Common Council Meeting — Agenda Packet
City of De Pere · Brown County · Common Council · meeting of Oct 20, 2026 · Agenda packets
Open the original document More from City of De Pere
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Common Council Regular Meeting Agenda
Tuesday, October 20, 2026 at 7:30 PM
Council Chambers and Virtual
In-Person Attendance:
City Hall Council Chambers
2nd Floor City Hall
335 S Broadway
Electronic Meeting Access:
https://www.gotomeet.me/DePere
Telephonic Meeting Access:
(866) 899-4679 -or- (312) 757-3117
Access Code: 154-883-28
1. Call to Order
2. Roll Call
3. Pledge of Allegiance
4. Approval of the Agenda
5. Public Hearings
A. Public Hearing on a request to approve a zoning map amendment from Business
Park 1 District to Business Park 2 District at 400 Destiny Drive.
i. Notice of public hearing.
ii. Recommendation from Plan Commission.
iii. Ordinance #26-22 Approving Zoning Map Amendment from BP-1 Business Park 1
District to BP-2 Business Park 2 District (Parcels ED-2385 and ED-2386; 400 Destiny
Drive).
B. Public Hearing on a request to approve a conditional use for shipping container
accessory use at 301-307 Main Av.
i. Notice of public hearing.
ii. Recommendation from Plan Commission.
iii. Resolution #26-99 Authorizing and Approving a Conditional Use of Accessory
Shipping Container in a MX1 (Downtown Mixed-Use) District (Parcels WD-906 and
WD907; 301-305 Main Avenue).
C. Public Hearing on a request to amend Chapter 46 De Pere Municipal Code regarding
Platting and Land Division.
i. Notice of public hearing.
Page 1 of 183
ii. Recommendation from Plan Commission.
iii. Ordinance #26-23 Amending Chapter 46 of the De Pere Municipal Code (Platting and
Land Division).
6. Public Comments
Comments made during the public comment period shall pertain only to matters under the
jurisdiction of the Common Council. §6-3(f) DPMC
7. New Business
A. Approval of the minutes of the October 6, 2026 Common Council meeting.
B. Appointment of Scott Thompson to the Historic Preservation Commission by Mayor
James Boyd; term to expire January 31, 2029.
C. Recommendation from Board of Public Works on award of Contract 26-09 Pond and
Drainage System Construction.
D. Recommendation from Board of Public Works on Design Options for the Main Avenue
Slope.
E. Recommendation from Board of Public Works on award of Contract 26-10 Phoenix of
De Pere Utility and Street Construction.
F. Consideration and Possible Action on Final Payment Application for the De Pere
Parking Garage Located at 224 N. Wisconsin ST.
G. Recommendation from the Finance/Personnel Committee to approve 2027 benefit
renewal & plan design changes.
H. Recommendation from the Redevelopment Authority to authorize a purchase offer of
up to $440,000 to acquire property located at 2535 Lawrence Drive and allow city
employees and representatives to take all necessary steps to acquire the property.
The Council may convene in closed session pursuant to Section 19.85(1)(e)
Wisconsin Statutes for the purpose of deliberating or negotiating the purchasing of
public properties, the investing of public funds, or conducting other specified public
business, whenever competitive or bargaining reasons require a closed session. The
Council may, thereafter, reconvene in open session pursuant to Section19.85(2)
Wisconsin Statutes to report any actions taken during the closed session and to
consider all other matters on the agenda.
8. Resolutions
A. Resolution #26-100 Authorizing the fourth amendment for consulting services with
Short-Elliot-Hendrickson, Incorporated (MSC Expansion).
B. Resolution #26-101 Approving contract for HVAC preventive maintenance with Tweet
- Garot Mechanical, Inc.
C. Resolution #26-102 Ratifying grant application to Wisconsin Department of
Transportation (Signals and ITS Standalone Program).
D. Resolution #26-103 State/Municipal Maintenance Agreement for the Construction of a
Wet Detention Pond within Wisconsin Department of Transportation Right-of-Way.
Page 2 of 183
E. Resolution #26-104 Authorizing Parking Lease Agreement with Ahlstrom Nicolet LLC.
9. Future Agenda Items
10. Adjournment
Any person wishing to attend this meeting who, because of disability, requires special
accommodations should contact the Clerk’s office at 920-339-4050 by noon on the
previous day so that arrangements can be made.
The Public or Members of the Common Council, which may count toward an
official quorum, may attend the meeting either in person in the Council
Chambers or telephonically or electronically via video conferencing or other
appropriate technological means.
This meeting may also be rebroadcast on TV throughout the week and is
available on demand at https://deperewi.portal.civicclerk.com/.
Page 3 of 183
City of De Pere, Wisconsin
Request for Common Council Action
5.A
Meeting Date: October 20, 2026
Department: Development Services
From: Peter Schleinz, City Planner/Zoning Administrator
Subject: Public Hearing on a request to approve a zoning map
amendment from Business Park 1 District to Business
Park 2 District at 400 Destiny Drive.
Recommendation: No Action Needed
Attachments:
None
Page 4 of 183
City of De Pere, Wisconsin
Request for Common Council Action
5.A.i
Meeting Date: October 20, 2026
Department: City Clerk
From: Carey Danen, City Clerk
Subject: Notice of public hearing.
Recommendation: No Action Needed
Attachments:
Public Hearing Notice_Zoning Map Amendment_Destiny Dr-Generations Blvd_10-20-26
mtg_Class 2
Page 5 of 183
Publish: October 2, 2026, and October 9, 2026, in the Press-Times (Class 2 Notice)
NOTICE OF PUBLIC HEARING
Notice is hereby given that on Tuesday, October 20, 2026, at 7:35 PM or as soon thereafter as can
be heard, a public hearing will be held by the Common Council of the City of De Pere to act on the
request for a zoning map amendment from BP-1 (Business Park 1 District) to BP-2 (Business Park 2
District) at the following properties:
Parcels ED-2385 and ED-2386, approximately 0.0 feet northeast from the Destiny DR and
Generations BL intersection.
The public may attend the meeting either in person in the Council Chambers (2nd Floor City Hall,
335 S Broadway ST, De Pere WI) or electronically. Electronic or telephonic access to the meeting is
below: Computer/smart phone accessing https://www.gotomeet.me/DePere OR dial by phone:
United States (Toll Free): 1-866 899-4679 United States: +1 (312) 757-3117 Access Code: 154-
883-285.
A map of the proposed zoning map amendment is available by emailing Peter Schleinz at
pschleinz@deperewi.gov.
Dated this 29th day of September, 2026.
BY ORDER OF THE COMMON COUNCIL
James G. Boyd
Mayor
Carey E. Danen
City Clerk
Page 6 of 183
City of De Pere, Wisconsin
Request for Common Council Action
5.A.ii
Meeting Date: October 20, 2026
Department: Development Services
From: Peter Schleinz, City Planner/Zoning Administrator
Subject: Recommendation from Plan Commission.
Recommendation: Motion to approve.
On September 28, 2026, Plan Commission unanimously recommended approval.
Attachments:
PC Report, Zoning Map Amendment, Application and supporting documents - 02 Sep
2026, Legal Description - 02 Sep 2026
Page 7 of 183
City of De Pere Plan Commission
Staff Comments September 28, 2026
Consideration and possible action for a zoning map amendment from BP-1 (Business Park 1
District) to BP-2 Business Park 2 District) at 400 BLK Destiny DR (Parcels ED-2385, ED-2386).*
SITE MAP
REQUESTED ACTION: Zoning Map Amendment Request for three areas. (File ZMA 26-05)
Note: Change BP-1 to BP-2 for future business park development.
COMMON DESCRIPTION: 400 BLK Destiny DR, northeast from the Destiny DR and Generations BL
intersection.
SURROUNDING LAND USES: Business Park (BP-1, BP-2) to the north and east.
Agricultural and residential (MX3) to the south.
Commercial (C) to the west.
COMPREHENSIVE PLAN: Business Park.
APPLICANT / OWNERS: Authorized Representative
Carolyn Adler
McMahon & Associates
1445 McMahon DR
Neenah, WI 54956
Property Owner
ED-2385, ED-2386:
City of De Pere
335 S Broadway ST
De Pere, WI 54115-2593
Page 8 of 183
City of De Pere Plan Commission
Staff Comments September 28, 2026
LAND USE HISTORY: Both undeveloped parcels were created in 2000 as part of the East Side Industrial
Park Third Addition plat. In 2026, the owner of the business to the east a
proposed an expansion, which would require a lot line adjustment and a zoning
map amendment.
STAFF REVIEW (GENERAL): When reviewing a zoning map amendment request, staff considers the future
land use recommendation of the Comprehensive Plan, surrounding land uses, and
desired development patterns. The proposed zoning map amendment complies
with the Comprehensive Plan and surrounding land uses, including matching
adjacent existing uses.
Existing Zoning District
The existing zoning district is BP-1, which permits industrial and certain
commercial uses. The proposed zoning map amendment references a change to
BP-2, allowing for moderate impact uses by right, and high impact uses with a
conditional use.
Surrounding Land Uses
The existing site zoning and surrounding land uses are referenced near the
beginning of this report. The 2010 Comprehensive Plan Update, with
amendments, identifies future land use as Business Park.
CLIP FROM FUTURE LAND USE MAP
Desired Development Patterns
The City's desired development pattern is shown in the Comprehensive Plan as
Business Park. The permitted uses and conditional uses for the BP-2 District is in
Zoning Ordinance Article VII and summarized in Table 7-1.
NEIGHBOR OUTREACH: The publishing of a Class II public notice and public hearing is required for a
zoning map amendment. Property owners within 300 feet of the proposed zoning
map amendment were notified by mail and a sign was placed on the site prior to
the Plan Commission meeting. No neighbor inquiries were made at the time this
report was written. The public hearing is tentatively scheduled for the October
20, 2026, Common Council meeting.
STAFF RECOMMENDATION: Staff recommends APPROVAL of the request for a zoning map amendment from
BP-1 (Business Park 1 District) to BP-2 Business Park 2 District) at 400 BLK Destiny
DR. A zoning map amendment must comply with the following:
• Compliance with all state and local laws and regulations, including
compliance with all the provisions of Chapter 14, De Pere Municipal Code.
FUTURE
BUSINESS PARK.
Page 9 of 183
Page 10 of 183
Submitted On:
Sep 2, 2026, 10:33AM EDT
Planning/Zoning Application
Planning & Zoning Department
Parcel Number: (Include ALL
parcels) ED-2385, ED-2386
Nearest property address to the
project site:
Street Address: 2020 COMMERCE DR
City: DePere
State: WI
Zip: 54115
Check each project type that is
being applied for: Zoning Map Amendment (Rezoning)
Current De Pere Zoning Districts: BP-1
Existing Site Land Uses: Undeveloped/Vacant/Agricultural
Proposed Site Land Uses: Business Park/Industrial
Does the project comply with the
Comprehensive Plan? Yes
Has City Staff been contacted for a
pre-consultation meeting? Yes
Property Owner: First Name: City of DePere
Last Name: City of DePere
Is the property owner's address
the same as the nearest property
address?
No
Property Owner's Address: Street Address: 335 S BROADWAY
City: DE PERE
State: WI
Zip: 54115
Property Owner's Phone Number:
Property Owner's Email Address:
Is someone processing the project
for the property owner as their
authorized representative?
Yes
Authorized Representative's Name: First Name: Carolyn
Last Name: Adler
Authorized Representative's
Business Name: McMahon Associates
Authorized Representative's
Address:
Street Address: 1445 McMahon Drive
City: Neenah
Page 11 of 183
State: WI
Zip: 54956
Authorized Representative's Phone
Number:
Authorized Representative's Email
Address:
What is the basis for the zoning
map amendment?
Change two parcels from BP-1 to BP-2 to match zoning on the adjacent
Belmark Plant 7 parcel (ED-3102) , to allow for combination of all three
parcels with a CSM
Proposed De Pere Zoning Districts: BP-2
Please attach an EXHIBIT MAP with
the zoning boundary. ZONING AMENDMENT-EXHIBIT.pdf
Please attach a WORD DOCUMENT
with the boundary legal
description.
Rezoning Description BP1 to BP2.docx
How do you plan on paying for
your application? Online with a credit card
Total Due: $350.00
Property Owner or Authorized
Representative Signature
First Name: Carolyn
Last Name: Adler
Email Address:
Signed at: September 2, 2026 9:54AM America/New_York
User's Session Information 67.53.157.66, Referrer URL
Page 12 of 183
DESCRIPTION OF LANDS TO BE REZONED FROM BUSINESS PARK 1 (BP-1) TO BUSIBNESS
PARK 2 (BP-2)
All of Lots Thirty-three (33) and Thirty-four (34) of East Side Industrial Park Third Addition
recorded in Volume 21 of Plats on Pages 117-118 as Document 1747462, located in the
Southeast ¼ of the Southeast ¼ and the Southwest ¼ of the Southeast ¼ of Section 33,
Township 23 North, Range 20 East, City of De Pere, Brown County, Wisconsin, containing
169,924 square feet (3.90 acres) of land.
September 1, 2026
B0039 09-26-00588.08
Page 13 of 183
City of De Pere, Wisconsin
Request for Common Council Action
5.A.iii
Meeting Date: October 20, 2026
Department: City Attorney
From: Angela Zills, Paralegal
Subject: Ordinance #26-22 Approving Zoning Map Amendment
from BP-1 Business Park 1 District to BP-2 Business
Park 2 District (Parcels ED-2385 and ED-2386; 400
Destiny Drive).
Recommendation: Motion to approve.
Corresponding ordinance prepared by the Law Department to support the
recommendation of the Plan Commission.
Attachments:
Ord26-22
Page 14 of 183
ORDINANCE #26-22
APPROVING ZONING MAP AMENDMENT FROM
BP-1 BUSINESS PARK 1 DISTRICT TO BP-2 BUSINESS PARK 2 DISTRICT
(Parcels ED-2385 and ED-2386; 400 Block Destiny Drive)
WHEREAS, the Common Council of the City of De Pere, having reviewed the recommendation
of the City Plan Commission regarding the proposed change in zoning classification and Zoning Map
amendment for the property described below and having scheduled a public hearing then to be
decided by the Common Council; and
WHEREAS, the City Clerk, having published a Class 2 Notice of Public Hearing regarding such
proposed zoning change and Zoning Map amendment and, pursuant thereto, a public hearing having
been held on the 20th day of October, 2026 at 7:35 p.m. and the Common Council having heard all
interested parties or their agents and attorneys;
NOW, THEREFORE, the Common Council of the City of De Pere, Wisconsin, do ordain as
follows:
Section 1. That the following described property:
ED-2385:
All of Lot Thirty-three (33) of East Side Industrial Park Third Addition recorded in Volume 21 of
Plats on Pages 117-118 as Document 1747462, located in the Southeast ¼ of the Southeast ¼ and
the Southwest ¼ of the Southeast ¼ of Section 33, Township 23 North, Range 20 East, City of De
Pere, Brown County, Wisconsin.
containing 104,560 square feet (2.40 acres) of land; and
ED-2386
All of Lot Thirty-four (34) of East Side Industrial Park Third Addition recorded in Volume 21 of Plats
on Pages 117-118 as Document 1747462, located in the Southeast ¼ of the Southeast ¼ and the
Southwest ¼ of the Southeast ¼ of Section 33, Township 23 North, Range 20 East, City of De Pere,
Brown County, Wisconsin.
containing 65,364 square feet (1.50 acres) of land
Page 15 of 183
Ordinance #26-22
Page 2 of 2
shall be and the same is hereby rezoned from the present zoning classification of BP-1 Business Park
1 District to BP-2 Business Park District as set forth in and regulated by the provisions of Chapter 14,
Article IV Commercial and Employment Districts, the permitted uses identified under Article VII. Uses
and on the Principal Use Table (DPMC Chapter 14, Article VII – Uses, Table 7.1) and pursuant to
Section 14-74 of the De Pere Zoning Code, conditioned upon compliance with the provisions of
Chapter 14, De Pere Municipal Code, as well as all state and local laws and regulations.
Section 2. The City Clerk is directed to amend the City of De Pere Zoning Map in conformity
with the provisions of this ordinance.
Section 3. All other ordinances in conflict herewith are hereby repealed.
Section 4. This ordinance shall take effect upon its passage and publication according to law.
Adopted by the Common Council of the City of De Pere, Wisconsin, this 20th day of October,
2026. APPROVED:
____________________________
James G. Boyd, Mayor
ATTEST:
_____________________________
Carey E. Danen, City Clerk
Ayes: ______
Nays: ______
Board/Committee Approval: 09/28/2026
Publication Date: _______
Effective Date: _______
Page 16 of 183
City of De Pere, Wisconsin
Request for Common Council Action
5.B
Meeting Date: October 20, 2026
Department: Development Services
From: Peter Schleinz, City Planner/Zoning Administrator
Subject: Public Hearing on a request to approve a conditional use
for shipping container accessory use at 301-307 Main
Av.
Recommendation: No Action Needed
Attachments:
None
Page 17 of 183
City of De Pere, Wisconsin
Request for Common Council Action
5.B.i
Meeting Date: October 20, 2026
Department: City Clerk
From: Carey Danen, City Clerk
Subject: Notice of public hearing.
Recommendation: No Action Needed
Attachments:
Public Hearing Notice _CU_301-307 Main Av_10-20-26 mtg_Class 2
Page 18 of 183
Publish: October 2, 2026, and October 9, 2026, in the Press-Times (Class 2 Notice)
NOTICE OF PUBLIC HEARING
Notice is hereby given, that on Tuesday, October 20, 2026, at 7:35 PM or as soon thereafter as can be
heard, a public hearing will be held by the Common Council of the City of De Pere to act on the request
for a conditional use for Shipping Container accessory use at the following property:
Parcels WD-906 and WD-907 at 301-307 Main AV, approximately 0.0 feet southwest from the Main AV
and Third ST intersection.
The public may attend the meeting either in person in the Council Chambers (2nd Floor City Hall, 335 S
Broadway ST, De Pere WI) or electronically. Electronic or telephonic access to the meeting is below:
Computer/smart phone accessing https://www.gotomeet.me/DePere OR dial by phone: United States
(Toll Free): 1-866 899-4679 United States: +1 (312) 757-3117 Access Code: 154-883-285.
A map of the proposed conditional use is available by emailing Peter Schleinz at
pschleinz@deperewi.gov.
Dated this 29th day of September, 2026.
BY ORDER OF THE COMMON COUNCIL
James G. Boyd
Mayor
Carey E. Danen
City Clerk
Page 19 of 183
City of De Pere, Wisconsin
Request for Common Council Action
5.B.ii
Meeting Date: October 20, 2026
Department: Development Services
From: Peter Schleinz, City Planner/Zoning Administrator
Subject: Recommendation from Plan Commission.
Recommendation: Motion to approve.
On September 28, 2026, Plan Commission unanimously recommended approval.
Attachments:
PC Report, Conditional Use Map, Application and supporting documents - 14 Sep 2026
Page 20 of 183
City of De Pere Plan Commission
Staff Comments September 28, 2026
Consideration and possible action for a conditional use of accessory shipping container in a MX1
(Downtown Mixed-Use) District at 301-305 Main AV (Parcels WD-906, WD-907).*
SITE MAP
Page 21 of 183
City of De Pere Plan Commission
Staff Comments September 28, 2026
REQUESTED ACTION: Conditional use request (File CU 26-01).
Proposed types of use include seasonal eating and drinking place with seating
at the rear of the property.
COMMON DESCRIPTION: 301-305 Main AV, southwest of the Main AV and Third ST intersection.
SURROUNDING LAND USES: Downtown mixed uses (MX1) to the north, south, and west.
St. Norbert College (PI-2) to the east.
COMPREHENSIVE PLAN: Commercial.
APPLICANT / OWNER: Applicant and Property Owner
Gavic Holdings LLC
ATTN: Tom Gavic
1818 Rainbow AV
De Pere, WI 54115
LAND USE HISTORY: After a review of air photographs, the site developed prior to 1938 air
photographs.
STAFF REVIEW: When reviewing a conditional use request, staff and Plan Commission consider
the following:
• Review criteria and standards, from Zoning Ordinance 14-123(9), are
required for all conditional use requests. The criteria are listed below with
the petitioner’s responses from the application form.
• Where allowed regulations, from Zoning Ordinance 14-78(14)(d), are
included for the shipping container accessory use. The specific regulations
are listed below; there was not a need for a petitioner’s response.
• Supplemental regulations, from Zoning Ordinance 14-78(14)(e), are
included for the shipping container accessory use. The criteria are listed
below with the petitioner’s responses from a separate document.
Conditional Use Review Criteria and Standards
1. That the establishment, maintenance or operation of the conditional use
will not be detrimental to or endanger the public health, safety or general
welfare;
Petitioner’s response: This conditional use is for a shipping container
for use of seasonal beverage, food service, and seating. It will follow all
public health guidelines per city of De Pere Health Dept.
2. That the uses, values and enjoyment of surrounding properties for
purposes already permitted in the district will not be substantially
impaired or diminished by the establishment, maintenance or operation of
the proposed conditional use;
Petitioner’s response: The container has received support from all
surrounding property owners and will add a convenient beverage and
food service option to the Alley District - as well as additional seating
for the public.
3. That establishment of the conditional use will not impede the normal and
orderly development and improvement of surrounding properties for uses
permitted in the district;
Petitioner’s response: Container is located on private property and will
Page 22 of 183
City of De Pere Plan Commission
Staff Comments September 28, 2026
not impede the development of surrounding properties.
4. That adequate utilities, access roads, drainage and other necessary
improvements have been or are being provided;
Petitioner’s response: All utilities to the container will be run separately
and winterized each season. Drainage will be maintained on site and
gathering via a catch
basin and connected to existing storm lateral.
5. That adequate measures have been or will be taken to provide ingress and
egress that will minimize on- and off-site traffic congestion; and
Petitioner’s response: The container will be located on the site per the
approved site plan which shows "future container" location - the
resulting location has no impact on ingress or egress traffic.
6. That the conditional use complies with all other applicable regulations of
this zoning ordinance.
Petitioner’s response: The container is located on an approved site plan
which has been vetted by all departments.
7. Finally, provide details that will help with decision making about the
operation of the use. Include hours and days of operations, seasonal
operation, shipment/delivery requirements and hours, parking
requirements, drop-off zones, queuing lines, height and width of existing
and new structures (for wireless telecommunications, site plan details,
etc.).
Petitioner’s response: The container will operate seasonally from April -
November annually, four days per week, Noon to 10PM daily.
Customer parking will be via public parking in Nicolet Square and street
parking. All customer queuing will be accommodated on site. The
container dimensions will be 8 ft x 40 ft and 9.5 ft tall, with stair access
to roof patio seating.
Conditional Use Where Allowed Regulations
Per Zoning Ordinance 14-78(14)(d):
1. Zoning Districts: Shipping containers may be allowed if approved by
conditional use in the X Districts.
2. Within Parcel: Shipping containers must be located in the rear half of an
interior side yard or in the rear yard of a parcel.
3. Setbacks: Shipping container setbacks are a minimum of 4 feet from all
property lines. However, alley-fronted property lines may be reduced to 0
feet. Shipping Containers cannot be placed over a property line.
4. Easements: Shipping containers may not be placed on utility, storm water,
access, or other public easements without written permission from the
holder of the easements.
5. Separation: Shipping containers cannot be located within 200 feet of other
approved shipping containers to prevent clusters from disrupting the X
Districts or downtown. Shipping containers that are less than 200 feet
apart may be considered if approved as a major design exception.
Conditional Use Supplemental Regulations
Per Zoning Ordinance 14-78(14)(e):
Page 23 of 183
City of De Pere Plan Commission
Staff Comments September 28, 2026
1. Site plan required: An approved site plan with the shipping
container shown is required prior to the installation of a shipping
container on a property.
Petitioner response: Site Plan previously submitted with approval
letter dated 7-31-26.
2. Building Codes: Use of shipping containers must comply with city
inspection, WUCBC, and ICC regulations.
Petitioner response: We will be working with the city building
inspector to assure the container complies.
3. Utility connections: Shipping containers with kitchens, sinks, or
restrooms, must include water, sanitary sewer, and
stormwater/storm sewer services that are approved by department
of public works.
Petitioner response: All utilities will be run and approved by Dept
of Public Works.
4. Permanent installation required: Shipping containers must be placed
on and attached to a permanent foundation (piers, slab, or
engineered footings).
Petitioner response: The container will be permanently attached
to approved reinforced concrete piers.
5. Accessibility: The shipping container order/receiving window(s) must
be accessible, meeting ADA compliance regulations. At least one
table must be provided that is ADA accessible between the
order/receiving window(s) and the table.
Petitioner response: None provided.
6. Maximum height: 10 feet tall.
Petitioner response: We will maintain this maximum height.
7. Stacking prohibited: Shipping containers cannot be stacked on top of
each other.
Petitioner response: We will be using one 8ft x 40ft x 9.5ft
container – with access to a seating deck on top.
8. Primary façade: The primary façade for the shipping container must
face a public street, alley, or public pedestrian corridor. The primary
façade may face into a courtyard or gathering space on the property
if located along an alley.
Petitioner response: The container’s primary façade will face into
a gathering space.
9. Façade treatment: Street, alley, and public pedestrian corridor
facing facades must include the addition of at least 20% major
façade materials that are allowed in the X Districts. A major design
exception may be requested for the following:
i. The use of a mural(s) on the entirety of a façade instead of 20%
major façade material on the same facade(s).
Petitioner response: We are requesting a design
exception and apply a mural on the west, south and east
facades – we are happy to provide the mural concept for
Page 24 of 183
City of De Pere Plan Commission
Staff Comments September 28, 2026
review when available.
ii. The use of no more than 20% fiber cement board or wood on a
façade(s) as a major façade material.
Petitioner response: Not needed.
10. Transparency: A minimum of 20% transparency is required for
street, alley, and public pedestrian corridor facing facades. However,
transparency is not required for alley facing facades of the primary
façade faces into a courtyard or gathering space on the property.
Windows, roll-up windows, garage style doors, and service windows
may be included when calculating 20%.
Petitioner response: Since the primary façade is facing into a
gathering space, there will not be any transparency on the west,
south and est facades.
11. Rooflines: Shipping containers must include a defined top edge such
as a parapet, cap, rooftop amenity deck, or architectural band.
Petitioner response: The container will have a rooftop amenity
deck.
12. Rooftop use allowed: The rooftop of a shipping container may be
used as a rooftop amenity deck.
Petitioner response: The container will have a rooftop amenity
deck.
13. Façade Colors: Colors used must be similar or complimentary to the
colors used on the primary structure. Fluorescent façade colors are
prohibited. However, fluorescent colors may be used in a mural.
Petitioner response: The container will have a painted mural on
the west, south and east facades – colors used on the primary
façade will complement and coordinate with the other structures
on site.
14. Seating areas: Seating areas cannot be within streets, alleys, and
public pedestrian corridors.
Petitioner response: All seating will be on private property on the
site.
15. Queuing Areas: Queuing areas must be provided that do not
obstruct streets, alleys, and public pedestrian corridors.
Petitioner response: Queuing areas will be maintained on site.
16. Landscaping: At least 10% of the designated outdoor gathering
space for shipping containers must include landscaping (planters,
trellises, green screens) that soften the industrial appearance of the
shipping container.
Petitioner response: Landscaping is planned throughout the side
that will help soften structures and hide exposed public utilities.
17. Illumination: The use of string lights, warm ambient lighting, and
architectural lighting is encouraged. All shipping container façade
lighting must be dark sky compliant and fall under the light spill
thresholds identified in Section 14-95.
Petitioner response: The site will string lighting and any
Page 25 of 183
City of De Pere Plan Commission
Staff Comments September 28, 2026
additional lighting will meet section 14-95 guidelines.
18. Refuse and Recyclable Materials: Refuse and recyclable material
storage must be located in the rear yard only and must comply with
Section 14-94. A shipping container may share refuse and recyclable
material storage with the primary use.
Petitioner response: There will be shared refuse and recycling
containers for the site.
19. Signage: Each shipping container is allowed to have a maximum of
two signs that are attached to the shipping container, if approved by
sign permit. At a minimum, allowed sign types, sizes, and locations
must comply with Sections 14-111 Table 11-4 and 13-113. Except
that free standing signs that are not attached to the shipping
container are prohibited.
Petitioner response: All signage will be approved the cities sign
permit process.
20. Murals: Shipping containers are allowed to have murals that do not
include signage.
Petitioner response: A mural will be painted on the west, south
and east facades.
21. Liquor licensing: Shipping containers that serve beer, wine, and/or
liquor must have a liquor license that is approved by the city clerk’s
office.
Petitioner response: The container will be included in Nicolet Ale
Works Brewpub license premise description.
22. Required removal of unused Shipping Container: If a shipping
container is unused for a period longer than 12 months, then the
conditional use becomes invalid, and the shipping container must be
removed from the property within 30 days.
Petitioner response: We understand this removal requirement –
the container will be in seasonal use May – November each year.
Staff Review Summary
The proposed MX1 District property may allow an accessory shipping
container high-impact use if a conditional use is successfully approved.
• The specific proposal includes a shipping container accessory use for a
seasonal eating and drinking place with seating at the rear of the
property.
• The proposal references a site plan that was approved in July, 2026, If
the conditional use is approved, the site plan needs to be amended to
add the shipping container to the site plan.
• The proposal include a property line that is crossed by the shipping
container. The property line will need to be removed or relocated
prior to amending the site plan.
• The proposal responses did not include specific details about
accommodating accessibility, which need to be addressed with the
amended site plan.
• The proposal references the desire to use murals as optional façade
Page 26 of 183
City of De Pere Plan Commission
Staff Comments September 28, 2026
materials, which requires a separate design exception review.
Specific conditions must be adhered to. If any conditions are violated, the city
may revoke the conditional use and the use must cease. Thus, it is extremely
important that the petitioner, and future property owners, is aware of all the
conditions that are included with an approved conditional use, in addition to
Zoning Ordinance regulations.
All conditions that the petitioner has agreed to are listed within the ‘Staff
Recommendation’ section of this report.
NEIGHBOR OUTREACH All property owners within 300 feet of the subject area have been notified of
the application via mail. The authorized representative notified nearby
property owners about the proposed conditional use.
