor fails to complete activity by its latest scheduled completion
date, Contractor shall, within five (5) working days, submit to Engineer written statement as to how and
when work force will be reorganized to return to current construction schedule.
If, during schedule review meetings, it becomes apparent that milestone completion dates or Contract
completion dates will not be met, Contractor shall take some or all of the following actions:
Increase construction staffing in such quantities and crafts as shall eliminate backlog of Work.
Increase number of working hours per shift, shifts per day, Work days per week, amount of
construction equipment or combination of foregoing sufficient to substantially eliminate backlog of
Work.
Reschedule Work actives to achieve concurrency of accomplishment
[20260519R 70]
Project #00628072 01 32 16-3 Construction Progress Schedule
© 2026 MSA Professional Services, Inc.
Under no circumstances will addition of equipment or construction forces, increasing working hours or other
method, manner or procedure to return to current Construction Progress Schedule be considered
justification for Contract modification or treated as acceleration.
MEASUREMENT AND PAYMENT
CONSTRUCTION PROGRESS SCHEDULE
General. Construction Progress Schedule shall be paid for at the bid price in accordance with one of the
following methods, unless indicated otherwise in the Bid Schedule or Special Procedures - Division 01.
Construction Progress Schedule, Lump Sum. When so provided, payment for construction progress
schedule shall be made at the contract lump sum price bid or as specified in Special Procedures -
Division 01.
Construction Progress Schedule, Inclusive. When no quantity is provided, construction progress
schedule shall be considered inclusive to payment for work associated with administration.
END OF SECTION
[20260519R 71]
THIS PAGE I NTENTIONALLY LEFT BLANK
[20260519R 72]
Project #00628072 01 32 23-1 Survey and Layout Data
© 2026 MSA Professional Services, Inc.
SECTION 01 32 23
SURVEY AND LAYOUT DATA
GENERAL
APPLICABLE PROVISIONS
Applicable provisions of Division 1 shall govern work of this section.
APPLICABLE PUBLICATIONS (NONE)
DESCRIPTION OF WORK
The Engineer shall supply marking for the following:
Removal limits
The Contractor will stake and layout all other work. The Contractor shall immediately, upon entering the
site for purpose of beginning work, locate general reference points and take such action as necessary to
prevent their destruction. The Contractor shall layout the work and be responsible for all lines, elevations
and measurements. The Contractor must exercise proper precaution to verify dimensions of the drawings
before laying out work and will be held responsible for any error resulting from failure to exercise such
precaution.
RELATED WORK ELSEWHERE
Procurement and Contracting Requirements - Division 00 (All Sections)
SUBMITTALS
Automated Machine Guidance (AMG) Control / Staking Plan
OPERATION/MAINTENANCE MANUALS AND INSTRUCTIONS (NONE)
PRODUCTS AND MATERIALS (N/A)
EXECUTION
AUTOMATED MACHINE GUIDANCE (AMG)
Contractor may utilize AMG in lieu of or in addition to conventional staking on all or part of the work. When
staking is inclusive to construction, or when the Engineer is supplying line and grade staking, any use of
AMG will be considered inclusive to associated work.
All AMG work must be coordinated with the Engineer throughout the course of construction to ensure that
work performed using AMG conforms to the contract tolerances and that the methods employed conform
to the contractor's AMG Control/Staking Plan and accepted industry standards. The contractor will need to
revert to conventional staking methods (at no additional cost to the Owner) for all or part of the work at
any point during construction if AMG is producing unacceptable results. Acceptable AMG work will be up to
the Engineer’s discretion.
AMG Control/Staking Plan - Submit a detailed AMG plan to the Engineer for review at least 5 business days
before the preconstruction meeting. This plan should explain, at a minimum, how AMG technology will be
integrated into the project , what bid items AMG will be associated with and which, if any, will use
conventional staking, and the process for verification of tolerances. The plan shall also include:
An explanation of how AMG Technology will be integrated into the project
A comprehensive list of bid items associated with AMG
[20260519R 73]
Project #00628072 01 32 23-2 Survey and Layout Data
© 2026 MSA Professional Services, Inc.
A list of any items for which conventional staking will be used (either alone or in conjunction with
AMG)
The process for verification of tolerances
The designation of a single primary contact person for AMG technology issues.
A list/diagram of all control points intended for use on the project for verification as required.
A description of Contractor's quality control procedures. Include the frequency and type of checks
performed to ensure that the work conforms to the contract plans.
Engineer will review the plan for conformance with contract documents. Contractor may not
perform AMG work prior to receiving written approval of the AMG plan. All work using AMG shall
be performed in accordance with the approved AMG plan. Contractor shall submit plan updates to
Engineer throughout the project as necessary, or as directed by the Engineer.
AMG Geometric Information
1. Develop and maintain a contractor construction model for areas of the project employing AMG. Confirm
that the resulting model accurately represents the contract plans. At Engineer’s request, provide the
construction model to the Engineer in .XML format, or other engineer-approved format.
2. Managing and Updating Information - Notify the Engineer of any errors or discrepancies in Engineer-
provided information. Engineer will determine what, if any, revisions may be required. Engineer may revise
the contract drawings, if necessary, to address errors or discrepancies that the contractor identifies. If the
Engineer requests, provide construction model updates to the Engineer. All Contractor costs for revisions
to the linework or other shall be inclusive to the item constructed and no additional money will be paid to
the Contractor.
3. Engineer shall contact Contractor if design changes are made after the bid if they will affect the digital
model. Contractor shall make the appropriate changes to the model or work with Engineer in the field to
ensure design changes are incorporated into final product. Contractor shall be solely responsible for making
adjustments or changes to the model as required.
4. Construction Checks - Check the work against the plan elevation at randomly selected points on cross-
sections located on the plans at the frequency the Engineer approved as a part of the AMGControl / Staking
Plan. Submit the results of these random checks to the Engineer daily. Notify the Engineer immediately if
a check variance exceeds the tolerances specified below. Check the wo rk at additional points as the
Engineer directs. The Engineer may conduct periodic independent checks to verify accuracy with the plans
and contract documents.
5. AMG Construction Tolerances
Item Horizontal Vertical
Daily Calibrations 0.10 feet* 0.05 feet*
Subgrade 0.25 feet 0.10 feet
Base Aggregate 0.25 feet 0.04 feet
Curb and Gutter 0.02 feet 0.01 feet
Concrete Pavement 0.02 feet 0.01 feet
*or as directed by the engineer
6. Contractor supplemental staking and dry run required by item to assist completing work withinconstruction
tolerances:
Sanitary Sewer
Sanitary Sewer staking shall include the structures, wye’s, and 25-feet and 50-feet
outside the structures along the sewer main being installed.
Storm Sewer
Storm Sewer staking shall include the manhole and inlet structures, as well as 25-
feet and 50-feet outside the structuresalong the storm sewer being installed. Inlet
type structures shall reference the “top of curb” as well as the “back of curb” (if
curb and gutter is required).
CONSTRUCTION SURVEY LAYOUT REQUIREMENTS AND TOLERANCES
Tolerances for staking shall be 0.02 feet horizontal and 0.01 feet vertical unless otherwise stated.
[20260519R 74]
Project #00628072 01 32 23-3 Survey and Layout Data
© 2026 MSA Professional Services, Inc.
Construction Staking Tolerances
Item Horizontal Vertical
Slope Stakes 0.25 feet 0.10 feet
Structure Layout 0.02 feet 0.01 feet
Sanitary Sewer 0.02 feet 0.01 feet
Water Main 0.10 feet 0.03 feet
Storm Sewer 0.02 feet 0.01 feet
Pipe Culverts 0.25 feet 0.03 feet
Electrical 0.02 feet 0.01 feet
Subgrade 0.25 feet 0.10 feet
Base Aggregate 0.25 feet 0.04 feet
Curb and Gutter 0.02 feet 0.01 feet
Curb Ramps 0.02 feet 0.01 feet
Concrete Pavement 0.02 feet 0.01 feet
MEASUREMENT AND PAYMENT
CONSTRUCTION LAYOUT
General. Construction Layout shall be paid for at the bid price for the work as described above in
accordance with one of the following methods, unless indicated otherwise in the Bid Schedule or Special
Procedures - Division 1.
Construction Staking, Lump Sum. When so provided, payment for Construction Layout shall be
made at the contract lump sum price bid or as specified in Special Procedures - Division 1.
Construction Staking, Inclusive. When no quantity is provided, Construction Layout shall be
considered inclusive to payment for the associated work.
END OF SECTION
[20260519R 75]
THIS PAGE I NTENTIONALLY LEFT BLANK
[20260519R 76]
Project #00628072 01 33 00-1 Submittals
© 2026 MSA Professional Services, Inc.
SECTION 01 33 00
SUBMITTALS
GENERAL
APPLICABLE PROVISIONS
Applicable provisions of Division 01 shall govern work of this section.
APPLICABLE PUBLICATIONS (NONE)
DESCRIPTION OF WORK
The work under this section shall cover furnishing submittal information as required by the contract
drawings, other specification sections and as specified herein.
RELATED WORK ELSEWHERE
Procurement and Contracting Requirements - Division 00 (All Sections)
Submittal Log - Section 01 33 23
SUBMITTALS
As soon as possible after Notice to Proceed, submit brochures of catalog cuts and specifications for all new
equipment. Submittal of product data shall comply with the requirements for Submittals.
Prior to fabrication or installation, submit Submittals for review. Each submittal shall consist of the minimum
number of copies as listed on the submittal log. Two will be returned to the Contractor. Should more than
two copies of reviewed Submittals be necessary for Contractor’s use and distribution, the Contractor shall
supply additional sufficient number of Submittals for review as required.
Submittals shall include layout details, schedules, setting instructions, and manufacturer’s literature.
Concrete reinforcing steel Submittals shall include a concrete pouring sequence for structures with vertical
construction joints.
Submittals shall be identified with the name of the project, numbered consecutively and bear the
stamp of review of the Contractor as evidence that all drawings have been checked by the
Contractor for accuracy and compatibility with contract requirements. Drawings not so checked
and noted will be returned without being examined.
Partial lists will not be considered; Submittals for each part of work shall be complete in one
submittal.
If information on previously submitted Submittals is altered, in addition to the notations made by the
Engineer, the Contractor shall bring all changes to the attention of the Engineer. Corrections or changes
indicated on reviewed Submittals shall not be considered an order for extra work.
Submittals will not be considered reviewed unless they bear the stamp of review and signature of the
Engineer. Drawings will be reviewed for general design only. Dimensions and fit of units of various parts
shall be the Contractor’s responsibility.
Prior to work at the site, submit samples allowing reasonable time for review and testing. Submit samples
in sufficient quantity (minimum of five), of adequate size showing quality, type, color range, finish and
texture. Label each sample stating materia l, description, applicable specification sections, intended use,
project name, and Contractor’s name.
Order no materials subject to sample review until receipt of written shop drawing review. Materials installed
shall match reviewed samples. No review of samples shall be taken in itself to change or modify contract
requirements beyond the expressed stipulations of the review letter.
[20260519R 77]
Project #00628072 01 33 00-2 Submittals
© 2026 MSA Professional Services, Inc.
All Submittals for major equipment must be reviewed and delivery dates scheduled prior to performing any
work at the site. A revised work schedule shall be submitted weekly showing corrected delivery dates.
OPERATION/MAINTENANCE MANUALS AND INSTRUCTIONS
Prior to start up of the equipment, the Contractor shall provide the Engineer with operation and
maintenance manuals as listed on the submittal log. The manuals shall include the following:
Supplier and manufacturer’s name, address, telephone number, and local representative’s name,
address and telephone number. Sources of service and parts and a list of local repair services,
supply houses, and potential sources for the types of repairs and equipment parts.
Complete and accurate set of record drawings including drawing dimensions, schematics of
hydraulics, wiring, and piping.
Warranties and bonds shall be included in manual.
Catalog literature complete with test data and performance data and ratings.
Specify equipment function, normal operating, and limiting conditions.
Assembly, installation, alignment, adjusting, and checking instructions.
Operating instructions for start-up, shutdown, routine and normal operation.
Emergency operating instructions indicating range and flexibility during emergencies.
Detailed service information including schedule of recommended maintenance.
Troubleshooting, common operating problems, problems that might occur in unit/process. List
probable causes and discuss control/prevention.
Detailed safety section covering the operation and maintenance of unit. Contractor shall supply a
complete list of equipment service numbers, model numbers, electrical requirements,
manufacturer’s names, etc.
The correct model number shall be designated where the literature covers more than one model.
For items assembled by the Contractor, the Contractor shall write and provide duplicate operation
and maintenance instructions.
Data shall be folded to 8-1/2 inch x 11 inch size and placed into hard cover binders. Material shall
be grouped according to specifications section and filed behind individual filing tab pages on which
the following is to be typed: Item, Manufacturer, Con tractor’s Order Number, Supplier’s Order
Number, Manufacturer’s Order Number.
Manuals shall be delivered to the Engineer for approval prior to job completion.
PERMITS AND APPROVALS
Obtain and submit copies of all permits, code inspections, and approval documents, as specified.
CONSTRUCTION SCHEDULE
Submit a minimum of five copies of a schedule of operation prior to construction. The schedule shall
provide for activities of the various trades and shall be sequenced to provide a minimum of interruption to
the operation of existing facilities. Allow ample time for the Owner to alter operations as required by the
construction of the various components of the work. Revised and updated construction schedule shall be
provided throughout the construction as deemed necessary and requested by the Engineer.
The construction schedule shall be supplemented by a list of Submittals, dates they will be submitted for
approval and a reasonable time allowance for review.
START-UP REPORTS
Where equipment startup by a factory-trained representative is required, a minimum of three copies of the
start-up report shall be submitted which describe the representatives activities and installation approval.
Start-up report shall be a typewritten document containing descriptive information specifically
identifying the piece by equipment, all tests conducted, and the results of the tests.
Start-up role log, with the dated signatures of those conducting and accepting all start- up
instructions and tests shall be provided as part of the report.
Substantial completion will not be issued until all start-up reports have been submitted.
[20260519R 78]
Project #00628072 01 33 00-3 Submittals
© 2026 MSA Professional Services, Inc.
RECORD DRAWINGS
The Engineer will provide the Contractor with a suitable set of contract drawings on which daily records of
changes and deviations from contract shall be recorded. All buried or concealed piping, conduit, or similar
items shall be located by dimensions and elevations on the record drawings.
The daily record of changes shall be the responsibility of Contractor’s field superintendent. No
arbitrary mark-ups will be permitted.
At completion of the project, the Contractor shall submit the marked -up record drawings to the
Owner.
SUBMITTAL LOG
A submittal log is included as Section 01 33 23 of this Project Manual, which lists the minimum required
Submittals, product data, samples, and operation and maintenance manuals. Additional submittals not
listed on the log may be required by the Engineer during the course of construction. All submittals to the
Engineer shall include the submittal number shown on the log. The minimum number of copies to be
submitted is shown on the submittal log. Any additional copies required by the Contractor may be
submitted in addition to the number shown on the log.
PRODUCTS AND MATERIALS (N/A)
EXECUTION (N/A)
MEASUREMENT AND PAYMENT
GENERAL
Submittals shall be paid for at the bid price in accordance with one of the following methods, unless
indicated otherwise in the Bid Schedule or Special Procedures - Division 01.
All work specified herein shall be considered in each of the measurement and payment method(s)
stipulated, unless indicated otherwise in the Bid Schedule or Special Procedures - Division 01.
SUBMITTALS
Submittals, Inclusive. The cost for all submittals shall be considered inclusive to payment for work related
to the respective equipment, associated construction, or utility, unless indicated otherwise in the Bid
Schedule or Special Procedures - Division 01.
END OF SECTION
[20260519R 79]
THIS PAGE I NTENTIONALLY LEFT BLANK
[20260519R 80]
Page 1 of 3SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SUBMITTAL LOG
PROJECT: MSA PROJECT NO:
CONTRACTOR:
To Date Sent
Date
Reviewed
Reviewed with no
Comments
Reviewed with
Comments as Noted
Amend and
Resubmit
Rejected
Date
Ret'd
Contractor
Owner
Field
File
2
01 32 16 Construction Progress Schedule 6
01 33 00 Submittals 6
01 55 26 Traffic Control 6
02 01 00 Maintenance of Existing Conditions 6
03 15 00 Concrete Accessories 6
03 30 00 Cast-In-Place Concrete 6
31 05 19.13 Geosynthetics for Earthwork 6
31 11 00 Clearing and Grubbing 6
31 23 13 Subgrade Preperation 6
31 23 33 Trenching and Backfilling 6
31 25 00 Erosion and Sedimentation Controls 6
32 11 23 Aggregate Base and Subbase 6
32 12 13.16 Asphaltic Tack Coat 6
32 12 16 Asphaltic Concrete Pavement 6
32 13 10 Concrete Sidewalk, Steps and Driveways 6
32 91 19.13 Topsoil Placement Grading 6
Spec Section # Spec Section Title/Product
Date
Rec'd
Min. # Req'd
Referred Action # copies to
00628072WOODSTOCK SANITARY SEWER IMPROVEMENT
Submittal/Revision #
# Submitted
01 33 23-1 Shop Drawing Log
[20260519R 81]
Page 2 of 3SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SUBMITTAL LOG
PROJECT: MSA PROJECT NO:
CONTRACTOR:
To Date Sent
Date
Reviewed
Reviewed with no
Comments
Reviewed with
Comments as Noted
Amend and
Resubmit
Rejected
Date
Ret'd
Contractor
Owner
Field
File
2
Spec Section # Spec Section Title/Product
Date
Rec'd
Min. # Req'd
Referred Action # copies to
00628072WOODSTOCK SANITARY SEWER IMPROVEMENT
Submittal/Revision #
# Submitted
32 92 19 Seeding 6
33 01 30.16 Sanitary Sewer Televising 6
33 01 30.83 Manhole Rehabilitation and Coatings for
Concrete Manholes
6
33 05 23.310 Pipe Bursting 6
33 31 13 Public Sanitary Utility Sewerage Pipe 6
33 39 13 Sanitary Sewer Manholes 6
33 41 13 Public Storm Utility Drainage Piping 6
33 49 13 Storm Drainage Manholes, Frames, and Covers 6
01 33 23-2 Shop Drawing Log
[20260519R 82]
Page 3 of 3SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SUBMITTAL LOG
PROJECT: MSA PROJECT NO:
CONTRACTOR:
To Date Sent
Date
Reviewed
Reviewed with no
Comments
Reviewed with
Comments as Noted
Amend and
Resubmit
Rejected
Date
Ret'd
Contractor
Owner
Field
File
2
Spec Section # Spec Section Title/Product
Date
Rec'd
Min. # Req'd
Referred Action # copies to
00628072WOODSTOCK SANITARY SEWER IMPROVEMENT
Submittal/Revision #
# Submitted
01 33 23-3 Shop Drawing Log
[20260519R 83]
THIS PAGE I NTENTIONALLY LEFT BLANK
[20260519R 84]
Project #00628072 01 35 00-1 Special Procedures
© 2026 MSA Professional Services, Inc.
SECTION 01 35 00
SPECIAL PROCEDURES
CONTENTS: Work under this section is intended to supplement and/or modify the individual specifications. This section
does not relieve the Contractor from fulfilling all items in said sections. The numbers of this section are referenced to those
of Specifications Divisions 01 through 33.
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00.01 SPECIFICATION EXPLANATION
A. The Special Procedures items will supplement or supersede the standard specifications. The number
preceding special provisions refers to standard specifications that are being referenced. Where reference
is made to Wisconsin Department of Transportation Specifications, all conditions of said specification will
apply except “Payment and Measurement.”
00.02 WAGE RATES
A. The Contractor shall pay wage rates established by the local wage scale.
00.03 BID QUANTITIES
A. All Bid Quantities are estimated. The Contractor shall field verify all quantities and work prior to submitting
a Bid. Final quantities shall be adjusted to reflect the field installed quantities. The unit price in the Bid
shall not be adjusted though final quantities may vary. Lump sum prices shall not be adjusted. The
Engineer’s estimate of quantities as shown in the Bid is approximate and the right is reserved by the Owner
to increase or decrease said quantities.
00.04 MOBILIZATION, BONDS, AND INSURANCE
A. Payment. The lump sum bid for mobilization, bonds, and insurance shall be a one- time charge to initiate
the construction.
00.05 SUBSURFACE CONDITIONS
A. Existing Conditions. No soil borings or formal Geotechnical Report was performed, conducted or used in
the preparation of the Contract Documents. It is the responsibility of the Contractor to satisfy themself as
to the character of the soils in the project area.
DIVISION 01 - GENERAL REQUIREMENTS
01.01 SECTION 01 14 00 – WORK RESTRICTONS AND PROVISIONS
A. Mail Service. Mail service shall be uninterrupted during construction operations. The Contractor shall
coordinate continued service and/or temporary mailbox location(s) with the Superior Post Office. All costs
for maintaining mail service shall be included in a related bid item. No additional payment will be allowed.
B. Street Signs. The contractor shall be responsible for the removal, storage, and reinstallation of existing
street signs.
C. Working Hours. Contractor shall perform all work required under this contract between the hours of 6 :00
a.m. and 8:00 p.m. on weekdays. Weekend work shall not be allowed unless permission is requested and
granted in writing by Owner. Holidays work restrictions are as follows:
1. Memorial Day: From noon on Friday before to 6:00 AM on Tuesday after;
2. Independence Day: From noon on day prior to 6:00 AM the following non-weekend day;
3. Labor Day: From noon on Friday before to 6:00 AM on Tuesday after.
[20260519R 85]
Project #00628072 01 35 00-2 Special Procedures
© 2026 MSA Professional Services, Inc.
D. Driveways and Entrances. Keep driveways serving adjacent premises clear and available to the property
owners at all times unless otherwise coordinated with City staff and affected property owners with minimum
24-hour notice. Do not use these areas for parking or storage of materials without prior approval of
property owner. Schedule deliveries to minimize on-site storage space requirements for materials and
equipment.
E. Contractor shall be responsible for locating and securing any construction staging areas needed to conduct
their operations. Any proposed staging areas on City of Superior lands or rights of way shall be approved
by the Owner and Engineer.
F. All excavations in traffic areas shall be properly barricaded or restored to a base course driving surface
before hours of darkness on the same day it is excavated. Excavations shall not remain open during
nighttime or non-working hours.
G. Utility Line Opening. Where no other excavation is required, excavations, exploratory or otherwise,
necessary to prevent damage to existing utilities shall be performed by vacuum excavation equipment
manufactured for the purpose of displacing and removing earthen materials in a small (four square feet or
less) area. All costs for locating and vacuum excavation and backfill of existing utilities shall be included in
the unit price bid for “Utility Line Opening”.
01.02 SECTION 01 31 13 – PROJECT COORDINATION
A. Utility Coordination. Gas, communications, or electric utilities may be relocating their facilities concurrently
with the work under this contract. Contractor coordination with utilities will be required. Utility contact
information is provided on the Contract Drawings.
B. Contractor shall be required to provide weekly assistance with garbage collection and tote management
when garbage vehicle access is not feasible. Contractor to coordinate with collection agency.
C. Contractor shall provide property owner notice to remove all non-structural landscape feature from the
work area and provide reasonable time to perform the removals.
01.03 SECTION 01 32 23 SURVEY AND LAYOUT DATA
A. Engineer will only mark removal limits.
B. Contractor will be responsible for staking all other needed work as deemed necessary. Engineer will provide
the alignment in .XML format and linework in .DWG format. No surface information will be provided.
01.04 CSECTION 01 55 26 – TRAFFIC CONTROL
A. General. Work will be performed under traffic control as shown on the Contract Drawings. Contractor shall
maintain local traffic access and emergency services including Fire and Ambulance/EMS. Access to and
from residential driveways shall be maintained at all times practicable during construction. Access for special
needs persons shall be provided as required. Fixed message signs, warning signs, and devices for the
protection of pedestrians and local traffic shall be maintained within the work zone until all utility work and
restoration is complete. Costs for signage shall be included in the lump sum bid for “Traffic Control.”
DIVISION 02 - EXISTING CONDITIONS
02.01 SECTION 02 01 00 – MAINTENANCE OF EXISTING CONDITIONS
A. If damage occurs to any existing pavement, sidewalks, aprons, landscaping, trees, utilities, and other
existing features outside the intent of the Contract Documents, said damage shall be repaired and/or
replaced at the Contractor’s expense.
[20260519R 86]
Project #00628072 01 35 00-3 Special Procedures
© 2026 MSA Professional Services, Inc.
DIVISION 31 - EARTHWORK
31.01 SECTION 31 11 00 – CLEARING & GRUBBING
A. Clearing and grubbing shall be kept to the minimum required for construction. No tree removals or
clearance pruning shall take place without prior landowner notification and approval of the Engineer and
City Forester. Payment of the Clearing and grubbingitem provided in the Bid will be made in the event that
tree removal is determined to be necessary by the Engineer and the Owner during construction.
31.02 SECTION 31 23 13 – SUBGRADE PREPERATION
A. Existing sidewalks, driveways and curb and gutter damaged or removed beyond the marked limits or as
shown on the Contract Drawings, without Engineer approval, shall be replaced at Contractor expense.
B. Excavation Below Subgrade (EBS) with Breaker Run and Geogrid. Breaker run shall be used to backfill EBS
areas. As directed by the Field Engineer, Contractor shall excavate below subgrade to remove weak or
unacceptable soils. The resulting excavation shall be filled with breaker run material and geogrid as per
this specification and compacted as required. Geogrid shall be Tensar BX 1100 (or Engineer approved
equal) and installed per manufacturer’s recommendations.
1. Payment. All costs associated with excavation, grading and disposal of material from EBS areas,
geogrid, breaker run placement, and compaction shall be included in the unit price bid for
“Excavation Below Subgrade with Breaker Run and Geogrid”.
31.03 SECTION 31 23 33 – TRENCHING AND BACKFILLING
A. Embedment Material. Class II bedding utilizing No. 2 clear stone from the undisturbed trench bottom to six
(6) inches above the top of pipe shall be used for all PVC sewer main and lateral. Embedment and initial
backfill materials shall be compacted with a vibratory compactor.
B. Where asphalt pavement removal is necessary, saw cutting shall be required parallel to or at right angles
to the centerline of the impacted roadway. Saw cut locations and removal limits shall meet the approval
of the Engineer. Costs for saw-cutting pavement shall be included in a related bid item.
C. Excavations shall be supported to minimize disturbance to existing adjacent roadways, surfaces and
retaining walls. No additional payment shall be made for the restoration of additional pavement, turf or
surfaces than reasonably necessary to safely complete the work.
D. Backfill. Backfill of all trenches shall be Type II compacted to 95% standard Proctor. Existing materials
from the site shall be utilized for backfill unless otherwise directed or approved by the Engineer. Rocks,
concrete or asphalt pieces over 6 inches in diameter shall not be placed within 2 feet of any sanitary sewer,
water main or service lateral.
E. Compaction of backfill within two feet of all vertical utility structures including valve boxes, cleanouts, and
manholes shall be accomplished by hand-operated compaction equipment in lift thicknesses of eight inches
or less.
F. Imported granular backfill may be utilized with prior approval of the Engineer. Daily load tickets shall be
provided to the Engineer to be eligible for payment.
G. The unit price bid for “Imported Granular Backfill” imported to the site shall include all related costs
including but not limited to removal and disposal of the native materials.
31.04 SECTION 31 25 00 – EROSION AND SEDIMENTATION CONTROLS
A. Installation. The Contractor shall install erosion control measures to prevent siltation into the storm sewer
pipes, structures, or onto any adjacent properties. Any cleaning of storm sewers necessary due to erosion
from the construction site shall be the responsibility of the Contractor at no expense to the Owner. The
[20260519R 87]
Project #00628072 01 35 00-4 Special Procedures
© 2026 MSA Professional Services, Inc.
Contractor will be required to provide and install erosion control as per Wisconsin DNR Conservation Practice
Standards.
B. Payment. All costs for providing, maintaining, and removing erosion control measures, as indicated on the
contract drawings, shall be included in the lump sum bid item for “Erosion Control”.
C. Temporary erosion control measures as shown on the Contract Drawings and included in the Bid are
intended to provide the minimum controls necessary to manage sediment transport.
DIVISION 32 - EXTERIOR IMPROVEMENTS
32.01 SECTION 32 11 23 AGGREGATE BASE AND SUBBASE
A. Breaker Run. Breaker run used to fill EBS areas shall be virgin 3- inch dense graded base meeting the
requirements of the Wisconsin DOT Standard Specifications.
1. Payment. All costs associated with breaker run breaker run placement, and compaction shall be
included in the unit price bid for “Excavation Below Subgrade with Breaker Run and Geogrid”.
B. Completed base course shall be roll tested prior to paving with a loaded dump truck or other machinery
with equivalent axle weights. Tests shall be performed under the observation of the Engineer.
32.02 SECTION 32 12 16 – ASPHALTIC CONCRETE PAVEMENT
A. Material. Asphalt roadways shall have a minimum of 4-inch-thick asphalt. This asphaltic concrete pavement
shall be a 2-inch thick 4 LT 58-34 S for the lower and upper layers. Asphalt driveways shall have a minimum
of 2-inch-thick asphalt in a single layer of 4 LT 58-34 S.
B. All costs for final shaping, grading, compaction of bases, butt joint preparation, valve box and manhole
casting adjustments shall be included in the respective bid item.
32.03 SECTION 32 13 10 – CONCRETE STEPS, SIDEWALKS AND DRIVEWAYS
A. Concrete Driveway 6-Inch. All costs for final shaping, grading, compaction of base, and pavement edge
preparation for driveways shall be included in the unit price bid for “Concrete Driveway 6-Inch”.
B. Prepare a square, straight, sound edge at all places where new concrete meets existing.
32.04 SECTION 32 91 19.13 – TOPSOIL PLACEMENT AND GRADING
A. Topsoil. All lawn areas shall be top dressed with 2- inches screened or sifted topsoil meeting the
requirements of these specifications as approved by Owner or Engineer . The total topsoil thickness in all
areas shall be no less than 6-inches. All rocks and other deleterious material greater than ½-inch nominal
dimension shall be removed from the topsoil prior to seeding.
B. Payment. All costs associated with re-establishing turf to the limits indicated on the Contract Drawings
including the placement of salvaged, screened and/or sifted topsoil, fertilizer, seed, mulch and initial
watering as required shall be included in the lump sum bid for “Turf Restoration”.
32.05 SECTION 32 92 19 – SEEDING
A. Seeding. Topsoil shall be seeded with a high-quality blended grass seed equal to WisDOT No. 40 or
approved equal at an application rate of 5 lbs. / 1000 square foot. A companion crop of annual rye at 2
lbs./1000 square feet shall be seeded as well.
B. Mulch. Straw mulch with a tackifier shall be applied to all areas where turf restoration is required.
[20260519R 88]
Project #00628072 01 35 00-5 Special Procedures
© 2026 MSA Professional Services, Inc.
C. Watering. The Contractor shall apply water to the newly seeded restored areas if weather conditions are
not suitable for establishing turf. Water shall be applied to all disturbed areas affected by this project.
Watering to achieve final turf establishment shall be considered incidental to “Turf Restoration”.
D. Payment. All costs associated with re-establishing turf to the limits indicated on the Contract Drawings
including the placement of salvaged, screened and/or sifted topsoil, fertilizer, seed, mulch and initial
watering as required shall be included in the lump sum bid for “Turf Restoration”.
DIVISION 33 - UTILITIES
33.01 SECTION 33 01 30.82 MANHOLE REHABILTIATION AND EPOXY COATINGS
A. Sewer Manhole Liner. The contractor can choose between epoxy as laid out in this section, polyurea as laid
out in Section 33 01 30.83, or geopolymer as laid out in Section 33 01 30.85.
33.02 SECTION 33 01 30.83 MANHOLE REHABILTIATION AND POLYUREA COATINGS
A. Sewer Manhole Liner. The contractor can choose between polyurea as laid out in this section, epoxy as laid
out in Section 33 01 30.82, or geopolymer as laid out in Section 33 01 30.85.
33.03 SECTION 33 01 30.85 MANHOLE REHABILTIATION AND GOEPOLYMER COATINGS
A. Sewer Manhole Liner. The contractor can choose between geopolymer as laid out in this section, epoxy as
laid out in Section 33 01 30.82, or polyurea as laid out in Section 33 01 30.83.
33.04 SECTION 33 31 13 – PUBLIC SANITARY UTILITY SEWERAGE PIPE
A. Laterals. Existing lateral locations as shown on the plans are approximate and are assumed to be 4-inch or
6-inch diameter. Contractor shall verify the location and size of the existing lateral and have a supply of
couplings and fittings readily available to connect to and match the existing lateral. All excavation, labor,
and materials required for locating and reconnecting to existing laterals shall be included in the unit price
bid for 6-inch PVC Lateral.
B. Inserta Tee Lateral Connection to HDPE. Inserta Tee couplings shall be used to connect existing sanitary
sewer laterals to proposed HDPE s ewer main. All costs for labor, materials, and verifying existing invert
elevations shall be included in the unit price bid for “Inserta Tee Lateral Connection to HDPE”.
C. Testing. Prior to acceptance, all new sewer mains shall be deflection and air tested in the presence of the
Owner/Engineer. Contractor may provide CCTV in lieu of testing.
D. Payment. All costs associated with excavating, removing, and disposing of existing manholes, sewer main,
installation of new sewer main, bedding, backfilling, compaction, and abandoning existing sewers shall be
included in the unit price bid for respective size and type of sanitary sewer and appurtenances. The sewer
main and appurtenances will be measured and paid for at the unit price bid.
33.05 SECTION 33 39 13 – SANITARY SEWER MANHOLES
A. Manhole Adjustment. Work shall include removal and reinstallation of existing or new casting to finished
grade including new concrete or polypropylene adjustment rings.
1. Precompressed butyl gasket, 3/8-inch x 3 1/2- inch shall be used between the structure and all
adjustment rings. A sloped/wedge adjusting ring shall be used between the top ring and the casting
to adjust to finished grade and slope.
2. All excavation, labor, and materials required to adjust the manhole casting shall be included in the
unit price bid for “Manhole Adjustment”.
B. New Casting. Where shown on the contract documents, contractor shall provide a new casting. Castings
shall be Neenah 1670-A Type C with concealed pick holes and self-sealing gasketed non-rocking lids. All
costs of the casting shall be included in the unit price bid for “New Casting”.
[20260519R 89]
Project #00628072 01 35 00-6 Special Procedures
© 2026 MSA Professional Services, Inc.
C. Exterior Chimney Seal (Visco Wrap). All manhole castings and adjusting rings shall be externally
encapsulated with Visco Wrap, or equal. Encapsulation shall extend from the top of the casting flange to
the top of the pre-cast structure. All costs for casting flange and adjusting ring encapsulation shall be
included in the unit price bid for “Exterior Chimney Seal (Visco Wrap)”.
D. Combined Sewer Manhole 48-Inch. The unit price for “Combined Sewer Manhole 48-Inch” shall include
castings, risers, steps, precast cone sections, precast barrel sections, precast base sections, appurtenances,
manhole drops, excavation, labor, and any other material required to install a sewer manhole.
E. Connect to Existing Manhole. Boot couplings shall be used to connect new to existing s ewer manholes. All
costs for labor, materials, and verifying existing invert elevations shall be included in the unit price bid for
“Connect to Existing Manhole”.
33.06 SECTION 33 41 13 – PUBLIC STORM UTILITY DRAINAGE PIPING
A. Inserta Tee Lateral Connection to HDPE. Inserta Tee couplings shall be used to connect existing sanitary
sewer laterals to the proposed HDPE sewer main. All costs for labor, materials, and verifying existing invert
elevations shall be included in the unit price bid for “Inserta Tee Lateral Connection to HDPE”.
B. Testing. Prior to acceptance, all new storm sewer mains shall be deflection and air tested in the presence
of the Owner/Engineer. Contractor may provide CCTV in lieu of testing.
C. Payment. All costs associated with excavating, removing, and disposing of existing structures, stormsewer,
installation of new storm sewer, bedding, backfilling, compaction, and abandoning existing storm sewers
shall be included in the unit price bid for respective size and type of storm sewer and appurtenances. The
sanitary sewer main and appurtenances will be measured and paid for at the unit price bid.
33.07 SECTION 33 49 13 – STORM DRAINAGE MANHOLES, FRAMES, AND COVERS
A. Catch Basin 36-Inch. The unit price for “Catch Basin 36-Inch” shall include castings, risers, steps, precast
flat top, precast barrel sections, precast base sections, casting, exterior chimney seal (Visco Wrap),
appurtenances, manhole drops, excavation, labor, and any other material required to install a storm sewer
catch basin.
B. Connect to Storm Structure. Contractor shall include verify the material and invert elevation of existing
active laterals into existing storm structures. Contractor shall core and connect active laterals into the
proposed storm structures. All costs associated with connecting to the existing storm structure shall be
included in the unit price for “Connect to Storm Structure”. Cost of additional pipe needed to reconnect
existing laterals to new structures will be paid separately under a respective unit bid item.
END OF SECTION
[20260519R 90]
Project #00628072 01 41 26-1 Permits
© 2026 MSA Professional Services, Inc.
SECTION 01 41 26
PERMITS
GENERAL
APPLICABLE PROVISIONS
Applicable provisions of Division 01 shall govern work of this section.
APPLICABLE PUBLICATIONS (NONE)
DESCRIPTION OF WORK
A. The Contractor shall comply in all ways with the requirements of the following permits:
1. City of Superior Land Disturbance/ROW permit for excavation work within City street rights of way
and any planned lane closures. Contractor to implement traffic control plan and complete dates
with emergency contact information in the permit so Public Works and Emergency/911 have project
contact.
2. City of Superior Plumbing Permit for reconnection and plumbing of sanitary sewer service laterals.
Environmental Services will inspect these connections, permits for recording alterations made to
these services.
3. City of Superior tree permit will be necessary if trees are altered or removed from City right of way.
4. These permits are free of cost since this is a City of Superior construction project.
RELATED WORK ELSEWHERE
Procurement and Contracting Requirements - Division 00 (All Sections)
SUBMITTALS (NONE)
OPERATION/MAINTENANCE MANUALS AND INSTRUCTIONS (NONE)
PRODUCTS AND MATERIALS (N/A)
EXECUTION (N/A)
MEASUREMENT AND PAYMENT (N/A)
END OF SECTION
[20260519R 91]
THIS PAGE I NTENTIONALLY LEFT BLANK
[20260519R 92]
Project #00628072 01 45 16.11-1 Concrete Quality Control
© 2026 MSA Professional Services, Inc.
SECTION 01 45 16.11
CONCRETE QUALITY CONTROL
GENERAL
APPLICABLE PROVISIONS
Applicable provisions of Division 01 shall govern work of this section.
APPLICABLE PUBLICATIONS
The following publications of the issues listed below, but referred to thereafter by basic designation only,
form a part of this specification to the extent indicated by the reference thereto.
American Concrete Institute (ACI), Annual Book of ACI Standards:
ACI 117/177R - Specification for Tolerances for Concrete Construction and Materials and
Commentary, Current Edition.
ACI 209.1R - Report on Factors Affecting Shrinkage and Creep of Hardened Concrete,
Current Edition.
ACI 301 - Specifications for Structural Concrete, Current Edition.
ACI 302.1R - Guide for Concrete Floor and Slab Construction, Current Edition.