At the time this report was written, no public comment or concern was made
to staff about the conditional use. Any additional comments will be shared at
the time of the Plan Commission meeting.
STAFF RECOMMENDATION: Staff recommends APPROVAL of the conditional use request for an accessory
shipping container in a MX1 (Downtown Mixed-Use) District at 301-305 Main
AV, subject to the following:
1. Compliance with all state and local laws and regulations, including
compliance with all the provisions of De Pere Municipal Code Chapter 14
(Zoning Ordinance).
2. Compliance with the following conditional use supplemental regulations
and the attached petitioner’s responses in this report:
a. Site plan required: An approved site plan with the shipping container
shown is required prior to the installation of a shipping container on a
property.
b. Building Codes: Use of shipping containers must comply with city
inspection, WUCBC, and ICC regulations.
c. Utility connections: Shipping containers with kitchens, sinks, or
restrooms, must include water, sanitary sewer, and stormwater/storm
sewer services that are approved by department of public works.
d. Permanent installation required: Shipping containers must be placed
on and attached to a permanent foundation (piers, slab, or engineered
footings).
e. Accessibility: The shipping container order/receiving window(s) must
be accessible, meeting ADA compliance regulations. At least one table
must be provided that is ADA accessible between the order/receiving
window(s) and the table.
f. Maximum height: 10 feet tall.
g. Stacking prohibited: Shipping containers cannot be stacked on top of
each other.
h. Primary façade: The primary façade for the shipping container must
face a public street, alley, or public pedestrian corridor. The primary
façade may face into a courtyard or gathering space on the property if
located along an alley.
i. Façade treatment: Street, alley, and public pedestrian corridor facing
facades must include the addition of at least 20% major façade
materials that are allowed in the X Districts. A major design exception
Page 27 of 183
City of De Pere Plan Commission
Staff Comments September 28, 2026
may be requested for the following:
i. The use of a mural(s) on the entirety of a façade instead of 20%
major façade material on the same facade(s).
ii. The use of no more than 20% fiber cement board or wood on a
façade(s) as a major façade material.
j. Transparency: A minimum of 20% transparency is required for street,
alley, and public pedestrian corridor facing facades. However,
transparency is not required for alley facing facades of the primary
façade faces into a courtyard or gathering space on the property.
Windows, roll-up windows, garage style doors, and service windows
may be included when calculating 20%.
k. Rooflines: Shipping containers must include a defined top edge such as
a parapet, cap, rooftop amenity deck, or architectural band.
l. Rooftop use allowed: The rooftop of a shipping container may be used
as a rooftop amenity deck.
m. Façade Colors: Colors used must be similar or complimentary to the
colors used on the primary structure. Fluorescent façade colors are
prohibited. However, fluorescent colors may be used in a mural.
n. Seating areas: Seating areas cannot be within streets, alleys, and public
pedestrian corridors.
o. Queuing Areas: Queuing areas must be provided that do not obstruct
streets, alleys, and public pedestrian corridors.
p. Landscaping: At least 10% of the designated outdoor gathering space
for shipping containers must include landscaping (planters, trellises,
green screens) that soften the industrial appearance of the shipping
container.
q. Illumination: The use of string lights, warm ambient lighting, and
architectural lighting is encouraged. All shipping container façade
lighting must be dark sky compliant and fall under the light spill
thresholds identified in Section 14-95.
r. Refuse and Recyclable Materials: Refuse and recyclable material
storage must be located in the rear yard only and must comply with
Section 14-94. A shipping container may share refuse and recyclable
material storage with the primary use.
s. Signage: Each shipping container is allowed to have a maximum of two
signs that are attached to the shipping container, if approved by sign
permit. At a minimum, allowed sign types, sizes, and locations must
comply with Sections 14-111 Table 11-4 and 13-113. Except that free
standing signs that are not attached to the shipping container are
prohibited.
t. Murals: Shipping containers are allowed to have murals that do not
include signage.
u. Liquor licensing: Shipping containers that serve beer, wine, and/or
liquor must have a liquor license that is approved by the city clerk’s
office.
v. Required removal of unused Shipping Container: If a shipping
container is unused for a period longer than 12 months, then the
conditional use becomes invalid, and the shipping container must be
removed from the property within 30 days.
Page 28 of 183
Page 29 of 183
Submitted On:
Sep 14, 2026, 10:10PM EDT
Planning/Zoning Application
Planning & Zoning Department
Parcel Number: (Include ALL
parcels) WD-906 & 907
Nearest property address to the
project site:
Street Address: 301-305 Main Avenue
City: De Pere
State: WI
Zip: 54115
Check each project type that is
being applied for: Conditional Use
Current De Pere Zoning Districts: MX1
Existing Site Land Uses: Commercial
Proposed Site Land Uses: Commercial
Does the project comply with the
Comprehensive Plan? Yes
Has City Staff been contacted for a
pre-consultation meeting? Yes
Property Owner: First Name: Tom
Last Name: Gavic
Is the property owner's address
the same as the nearest property
address?
No
Property Owner's Address: Street Address: 1818 Rainbow Ave
City: De Pere
State: WI
Zip: 54115
Property Owner's Phone Number:
Property Owner's Email Address:
Is someone processing the project
for the property owner as their
authorized representative?
No
What is the conditional use for? Restaurant
A Conditional Use request requires
a detailed narrative (project
description) and site plan graphics.
For the detailed narrative, would
you prefer to attach a PDF
Enter detailed narrative into the application form
Revised Sep 17, 2026
Page 30 of 183
document or enter the information
directly into this application form?
1. That the establishment,
maintenance or operation of the
conditional use will not be
detrimental to or endanger the
public health, safety or general
welfare.
This conditional use is for a shipping container for use of seasonal
beverage, food service, and seating. It will follow all public health
guidelines per city of De Pere Health Dept.
2. That the uses, values and
enjoyment of surrounding
properties for purposes already
permitted in the district will be not
be substantially impaired or
diminished by the establishment,
maintenance or operation of the
proposed conditional use.
The container has received support from all surrounding property
owners and will add a convenient beverage and food service option to
the Alley District - as well as additional seating for the public.
3. That establishment of the
conditional use will not impede the
normal and orderly development
and improvement of surrounding
properties for uses permitted in the
district.
Container is located on private property and will not impede the
development of surrounding properties.
4. That adequate utilities, access
roads, drainage and other
necessary improvements have
been or are being provide.
All utilities to the container will be run separately and winterized each
season. Drainage will be maintained on site and gathering via a catch
basin and connected to existing storm lateral.
5. That adequate measures have
been or will be taken to provide
ingress and egress that will
minimize on- and off-site traffic
congestion.
The container will be located on the site per the approved site plan
which shows "future container" location - the resulting location has no
impact on ingress or egress traffic.
6. That the conditional use
complies with all other applicable
regulations of this zoning
ordinance.
The container is located on an approved site plan which has been
vetted by all departments.
Finally, provide details that will
help with decisionmaking about
the operation of the use. Include
hours and days of operations,
seasonal operation,
shipment/delivery requirements
and hours, parking requirements,
drop-off zones, queuing lines,
height oand width of existing and
new structures (for wireless
The container will operate seasonally from April - November annually,
four days per week, Noon to 10PM daily. Customer parking will be via
public parking in Nicolet Square and street parking. All customer
queuing will be accommodated on site. The container dimensions will
be 8 ft x 40 ft and 9.5 ft tall, with stair access to roof patio seating.
Page 31 of 183
telecommunications, site plan
details, etc.
Please attach a SITE PLAN
GRAPHIC that details the
Conditional Use location.
260184_Eng_Base (4).pdf
How do you plan on paying for
your application? Mail a check
Total Due: $350.00
Property Owner or Authorized
Representative Signature
First Name: Tom
Last Name: Gavic
Email Address:
Signed at: September 14, 2026 10:10PM America/New_York
User's Session Information 74.135.166.226, Referrer URL
Page 32 of 183
1
Design Standards for Shipping-Container
Accessory Uses in the Mixed-Use Districts
Supplemental Regulations (Gavic Holdings Responses in Blue Text)
All shipping containers are subject to the following supplemental regulations:
1. Site plan required: An approved site plan with the shipping container shown is
required prior to the installation of a shipping container on a property.
i. Site Plan previously submitted with approval letter dated 7-31-26.
2. Building Codes: Use of shipping containers must comply with city inspection,
WUCBC, and ICC regulations.
i. We will be working with the city building inspector to assure the
container complies.
3. Utility connections: Shipping containers with kitchens, sinks, or restrooms, must
include water, sanitary sewer, and stormwater/storm sewer services that are
approved by department of public works.
i. All utilities will be run and approved by Dept of Public Works
4. Permanent installation required: Shipping containers must be placed on and
attached to a permanent foundation (piers, slab, or engineered footings).
i. The container will be permanently attached to approved reinforced
concrete piers.
5. Accessibility: The shipping container order/receiving window(s) must be
accessible, meeting ADA compliance regulations. At least one table must be
provided that is ADA accessible between the order/receiving window(s) and the
table.
6. Maximum height: 10 feet tall.
i. We will maintain this maximum height.
7. Stacking prohibited: Shipping containers cannot be stacked on top of each other.
i. We will be using one 8ft x 40ft x 9.5ft container – with access to a
seating deck on top.
8. Primary façade: The primary façade for the shipping container must face a public
street, alley, or public pedestrian corridor. The primary façade may face into a
courtyard or gathering space on the property if located along an alley.
i. The container’s primary façade will face into a gathering space.
9. Façade treatment: Street, alley, and public pedestrian corridor facing facades
must include the addition of at least 20% major façade materials that are
allowed in the X Districts. A major design exception may be requested for the
following:
Page 33 of 183
2
i. We are requesting a design exception and apply a mural on the west,
south and east facades – we are happy to provide the mural concept for
review when available.
ii. The use of a mural(s) on the entirety of a façade instead of 20% major façade
material on the same facade(s).
iii. The use of no more than 20% fiber cement board or wood on a façade(s) as a
major façade material.
10. Transparency: A minimum of 20% transparency is required for street, alley, and
public pedestrian corridor facing facades. However, transparency is not required
for alley facing facades of the primary façade faces into a courtyard or gathering
space on the property. Windows, roll-up windows, garage style doors, and
service windows may be included when calculating 20%.
i. Since the primary façade is facing into a gathering space, there will not
be any transparency on the west, south and est facades.
11. Rooflines: Shipping containers must include a defined top edge such as a
parapet, cap, rooftop amenity deck, or architectural band.
i. The container will have a rooftop amenity deck.
12. Rooftop use allowed: The rooftop of a shipping container may be used as a
rooftop amenity deck.
i. The container will have a rooftop amenity deck.
13. Façade Colors: Colors used must be similar or complimentary to the colors used
on the primary structure. Fluorescent façade colors are prohibited. However,
fluorescent colors may be used in a mural.
i. The container will have a painted mural on the west, south and east
facades – colors used on the primary façade will complement and
coordinate with the other structures on site.
14. Seating areas: Seating areas cannot be within streets, alleys, and public
pedestrian corridors.
i. All seating will be on private property on the site.
15. Queuing Areas: Queuing areas must be provided that do not obstruct streets,
alleys, and public pedestrian corridors.
i. Queuing areas will be maintained on site.
16. Landscaping: At least 10% of the designated outdoor gathering space for
shipping containers must include landscaping (planters, trellises, green screens)
that soften the industrial appearance of the shipping container.
i. Landscaping is planned throughout the side that will help soften
structures and hide exposed public utilities.
17. Illumination: The use of string lights, warm ambient lighting, and architectural
lighting is encouraged. All shipping container façade lighting must be dark sky
compliant and fall under the light spill thresholds identified in Section 14-95.
i. The site will string lighting and any additional lighting will meet section
14-95 guidelines.
18. Refuse and Recyclable Materials: Refuse and recyclable material storage must be
located in the rear yard only and must comply with Section 14-94. A shipping
Page 34 of 183
3
container may share refuse and recyclable material storage with the primary
use.
i. There will be shared refuse and recycling containers for the site.
19. Signage: Each shipping container is allowed to have a maximum of two signs that
are attached to the shipping container, if approved by sign permit. At a
minimum, allowed sign types, sizes, and locations must comply with Sections 14-
111 Table 11-4 and 13-113. Except that free standing signs that are not attached
to the shipping container are prohibited.
i. All signage will be approved the cities sign permit process.
20. Murals: Shipping containers are allowed to have murals that do not include
signage.
i. A mural will be painted on the west, south and east facades.
21. Liquor licensing: Shipping containers that serve beer, wine, and/or liquor must
have a liquor license that is approved by the city clerk’s office.
i. The container will be included in Nicolet Ale Works Brewpub license
premise description.
22. Required removal of unused Shipping Container: If a shipping container is
unused for a period longer than 12 months, then the conditional use becomes
invalid, and the shipping container must be removed from the property within
30 days.
i. We understand this removal requirement – the container will be in
seasonal use May – November each year.
# END #
Page 35 of 183
Page 36 of 183
Page 37 of 183
Page 38 of 183
Page 39 of 183
Page 40 of 183
Page 41 of 183
ALLEY EATS8FT X 40 FT X 9.5FTCONTAINER
PATIO ABOVE
GREEN LANDSCAPINGHIDING UTILITIES
12FT X 16FT MUSICSTAGE
Double Tap Cooler
Service Window Counter
StorageSinkCoolerCooler PizzaOven
PizzaPrepTable
Ice CreamBev
40'-0"
8'-2"
Page 42 of 183
PATIO ABOVE
ALLEY EATSSTAIRS TO PATIO16” SERVICEWINDOW
8FT X 40 FT STAIRS TO PATIO 16’ SERVICE WINDOW
ELEVATION
FLOOR PLAN
Double Tap Cooler Pizza
Oven
Service Window Counter
Bev
Cooler
Ice Cream
CoolerSink Storage
Pizza
Prep
Table
HSS4 x 4 x 1/4
A
A
A
A
B
B
B
B
C
D
HSS3 X 3 X 3/16
HSS3 X 3 X 3/16
HSS3 X 3 X 3/16
HSS12 X 3 X 3/16
HSS12 X 3 X 3/16
PLATE 1/2 X 4 AS POST SUPPORTING HSS BEAM ABOVE.
WELD TO WALL PANEL WITH 1/8" X 2" FILLET WELD AT 12" OC
Page 43 of 183
PATIO ABOVE
ALLEY EATSSTAIRS TO PATIO16” SERVICEWINDOW
STAIRS TO PATIO 11’ X 40’ ROOFTOPPATIO
Double Tap Cooler Pizza
Oven
Service Window Counter
Bev
Cooler
Ice Cream
CoolerSink Storage
Pizza
Prep
Table
ROOF FRAMING
HSS8 X 3 X 1/4
HSS3 X 3 X 3/16
HSS3 X 3 X 3/16
HSS12 X 3 X 3/16
HSS12 X 3 X 3/16
HSS8 X 3 X 1/4
HSS8 X 3 X 1/4
HSS10 X 3 X 1/4
HSS10 X 3 X 1/4
HSS8 X 3 X 1/4
HSS8 X 3 X 1/4
HSS3 X 3 X 1/4
HSS3 X 3 X 1/4
HSS3 X 3 X 1/4
HSS3 X 3 X 1/4
D
Page 44 of 183
ROOFTOP OVERFRAMING FOR UPPER PATIO
HSS3 X 3 X 3/16 AT 16" OC.
PROVIDE CLOSURE PLATE
EACH END AND SEAL WELD.
PROC 1/4" DIA DRAIN
HOLES IN BOTTOM OF HSS
HSS3 X 3 X 3/16.
PROVIDE CLOSURE
PLATE EACH END AND
SEAL WELD
E
F
COMPOSITE DECKING.
REVIEW FASTENING
REQUIREMTNS TO
STEEL TUBES WITH
MANUFACTURER
Page 45 of 183
HSS POST - SEE PLAN
EXISTING CHANNEL
JOISTS AT 10" OC.
EXISTING BENT
PLATE STEEL RAIL.
3/8" STIFF PLATE. SEE
DETAIL B.
1/8
3 SIDES
1/8
DETAIL AT NEW POST BASE
HSS POST - SEE PLAN
EXISTING BENT PLATE
STEEL RAIL.
3/8" STIFF PLATE.
SEE DETAIL B.
1/8
3 SIDES
CONCRETE PAVER SHIM
BENEATH POST TO PROVIDE
TIGHT CONTACT BETWEEN
COMPACTED SOIL AND
BOTTOM OF STEEL RAIL
A
B
DETAIL AT NEW POST BASE
CONCRETE PAVER SHIM
BENEATH POST TO PROVIDE
TIGHT CONTACT BETWEEN
COMPACTED SOIL AND
BOTTOM OF STEEL RAIL
Page 46 of 183
EXISTING
CORRUGATED WALL
PANEL
EXISTING CHANNEL
JOISTS AT 10" OC.
EXISTING BENT
PLATE STEEL RAIL.
DETAIL AT NEW POST BASE
CONCRETE PAVER SHIM
BENEATH POST TO PROVIDE
TIGHT CONTACT BETWEEN
COMPACTED SOIL AND
BOTTOM OF STEEL RAIL
C
STEEL POST - SEE
PLAN
STEEL BEAM -
SEE PLAN
1/8
1/8
3 SIDES
REMOVE AND REPLACE
EXISTING FLOOR DECK AS
REQUIRED TO INSTALL NEW
STEEL
Page 47 of 183
HSS POST - SEE PLAN
HSS BEAM - SEE
ELEVATION. NOTCH
AROUND HSS POST AND
SEAL WELD ALL AROUND
DETAIL AT NEW POST BASE
D
SERVICE
COUNTER BY
OTHERS. COORD.
WITH OWNER
EXISTING CORRUGATED
WALL PANEL. SEAL WELD TO
HSS POST AND HSS BEAM
DETAIL AT NEW POST BASE
E
EXIST. ROOF PANEL
EXIST. TUBE
SECTION
HSS POST - SEE PLAN
HSS BEAM - SEE PLAN
GUARDRAIL BY OTHERS.
COORD. WITH OWNER
Page 48 of 183
DETAIL AT NEW POST BASE
F
EXIST. ROOF PANEL
EXIST. TUBE
SECTION
EXISTING WALL PANEL
GUARDRAIL BY OTHERS.
COORD. WITH OWNER.
UPRIGHTS MUST ALIGN
WITH HSS3 RAFTERS
Page 49 of 183
City of De Pere, Wisconsin
Request for Common Council Action
5.B.iii
Meeting Date: October 20, 2026
Department: City Attorney
From: Angela Zills, Paralegal
Subject: Resolution #26-99 Authorizing and Approving a
Conditional Use of Accessory Shipping Container in a
MX1 (Downtown Mixed-Use) District (Parcels WD-906
and WD907; 301-305 Main Avenue).
Recommendation: Motion to approve.
This item is the corresponding resolution for the Plan Commission's recommendation to
approve a conditional use of an accessory shipping container at 301-305 Main Avenue.
The Zoning Ordinance was recently revised, pursuant to Ordinance #26-19, to create a
new accessory use subcategory, 14-78(14) Shipping Container.
Attachments:
Reso26-99
Page 50 of 183
RESOLUTION #26-99
AUTHORIZING AND APPROVING A CONDITIONAL USE OF ACCESSORY SHIPPING
CONTAINER IN A MX1 (DOWNTOWN MIXED-USE) DISTRICT
(Parcels WD-906 and WD-907; 301-305 Main Avenue)
WHEREAS, the Common Council of the City of De Pere has reviewed the recommendation
of the City Plan Commission regarding the granting of a conditional use as described below and
has determined that the matter be scheduled for public hearing and decided by the Common
Council; and
WHEREAS, the City Clerk has published a Notice of Public Hearing regarding the proposed
conditional use and, pursuant thereto, a Public Hearing has been held at the City Hall Council
Chambers on the 20th day of October, 2026 at 7:35 p.m. whereupon the Common Council heard
all interested parties, their agents and attorneys;
NOW, THEREFORE, BE IT HEREBY RESOLVED, by the Common Council of the City of De
Pere, Wisconsin, as follows:
1. The Common Council hereby finds and determines that an application for a
conditional use has been made by a party in interest meeting the requirements
of §14-123, De Pere Municipal Code (DPMC); and
2. The standards relating to the conditional use as set forth in DPMC §14-78(14)
and §14-123(9) have been or will be complied with; and
3. The Common Council does therefore pursuant to DPMC §14-123(8)authorize
and grant a conditional use as provided at DPMC §14-78(14(d), for purposes
of permitting the use of a shipping container as an accessory structure to
operate a public gathering space for use such as eating and drinking places,
stages and other outdoor event spaces in a MX1, Downtown Mixed-Use
District located at 301-305 Main Avenue, Parcels WD-906 and WD-907, as
shown on the Principal Use Table (DPMC Chapter 14, Article VII – Uses, Table
7.1); and
4. This authorization is further subject to compliance with any other terms and
conditions of the Plan Commission, including all of the following supplemental
regulations as itemized in DPMC §14-78(14)(e).
Page 51 of 183
Resolution #26-99
Page 2 of 2
5. Compliance with all requirements of Chapter 14 (Zoning Ordinance), De Pere
Municipal Code, as well as all state and local laws and regulations.
Adopted by the Common Council of the City of De Pere, Wisconsin, this 20 th day of
October, 2026.
APPROVED:
_________________________________
James G. Boyd, Mayor
ATTEST:
_________________________________
Carey E. Danen, City Clerk
Ayes:
Nays:
Board/Committee Approval: 09/28/2026
Page 52 of 183
City of De Pere, Wisconsin
Request for Common Council Action
5.C
Meeting Date: October 20, 2026
Department: Development Services
From: Peter Schleinz, City Planner/Zoning Administrator
Subject: Public Hearing on a request to amend Chapter 46 De
Pere Municipal Code regarding Platting and Land
Division.
Recommendation: Motion to approve.
Attachments:
None
Page 53 of 183
City of De Pere, Wisconsin
Request for Common Council Action
5.C.i
Meeting Date: October 20, 2026
Department: City Clerk
From: Carey Danen, City Clerk
Subject: Notice of public hearing.
Recommendation: No Action Needed
Attachments:
Public Hearing Notice_Land Division_10-20-26 mtg_Class 2
Page 54 of 183
Publish: October 2, 2026, and October 9, 2026, in the Press-Times (Class 2 Notice)
NOTICE OF PUBLIC HEARING
Notice is hereby given, that on Tuesday, October 20, 2026, at 7:35 PM or as soon thereafter as can be
heard, a public hearing will be held by the Common Council of the City of De Pere to act on the
following: Revising document submittal/review/recording procedures, updating references for the
director of development services or designee, updating references for zoning districts, adding street
trees as required improvements, and removing regulations for the urban reserve area in Chapter 46 De
Pere Municipal Code regarding the Platting and Land Division Ordinance.
The public may attend the meeting either in person in the Council Chambers (2nd Floor City Hall, 335 S
Broadway ST, De Pere WI) or electronically. Electronic or telephonic access to the meeting is below:
Computer/smart phone accessing https://www.gotomeet.me/DePere OR dial by phone: United States
(Toll Free): 1-866 899-4679 United States: +1 (312) 757-3117 Access Code: 154-883-285.
A copy of the proposed revision to the Chapter 46 Platting and Land Division Ordinance is available by
emailing Peter Schleinz at pschleinz@deperewi.gov.
Dated this 29th day of September, 2026.
BY ORDER OF THE COMMON COUNCIL
James G. Boyd
Mayor
Carey E. Danen
City Clerk
Page 55 of 183
City of De Pere, Wisconsin
Request for Common Council Action
5.C.ii
Meeting Date: October 20, 2026
Department: Development Services
From: Peter Schleinz, City Planner/Zoning Administrator
Subject: Recommendation from Plan Commission.
Recommendation: Motion to approve.
On September 28, 2026, Plan Commission unanimously recommended approval.
Attachments:
Platting and Land Division Ordinance Memo - 28 Sep 2026
Page 56 of 183
To: James Boyd, Mayor
Plan Commission Members
From: Peter Schleinz, Senior Planner | Zoning Administrator
Date: September 28, 2026
RE: Consideration and possible action for amendments to Municipal Code Chapter 46 (Platting and
Land Division Ordinance).*
Summary:
In 2027 a thorough review and rewrite of the Platting and Division of Land Ordinance is proposed. Until
then, staff proposes the following revisions:
• The required document submittal, review, and recording procedures for plats and certified
survey maps has been updated to reference the simplified City online application procedures,
rather than submitting multiple paper copies.
• References to the director of planning have been updated to be the director of development
services or designee.
• Zoning districts for land dedications have been updated to reference residential district names
used in the Zoning Ordinance that was rewritten in 2023.
• Street trees have been added as required improvements (1 tree in the right-of-way per 50 feet of
street frontage).
• References to regulations for the urban reserve area have been removed.
A copy of the Platting and Land Division Ordinance is included with this memo. The revisions are redlined.
Staff Request:
Recommend that the Common Council approve an amendment to modify the Platting and Land Division
Ordinance for submittal procedures, director of development services references, residential zoning
district names, and street tree regulations.
• A Class II public hearing will be held prior to the Common Council final decision.
Page 57 of 183
City of De Pere, Wisconsin
Request for Common Council Action
5.C.iii
Meeting Date: October 20, 2026
Department: City Attorney
From: Angela Zills, Paralegal
Subject: Ordinance #26-23 Amending Chapter 46 of the De Pere
Municipal Code (Platting and Land Division).
Recommendation: Motion to approve.
This ordinance was drafted by the Law Department to formalize the amendments to
Chapter 46 DPMC as recommended by the Plan Commission
Attachments:
Ord26-23, Redline - De Pere - Revisions - 14 Jul 2026
Page 58 of 183
ORDINANCE #26-23
AMENDING CHAPTER 46 OF THE DE PERE MUNICIPAL CODE
(Platting and Land Division)
WHEREAS, the Common Council of the City of De Pere having reviewed the
recommendation of the City Plan Commission regarding the proposed amendments to Chapter
46 (Platting and Land Division) of the City of De Pere Municipal Code and having scheduled a
public hearing then to be decided by the Common Council; and
WHEREAS, the City Clerk, having published a Class 2 Notice of Public Hearing regarding
such proposed Platting and Land Division ordinance amendments, and pursuant thereto, a public
hearing having been held on the 20th day of October, 2026 at 7:35 p.m. and the Common Council
having heard all interested parties, their agents and/or attorneys;
NOW, THEREFORE, THE COMMON COUNCIL OF THE CITY OF DE PERE, WISCONSIN, DOES
ORDAIN AS FOLLOWS:
Section 1. Chapter 46 – PLATTING AND LAND DIVISION shall be amended as follows:
(a) Sec. 46-2 Definitions. shall be amended by:
(i) deleting “director of economic development and planning” and replacing
with “development services director” in the definition of extraterritorial
plat approval jurisdiction.
(ii) deleting the definition of urban reserve area of extraterritorial review
jurisdiction in its entirety.
(b) Sec. 46-3 Procedure. shall be amended by:
(i) repealing subsection (1) under (b) Preliminary plat and replacing with: (1)
Before submitting a final plat for approval, the subdivider shall submit to
the development services director or designee an online application, a PDF
copy and CAD copy of a preliminary plat, preliminary engineering drawings
including street trees, and a review fee not less than 30 days preceding the
meeting of the plan commission for preliminary review.
Page 59 of 183
Ordinance #26-23
Page 2 of 2
(ii) adding the following language in subsection (2) under (b) Preliminary plat
following “…the plan commission shall”: “refer the preliminary plat with its
recommendation to the common council. The common council
shall,”…within 90 days of its submission…
(iii) repealing subsection (1) under (c) Final plat and replacing with: (1) An
online application, a PDF copy and CAD copy of a final plat, final
engineering drawing including street trees, and a review fee shall be
submitted to the development services direct or designee within 36
months after the last required approval of the preliminary plat. The plan
commission may extend the time for submission of the final plat.
(iv) amending subsection (2) under (c) Final plat by deleting the references to
“city director of planning and development” and “director of planning” and
replacing with “development services director or designee.”
(v) repealing subsection (4) under (c) Final plat and replacing with: (4) After
recording the final plat the county register of deeds’ office, the subdivider
shall submit to the city one PDF copy of the recorded plat.
(c) Sec. 46-4 General requirements and design standards. shall be amended by:
(i) deleting subsections (2) and (4) under (h) Lots. and renumbering the
remaining subsections as appropriate.
(d) Sec. 46-6 Required improvements. shall be amended by:
(i) deleting subsection (b)(5) and renumbering the remaining parapraphs as
appropriate.
(ii) adding the following as subsection (c): Street trees. The subdivider shall
pay a street tree fee for every linear foot of right-of-way frontage on each
side of the street (both sides) in the subdivision to plant street trees. Street
trees will be planted by the city after the issuing of 75% of the residential
until occupancy permits within the subdivision or certified survey map. The
final location and size for street trees shall be determined by the city
forester.
(iii) labeling the paragraph: “All facilities shall be installed according to
standard plans and specification as adopted by the city.” as subsection (d).
(e) Sec. 46-8 Land divisions other than subdivisions. shall be amended by:
(i) repealing (a) and replacing with: (a) Procedure. The divider shall submit to
the development services director or designee an online application, a PDF
copy and CAD copy of a certified survey map, preliminary engineering
drawings including street trees, and a review fee not less than 30 days
preceding the meeting of the plan commission for review. If the certified
survey map has no public lands and dedications, the plan commission shall,
within 40 days, approve, approve conditionally or reject the certified
survey map. If the certified survey map has public lands and/or dedications
the plan commission shall refer the certified survey map with its
Page 60 of 183
Ordinance #26-23
Page 2 of 2
recommendation to the common council to, within 40 days, approve,
approve conditionally or reject the certified survey map. The divider shall
be notified, in writing, of any conditions of approval or the reason for the
rejection.
(ii) adding the words “certified survey” before the word “map” in subsections
(2) and (4) under (b) Requirements. and subsection (1) and (2) under (c)
Certificates and affidavits.
(iii) subsection (d) Map. shall be repealed and recreated as follows: (d) Map.
The certified survey map shall be filed by the divider for recording with the
county register of deeds and one PDF copy of the recorded certified survey
map shall be filed with the development services director or designee.