ACI 305R - Hot Weather Concreting, Current Edition.
ACI 306.1 (R2002) - Standard Specification for Cold Weather Concreting, Current Edition.
ACI 311.4R - Guide for Concrete Inspection, Current Edition.
ACI 318/318R - Building Code Requirements for Structural Concrete and Commentary,
Current Edition.
ACI 530/530.1/530R/530.1R - Building Code Requirements and Specification for Masonry
Structures and Related Commentaries, Current Edition.
ACI ASCC-1(05) - The Contractor’s Guide to Quality Concrete Construction, Third Edition.
ACI CP -10/PACK - Craftsman Study Package for ACI Certification of Concrete Flatwork
Finisher, Current Edition.
ACI MCP06 - ACI Manual of Concrete Practice, Parts 1 through 6, and Index, 2006 Edition.
ACI SCM-24 - Concrete Repair Basics, Current Edition.
ACI SP-4 - Formwork for Concrete, Current Edition.
ACI SP-15 - Field Reference Manual: Standard Specifications for Structural Concrete ACI
301 with Selected ACI Reference, Current Edition.
ACI SP-71 - ASTM Standards in 318, Current Edition.
American Society for Testing and Materials (ASTM), Annual Book of ASTM Standards:
ASTM C31 - Standard Practice for Making and Curing Concrete Test Specimens in the Field,
Current Edition.
ASTM C39 - Standard Test Method for Compressive Strength of Cylindrical Concrete
Specimens, Current Edition.
ASTM C42 - Standard Test Method for Obtaining and Testing Drilled Cores and Sawed
Beams of Concrete, Current Edition.
ASTM C78 - Standard Test Method for Flexural Strength of Concrete (Using Simple Beam
with Third-Point Loading), Current Edition.
ASTM C114 - Standard Test Methods for Chemical Analysis of Hydraulic Cement, Current
Edition.
ASTM C143 - Standard Test Method for Slump of Hydraulic- Cement Concrete, Current
Edition.
ASTM C172 - Standard Practice for Sampling Freshly Mixed Concrete, Current Edition.
ASTM C173 - Standard Test Method for Air Content of Freshly Mixed Concrete by the
Volumetric Method, Current Edition.
ASTM C183 - Standard Practice for Sampling and the Amount of Testing of Hydraulic
Cement, Current Edition.
ASTM C186 - Standard Test Method for Heat of Hydration of Hydraulic Cement, Current
Edition.
ASTM C187 - Standard Test Method for Normal Consistency of Hydraulic Cement, Current
Edition.
[20260519R 93]
Project #00628072 01 45 16.11-2 Concrete Quality Control
© 2026 MSA Professional Services, Inc.
ASTM C188 - Standard Test Method for Density of Hydraulic Cement, Current Edition.
ASTM C192 - Standard Practice for Making and Curing Concrete Test Specimens in the
Laboratory, Current Edition.
ASTM C219 - Standard Terminology Relating to Hydraulic Cement, Current Edition.
ASTM C231 - Standard Test Method for Air Content of Freshly Mixed Concrete by the
Pressure Method, Current Edition.
ASTM C470 - Standard Specification for Molds for Forming Concrete Test Cylinders
Vertically, Current Edition.
ASTM C823 - Standard Practice for Examination and Sampling of Hardened Concrete in
Constructions, Current Edition.
ASTM E329 - Standard Specification for Agencies Engaged in Construction Inspection
and/or Testing, Current Edition.
DESCRIPTION OF WORK
The work under this section shall cover sampling and testing of concrete to determine the materials
conformance and work conformance to the requirements specified for cast-in-place concrete.
RELATED WORK ELSEWHERE
Procurement and Contracting Requirements - Division 00 (All Sections)
Concrete Accessories - Division 03
Cast-in-Place Concrete - Division 03
SUBMITTALS (NONE)
OPERATION/MAINTENANCE MANUALS AND INSTRUCTIONS (NONE)
PRODUCTS AND MATERIALS (N/A)
EXECUTION
TESTING FOR ACCEPTANCE
Samples of concrete shall be delivered to a location on the site where material conformance tests can be
performed.
Samples of concrete shall be obtained in accordance with ASTM C172.
Test specimens shall be stored without being disturbed for the first 24 hours.
Contractor’s Sampling and Testing. The Contractor, or independent testing laboratory engaged
and paid for by the Contractor, as approved by the Engineer, shall conduct tests on the proposed
concrete mixture to determine the slump, entrained air content, compressive strength, or other
appropriate tests to determine conformance with these specifications. The Contractor shall supply
the standard equipment and molds necessary, and the Contractor shall transport the test
specimens to the testing laboratory.
Owner’s Sampling and Testing. The Owner may conduct tests on the proposed concrete mixture
to determine the slump, entrained air content, compressive strength, or other appropriate tests to
determine conformance with these specifications, as deemed necessary by the Engineer.
Slump and Air Content Tests
Slump tests shall be made in accordance with ASTM C143. Air content tests shall be made in
accordance with ASTM C173 or ASTM C231. Slump tests and air tests shall always be performed
from the same batch from which strength tests are performed.
If the measured slump or air content falls outside the limits specified, a check test shall be made
immediately on another portion of the same sample. In the event of a second failure, the concrete
shall be considered to have failed to meet the requiremen ts of the specifications and shall not be
used in the work.
[20260519R 94]
Project #00628072 01 45 16.11-3 Concrete Quality Control
© 2026 MSA Professional Services, Inc.
Strength Tests (Contractor’s Sampling and Testing for Acceptance). Results from tests conducted by the
Contractor shall be considered evidence of compliance of Contractor’s materials used in the work, when
strength is used as the basis for acceptance.
Cylinders for strength tests shall be made in accordance with ASTM C31. During the first 24 hours
all test specimens shall be covered and kept at air temperatures between 60 Degrees Fahrenheit
and 80 Degrees Fahrenheit in facilities provided on the job site by the Contractor. At the end of
24 hours, specimens will be carefully transported by the Contractor to the testing laboratory, where
molds shall be removed, and cylinders shall be cured in a moist condition at 73.4 Degrees
Fahrenheit ±3.0 Degrees Fahrenheit until time of test.
A strength test for any class of concrete shall consist of four standard cylinders made from a
composite sample secured from a single load of concrete in accordance with ASTM C172, with one
cylinder tested at 7 days, two at 28 days, and the fourth used as a spare. The test results at 28
days shall be the average of the strength of two specimens determined in accordance with ASTM
C39, except that if one specimen in a test shows manifest evidence of improper sampling, molding
or testing, it shall be disregarded and the spare cylinder shall be tested.
Strength Test (For Early Formwork or Shoring Removal). If the Contractor wishes to remove formwork or
shoring prior to the minimum time as specified in Structural Cast-In- Place Concrete Forming - Division 03,
they shall, at their expense, prepare test cylinders as evidence of concrete strength as follows:
Cylinders shall be made in accordance with ASTM C31. During the period of time from completion
of the pour to removal of protective cover and stripping of forms, all test specimens shall be kept
with the pour and be subjected to ambient conditions resulting from the curing and protection
facilities provided on the job site by the Contractor. At the end of this period, specimens will be
carefully transported by the Contractor to the testing laboratory, where molds shall be removed
and cylinders shall be stored in outdoor ambient conditions to simulate on job site conditions until
time of test.
A minimum of two cylinders made from a composite sample secured from a single load of concrete
in accordance with ASTM C172. The test results shall be the average of the strength of two
specimens determined in accordance with ASTM C39, except that if one specimen in a test shows
manifest evidence of improper sampling, molding or testing, it shall be disregarded.
SELECTION OF TESTING LABORATORY
An independent testing laboratory to perform Concrete Quality Control shall meet the requirements of
ASTM E329. The laboratory shall be selected by the Contractor as approved by the Engineer.
TEST REPORTS
Test reports will be directly distributed by the laboratory as follows: The original to the Contractor; two
copies to the Engineer; one copy to the Owner.
TESTING REQUIREMENTS
The Contractor shall be required to perform one test for each 100 cubic yards of concrete poured, or
fraction thereof, for each class of concrete used. Each test shall consist of four (4) cylinders; one (1) to be
tested at seven (7) days, two (2) to be tested at twenty-eight (28) days, and one (1) to be a spare.
Compliance testing shall be performed on every single load, or portion thereof, where water addition to the
single load, or portion thereof, takes place on site.
A minimum of one (1) test shall be performed per day for each class of concrete placed.
CONDITIONS OF COMPLIANCE AND NON-COMPLIANCE
Compliance of Contractor’s Materials Used in the Work.
To conform to the requirements of this specification, every 28-day test representing each mix must
be equal to or greater than the specified minimum strength without exception. If a specimen
shows manifest evidence of improper sampling, molding, or testin g, it will be disregarded. Note,
[20260519R 95]
Project #00628072 01 45 16.11-4 Concrete Quality Control
© 2026 MSA Professional Services, Inc.
however, that the anticipated strength for all mixes is appreciably above the specified minimum
strength due to quality required by the water-cement ratio specified.
Non-Compliance of Contractor’s Materials Used in the Work
When strength is used as the basis for acceptance, should individual tests of the Contractor’s
specimens produce strengths less than 90% of the specified strength (f’c), tests of cores drilled
from the area in question may be required in accordance with ASTM C42. Three cores shall be
taken for each cylinder test less than 90% of the specified strength (f’c). If the concrete in the
structure will be dry under service conditions, the cores shall be air dried (temperature 60 to 80F,
relative humidity less than 60 percent) for seven (7) days before test and shall be tested dry. If
the concrete in the structure will be more than superficially wet under service conditions, the cores
shall be immersed in water for at least 48 hours and tested wet.
Concrete represented by the core tests will be considered structurally adequate and meet the
requirements of this specification if the average of the three cores is equal to at least 95 percent
of the specified strength (f’c) and if no single core is less than 90 percent of f’c. To check testing
accuracy, locations represented by erratic core strengths may be retested. If these strength
acceptance criteria are not met by the core tests, the Engineer shall order appropriate action at no
additional cost to the Owner.
MEASUREMENT AND PAYMENT
GENERAL
Concrete quality control shall be paid for at the bid price in accordance with one of the following methods,
unless indicated otherwise in the Bid Schedule or Special Procedures - Division 01.
All work specified herein shall be considered in each of the measurement and payment method(s)
stipulated, unless indicated otherwise in the Bid Schedule or Special Procedures - Division 01.
CONCRETE QUALITY CONTROL
Concrete Quality Control, Inclusive . All required sampling, preparing of specimen and testing, except as
modified by these specifications shall be performed by the Contractor, or an independent testing laboratory
engaged and paid for by the Contractor and shall be inclusive to payment for work associated with cast-in-
place concrete.
The cost of any additional testing required because of failure of previous tests to meet specification
requirements shall be borne by the Owner for subsequent tests which comply with the
specifications.
The cost of any additional testing required because of failure of concrete to meet specification
requirements shall be borne by the Contractor for tests which fail to comply with the specifications.
All tests required under Paragraph 3.05 “Conditions of C ompliance and Non -Compliance”, above
shall be borne by the Contractor.
Concrete Quality Control, Lump Sum. When so provided, payment for concrete quality control shall be
made at the contract lump sum price bid.
END OF SECTION
[20260519R 96]
Project #00628072 01 55 26-1 Traffic Control
© 2026 MSA Professional Services, Inc.
SECTION 01 55 26
TRAFFIC CONTROL
GENERAL
APPLICABLE PROVISIONS
Applicable provisions of Division 01 shall govern work of this section.
APPLICABLE PUBLICATIONS
The following publications of the issues listed below, but referred to thereafter by basic designation only,
form a part of this specification to the extent indicated by the reference thereto.
Manual on Uniform Traffic Control Devices (MUTCD) for Streets and Highways, current edition.
DESCRIPTION OF WORK
The work covered under this section shall include installing and maintaining traffic control devices to safely
and efficiently direct traffic through or around the construction site.
The work also includes removing temporary traffic control devices at the completion of the project.
RELATED WORK ELSEWHERE
Procurement and Contracting Requirements - Division 00 (All Sections)
Work Restrictions and Provisions – Division 01
Submittals – Division 01
SUBMITTALS
If a detailed traffic control plan is not included in the Contract Drawings, the Contractor shall submit a
traffic control plan. Information shall be in conformance with requirements of Submittals - Division 01 of
these specifications.
OPERATION/MAINTENANCE MANUALS AND INSTRUCTIONS (N/A)
PRODUCTS AND MATERIALS
GENERAL
Traffic control devices and materials shall conform to the MUTCD and applicable State Department of
Transportation specifications.
EXECUTION
TRAFFIC CONTROL
All Contractors shall comply with the plan included in the Contract Drawings.
The Contractor shall maintain one lane for resident and emergency vehicle traffic on St. Albans Road and
Newton Lane throughout the duration of the project.
Contractor shall provide and maintain work zone traffic control devices including but not limited to drums,
barricades, signs, warning lights and safety fencing throughout construction to protect local pedestrian and
vehicle traffic from construction hazards.
[20260519R 97]
Project #00628072 01 55 26-2 Traffic Control
© 2026 MSA Professional Services, Inc.
At the end of each workday (7:00 pm) the construction site shall be accessible to property owners. Except
during the concrete curing/setting periods, driveways shall be ramped and accessible by vehicles at the
end of each workday.
It is the responsibility of the Contractor to verify that all traffic control devices are in place before leaving
the site each day, and also maintained during off-work hours if notified by the Engineer or Owner.
All streets shall be accessible for emergency vehicle traffic at all times practicable during construction.
The Contractor shall notify the Engineer and Owner a minimum of 48 hours in advance of closing any
portion of any City street.
MEASUREMENT AND PAYMENT
GENERAL
Traffic control shall be paid for at the bid price in accordance with one of the following methods, unless
indicated otherwise in the Bid Schedule or Special Procedures - Division 01.
All work specified herein shall be considered in each of the measurement and payment method(s)
stipulated, unless indicated otherwise in the Bid Schedule or Special Procedures - Division 01.
TRAFFIC CONTROL
Traffic Control, Lump Sum. When so provided, payment for traffic control shall be made at the contract
lump sum price bid.
Traffic Control, Inclusive. When no quantity is provided, traffic control shall be considered inclusive to
payment for contract work related to the associated construction.
END OF SECTION
[20260519R 98]
Project #00628072 02 01 00-1 Maintenance of Existing Conditions
© 2026 MSA Professional Services, Inc.
SECTION 02 01 00
MAINTENANCE OF EXISTING CONDITIONS
GENERAL
APPLICABLE PROVISIONS
Applicable provisions of Division 01 shall govern work of this section.
APPLICABLE PUBLICATIONS
The following publications of the issues listed below, but referred to thereafter by basic designation only,
form a part of this specification to the extent indicated by the reference thereto.
State of Wisconsin, Department of Transportation, Standard Specifications for Highway and
Structure Construction, Current Edition at time of bid opening.
DESCRIPTION OF WORK
The work under this section shall cover all materials, equipment, supervision, and labor necessary for
surface restoration. The various street surfaces disturbed, damaged, or destroyed during the performance
of the work under this contract shall be restor ed and maintained as shown, specified, and directed.
Included in this classification are pavement surfaces of all types, pavement bases, shoulders, and
appurtenances as driveways, curb and gutter sections, sidewalks, alleys, and all other miscellaneous
surfaces required but not designated under other sections of these specifications.
A schedule of restoration of the pavement surfaces shall be worked out by the Contractor and approved
by the Engineer. The schedule shall be adhered to unless subsequent changes are approved by the
Engineer.
RELATED WORK ELSEWHERE
Procurement and Contracting Requirements - Division 00 (All Sections)
Cast-in-Place Concrete - Division 03
Subgrade Preparation - Division 31
Trenching and Backfill - Division 31
Aggregate Base and Subbase - Division 32
Asphaltic Concrete Pavement - Division 32
SUBMITTALS
Contractor shall submit such product literature and catalog cuts of materials to be supplied to relate these
materials to these specifications. Information shall be in conformance with requirements of Submittals -
Division 01 of these specifications.
OPERATION/MAINTENANCE MANUALS AND INSTRUCTIONS (NONE)
PRODUCTS AND MATERIALS
GENERAL
Materials shall comply with the respective sections of Divisions 03, 31, and 32 of these specifications, as
they are applicable, and those of the State of Wisconsin, Department of Transportation, Standard
Specifications to the extent indicated by the reference thereto.
[20260519R 99]
Project #00628072 02 01 00-2 Maintenance of Existing Conditions
© 2026 MSA Professional Services, Inc.
PAVEMENT SURFACE AND APPURTENANCES
Asphaltic concrete pavement and appurtenances shall conform to the requirements specified in Asphaltic
Concrete Pavement - Division 32 or as specified in Special Procedures - Division 01.
Concrete pavement and appurtenances shall conform to the requirements specified in Cast-in- Place
Concrete - Division 03 or as specified in Special Procedures - Division 01.
EXECUTION
GENERAL
Workmanship shall comply with the respective sections of Divisions 03, 31, and 32 of these specifications,
as they are applicable, and those of the State of Wisconsin, Department of Transportation, Standard
Specifications to the extent indicated by the reference thereto.
TEMPORARY RESTORATION
Upon completion of backfilling, the pavement surface damaged or destroyed shall be temporarily restored
by the Contractor.
The pavement shall be temporarily restored by placing on a prepared subgrade a base consisting
of crushed gravel or crushed stone. The base shall have a minimum thickness of 8 inches plus the
thickness of the permanent type of pavement to be replaced, or greater thickness if necessary to
conform to the thickness of the base disturbed or removed, and shall be placed at the proper line
and grade.
Temporary pavement shall be maintained in a suitable and safe condition for traffic until the
permanent pavement is laid.
Type I backfill shall be used under all paved streets, paved roads, driveways, sidewalks and curb and gutter
sections.
Curbs, where possible, shall be temporarily reset in their place as a part of the temporary restoration.
Damaged or destroyed sidewalks shall be temporarily restored by placing a 3 -inch layer of granular base
material, or other approved material.
PERMANENT RESTORATION
Preparation for pavement and appurtenance replacements may proceed after trenches have been
compacted in accordance with Trenching and Backfill - Division 31. Level and grade, fill, or re-excavate as
necessary. Neatly trim any adjacent permanent pavement by a sawcut joint prior to pavement
replacement.
Base material shall be in accordance with Aggregate Base Course - Division 32 and to a depth of
8 inches or as specified in Special Procedures - Division 01.
Asphaltic concrete pavement shall be in accordance with Asphaltic Concrete Pavement - Division32
and to a depth of 3 inches or as specified in Special Procedures - Division 01.
Concrete pavement and appurtenances shall be in accordance with Cast-in- Place Concrete -
Division 03 and shall be to a depth of 8 inches or as specified in Special Procedures - Division 01.
Concrete pavement reinforcement shall be equal to or exceeding that existing.
MEASUREMENT AND PAYMENT
GENERAL
Maintenance of existing conditions shall be paid for at the bid price in accordance with one of the following
methods, unless indicated otherwise in the Bid Schedule or Special Procedures - Division 01.
All work specified herein shall be considered in each of the measurement and payment method(s)
stipulated, unless indicated otherwise in the Bid Schedule or Special Procedures - Division 01.
[20260519R 100]
Project #00628072 02 01 00-3 Maintenance of Existing Conditions
© 2026 MSA Professional Services, Inc.
MAINTENANCE OF EXISTING CONDITIONS
Maintenance of Existing Conditions, Lump Sum. When so provided, payment for maintenance of existing
conditions shall be made at the contract lump sum price bid.
Maintenance of Existing Conditions, Inclusive. When no quantity is provided, maintenance of existing
conditions shall be considered inclusive to payment for work associated.
END OF SECTION
[20260519R 101]
[20260519R 102]
Project #00628072 02 42 00-1 Removal, Salvage and Abandonment
© 2026 MSA Professional Services, Inc.
SECTION 02 42 00
REMOVAL, SALVAGE AND ABANDONMENT
GENERAL
APPLICABLE PROVISIONS
Applicable provisions of Division 1 shall govern the work of this section.
APPLICABLE PUBLICATIONS
The following publications of the issues listed below, but referred to thereafter by basic designation only,
form a part of this specification to the extent indicated by the reference thereto.
State of Wisconsin, Department of Transportation, Standard Specifications for Highway and Structure
Construction, Current Edition at time of bid opening.
DESCRIPTION OF WORK
The work under this section shall includeremovals and abandonments of existing improvementsas specified
herein and marked in the field.
RELATED WORK ELSEWHERE
Procurement and Contracting Requirements - Division 00 (All Sections)
SUBMITTALS (NONE)
OPERATION/MAINTENANCE MANUALS AND INSTRUCTIONS (NONE)
PRODUCTS AND MATERIALS (NONE)
EXECUTION
REMOVE CURB & GUTTER
Remove curb and gutter at existing joint or sawcut straight joint to aid in removal.
If curb and gutter is tied to concrete pavement, sawcut tie bars prior to removal.
REMOVE CONCRETE
Remove concrete driveway, sidewalk and steps at existing jointand/or sawcut straight joint to aid in removal.
Remove railings, if any.
REMOVE ASPHALTIC PAVEMENT
Remove asphaltic roadway (including asphaltic curbs, if any), driveway and trail. Sawcut straight joint toaid
in removal.
REMOVE PIPE
Verify that all connections to/from the pipe have been disconnected and redirected to new facilities.
Remove pipes and culverts, including endwalls, valves and any other appurtenant items.
Backfill trench in accordance with Section 31 23 33.
[20260519R 103]
Project #00628072 02 42 00-2 Removal, Salvage and Abandonment
© 2026 MSA Professional Services, Inc.
REMOVE STRUCTURE
Verify that all connects to/from the structure have been disconnected and redirected to new facilities.
Remove total structure including casting, unless salvage casting is specified.
Backfill trench in accordance with Section 31 23 33.
REMOVE HYDRANT
Remove hydrant, valves and lead pipe.
Install mechanical plug in existing tee after hydrant has been removed if watermain is not also slated for
immediate removal or abandonment. Mechanical plug shall be in accordance with Section 33 10 00.
Backfill trench in accordance with Section 31 23 33.
REMOVE RETAINING WALL
Remove retaining wall, tie backs, anchorages, foundation, drain tile and any other appurtenant items.
Avoid damage to adjacent structures including remaining sections of wall not scheduled for removal.
Temporarily support soil retained by wall until grading and/or new wall is complete.
SALVAGE ASPHALTIC PAVEMENT AND BASE
Salvage asphaltic pavement and base in accordance with WisDOT Standard Specification 325 except:
Salvage any underlying crushed aggregate base.
Pulverize asphaltic pavement to until at least 97% will pass the 2-inch sieve.
Pickup, load, haul and stockpile material at a location directed by the Engineer.
Salvaged material shall become Owner’s property unless indicated otherwise in the Bid Schedule or
Special Procedures – Division 01.
SALVAGE CULVERT
Salvage culverts and apron endwalls in a manner that will prevent damage. Remove any sediment from
within the culvert.
Pickup, load, haul and stockpile at a location directed by the Engineer.
Salvaged material shall become Owner’s property unless indicated otherwise in the Bid Schedule or Special
Procedures – Division 01.
Backfill trench in accordance with Section 31 23 33.
SALVAGE CASTING
Salvage casting and lid in a manner that will prevent damage. Remove any concrete or asphaltic pavement
stuck to the casting and lid.
Pickup, load, haul and stockpile at a location directed by the Engineer.
Salvaged material shall become Owner’s property unless indicated otherwise in the Bid Schedule or Special
Procedures – Division 01.
SALVAGE HYDRANT
[20260519R 104]
Project #00628072 02 42 00-3 Removal, Salvage and Abandonment
© 2026 MSA Professional Services, Inc.
Salvage hydrant and valve in a manner that will prevent damage.
Remove lead pipe.
Install mechanical plug in existing tee after hydrant has been removed if watermain is not also slated for
immediate removal or abandonment. Mechanical plug shall be in accordance with Section 33 10 00.
Pickup, load, haul and stockpile at a location directed by the Engineer.
Salvaged material shall become Owner’s property unless indicated otherwise in the Bid Schedule or Special
Procedures – Division 01.
Backfill trench in accordance with Section 31 23 33.
SAWCUT
Asphaltic pavement sawcuts shall be cut a minimum of 2 inches deep.
Concrete sawcuts shall be a minimum depth of one-third the concrete thickness.
Contractor shall endeavor to minimize dust.
Sludge from sawing shall not be allowed to flow onto,or be deposited on, any live traffic lane. If sludge from
sawing is deposited onto adjacent concrete surfaces that will remain after the completion of the project, it
shall be promptly removed to avoid staining.
ABANDON PIPE
Verify that all connections to/from the pipe have been disconnected and redirected to new facilities.
For watermains, close all valves, remove all valve boxes and hydrants.
For sanitary sewers and storm sewers, remove all structures and apron endwalls in their entirety.
Seal all pipe ends with concrete for a distance of 1 foot plus the diameter of the pipe.
For all pipes greater than 8 inches in diameter:
Provide fill and vent tubes through the end seals discussed above.
Fill pipes with blown silica sand or flowable concrete.
Seal fill and vent tubes as stated above after filling operations are complete.
All trenches shall be backfilled in accordance with Section 31 23 33.
OTHER REMOVALS
Includes all removals and salvaged items within the project area not specifically designated as a contract bid
item in the bid form.
Includes existing utilities designated for replacement and/or abandonment as part of the project.
Shall be performed in accordance with the requirements of Section 204, State of Wisconsin, Department of
Transportation, Standard Specifications.
Where new pipe or structures are laid in the same location or below, the removal of any existing pipe or
structures shall be incidental to the construction of the new system.
DISPOSAL
[20260519R 105]
Project #00628072 02 42 00-4 Removal, Salvage and Abandonment
© 2026 MSA Professional Services, Inc.
All removed materials not designated for salvage, shall be removed from the project site and abandoned in
accordance with all applicable laws and regulations. The Contractor is responsible for providing all necessary
erosion control measures at disposal sites. No materials shall be deposited in wetland areas.
Contractor is encouraged to recycle as much material as is practical.
MEASUREMENT AND PAYMENT
GENERAL
Removals and abandonments shall be paid for at the bid price in accordance with one of the following
methods, unless indicated otherwise in the Bid Schedule or Special Conditions - Division 1.
REMOVALS
Remove Curb and Gutter, Lineal Foot. Measurement for remove curb and gutter shall be per lineal foot of
curb removed as measured along the face of curb. Payment shall be made at the contract unit price as
measured above for removal and disposal of curb and gutter.
Remove Concrete, Square Yard. Measurement for remove concrete shall be per square yard of concrete
removed. Payment shall be made at the contract unit price as measured above for removal and disposal of
concrete.
Remove Asphalt Pavement, Square Yard. Measurement for remove asphalt pavement shall be per square
yard of asphalt removed. Payment shall be made at the contract unit price as measured above for removal
and disposal of asphalt.
Remove Pipe, Lineal Foot. Measurement for remove pipe shall be per lineal foot of pipe or culverts removed
as measured along the centerline of the pipe to the center of adjacent structures and/or the end of endwalls.
No measurement shall be made for removal of pipes when a new pipe or structure is installed in the same
trench. Payment shall be made at the contract unit price as measured above for removal and disposal of
pipe, endwalls, valves and any other appurtenant items.
Remove Structure, Each. Measurement for remove structure shall be per each structure removed. No
measurement shall be made for removal of structures when a new pipe or structure is installed in the same
trench. Payment shall be made at the contract unit price as measured above for removal and disposal of
structures and any other appurtenant items.
Remove Hydrant, Each. Measurement for remove hydrant shall be per each hydrant removed. No
measurement shall be made for removal of hydrants when a new pipe or hydrant is installed in the same
trench. Payment shall be made at the contract unit price as measured above for removal and disposal of
hydrant, valve, lead and any other appurtenant items and plugging existing tee.
Remove Retaining Wall, Lineal Foot. Measurement for remove retaining wall shall be per lineal foot of
retaining wall removed as measured along the face of the retaining wall at its base. Payment shall be made
at the contract unit price as measured above for removal and disposal of retaining wall, tie backs,
anchorages, foundation, drain tile and any other appurtenant items and providing temporary soil support.
Other Removals, Inclusive. No separate measurement and payment will be made for other removals. All
costs shall be inclusive to other items of work within this section or other related sections.
SALVAGE
Salvage Asphalt Pavement and Base, Square Yard. Measurement for salvage asphaltic pavement and base
shall be per square yard. Payment shall be made at the contract unit price as measured above for
pulverizing, pickup, loading, hauling and stockpiling salvaged asphaltic pavement and base.
[20260519R 106]
Project #00628072 02 42 00-5 Removal, Salvage and Abandonment
© 2026 MSA Professional Services, Inc.
Salvage Culvert, Lineal Foot. Measurement for salvage culvert shall be per lineal foot of culverts salvaged as
measured along the centerline of the pipe to the center of adjacent structures and/or the end of endwalls.
Payment shall be made at the contract unit price as measured above for salvaging, loading, hauling and
stockpiling of culverts.
Salvage Casting, Each. Measurement for salvage casting shall be per each casting salvaged. Payment shall
be made at the contract unit price as measured above for salvaging, cleaning, loading, hauling and
stockpiling casting.
Salvage Hydrant, Each. Measurement for salvage hydrant shall be per each hydrant salvaged. Payment shall
be made at the contract unit price as measured above for salvaging, loading, hauling and stockpiling hydrant
and valve, removing and disposing of lead and any other appurtenant items and plugging existing tee.
SAWCUT
Sawcut, Lineal Foot. Measurement for sawcut of asphalt and concrete shall be per lineal foot. Payment shall
be made at the contract unit price as measured above for sawcut.
ABANDONMENT
Abandon Pipe, Lineal Foot. Measurement for abandon pipe shall be per lineal foot of abandoned pipes of
greater than 6 inches in diameter. No measurement will be made for abandoned pipes of 6 inches in
diameter or less. Payment shall be made at the contract unit price as measured above for abandonment of
pipes by way of sealing and filling.
END OF SECTION
[20260519R 107]
THIS PAGE I NTENTIONALLY LEFT BLANK
[20260519R 108]
Project #00628072 03 15 00-1 Concrete Accessories
© 2026 MSA Professional Services, Inc.
SECTION 03 15 00
CONCRETE ACCESSORIES
GENERAL
APPLICABLE PROVISIONS
Applicable provisions of Division 01 shall govern work of this section.
APPLICABLE PUBLICATIONS
The following publications of the issues listed below, but referred to thereafter by basic designation only,
form a part of this specification to the extent indicated by the reference thereto.
American Concrete Institute (ACI), Annual Book of ACI Standards:
ACI 308R – Guide to Curing Concrete, Current Edition.
American Society for Testing and Materials (ASTM), Annual Book of ASTM Standards:
ASTM C171 - Standard Specification for Sheet Materials for Curing Concrete, Current Edition.
ASTM C272 - Standard Test Method for Water Absorption of Core Materials for Structural
Sandwich Constructions, Current Edition.
ASTM C309 – Standard Specification for Liquid Membrane-Forming Compounds for Curing
Concrete, Current Edition.
ASTM C578 - Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation,
Current Edition.
ASTM C881 - Standard Specification for Epoxy-Resin-Base Bonding Systems for Concrete,
Current Edition.
ASTM C882 - Standard Test Method for Bond Strength for Epoxy-Resin Systems Used with
Concrete by Slant Shear, Current Edition.
ASTM C884 - Standard Test Method for Thermal Compatibility Between Concrete and an
Epoxy-Resin Overlay, Current Edition.
ASTM D6 – Standard Test Method for Loss on Heating of Oil and Asphaltic Compounds,
Current Edition.
ASTM D297 – Standard Test Methods for Rubber Products - Chemical Analysis, Current
Edition.
ASTM D994 – Standard Specification for Preformed Expansion Joint Filler for Concrete
(Bituminous Type), Current Edition.
ASTM D1751 – Standard Specification for Preformed Expansion Joint Filler for Concrete
Paving and Structural Construction (Nonextruding and Resilient Bituminous Types), Current
Edition.
ASTM D1752 – Standard Specification for Preformed Sponge Rubber Cork and Recycled PVC
Expansion Joint Fillers for Concrete Paving and Structural Construction, Current Edition.
ASTM E154 –Standard Test Methods for Water Vapor Retarders Used in Contact with Earth
Under Concrete Slabs, on Walls, or as Ground Cover, Current Edition.
ASTM E1643- 98 - Standard Practice for Installation of Water Vapor Retarders Used in
Contact with Earth or Granular Fill Under Concrete Slabs.
ASTM E1745 - Standard Specification for Plastic Water Vapor Retarders Used in Contact with
Soil or Granular Fill Under Concrete Slabs.
Canadian General Standards Board (CGSB) Standards:
CGSB 41-GP-35M - Performance Standards for Poly Vinyl Chloride (PVC) Waterstops, Types I
and III, Current Edition.
Federal Specification TTS 227 and TTS 230, Current Edition.
U.S. Army Corps of Engineers (USACOE), Specifications and Standards:
USACOE CRD-C572 - Specification for Poly Vinyl Chloride (PVC) Waterstop, Current Edition.
DESCRIPTION OF WORK
The work under this section shall cover furnishing and installing concrete accessories as shown on the
contract drawings and specified herein.
[20260519R 109]
Project #00628072 03 15 00-2 Concrete Accessories
© 2026 MSA Professional Services, Inc.
RELATED WORK ELSEWHERE
Procurement and Contracting Requirements - Division 00 (All Sections)
Structural Cast-In-Place Concrete Forming - Division 03
Cast-in-Place Concrete - Division 03
SUBMITTALS
Contractor shall submit such product literature and catalog cuts of materials to be supplied to the rate these
materials to the specifications. Information shall be in conformance with requirements of Submittals -
Division 01 of these specifications.
OPERATION/MAINTENANCE MANUALS AND INSTRUCTIONS (NONE)
PRODUCTS AND MATERIALS
EXPANSION AND CONTRACTION JOINT FILLER
Preformed Bituminous. Bituminous expansion and contraction joint filler shall be preformed bituminous strips
which complies with ASTM D994.
Preformed Sponge Rubber. Sponge rubber expansion and contraction joint filler shall be preformed which
complies with ASTM D1752.
Preformed Cork. Cork expansion and contraction joint filler shall be preformed which complies with ASTM
D1752.
Thermal Isolation Joint Material (Rigid Insulation). Polystyrene insulation, ASTM C578, Type X, extruded
cellular type, 5 year aged R-value of 5.0 minimum at 75°F water absorption in accordance with ASTM C272 of
0.3 percent by volume maximum, minimum 15 psi compressive strength, 0.5 inch thick.
BOND BREAKER
Cast-in-Place Concrete Flatwork. Asphalt impregnated felts, 15 pound.
Cast-in-Place Concrete Formwork. Non-staining liquid product which imparts a waterproof film to prevent
adhesion of concrete and will not leave a paint-impeding coating on the face of the concrete.
WATERPROOF SHEET MATERIAL FOR CURING
Provide one of the following, complying with ASTM C171: waterproof paper, polyethylene film or
polyethylene-coated burlap.
Use only materials which are resistant to decay when tested in accordance with ASTM E154, as follows:
Polyethylene sheet not less than 6 mils thick; or
Water resistant barrier paper consisting of heavy papers laminated together with glass fiber
reinforcement and overcoated with black polyethylene on each side.
CONCRETE REPAIR COMPOUND
Concrete repair compound shall be as required for the installation as manufactured, Master Builders
Solutions, or equal.
CURING COMPOUND - EXTERIOR
[20260519R 110]
Project #00628072 03 15 00-3 Concrete Accessories
© 2026 MSA Professional Services, Inc.
Curing compound for use on standard exterior concrete shall comply with ASTM C309, Type 2; resin, white
pigmented.
Curing compound for use on colored exterior concrete shall comply with ASTM C309, Type 1, and shall be
compatible with concrete coloring method and surface finish.
EXECUTION
INSTALLATION
Install accessories where shown on contract drawings and as specified herein.
Place bond breaker at junctures of slabs-on-grade with vertical walls.
Expansion and Contraction Joint Filler: Install at locations noted on the drawings calling for expansion /
contraction joint materials.
Seal all exposed surfaces of expansion and contraction joints with joint sealer (3/4 inch deep and hold
1/8 inch below surface of concrete).
Concrete Structural Repair Compound: Apply first coat of repair mortar with a stiff bristle brush to apply a
scrub coat working the mortar into the honeycomb areas, then use a trowel to completely fill the honeycomb
areas and trowel smooth the mortar to flush it out with the face of the concrete.
MEASUREMENT AND PAYMENT
GENERAL
Concrete accessories shall be paid for at the bid price in accordance with one of the following methods,
unless indicated otherwise in the Bid Schedule or Special Procedures - Division 01.
All work specified herein shall be considered in each of the measurement and payment method(s) stipulated,
unless indicated otherwise in the Bid Schedule or Special Procedures - Division 01.
CONCRETE ACCESSORIES
Concrete Accessories, Inclusive. When no quantity is provided, concrete accessories shall be considered
inclusive to payment for work associated with cast-in-place concrete.
END OF SECTION
[20260519R 111]
THIS PAGE I NTENTIONALLY LEFT BLANK
[20260519R 112]
Project #00628072 03 30 00-1 Cast-in-Place Concrete
© 2026 MSA Professional Services, Inc.
SECTION 03 30 00
CAST-IN-PLACE CONCRETE
GENERAL
DESCRIPTION OF WORK
The work covered under this section shall cover furnishing all materials, equipment and labor required to
construct all cast-in-place concrete as shown on the contract drawings and as specified.
RELATED WORK ELSEWHERE
Procurement and Contracting Requirements - Division 00 (All Sections)
Submittals - Division 01
Concrete Quality Control - Division 01
Concrete Accessories - Division 03
Concrete Reinforcing - Division 03
APPLICABLE PROVISIONS
Applicable provisions of Division 01 shall govern work of this section.
APPLICABLE PUBLICATIONS
The following publications of the issues listed below, but referred to thereafter by basic designation only,
form a part of this specification to the extent indicated by the reference thereto.
American Concrete Institute (ACI), Annual Book of ACI Standards:
ACI 117/177R - Standard Specification for Tolerances for Concrete Construction and
Materials and Commentary, Current Edition.
ACI 211.1 - Standard Practice for Selecting Proportions for Normal, Heavyweight, and Mass
Concrete, Current Edition.
ACI 209.1R - Report on Factors Affecting Shrinkage and Creep of Hardened Concrete,
Current Edition.
ACI 301 - Specification for Structural Concrete, Current Edition.
ACI 302.1R - Guide for Concrete Floor and Slab Construction, Current Edition.
ACI 304R - Guide for Measuring, Mixing, Transporting, and Placing Concrete, Current
Edition.
ACI 305R - Hot Weather Concreting, Current Edition.
ACI 306 - Standard Specification for Cold Weather Concreting, Current Edition.
ACI 308R - Guide to Curing Concrete, Current Edition.
ACI 309R - Guide for Consolidation of Concrete, Current Edition.
ACI 311.4R - Guide for Concrete Inspection, Current Edition.
ACI 318/318R - Building Code Requirements for Structural Concrete and Commentary,
Current Edition.
ACI 350 –Code Requirements for Environmental Engineering Concrete Structures, Current
Edition.
ACI 530/530.1/530R/530.1R - Building Code Requirements for Commentary for Masonry
Structures and Specification for Masonry Structures and Related Commentaries, Current
Edition.