(f) Sec. 46-13. Condominium developments. shall be amended by deleting
“director of development services” and replacing with “development services
director” in subsection (b)(5).
These amendments shall be made as referenced above, consistent with the redlined
revision attached hereto and incorporated herein by reference.
Section 2. That all other ordinances in conflict herewith are hereby repealed.
Section 3. That this ordinance shall take effect upon passage and publication.
Adopted by the Common Council of the City of De Pere, Wisconsin, this 20th day of
October, 2026.
APPROVED:
____________________________
James G. Boyd, Mayor
ATTEST:
______________________________
Carey E. Danen, City Clerk
Ayes: _____
Nays: _____
Board/Committee/Commission Approval: 09/28/2026
Publication Date:
Page 61 of 183
- CODE OF ORDINANCES
Chapter 46 PLATTING AND LAND DIVISION
De Pere, Wisconsin, Code of Ordinances Created: 2025-11-24 15:33:33 [EST]
(Supp. No. 8)
Page 1 of 14
Chapter 46 PLATTING AND LAND DIVISION
Sec. 46-1. Applicability.
The regulations contained in this chapter shall apply to the following:
(1) Subdivision. Any division of land within the city or its extraterritorial plat approval jurisdiction which
results in a subdivision as defined in this chapter shall be, and any other division may be, surveyed and
a plat thereof approved and recorded as required by this chapter and Wis. Stats. ch. 236.
(2) Other than subdivision. Any division of land other than a subdivision within the city, or its
extraterritorial plat approval jurisdiction, of which plat has not been approved and recorded, shall be
surveyed and a certified survey map of such division approved and recorded in acc ordance with the
provisions of section 46-8 and Wis. Stats. ch. 236.
(3) Exception. The provisions of this chapter shall not apply to:
a. Transfers of interest in land by will or pursuant to court order;
b. Leases for a term not to exceed ten years, mortgages or easements;
c. The sale or exchange of parcels of land between owners of adjoining property if additional lots
are not thereby created and the lots resulting are not reduced below the minimum sizes required
by this chapter or other applicable laws or ordinances;
d. Condominium conversion of existing structures where no additional dwelling units, building sites
or lot equivalents are being created;
e. A division of original lots having a maximum size of 1½ acres within an approved and recorded
subdivision plat.
(Code 1974, § 13.01; Code 2001, § 46-1; Ord. No. 15-31, § 1, 12-1-2015)
Sec. 46-2. Definitions.
The following words, terms and phrases, when used in this chapter, shall have the meanings ascribed to
them in this section, except where the context clearly indicates a different meaning:
Condominium development means a real estate development in which the condominium form of ownership
pursuant to Wis. Stats. ch. 703 is utilized.
Extraterritorial plat approval jurisdiction means the area within three miles of the corporate limits of the city
and is delineated on a map filed in the office of the director of economic development and planning development
services director.
Street means a way of travel for vehicular traffic and is further described as follows:
Collector street means any street which carry traffic from minor streets to the system of highways,
thoroughfares and major streets and including the principal entrance streets of a residential development
and streets for circulation within such a development.
Connector street means any street which intersects at least two other streets, one of which shall be a
collector street.
Page 62 of 183
Created: 2025-11-24 15:33:33 [EST]
(Supp. No. 8)
Page 2 of 14
Cul-de-sac means a minor street which is accessible to motor vehicle traffic at only one point.
Highways and thoroughfares mean state and federal routes and their connecting links.
Loop street means a minor street which is accessible to motor vehicle traffic from only one other street
(which has to be either a collector or connector) at two points.
Major street and highway mean any street with high traffic densities serving relatively large areas.
Minor street means any street which are used primarily for access to the abutting properties.
Subdivisions means a division of a lot, parcel or tract of land by the owner thereof or his or her agent for the
purpose of sale or of building development, where:
(1) The act of division creates six or more building sites of 1½ acres or less in area; or
(2) Five or more parcels or building sites of 1½ acres each or less in area are created by successive divisions
within a period of five years.
Urban reserve area of extraterritorial review jurisdiction means that area designated as urban reserve in the
latest update to the city's comprehensive plan.
(Code 1974, § 13.02; Code 2001, § 46-2; Ord. No. 13-17, § 15, 8-20-2013; Ord. No. 15-31, § 2, 12-1-2015; Ord. No.
16-18, § 1, 9-6-2016; Ord. No. 20-16, § 1, 10-6-2020)
Sec. 46-3. Procedure.
(a) Preliminary matters.
(1) If the time limits, deadlines, notice requirements or other provisions in this chapter are more restrictive
than time limits, deadlines, notice requirements or other provisions that provide protections for a
subdivider contained in Wis. Stats. ch. 236, the time limits, deadlines, notice requirements or other
provisions that provide protections for a subdivider contained in Wis. Stats. ch. 236 shall apply.
(2) Plat submissions shall comply with all ordinances in effect as of the date the preliminary plat is
submitted.
(3) Previous to filing a preliminary plat, the subdivider may consult the plan commission and its staff for
advice and assistance.
(b) Preliminary plat.
(1) Before submitting a final plat for approval, the subdivider shall submit to the director of planning and
economic development services director or designee an online application, a PDF copy and CAD copy14
copies of a preliminary plat, preliminary engineering drawings including street trees, and a review fee
not less than 30ten days preceding the meeting of the plan commission for preliminary
review.approval. One additional copy shall be submitted if the plat is adjacent to a state highway. The
subdivider shall submit two copies if the plat is in the extraterritorial platting jurisdiction of the city.
(2) After review of the preliminary plat and negotiations with the subdivider on changes deemed advisable
and the kind and extent of public improvements which will be required, the plan commission shall refer
the preliminary plat with its recommendation to the common council. The common council shall,
within 90 days of its submission, approve, approve conditionally or reject the plat. The subdivider shall
be notified, in writing, or any conditions or approval or the reasons for rejection.
(3) Approval of the preliminary plat shall entitle the subdivider to final approval of the layout shown by
such plat if the final plat conforms substantially to the preliminary plat and conditions of approval have
been met.
Page 63 of 183
Created: 2025-11-24 15:33:33 [EST]
(Supp. No. 8)
Page 3 of 14
(c) Final plat.
(1) An online application, a PDF copy and CAD copy of a final plat, final engineering drawings including
street trees, and a review feeThe final plat and nine copies for plats located within the city limits, or
two copies for plats located in the extraterritorial platting jurisdiction shall be submitted to the director
of planning and economic development services director or designee within 36 months after the last
required approval of the preliminary plat. The plan commission may extend the time for submission of
the final plat.
(2) The plan commission shall refer the final plat with its recommendation to the common council. The
council shall approve or reject the final plat within 60 days of its submission to the plan commission
unless the time is extended by agreement with the subdivider. Conclusions and recommendations of
the city director of planning and development services director or designee as to whether the final plat
conforms substantially to the preliminary plat and the director of planning development services
director or designee recommendation on approval of the final plat shall be made a part of the record
either verbally or in writing of the council proceeding. Reasons for rejection shall be stated in the
minutes of the council meeting and a copy thereof or a written statement o f such reasons shall be
supplied the subdivider.
(3) If the original of the final plat has been filed with another approving authority, the subdivider may file a
true copy of such plat in lieu of the original. However, before the approval of the council will be
inscribed on the original of the final plat, the surveyor or the subdivider shall certify the respects in
which the original of the final plat differs from the true copy and all modifications must first be
approved.
(4) After recording the final plat at the county register of deeds' office, the subdivider shall submit to the
city one PDF copyeight true copies of the finalrecorded plat. if the plat is located in the city, and two
true copies if the plat is located within the extraterritorial platting jurisdiction of the city. The
subdivider shall submit one additional copy of the recorded plat if it is located within the city adjacent
to a state highway.
(Code 1974, § 13.03; Code 2001, § 46-3; Ord. No. 10-28, § 1, 12-7-2010)
Sec. 46-4. General requirements and design standards.
(a) General conformance. The proposed subdivision shall conform to:
(1) The provisions of Wis. Stats. ch. 236.
(2) All applicable ordinances of the city.
(3) The master plan, or functional segments thereof, as they may be completed.
(4) The official map.
(5) The rules of the state board of health relating to lot size and lot elevation if the subdivision is not
served by a public sewer and provision for such service has not been made.
(6) The rules of the state highway commission relating to safety of access and the preservation of the
public interest and investment in the streets if the subdivision of any lot contained therein abuts on a
state trunk highway or connecting street.
(7) The preliminary plat shall be drawn at the scale not more than 100 feet to an inch. The required copies
of the preliminary plat shall be made from a black ink line drawing.
(b) Applicability to condominiums. This chapter is expressly applicable to condominium developments within the
city's territorial or extraterritorial jurisdiction, pursuant to Wis. Stats. § 703.27(1). For the purposes of this
Page 64 of 183
Created: 2025-11-24 15:33:33 [EST]
(Supp. No. 8)
Page 4 of 14
chapter, a condominium unit and any associated limited common elements shall be deemed to be equivalent
to a lot or parcel created by the act of subdivision.
(c) Streets.
(1) General considerations. The streets shall be designed and located in relation to existing and planned
streets, to topographical conditions and natural terrain features such as streams and existing tree
growth, to public convenience and safety, and in their appropriate relation t o the proposed uses of the
land to be served by such streets. The preliminary plat shall show topography or be accompanied by a
map of the same scale showing topography using contour intervals not greater than five feet.
(2) Conform to official map. The arrangement, width and location of all streets shall conform to the official
map.
(3) Arrangement.
a. Major streets shall be properly integrated with the existing and proposed system of major
streets, highways, and thoroughfares.
b. Collector streets shall be properly related to the mass transit system, to special traffic generating
from facilities such as schools, churches and shopping centers, to population densities, and to the
arterial streets into which they feed.
c. Minor streets shall be laid out to conform as much as possible to topography, to discourage use
by through traffic, to permit efficient drainage and sewer systems, and to require the minimum
amount of street necessary to provide convenient, safe access to property. The reasonable and
intelligent use of curvilinear and cul-de-sac streets is encouraged.
(4) Railroad right-of-way or limited access highway. Where a residential subdivision borders on or contains
a railroad right-of-way or limited access highway right-of-way, the plan commission may require a
street approximately parallel to and on each side of such right-of-way at a distance suitable for park or
residential purposes.
(5) Highways and thoroughfares. Where a subdivision borders on or contains an existing or proposed
highway or thoroughfare, the plan commission may require that the backs of lots abut the highway or
thoroughfare and be provided with screen planting contained in a nonaccess reservation along the rear
property line, that deep lots with rear service alleys be provided, or that other provisions be made for
the adequate protection of properties and the separation of through and local traffic.
(6) Width. All streets shall be of the width specified on the official map or, if no width is specified there,
they shall be not less than the width specified as follows:
a. Highways: 80 feet, plus eight-foot tree planting easement on both sides of right-of-way.
b. Collector streets: 80 feet.
c. Minor streets: 70 feet.
d. Minor streets designed with parking on one side: 60 feet, plus eight -foot tree planting easement
on both sides of right-of-way.
(7) Alignment and visibility. Clear visibility, measured along the centerline, shall be provided for at least
400 feet on major streets, 350 feet on collector streets, and 250 feet on minor streets.
(8) Minimum radii or curvature on the centerline.
a. Major streets: 300 feet.
b. Collector streets: 200 feet.
Page 65 of 183
Created: 2025-11-24 15:33:33 [EST]
(Supp. No. 8)
Page 5 of 14
c. Minor streets: 100 feet.
(9) Tangents. A tangent at least 100 feet long shall be introduced between reverse curves on major and
collector streets.
(10) Street names. Any street which is the reasonable continuation of an existing street shall bear the same
name. If the topography or other features of a permanent nature are such as to render the
continuation of the actual roadway impossible, and where such nomenclature is apt to produce
confusion, the street shall not carry the same name as the street to which it may be geometrically
aligned.
Type Dead-end Curving Straight
Short streets Places or Courts Crescent, Way, Circle
or Lane
Terrace, Row, Lane
Long streets Road or Drive Street or Avenue
The term "boulevard" shall be reserved for such streets which, because of their breadth or
monumental character, are to be especially designated.
(d) Intersections.
(1) Streets shall intersect as nearly as possible at right angles and the intersection of more than two streets
at one point is discouraged. The number of streets converging at one intersection shall be reduced to
the minimum possible.
(2) Property lines at street intersections shall be rounded with a radius of 12 feet or a greater radius where
the plan commission considers it necessary. Cutoffs or chords may be permitted in place of rounded
corners.
(3) Street jogs with centerline offsets of less than 125 feet shall be avoided. Where streets intersect
highways, thoroughfares and major streets, their alignment shall be continuous.
(e) Alleys.
(1) Alleys shall be provided in all commercial and industrial districts, except that the plan commission may
waive this requirement if definite and assured provision is made for service access such as off -street
loading and parking consistent with, and adequate for, the uses proposed.
(2) Alleys shall not be approved in residential areas unless necessary because of topography or other
exceptional circumstances.
(3) The width of alleys shall be not less than 20 feet.
(4) Dead-end alleys are prohibited except under very unusual circumstances, and crooked and "T" alleys
shall be discouraged. Where dead-end alleys are unavoidable, they shall be provided with adequate
turnaround facilities at the dead end.
(f) Easements and restrictive covenants.
(1) Easements across lots or centered on rear or side lot lines shall be provided for utilities where required
by the plan commission and shall be at least ten feet wide.
(2) A drainage easement in favor of the city, centered on rear lot lines, shall be provided on all subdivisions
of land. Such easement shall, at a minimum, contain the following restrictions:
a. Any obstruction to the flow of water, by any means, shall be prohibited.
Page 66 of 183
Created: 2025-11-24 15:33:33 [EST]
(Supp. No. 8)
Page 6 of 14
b. No structure, earthen berm, dam, erection of other improvement, tree, or landscaping shall be
permitted.
c. The erection of a fence or annual plantings may be allowed, provided that same do not obstruct
the flow of water.
d. Grantor (property owner) is prohibited from changing the grade elevation of the drainage
easement from that established by grantee.
e. Grantee shall have full rights of ingress and egress to carry on and all work in connection with the
maintenance and operation in, over, under and across the lands of grantor.
f. The property covered by said easement shall not be used in any way or manner that will impair
the rights of grantee.
g. The easement shall run with the land, and shall be binding upon the grantees, lessees,
successors, heirs and assigns of grantor and grantee.
h. The easement shall be assignable.
(3) A stormwater covenant shall be provided on the face of each subdivision as follows: The land on the
side of the lots within the area shall be graded by the subdivider and maintained by the abutting
property owner to provide for the adequate drainage of surface water.
(4) Where a subdivision is traversed by a watercourse, drainageway, channel or stream, there shall be
provided a stormwater easement or drainage right-of-way of sufficient width conforming substantially
with the lines of such watercourse. Grading or construction adequate for the purpose may be required.
Wherever possible, the drainage shall be maintained by an open channel with landscaped banks and
adequate width for maximum potential volume of flow as determined by the plan commission. Such
improvement shall be installed prior to council approval of the final plat.
(5) A stormwater covenant shall be provided on each plat as follows: The land on the rear of all lots and on
the side of lots (specified) within the area shall be graded by the subdivider and maintained by the
abutting property owner to provide for the adequate drainage of surface water.
(6) An eight-foot tree planting easement shall be provided on the front or side of each lot fronting or
siding a major street and streets with a width less than 70 feet, and no portion of the street shall be
used for tree planting. Such easement shall be contained in a restrictive covenant written on the face
of the plat.
(g) Blocks.
(1) The lengths, widths and shapes of blocks shall be such as are appropriate for the locality and the type
of development contemplated, but block lengths in residential areas shall not exceed 1,500 feet
between street lines.
(2) Pedestrian crosswalks, not less than ten feet wide, may be required by the plan commission through
the center of blocks more than 900 feet long where deemed essential to provide circulation or access
to schools, playgrounds, shopping centers, transportation and other community facilities.
(h) Lots.
(1) General lot orientation of lots. The size, shape and orientation of lots shall be appropriate for the
location of the subdivision and for the type of development and use contemplated.
(2) Lots within the city's extraterritorial plat approval jurisdiction. Every lot within the city's extraterritorial
plat approval jurisdiction that is identified in the city's current comprehensive plan as a growth area or
an urban reserve area, shall be a minimum of ten acres in area.
Page 67 of 183
Created: 2025-11-24 15:33:33 [EST]
(Supp. No. 8)
Page 7 of 14
(3) Lot dimensions. Lot dimensions shall conform to the requirements of the zoning ordinance, and in
residential districts shall be not less than 75 feet in frontage nor less than 8,000 square feet in area.
Residential lots to be served by private sewage disposal facilities shall comply with the rules of the
state board of health in addition to the regulations contained in this section. Depth and width of
properties reserved or laid out for commercial and industrial purposes shall be adequate to provide for
the off-street service and parking facilities required by the type of use and development contemplated.
Residential lots fronting or backing on major streets, highways, and thoroughfares should be platted
with extra depth to permit generous distance between the buildings and such traffic ways. Excessive
depth in relation to width shall otherwise be avoided.
(4) Lot dimensions within urban reserve area of extraterritorial review jurisdiction. Every lot within the
urban reserve area of the extraterritorial review jurisdiction shall have a minimum lot width and
frontage of not less than 300 feet.
(5) Corner lots. Corner lots for residential use shall have extra width to permit full building setback from
both streets.
(6) Access to public street. Every lot shall front on, or abut onto, a public street.
(7) Lots at right angles. Lots at right angles to each other should be avoided wherever possible, especially
in residential areas.
(8) Lot lines. Side lot lines shall be substantially at right angles or radial to street lines.
(9) Large lots. In case a tract is subdivided into parcels contained one or more acres, such parcels shall be
arranged to allow the re-subdivision of any parcels into normal lots in accordance with the provisions
of this chapter.
(10) Municipal boundaries. Lots shall follow municipal boundary lines whenever practicable rather than
cross them.
(Code 1974, § 13.04; Code 2001, § 46-4; Ord. No. 03-23, § 1, 10-7-2003; Ord. No. 07-20, §§ 1—3, 8-7-2007; Ord.
No. 15-31, § 3, 12-1-2015; Ord. No. 16-18, § 2, 9-6-2016; Ord. No. 19-26, § 1, 12-17-2019; Ord. No. 20-16, § 2, 10-
6-2020; Ord. No. 22-03, §§ 1, 2, 4-6-2022)
Sec. 46-5. Public sites and open spaces.
(a) Dedication of property unsuitable for development. Whenever a plat is filed of a subdivision containing
submarginal land or containing or adjoining an open stream or watercourse, such land shall be dedicated to
the city or other appropriate municipality for drainage purposes. Such dedication or reservatio n shall be
made for the purpose of preventing the erection of structures on unsuitable property and to secure the
public health and safety and to facilitate adequate provision for drainage.
(b) Public open spaces.
(1) Purpose. It is the purpose of this section that adequate open spaces may be properly located and
preserved as the community develops, and that the cost of providing sites for parks, recreational areas,
and all their uses related to the operation of the city government necessary to serve the additional
population brought into the community by subdivision or condominium development may be most
equitably apportioned on the basis of the additional need created by the individual subdivision or
condominium.
(2) Dedication of sites.
Page 68 of 183
Created: 2025-11-24 15:33:33 [EST]
(Supp. No. 8)
Page 8 of 14
a. The subdivider shall provide, and dedicate to the public, land compatible with the comprehensive
plan for the development of the community, provided that such development shall not exceed in
area that provided in subsection (b)(2)b of this section.
b. The amount of land to be provided and dedicated in R-1, R-2, R-3, and R-4 R1-, R2-, and RM-
residential districts shall be 4.4 percent of the total nonpublic residential property developed. If
dedicated land is set aside in the plat, it shall be done with the approval and in coordination with
the city plan commission and the park board.
(3) Payment in lieu of dedication.
a. Where the plan commission determines that such dedication is not compatible with the
comprehensive plan, the subdivider shall, in lieu thereof, pay to the city a fee as determined by
resolution of the common council.
b. Such fees shall be used only for open space acquisition or the preparation of park and open space
plans, including a master plan of development.
c. Payment shall be made at the time the building permit is issued.
d. No payment shall be required for a parcel on which a permanent residential structure exists prior
to the date of the division. However, a residence that is intentionally razed and a new structure
built of additional dwellings would come under the provisions of this chapter and be subject to
the fees in accordance with subsection (b)(3)a of this section.
e. Where the plat, certified survey or condominium does not specify the number of dwelling units
to be constructed, the land dedication or payment in lieu of dedication shall be based upon the
maximum number of dwelling units permitted by the city zoning code and this chapter.
(Code 1974, § 13.05; Code 2001, § 46-5; Ord. No. 14-20, § 2, 12-16-2014; Ord. No. 20-16, §§ 4, 5, 10-6-2020)
Sec. 46-6. Required improvements.
(a) The subdivision shall be monumented, as required by Wis. Stats. § 236.15, which is hereby adopted by
reference and incorporated in this section as though fully set out.
(b) Before the final plat or subdivision located within the corporate limits is approved, the subdivider may
provide the following facilities:
(1) Water and sanitary sewer mains and laterals to the lot line where connection to existing systems can
be reasonably provided.
(2) Streets graded to full width and roadway graveled.
(3) Adequate facilities to provide surface water drainage.
(4) Curb and gutter and gravel when so ordered by the common council.
(5) Street trees of such variety, size, number and location as designated by the park board and forester.
(65) Adequate facilities for interior lot improvement to provide surface water drainage. Surface water shall
be drained over easements to public facilities where possible. Where necessary due to ground
elevations and topography, storm sewer construction, including installation of catchbasins, shall be
required at the expense of the subdivider.
(76) The land surface within the proposed subdivision, including the street right -of-way to be dedicated,
shall be graded to the proposed contours as approved on the preliminary plat. Any land surface so
graded shall be appropriately and adequately protected to maintain the grade and protect the same
Page 69 of 183
Created: 2025-11-24 15:33:33 [EST]
(Supp. No. 8)
Page 9 of 14
from erosion. As an alternative, the city shall design, construct and install such improvements after
approval of the final plat at a time and under such conditions as the city shall determine in its
discretion. If the city constructs such improvements, th e cost shall be assessed pursuant to chapter 13.
(c) Street Trees. the subdivider shall pay a street tree fee for every linear foot of right-of-way frontage on each
side of the street (both sides) in the subdivision to plant street trees. Street trees will be planted by the city
after the issuing of 75% of the residential unit occupancy permits within the subdivision or certified survey
map. The final location and size for street trees shall be determined by the city forester.
(d) All facilities shall be installed according to standard plans and specifications as adopted by the city.
(Code 1974, § 13.06; Code 2001, § 46-6)
Sec. 46-7. Plats and data.
(a) Preliminary consultation data. The following information shall be provided at the time of the preliminary
consultation or upon filing the preliminary plat if no preliminary consultation is held:
(1) Data on existing covenants, land characteristics and available community facilities and utilities,
description of the subdivision proposal, such as number of residential lots, typical lot width and depth,
business areas, playgrounds, park areas, other public areas, proposed protective covenants and
proposed utilities and street improvements.
(2) A location map showing the relationship of the proposed subdivision to existing community facilities
which serve or influence it, including development name and location, main traffic arteries, public
transportation lines, shopping centers, elementary and high schools, parks and playgrounds, and other
community features such as hospitals and churches. The map shall also include title, scale, north arrow
and date.
(3) A sketch plan showing in simple sketch form the proposed layout of streets, lots and other features in
relation to existing conditions. The sketch plan may be a free hand pencil sketch made directly on a
print of the topographic survey.
(b) Preliminary plat.
(1) The preliminary plat shall be drawn with waterproof nonfading black ink or legibly drawn with pencil
on tracing cloth, or tracing paper of good quality on a scale of not more than 100 feet to an inch and
shall show correctly on its face:
a. Date, scale and north point.
b. The proposed subdivision name, which shall not duplicate the name of any plat previously
recorded in the county.
c. The name and address of the owner, the subdivider and a surveyor registered in the state
preparing the plat.
d. Location of the subdivision by government lot, quarter, quarter section, section, township, range
and county.
e. A small scale drawing of the section of government subdivision of the section in which the
subdivision lies with the location of the subdivision indicated thereon.
f. The exact length and bearing of the exterior boundaries of the subdivision.
g. Location and names of adjacent subdivisions and the owners of adjoining parcels or unsubdivided
land.
Page 70 of 183
Created: 2025-11-24 15:33:33 [EST]
(Supp. No. 8)
Page 10 of 14
h. Zoning on the adjacent land to the subdivision for subdivisions outside the city.
i. Location, widths and names of all existing platted or dedicated streets, alleys or other public
ways and easements, railroad, and utility rights-of-way, parks, cemeteries, watercourses,
drainage ditches, permanent buildings, bridges and other pertinent data, as determined by the
city plan commission.
j. The water elevations of adjoining lakes or streams at the date of survey and the approximate
high and low water elevations of such lakes or streams. All elevations shall be referred to the U.S.
Coast and Geodetic Survey or established city datum.
k. If the subdivision borders a lake or stream, the distances and bearings of a meander line
established not less than 20 feet back from the ordinary high-water mark of the lake or stream.
l. Layout and width of all new streets and rights-of-way, such as alleys, highways, easements for
sewers, water mains and other public utilities.
m. Direction and distance to nearest water and sewer mains.
n. Approximate dimensions of and areas of lots.
o. Proposed building lines.
p. Approximate radii of all curves and length of tangents.
q. Approximate location and area of property proposed to be dedicated for public use or to be
reserved by deed covenant for use of all property owners in the subdivision with the conditions,
if any, of such dedication or reservation.
(2) The subdivider shall furnish the following information along with his or her preliminary plat:
a. A brief description of the improvements such as grading, paving, tree planting, installation of
utilities which the subdivider proposes to make and the time when he or she proposes to make
them.
b. A brief description of the deed restrictions, if any, which will be put on the plat.
c. A topographic plan illustrating the existing and proposed contours of the land surface within the
proposed subdivision, including the proposed contours within and adjacent to the street right -of-
way using contour intervals not greater than two feet within the city and five feet elsewhere at
the same scale as the preliminary plat.
(c) Final plat.
(1) A final plat of subdivided land shall comply with the requirements of Wis. Stats. § 236.20, which is
hereby adopted by reference and incorporated in this section as though fully set out.
(2) The affidavits and certificates required by Wis. Stats. ch. 236, shall be lettered or printed legibly with
black, durable ink or typed with black ribbon on the final plat.
(3) Prior to approval of the final plat, the subdivider shall submit the grade or elevation of all streets
located within the plat to the director of public works. The grades submitted shall be at the centerline
of each street. Such grade or elevation shall be consistent with the topographic plan previously
approved by the plan commission in accordance with subsection (b)(2)c of this section and shall
assume as a base the datum plane of reference filed in accordance with section 22 -4, in the office of
the director of public works.
(Code 1974, § 13.07; Code 2001, § 46-7; Ord. No. 13-17, §§ 13, 15, 8-20-2013)
Page 71 of 183
Created: 2025-11-24 15:33:33 [EST]
(Supp. No. 8)
Page 11 of 14
Sec. 46-8. Land divisions other than subdivisions.
(a) Procedure. The divider shall submitfile a certified survey map with the plan commissionto the development
services director or designee an online application, a PDF copy and CAD copy of a certified survey map,
preliminary engineering drawings including street trees, and a review fee not less than 30 days preceding the
meeting of the plan commission for review. If the certified survey map has no public lands and dedications,
Tthe plan commission shall, within 40 days, approve, approve conditionally or reject the certified survey
map. If the certified survey map has public lands and/or dedications, the plan commission shall refer the
certified survey map with its recommendation to the common council to, within 40 days, approve, approve
conditionally or reject the certified survey map. The divider shall be notified, in writing, of any conditions of
approval or the reason for rejection. The divider shall submit to the city 13 copies of a preliminary certified
survey map if the property is located within the city and two copies of the preliminary certified survey map if
the property is located within the extraterritorial platting jurisdiction of the city.
(b) Requirements.
(1) To the extent reasonably practicable, the division shall comply with the provisions of this chapter
relating to general requirements, design standards, required improvements, and public sites and open
spaces.
(2) The survey shall be performed and the certified survey map prepared by a surveyor registered in the
state.
(3) All corners shall be monumented in accordance with Wis. Stats. § 236.15(1)(c) and (d).
(4) The certified survey map shall be prepared in accordance with Wis. Stats. § 236.20(2)(b), (c), (e), (f), (g),
(h), (j), (k) and (l), on durable white paper 8½ inches wide by 14 inches long. All lines shall be made with
nonfading black ink on a scale of not more than 200 feet to an inch.
(c) Certificates and affidavits.
(1) The certified survey map shall include the affidavit of the surveyor who surveyed and mapped the
parcel, typed, lettered or reproduced legibly with nonfading black ink, giving a clear and concise
description of the land surveyed by bearings and distances, commencing with some corner marked and
established in the U.S. Public Land Survey or some corner providing reference to a corner marked and
established in the U.S. Public Land Survey. Such affidavit shall include the certificate of the surveyor to
the effect that he or she has fully complied with the requirements of this section.
(2) The certificate of approval of the plan commission shall be typed, lettered or reproduced legibly with
nonfading black ink on the face of the certified survey map.
(d) Map. The certified survey map shall be filed by the divider for record with the county register of deeds, and
two copies one PDF copy of the recorded certified survey map shall be filed with the city director of
development services director or designee.planning if the property is located within the city. Two copies shall
be filed with the director of planning if the property is located within the extraterritorial platting jurisdiction
of the city.
(Code 1974, § 13.08; Code 2001, § 46-8; Ord. No. 13-17, § 13, 8-20-2013)
Sec. 46-9. Subdivisions created by successive divisions.
(a) Where it is not practical to require that a final plat of a subdivision created by successive division be filed in
accordance with this chapter, the common council may, in lieu thereof, order an assessor's plat to be made
under Wis. Stats. § 70.27 and may assess the cost (as provided in such section) to the subdivider.
Page 72 of 183
Created: 2025-11-24 15:33:33 [EST]
(Supp. No. 8)
Page 12 of 14
(b) Regardless of the type of plat filed, any such subdivision shall comply with all provisions of this chapter to the
extent that they may reasonably be applied.
(Code 1974, § 13.09; Code 2001, § 46-9)
Sec. 46-10. Variances.
(a) Plan commission authority to grant. In circumstances where the plan commission is the final approval
authority for a subdivision and where, owing to special conditions, a literal enforcement of the provisions of
this chapter or of the zoning code, would result in practical difficulty or unn ecessary hardship so that the
spirit of this chapter and the zoning code shall be observed, public safety and welfare served, and substantial
justice done, the plan commission may approve a certified survey map or plat which includes, in whole or in
part, parcels of land which do not meet one or more of the following requirements in the district where such
land is located:
(1) Minimum lot area;
(2) Minimum lot width;
(3) Minimum open space;
(4) Minimum setback;
(5) Minimum side; or
(6) Minimum rear yard.
(b) Authority of common council. Where the common council has final approval authority over a subdivision, it
may, upon its own motion or upon recommendation of the plan commission, grant such final approval of a
certified survey map or plat which includes, in whole or in part, parcels o f land which do not meet one or
more of the following requirements in the district where such land is located:
(1) Minimum lot area;
(2) Minimum lot width;
(3) Minimum open space;
(4) Minimum setback;
(5) Minimum side; or
(6) Minimum rear yard;
where, owing to special conditions, a literal enforcement of the provisions of this chapter or the zoning code,
would result in practical difficulty or unnecessary hardship so that the spirit of this chapter shall be observed,
public safety and welfare served, and substantial justice done.
(c) Limitation. Neither the plan commission nor common council shall waive the requirement of recording a plat
or certified survey map.
(d) Recording. Any modification or variance granted shall be entered in the minutes of the city plan commission
and/or common council, setting forth the reasons which, in the opinion of the commission and/or council,
justify the variance.
(Code 1974, § 13.10; Code 2001, § 46-10)
Page 73 of 183
Created: 2025-11-24 15:33:33 [EST]
(Supp. No. 8)
Page 13 of 14
Sec. 46-11. Fees.
Any person who shall plat or otherwise divide land subject to review and approval by the city pursuant to
this chapter shall pay to the city such fees as determined by resolution of the common council, such fees may
include late fees, penalties and expediting fees. All fees shall be non-returnable and shall be paid to the clerk.
(Code 1974, § 13.11; Code 2001, § 46-11; Ord. No. 01-08, § 1, 7-2-2001; Ord. No. 06-33, § 4, 11-8-2006)
Sec. 46-12. Penalties and remedies.
(a) It shall be unlawful to build upon, divide, convey, record or monument any land in violation of this chapter or
the state statutes, and no person, firm or corporation shall be issued a building permit by the city authorizing
the building on, or improvement of, any subdivision, certified survey map, condominium or replat within the
jurisdiction of this chapter not of record as of the effective date of the ordinance from which this chapter is
derived until the provisions of this chapter have been fully met. The city may institute appropriate actions or
proceedings to enjoin violations of this chapter or the applicable state statutes.
(b) Any person who fails to comply with the provisions of this chapter shall, upon conviction, be subject to such
forfeiture as determined by resolution of the common council. Each day a violation exists or continues shall
constitute a separate offense. In addition, the remedies provided by Wis. Stats. ch. 236 shall be available to
the city.
(c) This chapter shall be in full force and effect after a public hearing is held thereon pursuant to Wis. Stats. §
236.45(4) and its subsequent passage and publication.
(Code 1974, § 13.12; Code 2001, § 46-12; Ord. No. 14-20, § 1, 12-16-2014; Ord. No. 20-16, § 6, 10-6-2020)
Sec. 46-13. Condominium developments.
(a) Purpose.
(1) The common council hereby finds that certain issues arise in condominium developments that require
limited applicability of this chapter to condominium developments. The state legislature has
recognized that subdivision ordinances may apply to condominiums but that subdivision ordinances
may not impose burdens upon condominiums that are different from those imposed on other property
of a similar character not subject to a declaration of condominium.
(2) The factor that makes this chapter applicable to condominium development is the creation of multiple,
distinct property entities at or near the ground surface, subject to property taxation and separate tax
parcels, with each property entity having different ownership and management. The city determines
that this factor makes a condominium development dissimilar, both physically and in ownership, from
developments in which the land and improvements are under unitary ownership, management and
control.
(3) Thus, the common council hereby finds that new condominium developments can place impacts upon
community resources in the same manner as other new developments that are characterized by
division of land into lots. These impacts include:
a. Additional population density.
b. Possibility of use of particular land in a manner unsuitable to the land's characteristics.
c. Additional demands upon city parks, recreation areas, utility facilities and schools.
Page 74 of 183
Created: 2025-11-24 15:33:33 [EST]
(Supp. No. 8)
Page 14 of 14
d. Additional traffic and street use.
(b) Portions of chapter applicable to condominium developments. Subject to the provisions of Wis. Stats. §
703.115, the following sections of this chapter shall apply to condominium developments other than the
conversion of existing, attached two-unit buildings to condominium ownership:
(1) Section 46-4(b) through (g) relating to design standards for improvements.
(2) Section 46-5 relating to public sights and open spaces.
(3) Section 46-6 relating to required improvements.
(4) Section 46-11 relating to fees for review, except that this requirement shall not apply to existing
structures converting to condominium ownership.
(5) Review and approval or denial of condominium developments under this section shall be
administratively performed by the director of development services director or designee in order to
meet the review timeline of Wis. Stats. § 703.115.
(c) Applicability. This section shall not apply to any condominium plat recorded prior to the effective date of the
ordinance from which this chapter is derived.
(Code 2001, § 46-13; Ord. No. 20-16 § 3, 10-6-2020; Ord. No. 21-10, § 1, 5-4-2021)
Page 75 of 183
City of De Pere, Wisconsin
Request for Common Council Action
7.A
Meeting Date: October 20, 2026
Department: City Clerk
From: Carey Danen, City Clerk
Subject: Approval of the minutes of the October 6, 2026 Common
Council meeting.
Recommendation: Motion to approve.
Attachments:
10-6-26 Common Council minutes_draft
Page 76 of 183
Common Council
Regular Meeting
Draft Minutes
335 South Broadway
De Pere, WI 54115
www.deperewi.gov
Tuesday, October 6, 2026 7:30 PM Council Chambers/Virtual
1. Call to Order
The meeting was called to order at 7:30 PM by Mayor James Boyd.
2. Roll Call
Present: Mike Eserkaln, Pamela Gantz, Jonathon Hansen, Amy Kundinger, Shana Ledvina, Casey
Nelson, Devin Perock, Dustin Thill, James Boyd
3. Pledge of Allegiance
4. Approval of the Agenda
RESULT: APPROVED [UNANIMOUS]
MOVER: Jonathon Hansen
SECONDER: Pamela Gantz
AYES: Mike Eserkaln, Pamela Gantz, Jonathon Hansen, Amy Kundinger, Shana Ledvina,
Casey Nelson, Devin Perock, Dustin Thill, James Boyd
5. Presentations/Awards/Recognition
A. Presentation from the De Pere Beautification Committee.
Eben Erhard and Sue Walsh presented an overview of the Beautification Committee's
accomplishments over the past year and shared a visual tour of the flower beds, planters, and
roundabouts maintained throughout the City. They also reported on a new initiative launched
this year: the installation of a butterfly habitat in the roundabout at Scheuring Road and
Suburban Drive.
Erhard noted that the City staff responsible for watering the plantings are becoming
increasingly stretched. He added that additional roundabouts will be installed when the
southern bridge opens, further expanding the workload. Erhard encouraged the Council to
consider adding another staff position to support these efforts. He concluded by recognizing
the Committee’s volunteers, donors, suppliers, and City staff for their ongoing support of the
Beautification Committee.
B. Proclamation for Wisconsin Stormwater Week.
Page 77 of 183
Mayor Boyd read the proclamation and presented a plaque to Public Works Director Scott
Thoresen and Assistant City Engineer Chase Kuffel.
6. Public Comments
Comments made during the public comment period shall pertain only to matters under the
jurisdiction of the Common Council. §6-3(f) DPMC
None.
7. Consent Agenda
Consent Agenda items are those items of a routine administrative nature that are voted on by the
Council in a single roll call vote. Staff recommends approval of all items. Common Council may
request that an item be removed from the Consent Agenda for discussion.
RESULT: APPROVED [UNANIMOUS]
MOVER: James Boyd
SECONDER: Pamela Gantz
AYES: Mike Eserkaln, Pamela Gantz, Jonathon Hansen, Amy Kundinger, Shana Ledvina,
Casey Nelson, Devin Perock, Dustin Thill, James Boyd
A. Approval of the minutes of the September 15, 2026 Common Council meeting.
B. Recommendation from Board of Public Works to approve City Engineer Parking and Traffic
Recommendations.
C. Appointment of Sarah Inman to the Redevelopment Authority by Mayor Boyd (term to expire
September 30, 2031).
8. New Business
A. Recommendation from Board of Park Commissioners to approve bid from Bluemels in the
amount of $40,520 for playground fall surfacing at Carney Park.
Parks Director Marty Kosobucki reported that Bluemels was the sole bidder for this project.
RESULT: APPROVED BY ROLL CALL VOTE [UNANIMOUS]
MOVER: Jonathon Hansen
SECONDER: Amy Kundinger
AYES: Mike Eserkaln, Pamela Gantz, Jonathon Hansen, Amy Kundinger, Shana Ledvina,
Casey Nelson, Devin Perock, Dustin Thill, James Boyd
B. Recommendation from the Board of Park Commissioners to accept donation of $25,000 from
the David and Rita Nelson Foundation to cover additional costs related to the Wilson Park
improvement project.
RESULT: ACCEPTED [UNANIMOUS]
MOVER: James Boyd
SECONDER: Amy Kundinger
Page 78 of 183
AYES: Mike Eserkaln, Pamela Gantz, Jonathon Hansen, Amy Kundinger, Shana Ledvina,
Casey Nelson, Devin Perock, Dustin Thill, James Boyd
C. Recommendation from the License Committee on an application for a Class "B" Fermented
Malt Beverage/"Class B" Intoxicating Liquor License for ASN Tavern & Grill LLC (DBA Baba
Louie's), 419 Main Av. Agent: Sandeep Singh, Green Bay WI.
RESULT: APPROVED [UNANIMOUS]
MOVER: Devin Perock
SECONDER: Pamela Gantz
AYES: Mike Eserkaln, Pamela Gantz, Jonathon Hansen, Amy Kundinger, Shana Ledvina,
Casey Nelson, Devin Perock, Dustin Thill, James Boyd
D. Recommendation from the License Committee on an application for change of agent for
Walgreen Co., DBA Walgreens East #15637, 150 S Wisconsin St.
RESULT: APPROVED [UNANIMOUS]
MOVER: Pamela Gantz
SECONDER: Dustin Thill
AYES: Mike Eserkaln, Pamela Gantz, Jonathon Hansen, Amy Kundinger, Shana Ledvina,
Casey Nelson, Devin Perock, Dustin Thill, James Boyd
E. Recommendation from the License Committee on an application for a premises description
change submitted by Nicolet Ale Works, LLC, 301 Main Av.
RESULT: APPROVED [UNANIMOUS]
MOVER: Casey Nelson
SECONDER: Amy Kundinger
AYES: Mike Eserkaln, Pamela Gantz, Jonathon Hansen, Amy Kundinger, Shana Ledvina,
Casey Nelson, Devin Perock, Dustin Thill, James Boyd
F. Recommendation from Plan Commission to approve a 1-lot extraterritorial preliminary plat of
Grande Ridge Estates Third Addition at 4835 Big Sky Pass in Ledgeview (Parcel D-2641).
RESULT: APPROVED [UNANIMOUS]
MOVER: Devin Perock
SECONDER: Shana Ledvina
AYES: Mike Eserkaln, Pamela Gantz, Jonathon Hansen, Amy Kundinger, Shana Ledvina,
Casey Nelson, Devin Perock, Dustin Thill, James Boyd
G. For consideration and possible action on EV Charger rates for the parking garage located at
224 N Wisconsin St.
RESULT: APPROVED [UNANIMOUS]
MOVER: James Boyd
SECONDER: Pamela Gantz
AYES: Mike Eserkaln, Pamela Gantz, Jonathon Hansen, Amy Kundinger, Shana Ledvina,
Casey Nelson, Devin Perock, Dustin Thill, James Boyd
Page 79 of 183
9. Resolutions
Mayor Boyd moved, seconded by Alderperson Nelson to suspend the rules and approve items #9 A-
D with one roll call vote. Upon vote, motion carried unanimously.
RESULT: ADOPTED BY ROLL CALL VOTE [UNANIMOUS]
MOVER: James Boyd
SECONDER: Shana Ledvina
AYES: Mike Eserkaln, Pamela Gantz, Jonathon Hansen, Amy Kundinger, Shana Ledvina,
Casey Nelson, Devin Perock, Dustin Thill, James Boyd
A. Resolution #26-95 Authorizing Utility Easement (747 Heritage Road; Parcel ED-F0103-2).
B. Resolution #26-96 Authorizing Amendment #1 to Municipal Project Agreements for South
Bridge Connector Segments GV-15, GV-16, and GV-18.
C. Resolution #26-97 Regarding the vacation of a portion of a public thoroughfare (right-of-way
discontinuance at 450 BLK Fortune AV adjacent to Parcels WD-1041-1 and WD-1043). - Intro
resolution for referral to public hearing.
D. Resolution #26-98 Authorizing agreement regarding the development of business park
property with NSN Real Estate LLC (Parcel WD-L492-B-7; 2330 American Boulevard).
10. Future Agenda Items
None.
11. Adjournment
Mayor Boyd moved, seconded by Alderperson Gantz to adjourn the meeting at 8:14 PM. Upon vote,
motion carried unanimously.
Respectfully submitted,
Carey Danen, City Clerk
Page 80 of 183
City of De Pere, Wisconsin
Request for Common Council Action
7.B
Meeting Date: October 20, 2026
Department: Administration
From: James Boyd, Mayor
Subject: Appointment of Scott Thompson to the Historic
Preservation Commission by Mayor James Boyd; term to
expire January 31, 2029.
Recommendation: Motion to approve.
Scott has been a De Pere resident since 1993. He has been a history lover (was a
history minor before switching to a comprehensive major) and grew up in historic Prairie
du Chien, WI (second-oldest city after Green Bay). He graduated from UWEC in 1989
and is currently VP of Client Services for SGX. Scott loves to travel and spend time
outdoors and playing golf.
Attachments:
None
Page 81 of 183
City of De Pere, Wisconsin
Request for Common Council Action
7.C
Meeting Date: October 20, 2026
Department: Public Works
From: Eric Rakers, City Engineer
Subject: Recommendation from Board of Public Works on award of
Contract 26-09 Pond and Drainage System Construction.
Recommendation: Accept the bid from Kruczek Construction, Inc. in the
amount of $171,171.00.
The Board of Public Works at the October 12, 2026 meeting approved award of
Contract 26-09 Pond and Drainage System Construction. The motion passed with a 5-0
vote.
Attachments:
2026 1012 CI_BOPW_Project_26-09_Award, 2026 1008 CE_Project 26-09 Bid Tab
Page 82 of 183
1
To: Honorable Mayor Boyd
Members of the Board of Public Works
From: Eric P. Rakers, P.E., City Engineer
Date: October 12, 2026
RE: Consideration and Possible Action on Award of Contact 26-09 Pond and Drainage System
Construction*
The Engineering Division received bids on Project 26-09 Pond and Drainage System Construction on
October 8, 2026. This project consists of the construction of a new storm water treatment pond in the
vacant area to the southeast of the intersection of Cook Street and Honey Court. The bids received
were as follows:
Contractor Base Bid
Kruczek Construction Inc. $171,171.00
Advance Construction Inc. $177,800.50
De Groot, Inc. $205,587.58
Dorner Inc. $232,962.00
Calnin & Goss, LLC $254,181.75
Relyco Plus LLC $281,721.04
The City allocated $180,000 for the wet pond construction in 2026 with $72,970 from a Wisconsin
Department of Natural Resources grant, $72,970 from the storm water utility, and $34,060 from the
water utility.
Staff’s recommendation is to accept the bid from Kruczek Construction, Inc. in the amount of
$171,171.00.
Attachments
2026 1008 CE_Project 26-09 Bid Tab PDF
Page 83 of 183
PROJECT 26-09 POND AND DRAINAGE SYSTEM CONSTRUCTION
BID TAB
ITEM DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
BID UNIT PRICE AMOUNT
BID UNIT PRICE AMOUNT
BID UNIT PRICE AMOUNT
BID UNIT PRICE AMOUNT
BID UNIT PRICE AMOUNT
BID
ST-01Provide 15” PVC, RCP Class III, or PP Storm Sewer LF 80 $ 135.00 $ 10,800.00 $ 152.50 $ 12,200.00 $ 154.19 $ 12,335.20 $ 103.00 $ 8,240.00 $ 148.00 $ 11,840.00 $ 92.41 $ 7,392.80
ST-02Provide 4’ Diameter Storm Manhole VF 5 $ 1,050.00 $ 5,250.00 $ 1,017.00 $ 5,085.00 $ 1,339.97 $ 6,699.85 $ 1,180.00 $ 5,900.00 $ 1,475.00 $ 7,375.00 $ 1,226.50 $ 6,132.50
ST-03Connect to Existing Structure EA 2 $ 1,050.00 $ 2,100.00 $ 1,000.00 $ 2,000.00 $ 1,515.00 $ 3,030.00 $ 1,750.00 $ 3,500.00 $ 808.00 $ 1,616.00 $ 907.50 $ 1,815.00
ST-04Provide 15” RCP Endwall EA 2 $ 1,300.00 $ 2,600.00 $ 1,472.00 $ 2,944.00 $ 1,588.73 $ 3,177.46 $ 1,805.00 $ 3,610.00 $ 2,995.00 $ 5,990.00 $ 1,219.53 $ 2,439.06
ST-05Provide Pond Discharge Structure EA 1 $ 10,000.00 $ 10,000.00 $ 8,919.00 $ 8,919.00 $ 9,519.86 $ 9,519.86 $ 7,520.00 $ 7,520.00 $ 9,920.00 $ 9,920.00 $ 6,854.00 $ 6,854.00
ST-06Abandon/Remove Existing Storm Sewer AppurtenancesLS 1 $ 9,000.00 $ 9,000.00 $ 3,600.00 $ 3,600.00 $ 3,535.00 $ 3,535.00 $ 5,650.00 $ 5,650.00 $ 2,595.00 $ 2,595.00 $ 24,300.00 $ 24,300.00
W-01Provide 8” PVC Water Main (Granular Backfill)LF 15 $ 262.00 $ 3,930.00 $ 230.00 $ 3,450.00 $ 170.69 $ 2,560.35 $ 265.00 $ 3,975.00 $ 519.00 $ 7,785.00 $ 238.80 $ 3,582.00
W-02Provide 8" PVC Water Main - Directional DrillLF 200 $ 118.50 $ 23,700.00 $ 126.00 $ 25,200.00 $ 138.50 $ 27,700.00 $ 145.00 $ 29,000.00 $ 163.00 $ 32,600.00 $ 160.11 $ 32,022.00
W-03Provide 6" PVC Water Main (Granular Backfill)LF 5 $ 307.00 $ 1,535.00 $ 181.00 $ 905.00 $ 162.61 $ 813.05 $ 436.00 $ 2,180.00 $ 620.00 $ 3,100.00 $ 226.88 $ 1,134.40
W-04Provide 2" Corporation with Plug/Saddle with 2" EA 1 $ 1,000.00 $ 1,000.00 $ 1,400.00 $ 1,400.00 $ 2,020.00 $ 2,020.00 $ 1,500.00 $ 1,500.00 $ 1,855.00 $ 1,855.00 $ 1,538.73 $ 1,538.73
W-05Provide 8" Gate Valve EA 1 $ 3,200.00 $ 3,200.00 $ 2,755.00 $ 2,755.00 $ 3,125.95 $ 3,125.95 $ 3,660.00 $ 3,660.00 $ 4,470.00 $ 4,470.00 $ 3,095.95 $ 3,095.95
W-06Provide 6" Gate Valve EA 1 $ 2,221.00 $ 2,221.00 $ 1,925.00 $ 1,925.00 $ 2,297.75 $ 2,297.75 $ 2,750.00 $ 2,750.00 $ 3,425.00 $ 3,425.00 $ 2,178.75 $ 2,178.75
W-07Provide Connection to Existing Water Main EA 1 $ 2,150.00 $ 2,150.00 $ 2,528.00 $ 2,528.00 $ 8,231.50 $ 8,231.50 $ 3,000.00 $ 3,000.00 $ 3,205.00 $ 3,205.00 $ 5,055.00 $ 5,055.00
W-08Provide Connection to Existing Water Main 6”x 6” EA 1 $ 5,850.00 $ 5,850.00 $ 7,276.00 $ 7,276.00 $ 7,856.79 $ 7,856.79 $ 6,050.00 $ 6,050.00 $ 10,100.00 $ 10,100.00 $ 9,450.00 $ 9,450.00
W-09Provide Hydrant (7.0' Bury) EA 1 $ 7,150.00 $ 7,150.00 $ 6,376.00 $ 6,376.00 $ 9,267.76 $ 9,267.76 $ 7,350.00 $ 7,350.00 $ 9,360.00 $ 9,360.00 $ 6,291.25 $ 6,291.25
W-10Provide 6” PVC Hydrant Lead LF 25 $ 145.00 $ 3,625.00 $ 75.00 $ 1,875.00 $ 96.96 $ 2,424.00 $ 108.00 $ 2,700.00 $ 131.00 $ 3,275.00 $ 135.89 $ 3,397.25
W-11Abandon/Remove Water Main and AppurtenancesLS 1 $ 6,000.00 $ 6,000.00 $ 2,500.00 $ 2,500.00 $ 5,050.00 $ 5,050.00 $ 4,500.00 $ 4,500.00 $ 2,775.00 $ 2,775.00 $ 22,845.00 $ 22,845.00
SD-01Provide Clearing and Grubbing LS 1 $ 4,000.00 $ 4,000.00 $ 17,700.00 $ 17,700.00 $ 1,060.50 $ 1,060.50 $ 5,300.00 $ 5,300.00 $ 4,910.00 $ 4,910.00 $ 3,550.00 $ 3,550.00
SD-02Unclassified Excavation CY 3425 $ 12.00 $ 41,100.00 $ 11.40 $ 39,045.00 $ 13.32 $ 45,621.00 $ 26.00 $ 89,050.00 $ 24.75 $ 84,768.75 $ 29.41 $ 100,729.25
SD-03Provide Asphalt Patch (Full-Depth) SY 50 $ 87.00 $ 4,350.00 $ 83.50 $ 4,175.00 $ 197.25 $ 9,862.50 $ 105.00 $ 5,250.00 $ 243.00 $ 12,150.00 $ 185.95 $ 9,297.50
SD-04Remove and Replace 24” Concrete Curb and Gutter LF 60 $ 80.00 $ 4,800.00 $ 85.00 $ 5,100.00 $ 79.54 $ 4,772.40 $ 91.00 $ 5,460.00 $ 98.00 $ 5,880.00 $ 75.00 $ 4,500.00
SD-05Provide #4 Reinforcement Bars for Curb and SidewalkLF 120 $ 3.00 $ 360.00 $ 3.00 $ 360.00 $ 3.18 $ 381.60 $ 9.00 $ 1,080.00 $ 3.90 $ 468.00 $ 3.00 $ 360.00
SD-06Drilled Tie Bars (Existing Sidewalk, Driveway, and Curb EA 12 $ 10.00 $ 120.00 $ 10.00 $ 120.00 $ 13.13 $ 157.56 $ 11.00 $ 132.00 $ 39.50 $ 474.00 $ 10.00 $ 120.00
SD-07Landscaping – Topsoil, Mesic Prairie Planting, Fertilizer SY 850 $ 8.00 $ 6,800.00 $ 7.45 $ 6,332.50 $ 9.09 $ 7,726.50 $ 17.50 $ 14,875.00 $ 5.20 $ 4,420.00 $ 8.50 $ 7,225.00
SD-08Landscaping – Topsoil, Seed, Fertilizer and Mulch SY 200 $ 9.00 $ 1,800.00 $ 6.45 $ 1,290.00 $ 11.11 $ 2,222.00 $ 8.00 $ 1,600.00 $ 3.90 $ 780.00 $ 7.50 $ 1,500.00
SC-01Pipe Foundation Stabilization CY 10 $ 1.00 $ 10.00 $ 30.00 $ 300.00 $ 25.25 $ 252.50 $ 25.00 $ 250.00 $ 38.00 $ 380.00 $ 79.06 $ 790.60
SC-02Slurry Backfill (If Needed) CY 10 $ 140.00 $ 1,400.00 $ 100.00 $ 1,000.00 $ 202.00 $ 2,020.00 $ 150.00 $ 1,500.00 $ 183.00 $ 1,830.00 $ 100.00 $ 1,000.00
SC-03Provide Silt Fence LF 300 $ 2.25 $ 675.00 $ 2.05 $ 615.00 $ 3.03 $ 909.00 $ 3.00 $ 900.00 $ 6.50 $ 1,950.00 $ 5.00 $ 1,500.00
SC-04Provide Erosion Bales EA 10 $ 20.00 $ 200.00 $ 14.00 $ 140.00 $ 20.20 $ 202.00 $ 38.00 $ 380.00 $ 32.50 $ 325.00 $ 25.00 $ 250.00
SC-05Inlet Protection Type A EA 1 $ 125.00 $ 125.00 $ 105.00 $ 105.00 $ 202.00 $ 202.00 $ 250.00 $ 250.00 $ 209.00 $ 209.00 $ 160.00 $ 160.00
SC-06Inlet Protection Type D EA 4 $ 80.00 $ 320.00 $ 95.00 $ 380.00 $ 151.50 $ 606.00 $ 125.00 $ 500.00 $ 209.00 $ 836.00 $ 160.00 $ 640.00
SC-07Medium Rip Rap with Geotextile Fabric (Type HR)SY 50 $ 62.00 $ 3,100.00 $ 80.00 $ 4,000.00 $ 75.75 $ 3,787.50 $ 55.00 $ 2,750.00 $ 85.00 $ 4,250.00 $ 120.00 $ 6,000.00
SC-08Tracking Pad EA 1 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 1,313.00 $ 1,313.00 $ 1,900.00 $ 1,900.00 $ 1,520.00 $ 1,520.00 $ 2,500.00 $ 2,500.00
SC-09Polystyrene Insulation Board LF 20 $ 20.00 $ 400.00 $ 10.00 $ 200.00 $ 10.10 $ 202.00 $ 10.00 $ 200.00 $ 10.00 $ 200.00 $ 18.00 $ 360.00
SC-10Provide Temporary Plug and Storm Water Bypass LS 1 $ 500.00 $ 500.00 $ 5,000.00 $ 5,000.00 $ 14,645.00 $ 14,645.00 $ 500.00 $ 500.00 $ 7,545.00 $ 7,545.00 $ 1,715.00 $ 1,715.00
Relyco Plus LLC
STORM SEWER CONSTRUCTION
WATER MAIN CONSTRUCTION
TOTAL AMOUNT BID
BIDDER NO. 3
DE GROOT, INC.
BIDDER NO. 5
Calnin & Goss, LLC
$ 254,181.75
BIDDER NO. 1
Kruczek Construction Inc.
$ 171,171.00
BIDDER NO. 2
$ 177,800.50 $ 232,962.00 $ 205,587.58
BIDDER NO. 4
Dorner Inc.Advance Construction Inc.
STREET AND DRAINAGE CONSTRUCTION
SPECIAL CONSTRUCTION
$ 281,721.04
BIDDER NO. 6
X:\ENG\Projects\City Projects\2026\Project 26-09 Pond_and_Drainage_System_Construction\500- Bidder Correspondence\2026 1008 CE_Project 26-09 Bid Tab 1 of 1
Page 84 of 183
City of De Pere, Wisconsin
Request for Common Council Action
7.D
Meeting Date: October 20, 2026
Department: Public Works
From: Scott Thoresen, Public Works Director
Subject: Recommendation from Board of Public Works on Design
Options for the Main Avenue Slope.
Recommendation: Motion to approve.
The Board of Public Works at the October 12, 2026 meeting approved the Natural
Prairie Plantings Design Option for the Main Avenue Slope. The motion passed with a
5-0 vote.
Attachments:
Main Avenue Slopes 10-5-2026, Resolution #25-98, Main Avenue Slope Letter 9-14-
2026
Page 85 of 183
1
To: Honorable Mayor Boyd
Members of the Board of Public Works
From: Scott Thoresen, P.E., Director of Public Works
Date: October 7, 2026
RE: Consider and Possible Action on Design Options for the Main Avenue Slope*
Purpose:
To summarize property owner feedback regarding slope treatment options along the 600 block of Main
Avenue in preparation for WisDOT Project 4190-17-00 (Main Avenue & Reid Street Reconstruction) and
to request direction from the Board of Public Works.
Background:
The City Council approved Resolution #25-98 (see attached), authorizing Revision #3 to the
State/Municipal Agreement for the upcoming Main Avenue and Reid Street reconstruction project. This
revision includes funding for slope improvements near the CN Railroad bridge, originally proposed as
concrete slope paving.
As part of the Council’s discussion, staff was directed to gather input from adjacent property owners on
potential slope treatments before finalizing design. Staff sent the attached letter to eleven property
owners along Main Avenue between Seventh Street and Reid Street outlining the following options:
1. Maintain slopes as they exist today.
2. Install natural prairie plantings.
3. Install concrete slope paving.
Summary of Property Owner Responses:
• 627 Main: First choice 3
• 633 Main: First choice 3 – Comment: “Best look for City.”
• 649 Main: First choice 2, second choice 1 – Note: Option 2 only if weeds are not sprayed.
• 655 Main: First choice 2, second choice 1
• 659 Main: First choice 2, second choice 3 – Comment: Not Option 1.
• 665 Main: First choice 1 – Comment: Does not want Option 3.
Discussion:
The purpose of this item is to present the collected feedback and determine whether the Board wishes
Page 86 of 183
2
to proceed with the originally planned concrete slope paving or consider one of the alternative options
based on property owner preferences.
Requested Action:
Provide direction on which slope treatment option should be incorporated into the design for the
WisDOT reconstruction project.