ACI ASCC MNL-5 - The Contractor’s Guide to Quality Concrete Construction, Current
Edition.
ACI CP -10/PACK - Craftsman Study Package for ACI Certification of Concrete Flatwork
Technician/Finisher, Current Edition.
ACI MCP - ACI Manual of Concrete Practice, Parts 1 through 7, and Index,Current Edition.
[20260519R 113]
Project #00628072 03 30 00-2 Cast-in-Place Concrete
© 2026 MSA Professional Services, Inc.
ACI SCM-24 - Concrete Repair Basics, Current Edition.
ACI SP15 - Field Reference Manual: Standard Specifications for Structural Concrete ACI
301 with Selected ACI Reference, Current Edition.
ACI SP-71 - ASTM Standards in ACI 318, Current Edition.
American Society for Testing and Materials (ASTM), Annual Book of ASTM Standards:
ASTM C33 - Standard Specification for Concrete Aggregates, Current Edition.
ASTM C70 - Standard Test Method for Surface Moisture in Fine Aggregate, Current Edition.
ASTM C94 - Standard Specification for Ready-Mixed Concrete, Current Edition.
ASTM C109 - Standard Test Method for Compressive Strength of Hydraulic Cement Mortars
(using 2-inch or [50 mm] Cube Specimens), Current Edition.
ASTM C125 - Standard Terminology Relating to Concrete and Concrete Aggregates,
Current Edition.
ASTM C127 - Standard Test Method for Density, Relative Density (Specific Gravity) and
Absorption of Coarse Aggregate, Current Edition.
ASTM C128 - Standard Test Method for Density, Relative Density (Specific Gravity) and
Absorption of Fine Aggregate, Current Edition.
ASTM C131 - Standard Test Method for Resistance to Degradation of Small- Size Coarse
Aggregate by Abrasion and Impact in the Los Angeles Machine, Current Edition.
ASTM C143 - Standard Test Method for Slump of Hydraulic- Cement Concrete, Current
Edition.
ASTM C150 - Standard Specification for Portland Cement, Current Edition.
ASTM C171 - Standard Specification for Sheet Materials for Curing Concrete, Current
Edition.
ASTM C191 -Standard Test Methods for Time Setting of Hydraulic Cement by Vicat Needle,
Current Edition.
ASTM C219 - Standard Terminology Relating to Hydraulic Cement, Current Edition.
ASTM C226 - Standard Specification for Air-Entraining Additions for Use in the Manufacture
of Air-Entraining Hydraulic Cement, Current Edition.
ASTM C233 - Standard Test Method for Air -Entraining Admixtures in Concrete, Current
Edition.
ASTM C260 - Standard Specification for Air-Entraining Admixtures for Concrete, Current
Edition.
ASTM C311 -Standard Test Methods for Sampling and Testing Fly Ash or Natural Pozzolans
for use as a Mineral Admixture in Portland-Cement Concrete, Current Edition.
ASTM C494 - Standard Specification for Chemical Admixtures for Concrete, Current Edition.
ASTM C535 - Standard Test Method for Resistance to Degradation of Large- Size Coarse
Aggregate by Abrasion and Impact in the Los Angeles Machine, Current Edition.
ASTM C566 - Standard Test Method for Total Evaporable Moisture Content of Aggregate
by Drying, Current Edition.
ASTM C595 - Standard Specification for Blended Hydraulic Cement, Current Edition.
ASTM C618 - Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzlan
for Use in Concrete, Current Edition.
ASTM C688 - Standard Specification for Functional Additions for Use in Hydraulic Cements,
Current Edition.
ASTM C989 - Standard Spe cification for Slag Cement for Use in Cement and Mortars,
current edition.
Portland Cement Association (PCA) Standards and Specifications:
PCA - Design and Control of Concrete Mixtures, Current Edition.
DEFINITIONS
Public: Persons allowed on-site and within buildings by the Owner.
Severe Exposure: Conditions where concrete is subjected to aggressive environments that can significantly
impact its durability, such as chemical attacks from substances like acids, alkalis, or other corrosive
chemicals.
SUBMITTALS
[20260519R 114]
Project #00628072 03 30 00-3 Cast-in-Place Concrete
© 2026 MSA Professional Services, Inc.
Submit such product literature and catalog cuts of materials to be supplied to relate these materials to the
specification. Information shall be in conformance with requirements of Submittals - Division 01 of these
specifications.
Concrete Design Mix
Prior to the start of placing of concrete, submit the design mix for each class of concrete, indicating
that the concrete constituents and proportions will result in a concrete mix meeting the physical
requirements for each class of concrete specified.
Submit with the design mix, laboratory strength test reports and manufacturer’s certificates
attesting the conformance of constituents with these specifications.
Do not vary the proportions of the constituents or source of material of the approved mix without
submitting corresponding test result documentation to the Engineer for review and approval.
Design mix shall indicate proportions of cement, aggregate and water, and names and proportions
of admixtures and air-entraining agents.
Laboratory strength test reports shall contain strength data for the required number of tests as
specified in ACI 318 (for non-water retaining concrete) or ACI 350 (for water-retaining concrete)
design specifications. If existing data for the required number of tests is not available, then ACI
318/350 allows for alternate data or trial mixture results to be submitted for approval. Provide
certification that the design mix complies with all ACI and ASTM requirements.
Concrete Installation Submittals
Submit proposed plans and methods for cold/hot weather concrete placement procedures.
OPERATION/MAINTENANCE MANUALS AND INSTRUCTIONS (NONE)
PRODUCTS AND MATERIALS
CEMENTITIOUS MATERIALS
Cement
Cement shall be Portland Cement ASTM C150 Type I or IA or ASTM C595 Class IL, except as
otherwise noted or approved.
Type III cement shall only be used for Class L concrete, or when approved by the Engineer.
ASTM C150 Type I or IA, Type II, and Type III, and ASTM C595 blended cement types IL,
IP, and IS shall be used for exterior flatwork as approved by the Engineer.
A singular brand and manufacturer of cement shall be used for the entire work.
Fly Ash and Slag
Cement Substitutions:
Contractor may use fly ash or ground granulated blast furnace slag (GGBFS) as a substitute
for a portion of Portland cement in the structural concrete. The maximum allowable
substitution rates shall be as follows:
Fly Ash: 20%
GGBFS: 30%
Total Mineral Admixture: 30%
Fly Ash:
Fly ash shall conform to ASTM C618 Class C.
A singular source of fly ash shall be used for the entire work.
Slag:
Slag shall be ground granulated blast furnace slag (GGBFS) conforming to ASTM C989.
AGGREGATE
Aggregate shall consist of clean, hard durable sand, gravel, crushed gravel or crushed rock.
[20260519R 115]
Project #00628072 03 30 00-4 Cast-in-Place Concrete
© 2026 MSA Professional Services, Inc.
Aggregate shall conform to the requirements of ASTM C33. Fine and coarse aggregate shall meet ASTM
C33 grading requirements. Coarse aggregates shall be graded in accordance with ASTM gradations as
follows:
3/4 inch maximum coarse aggregate - ASTM No. 67
1-1/2 inch maximum coarse aggregate - ASTM No. 467
Maximum aggregate size shall be as defined in the Concrete Schedule, or where not defined in the Concrete
Schedule, as defined by dimensional constraints for cast-in-place concrete as follows.
Not larger than one-fifth of the narrowest dimension between sides of the forms;
Not larger than one-third the thickness of the slab;
Not larger than three-fourths of the minimum clear spacing between individual reinforcing bars or
wire, bundles of bars, or prestressing tendons or ducts.
MIXING WATER
Mixing water shall be natural or treated water, clean and free from injurious amount of oil, acid, alkali,
chlorides and sulfates, other common salts, organic matter or other deleterious substances.
Mixing water shall yield cement paste complying with the requirements ASTM C109 and ASTM C191.
ADMIXTURES
All admixtures are subject to the written approval of the Engineer and shall be used in strict accordance
with the manufacturer’s recommendations.
Air-Entraining Admixture
All concrete exposed to weather and freeze -thaw cycles shall be air-entrained, unless
otherwise specified.
Air-Entraining admixture shall conform to ASTM C260.
Air-Entrainment shall be as indicated for each class as in the Concrete Schedule.
Water-Reducing, Set-Controlling Admixtures
Water-Reducing, Set-Controlling admixtures shall conform to ASTM C494, Type A for
water-reducing, Type C for accelerating, Type D for water -reducing and retarding, and
Type E for water- reducing and accelerating. Type F for water reducing, high range, and
Type G for water reducing, high range and retarding.
Admixtures containing calcium chloride or soluble chloride shall not be used.
EXECUTION
COORDINATION
Examine the drawings and specifications for work of other sections or other contractors and coordinate
such work with the requirements of this Section; make provisions for installation of such items as sleeves,
pipes, conduits, inserts and hangers in a manner that will not impair or weaken concrete construction.
Verify that preinstallation meetings have occurred per requirements of Part 1.
READI-MIX CONCRETE
Acceptability and Use. Readi-mix concrete shall be designed on the basis of strength, durability,
impermeability, and exposure condition, as required for the intended use of the structure by methods
specified in ACI 211.1 and ACI 318. All readi-mix concrete shall comply with the water-cement ratio for
each specific class of concrete as specified in the Concrete Schedule. Concrete design mix, complete with
sample test results shall be submitted to the Engineer for approval prior to placing any concrete.
Failure to Meet Strength Requirements. Failure to meet strength requirements shall be as defined
in Concrete Quality Control- Division 01 of these specifications.
Watertight Concrete. All concrete exposed to earth or water shall be watertight, shall have a water-
cement ratio as specified, and shall be air-entrained as specified in the Concrete Schedule.
Provide damp-proofing membrane as indicated on the contract drawings.
[20260519R 116]
Project #00628072 03 30 00-5 Cast-in-Place Concrete
© 2026 MSA Professional Services, Inc.
Waterproof Concrete. All concrete for water retaining structures shall be waterproof, shall have a
water-cement ratio as specified, and shall be air-entrained as specified in the Concrete Schedule.
Install waterstops as indicated on the contract drawings.
Mix Proportioning. Mix proportioning shall be the responsibility of the Contractor and shall be submitted
for review and approval by the Engineer, in accordance with these specifications.
Select proportions for concrete to obtain the quality requirements for the class of concrete as
specified in the Concrete Schedule. Contractor, at their expense, shall have an approved
independent laboratory prepare design mixes for each specified concrete class.
Slump. Slump for class of concrete shall be as specified in the Concrete Schedule. The Contractor
shall at their expense, make field slump tests in accordance with ASTM C143 and Concrete Quality
Control-Division 01 of these specifications.
Adjustment to Concrete Mixes. Design mix adjustments may be requested by the Contractor when
characteristics of materials, conditions, weather, test results, or other circumstances warrant.
Laboratory test data for revised design mixes and strength results shall be submitted and approved
before using in the work. No change in contract price will be allowed for these changes.
Addition of Water to the Batch. Addition of water to the batch delivered to the site shall be in strict
accordance with ASTM C94. This shall be the Contractor’s responsibility and by their direction,
following consultation with the Engineer.
Addition of water to the batch shall be one time only. Total gallons of water added to the
batch shall be recorded on the load ticket, which shall be supplied to the Engineer prior to
that delivery truck leaving the site. If water is permitted to be added to mixed concrete
upon arrival at the job, an additional mixing of 30 revolutions of the drum shall be required.
Contractor shall adjust the water -cement ratio of the batch to the corresponding value
based on the addition of water to the batch and shall submit this information to the
Engineer with adjusted strength data for the final batch proportion.
At no time shall the addition of water cause the water-cement ratio specified in the concrete
class schedule to be exceeded.
GENERAL
Unless otherwise specified, conform to ACI 304, 305, and 306 for concrete installation requirements such
as preparation, mixing, conveying, depositing, curing, and cold and hot weather requirements; consolidate
concrete in accordance with ACI 309.
Concrete not placed within 90 minutes or 300 revolutions, whichever occurs first, after the first mixing of
the cement and aggregates will be rejected.
Contractor shall indicate on record set of Drawings at site, for review prior to installation, a pouring program
for concrete work showing unit of operation, method of pouring, installation of construction/control joints,
expansion joints and all necessary work.
Proper grade marker or stakes shall be used by Contractor to establish grades for ramps, platforms,
sidewalks, slopes to drains, inlets, etc.
Trenches, forms, conveying equipment shall be prepared to receive concrete in accordance with ACI 304.
Place concrete footings upon undistributed clean surfaces, free from frost, ice, mud and water; when
foundation is on dry soil or pervious material, lay waterproof sheathing paper over earth surfaces to receive
concrete.
Rock surfaces upon which concrete is to be placed, make level, clean, free from all objectionable coatings,
water, mud, debris, loose semi -detached or unsound fragments; level surfaces to receive sand cushion
placed to minimum thickness of 2 inches.
Immediately after placement, protect concrete from premature drying, excessively hot or cold temperature
and mechanical injury; maintain with minimum moisture loss and relatively constant temperature for the
period necessary for hydration of the cement and hardening of the concrete.
[20260519R 117]
Project #00628072 03 30 00-6 Cast-in-Place Concrete
© 2026 MSA Professional Services, Inc.
All freshly cast concrete shall be protected from damaging effects of the elements freezing, rapid drop in
temperature and loss of moisture and from future construction operations.
PREPARATION OF EQUIPMENT AND PLACE OF DEPOSIT
Before placement, clean equipment for mixing and transporting the concrete; remove debris and ice from
all surfaces upon which concrete is placed; clean reinforcement of dirt, loose rust, and mill scale, or other
coatings.
Remove water from all areas before depositing concrete; before depositing new concrete on or against
concrete that has set, thoroughly roughen; clean existing surfaces of laitance, foreign matter or loose
particles; retighten forms; slush existing surfaces with neat cement grout coat; place new concrete before
grout has attained initial set; give horizontal construction joints grout brush coat of cement, fine aggregate,
in same proportions as concrete to be placed.
Thoroughly wet the stone base on which slabs are to be placed where no vapor barrier is indicated.
Check compaction of fill and proper grade for slabs-on-grade. Check screeds and exercise care to prevent
disturbing screeds during placement. Provide for construction joints in slabs-on-grade at 20 feet maximum
in each direction unless shown otherwise on the contract drawings. Place expansion joint material at
junctures of slabs-on-grade with vertical walls and as otherwise shown.
Remove debris, excess form oil, and water from formwork; avoid washing newly deposited concrete.
MIXING
Ready-mixed concrete shall be mixed and delivered in accordance with ASTM C94 and ACI 304. The
production facilities shall comply with the requirements of the National Ready Mixed Concrete Association
Certification Plan as regards materials storage and handling, batching equipment, central mixer, truck
mixers, agitators, non-agitating units, ticketing system, etc.
Do not over-mix; do not use concrete which is retained in mixers so long as to require additional water in
excess of design mix water to permit satisfactory placing; retempering of mix is not permitted.
Concrete shall be delivered to the site of the work and the mixed concrete discharged completely within 1-
1/2 hours after water has been added to cement. In hot weather, or under conditions contributing to quick
stiffening of concrete, this time may be reduced by the Engineer.
Concrete delivered shall arrive at the site having a temperature not less than 50 Degrees F nor greater
than 85 Degrees F, unless otherwise permitted by the Engineer.
CONVEYING
Convey concrete from the mixer to the final deposit by methods that will prevent segregation or loss of
materials.
Use of aluminum conveyances is not permitted.
CONCRETE PLACEMENT
Place concrete, including drops greater than 60 inches using recommended practices in accordance with
ACI 304 and ACI 318. Once pouring operation commences, it shall be carried out as a continuous operation
until a section is completed.
Deposit concrete as nearly as practical in its final position to avoid segregation due to rehandling or flowing;
do not use vibrators to move concrete horizontally within the forms.
Do not use retempered concrete or concrete contaminated by foreign material.
[20260519R 118]
Project #00628072 03 30 00-7 Cast-in-Place Concrete
© 2026 MSA Professional Services, Inc.
Plan and conduct concrete placement to ensure that the concrete is kept plastic and that the concrete is
free of cold joints.
Where there is a time delay greater than 45-minutes between adjacent concrete placement, a bulkhead
construction joint, complete with waterstops where required, must be installed.
Do not commence placing when the sun, heat, wind or limitations of facilities provided prevent proper
finishing or curing.
Discontinue concreting when the descending natural air temperature falls lower than 40 Degrees Fahrenheit
unless preparations are made and in place to heat or insulate concrete in accordance with the cold weather
concreting requirements of this specification.
Concrete shall not be placed or poured in water. Water level shall be removed or lowered in a manner
approved by Engineer. Excess water shall not be permitted. Powdering a mixture of cement to absorb
excess water shall not be permitted.
Concrete shall be placed before initial set has occurred. Placing should be carried on in such manner that
the concrete in the form is still plastic and can be integrated with fresh concrete.
Contractor shall notify Engineer of concrete pouring schedule one day in advance of pour to allow for
inspection of reinforcing and forms.
Bottom dump buckets may be used for transporting mixed concrete to the desired location. Particular care
shall be taken to avoid jarring or bumping as this may cause segregation.
Where chutes are used to transport concrete, they shall be of metal or wood with metal lining and should
have a slope not exceeding 1 vertical to 2 horizontal and not less than 1 vertical to 3 horizontal so that the
concrete will travel fast enough to keep the chute clean but slow enough to avoid segregation of materials.
The end of each chute shall be provided with a baffle to help prevent segregation, or the concrete should
be discharged through a tremie or elephant trunk directly into the form.
Elephant trunks and/or tremies shall be used in walls and columns to prevent free fall of the concrete and
to allow the concrete to be placed through the cage of reinforcing steel.
Pumping equipment shall be of suitable type, without Y -sections, and with adequate pumping capacity.
Loss of slump in pumping shall not exceed 1-1/2 inches.
CONSOLIDATION
Each concrete layer placed shall be compacted by mechanical internal vibrating equipment supplemented
by hand spading, rodding, or tamping.
The period of concrete vibration shall not be less than two seconds nor more than five seconds at any one
point.
Consolidate concrete thoroughly as it is placed in order to secure a dense mass; work concrete well around
the reinforcement and embedded items and into the corners of the forms.
Use internal vibrators inserted vertically over the entire area of the placement; form vibrators not permitted;
internal vibrators shall maintain a minimum of 5000 impulses when submerged in concrete.
Vibrate until voids are eliminated, coarse aggregate is suspended in mortar, and entrapped air bubbles
begin to rise to the surface; concrete should move back into the space vacated by the vibrator; vibration
duration shall be limited only to the time necessary to produce consolidation without causing segregation.
Space vibrator insertions such that the area visibly affected by the vibrator overlaps the adjacent just-
vibrated area by a few inches.
[20260519R 119]
Project #00628072 03 30 00-8 Cast-in-Place Concrete
© 2026 MSA Professional Services, Inc.
Penetrate at least 6 inches into previously placed layers in order to bond between layers and avoid cold
joints.
Take care not to over-vibrate air entrained concrete; place vibrator to eliminate honeycombing but avoid
excess vibrating that bleeds all entrapped air from the mix.
Do not use vibrators to transport concrete.
JOINTS
Construct expansion, control, and isolation joints only where indicated on the drawings or at additional
locations approved by the Engineer (and as shown on the Standard Details).
Where the placing of concrete is discontinued, clean off laitance and other objectionable material to a
sufficient depth to expose sound concrete as soon as concrete is firm enough to retain its form; smooth
the top surface of concrete adjacent to the forms with a trowel to minimize visible joints on exposed faces.
Immediately upon completion of the work of placing concrete, remove accumulations splashed upon the
reinforcement and the surfaces of the forms; perform this removal before concrete takes its initial set;
clean reinforcing steel carefully to prevent damage to the concrete steel bond.