Page 87 of 183
Page 88 of 183
Page 89 of 183
Page 90 of 183
Page 91 of 183
Page 92 of 183
City of De Pere, Wisconsin
Request for Common Council Action
7.E
Meeting Date: October 20, 2026
Department: Public Works
From: Eric Rakers, City Engineer
Subject: Recommendation from Board of Public Works on award of
Contract 26-10 Phoenix of De Pere Utility and Street
Construction.
Recommendation: Accept the bid from PTS Contractors, Inc. in the amount of
$868,960.00.
The Board of Public Works at the October 12, 2026 meeting approved award of
Contract 26-10 Phoenix of De Pere Utility and Street Construction. The motion passed
with a 5-0 vote.
Attachments:
2026 1012 CI_BOPW_Project_26-10_Award, 2026 1008 CE_Project 26-10 Bid Tab
Page 93 of 183
1
To: Honorable Mayor Boyd
Members of the Board of Public Works
From: Eric P. Rakers, P.E., City Engineer
Date: October 12, 2026
RE: Consideration and Possible Action on Award of Contact 26-10 Phoenix of De Pere Utility and
Street Construction*
The Engineering Division received bids on Project 26-10 Phoenix of De Pere Utility and Street
Construction on October 8, 2026. This project consists of the construction of Longtail Court, its
corresponding utilities, and stormwater treatment facilities for the second phase of the Phoenix of De
Pere development on the City’s west side. Final curb and gutter installation and paving of Longtail Court
will take place in 2027. Longtail Court is located north of Employers Boulevard and west of Lawrence
Drive. This project will service and provide immediate access to four 42-unit multi-family buildings. The
bids received were as follows:
Contractor Base Bid
PTS Contractors, Inc. $868,960.00
MCC, Inc. $878,765.00
Kruczek Construction Inc. $968,968.00
De Groot, Inc. $982,828.23
Peters Concrete Company $998,946.50
Dorner Inc. $1,009,073.00
Advance Construction Inc. $1,010,992.75
Relyco Plus LLC $1,159,210.39
Calnin & Goss, LLC $1,188,412.90
This project is funded by TID 15.
Staff’s recommendation is to accept the bid from PTS Contractors, Inc. in the amount of $868,960.00.
Attachments
2026 1008 CE_Project 26-10 Bid Tab PDF
Page 94 of 183
PROJECT 26-10 PHOENIX OF DE PERE UTILITY AND STREET CONSTRUCTION
BID TAB
ITEM DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
BID UNIT PRICE AMOUNT
BID UNIT PRICE AMOUNT
BID UNIT PRICE AMOUNT
BID UNIT PRICE AMOUNT
BID UNIT PRICE AMOUNT
BID UNIT PRICE AMOUNT
BID UNIT PRICE AMOUNT
BID UNIT PRICE AMOUNT
BID
SS-01 Provide 8-Inch PVC Sanitary Sewer (Granular Backfill) LF460 $ 105.00 $ 48,300.00 $ 105.00 $ 48,300.00 $ 133.00 $ 61,180.00 $ 141.82 $ 65,237.20 $ 121.50 $ 55,890.00 $ 154.00 $ 70,840.00 $ 150.00 $ 69,000.00 $ 196.38 $ 90,334.80 $ 168.69 $ 77,597.40
SS-02 Provide 4-Foot Diameter Sanitary Sewer Manhole VF30 $ 575.00 $ 17,250.00 $ 575.00 $ 17,250.00 $ 450.00 $ 13,500.00 $ 570.15 $ 17,104.50 $ 465.00 $ 13,950.00 $ 490.00 $ 14,700.00 $ 513.00 $ 15,390.00 $ 597.44 $ 17,923.20 $ 619.00 $ 18,570.00
SS-03 Provide Connection to Existing Sanitary Sewer Manhole EA1 $ 8,840.00 $ 8,840.00 $ 8,840.00 $ 8,840.00 $ 1,200.00 $ 1,200.00 $ 4,242.00 $ 4,242.00 $ 7,070.00 $ 7,070.00 $ 3,864.00 $ 3,864.00 $ 2,500.00 $ 2,500.00 $ 3,980.50 $ 3,980.50 $ 1,740.00 $ 1,740.00
ST-01Provide 48-Inch PP or RCP (Class III) Storm SewerLF 80 $ 200.00 $ 16,000.00 $ 200.00 $ 16,000.00 $ 237.00 $ 18,960.00 $ 272.36 $ 21,788.80 $ 234.00 $ 18,720.00 $ 196.00 $ 15,680.00 $ 228.00 $ 18,240.00 $ 210.21 $ 16,816.80 $ 337.00 $ 26,960.00
ST-02Provide 42-Inch PP or RCP (Class III) Storm SewerLF 350 $ 156.00 $ 54,600.00 $ 156.00 $ 54,600.00 $ 174.00 $ 60,900.00 $ 170.51 $ 59,678.50 $ 176.00 $ 61,600.00 $ 177.00 $ 61,950.00 $ 184.00 $ 64,400.00 $ 171.03 $ 59,860.50 $ 250.00 $ 87,500.00
ST-03Provide 30-Inch PP or RCP (Class III) Storm SewerLF 65 $ 150.00 $ 9,750.00 $ 150.00 $ 9,750.00 $ 198.00 $ 12,870.00 $ 183.04 $ 11,897.60 $ 150.00 $ 9,750.00 $ 157.00 $ 10,205.00 $ 169.00 $ 10,985.00 $ 176.64 $ 11,481.60 $ 240.00 $ 15,600.00
ST-04Provide 24-Inch PP or RCP (Class III) Storm SewerLF 15 $ 152.00 $ 2,280.00 $ 152.00 $ 2,280.00 $ 182.00 $ 2,730.00 $ 153.49 $ 2,302.35 $ 120.00 $ 1,800.00 $ 143.00 $ 2,145.00 $ 144.50 $ 2,167.50 $ 144.30 $ 2,164.50 $ 217.00 $ 3,255.00
ST-05Provide 24-Inch PP or RCP (Class III) Storm SewerLF 875 $ 3.80 $ 3,325.00 $ 3.80 $ 3,325.00 $ 81.00 $ 70,875.00 $ 86.59 $ 75,766.25 $ 88.60 $ 77,525.00 $ 98.00 $ 85,750.00 $ 88.50 $ 77,437.50 $ 85.45 $ 74,768.75 $ 122.00 $ 106,750.00
ST-06Provide 18-Inch PP or RCP (Class III) Storm SewerLF 75 $ 102.00 $ 7,650.00 $ 102.00 $ 7,650.00 $ 90.00 $ 6,750.00 $ 108.32 $ 8,124.00 $ 76.00 $ 5,700.00 $ 89.00 $ 6,675.00 $ 114.65 $ 8,598.75 $ 94.42 $ 7,081.50 $ 135.00 $ 10,125.00
ST-07Provide 18-Inch PP or RCP (Class III) Storm SewerLF 50 $ 100.00 $ 5,000.00 $ 100.00 $ 5,000.00 $ 93.00 $ 4,650.00 $ 72.93 $ 3,646.50 $ 95.75 $ 4,787.50 $ 95.00 $ 4,750.00 $ 95.65 $ 4,782.50 $ 75.13 $ 3,756.50 $ 107.00 $ 5,350.00
ST-08Provide 12-Inch PVC, PP, or RCP (Class III) Storm SewerLF 70 $ 81.00 $ 5,670.00 $ 81.00 $ 5,670.00 $ 75.00 $ 5,250.00 $ 85.56 $ 5,989.20 $ 56.00 $ 3,920.00 $ 68.00 $ 4,760.00 $ 80.00 $ 5,600.00 $ 78.08 $ 5,465.60 $ 98.60 $ 6,902.00
ST-09Provide 12-Inch PVC, PP, or RCP (Class III) Storm SewerLF 325 $ 59.00 $ 19,175.00 $ 59.00 $ 19,175.00 $ 50.00 $ 16,250.00 $ 48.41 $ 15,733.25 $ 50.25 $ 16,331.25 $ 50.00 $ 16,250.00 $ 51.50 $ 16,737.50 $ 51.69 $ 16,799.25 $ 63.80 $ 20,735.00
ST-10Provide 7-Foot Diameter Storm Sewer ManholeVF 12 $ 1,340.00 $ 16,080.00 $ 1,340.00 $ 16,080.00 $ 1,300.00 $ 15,600.00 $ 1,410.03 $ 16,920.36 $ 1,230.00 $ 14,760.00 $ 1,298.00 $ 15,576.00 $ 1,331.00 $ 15,972.00 $ 1,362.17 $ 16,346.04 $ 1,625.00 $ 19,500.00
ST-11Provide 6-Foot Diameter Storm Sewer ManholeVF 20 $ 1,050.00 $ 21,000.00 $ 1,050.00 $ 21,000.00 $ 980.00 $ 19,600.00 $ 1,032.86 $ 20,657.20 $ 940.00 $ 18,800.00 $ 942.00 $ 18,840.00 $ 1,000.00 $ 20,000.00 $ 1,054.00 $ 21,080.00 $ 1,370.00 $ 27,400.00
ST-12Provide 5-Foot Diameter Storm Sewer ManholeVF 28 $ 865.00 $ 24,220.00 $ 865.00 $ 24,220.00 $ 765.00 $ 21,420.00 $ 873.67 $ 24,462.76 $ 800.00 $ 22,400.00 $ 686.00 $ 19,208.00 $ 783.00 $ 21,924.00 $ 851.68 $ 23,847.04 $ 1,100.00 $ 30,800.00
ST-13Provide 4-Foot Diameter Storm Sewer ManholeVF 28 $ 685.00 $ 19,180.00 $ 685.00 $ 19,180.00 $ 629.00 $ 17,612.00 $ 740.38 $ 20,730.64 $ 620.00 $ 17,360.00 $ 608.00 $ 17,024.00 $ 690.00 $ 19,320.00 $ 692.93 $ 19,402.04 $ 894.00 $ 25,032.00
ST-14Provide Type B Inlet EA 8 $ 3,030.00 $ 24,240.00 $ 3,030.00 $ 24,240.00 $ 3,530.00 $ 28,240.00 $ 3,482.28 $ 27,858.24 $ 3,595.00 $ 28,760.00 $ 3,520.00 $ 28,160.00 $ 2,884.00 $ 23,072.00 $ 3,685.69 $ 29,485.52 $ 5,050.00 $ 40,400.00
ST-15Provide 48-Inch Concrete Endwall EA 1 $ 3,200.00 $ 3,200.00 $ 3,200.00 $ 3,200.00 $ 3,950.00 $ 3,950.00 $ 3,346.13 $ 3,346.13 $ 3,465.00 $ 3,465.00 $ 4,121.00 $ 4,121.00 $ 4,004.00 $ 4,004.00 $ 3,499.75 $ 3,499.75 $ 5,570.00 $ 5,570.00
ST-16Provide 24-Inch Concrete Endwall EA 1 $ 1,445.00 $ 1,445.00 $ 1,445.00 $ 1,445.00 $ 1,800.00 $ 1,800.00 $ 1,760.43 $ 1,760.43 $ 2,200.00 $ 2,200.00 $ 1,662.00 $ 1,662.00 $ 1,544.00 $ 1,544.00 $ 1,757.50 $ 1,757.50 $ 2,825.00 $ 2,825.00
ST-17Salvage and Reinstall Existing Concrete EndwallEA 2 $ 350.00 $ 700.00 $ 350.00 $ 700.00 $ 950.00 $ 1,900.00 $ 858.50 $ 1,717.00 $ 1,950.00 $ 3,900.00 $ 1,181.00 $ 2,362.00 $ 1,000.00 $ 2,000.00 $ 1,250.25 $ 2,500.50 $ 734.00 $ 1,468.00
ST-18Provide Pond Discharge Structure EA 1 $ 6,525.00 $ 6,525.00 $ 6,525.00 $ 6,525.00 $ 7,150.00 $ 7,150.00 $ 8,524.88 $ 8,524.88 $ 6,050.00 $ 6,050.00 $ 5,182.00 $ 5,182.00 $ 7,925.00 $ 7,925.00 $ 6,402.50 $ 6,402.50 $ 8,190.00 $ 8,190.00
ST-19Abandon/Remove Existing Storm Sewer and LS 1 $ 1,325.00 $ 1,325.00 $ 1,325.00 $ 1,325.00 $ 14,000.00 $ 14,000.00 $ 2,525.00 $ 2,525.00 $ 500.00 $ 500.00 $ 4,000.00 $ 4,000.00 $ 1,000.00 $ 1,000.00 $ 6,310.00 $ 6,310.00 $ 104.00 $ 104.00
W-01Provide 12-Inch PVC Water Main (Natural Backfill)LF 850 $ 74.00 $ 62,900.00 $ 74.00 $ 62,900.00 $ 85.00 $ 72,250.00 $ 76.75 $ 65,237.50 $ 84.75 $ 72,037.50 $ 77.00 $ 65,450.00 $ 77.00 $ 65,450.00 $ 87.70 $ 74,545.00 $ 115.00 $ 97,750.00
W-02Provide 8-Inch PVC Water Main (Natural Backfill)LF 25 $ 85.00 $ 2,125.00 $ 85.00 $ 2,125.00 $ 108.00 $ 2,700.00 $ 96.68 $ 2,417.00 $ 82.25 $ 2,056.25 $ 78.00 $ 1,950.00 $ 62.50 $ 1,562.50 $ 80.44 $ 2,011.00 $ 146.00 $ 3,650.00
W-03Provide 12-Inch Gate Valve EA 1 $ 4,850.00 $ 4,850.00 $ 4,850.00 $ 4,850.00 $ 5,490.00 $ 5,490.00 $ 5,236.85 $ 5,236.85 $ 5,100.00 $ 5,100.00 $ 5,363.00 $ 5,363.00 $ 4,785.00 $ 4,785.00 $ 5,015.25 $ 5,015.25 $ 6,830.00 $ 6,830.00
W-04Provide 8-Inch Gate Valve EA 1 $ 2,725.00 $ 2,725.00 $ 2,725.00 $ 2,725.00 $ 3,030.00 $ 3,030.00 $ 3,014.85 $ 3,014.85 $ 2,800.00 $ 2,800.00 $ 3,025.00 $ 3,025.00 $ 2,645.00 $ 2,645.00 $ 2,920.25 $ 2,920.25 $ 4,105.00 $ 4,105.00
W-05Provide 6-Inch Gate Valve EA 2 $ 1,910.00 $ 3,820.00 $ 1,910.00 $ 3,820.00 $ 2,114.50 $ 4,229.00 $ 2,228.06 $ 4,456.12 $ 1,950.00 $ 3,900.00 $ 2,148.00 $ 4,296.00 $ 1,856.00 $ 3,712.00 $ 2,057.25 $ 4,114.50 $ 3,095.00 $ 6,190.00
W-06Provide Connection to Existing Water Main 12-Inch x 12-EA 1 $ 10,125.00 $ 10,125.00 $ 10,125.00 $ 10,125.00 $ 11,000.00 $ 11,000.00 $ 11,071.62 $ 11,071.62 $ 10,850.00 $ 10,850.00 $ 11,147.00 $ 11,147.00 $ 12,312.00 $ 12,312.00 $ 10,965.00 $ 10,965.00 $ 15,600.00 $ 15,600.00
W-07Provide Hydrant (7.5-Foot Bury) EA 1 $ 6,400.00 $ 6,400.00 $ 6,400.00 $ 6,400.00 $ 7,100.00 $ 7,100.00 $ 6,877.09 $ 6,877.09 $ 6,650.00 $ 6,650.00 $ 6,922.00 $ 6,922.00 $ 6,484.00 $ 6,484.00 $ 6,022.50 $ 6,022.50 $ 9,255.00 $ 9,255.00
W-08Provide Hydrant (7.0-Foot Bury) EA 1 $ 6,295.00 $ 6,295.00 $ 6,295.00 $ 6,295.00 $ 7,000.00 $ 7,000.00 $ 6,768.01 $ 6,768.01 $ 6,550.00 $ 6,550.00 $ 6,805.00 $ 6,805.00 $ 6,376.00 $ 6,376.00 $ 5,912.50 $ 5,912.50 $ 9,125.00 $ 9,125.00
W-09Provide 6-Inch PVC Hydrant Lead LF 10 $ 68.00 $ 680.00 $ 68.00 $ 680.00 $ 61.00 $ 610.00 $ 42.72 $ 427.20 $ 90.00 $ 900.00 $ 58.00 $ 580.00 $ 61.00 $ 610.00 $ 80.25 $ 802.50 $ 84.30 $ 843.00
SD-01Provide Clearing and Grubbing LS 1 $ 5,200.00 $ 5,200.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,252.00 $ 5,252.00 $ 17,490.00 $ 17,490.00 $ 5,279.00 $ 5,279.00 $ 12,155.00 $ 12,155.00 $ 10,000.00 $ 10,000.00 $ 38,700.00 $ 38,700.00
SD-02Unclassified Excavation (Pond) CY 38250 $ 4.40 $ 168,300.00 $ 4.50 $ 172,125.00 $ 4.30 $ 164,475.00 $ 4.42 $ 169,065.00 $ 5.56 $ 212,670.00 $ 5.20 $ 198,900.00 $ 4.29 $ 164,092.50 $ 7.99 $ 305,617.50 $ 5.55 $ 212,287.50
SD-03Unclassified Excavation (Street and Clay Stockpile)CY 7700 $ 4.80 $ 36,960.00 $ 4.75 $ 36,575.00 $ 4.75 $ 36,575.00 $ 4.84 $ 37,268.00 $ 5.20 $ 40,040.00 $ 8.20 $ 63,140.00 $ 3.50 $ 26,950.00 $ 5.20 $ 40,040.00 $ 6.15 $ 47,355.00
SD-05Remove Existing Paved Surfaces and Base CourseSY 1300 $ 3.20 $ 4,160.00 $ 3.25 $ 4,225.00 $ 3.20 $ 4,160.00 $ 3.22 $ 4,186.00 $ 4.00 $ 5,200.00 $ 2.80 $ 3,640.00 $ 5.00 $ 6,500.00 $ 6.25 $ 8,125.00 $ 4.50 $ 5,850.00
SD-06Topsoil Stripping (Fill Areas) SY 35100 $ 2.40 $ 84,240.00 $ 2.50 $ 87,750.00 $ 2.40 $ 84,240.00 $ 2.44 $ 85,644.00 $ 0.99 $ 34,749.00 $ 0.80 $ 28,080.00 $ 2.79 $ 97,929.00 $ 1.00 $ 35,100.00 $ 0.65 $ 22,815.00
SD-07Salvage and Reuse Asphaltic Concrete Pulverized CY 1200 $ 4.40 $ 5,280.00 $ 4.50 $ 5,400.00 $ 4.50 $ 5,400.00 $ 4.52 $ 5,424.00 $ 9.25 $ 11,100.00 $ 7.30 $ 8,760.00 $ 7.00 $ 8,400.00 $ 5.25 $ 6,300.00 $ 10.60 $ 12,720.00
SD-08Provide 1 1/4-Inch Crushed Aggregate Base CourseCY 1000 $ 36.20 $ 36,200.00 $ 36.10 $ 36,100.00 $ 36.75 $ 36,750.00 $ 36.62 $ 36,620.00 $ 35.35 $ 35,350.00 $ 36.50 $ 36,500.00 $ 30.00 $ 30,000.00 $ 38.50 $ 38,500.00 $ 41.00 $ 41,000.00
SD-092-Inch Asphalt Cold Patch (Employers Boulevard & Trail)SY 65 $ 25.00 $ 1,625.00 $ 25.00 $ 1,625.00 $ 30.00 $ 1,950.00 $ 38.84 $ 2,524.60 $ 25.00 $ 1,625.00 $ 38.00 $ 2,470.00 $ 28.00 $ 1,820.00 $ 40.00 $ 2,600.00 $ 88.60 $ 5,759.00
SD-10Landscaping - Topsoil, Mesic Prairie Planting, Fertilizer, SY 6000 $ 3.30 $ 19,800.00 $ 3.50 $ 21,000.00 $ 3.40 $ 20,400.00 $ 3.35 $ 20,100.00 $ 3.45 $ 20,700.00 $ 5.40 $ 32,400.00 $ 4.12 $ 24,720.00 $ 3.57 $ 21,420.00 $ 3.69 $ 22,140.00
SD-11Landscaping – Topsoil, Seed, Fertilizer and Mulch SY 16500 $ 1.90 $ 31,350.00 $ 2.00 $ 33,000.00 $ 2.00 $ 33,000.00 $ 1.93 $ 31,845.00 $ 2.35 $ 38,775.00 $ 2.00 $ 33,000.00 $ 2.75 $ 45,375.00 $ 3.12 $ 51,480.00 $ 1.95 $ 32,175.00
SD-12Landscaping - Topsoil, Temporary Nurse Crop and MulchSY 40500 $ 1.10 $ 44,550.00 $ 1.10 $ 44,550.00 $ 1.10 $ 44,550.00 $ 1.07 $ 43,335.00 $ 1.45 $ 58,725.00 $ 1.60 $ 64,800.00 $ 1.35 $ 54,675.00 $ 1.55 $ 62,775.00 $ 0.80 $ 32,400.00
SC-01Pipe Foundation Stabilization CY 100 $ 28.00 $ 2,800.00 $ 28.00 $ 2,800.00 $ 0.10 $ 10.00 $ 25.25 $ 2,525.00 $ 31.00 $ 3,100.00 $ 27.00 $ 2,700.00 $ 30.00 $ 3,000.00 $ 40.40 $ 4,040.00 $ 38.00 $ 3,800.00
SC-02Provide Silt Fence LF 2200 $ 2.25 $ 4,950.00 $ 2.20 $ 4,840.00 $ 2.25 $ 4,950.00 $ 2.29 $ 5,038.00 $ 2.20 $ 4,840.00 $ 2.40 $ 5,280.00 $ 2.20 $ 4,840.00 $ 2.20 $ 4,840.00 $ 2.60 $ 5,720.00
SC-03Provide Erosion Bales EA 20 $ 10.00 $ 200.00 $ 10.00 $ 200.00 $ 10.00 $ 200.00 $ 14.14 $ 282.80 $ 10.00 $ 200.00 $ 35.00 $ 700.00 $ 10.00 $ 200.00 $ 10.00 $ 200.00 $ 13.00 $ 260.00
SC-04Inlet Protection Type D EA 8 $ 105.00 $ 840.00 $ 100.00 $ 800.00 $ 89.00 $ 712.00 $ 111.10 $ 888.80 $ 100.00 $ 800.00 $ 112.00 $ 896.00 $ 100.00 $ 800.00 $ 100.00 $ 800.00 $ 130.00 $ 1,040.00
SC-05Medium Rip Rap with Geotextile Fabric (Type HR)SY 150 $ 38.00 $ 5,700.00 $ 40.00 $ 6,000.00 $ 38.00 $ 5,700.00 $ 38.64 $ 5,796.00 $ 40.00 $ 6,000.00 $ 10.00 $ 1,500.00 $ 80.00 $ 12,000.00 $ 70.00 $ 10,500.00 $ 46.10 $ 6,915.00
SC-06Tracking Pad EA 1 $ 1,130.00 $ 1,130.00 $ 1,100.00 $ 1,100.00 $ 1,100.00 $ 1,100.00 $ 1,515.00 $ 1,515.00 $ 1,500.00 $ 1,500.00 $ 1,786.00 $ 1,786.00 $ 1,000.00 $ 1,000.00 $ 3,500.00 $ 3,500.00 $ 1,755.00 $ 1,755.00
TOTAL AMOUNT BID
BIDDER NO. 9
Calnin & Goss, LLC
SANITARY SEWER CONSTRUCTION
STORM SEWER CONSTRUCTION
WATER MAIN CONSTRUCTION
BIDDER NO. 6 BIDDER NO. 7 BIDDER NO. 8
Dorner Inc. Advance Construction Inc. Relyco Plus LLCDE GROOT, INC.
$ 1,009,073.00 $ 1,010,992.75 $ 1,159,210.39 $ 1,188,412.90
BIDDER NO. 1
PTS Contractors, Inc
$ 868,960.00
BIDDER NO. 2
$ 878,765.00
MCC, Inc.
STREET AND DRAINAGE CONSTRUCTION
SPECIAL CONSTRUCTION
BIDDER NO. 3
Kruczek Construction Inc.
BIDDER NO. 5
Peters Concrete Company
$ 998,946.50 $ 982,828.23 $ 968,968.00
BIDDER NO. 4
X:\ENG\Projects\City Projects\2026\Project 26-10 Phoenix of De Pere Street Construction\500-Bidder_Correspondence\2026 1008 CE_Project 26-10 Bid Tab 1 of 1
Page 95 of 183
City of De Pere, Wisconsin
Request for Common Council Action
7.F
Meeting Date: October 20, 2026
Department: City Attorney
From:
Subject: Consideration and Possible Action on Final Payment
Application for the De Pere Parking Garage Located at
224 N. Wisconsin ST.
Recommendation: Motion to Approve.
Attachments:
Parking Ramp Final Pay Memo - 10202026, CM Advantages, 250840 Pay App 10 Sept
2026_GRAEF
Page 96 of 183
To: Mayor James Boyd
Common Council
From: Daniel Lindstrom, Development Services Director
Date: October 20, 2026
RE: Consideration and Possible Action on Final Payment Application for the De Pere Parking Garage.
Overview
In 2023, the City of De Pere approved a term sheet for redeveloping the former ShopKo retail store at the
200 block of Broadway and Wisconsin Streets. The approved term sheet included development terms for
five new mixed-use buildings downtown and a publicly owned parking structure. Since then, the
developer(s) have been slowly moving toward the redevelopment. Last week saw the ribbon-cutting of the
550 William Street, 60-unit mixed-use building, the first night of operation for the 90-room Marriott
TownPlace Suites, and the soft opening of the parking structure. The City issued two RFPs for the
development of the project – (1) Design and (2) Construction Manager at Risk (CMaR). GRAEF led the
architectural and engineering work, with close coordination with Miron as the CMaR.
What is Construction Management at Risk (CMaR)
CMaR is a delivery method in which the Construction Manager commits to delivering the project within a
Guaranteed Maximum Price (GMP) based on the construction documents and specifications at the time of
the GMP. The CMaR provides professional services and acts as a consultant to the owner in the design
development with the designer and construction phases with the contractor. Often, the CMaR also
provides some of the actual construction of the project, depending on bidder availability and the
company's expertise. In addition to acting in the owner's interest, the CMaR must manage and control
construction costs to avoid exceeding the GMP because, contractually, any costs exceeding the GMP that
are not change orders are the CMaR's financial liability. An additional benefit to the project is that having a
CMaR with construction experience creates feedback for the designer, helping them identify construction
challenges before the design is final. As such, they are able to streamline the overall design and bidding
process.
Overall Design and Key Features
The project originally contemplated one level of underground parking. However, geotechnical analysis
identified soil conditions that made below‑grade construction cost‑prohibitive. As a result, the design
shifted to an above‑ground structure, requiring the entire development footprint to move approximately
20 feet south. This adjustment allowed the City and its development partners to create a new public plaza
between the ramp and the 550 William Street mixed‑use building.
The ramp incorporates several integrated systems, including:
• EV charging stations on the ground floor.
• Auto‑dimming lighting to reduce energy use and glare to the downtown/near downtown residents.
• A street‑light controller and generator serving several downtown blocks.
• Architectural concrete forms by Wells Precast that hold actual face brick, significantly improving
aesthetics at a modest cost premium.
Page 97 of 183
Delivery Method – Construction Manager at Risk (CMaR)
The City selected Miron Construction as its Construction Manager at Risk in March 2025. Miron provided
extensive preconstruction services, including value engineering, constructability review, and daily
coordination that reduced the burden on Development Services Department and the Law Departments.
The Guaranteed Maximum Price (GMP) and Construction Fee was set at approximately $9,620,000,
providing cost certainty and risk protection for the City.
Project Timeline
• Feasibility & Concept Development: 2022–2024
• Design Start: Fall 2024
• CMaR Selection: March 2025
• Groundbreaking: December 2025 / January 2026
• Precast Installation & Topping Out: Spring 2026
• Substantial Completion: September 2026
• Final Completion: October 2026 (PARC system outstanding)
Budget & Financing
The original anticipated budget was $9,000,000 (construction only). The final project cost, including design
and CMaR services, totaled $10,005,000, and broke down as follows (rounded figures):
• Design: $385,000 (including one amendment for additional soil pressure testing)
• CMaR: $233,000
• Construction (GMP): $9,387,000
• Total: $10,005,000
Change Orders
The project included 35 Potential Change Orders (PCOs), most of which were minor refinements captured
within four consolidated change orders. Change orders to $142,017.03. Resulting in a new total price of
$9,761,911.03. These adjustments were theoretically funded through project contingency and did not
require out-of-scope approvals. The net result shows a $546,975.91 balance to Finish/Retainage. Stated
differently, no change orders exceeded the GMP, and the project remained under budget.
Scope Changes Not Originally Included in the Design
The team made material selections and minor refinements throughout the project, but no changes were
driven by public input, Council direction, or contractor recommendations. Outside the Miron scope were
the inclusion of enhanced security cameras with a Camera Corner Connecting Point (CCCP) and the addition
of cell phone single boosters for the EV charging stations and users on the bottom floor in the ramp. The
security camera system cost an additional $109,539.75. The cell phone system booster is still outstanding.
Construction Challenges & Resolutions
The project team navigated several challenges:
• Architectural Aesthetic: The City prioritized a design that did not resemble a traditional parking
ramp. Wells Precast's brick‑holding concrete forms provided a high‑quality façade at a modest cost
premium (approximately $100,000–$130,000).
• Soil Conditions: A major cost‑implication decision was the shift to above‑ground construction,
which avoided roughly $1,000,000 in soil stabilization costs. Even with the additional $120,000 land
purchase required for the site shift, the net savings were substantial. The inability to construct
underground parking required a full redesign and site shift, ultimately improving the plaza layout
and reducing costs.
Page 98 of 183
• Coordination with Adjacent Projects: Miron, City Engineering, Immel Construction, and American
Construction Services coordinated closely to manage street reconstruction, utility work, and site
access.
• Top Deck Concrete Shrinkage: The first concrete pour experienced plastic shrinkage due to rapid
surface drying. After extensive evaluation, staff met with several industry professionals and
ultimately selected an MMA sealant to "seal and heal" the cracks; this is a product similar to one
used on highway bridge decks. Unfortunately, the MMA product is off-white/yellow. The
temporary off‑white/yellow appearance will fade as the material wears. The City, Miron, and
GRAEF will reconvene in spring 2027 to evaluate long‑term performance following the first winter
freeze/thaw cycle.
Additional Notes and Final Thoughts
The project was a large undertaking for the City, one we have never undertaken before. What is most
impressive was the construction coordination by Miron, the City Engineering Department for the
reconstruction of William and Wisconsin Streets, Immel Construction (550 William Street), and American
Construction Services (hotel development) – four large projects in a small space, all at once.
The ramp will be fully operational in the coming month, following completion of the PARC training. General
public feedback has been positive, particularly regarding the brick façade and overall integration with
surrounding development. The PARC system and online portal will allow for minimal staffing and
streamlined operations. The project was generally delivered on time with minimal delays, under budget,
and with minimal disruption, supporting the City's broader redevelopment goals and providing essential
structured parking for downtown.
Page 99 of 183
PROJECT DELIVERY METHODS | MIRON CONSTRUCTION CO., INC.
OWNER
ARCHITECT GENERAL CONTRACTOR
CONSULTANT ENGINEER SUB-
CONTRACTORS SUPPLIERS
DESIGN | BID | BUILD
ROLE
| General Contractor contracts directly with Owner
| Architect contracts directly with Owner
| General Contractor contracts directly with subcontractors/suppliers
| Low bidder is generally selected on lump-sum basis
ADVANTAGES
| Design is complete prior to bidding
| Bid documents are prepared at one time vs. phased bidding
CONSIDERATIONS
| No General Contractor input during design
| May cause adversarial relationships among parties
| Low bidders may lack proper qualifications
| Can lead to increased change orders
| No Owner input during subcontractor/supplier selection
| No “open book” process; savings accrue to General Contractor
| Overall project costs are not identified until design is complete and bid
DESIGN-BUILD
ROLE
| Comprehensive services from beginning to end
| Design-Builder contracts directly with Owner
| Design-Builder holds all contracts (A/E, subcontractors, suppliers,etc.)
| Early involvement and collaboration to achieve Owner’s objectives
ADVANTAGES
| Single point of responsibility throughout design and construction
| GMP established at completion of design phase
| Value engineering and constructability reviews may be completed during design
| Typically requires fewer change orders than Design/Bid/Build method
| Allows for phased and fast-track construction
| Includes an “open book” process; savings accrue to Owner
| Owner determines own level of involvement
| Competitive bidding on all work with input from Owner
CONSIDERATIONS
| Limited checks and balances between design and construction team
| Tendency to focus on Guaranteed Maximum Price (GMP) vs. quality
| Many General Contractors are not qualified Design-Builders
OWNER
DESIGN-BUILDER
CONSULTANT ENGINEER SUB-
CONTRACTORS SUPPLIERS
ARCHITECT
CONSTRUCTION MANAGEMENT AT RISK
OWNER
ARCHITECT CONSTRUCTION MANAGER
AT RISK
CONSULTANT ENGINEER SUB-
CONTRACTORS SUPPLIERS
ROLE
| CM collaborates with Owner and A/E throughout project
| CM contracts directly with Owner, A/E contracts directly with Owner
| CM holds all contracts (subcontractors, suppliers, etc.)
| CM bonds entire project
ADVANTAGES
| Single point of responsibility for construction
| Guaranteed Maximum Price (GMP) established at completion of design phase
| CM selection based on experience and performance, not price
| Allows for phased and fast-track construction
| Includes an “open book” process; savings accrue to Owner
| CM can provide value engineering and constructability reviews during design
| Competitive bidding on all work with input from Owner
| Subcontractor and supplier selection based on price, experience and performance
| Creates a strong system of checks and balances between A/E and CM
CONSIDERATIONS
| May require additional bid packages
| Requires additional coordination by design team
| Many General Contractors are not qualified Construction Managers
11QQ 22QQ 33QQ 44QQ 11QQ 22QQ 33QQ
OOwwnneerr
AArrcchhiitteecctt ((DDeessiiggnn))
CCoonnssttrruuccttiioonn MMaannaaggeerr
AArrcchhiitteecctt ((CCoonnttrraacctt MMaannaaggeemmeenntt))
SSuubbccoonnttrraaccttoorrss && SSuupppplliieerrss
11QQ 22QQ 33QQ 44QQ 11QQ 22QQ
OOwwnneerr
AArrcchhiitteecctt ((DDeessiiggnn))
CCoonnssttrruuccttiioonn MMaannaaggeerr
AArrcchhiitteecctt ((CCoonnttrraacctt MMaannaaggeemmeenntt))
SSuubbccoonnttrraaccttoorrss && SSuupppplliieerrss
11QQ 22QQ 33QQ 44QQ 11QQ 22QQ 33QQ 44QQ 11QQ 22QQ 33QQ 44QQ
OOwwnneerr
AArrcchhiitteecctt ((DDeessiiggnn))
CCoonnssttrruuccttiioonn MMaannaaggeerr
AArrcchhiitteecctt ((CCoonnttrraacctt MMaannaaggeemmeenntt))
SSuubbccoonnttrraaccttoorrss && SSuupppplliieerrss
11QQ 22QQ 33QQ 44QQ 11QQ 22QQ 33QQ 44QQ 11QQ
OOwwnneerr
AArrcchhiitteecctt ((DDeessiiggnn))
CCoonnssttrruuccttiioonn MMaannaaggeerr
AArrcchhiitteecctt ((CCoonnttrraacctt MMaannaaggeemmeenntt))
SSuubbccoonnttrraaccttoorrss && SSuupppplliieerrss
27 months
24 months
24 months
24 months
YEAR 1 YEAR 2
9 months
YEAR 3
24 months
YEAR 1 YEAR 3
6 months
12 months
12 months
12 months
YEAR 2
36 months
9 months
24 months
24 months
18 months
12 months
12 months
12 months
YEAR 2YEAR 1
YEAR 1
6 months
21 months
YEAR 2
11QQ 22QQ 33QQ 44QQ 11QQ 22QQ 33QQ
OOwwnneerr
AArrcchhiitteecctt ((DDeessiiggnn))
CCoonnssttrruuccttiioonn MMaannaaggeerr
AArrcchhiitteecctt ((CCoonnttrraacctt MMaannaaggeemmeenntt))
SSuubbccoonnttrraaccttoorrss && SSuupppplliieerrss
11QQ 22QQ 33QQ 44QQ 11QQ 22QQ
OOwwnneerr
AArrcchhiitteecctt ((DDeessiiggnn))
CCoonnssttrruuccttiioonn MMaannaaggeerr
AArrcchhiitteecctt ((CCoonnttrraacctt MMaannaaggeemmeenntt))
SSuubbccoonnttrraaccttoorrss && SSuupppplliieerrss
11QQ 22QQ 33QQ 44QQ 11QQ 22QQ 33QQ 44QQ 11QQ 22QQ 33QQ 44QQ
OOwwnneerr
AArrcchhiitteecctt ((DDeessiiggnn))
CCoonnssttrruuccttiioonn MMaannaaggeerr
AArrcchhiitteecctt ((CCoonnttrraacctt MMaannaaggeemmeenntt))
SSuubbccoonnttrraaccttoorrss && SSuupppplliieerrss
11QQ 22QQ 33QQ 44QQ 11QQ 22QQ 33QQ 44QQ 11QQ
OOwwnneerr
AArrcchhiitteecctt ((DDeessiiggnn))
CCoonnssttrruuccttiioonn MMaannaaggeerr
AArrcchhiitteecctt ((CCoonnttrraacctt MMaannaaggeemmeenntt))
SSuubbccoonnttrraaccttoorrss && SSuupppplliieerrss
27 months
24 months
24 months
24 months
YEAR 1 YEAR 2
9 months
YEAR 3
24 months
YEAR 1 YEAR 3
6 months
12 months
12 months
12 months
YEAR 2
36 months
9 months
24 months
24 months
18 months
12 months
12 months
12 months
YEAR 2YEAR 1
YEAR 1
6 months
21 months
YEAR 2
11QQ 22QQ 33QQ 44QQ 11QQ 22QQ 33QQ
OOwwnneerr
AArrcchhiitteecctt ((DDeessiiggnn))
CCoonnssttrruuccttiioonn MMaannaaggeerr
AArrcchhiitteecctt ((CCoonnttrraacctt MMaannaaggeemmeenntt))
SSuubbccoonnttrraaccttoorrss && SSuupppplliieerrss
11QQ 22QQ 33QQ 44QQ 11QQ 22QQ
OOwwnneerr
AArrcchhiitteecctt ((DDeessiiggnn))
CCoonnssttrruuccttiioonn MMaannaaggeerr
AArrcchhiitteecctt ((CCoonnttrraacctt MMaannaaggeemmeenntt))
SSuubbccoonnttrraaccttoorrss && SSuupppplliieerrss
11QQ 22QQ 33QQ 44QQ 11QQ 22QQ 33QQ 44QQ 11QQ 22QQ 33QQ 44QQ
OOwwnneerr
AArrcchhiitteecctt ((DDeessiiggnn))
CCoonnssttrruuccttiioonn MMaannaaggeerr
AArrcchhiitteecctt ((CCoonnttrraacctt MMaannaaggeemmeenntt))
SSuubbccoonnttrraaccttoorrss && SSuupppplliieerrss
11QQ 22QQ 33QQ 44QQ 11QQ 22QQ 33QQ 44QQ 11QQ
OOwwnneerr
AArrcchhiitteecctt ((DDeessiiggnn))
CCoonnssttrruuccttiioonn MMaannaaggeerr
AArrcchhiitteecctt ((CCoonnttrraacctt MMaannaaggeemmeenntt))
SSuubbccoonnttrraaccttoorrss && SSuupppplliieerrss
27 months
24 months
24 months
24 months
YEAR 1 YEAR 2
9 months
YEAR 3
24 months
YEAR 1 YEAR 3
6 months
12 months
12 months
12 months
YEAR 2
36 months
9 months
24 months
24 months
18 months
12 months
12 months
12 months
YEAR 2YEAR 1
YEAR 1
6 months
21 months
YEAR 2
27 MONTHS
36 MONTHS
27 MONTHS
TYPICAL SCHEDULETYPICAL SCHEDULETYPICAL SCHEDULE
Page 100 of 183
APPLICATION AND CERTIFICATE FOR PAYMENT
TO OWNER:City of De Pere
335 S Broadway St
De Pere, Wl 54115
Page: 1 of 3
FROM Miron Construction Co., lnc.
CONTRACTOR:pO Box 1372
Green Bay, Wl 54305-1372
CONTRACT FOR: De Pere Parkinq Facility
is attached.
1. ORIGINAL CONTRACT SUM
2. Net change by change orders
3. CONTRACT SUM TO DATE ( Linel +l-2) . . . . .
4. TOTAL COMPLETED & STORED TO DATE . . . .
(Column G on G703)
5. RETAINAGE:
(Total retainage Column I of G703)
6. TOTAL EARNED LESS RETAINAGE
(Line 4 less Line 5 Total )
7. LESS PREVIOUS CERTIFICATES FOR PAYMENT
(Line6from priorCertificate) . ...
8. CURRENT PAYMENT DUE. -
9. BALANCE TO FINISH, INCLUDING RETAINAGE
(Line 3 less Line 6 )
PROJECT: De Pere Parking Facility
250 N. Wisconsin Street
De Pere, Wl 54115
ARCHITECT:GRAEF
1 150 Springhurst Dr
Ste 201
Green Bay, Wl 54304-5950
9,619,894.00
142,017.03
9,761,91 1.03
9,214,935.12
o.oo
tY'
9,214,935.12 state of:
18,93
546,975.91
APPLICATION NO
PÊRIOD TO
PROJECT NOS
INVOICE NO
10
09t30t2026
250E40
250840-001 0
Distribution to:
! owuen
n ARcHrrEcr
! corurnncron
ntrCONTRACT DAIE : O3lO4l2O25
APPLICATION AND CERTIFICATE FOR PAYMENT rheundersisnedGontractorcertifiesthattothebestofthecontractor'sknowledse, informationandbeliefthework
covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts
$
$
$
$
$
$
$
from the Owner, and that current paymeni shown herein is now due.
WARNING: DO NOT CHANGE ESTABLISHED PAYMENT INSTRUCTIONS FOR PAYMENTS TO MIRON
CONSTRUCTION CO., lNC.. Miron Construction Co., lnc. does not change its bank routing or account numbers. Do not
accept or rely upon emails or corespondence requesting changes to Miron Construction Co., lnc.'s established payment
instructions. Any change to Miron Construction Co., lnc.'s payment instructions can only be made by a fully executed
Change Order to the Agreement between Owner and Miron Construction Co., lnc..
Confactor: Miron Construction Co., lnc.
Date:
$
$
CounÇ of: Winnebago
Subscribed and sworn to before
me this 0S of 2026
Notary Public:
My Commission expires
ARCHITECTS CERTIFICATE FOR PAYMENT
ln accordance with the Contract Documents, based on on-site observations and the data comprising the above application,
the Architect certifies to the Owner that to the best of the Architect's knowledge, information and belief the Work has
progressed as indicated, the quality of Work is in accordance with the Contract Documents, and the Contraclor ¡s ent¡tled io
the payment of the AMOUNT CERTIFIED.
(Atþch explanation lf amount ært¡t¡ed ditrers from the amount aø¡ed for. lnitial frgures on this Application and on the
Cont¡nuat¡on Sheet that are changed to conform to the amount certifred.)
ARCHITECT: GRAEF
Date:
This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. lssuance,
payment and acceptance of payment are without prejud¡ce to any rights of the Owner or Contractor under this Contract.
By:
ât¡eu\o
AQ}\\oT
DEDUCTIONS
-15,932.98
0.00
o.oo
tlet Change by Change Orders 142.017.03
ADDITIONS
157,950.01
0.o0
CHANGE ORDER SUMMARY
Change Order approved in
previous months by Owner
APPROVED THIS MONTH
Number Date Approved
49t15t2026
Cunent Total:
coo04
AIA D@mênt G702 -'lgg2.Copfight O 1S53, 1963, '1S65, 1971, f S78, 1983 and l9g2 by The Amêri€n lnstitub of Architec'ts. Al ¡ights læded.
WARNING: This AIA¡O Ddtunt ¡s polêct€d by U,S. Copyright Láw and lñtémâlioml T@tiês, ljnãuthoriæd ßprcducöon or distribut¡on of th¡s AIA@
D@ment, or any portion of it, may Edt ¡n ærere civl and simiml penallis, and wil¡ be pruæcuted lo the mdimum qtent pos¡ble under the law.
Th¡6d@mntwasprcduædat10:13:12on10/012026underOrdorNo20240046063úìichdpi@oig7lz¿il2g27,arÌdisrctbrlæl€. Us.Notês:
Page 101 of 183
Miron Co lnc.
CONTINUATION SHEET AIA DOCUMENT G7O3
AIA DOCUMENT G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing
Contractofs signed Certification is attached.
ln tabulation below, amounts are stated to the nearest cent.
Use Column I on Contracts where variable retainage for line items may apply.
APPLICATION NUMBER: 10
APPLICATION DATE:'10/05/2026
PERIOD TO: 09/30/2026
PROJECT NO: 250840
Page: 2
INVOICE NO,:
250840-001 0
I
RETAINAGE
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
H
BALANCE
TO FINISH
0.0c
0.0c
0.0c
0.0c
0.0c
0.0c
71,833.0C
0.0c
0.0c
0.0c
0.0c
39,356.0C
0.0c
0.0c
0.0c
0.0c
0.0c
0.0(
0.0c
0.0(
0.0(
0.0c
PER-
100
100
100
r00
100
100
42
100
100
100
100
76
100
100
100
100
100
r00
100
100
r00
100
G
TOTAL
COMPLETED
\ND STOREE
TO DATE
2,209,778.O1
1,787,579.00
995,614.00
377,033.00
219,442.13
44,000,00
52,667.00
255, I 09.00
22,212.O4
51,272.04
51,277.28
122,160.OQ
127,566.00
45,499.00
160,329.67
118,679.35
530,801.00
46r,031.93
482,300.00
66,400.00
21,206.67
14,978.0C
F
MATERIAL
PRESENTLY
STORED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0,00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ED
woRK ooMPLETED (D+E)
THIS PERIOD
-2,171.39
0.00
0.00
5,856.00
16,512.50
0.00
0.00
15,631 .00
0.00
0.00
0.00
16,376.00
3,816.00
-908.00
2,171.39
0.00
7,007,00
0.00
0.00
0.00
0.00
0.00
FROM
PREVIOUS
APPLICATION
2,211,949.40
'1,787,579.00
995,614.00
371,177.OA
202,929.63
¿14,000.00
s2,667.00
239,478.O4
22,212.O4
51,272.04
51,277.28
'105,784.00
123,750.O4
46,407.O4
158,158.28
I 18,679.35
523,794.04
461 ,031.93
482,300.00
66,400.0c
21,206.67
14,978.0C
c
SCHEDULED VALUE
CURRENT
2,209,778.O1
1,787,579.00
995,614.00
377,033.00
219,442.13
¿t4,000.00
124,500.00
255, I 09.00
22,212.OO
51,272.OO
51,277.28
161,516.00
127,566.00
45,499.00
160,329.67
118,679.3s
530,801.00
461,031.93
482,300.00
66,400.00
21,206.67
14,978.00
CHANGE
ORDERS
-13,329.99
0.00
0.00
15,033.00
11,477.'t3
0.00
0,00
22,257.O0
0.00
554.00
-13,519.72
13,316.00
7,566.00
-908.00
M,O67.67
3,829.35
I 56,023.00
31,029.93
0.00
-55.00
-2,693.33
0.00
ORIGINAL
2,223,158.OO
1,787,579.00
995,614.00
362,000.00
207,965.00
44,000.00
124,s00.00
232,852.OO
22,212.OO
50,718.00
M,797.OO
148,200.00
120,000.00
46,407.OO
116,262.00
114,850.00
374,778.OO
430,002.00
482,300.00
66,455.00
23,900.00
14,978.00
B
DESCRIPTION OF WORK
Cast in P¡ace Concrete
Precast Concrete Material
Precast Concrete Erection
Steel Fabrication and Erection
General Trades
Roofing
Caulk¡ng (Allowance)
Aluminum Windows, Entranc€s, Glass/Glazing
Gypsum Board Systems
Painting
Signage
Parking Access & Revenue Control System
(PARCS) (Allowance)
Elevators
Fire Suppression
Plumbing
HVAC
Electrical
Earthwork and Selective Site Demol¡tion
Rigid lnclus¡on Ground lmprovement
Asphalt Paving
Site Concrete
Fencing
A
ITEM NO.
105
110
)15
J20
)25
t30
135
140
J45
t50
155
160
165
)70
175
180
t85
190
195
100
't05
110
Page 102 of 183
Miron Co lnc.
CONTINUATION SHEET AIA DOCUMENT G7O3
AIA DOCUMENT G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing
Contracto/s signed Certification is attached.
ln tabulation below, amounts are stated to the nearest cent.
Use Column I on Contracts where variable retiainage for line items may apply.
APPLICATION NUMBER: 10
APPLICATION DATE: 10/05/2026
PERIOD TO: 09/30/2026
PROJECT NO: 250840
Page: 3
INVOICE NO
250840-001 0
I
RETAINAGE
and Landscaping 27 100
100
0
100
101
31
I
85
77
100
100
71
0
100
100
100
120
125
130
135
140
145
150
155
160
165
170
Utilities 16, 16,1 16, 0.00
0.00
17,077.50
6,300.36
0.00
0.00
0.00
0.00
0.00
16,
Storefront (Allowance)
Conditions
Requirements (Allowance)
297 322,61
159,097 -388. 158, -1
Conditions / Temp Heat & Enclosure 0.00 23, 23, s1,81 0.00
(Allowance) 1 92,1 7 7
lnclusion Testing (Allowance) 0.00
0.00
25,467 25,467
Permit (Allowance) 24,31 24,31 0.00
0.00
0.00
0.00
0.00
0.00
0.00
Requirements 57,1
Risk 7 7.1 7.1
Expenses (Allowance)
Manager's Cont¡ngency (Allowance)
Softivare
Fee
0 2, 2, 859.
75 -149, 289,81 289,81
80
85
90
0 1 1
232, 237,251.97
78,295.O1
237,251 237,251
Performance and Payment Bonds 1,947.O1 78,295.01 0.00 78,295.01
Project 142,0 9,761,91 1.03 I, 9,214,935- 94 0.
H
BALANCE
TO FINISH
PER-
G
TOTAL
COMPLETED
\ND STORED
TO DATE
F
MATERIAL
PRESENTLY
SÏORED
D E
woRK CoMPLETED (D+E)
THIS PERIOD
FROM
PREVIOUS
APPLICATION
c
SCHEDULED VALUE
CURRENTCHANGE
ORDERSORIGINAL
B
DESCRIPTION OFWORK
A
ITEM NO.
AIA DOCUMENT G7O3 - APPLICATION AND CERTIFICATE FOR PAYMENT
THE AMERICAN INSTITUTE OF ARCHITECÏS 1735 NEW YORK AVENUE NW WASHINGTON DC 20006
Page 103 of 183
City of De Pere, Wisconsin
Request for Common Council Action
7.G
Meeting Date: October 20, 2026
Department: Human Resources
From: Shannon Metzler, Human Resources Director
Subject: Recommendation from the Finance/Personnel Committee
to approve 2027 benefit renewal & plan design changes.
Recommendation: Motion to approve.
This item was unanimously approved by the Finance/Personnel Committee at its
October 13, 2026, meeting.
Attachments:
2027 Renewal Memo - City of De Pere Draft V1 (002)
Page 104 of 183
To: Members of the Finance/Personnel Committee
From: Shannon Metzler, Human Resources Director
Date: October 13, 2026
RE: For consideration and possible action to approve 2027 benefit renewal & plan design changes*
We continue to monitor the benefit plans provided to the employees to maintain high value, financially stable design
and costs. After multiple years of reducing our health plan surplus, we are now in a position in which we must ensure
that our budget matches our expected health plan costs. As in previous years, below showcases the status of the health
plan as well as our recommendations for the 2027 plan year.
HEALTH PLAN PERFORMANCE
Current Plan Year: January 2026 – December 2026 | Claims Paid Through: August 2026
Page 105 of 183
2
MEDICAL PLAN RECOMMENDATIONS
2027 RENEWAL RATES
We are recommending moving forward with a 6% increase for the 2027 plan year. This increase is based on increased
medical claims costs for the City. Medical trend is 8.5-12% for other public sector and private sector plans for 2027.
MEDICAL PLAN CURRENT RENEWAL
Single: $802.59 $850.76
EE+1: $1,493.81 $1,583.46
Family: $2,450.09 $2,597.12
MEDICAL PLAN DESIGN
In 2025, the City and M3 conducted a comprehensive review of the Medical Plan to evaluate opportunities for cost
containment while preserving the quality and value of benefits provided to employees. The plan design modifications
implemented in the prior year have demonstrated meaningful fiscal impact, generating substantial savings for the City.
The most significant of last year’s changes, Garner Health, is estimated to have produced a gross $320,000 in savings as
of July of 2026. As a reminder, Garner Health is a healthcare benefit navigation company that helps plan members find
high-quality doctors that we highly incentivize to use.
Given the significance of those changes and the importance of allowing plan members adequate time to adapt, the City
is not recommending additional plan design modifications for the current plan year.
STOP LOSS INSURANCE CARRIER CHANGE
Each year the City purchases stop loss insurance to protect our health plan from the financial impact of high-cost
claimants. Stop Loss is the City’s largest fixed cost related to the health plan and is estimated to cost approximately
$700,000 in 2027. We solicit proposals from several different preferred carriers to ensure we have the most
economically feasible option built into our plan. Our current carrier, Sun Life, proposed no increase to the 2026 rates.
We marketed these plans to seven additional stop loss carriers. The best financial offer is with Tokio Marine HCC, who
offered a 3% decrease to our current rates. The recommendation for 2027 is to change carriers to Tokio Marine HCC.
There is no member impact to this change.
DENTAL PLAN RECOMMENDATIONS
2027 RENEWAL RATES
Based on the plan performance, we are not recommending an increase to our Delta Dental self-funded plan and
recommend a plan enhancement. The CarePlus (Dental Associates) rates, which is a fully-insured plan, will not have an
increase for 2027.
DENTAL PLAN – DELTA DENTAL CURRENT RENEWAL
Single: $47.16 $47.16
Family: $143.34 $143.34
DENTAL PLAN – CARE PLUS CURRENT RENEWAL
Single: $37.43 $37.43
Family: $106.81 $106.81
Delta Dental – Dependent Orthodontic Coverage to Age 26
Our plan currently offers orthodontic benefits to dependents up to age 19, and most other dependent benefits to age
26. We recommend raising the orthodontic benefits for dependents to age 26 to mirror other dependent benefits. We
can offer this additional benefit and keep premium rates at a 0% increase.
If you have any questions in advance of the meeting, please give me a call at 920-339-4045. Thank you.
Page 106 of 183
City of De Pere, Wisconsin
Request for Common Council Action
7.H
Meeting Date: October 20, 2026
Department: Development Services
From: Quasan Shaw, Community & Economic Development
Specialist
Subject: Recommendation from the Redevelopment Authority to
authorize a purchase offer of up to $440,000 to acquire
property located at 2535 Lawrence Drive and allow city
employees and representatives to take all necessary
steps to acquire the property.
The Council may convene in closed session pursuant to
Section 19.85(1)(e) Wisconsin Statutes for the purpose
of deliberating or negotiating the purchasing of public
properties, the investing of public funds, or conducting
other specified public business, whenever competitive or
bargaining reasons require a closed session. The
Council may, thereafter, reconvene in open session
pursuant to Section19.85(2) Wisconsin Statutes to report
any actions taken during the closed session and to
consider all other matters on the agenda.
Recommendation: Motion to approve.
The RDA made the recommendation as suggested by outside counsel for an "up to"
amount for submission of its offer to acquire the property at 2535 Lawrence Drive
through the pending condemnation proceedings.
Attachments:
[CLEANED]2026-09-18 Memo re Condemnation of G&G Rebuilders Property; Process
and Next Steps.pdf(44934691.1), [CLEANED]Appendix - Exhibits A-K (bookmarked,
email size)(44934690.2)
Page 107 of 183
City of De Pere, Wisconsin
Request for Common Council Action
8.A
Meeting Date: October 20, 2026
Department: Public Works
From: Scott Thoresen, Public Works Director
Subject: Resolution #26-100 Authorizing the fourth amendment for
consulting services with Short-Elliot-Hendrickson,
Incorporated (MSC Expansion).
Recommendation: Motion to approve.
The Board of Public Works at the October 12, 2026 meeting approved SEH's Fourth
Amendment for Consulting Services for MSC Expansion in the amount of $226,422.00.
The motion passed with a 5-0 vote.
Attachments:
Reso26-100, Amendment-Fourth-SEH (MSC Additional Scope 2026) Rev, Consider
SEH's Fourth Amendment Proposal for Consulting Services for MSC Expansion,
DePere Office Expansion Scope of Services 9-10-26 SEH
Page 108 of 183
RESOLUTION #25-100
AUTHORIZING FOURTH AMENDMENT TO AGREEMENT FOR CONSULTING SERVICES
BETWEEN THE CITY OF DE PERE AND SHORT-ELLIOTT-HENDRICKSON, INCORPORATED
(Municipal Service Center Facility Expansion – Design and Construction Engineering Services)
WHEREAS, the City and Short-Elliott-Hendrickson, Incorporated are parties to a
Consulting Agreement (approved by Resolution #21-59) an Amendment thereto (approved by
Resolution #23-02), a Second Amendment thereto (approved by Resolution #25-01) and a Third
Amendment thereto (approved by Resolution #25-60) providing comprehensive design services
and construction engineering services for expansion of City’s Municipal Service Center (“MSC”)
facility; and
WHEREAS, the City is in need of additional professional architectural and engineering
consulting design services related to additional design servers for DSPS Special Inspections and
testing for contaminated soils, along with additional staff requested changes resulting in the
need to further amend the agreement, pursuant to the terms and conditions of the Fourth
Amendment attached hereto; and
WHEREAS, this matter has been reviewed by the Board of Public Works, which
recommends approval thereof.
NOW THEREFORE, BE IT HEREBY RESOLVED THAT:
The City Manager and City Clerk are authorized and directed to execute
the Fourth Amendment to Agreement for Consulting Services Between
the City of De Pere and Short-Elliott-Hendrickson, Incorporated as is
attached hereto.
BE IT FURTHER RESOLVED THAT:
All City officials, officers, employees, and agents are authorized and directed to
take such steps as are lawful and necessary in furtherance thereof.
Page 109 of 183
Resolution #25-100
Page 2 of 2
Adopted by the Common Council of the City of De Pere, Wisconsin, this 20th day of
October, 2026.
APPROVED:
______________________________
James G. Boyd, Mayor
ATTEST:
______________________________
Carey E. Danen, City Clerk
Ayes:
Nays:
Board/Committee Approval: 10/12/2026
Page 110 of 183
FOURTH AMENDMENT TO AGREEMENT FOR CONSULTING SERVICES
BETWEEN THE CITY OF DE PERE AND SHORT- ELLIOTT-HENDRICKSON, INCORPORATED
(MSC Facility Expansion – Design and Construction Engineering Services)
THIS FOURTH AMENDMENT made and entered into this ____ day of _______________,
2026, by and between the City of De Pere, a Wisconsin municipal corporation (“City”) and Short-
Elliott-Hendrickson, Incorporated, a foreign corporation authorized to conduct business in the
State of Wisconsin (“Consultant”).
WHEREAS, the City and Consultant are parties to an Agreement for Consulting Services
dated June 30, 2021, Amendment #1 dated January 20, 2023, Amendment #2 dated
January 22, 2025 and Amendment #3 dated April 14, 2025 (collectively “the Agreement”); and
WHEREAS, the parties wish to further amend the Agreement to provide for additional
professional architectural and engineering services for Consultant to perform, namely, as
outlined in Consultant’s Proposal attached hereto.