Do not halt work within 18 inches of the top of any face.
For bonded horizontal joint construction, roughen the surface and expose the aggregate; clean the surface
thoroughly by wet sandblasting, by cutting with high- pressure water jet or by other approved methods;
perform cleaning after the concrete has hardened to prevent raveling of the surface below the desired
depth.
Construction and contraction joints shall be constructed with interfaces roughened to 1/4-inch amplitude,
cleaned and laitance removed.
Before bonding concrete is placed, clean the surface of loose or soft particles or other objectionable
materials and keep wet for a minimum period of 12 hours.
Cover the cleaned and saturated surface with a coating of neat cement grout and deposit new concrete
before the grout has attained its initial set.
CURING
Concrete shall be wet cured by immersion of moisture-retaining covers in conformance with ACI 308 or
shall receive curing compound in accordance with ACI 309.
Water curing is the preferred method of protection for curing concrete; cover exposed surfaces with a
saturated material (burlap or cotton mats) and keep wet continuously with a soil soaker hose for 7 curing
days for all concrete except high early strength concrete; leave covering in place, without wetting, for an
additional 3 days.
A curing day is defined as 24-hour day when the concrete surfaces are kept moist and the uniform
temperature of the concrete mass is between 55 Degrees Fahrenheit and 75 Degrees Fahrenheit.
Curing shall start as soon as free surface water disappears after finishing. Where forms are not removed
immediately, curing shall be accomplished in a manner acceptable to the Engineer.
Curing compounds may not be used on surfaces that are to receive additional concrete, paint or tile, unless
approved by the manufacturer for such use.
Curing and sealing compound shall not be applied to steel reinforcing anchors, water stops, construction
joints, or surfaces to be bonded to other concrete.
[20260519R 120]
Project #00628072 03 30 00-9 Cast-in-Place Concrete
© 2026 MSA Professional Services, Inc.
When using a curing compound, keep surfaces moist after the forms are removed. Preferred sequence:
Remove forms in accordance with 03 11 13 Structural Cast-In-Place Concrete Forming of this specification:
apply curing compound according to manufacturer’s recommendations (if manufacture allows pre-finishing
application); repair form tie holes; finish surface. Alternate sequence (if manufacturer does not allow pre-
finishing application): Remove forms in accordance with 03 11 13 Structural Cast-In-Place Concre te
Forming of this specification; repair form tie holes; finish surface; apply curing compound according to
manufacturer’s recommendations.
Slabs: Immediately following slab finishing, begin water curing before the surface becomes dry or apply
liquid membrane-forming curing compound.
For curing concrete under hot weather conditions, see Hot Weather Requirements in this section.
For curing concrete under cold weather conditions, see Cold Weather Requirements in this section.
CONCRETE SLAB FINISHING
Complete screeding and darbying slabs before excess moisture or bleeding water is present on the surface.
Do not begin subsequent finishing operations until surface water has disappeared and the concrete will
sustain foot pressure with only approximately 1/4 inch indentation.
Refer to Concrete Schedule, included in this specification section, for finish type at each location, defined
as follows:
Smooth Float Finish: (Type S1)
Consolidate concrete with a power -driven disc -type float or a combination floating -
troweling machine with metal float shoes attached.
Machines which have a water attachment for wetting the concrete during the finishing
operation are prohibited.
Check and level surface plane to a tolerance not exceeding 1/4 inch in 10 feet when tested
with a 10-foot straightedge. Cut down high spots and fill low spots; immediately after re-
leveling, refloat surface to a uniform, smooth, granular texture.
Where slab drainage is indicated, take care to maintain accurate slopes for drainage.
Steel Troweled Finish: (Type S2)
Produce a Smooth Float Finish S1.
After float finishing, steel trowel surface as specified in Concrete Schedule to increase the
compaction of fines and to provide maximum density and wear resistance.
Steel Troweled Finish: Screed and bull float or darby. Give preliminary float finish, true,
even and free from depressions; float surface with hand or machine floats; compact surface
with not less than 2 thorough and complete steel troweling operations.
Tolerance on finished steel troweled floors in no instance shall exceed 1/8 inch in 10’-0”
on surface; where floor drains occur, slope floors to drains.
Buffing: After concrete floors have been properly cured, buff thoroughly to remove soluble
salt incrustation or other foreign substances.
Integral Finishes: (Type S3)
Use for slabs where some material other than concrete will be the final wearing surface.
Screeded Finish - Place screed blocks at frequent intervals and strike off to surface
elevations desired; unless otherwise indicated, use on base slabs upon which grout finish,
regular mortar bed ceramic tile, sand cushion terrazzo or similar type wearing surface is
applied.
Broom Finish: (Type S4)
Produce Smooth Float Finish S1.
Draw stiff broom over surface, to obtain non-slip finish.
At Sidewalks, produce a medium-coarse broom finish.
At all other areas produce a fine broom finish.
For slabs with synthetic fiber (fiber mesh) reinforcement, broom in one direction only, with
a consistent sweeping motion to align the fibers with the broom texture.
Abrasive Aggregate Non-slip Finish: (Type S5)
[20260519R 121]
Project #00628072 03 30 00-10 Cast-in-Place Concrete
© 2026 MSA Professional Services, Inc.
Screed and float concrete to the required finish level with no coarse aggregate visible.
Uniformly sprinkle abrasive aggregate over the floated surface at a rate of not less than
1/4-pound per square foot.
Steel trowel surface to a smooth even finish, uniform in texture and appearance and free
from blemishes, including trowel marks.
Immediately after curing remove cement coating covering the abrasive aggregate by steel
brushing, rubbing with an abrasive stone or sandblasting to expose abrasive particles.
Hardener Floor Treatment: (Type S6)
Hardener shall be installed in strict accordance with manufacturer’s printed instructions;
experienced workmen shall apply hardener at a minimum of 45 pounds per 100 square
feet.
CONCRETE SIDEWALKS
Concrete sidewalk construction shall be as specified in Concrete Sidewalks, Steps, and Driveways -
Division 32 of these specifications.
CONCRETE CURB AND GUTTER
Concrete curb and gutter construction shall be as specified in Concrete Curb and Gutter - Division 32 of
these specifications.
HOT WEATHER REQUIREMENTS
Comply with ACI 305R unless otherwise specified herein below.
Hot weather conditions are deemed to exist when the temperature in the forms is 75 Degrees Fahrenheit
or above, or a combination of high air temperature, low relative humidity and wind velocity impair the
quality of fresh or hardened concrete; take protective measures for mixing, transporting and placing
concrete in accordance with ACI 305R.
The temperature of the concrete at the place of discharge may not exceed 85 Degrees Fahrenheit.
If ice is used to lower temperature, place crushed, shaved or chipped ice directly into the mixer as
part or all of the mixing water; mix until ice is completely melted.
Record the concrete temperature at the time of discharge.
Do not add water that will cause the proportions to exceed the maximum water-cement ratio shown in
Table I.
Notify the Engineer before adding any water to the concrete mix.
Record the amount of water added to the concrete at the jobsite.
Discharge concrete within 45 minutes or 100 revolutions, whichever occurs first, after the first mixing of
cement and aggregates.
Placing and Curing:
Place concrete promptly upon arrival.
Provide at least one standby vibrator for each 3 vibrators in use.
Protect concrete from direct sunlight; keep forms covered and moist by means of water sprinkling
or the application of continuously wetted burlap or cotton mats for a minimum of 24 hours.
Windbreaks and/or sunshades shall be provided as directed by the Engineer.
When forms are removed, provide wet cover to the newly exposed surfaces to avoid exposure to
hot sun and wind.
Continue specified water curing methods for 10 days; leave covering in place 4 additional days; do
not permit alternate wetting and drying cycles.
For slabs on grade, beam and deck concrete, and other horizontal placements protect the surface
between finishing operations using one or more of the following methods:
Careful use of a fog nozzle.
Spreading and removing polyethylene sheeting between finishing operations.
[20260519R 122]
Project #00628072 03 30 00-11 Cast-in-Place Concrete
© 2026 MSA Professional Services, Inc.
Application of mono-molecular film after the strike-off.
During extremes in weather, floor slabs shall not be cast unless the slab is protected by a roof and other
suitable protective measures are provided. After curing has been completed, the floor shall be exposed to
the air for 48 hours prior to allowing traffic on the floors.
COLD WEATHER REQUIREMENTS
Comply with ACI 306.1 (R2002) unless otherwise specified herein below.
Cold weather is defined any time when the daily temperature is 40 Degrees Fahrenheit or lower during
placement and the protection period. If at any time during the progress of the work, the temperature
drops below 40 Degrees F., the Contractor shall make suitable provisions to protect the concrete by use of
insulation materials such as blankets, mats, etc., and equipment for providing artificial heat.
Combustion type temporary heating devices shall be vented outside of any temporary enclosure and
building envelope. Combustion gases shall not be allowed in any temporary enclosure and building
envelope.
Protect concrete surfaces from freezing for at least 24 hours after placement.
All surfaces in contact with newly-placed concrete including formwork, reinforcement and subgrade must
be above 35 Degrees Fahrenheit.
Use preparation methods capable of producing concrete with a temperature not more than 85 Degrees
Fahrenheit, and not less than 55 Degrees Fahrenheit, at the time of placement.
Do not heat concrete ingredients to a temperature higher than that necessary to keep the temperature of
the mixed concrete, as placed, within the specified temperatures. (Do not heat water in excess of 140
Degrees Fahrenheit.)
Concrete shall have a temperature of not less than 55 Degrees Fahrenheit when placed; mix concrete at a
temperature between:
60 Degrees Fahrenheit and 70 Degrees Fahrenheit when outside air temperature is above 30
Degrees Fahrenheit.
65 Degrees Fahrenheit and 75 Degrees Fahrenheit when outside air temperature is between 0
Degrees Fahrenheit and 30 Degrees Fahrenheit.
70 Degrees Fahrenheit and 80 Degrees Fahrenheit when outside air temperature is below 0
Degrees Fahrenheit.
Follow concrete placement with tarpaulins or other readily movable coverings, so only a few feet of concrete
is exposed to the outside air at any time.
Maintain the temperature and moisture conditions specified in all parts of the newly placed concrete by
covering, insulating, housing or heating; arrange for protection methods in advance of placement.
Maintain concrete at a temperature of not less than 55 Degrees Fahrenheit nor more than 70 Degrees
Fahrenheit for a period of 3 days after placement.
A thermometer accurate to plus or minus 2 Degrees F shall be placed under the curing blanket. Additional
insulation shall be supplied as required to maintain the temperature above 55 Degrees F.
After the curing period, the temperature of the exposed surface shall not be permitted to drop faster than
30 Degrees F in 24 hours.
Do not remove forms during the initial protection period.
[20260519R 123]
Project #00628072 03 30 00-12 Cast-in-Place Concrete
© 2026 MSA Professional Services, Inc.
Protect insulation against wetting that will impair its insulating value using moisture -proof cover material;
keep insulation in close contact with concrete.
Construct enclosure to withstand wind and snow loads and be reasonably airtight; provide sufficient space
between the concrete and enclosure to permit free circulation of heated air.
Use vented heaters; do not permit heaters to heat or dry concrete locally. Unvented salamanders or other
heaters which produce carbon dioxide as by-products shall not be permitted within enclosures or inside
buildings. If heaters are used, precautions shall be taken to prevent drying of the slab through the use of
water jackets or other suitable methods.
Maintain relative humidity above 40% within heated enclosures before construction supports are removed.
Monitor temperature to ensure concrete is kept within specified limits recording time and concrete
temperature every 8 hours.
Assure concrete has developed necessary strength before removing forms; provide additional test cylinders
with the same protection as the structure they represent to verify concrete strength before construction
supports are removed.
If water curing is used, terminate at least 12- hours before end of temperature protection period. Permit
concrete to dry.
After the required protection period gradually reduce the concrete temperature within an enclosure or
insulation at a rate not to exceed 20 Degrees Fahrenheit per day until the outside temperature has been
reached.
Apply membrane forming curing compound to concrete surfaces during the first period of above -freezing
temperatures after forms are stripped and before air temperature rises to 50 Degrees Fahrenheit; apply
membrane forming curing compound to slabs as soon as finishing operations are completed, except where
live steam curing is used.
DELIVERY TICKETS
With each load of concrete delivered to the job there shall be furnished by the ready- mixed concrete
producer duplicate delivery tickets, one for the Contractor and one for the Engineer. Delivery tickets shall
provide the following information:
Date and serial number of ticket;
Name of ready-mixed concrete plant;
Job location;
Contractor;
Type and brand name of cement;
Mix number or specified cement content in bags per cubic yard of concrete;
Truck number;
Time dispatched stamped by a time clock;
Amount of concrete in load in cubic yards;
Admixtures in concrete, if any;
Maximum size of aggregate;
Water added at job, if any;
Slump of concrete ordered
[20260519R 124]
Project #00628072 03 30 00-13 Cast-in-Place Concrete
© 2026 MSA Professional Services, Inc.
TABLE 1
CONCRETE CLASS SCHEDULE
Slump
Compressive Water- Air Content Range Coarse
Strength Cement Range (%) (Inches) Aggregate
Parameter (PSI) Ratio Minimum- Minimum- (Inches)
Value 28-Day Maximum Maximum Maximum Maximum
Class A 4,000 0.5 1 to 2 2 to 4 3/4
Class B 4,000 0.5 1 to 2 2 to 4 1-1/2
Class C 4,000 0.5 5 to 7 2 to 4 3/4
Class D 4,000 0.5 4 to 6 2 to 4 1-1/2
Class E 3,000 0.5 1 to 2 2 to 4 3/4
(Interior)
Class F 3,000 0.5 5 to 7 2 to 4 1-1/2
(Exterior)
Class G 2,000 0.67 1 to 2 4 to 6 1-1/2
Class H 5,000 0.45 1 to 2 2 to 4 3/4
Class I 5,000 0.45 1 to 2 2 to 4 1-1/2
Class J 5,000 0.45 5 to 7 2 to 4 3/4
Class K 5,000 0.45 4 to 6 2 to 4 1-1/2
(Exterior)
Class L 3,000 psi 0.40 5 to 7 2 to 4 3/4
@24 hours 4 to 6 2 to 4 1-1/2
[20260519R 125]
Project #00628072 03 30 00-14 Cast-in-Place Concrete
© 2026 MSA Professional Services, Inc.
TABLE 2
CONCRETE SCHEDULE
USES AND PROPERTIES
Use Finish Class and Considerations
Standard Concrete (not including liquid-retaining or severe exposure structures)
Foundations, walls, and footings, W1 Class A
(Buried and non-exposed) W1 Class B
Foundations and walls S2 Top, W5 Sides Class C
(Exterior and exposed) S2 Top, W5 Sides Class D
Exterior exposed retaining walls S2 Top, W5 Sides Class C
S2 Top, W5 Sides Class D
Slabs and floors, S4 Top, W5 Sides Class C
(Exterior) S4 Top, W5 Sides Class D
Slabs and floors, S2Top, W5 Sides Class A
(Interior) S2 Top, W5 Sides Class B
Beams, joists, bond beams, W5 Class A
Spandrels, lintels, and columns
Topping for precast decking, (Interior) S2 or S4, Top Class E
W5 Sides
Topping for precast decking, (Exterior) S2 or S4, Top Class F
W5 Sides
Equipment pads and bases S2 Top, W5 Sides Class E (Interior)
S2 Top, W5 Sides Class F (Exterior)
Curbing, sidewalk, endwalls, S4 Top, W5 Sides Class C
stairs, driveways and ramps S4 Top, W5 Sides Class D
Manhole bases and benches Special Construction Class E
Pavement base, cradles Special Construction Class E
and inlet walls Class F
Mass and fill None Class G
Traffic areas requiring
early access or use Special Construction Class L
MEASUREMENT AND PAYMENT
GENERAL
Cast-in-place concrete shall be paid for at the bid price in accordance with one of the following methods,
unless indicated otherwise in the Bid Schedule or Special Procedures - Division 01.
All work specified herein shall be considered in each of the measurement and payment method(s)
stipulated, unless indicated otherwise in the Bid Schedule or Special Procedures - Division 01.
CAST-IN-PLACE CONCRETE
Cast-in-Place Concrete, Lump Sum. When so provided, payment for cast -in-place concrete shall be made
at the contract lump sum price bid or as specified in Special Procedures - Division 01.
Cast-in-Place Concrete, Inclusive. When no quantity is provided, cast-in-place concrete shall be considered
inclusive to payment for work associated with the related structure, utility, or improvement.
END OF SECTION
[20260519R 126]
Project #00628072 31 05 19.13-1 Geosynthetics for Earthwork
© 2026 MSA Professional Services, Inc.
SECTION 31 05 19.13
GEOSYNTHETICS FOR EARTHWORK
GENERAL
APPLICABLE PROVISIONS
Applicable provisions of Division 01 shall govern work of this section.
APPLICABLE PUBLICATIONS
The following publications of the issues listed below, but referred to thereafter by basic designation only,
form a part of this specification to the extent indicated by the reference thereto.
American Society for Testing and Materials (ASTM), Annual Book of ASTM Standards, Current Edition.
State of Wisconsin, Department of Transportation, Standard Specifications for Highway and Structure
Construction, Current Edition at time of bid opening.
DESCRIPTION OF WORK
The work under this section shall cover furnishing and installing geotextile fabrics for subgrade separation
and stabilization, and under riprap in accordance with the contract drawings and specified herein, and in
accordance with Section 645 of the State of Wisconsin, Department of Transportation, Standard
Specifications.
RELATED WORK ELSEWHERE
Procurement and Contracting Requirements - Division 00 (All Sections)
Submittals - Division 01
Subgrade Preparation - Division 31
Riprap - Division 31
SUBMITTALS
Contractor shall submit such product literature and catalog cuts of materials to be supplied to relate these
materials to the specifications. Information shall be in conformance with requirements of Submittals -
Division 01 of these specifications.
The Contractor shall furnish to the Engineer at least ten days prior to use in the work a manufacturer’s
Certified Report of Test or Analysis that the geotextile fabric delivered for use conforms to this specification.
The delivered geotextile fabric shall bear markings to clearly identify it with the applicable test report
furnished to the Engineer.
OPERATION/MAINTENANCE MANUALS AND INSTRUCTIONS (NONE)
PRODUCTS AND MATERIALS
GENERAL
The geotextile fabric shall consist of either woven or nonwoven polyester, polypropylene, stabilized nylon,
polyethylene or polyvinylidene chloride. All fabric shall have the minimum strength values in the weakest
principal direction. Nonwoven fabric may be needle punched, heat bonded, resin bonded, or combinations
thereof.
The geotextile fabric shall be insect, rodent, mildew, and rot resistant.
[20260519R 127]
Project #00628072 31 05 19.13-2 Geosynthetics for Earthwork
© 2026 MSA Professional Services, Inc.
The geotextile fabric shall be furnished in a wrapping which will protect the fabric from ultraviolet radiation
and from abrasion due to shipping and hauling. The geotextile is to be kept dry until installed.
The geotextile fabric rolls shall be clearly marked showing the type of fabric.
Samples of fabric for testing may be obtained from the job site as specified herein or as determined by the
Engineer.
If sewn seams are used, the Contractor shall furnish a field sewn seam sample produced from the geotextile
fabric and thread and with the equipment to be used on the project, prior to its incorporation into the work.
All numerical values specified below represent minimum/maximum average roll values (i.e., the average of
minimum test results on any roll in a lot should meet or exceed the minimum specified values).
GEOTEXTILE FABRIC, TYPE SAS (SUBGRADE AGGREGATE SEPARATION)
The fabric shall comply with the following physical properties:
Test Method Value
Grab Tensile Strength, lbs ASTM D 4632 170 min.
Apparent Opening Size,
U.S. Standard Sieve ASTM D 4751 70 max.