NOW , THEREFORE, upon the promises and obligations provided herein, together with
such other consideration, the receipt and sufficiency of which is hereby acknowledged, the
parties mutually agree to amend the Agreement as follows:
1. Consultant’s Scope of Work shall be amended to add consulting services to include
additional design services for DSPS Special Inspections and testing for contaminated
soils. This additional design work also includes Owner requested changes to the existing
locker and toilet rooms, washbay revisions, removal and replacement of the yard
retaining wall, and electrical upgrades to the existing office area.
2. The cost for such additional consulting services shall be performed in the lump sum
amount of $56,253.
3. The cost for Special Inspections by Brander Engineering shall be performed on a Time
and Material basis with an estimated maximum total fee of $170,170
4. All other terms and conditions of the Agreement shall remain in full force and effect,
unless specifically modified by this Fourth Amendment.
This Fourth Amendment has been duly executed as of the date and year first set forth above.
SHORT-ELLIOTT-HENDRICKSON, INCORPORATED CITY OF DE PERE
By:
Trevor Frank, NCARB, AIA, PMP , LEED AP Sr.
Architect /Project Manager
Kimberly T. Flom, City Manager
Carey E. Danen, City Clerk
Page 111 of 183
To: Honorable Mayor Boyd
Board of Public Works Members
From: Scott J. Thoresen, Director of Public Works
Date: September 21, 2026
RE: Consider and Possible Action Regarding SEH’s Fourth Amendment for Consulting
Services for MSC Expansion *
The City is currently under contract with SEH for design and construction services related to the
Municipal Service Center (MSC) expansion, which includes enlarging existing facilities for City
equipment and vehicles, expanding office areas, and updating the building to meet ADA
requirements. Construction began in May.
As construction progressed, several additional services were required that were not included in
SEH’s original contract. These services and associated costs are as follows:
1. Testing for contaminated soils – $2,764
2. Architectural services – $8,750
3. Structural engineering services – $15,200
4. Civil engineering fees – $15,568
5. Electrical, plumbing, and HVAC fees – $13,970
6. Special inspections by Brander Engineering – $170,170
Total additional cost: $226,422
Staff recommends approval of SEH’s Fourth Amendment proposal in the amount of $226,422.
Page 112 of 183
Engineers | Architects | Planners | Scientists
Short Elliott Hendrickson Inc., 425 West Water Street, Suite 300, Appleton, WI 54911- 6058
920.380.2800 | 888.413.4214 | 888.908.8166 fax | sehinc.com
SEH is 100% employee -owned | Affirmative Action –Equal Opportunity Employer
September 10, 2026 RE: De Pere MSB Facility and Office
Expansion and Renovation- Revised
9/10/26
Mr. Scott Thoreson
City of De Pere
925 S 6th Street
De Pere, WI 53533
Dear Scott:
Short Elliott Hendrickson Inc. (SEH®) appreciates the opportunity to submit this proposal to the City of De
Pere (Client) for professional architectural and engineering services related to scope changes for the
renovated MSB facility and proposed Public Works office improvements in De Pere, Wisconsin (Project).
PROJECT UNDERSTANDING
This proposal is based on architectural and engineering services previously completed for the De Pere
Public Works Department, which included the development of design documents, bidding documents,
and a phasing plan for campus-wide improvements to the Municipal Services Building facility on 6th
Street. This proposal has been revised from the most recent proposal for professional services (dated
April 14, 2025) and includes additional design services requested by the City.
Based on previous design efforts for the renovation and expansion of the existing office facility and site,
the scope of work and professional service fees associated with this contract revision include the
following:
• Demolition and renovation of the existing locker rooms in the office area and the toilet rooms in
the vehicle maintenance area. Additional office layout changes.
• Revisions to the washbay scope.
• Electrical upgrades to the existing office area to remove shared neutrals.
• Site modifications within the Fuel Tank/Public Rubbish Drop-Off Area.
• Soil testing for suspected contaminated soils.
Professional Services Included
1. Testing for Contaminated Soils (PSI as a Subconsultant to Brander Engineering) Fee: $2,764
As a subconsultant to SEH through Brander Engineering, PSI provided soil testing for suspected
contaminated soils encountered during excavation.
2. Architectural Services (SEH) Fee: $8,750
Architectural Scope: The proposed scope of work includes design services for City -requested
improvements to upgrade and make ADA-accessible the men's and women's locker rooms in the
office area, as well as the toilet rooms in the maintenance area.
3. Structural Engineering (SEH) Fee: $15,200
Structural Engineering Scope: The proposed scope of work includes design services for the
removal and replacement of the retaining wall located within the Fuel Tank/Public Rubbish Drop-
Page 113 of 183
Mr. Scott Thoreson
City of De Pere MSB Expansion
Page 2
Engineers | Architects | Planners | Scientists
Short Elliott Hendrickson Inc., 425 West Water Street, Suite 300, Appleton, WI 54911- 6058
920.380.2800 | 888.413.4214 | 888.908.8166 fax | sehinc.com
SEH is 100% employee -owned | Affirmative Action –Equal Opportunity Employer
off Area.
4. Civil Engineering (raSmith) Fee: $15,568
Civil Engineering Scope: The proposed scope of work includes design services for site
modifications within the Fuel Tank/Public Rubbish Drop-Off Area.
5. Electrical, Plumbing, and HVAC Engineering (MSA Professional Services) Fee: $13,970
MEP Engineering Scope: The proposed scope of work includes design services for locker room
and toilet room upgrades, wash bay modifications, and electrical upgrades to the existing office
area.
6. Special Inspections (Brander Engineering) Fee: $170,170
As a subconsultant to SEH, Brander Engineering is providing DSPS-required special inspections
for the main facility and storage building expansion. This fee is an estimate and will be billed
based on time and expenses incurred.
Proposed Fee
Our fee for these services shall be on a lump-sum basis for Items 1 through 5 and on a time-and-expense
basis for Item 6. Monthly invoices will be based on work completed during the calendar month preceding
the invoice date.
The additional professional service fees proposed in this contract revision are in addition to the fees
previously established under the existing agreement.
A breakdown of the above fees is as follows:
1. Fee for the additional services identified in Items 1 through 5 above: $56,253
2. Estimated fee for the additional services identified in Item 6 above, on a time-and-materials basis:
$170,170
3. Expenses: No additional expenses have been identified as part of these proposed professional
services.
Please let me know if this proposal meets your approval, after which our standard contract will be
forwarded to you for signature. If you have any questions or concerns regarding this proposal, please
contact me at 920.585.4320.
Short Elliott Hendrickson Inc. (SEH
®) appreciates the opportunity to submit this proposal to the City of De
Pere (client) for professional architectural and engineering services as required for scope changes to the
renovated MSB facility and proposed new Public Works office improvements in De Pere, Wisconsin
(Project).
Sincerely,
Trevor M. Frank, NCARB, AIA, PMP, LEED AP
Sr. Architect / Project Manager
(Lic WI, AZ, FL, GA, IA, IL, IN, KY, MI, MN, NC, ND, OH, RI, SD, TN, VA.)
CC: File
Page 114 of 183
City of De Pere, Wisconsin
Request for Common Council Action
8.B
Meeting Date: October 20, 2026
Department: Public Works
From: Thomas Blohowiak , Maintenance Supervisor
Subject: Resolution #26-101 Approving contract for HVAC
preventive maintenance with Tweet - Garot Mechanical,
Inc.
Recommendation: Motion to approve.
The Board of Public Works at the October 12, 2026 meeting approved a 3-year contract
with TweetGarot Mechanical for Preventative Maintenance Service on City HVAC
Equipment in the amount of $78,184.99. The motion passed with a 5-0 vote.
Attachments:
Reso26-101, Tweet Garot Mechanical(HVAC Preventive Maintenance)10-15-2026,
Exhibits-TweetGarot Mechanical, Memo for Preventative Maintenance for HVAC
Equipment 2023, Hurckman Mechanical Industries Inc. Proposal, Email notice to
Hurckman, Bassett Mechanical email
Page 115 of 183
RESOLUTION #26-101
APPROVING CONTRACT FOR HVAC PREVENTIVE MAINTENANCE
BETWEEN THE CITY OF DE PERE AND TWEET - GAROT MECHANICAL, INC.
WHEREAS, the City requires preventive maintenance services for all HVAC related
equipment owned by the City; and
WHEREAS, Tweet - Garot Mechanical, Inc. – De Pere has available and offers to provide
personnel and equipment necessary to accomplish the requested preventive maintenance
services within the required timeframe; and
WHEREAS, the Board of Public Works has reviewed such proposal and recommends
approval thereof.
NOW, THEREFORE, BE IT HEREBY RESOLVED THAT:
The City Manager and City Clerk are authorized and directed to execute the
attached City of De Pere Contract for Purchase of Services with Tweet – Garot
Mechanical, Inc. (HVAC Preventative Maintenance Services), subject to such
changes as deemed necessary by the City Attorney.
BE IT FURTHER RESOLVED THAT:
All City officials, officers, and employees are authorized and directed to take
such steps as are lawful and necessary in furtherance thereof.
Adopted by the Common Council of the City of De Pere, Wisconsin, this 20th day of
October, 2026.
APPROVED:
James G. Boyd, Mayor
ATTEST:
Carey E. Danen, City Clerk
Ayes: _____
Nays: _____
Board/Committee Approval: 10/12/2026
Page 116 of 183
1
Contract for Services Version: 4/23/2026
CITY OF DE PERE
CONTRACT FOR PURCHASE OF SERVICES
1. PARTIES.
This is a Contract between the City of De Pere, a Wisconsin municipal corporation, hereafter referred to as the
"City" and Tweet/Garot Mechanical, Inc. – De Pere, hereafter referred to as "Contractor."
The Contractor is a:
2. PURPOSE.
The purpose of this Contract is as set forth in Section 3.
3. SCOPE OF SERVICES AND SCHEDULE OF PAYMENTS.
Contractor will perform the following services and be paid according to the following schedule(s) or attachment(s):
City’s Request for Proposals dated , attached hereto as Exhibit A and Consultant’s Proposal thereto dated September 28, 2026,
attached hereto as Exhibit B.
The date for each progress payment should be the 3rd Tuesday of each month. The period covered by each Application for
Payment starts on the day following the end of the preceding period and ends the 4th Friday of the month.
4. ORDER OF PRECEDENCE.
In the event of a conflict between the terms of this Contract and the terms of any document attached or incorporated herein,
the terms of this Contract, the City’s requests for proposals/bids, the version of the Contractor’s proposal/bid that was accepted
by the City, and the City’s Purchase Order (if any) shall control and supersede any such conflicting term.
5. TERM AND EFFECTIVE DATE.
This Contract shall become effective upon execution by the City Manager and the City Clerk (or the Purchasing Agent if so
authorized) on behalf of the City of De Pere, unless another effective date is specified in the attachment(s) incorporated in Section
3. The effective date of this Contract shall be January 1, 2027. The term of this Contract shall be three years, terminating on
December 31, 2029, with the option of two additional years (2030/2031), pursuant to the attached Schedule C Price Quote in
Exhibit B.
6. ENTIRE AGREEMENT.
This Contract for Purchase of Services, including any and all attachments, exhibits and other documents referenced in Section 3
(hereafter, “Agreement” or “Contract”) is the entire Agreement of the parties and supersedes any and all oral contracts and
negotiations between the parties. If any document referenced in Section 3 includes a statement that expressly or implicitly disclaims
the applicability of this Contract for Purchase of Services, or a statement that such other document is the “entire agreement,”
such statement shall be deemed rejected and shall not apply to this Contract.
7. ASSIGNABILITY/SUBCONTRACTING.
Contractor shall not assign or subcontract any interest or obligation under this Contract without the City's prior written approval.
All of the services required hereunder will be performed by Contractor and employees of Contractor.
8. DESIGNATED REPRESENTATIVE
A. Contractor designates as Contract Agent with primary responsibility for the performance of this
Contract. In case this Contract Agent is replaced by another for any reason, the Contractor will designate another
Contract Agent within seven (7) calendar days of the time the first terminates his or her employment or responsibility
using the procedure set forth in Section 14, Notices.
☒Corporation ☐Limited Liability Company ☐General Partnership ☐LLP
☐Sole Proprietor ☐Unincorporated
Association
☐Other:
_____________________
Page 117 of 183
2
Contract for Services Version: 4/23/2026
B. In the event of the death, disability, removal or resignation of the person designated above as the Contract agent, the
City may accept another person as the Contract agent or may terminate this Agreement under Section 25, at its option.
9. PROSECUTION AND PROGRESS.
A. Services under this Agreement shall commence upon written order from the City to the Contractor, which order will
constitute authorization to proceed; unless another date for commencement is specified elsewhere in this Contract
including documents incorporated in Section 3.
B. The Contractor shall complete the services under this Agreement within the time for completion specified in Section 3
and Section 5, the Scope of Services, including any amendments. The Contractor's services are completed when the City
notifies the Contractor in writing that the services are complete and are acceptable. The time for completion shall not
be extended because of any delay attributable to the Contractor, but it may be extended by the City in the event of a
delay attributable to the City, or in the event of unavoidable delay caused by war, insurrection, natural disaster, strikes,
labor disputes, epidemic or pandemic, or other unexpected event beyond the control of the Contractor. If at any time
the Contractor believes that the time for completion of the work should be extended because of unavoidable delay
caused by an unexpected event, or because of a delay attributable to the City, the Contractor shall notify the City as
soon as possible, but not later than seven (7) calendar days after such an event. Such notice shall include any justification
for an extension of time and shall identify the amount of time claimed to be necessary to complete the work.
C. Services by the Contractor shall proceed continuously and expeditiously through completion of each phase of the work.
D. Progress reports documenting the extent of completed services shall be prepared by the Contractor and submitted to
the City with each invoice under Section 23 of this Agreement, and at such other times as the City may specify, unless
another procedure is specified in Section 3.
E. The Contractor shall notify the City in writing when the Contractor has determined that the services under this
Agreement have been completed. When the City determines that the services are complete and are acceptable, the
City will provide written notification to the Contractor, acknowledging formal acceptance of the completed services.
10. AMENDMENT.
This Contract shall be binding on the parties hereto, their respective heirs, devisees, and successors, and cannot be varied or
waived by any oral representations or promise of any agent or other person of the parties hereto. Any other change in any
provision of this Contract may only be made by a written amendment, signed by the duly authorized agent or agents who executed
this Contract.
11. EXTRA SERVICES.
The City may request the Contractor to perform extra services or decreased services, according to the procedure set forth in
Section 23.B. Extra services or decreased services means services which are not different in kind or nature from the services called
for in the Scope of Services, Section 3, but which may increase or decrease the quantity and kind of labor or materials or expense
of performing the services. Extra services may not increase the total Contract price, as set forth in Section 22, unless the Contract
is amended as provided in Section 10 above.
12. NO WAIVER.
No failure to exercise, and no delay in exercising, any right, power or remedy hereunder on the part of the City or Contractor shall
operate as a waiver thereof, nor shall any single or partial exercise of any right, power or remedy preclude any other or further
exercise thereof or the exercise of any other right, power or remedy. No express waiver shall affect any event or default other
than the event or default specified in such waiver, and any such waiver, to be effective, must be in writing and shall be operative
only for the time and to the extent expressly provided by the City or Contractor therein. A waiver of any covenant, term or
condition contained herein shall not be construed as a waiver of any subsequent breach of the same covenant, term or condition.
13. SEVERABILITY.
It is mutually agreed that in case any provision of this Contract is determined by any court of law to be unconstitutional,
illegal or unenforceable, it is the intention of the parties that all other provisions of this Contract remain in full force and
effect.
14. NOTICES.
All notices to be given under the terms of this Contract shall be in writing and signed by the person serving the notice and shall
be sent registered or certified mail, return receipt requested, postage prepaid, or hand delivered to the addresses of the parties
listed below:
Page 118 of 183
3
Contract for Services Version: 4/23/2026
FOR THE CITY:
City of De Pere
Attn: City Manager
335 South Broadway Street
De Pere, WI 54115
FOR THE
CONTRACTOR: Josh Andrews, Service Sales Account Representative
Tweet-Garot Mechanical, Inc. – De Pere
325 Reid Street
De Pere, WI 54115
15. STATUS OF CONTRACTOR/INDEPENDENT/TAX FILING.
The parties hereto agree that the Contractor, its officers, agents, and employees, in the performance of this agreement shall act in
the capacity of an independent contractor and not as an officer, employee, or agent of the City. The Contractor agrees to take such
steps as may be necessary to ensure that each subcontractor of the Contractor will be deemed to be an independent contractor
and will not be considered or permitted to be an agent, servant, joint venturer, or partner of the City.
Contractor shall provide a valid IRS W9 form to the City prior to payment. The Contractor is informed that as an independent
Contractor, they may have a responsibility to make estimated tax returns, file tax returns, and pay income taxes and make social
security payments on the amounts received under this Contract and that no amounts will be withheld from payments made to this
Contractor for these purposes and that payment of taxes and making social security payments are solely the responsibility and
obligation of the Contractor. The Contractor is further informed that they may be subject to civil and/or criminal penalties if they
fail to properly report income and pay taxes and social security taxes on the amount received under this Contract.
16. GOODWILL.
Any and all goodwill arising out of this Contract inures solely to the benefit of the City; Contractor waives all claims to benefit of such
goodwill.
17. THIRD PARTY RIGHTS.
This Contract is intended to be solely between the parties hereto. No part of this Contract shall be construed to add, supplement,
amend, abridge or repeal existing rights, benefits or privileges of any third party or parties, including but not limited to employees
of either of the parties.
18. AUDIT AND RETAINING OF DOCUMENTS.
The Contractor agrees to provide all reports requested by the City including, but not limited to, financial statements and reports,
reports and accounting of services rendered, and any other reports or documents requested. Financial and service reports shall
be provided according to a schedule (when applicable) to be included in this Contract. Any other reports or documents shall be
provided within five (5) working days after the Contractor receives the City's written requests, unless the parties agree in writing
on a longer period. Payroll records and any other documents relating to the performance of services under the terms of this
Contract shall be retained by the Contractor for a period of three (3) years after completion of all work under this Contract, in
order to be available for audit by the City or its designee.
19. CHOICE OF LAW.
This Contract shall be governed by and construed, interpreted and enforced in accordance with the laws of the State of Wisconsin.
The parties agree, for any claim or suit or other dispute relating to this Contract that cannot be mutually resolved, the venue shall
be Brown County Circuit Court or the United States District Court for the Eastern District of Wisconsin.
20. CONTRACTOR COMPLIANCE AND RESPONSIBILITY.
A. LAWS TO BE OBSERVED/LICENSING AND PERMITS.
(1) The Contractor shall give all notices and shall at all times comply with and observe all federal and state laws,
local laws, ordinances, and regulations which are in effect during the period of this Contract and which in any
manner affect the work or its conduct. The Contractor shall indemnify and hold harmless the City and its
Page 119 of 183
4
Contract for Services Version: 4/23/2026
officers, agents and employees against any claim or liability arising from or based on the violation of any such
law, ordinance, or regulation whether by Contractor or its employees, subcontractors, or agents. The City
reserves the right to cancel this Contract if the Contractor fails to follow the requirements of s. 77.66, Wis.
Stats., and related statutes regarding certification for collection of sales and use tax. The City also reserves
the right to cancel this Contract with any state or federally debarred contractor or a contractor that is
presently identified on the list of parties excluded from federal procurement and non-procurement contracts.
(2) Contractor shall procure and be required to demonstrate valid possession of appropriate required permits and
licenses necessary and incidental to the work required hereunder and will keep them in effect for the term of
this Contract. The Contractor shall also be required, when appropriate to obtain the necessary building
permits prior to performing work on City facilities.
B. WORK SAFETY AND HEALTH.
(1) The Contractor shall comply with all federal, state and local laws governing work safety and health and shall
provide all safeguards, safety devices and protective equipment, and take any other needed actions as the
Contractor or the City may determine reasonably necessary , to protect the life and health employees on the
job and the safety of the public and to protect the property in connection with the performance of the work
covered by the Contract.
C. CONTRACTOR’S RESPONSIBILITY FOR WORK.
(1) Until acceptance of the work by the City, as provided under Section 9(E), the Contractor shall have the charge
and care thereof and shall take every precaution against injury or damage to any part thereof by the action
of the elements, or from any other cause, whether arising from the execution of nonexecution of the work.
The Contractor shall rebuild, repair, restore and make good all injuries or damages to any portion of the work
occasioned by any of the above cause before acceptance and shall bear the expense thereof, except damage
to the work due to unforeseeable causes beyond control of and without the fault of negligence of the
Contractor, including but not restricted to acts of God, of public adversaries or of governmental authorities.
In case of suspension of work from any cause whatever, the Contractor, prior to suspension, shall take such
precautions as may be necessary to prevent damage to the project, provide for normal drainage and shall
erect any necessary temporary barricades, signs or other facilities, at the Contractor’s expense, as directed
by the City.
21. CONFLICT OF INTEREST.
A. The Contractor warrants that it and its agents and employees have no public or private interest and will not acquire
directly or indirectly any such interest, which would conflict in any manner with the performance of the services under
this Agreement.
B. The Contractor shall not employ or Contract with any person currently employed by the City for any services included
under the provisions of this Agreement.
22. COMPENSATION.
It is expressly understood and agreed that in no event will the total compensation under this Contract exceed $ .
23. BASIS FOR PAYMENT.
A. GENERAL.
(1) The City will pay the Contractor for the completed and accepted services rendered under this Contract on the
basis and at the Contract price set forth in Section 22 of this Contract. The City will pay the Contractor for
completed and approved "extra services," if any, if such "extra services" are authorized according to the
procedure established in this section. The rate of payment for "extra services" shall be the rate established in
this Contract. Such payment shall be full compensation for services rendered and for all labor, material,
supplies, equipment and incidentals necessary to complete the services.
(2) The Contractor shall submit itemized invoices, on the form or format approved by the City and as may be
further specified in Section 3 of this Contract. The City will pay the Contractor in accordance with the schedule,
if any, set forth in Section 3. The final invoice, if applicable, shall be submitted to the City within three months
of completion of services under this Agreement.
(3) Payment shall not be construed as City acceptance of unsatisfactory or defective services or improper materials.
(4) Final payment of any balance due to the Contractor will be made upon acceptance by the City of the services
under the Agreement and upon receipt by the City of documents required to be returned or to be furnished
Page 120 of 183
5
Contract for Services Version: 4/23/2026
by the Contractor under this Agreement.
(5) The City has the equitable right to set off against any sum due and payable to the Contractor under this
Agreement, any amount the City determines the Contractor owes the City, arising under this Agreement.
(6) Compensation in excess of the total Contract price will not be allowed unless authorized by an amendment
under Section 10, AMENDMENT.
(7) The City will not compensate for unsatisfactory performance by the Contractor.
B. SERVICE ORDERS, EXTRA SERVICE, OR DECREASED SERVICE.
(1) Written orders regarding the services, including extra services or decreased services, will be given by the City,
using the procedure set forth in Section 14, NOTICES.
(2) The City may, by written order, request extra services or decreased services, as defined in Section 11 of this
Contract. Unless the Contractor believes the extra services entitle it to extra compensation or additional time,
the Contractor shall proceed to furnish the necessary labor, materials, and professional services to complete
the services within the time limits specified in the Scope of Services, Section 3 of this Agreement, including
any amendments under Section 10 of this Agreement.
(3) If in the Contractor's opinion the order for extra service would entitle it to extra compensation or extra time,
or both, the Contractor shall not proceed to carry out the extra service, but shall notify the City, pursuant to
Section 14 of this Agreement. The notification shall include the justification for the claim for extra
compensation or extra time, or both, and the amount of the additional fee or time requested.
.
(4) The City shall review the Contractor's submittal and respond in writing, either authorizing the Contractor to
perform the extra service, or refusing to authorize it. The Contractor shall not receive additional
compensation or time unless the extra compensation is authorized by the City in writing.
24. WARRANTY OF MATERIALS AND WORKMANSHIP.
The Contractor warrants all materials furnished and work performed under this Agreement to be free of defects in materials and
workmanship for a period of one (1) year from the date of final payment (the “Warranty Period”). The Contractor shall, at its
expense and within a reasonable time after receipt of written notice from the City, promptly repair or replace any defective
materials or workmanship. Any repair or replacement performed under this warranty shall itself be warranted for one (1) year
from the date of repair or replacement. If the Contractor fails to commence correction within thirty (30) days of notice, the City
may correct the defect and recover cost from the Contractor. The Contractor shall also obtain and assign to the City all warranties
from any and all subcontractors, manufacturers, and suppliers, and shall enforce the same for the benefit of the City.
25. CANCELATION/TERMINATION.
A. The City reserves the right to cancel any contract in whole or in part without penalty due to non-appropriation of funds.
B. The City may terminate this Contract for any reason upon 30 days prior written notification to Contractor. Termination by City
will entitle Contractor to payment for only those goods or services delivered, received and accepted and not subsequently
rejected by the City.
C. In the event the Contractor shall default in any of the covenants, agreements, commitments, or conditions and any such default
shall continue unremedied for a period of ten (10) days after written notice to the Contractor, the City may, at its option and in
addition to all other rights and remedies which it may have, terminate the Contract and all rights of the Contractor under the
Contract.
D. Failure to maintain the required certificates of insurance, permits, licenses and bonds will be cause for Contract termination. If
the Contractor fails to maintain and keep in force the insurance, if required, the City shall have the right to cancel or terminate
the Contract without notice.
26. INDEMNIFICATION.
Contractor hereby agrees to indemnify, defend and hold harmless the City of De Pere its elected and appointed officials, officers,
employees, agents, representatives and volunteers, and each of them, from and against any and all suits, actions, legal or
administrative proceedings, claims, demands, damages, liabilities, interest, attorneys’ fees, costs and expenses of whatsoever
kind or nature in any manner directly or indirectly caused, occasioned, or contributed to in whole or in part or claimed to be
caused, occasioned, or contributed to in whole or in part, by reason of any act, omission, fault, or negligence, whether active or
Page 121 of 183
6
Contract for Services Version: 4/23/2026
passive, of Contractor or of anyone acting under its direction or control or on its behalf, even if liability is also sought to be
imposed on City of De Pere, its elected and appointed officials, officers, employees, agents, representatives and volunteers. The
obligation to indemnify, defend and hold harmless the City of De Pere, its elected and appointed officials, officers, employees,
agents, representatives and volunteers, and each of them, shall be applicable unless liability results from the sole negligence of
the City of De Pere, its elected and appointed officials, officers, employees, agents, representatives and volunteers. Contractor shall
reimburse the City of De Pere, its elected and appointed officials, officers, employees, agent or authorized representatives or
volunteers for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity
herein provided. In the event that Contractor employs other persons, firms, corporations or entities (sub-contractor) as part of
the work covered by this Agreement, it shall be Contractor’s responsibility to require and confirm that each sub-contractor enters
into an Indemnity Agreement in favor of the City of De Pere, its elected and appointed officials, officers, employees, agents,
representatives and volunteers, which is identical to this Indemnity Agreement. This indemnity provision shall survive the
termination or expiration of this Agreement.
27. LIMITATION OF LIABILITY
Neither City nor Contractor will be liable for any loss of use, interruption of business, lost profits, or any indirect, special,
incidental, or consequential damages of any kind regardless of the form of action whether in contract, tort (including negligence),
strict product liability, or otherwise, even if it has been advised of the possibility of such damages.
28. INSURANCE.
It is hereby agreed and understood that the insurance required by the City of De Pere is primary coverage and that any insurance
or self-insurance maintained by the City of De Pere, its officers, council members, agents, employees or authorized volunteers
will not contribute to a loss. This insurance shall be written for not less than any limit of liability specified herein, or required by
law, whichever is greater, notwithstanding that the policy may have lower limits applying elsewhere in the policy. All applicable
insurance and endorsements shall be in full force and evidenced prior to commencing work and remain in force until the entire
job is completed or the length of time that is specified in the Contract.
1. GENERAL LIABILITY COVERAGE
Commercial General Liability. Policy will be written to provide coverage for, but not limited to, the following: Premises and
Operations Liability, Products and Completed Operations, Personal Injury, Blanket Contractual Liability coverage for the
joint negligence of the City of De Pere, its officers, council members, agents, employees, authorized volunteers and the
named insured, Broad Form Property Damage, Independent Contractor’s coverage, and coverage for Property Damage
from Perils of Explosion, Collapse, or Damage to Underground Utilities (commonly known as XCU coverage). Limits of
liability not less than:
1. $2,000,000 general aggregate;
2. $1,000,000 products/completed operations aggregate per project;
3. $1,000,000 personal injury and advertising injury per project; and
4. $1,000,000 each occurrence limit.
2. AUTOMOBILE LIABILITY COVERAGE
A. Minimum Limits - $1,000,000 Combined Single Limit for Bodily Injury and Property Damage each accident
B. Business automobile policy must cover liability for "Any Auto" - including Owned, Non-Owned private passenger automobile
and commercial vehicles and Hired automobiles
3. UMBRELLA LIABILITY
Coverage to be in excess of employers’ liability, commercial general liability, and automobile liability insurance required above.
Limits of liability not less than $2,000,000 each occurrence, $4,000,000 aggregate.
4. WORKERS COMPENSATION AND EMPLOYERS’ LIABILITY
Workers Compensation and Employers’ Liability Insurance. Statutory workers compensation benefits and employers’ liability
insurance with a limit of liability no less than $1,000,000 each accident. This policy shall be endorsed to include a waiver of
subrogation in favor of City. Contractor shall require subcontractors and others not protected under its insurance to obtain and
maintain such insurance.
5. PROPERTY COVERAGE
Property Insurance. Each party to this Agreement will be responsible for maintaining property insurance on its own facilities,
buildings, and other improvements, including all equipment, fixtures, and City structures, fencing, or support systems that may
be placed on, within, or around City Facilities to fully protect against hazards of fire, vandalism, and malicious mischief, and such
other perils as are covered by policies of insurance commonly referred to and known as “extended coverage” insurance.
Page 122 of 183
7
Contract for Services Version: 4/23/2026
6. ADDITIONAL PROVISIONS
* Additional Insured – The City of De Pere, and its elected or appointed officials, officers, employees, agents and authorized
volunteers shall be named as “Additional Insureds” on all Liability policies.