Permittivity, SEC-1 ASTM D 4491 0.35 min.
Acceptable materials are Geotex 701, Thrace-LINQ 160EX, Mirafi 170N, and US 180 NW, or equal.
GEOTEXTILE FABRIC, TYPE R (RIPRAP)
The fabric shall comply with the following physical properties:
Test Method Value
Grab Tensile Strength, lbs ASTM D 4632 200 min.
CBR Puncture Strength ASTM D 6241 500 min.
Apparent Breaking
Elongation, Percent ASTM D 4632 20 min.
Apparent Opening Size,
U.S. Standard Sieve ASTM D 4751 30 max.
Permittivity, SEC-1 ASTM D 4491 0.40 min.
Acceptable materials are Geotex 801, Thrace-LINQ 180EX, Mirafi 180N, and US NW 205, or equal.
GEOTEXTILE FABRIC, TYPE HR (HEAVY RIPRAP)
The fabric shall comply with the following physical properties:
Test Method Value
Grab Tensile Strength, lbs ASTM D 4632 300 min.
CBR Puncture Strength ASTM D 6241 800 min.
Apparent Breaking
Elongation, Percent ASTM D 4632 20 min.
Apparent Opening Size,
U.S. Standard Sieve ASTM D 4751 30 max.
Permittivity, SEC-1 ASTM D 4491 0.40 min.
Acceptable materials areGeotex 1201, Thrace-LINQ 275EX, Mirafi 1120N, Mirafi HP370, and US 300 NW, or
equal.
GEOTEXTILE FABRIC, TYPE RSF (RECIRCULATING SAND FILTER)
[20260519R 128]
Project #00628072 31 05 19.13-3 Geosynthetics for Earthwork
© 2026 MSA Professional Services, Inc.
The filter fabric shall be of preferentially orientated isostatic polypropylene. Fabric shall be nonwoven and
may be needle punched, heat bonded, resin bonded or combination thereof. Fabric shall have the following
characteristics:
Value
Minimum
Test Property Test Method Requirements1
Nominal Weight (oz/yd2) ASTM D5261 8.0
Grab Tensile (lbs) ASTM D4632 205
Grab Elongation At Break (%) ASTM D4632 50
Puncture Resistance (lbs) ASTM D4833 95
Trapezoidal Tear (lbs) ASTM D4533 85
Mullen Burst (psi) ASTM D3786 300
Water Flow Rate (gpm/ft2) ASTM D4491 130
Permittivity (sec-1) ASTM D4491 1.6
Permeability kv (cm/sec) ASTM D4491 0.4
A.O.S.2 (sieve size) ASTM D4751 120-80
UV Resistance (500 hrs)3 ASTM D4355 >85
pH Resistance 2-13
Acceptable manufacturer of filter fabric materials are Phillips 66, Polyfelt, Mirafi, DuPont, Webtec, or equal.
EXECUTION
GENERAL
Installation procedures shall be in accordance with manufacturer’s recommendations and as specified herein.
Sewing. All factory and field seams shall be sewn with a thread having the same orgreater durability as the
material in the fabric. A 401 stitch conforming to Federal Standard No. 751a shall be used for all seams. All
seams shall develop a tensile strength equal to or greater than 60 percent of the specified grab tensile
strength of the fabric, unless otherwise specified.
GEOTEXTILE FABRIC, TYPE SAS
Prior to the placement of the geotextile fabric, the subgrade shall be smoothed, shaped and compacted to the
required grade, section, and density. After the fabric has been placed on the subgrade area, no traffic or
construction equipment will be permitted to travel directly on the fabric.
The fabric shall be rolled out on the roadway and pulled taut manually to remove wrinkles. Separate pieces
of fabric shall be joined by overlapping or sewing. The fabric in the overlapped joints shall be placed with a
minimum overlap of 18 inches.
Weight or pins may be required to prevent lifting of the fabric by wind.
After placement, the fabric shall be exposed no longer than 48 hours prior to covering.
The base course material shall be placed over the fabric by back dumping with trucks and leveling with a
crawler dozer. Construction equipment shall be such that ruts do not exceed 3 inches in depth. All ruts shall
be filled with additional material. The smoothing of ruts without adding additional material will not be
permitted. Damaged areas shall be covered with a patch of fabric using a 36 inch overlap in all directions.
GEOTEXTILE FABRIC, TYPE R
1 Values in weaker principal direction. All minimum values represent minimum average roll values (i.e., test results from any
sampled roll in a lot, tested in accordance with ASTM D 4759 shall meet or exceed the minimum values listed).
2 Small sieve size number represents the maximum average roll value.
3 UV resistance testing is based on results from independent conformance testing.
[20260519R 129]
Project #00628072 31 05 19.13-4 Geosynthetics for Earthwork
© 2026 MSA Professional Services, Inc.
The area shall be graded smooth and all stones, roots, sticks, or other foreign material which would interfere
with the fabric being completely in contact with the soil shall be removed prior to placing the fabric.
The fabric shall be placed loosely and laid parallel to the direction of the water movement. Pinning or
stapling may be required to hold the geotextile in place. Separate pieces of fabric shall be joined by
overlapping or sewing. The fabric in the overlapped joints shall be placed with a minimum overlap of 24
inches in the direction of the flow.
After placement, the fabric shall be exposed no longer than 48 hours prior to covering.
Damaged areas shall be covered with a patch of fabric using a 36 inch overlap in all directions.
Placement of riprap shall be from the base of the slope upward. Height of free fall of riprap shall be
determined by the Engineer but in no case shall this height exceed 12 inches.
GEOTEXTILE FABRIC, TYPE HR
The construction methods for Type HR fabric shall conform to the requirements of Subsection 3.03, except
that the height of freefall of riprap shall not exceed 6 inches.
GEOTEXTILE FABRIC, TYPE RSF (RECIRCULATING SAND FILTER)
The fabric shall be placed directly upon the sand filter liner.
After placement, the liner shall be exposed no longer than 48 hours prior to covering.
Damaged areas shall be covered with a patch of fabric using a 36 inch overlap in all directions.
MEASUREMENT AND PAYMENT
GENERAL
Geosynthetics for earthworks shall be paid for at the bid price in accordance with one of the following
methods, unless indicated otherwise in the Bid Schedule or Special Procedures - Division 01.
All work specified herein shall be considered in each of the measurement and payment method(s) stipulated,
unless indicated otherwise in the Bid Schedule or Special Procedures - Division 01.
GEOTEXTILE FABRIC
Geotextile Fabric, Square Yards. The measurement for geotextile fabric of the specified type shall be by the
square yard of surface area upon which the geotextile fabric has been placed. Payment shall be made at the
contract unit price bid per square yard of geotextile fabric of the specified type installed, as measured.
END OF SECTION
[20260519R 130]
Project #00628072 31 11 00-1 Clearing and Grubbing
© 2026 MSA Professional Services, Inc.
SECTION 31 11 00
CLEARING AND GRUBBING
GENERAL
APPLICABLE PROVISIONS
Applicable provisions of Division 01 shall govern work of this section.
APPLICABLE PUBLICATIONS
The following publications of the issues listed below, but referred to thereafter by basic designation only,
form a part of this specification to the extent indicated by the reference thereto.
State of Wisconsin, Department of Transportation, Standard Specifications for Highway and
Structure Construction, Current Edition at time of bid opening.
DESCRIPTION OF WORK
Under this item the Contractor shall furnish all equipment and labor necessary to cut and dispose of any
vegetation within the clearing limits as described in this section and specified herein.
RELATED WORK ELSEWHERE
Procurement and Contracting Requirements - Division 00 (All Sections)
SUBMITTALS (NONE)
OPERATION/MAINTENANCE MANUALS AND INSTRUCTIONS (NONE)
PRODUCTS AND MATERIALS (N/A)
EXECUTION
CLEARING AND GRUBBING
Clearing and Grubbing shall consist of cutting and disposing of trees, brush, windfalls, logs, and other
vegetation occurring within the clearing limits, and the removing and disposing of roots, stumps, stubs,
grubs, logs and other timber from within the grubbing limits.
All work performed under this section shall be done in accordance with Subsection 201.3 of the State of
Wisconsin, Department of Transportation, Standard Specifications, with the following exceptions and
additions:
Clearing and Grubbing Limits defined as follows:
Trees/brush as individually marked for removal.
Between lines 3 feet outside the grading limits (slope-intercept line) of the roadway cuts
and fills, including intercepting embankments, channels, ditches, borrow pits, and marsh
or waste disposal area.
Other parts of the right-of-way as designated in the plans or special provisions.
With Engineer’s approval, areas with vegetation that interferes with excavation,
embankment, or other construction operations.
At no time shall Clearing and Grubbing operations extend beyond the right-of-way without
written approval from both Engineer and Owner.
At no time shall Clearing and Grubbing operations occur on trees, brush , or other
vegetation clearly marked for preservation.
DISPOSAL OF MATERIALS
[20260519R 131]
Project #00628072 31 11 00-2 Clearing and Grubbing
© 2026 MSA Professional Services, Inc.
Material removed shall be removed from the site and disposed of by the Contractor in accordance with all
local codes and ordinances.
MEASUREMENT AND PAYMENT
GENERAL
Clearing and Grubbing shall be paid for at the bid price in accordance with one of the following methods,
unless indicated otherwise in the Bid Schedule or Special Procedures - Division 01.
All work specified herein shall be considered in each of the measurement and payment method(s)
stipulated, unless indicated otherwise in the Bid Schedule or Special Procedures - Division 01.
The following incidental Clearing and Grubbing operations required to perform the work will not be
measured, and will be considered inclusive to the work for which the incidentalClearing and Grubbing must
occur:
Clearing areas of light brush, shrubs , and other vegetation that Contractor removes with a brush
scythe or mowing machine.
Clearing areas containing logs, tree roots, roots of brush and shrubs, and other vegetation having
a woody structure that the Contractor can remove with a rooter.
Trimming overhanging limbs and branches to provide required clearance.
Clearing and Grubbing borrow pits.
CLEARING AND GRUBBING
Clearing and Grubbing, Inch of Diameter. When so provided, measurement for Clearing and Grubbing will
be by the inch of diameter acceptably completed. The diameter of the tree at a distance 4 feet above the
existing ground level will be used (diameter will be computed by dividing circumference by 3.14). Only
those trees and stumps larger than 3-inches in diameter will be added to the measurement. Measurement
will be rounded to the nearest inch. Payment will be made at the contract unit price bid per inch ofdiameter
cleared and grubbed.
Clearing and Grubbing, Square Yards. When so provided, measurement for Clearing and Grubbing will be
by the square yard of horizontal area bounded by the trunks cut and/or grubbed. Payment for Clearing and
Grubbing shall be made at the contract square yard price bid or as specified in Special Procedures -
Division 01.
Clearing and Grubbing, Lump Sum. When so provided, payment for Clearing and Grubbing shall be made
at the contract lump sum price bid or as specified in Special Procedures - Division 01.
Clearing and Grubbing, Inclusive. When no quantity is provided,Clearing and Grubbing shall be considered
inclusive in the payment for contract work related to the associated construction.
END OF SECTION
[20260519R 132]
Project #00628072 31 23 13-1 Subgrade Preparation
© 2026 MSA Professional Services, Inc.
SECTION 31 23 13
SUBGRADE PREPARATION
GENERAL
APPLICABLE PROVISIONS
Applicable provisions of Division 01 shall govern work of this section.
APPLICABLE PUBLICATIONS
The following publications of the issues listed below, but referred to thereafter by basic designation only,
form a part of this specification to the extent indicated by the reference thereto.
State of Wisconsin, Department of Transportation, Standard Specifications for Highway and Structure
Construction, Current Edition at time of bid opening.
DESCRIPTION OF WORK
The work under this section shall cover furnishing all material, equipment, and labor required to execute the
earthwork for this project in accordance with Sections 201 through 214 of the State of Wisconsin,
Department of Transportation Standard Specifications.
RELATED WORK ELSEWHERE
Procurement and Contracting Requirements - Division 00 (All Sections)
Erosion and Sedimentation Controls - Division 31
Aggregate Base and Subbase - Division 32
Topsoil Placement and Grading - Division 32
Seeding - Division 32
Sodding - Division 32
SUBMITTALS (NONE)
OPERATION/MAINTENANCE MANUALS AND INSTRUCTIONS (NONE)
PRODUCTS AND MATERIALS (N/A)
EXECUTION
PRESERVATION OF TREES AND SHRUBS
Trees and shrubs to be preserved shall be thoroughly protected from scarring or other injury during grading
operations. Excavation operations shall not disturb the original ground around trees within a distance of one
foot or twice the diameter of the tree, whichever is greater. Exposed roots resulting from excavation shall be
cut cleanly and covered with humus-bearing soil.
When necessary or required by the Contract Documents, trees or shrubs around which embankment is placed
shall be protected by tree wells built in accordance with Detailed Drawings or as laid out in the field by the
Owner or Engineer.
UNCLASSIFIED EXCAVATION AND GRADING
[20260519R 133]
Project #00628072 31 23 13-2 Subgrade Preparation
© 2026 MSA Professional Services, Inc.
Excavation to subgrade shall be performed to provide a finished subgrade prepared for the application of
crushed aggregate, curb and gutter, sidewalks and topsoil as shown on the typical section.
Also included is the removal and disposal of existing stumps, trees, miscellaneous structures and rubble as
shown on the contract drawings and any other obstructions encountered which interfere with the proposed
construction. Stumps shown on contract drawings to be removed from terraces or backslopes shall be
shredded to a minimum of 6 inches below finish subgrade or otherwise removed by the Contractor.
Driveways shall be graded to a 10:1 maximum slope to match proposed construction.
The Contractor shall adjust all valve boxes, manhole frames, and other utility appurtenances to within 1 inch
of the final grade as shown on the contract drawings or as staked in the field by the Engineer.
FILLING
All suitable excavated material shall be used for roadway construction, and at other places shown on the
drawings.
Fill shall be spread in successive uniform horizontal layers not exceeding 9 inches in depth over entire area
before compaction. Each layer shall be worked to break down clods over 6 inches in size and to secure
uniform moisture content. Where filling in 9 inch layers is not feasible, as in the case of filling in water or
over steep slopes, construct fill in one layer to the minimum elevation at which equipment can be operated.
Above this elevation, the fill shall be constructed in layers of the specified depth.
Compact each layer of fill material to the following percentage of maximum dry density per modified proctor
(ASTM D1557).
91 percent for fine grained soils (more than 50 percent passing the No. 200 sieve).
93 percent for coarse-grained soils (less than 50 percent passing the No. 200 sieve).
PREPARATION OF SUBGRADE
The preparation of the subgrade shall consist of bringing the area to be paved to a subgrade conforming to
the required grade and cross section, of uniform density, ready to receive the base course. This is to be
accomplished by excavating or backfilling as needed, shaping, watering as required, or permitting to dry to
proper consistency, and rolling the entire area with an approved self-propelled roller weighing not less than 8
tons. Shaping and rolling shall be continued until the subgrade has been properly prepared and shows that
no further compaction of any practical benefit would result from continued compaction. The subgrade shall
be tested as to cross section, crown, and elevation. After being properly prepared, it shall be so maintained
until the base course is constructed. A completed subgrade shall be maintained sufficiently in advance of the
base course operations to permit proper control. Any part of the subgrade area not accessible to a roller
shall be thoroughly compacted by hand or mechanical compaction in a manner acceptable to the Engineer.
This work shall be in accordance with Section 211 of the State of Wisconsin, Department of Transportation
Standard Specifications.
UNSTABLE SUBBASE/EXCAVATION BELOW SUBGRADE (EBS)
Deposits of frost-heave material, unstable soils, topsoil containing considerable amounts of organic matter, or
other undesirable foundation material shall be removed from the area within the roadbed depths as shown on
the drawings or as directed by the Engineer and shall be replaced as directed by the Engineer in the field.
Contractor shall notify the Engineer of any questionable material. The work shall be performed in accordance
with Section 205 of the State of Wisconsin, Department of Transportation, Standard Specifications.
DRAINAGE
During construction, ditches and channels shall be drained at all times by keeping the excavation areas and
embankments sloped to the approximate section of the final earth grade. If existing surface drainage must
be interrupted, temporary drainage shall be provided.
[20260519R 134]
Project #00628072 31 23 13-3 Subgrade Preparation
© 2026 MSA Professional Services, Inc.
Construction in and adjacent to flowing streams shall be performed to avoid washing, sloughing or deposition
of materials into the channel which may obstruct or impair stream flow, or which may result in contamination
and/or silting of the stream.
Precautions shall be taken to preserve, protect, and continue service of all existing tile drains, sewers, and
other subsurface utilities; repair any damage to drains, sewers and utilities.
TESTING
A testing laboratory will perform compaction and density tests at locations determined by the Owner’s
Authorized Representative. Where tests indicate that the subgrade does not conform to the compaction
density specified, the subgrade shall be replaced or re-worked until it does conform.
MEASUREMENT AND PAYMENT
GENERAL
Subgrade preparation shall be paid for at the bid price in accordance with one of the following methods,
unless indicated otherwise in the Bid Schedule or Special Procedures - Division 01.
All work specified herein shall be considered in each of the measurement and payment method(s) stipulated,
unless indicated otherwise in the Bid Schedule or Special Procedures - Division 01.
UNCLASSIFIED EXCAVATION
Unclassified Excavation, Inclusive. Payment for subgrade preparation shall be made inclusive to related bid
item.
UNSTABLE SUBBASE/EXCAVATION BELOW SUBGRADE
Excavation Below Subgrade, Cubic Yards. The measurement and payment for this item shall be per cubic
yard. Measurement shall be taken in the field by cross sections before any excavation below subgrade takes
place and after a stable subbase is reached. Payment shall be made at the contract unit price bid per cubic
yard of excavation below subgrade.
END OF SECTION
[20260519R 135]
THIS PAGE I NTENTIONALLY LEFT BLANK
[20260519R 136]
Project #00628072 31 23 33-1 Trenching and Backfilling
© 2026 MSA Professional Services, Inc.
SECTION 31 23 33
TRENCHING AND BACKFILLING
GENERAL
APPLICABLE PROVISIONS
Applicable provisions of Division 01 shall govern work of this section.
APPLICABLE PUBLICATIONS
The following publications of the issues listed below, but referred to thereafter by basic designation only,
form a part of this specification to the extent indicated by the reference thereto.
American Society for Testing and Materials (ASTM), Annual Book of ASTM Standards, Current Edition.
Code of Federal Regulations (CFR), Title 29, Chapter XVII - Occupational Safety and Health
Administration (OSHA), Department of Labor, Part 1926 Regulations, Current Edition.
Wisconsin Administrative Code (WAC), Department of Natural Resources, Environmental Protection,
Regulations, Current Edition.
State of Wisconsin, Department of Transportation, Standard Specifications for Highway and Structure
Construction, Current Edition at time of bid opening.
DESCRIPTION OF WORK
The work under this section shall include all excavating, trenching, and backfilling for utilities as indicated
from the contract drawings and as specified herein.
RELATED WORK ELSEWHERE
Procurement and Contracting Requirements - Division 00 (All Sections)
Dewatering - Division 31
Rock Excavation – Division 31
Structural Excavation for Structures - Division 31
Erosion and Sedimentation Controls - Division 31
Utility Horizontal Directional Drilling – Division 33
SUBMITTALS (NONE)
OPERATION/MAINTENANCE MANUALS AND INSTRUCTIONS (NONE)
PRODUCTS AND MATERIALS
INSITU BACKFILL MATERIAL
Previously excavated soil free of organic debris, clay balls, and aggregate larger than 1 -1/2 inches as
approved by the Engineer.
IMPORTED GRANULAR BACKFILL (TRUCKED BACKFILL) MATERIAL
Imported granular fill (trucked backfill) shall be sand conforming to State of Wisconsin, Department of
Transportation, Standard Specifications Subsection 209.2.2, Grade No. 1 Granular Backfill or well-graded sand
and gravel conforming to Subsection 305.2.2.1 of said State Standard Specification 1-1/4 inch dense graded
base with not more than eight percent (8 percent) by weight passing a No. 200 sieve.
[20260519R 137]
Project #00628072 31 23 33-2 Trenching and Backfilling
© 2026 MSA Professional Services, Inc.
FLOWABLE BACKFILL
A cubic yard of flowable backfill shall consist of 1,350 pounds of sand, 775 pounds of #1 stone, 1,150 pounds
of #2 stone, and 25 gallons of water. All weights are damp weights and no additional water will be allowed.
The #1 stone shall conform to the gradation of ASTM C33 No. 67 Stone. The #2 stone shall conform to the
gradation of ASTM C33 No. 4 stone.
2.04 CONTROLLED LOW STRENGTH MATERIAL (CLSM)
The CLSM shall include fine aggregate, cementious material, and water to produce a flowable, non-shrinking
backfill. The strength of the CLSM shall be less than 1200 psi. If future excavation of the area is a
possibility, the CLSM shall have a maximum strength of 150 psi. The Contractor shall submit a mix design to
the Engineer for approval prior to use.
EXECUTION
SURFACE OBSTRUCTIONS
Structures, sidewalk, driveways, curb and gutter, trees, shrubs, lawns, signs, fences, utilities, survey
monuments, pavements, culverts and other appurtenances which are adjacent to the right-of-way or work
easements, shall be carefully protected against damage. In the event of damage or inadvertent injury or
removal of these surface features by failure of the Contractor to exercise reasonable precautions or proper
construction techniques, he shall bear the full cost and responsibility for resulting damages and shall replace
or repair such damage as early as possible. No allowance for extra payment or time lost will be allowed for
such interferences that the Contractor could have suspected or anticipated during pre-bid site inspection and
interpretation of the bidding documents.
Clearing, grubbing, and removal of all pavements, sidewalks, curbs, signs, poles, fences, etc., shall be done
only as necessary for the completion of the work. Brush, trees, shrubs, concrete, rubble, and other removals,
which are not intended to be replaced, shall be disposed of by the Contractor off the work site.
Obstructions, which are intended to be reset, shall be stored and protected by the Contractor. Fences, signs,
mailboxes, trees, shrubs, structures, and similar features requiring removal, shall be restored to their original
position except where permanent removal is indicated.
Monuments for land surveys encountered in the path of work shall be carefully protected from movement.
Should removal be necessary, the Contractor shall notify the Engineer in advance. The Contractor will be
held responsible for re-establishing monuments lost due to his negligence or failure to notify the Engineer at
least 24 hours in advance of disturbing.
SUBSURFACE OBSTRUCTIONS
The approximate location and size of sewers, drains, culverts, gas mains, water mains, survey monuments,
electric and telephone conduits and other underground structures shown on the drawings are based on
records available to the Owner or surface markings indicating their existence.
The Contractor shall use caution in excavating and trenching so that the exact location of underground
structures, both known and unknown, may be determined; he shall be held responsible for the repair of such
structures when broken or otherwise damaged during construction.
The Contractor shall make arrangements with the utility companies for any relocation of interfering utilities.
No extra cost due to unexpected delays or coordination work shall be incurred on the Owner except for
authorized utility alterations performed by the Contractor as provided below.
When the Engineer permits the Contractor to make a change to avoid a utility relocation, the Engineer shall
determine whether the change constitutes extra work as defined in the General Conditions.
[20260519R 138]
Project #00628072 31 23 33-3 Trenching and Backfilling
© 2026 MSA Professional Services, Inc.
Any underground utilities or other structures, which the Contractor wishes to have moved to facilitate
construction, shall be arranged with the owner of such structures. The Contractor shall pay all costs of the
accommodation.
In the event that there is any question as to whether any of the above enumerated obstructions,
underground utilities or other structures cross or pass through the space occupied by the completed
structures of this contract, the Engineer’s decision shall be binding upon the Owner and the Contractor.
During the construction of the pipe lines, it may be necessary to cross under certain sewers, drains, culverts,
water lines, gas lines, electric conduits and other underground structures. Where necessary, the flow in
drains or culverts shall be diverted so that the excavation is kept dry during the progress of the construction
work. Every effort shall be made to prevent damage to such underground structures. Wherever such
structures are disturbed or broken, they shall be restored to good condition at no additional cost to the
Owner.
The Contractor shall use sand or gravel backfill beneath said structures. This backfill shall be deposited and
thoroughly compacted by mechanical means in layers not to exceed 6 inches in depth.
EXCAVATION
General. All excavation of every description and of whatever substances encountered shall be performed to
the depths indicated or as otherwise specified.
During excavation, material suitable for backfilling shall be piled in an orderly manner a sufficient
distance from the banks of the trench to avoid overloading and to prevent slides or cave-ins. All
excavated materials not required or suitable for backfill shall be removed and wasted as specified.
Grading shall be done as may be necessary to prevent surface water from flowing into trenches or
other excavations and any water accumulated therein shall be removed by pumping or by other
approved methods.
Sheeting and shoring shall be placed as may be necessary for the protection of the work and for the
safety of personnel. Unless otherwise indicated, excavation shall be by open cut.
Trench Excavation. Trenches shall be of the necessary width for proper laying of pipe and shall conform to
WAC requirements. The banks of pipe trenches shall conform to OSHA requirements and the Contractor is
responsible for all safety requirements of said codes.
Care shall be taken not to overexcavate. The bottom of the trenches shall be accurately graded to
provide uniform bearing and support for each section of the pipe. Bell holes and depressions for
joints shall be dug after the trench bottom has been graded, and in order that the pipe rest on the
prepared bottom for as nearly its full length as practicable, bell holes and depressions shall be only of
such length, depth, and width as required for properly making the particular type of joint. Stones
shall be removed as necessary to avoid point bearing.
Except as hereinafter specified for wet or other unstable material, overdepths shall be backfilled as
and with materials specified for, backfilling the lower portion of trenches. Whenever wet or
otherwise unstable material that is incapable of properly supporting the pipe is encountered in the
bottom of the trench, such material shall be overexcavated to a depth to allow for construction of a
stable pipe bedding. The trench shall be backfilled to the proper grade with suitable approved
materials.
Trench Width. The width of the trench at and below the top of the pipe shall be such that the clear
space between the barrel of the pipe and the trench wall shall not be less than 6 inches nor exceed
8 inches on either side of the pipe, unless otherwise approved by the Engineer in writing. The width
of the trench above that level shall be as wide as necessary for sheeting and bracing and the proper
performance of the work.
Excavation for Appurtenances. Excavation for manholes and similar structures shall be sufficient to
leave at least 12 inches clear space between the outer surface of structure and the bank or timber
that may be used to hold and protect the banks. Any overdepth excavation below such
appurtenances that has not been directed will be considered unauthorized and shall be refilled with
sand, gravel, or concrete, as directed, at no additional cost to the Owner.
Embedment. Embedment for utilities shall be as specified in the respective utility specification
section.
[20260519R 139]
Project #00628072 31 23 33-4 Trenching and Backfilling
© 2026 MSA Professional Services, Inc.
Protection and Removal of Utility Lines. The Contractor shall notify all affected utility companies at least
three consecutive working days preceding his construction operations to coordinate his work regarding poles,
wires, valve boxes and other surface obstructions and to determine the location of gas, water main, power,
light, telephone or telegraph conduit or service connection thereto or any other subsurface structure that
crosses or passes through the space occupied by any of the proposed improvements. The Contractor shall
make advance arrangements with the utility companies for any relocation of interfering utilities so as not to
delay construction.
Interruptions of Services. Interruptions of utility services to existing buildings or facilities which become
necessary either directly or indirectly due to work required under this contract shall be coordinated with the
Owner through the Engineer. If the down time for connections is limited by them as to duration and time
(weekend, nights or holidays), the Contractor shall perform the work during the designated period at no
additional cost to the Owner.
BACKFILLING
Types of Backfill. Backfill for sanitary sewers, water mains, storm sewers, culverts, and drainpipes is the
material placed between the bedding and the ground surface. Debris, frozen material, organic matter,
unstable material, or stones greater than 8 inches in diameter shall not be suitable for backfill. Large clods
and stones not exceeding 8 inches in diameter, when allowed for use as backfill, shall not be placed within
two feet of the top of the pipe. Backfill shall be of the following types:
Type I Backfill:
Type I backfill shall be used where shown on the contract drawings or stated in Special
Procedures - Division 01, and unless directed otherwise shall extend from the top of the
embedment to the underside of surface restoration.
Type I backfill shall be used under and around all existing underground structures, tunnels,
conduits, and pipes crossing the excavation. Such backfill shall extend underneath and on
all sides to a structure, tunnel, conduit or pipe.
Type I backfill shall be selected fill material consisting of granular subbase course, base
course or approved existing sand. The backfill material shall be mechanically compacted in
6-inch layers, from a distance of one foot above the pipe to the surface. The degree of
compaction shall be to 95 percent maximum dry density per modified proctor (ASTM
D1557).
Type II Backfill:
Type II backfill shall be used where shown on the contract drawings or stated in Special
Procedures - Division 01.
Type II backfill shall be suitable excavated material, or other approved material, placed in
uniform layers and mechanically compacted. The following compaction percentages based
on the maximum dry density per modified proctor (ASTM D1557) for the materials are
required:
For fine grained soils (more than 50 percent passing the No. 200 sieve).
Zone III: From bottom of surface restoration to 3 feet below - 91 percent
Zone II: From bottom of Zone III to top of the embedment - 88 percent
Zone I: Specified as embedment
For coarse grained soils (less than 50 percent passing the No. 200 sieve).
Zone III: From bottom of surface restoration to 3 feet below - 93 percent
Zone II: From bottom of Zone III to top of the embedment - 90 percent
Zone I: Specified as embedment
Type III Backfill:
Type III backfill shall be used in all areas where shown on the Plans or stated in Special
Procedures - Division 01. Backfill material shall be suitable excavated material placed, from
top of embedment to the bottom of surface restoration, in 12 to 18 inch layers and
consolidated by jetting, spading, tamping, or puddling, to the approval of the Engineer, to
insure complete filling of the trench.
Type IV Backfill:
Utilize Type III Backfill with the following jetting: at least a 1-1/2 inch jetting hose, equipped
with a regulating valve which permits the hydrant valve to be fully open during use, with a
minimum 1-1/2 inch diameter pipe nozzle at least 6 feet long shall be used. During the
flooding operation, the nozzle shall be inserted as deeply into the backfill as is possible
[20260519R 140]
Project #00628072 31 23 33-5 Trenching and Backfilling
© 2026 MSA Professional Services, Inc.
without damaging the sewers, water mains, or foundations. The insertions shall be made at
intervals of 5 feet or less and maintained until the backfill is saturated. Depressions caused
by flooding shall be backfilled until there is no further settlement.
Flowable Backfill:
The materials shall be placed in a clean cement mixer truck and thoroughly mixed. Just
prior to placement, the mixer shall be run at mixing speed for one full minute to insure an
even mixture. The mixture shall be deposited in the trench directly from the mixer truck.
Copies of the load tickets shall be provided to the Engineer.
After Settlement. Should after settlement occur, succeeding any of the above backfilling methods, the
Contractor shall scarify the surface of the fill material and place additional fill material in the same manner as
herein described so that the surface elevation conforms to that shown on the Plans. No additional
compensation shall be allowed for repairing filled areas where after-settlement occurs.
Backfill Placement. The excavated space around and above underground structures, tunnels, conduits and
pipes not filled with embedment material and where select fill backfill is not shown or specified may be
backfilled by machine.
Backfilling work shall be done in such a way as to prevent dropping of material directly on top of any conduit
or pipe through any great vertical distance. In no case shall backfilling material from a bucket be allowed to
fall directly on a structure or pipe and in all cases, the bucket shall be lowered so that the shock of falling
earth will not cause damage.
Lumps shall be broken up and if there are any stones, pieces of crushed rock or lumps, which cannot be
readily broken up, they shall be distributed throughout the mass so that all interstices are solidly filled with
fine material. Stones, lumps and clods shall also be placed to maintain a 2 foot minimum separation distance
from the top of the pipe or structure. No frozen material shall be used for backfilling.
MEASUREMENT AND PAYMENT
GENERAL
Trenching and Backfilling for utilities shall be paid for at the bid price in accordance with one of the following
methods, unless indicated otherwise in the Bid Schedule or Special Procedures - Division 01.
All work specified herein shall be considered in each of the measurement and payment method(s) stipulated,
unless indicated otherwise in the Bid Schedule or Special Procedures - Division 01.
TRENCHING AND BACKFILLING
Trenching and Backfilling, Inclusive. When no quantity is provided, trenching and backfilling shall be included
in the payment for contract work related to the associated utility.
IMPORTED GRANULAR BACKFILL (TRUCKED BACKFILL)
Imported Granular Backfill (Trucked Backfill), Cubic Yard. Measurement for imported granular backfill
(trucked backfill) shall be per cubic yard, as in truck volume. Payment shall be made at the contract unit
price bid for imported granular backfill (trucked backfill), as measured.
Imported Granular Backfill (Trucked Backfill), Ton. Measurement for imported granular backfill (trucked
backfill) shall be per ton, as trucked in weight. Payment shall be made at the contract unit price bid for
imported granular backfill (trucked backfill) as measured.
Imported Granular Backfill (Trucked Backfill), Inclusive. When no quantity is provided, imported granular
backfill (trucked backfill) shall be included in the payment for contract work related to the associated utility.
FLOWABLE BACKFILL
[20260519R 141]
Project #00628072 31 23 33-6 Trenching and Backfilling
© 2026 MSA Professional Services, Inc.
Flowable Backfill. Measurement for flowable backfill shall be per cubic yard, as in truck volume. Payment
shall be made at the contract unit price bid for flowable backfill, as measured.
END OF SECTION
[20260519R 142]
Project #00628072 31 25 00-1 Erosion and Sedimentation Controls
© 2026 MSA Professional Services, Inc.
SECTION 31 25 00
EROSION AND SEDIMENTATION CONTROLS
GENERAL
APPLICABLE PROVISIONS
Applicable provisions of Division 01 shall govern work of this section.
APPLICABLE PUBLICATIONS
The following publications of the issues listed below, but referred to thereafter by basic designation only,
form a part of this specification to the extent indicated by the reference thereto.
State of Wisconsin, Department of Natural Resources (WDNR), Conservation Practice Standards,
Current Edition.
State of Wisconsin, Department of Transportation, Standard Specifications for Highway and Structure
Construction, Current Edition at time of bid opening.
DESCRIPTION OF WORK
The work under this section shall cover providing the necessary materials, equipment and labor to control
erosion and sedimentation controls by the methods specified herein. If no specific quantities are shown on
the contract drawings, the Contractor shall use whatever quantities are necessary to prevent sediment
transport off the job site, into permanent manmade storm water conveyances or management facilities or to
Waters of the State.
The Contractor will be required to provide erosion control as per the current edition of the applicable State of
Wisconsin, Department of Natural Resources (WDNR), Conservation Practice Standards. Copies of these
standards can be obtained by contacting the following:
State of Wisconsin Department of Natural Resources
Non-Point Source and Land Management Section
101 South Webster Street, P.O. Box 7921
Madison, WI 53707-7921
or by visiting the following website:
http://dnr.wi.gov/topic/stormwater/standards/const_standards.html
The Engineer has prepared an erosion control plan for this project. The intent of this plan is to identify
erosion control provisions for the construction site that comply with local, state, and federal regulations. The
Contractor shall submit for approval by the appropriate regulatory agency any changes to the Erosion Control
Plan, prior to beginning any construction on the project which may cause erosion in the portion of the site
where the change to the Erosion Control Plan is proposed.
RELATED WORK ELSEWHERE
Procurement and Contracting Requirements - Division 00 (All Sections)
Clearing and Grubbing - Division 31
Grading - Division 31
Subgrade Preparation - Division 31
Structural Excavation for Structures - Division 31
Trenching and Backfilling - Division 31
[20260519R 143]
Project #00628072 31 25 00-2 Erosion and Sedimentation Controls
© 2026 MSA Professional Services, Inc.
Riprap - Division 31
SUBMITTALS (NONE)
OPERATION/MAINTENANCE MANUALS AND INSTRUCTIONS (NONE)
PRODUCTS AND MATERIALS
TOPSOIL
Topsoil shall be fertile, friable, natural loam surface soil, reasonably free of subsoil, clay lumps, brush, weeds
and free of roots, stumps, stones larger than 2 inches in any dimension, and other matter harmful to plant
growth. Topsoil to supplement insufficient topsoil on the site shall originate from local sources, but not from
bogs or marshes.
LIME
Lime used for soil amendment shall be agricultural grade limestone ground sufficiently fine so that 80percent
passes a No. 8 sieve. Lime shall contain 80 percent calcium carbonate equivalent. Moisture shall not exceed
10 percent.
FERTILIZER
Fertilizer used in conjunction with seeding shall be dry, free-flowing granular fertilizer suitable for application
by agricultural fertilizer spreaders or blower equipment, or non-volatile liquid commercial fertilizer, having an
analysis of 20-10-10 (Nitrogen-Phosphoric Acid-Potash), or equal, unless use of phosphorus based fertilizers
are banned by the community where the work is to be completed. In such communities, an analysis of 20-0-
10, or equal, shall be used. Fertilizer having other analysis shall be applied at a rate to achieve at least the
individual following amounts of nutrient per unit area:
Nutrient Application Rate Application Rate
(Per Acre) (Per 1000 Sq. Ft.)
Nitrogen (N) 100 pounds 2.3 pounds
Phosphoric Acid (P2O5) 50 pounds 1.2 pounds
Potash (K2O) 50 pounds 1.2 pounds
SEEDING FOR CONSTRUCTION SITE EROSION CONTROL
Seeding for Construction Sites shall conform with Wisconsin DNR Conservation Practice Standard 1059.
Seed mixtures shall conform to one of the following:
WisDOT, 2003. State of Wisconsin Standard Specifications For Highway and Structure Construction.
Section 630, Seeding.
United States Department of Agriculture – Natural Resource Conservation Service Field Office
Technical Guide Section IV, Standard 342, Critical Area Planting.
UWEX Publication A3434 Lawn and Establishment & Renovation.
All seed shall conform to the requirements of the Wisconsin Statutes and of the Administrative Code Chapter
ATCP 20.01 regarding noxious weed seed content and labeling.
Seed mixtures that contain potentially invasive species or species that may be harmful to native plant
communities shall be avoided.
Seed shall not be used later than one year after the test date that appears on the label.
[20260519R 144]
Project #00628072 31 25 00-3 Erosion and Sedimentation Controls
© 2026 MSA Professional Services, Inc.
Seed shall be tested for purity, germination and noxious weed seed content and shall meet the minimum
purity and germination requirements as prescribed in the current edition of Rules for Testing Seed, published
by the Association of Official Seed Analysts.
MULCH FOR CONSTRUCTION SITES
Mulching for construction sites shall conform with Wisconsin DNR Conservation Practice Standard 1058.
Mulch shall consist of natural biodegradable material such as plant residue (including but not limited to straw,
hay, wood chips, bark and wood cellulose fiber), or other equivalent materials of sufficient dimension (depth
or thickness) and durability to achieve the intended effect for the required time period.
Mulch shall be environmentally harmless to wildlife and plants. Materials such as gravel, plastic, fabric,
sawdust, municipal solid waste, solid waste byproducts1, shredded paper, and non-biodegradable products
shall not be used.
Mulch shall be free of diseased plant residue (i.e., oak wilt), noxious weed seeds, harmful chemical residues,
heavy metals, hydrocarbons and other known environmental toxicants.
Marsh hay shall not be used as mulch in lowland