* Waiver of Workers Compensation Subrogation - The workers’ compensation policy is to be endorsed with a waiver of
subrogation. The insurance company, in its endorsement, agrees to waive all rights of subrogation against the City, its officers,
officials, employees and volunteers for losses paid under the terms of the policy that arises from the work performed by the
named insured for or on behalf of the City of De Pere.
* Certificates of Insurance – Certificates of Insurances, Commercial General, Umbrella and Additional Insured
Endorsements acceptable to the City shall be submitted prior to commencement of the work.
* Endorsement -The Additional Insured and Workers’ Compensation Subrogation Waiver policy endorsements must
accompany the Certificate of Insurance.
* Occurrence Basis – All policies, other than workers compensation, shall be written on an occurrence and not on an claims-
made basis.
* Notice - City of De Pere requires thirty (30) day advance written notice of cancellation.
* Acceptability of Insurers - No insurance required hereunder shall be carried with an insurer not authorized to do business
in Wisconsin. The City reserves the right to disapprove of any insurance company. A minimum rating of no less than A and
Financial Size Category of no less than Class VI is required.
* Prohibited Exclusions - No policies of insurance required to be obtained by Contractor or its contractors or subcontractors shall
contain provisions (1) that exclude coverage of liability assumed by this Agreement with City except as to infringement of
patents or copyrights or for libel and slander in program material, (2) that exclude coverage of liability arising from excavating,
collapse, or underground work, (3) that exclude coverage for injuries to City’s employees or agents, or (4) that exclude coverage
of liability for injuries or damages caused by Contractor’s contractors or contractors employees, servants, or agents.
Proof of Insurance, Approval. The Contractor shall provide the City with certificate(s) of insurance showing the type, amount,
effective dates, and expiration dates of required policies prior to commencing work under this Contract. Contractor shall provide
the certificate(s) to the City’s representative upon execution of the Contract, or sooner, for approval by the City. If any of the
policies required above expire while this Contract is still in effect, Contractor shall provide renewal certificate(s) to the City for
approval. Certificate Holder language should be listed as follows:
City of De Pere
335 South Broadway
De Pere, WI 54115
The Contractor shall provide copies of additional insured endorsements or insurance policies, if requested by the City. The
Contractor and/or Insurer shall give the City thirty (30) days advance written notice of cancellation, non-renewal or material
changes to any of the above-required policies during the term of this Contract.
29. CONFIDENTIAL INFORMATION
Each party (on its behalf and on behalf of its subcontractors, employees or representatives, or agents of any kind) agrees to hold
and treat all confidential information of the other party, including, but not limited to, trade secrets, sales figures, employee and
customer information and any other information that the receiving party reasonably should know is confidential (“Confidential
Information”) as confidential and protect the Confidential Information with the same degree of care as each party uses to protect
its own Confidential Information of like nature.
Confidential Information does not include any information that (i) falls under Wisconsin Public Records Law (see section 28) at
the time of the disclosure or thereafter is lawfully obtained from publicly available sources generally known by the public (other
than as a result of a disclosure by the receiving party or its representatives); (ii) is available to the receiving party on a non-
confidential basis from a source that is not and was not bound by a confidentiality agreement with respect to the Confidential
Information; or (iii) has been independently acquired or developed by the receiving party without violating its obligations under
this Agreement or under any federal or state law.
30. OPEN RECORDS
Both parties understand that the City is bound by the Wisconsin Public Records Law, and as such, responses and contracts are
subject to and conditioned on the provisions of the law. Contractor acknowledges that it is obligated to assist the City in retaining
and producing records that are subject to Wisconsin Public Records Law, and that the failure to do so shall constitute a material
breach of the Contract, and that the Contractor must defend and hold the City harmless from liability under that law. Except as
otherwise authorized, those records shall be maintained for a period of seven (7) years after receipt of final payment under the
Contract.
31. OWNERSHIP OF CONTRACT PRODUCT.
Page 123 of 183
8
Contract for Services Version: 4/23/2026
All of the work product, including, but not limited to, documents, materials, files, reports, data, including magnetic tapes, disks
of computer-aided designs or other electronically stored data or information (the "Documents"), which the Contractor prepares
pursuant to the terms and conditions of this Contract are the sole property of the City. The Contractor will not publish any such
materials or use them for any research or publication, other than as expressly required or permitted by this Contract, without the
prior written permission of the City. The grant or denial of such permission shall be at the City's sole discretion.
The Contractor intends that the copyright to the Documents shall be owned by City, whether as author (as a Work Made For Hire),
or by assignment from Contractor to City. The parties expressly agree that the Documents shall be considered a Work Made For
Hire as defined by Title 17, United States Code, Section 101(2).
As further consideration for the City entering into this Contract, the Contractor hereby assigns to City all of the Contractor's rights,
title, interest and ownership in the Documents, including the right to procure the copyright therein and the right to secure any
renewals, reissues and extensions of any such copyright in any foreign country. The City shall be entitled to the sole and exclusive
benefit of the Documents, including the copyright thereto, and whenever required by the City, the Contractor shall at no additional
compensation, execute all documents of assignment of the full and exclusive benefit and copyright thereof to the City. Any
subcontractors and other independent Contractors who prepare portions of the Documents shall be required by the Contractor
to execute an assignment of ownership in favor of the City before commencing work.
32. FORCE MAJEURE.
Neither party shall be in default by reason of any failure in performance of this contract in accordance with reasonable control
and without fault or negligence on their part. Such causes may include, but are not restricted to, acts of nature or the public
enemy, acts of the government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions,
strikes, freight embargoes and unusually severe weather, but in every case the failure to perform such must be beyond the
reasonable control and without the fault or negligence of the party.
33. AUTHORITY.
Contractor represents that it has the authority to enter into this Contract. If the Contractor is not an individual, the person
signing on behalf of the Contractor represents and warrants that he or she has been duly authorized to bind the Contractor
and sign this Contract on the Contractor’s behalf.
34. COUNTERPARTS, ELECTRONIC DELIVERY.
This Contract may be signed in counterparts, each of which shall be taken together as a whole to comprise a single document.
Signatures on this Contract may be exchanged between the parties by facsimile, electronic scanned copy (.pdf) or similar
technology and shall be as valid as original. Executed copies or counterparts of this Contract may be delivered by facsimile or
email and upon receipt will be deemed original and binding upon the parties hereto, whether or not a hard copy is also
delivered. Copies of this Contract, fully executed, shall be as valid as an original.
SIGNATURE PAGE FOLLOWS
Page 124 of 183
IN WITNESS WHEREOF, the parties hereto have set their hands at De Pere, Wisconsin.
CONTRACTOR:
By: _____________________________________
(Signature)
(Print Name and Title of Person Signing)
Date:
By: _________________________________
(Signature)
_________________________________
(Print Name and Title of Person Signing)
Date: _______________________________
CITY OF DE PERE
A Wisconsin municipal corporation:
By:
Kimberly T. Flom, City Manager
Date:
By:
Carey E. Danen, City Clerk
Date:
Page 125 of 183
JULY 10-AUGUST 3
CITY OF DE PERE
ADVERTISEMENT FOR QUOTES
HVAC PREVENTATIVE MAINTENANCE
The City of De Pere accepts quotes to conduct Preventative Maintenance on all HVAC equipment
within the city. Proposals are due by September 30, 2026, at 2:30 pm at the Municipal Service Center
at 925 South Sixth Street, De Pere, WI, 54115. Interested contractors are welcome to participate in a
city walkthrough on September 22th, starting at 8:00am at the Community Center (600 Grant Street).
Any questions or concerns may be directed to Thomas Blohowiak, Maintenance Supervisor at
(920) 339-4072 ext. 2250, or e-mail at tblohowiak@deperewi.gov
Agreement:
• The agreement shall be a period of three (3) years, with an option to renew on a yearly basis
contingent on both parties’ approval for a maximum total of five (5) years.
• The city will use its standard Contractor Agreement (sample attached). No standard terms and
conditions of any firm or entity responding to this proposal will be incorporated into the
Contractor Agreement.
Scope of Services:
• Conduct a spring and fall maintenance check of listed HVAC related equipment owned by
the City of De Pere. Spring PM to be completed by end of May and Fall PM completed by
November 15.
• Provide a status/condition report of each piece of equipment within one (1) week of seasonal
maintenance completion.
• Cover all necessary labor and preventative maintenance to maintain listed HVAC related
equipment. Preventative Maintenance shall consist of cleaning, aligning, calibrating,
adjusting, changing filter, replacing belts, and lubricating. Schedule A provides a general
list of HVAC related equipment owned by the City of De Pere.
• Submit Schedule B and C for consideration.
Customer Responsibilities:
• Customer assumes that all equipment is in satisfactory working condition. Any equipment
found in need of repair upon initial inspection or seasonal start -up will be reported to the
owner’s representative with a written estimate to repair the item in question.
• Repair work shall not commence unless authorized by City representative.
• Customer will provide all belts and air filters for replacement.
• Customer will cover the cost of repair parts outside of preventative maintenance agreement.
• Redesign, repair, or adaptation of any equipment due to the obsolescence or unavailability of
refrigerant and/or replacement parts is beyond the scope of the agreement.
• Customer shall provide reasonable means of access to all equipment.
• Customer shall make available all Material Safety Data Sheets.
• Customer agree to pay for any authorized work performed outside of preventative maintenance
contract.
Exhibit A
Page 126 of 183
Submittal Requirements:
• Contractor shall submit all required documents by the deadline.
• Contractor must submit Schedule B indicating contact information and references related to
preventative maintenance.
• Contractor shall submit Schedule C, indicating proposed fees.
Questions:
For any questions or to review City HVAC equipment please contact Thomas Blohowiak, Maintenance
Supervisor at (920) 339-4072 ext. 2250, or e-mail at tblohowiak@deperewi.gov
Page 127 of 183
V. 06/26 P a g e | 1
September 28, 2026
Mr. Thomas Blowhowiak
City of De Pere
925 S. Sixth St.
De Pere, WI 54115
RE: HVAC Preventive Maintenance Agreement Effective 1/1/27-12/31/29
Dear Tom:
If selected, our pricing is contingent on meeting to clarify the scope and equipment list. During the walk through,
several units were identified as requiring service less often than the spring and fall maintenance checks as required in
the Scope of Services section. Calibrating is listed as a required maintenance step, quantities of pneumatic & other
devices requiring calibration will also need to be confirmed. Also, equipment quantities will need to be verified
based on the construction at the Municipal Service Center and an effort to maintain uniformity across City proper-
ties.
Our Proposal includes:
❖ Perform 24/7/365 emergency service and repairs as needed
❖ Priority status over non-agreement customers
❖ Repairs and service calls charged out at our “AA” rate which changes June 1st of each year in line with the
Union collective bargaining agreement
Our proposal does not include:
• Provision of a second technician to accommodate a two man rule.
• Air compressor at the community center as it is a component of a life safety system
• Any equipment not called out specifically in the included equipment list received via email 9/22/26
• Belts, Filters, Humidification equipment, parts of any kind, refrigerants, and chemicals, which will be billed as
material sale if not provided by customer
• Labor to perform service outside of normal business hours
• Rental of a lift to service various equipment, which will be billed at 15% over cost if not supplied by customer
This proposal is valid for 30 days.
Our standard payment terms are net 30 days. Interest will be charged on past due accounts at 1.5% per month. Pay-
ments made via credit card are subject to a 2.5% service charge.
Exhibit B
Page 128 of 183
V. 06/26 P a g e | 2
In no event shall Tweet/Garot be responsible for lost, misdirected, misallocated, or misplaced Customer funds other-
wise intended for the satisfaction of invoice(s) but directed to non-affiliated third-parties, including Contractor. Cus-
tomer acknowledges and agrees it is the sole responsibility of Customer to confirm application and allocation of Cus-
tomer funds to the correct invoice(s), and agrees to indemnify and hold harmless Tweet/Garot regarding the same.
Acceptance of any proposal will be based upon receipt of a signed copy of this proposal or a written purchase order.
All purchases are subject to Tweet/Garot Contract Terms and Conditions (see attached). Work will not commence
prior to receipt of written authorization as stated above.
Projects may be progress billed. Any applicable tax is not included in this proposal. If this project is tax-exempt, an
exemption certificate must be submitted with your purchase order.
Thank you for the opportunity to submit this proposal. Please call (920) 606-7325 or e-mail
josh.adrews@tweetgarot.com with any questions.
Sincerely,
TWEET/GAROT MECHANICAL, INC. – De Pere
Josh Andrews
Service Sales Account Representative
ACCEPTANCE OF PROPOSAL:
By: ____________________________________________ Date: __________
P.O. No. _______________________________________________________
Page 129 of 183
City of De Pere
HVAC Preventative Maintenance
Schedule A
Generalized Inventory of HVAC
The list below is a representation of HVAC units and equipment throughout the City of De Pere. The
list should be used as a guide and not as an accurate inventory. Contractors are welcome to visit or
contact City representatives to get further information.
Location
Community Center HW Boilers Hot Water Pumps Train Condenser unit
Or Chiller unit
Air Handler Unit
Municipal Service
Center
Hot Water Boilers Roof Top Units Oil Fired Unit
Heater
Make-up air units
City Hall HW Boilers HW Pumps Split System Units Air Handler Units
Roof Condenser Roof Top Packaged
Unit
Water
Department Building
Ninth St Pump
Station HW Boiler
Fire Station (East) HW Boilers Hot Water Pumps Roof Condenser Air Handler Unit
Police Station Roof Top Packaged
Unit
Park Pool Buildings Pool boilers VFW
Part of Spring PM
Pool Boilers Legion
Part of Spring PM
Legion boiler for heat
In Fall
Page 130 of 183
City of De Pere
HVAC Preventative Maintenance
2. Company: Mulva Cultural Center Phone: 920-309-8200
Address: 221 S. Broadway
Contact Person: Jim Brozak De Pere, WI 54115
___________________
3. Company: St. Norbert College Phone: _920-337-3181
Address:__100 Grant St
Contact Person: Ryan Guillette _De Pere, WI 54115
___________________
Schedule B
Contact and Reference Page
Schedule B should be completed accurately and completely. For questions or concerns, contact
Thomas Blohowiak, Maintenance Supervisor at (920) 339 -4072 ext. 2250, or e -mail at
tblohowiak@deperewi.gov. Proposals shall be submitted to the Municipal Service Center by September
30, 2026, at 2:30 pm. The Municipal Service Center is located at 925 South Sixth Street, De Pere, WI,
54115.
Contact Information
Company Name: Tweet Garot Mechanical, Inc.
Contact Person: Josh Andrews E-mail: josh.andrews@tweetgarot.com
Phone: Cell Phone: 920-606-7325
Address: 325 Reid St
De Pere, WI 54115
Reference Information
1. Company: Greater Green Bay YMCA Phone: 920-436-9622
Address: 235 N. Jefferson St
Contact Person: Tom Wyckoff Green Bay, WI 54301
Page 131 of 183
City of De Pere
HVAC Preventative Maintenance
Schedule C
Price Quote
Please indicate price quotes based on the scope of services for each of the indicated City of De Pere
locations. Price quotes should reflect the total fee per year Fall PM and Spring PM.
(Note the Municipal Service Center is under construction in 2027)
Location Price
2027 2028 2029
Community Center $4,225.00 $4,415.13 $4,613.81
Municipal Service Center $9,314.87 $9,734.04
City Hall $6,017.25 $6,288.03 $6,570.99
Water Department $757.50 $791.59 $827.21
Fire Department (East) $3,104.25 $3,243.94 $3,389.92
Police Station $1,398.00 $1,460.91 $1,526.65
Park Pool Buildings $3,349.00 $3,499.71 $3,657.19
Total (Year –2027)
Total (Year - 2028)
Total (Year - 2029)
Grand Total
Percent Increase (Year 2030) 6%
Percent Increase (Year 2031) 5%
$18,851.00
$29,014.18
$30,319.81
$78,184.99
Page 132 of 183
Tag Building Location Type Manufacturer Installed date Website Comments Belts Filter size Filters
ACCU-1 City Hall HVAC > Air Conditioning Unit McQuay (1)-4L180 & 4L220
AHU-1 City Hall HVAC > Air Handling Unit Lennox 7/28/2016 (1)-4L350 (8)-20x20x2
AIR-1 City Hall Air Compressor Curtis (2)-4L480
BOL-1 City Hall HVAC > Boiler PK boiler
BOL-2 City Hall HVAC > Boiler Pk boiler
HUM-1 City Hall HVAC > Humidifier Dri-Steem
P-1 City Hall HVAC Taco
P-2 City Hall HVAC Taco
P-3 City Hall HVAC Taco
P-4 City Hall HVAC Taco
RTU-1 City Hall HVAC Trane
ACCU-1 Community Center HVAC > Air Conditioning Unit chiller unit
AHU-1 Community Center HVAC > Air Handling Unit Trane (2)-3x475 (8)-20x25x2 (2)-20x20x2
AIR-1 Community Center Air Compressor
BOL-1 Community Center HVAC > Boiler Trinity 1/18/2016
BOL-2 Community Center HVAC > Boiler Trinity
BP-1 Community Center HVAC
BP-2 Community Center HVAC
GRILLE Community Center HVAC
P-1 Community Center HVAC B&G
P-2 Community Center HVAC B&G
ACCU-1 Fire Station #1 HVAC > Air Conditioning Unit
AHU-1 Fire Station #1 HVAC > Air Handling Unit Trane (1)-B44 & A37 (8)-20x20x2
AIR-1 Fire Station #1 Air Compressor Quincy Compressor
BOL-1 Fire Station #1 HVAC > Boiler PK boiler
BOL-2 Fire Station #1 HVAC > Boiler Pk boiler
MAUH-1 Fire Station #1 HVAC > Makeup Air Handling Unit (1) B62 (4) 16x20x2
REF-1 Fire Station #1 HVAC Trane
BOL-1 MSC HVAC > Boiler PK boiler
BOL-2 MSC HVAC > Boiler PK boiler
P-1 MSC HVAC Armstrong
P-2 MSC HVAC Armstrong
P-3 MSC HVAC B&G
P-4 MSC HVAC B&G
MUA-1 Police Station HVAC > Makeup Air Handling Unit Weather Rite
RTU Police Station HVAC Aaon
BLR-1 Pool, Legion HVAC > Boiler Peerless
BLR-2 Pool, Legion HVAC > Boiler Ray Pack
BLR-1,2,3 Pool, VFW HVAC > boilers, 3 for pools
BLR-1
Water Dept, 9th Street
Pump Station and Tower HVAC > Boiler Lochinvar
Page 133 of 183
Inventory Location Model Number Serial # Serial number ID
Belts Rooftop - Air Cooled Condensing Unit-Serves: AHU-1 245091
Filters & BeltsIst Floor/ Mechanical Room - Air Handling unit-1CB17-275V-1 245090
Belts Office/Basement 245046
1st Floor/ Mechanical Room 245093
1st Floor/ Mechanical Room 245094
Humidifier gas fired GTS-150 1020196
Pump P-1 Serves: Boiler B-3 1611C3N1 1020197
Pump P-2-Serves: Boiler B-4 1611C3N1 1020199
Pump P-3-Serves: Bldg Heat 1915C1N1 1020200
Pump P-4-Serves: Bldg Heat 1915C1N1 1020201
Rooftop unit-1 SLHFC25EBV37C3BD9001000E000KL000T008000C00G21148 1020203
Northside/Outside Building - Condenser 244996
Filters and BeltsMechanical Room MCCA025 244994
1st Floor/Fire Suppression Closet 245036
Mechanical Room LB1000 980 A99 48902 244999
Mechanical Room NRI LX800 82062 245000
Boiler Pump 1019668
Boiler Pump 1019669
Return grilles Intake/Exhaust for AHU-1 1019671
Hot Water System Pump 1019676
Hot Water System Pump 1019677
Roof - 20 ton Condenser 245134
Filters and BeltsBasement - Air Handler - Serves MCCA012GAY K00F06491A 245133
Air Compressor QC01006D00146 5133712 1020147
Basement - Hot water bolier - B-1 245138
Basement - Hot water bolier - B-2 245139
Filters and BeltsOutside /Front of Building F165 BDJ31KC3N56911X 245142
Return Air Fan-Serves: AHU-1 MCCA010GAY 1020184
245048
245049
System Pump 1019655
System Pump 1019656
Hot Water System Pump Basement 1019657
Hot Water System Pump Sign Shop FBOU000400178 CAH014FDAC 1019658
Make-up Air Unit Range GGBRT-30 J12011691580030G1 1027698
Roof Top Unit-Aaon-30 Ton 1030294
Boiler 1 1026738
Boiler 2 1026739
boiler 1, 2, 3 1027599
Boiler 1 1027635
Page 134 of 183
City
of
De
Pere
HVAC
Preventative
Maintenance
Schedule
A
Generalized
Inventory
of
HVAC
The
list
below
is
a representation
of
HVAC
units
and
equipment
throughout
the
City
of
De
Pere.
The
list
should
be
used
as
a
guide
and
not
as
an
accurate
inventory.
Contractors
are
welcome
to
visit
or
contect
City
renresentatives
to
get
further
information
contact
City
representatives
to
get
further
information.
LocationCommunity
Center
HW
Boilers
Hot
Water
Pumps
Municipal
Service
CeCity
Hall
Hot
Water
Boilers
Roof
Top
Units
HW
Boilers
HW
Pumps
Roof
Condenser
Roof
Top
Packaged
Train
Condenser
unit
Or
Chiller
unit
Oil
Fired
Unit
HeaterSplit
System
Units
Air
Handler
Unit
Make-up
air
units
Air
Handler
Units
Unit
WaterDepartment
Building
Fire
Station
(East)
Police
Station
Park
Pool
Buildings
Ninth
St
Pump
Station
HW
Boiler
HW
Boilers
Hot
Water
Pumps
Roof
Condenser
Roof
Top
Packaged
UnitPool
Pool
boilers
boilers
VFWVFW
Pool
Boilers
Legion
Legion
boiler
for
heat
Part
of
Spring
PM
Part
of
Spring
PM
In
Fall
Air
Handler
Unit
Page 135 of 183
A
CHLLE
ING
DET
NIR
COOLE
AIR
COOLED
WATER
CHILLER
SCHE
CHEDULE
NOTES:
PUMP
SCHEDULE
SCHEDULE
NOTES:
BUFFER
TANK
SCHEDUL
TAS
LOCATICN
MAMFACTURER
MOEL
T
SCHEDULE
NOEL
E ANASME
RATED
FRESSURE
VESSEL
DESCAED,
FABMLAC
IF NOT
FURN
SHED
NTEGRAL
TO
ARVENT,
TYP
SCHARGE
TO
GLYC
NSTALL
UNT
BLO
NECTION
ION
UNTS
WT
CHILED
WATE
ROL
AND
COOLING
COIL
SCHEDULE
TAG
LOCATON
COL
TIPE
EXPANSION
TANK
SCHEDULE
TAG
LOCATION
SCHEDULE
NOTES:
FAN
ARRAY
SCHEDULE
TAG
SERVCE
LOCATION
TCH,
AND
MANUAL
SPEED
CONTROLLER
DE PERE COMMUNITY CENTER
AHU UPGRADE
600 GRANT STREET, DE PERE, WI 54115
twee arot
325 REID STREET
www.TWERTGAROT.COM
DOCUMENTS
SCHEDULES
AS
SH
M601
THIS
LINE
SHOULD
MEASURE
1'
LON
Page 136 of 183
8/20/2023 10/26:11 AM
PACKAGED
ROOFTOP
UNITS
-
GAS/DX
OF
CFM
SERVICE
SYSTEM
STOOF
NO.
ING
LAB
& SIGN
RTU-1
STH
SZVAV
970
100
SUPPLY
FAN
FAN
HP
TYPE
TYPE
VFD
FILTE
OFFICES
VAV
12,00
2,65025
ENERGY
RECOVERY
UNITS
NO.RU-2ERU
SERVICE
GARAGE
ADDITION
GARAGE
ADDITION
EXT.
S.P.
CFM
OF
CFM
OF
IN
IN.
STD.
AIR
OA.
WATER
10,1006,.100
16,100
0.75
1.19
11
GAS
FIRED
UNIT
HEATERS
UNITNO.
GARAGEADOLT
ION
GUH-19
VEHICLE
MAINTENANCE
MOTOR
STARTERS
COA
MBH105,000
GAS
OUTPUT
AEWINTER
TYPE
HP
ODP
YES
2"
NERV
IE
SUPPLY
SIDE
1.
D.B.
W..
E.A.T.
15
MBH
STD.
AIR
87,150
¥333333333
12
MOCP
MOTOR
HP
VOLTAGE
PHASE
KW
GAS
PRES
OR
2
~
02 23 2 3 20
VFD
EXCHANGER
万万万万
ਨ ਨ ਨ ਨ
SUPPROOF
CURB
YES
ROOF
YESYES
GRILLES
AND
DIFFUSERS
VENT
DIA
FUEL
VENT
CFM
OF
EXHAUST10,2503,259
IN
IN.as
10,250
0.5
SUMMER
E.A.T.
SUM
65
°F
49.2
oF
87
°F
W.B.
81
65
F
49.2°F
65
Coo
AIR
AIR
TONS
TYPE
TEMP
IG
SECTIONMIN.
NO.
OF
AIR
COOLING
DESIGN
DIMENSIONS
VIBRATION
ISOLATORS
CONDENSER
FANS
NO.
TYPE
EER
WIDTH
LENGTH
HEIGHT
LBS.
TEMP.
STAGES
NO.
PEE29
4-0
6-2
3-4
1,000
40
R454b
77.7
°F
53
MOTOR
TYPE
WYPE
TEF
UNDERCUT
DOORS
F
DIGITAL
4
PROP.
8.7
8-5"
19-53/4
9-10"
6,500
DESIGN
DIMENSION
UPPORT
ROOF
CURB
SPTYPE
DEFLECT.EFLECT
MANUF.
MODEL
SEH
ROOF
CURB
SP
0-1"
AAON
RN
MANUF
17-2
9-
RENEWAIRE
LE10XR
3,000
RENEWAIRE
LE6XRTV
ROOF
CURB
4-10
6-1
ROOF
CURB
1,500
RENEWAIRE
HEXRTV
17-2
9-
4,000
RENEWAIRE
LE10XRTV
Project
Oaner
DIFFOSER
FIN.
FL.
NECK
ROUND
है हैं हैं हैं हैं हैं हैं
ВЕNOR
UBXC-150
REZNOR
UBXC-150
OR
UBXC-150
REZNOR
UBXC
OR
UBXC-150
ZNOR
UBXC
ZNOR
UBXC
REZNOR
UBXC-100
NAME/NO.
SYMBOL
DESCRIPTION
UNDERCUT
SIZE
CONN.
SIZE
DAMPER
E
LOCATION
DUCT
SIZE
EG-1
EXHAUST
GRILLE
12x12
0.01
DUCT
TAKEOFF
AIR
PATTERN
EGGCRATE
MODELPRICE
80
EG-3
EXHAUST
GRILLE
16x16
140
DUCT
TAKEOFF
EGGCRATE
PRICE
80
SIDEWALL
EXHAUST
GRILLE
12x8
-DUCT
TAKEOFF
45°
PRICE
530
RG-
RETURN
GRILLE
12x12
100
DUCT
TAKEOFF
EGGCRATE
PRICE
80
SIDEWALL
SUPPLY
GRILLE
40x24
DUCT
TAKEOFF
MSА
(600)
362-4505
www.maa-pa.c
SG-2
22.5°
PRICE
520
SIDEWALL
SUPPLY
GRILLE
22x12
DUCT
TAKEOFF
SG-3
22.5°
PRICE
520
PLAQUE
DIFFUSER
24x24
8.0
DUCT
TAKEOFF
4-WAY
PRICE
SPD
PLAQUE
DIFFUSER
24x24
10.0
DUCT
TAKEOFF
4-WAY
PRICE
SPD
SIDEWALL
SUPPLY
GRILLE
22x10
DUCT
TAKEOFF
22.5°
PRICE
520
SIDEWALL
SUPPLY
GRILLE
16x8
DUCT
AKEOFF
PURNISHED
INSTALLED
STARTER
RកកកA
BYHAC
LOCATIONPREWIRED
IREO
YMBOLS
STARTER
ARKS
A
PRE-WIREDMPRE-WIREDDAEGREDY
SP.SW.
WIREDWIREDR UNTT
AR UNIT
SP.SW.
WIREDWIREDWIREDWIREDWIREDWIRED
E-WIRED
ACY
PREY
DECMUPOT.
AR UNIT
MAN
AR UNIT
MAN.
AR
UNIT
MANMAN.MAN
UNITR UNIT
MAN
UNIT
MANL
UNIT
MANMAN
RED
INTERLOCK
W/CORR.
OUTDOOR
UNIT
AR
UNIT
AR
UNIT
AR UNIT
VFDVFDVFD
-WIRED
ECM/VFD
WIRED
ECM/VFD
RED
ECM/VFDCHуPOT
IRED
ECM/POT.
IRED
ECM/POT.
IRED
ECM/POT.
IRED
ECMYPOT.ECM/POT.
MAe
E
1 三
22.5°
PRICE
520
TG-1
TRANSFER
GRILLE
22x22
SEE
SHEET
EGGCRATE
PRICE
80
TG-2
SIDEWALL
TRANSFER
GRILLE
24x12
45°
PRICE
530
TG-4TG-S
TRANSFER
GRILLE
12x12
TRANSFER
GRILLE
16x16
10.0140
EGGCRATEEGGCRATE
PRICE
80
PRICE
80
GENERAL
NO
FLOW
DIRECTION
GAS
VALVE
A.
THE
MECHANIC
E PREMISES
AND
TAKE
NOTE
OF
ALL
EXISTING
CONDITIONS
WHICH
MAY
AFFECT
HIS
WORK
AN
HE PREPARATION
OF HIS
BIO.
LACK
OF
INFORMATION
ON
EXISTING
FORMATION
ON
EXISTING
ADDITIONAL
COMPENSATION
LOW
PRESS
MANUAL
VOLUME
DAMPER
UNDERCUT
BY
GEN,
CONTR
ROOM
SE
ENSOR
OR
THERMOSTAT
HUMOUM
DISTAT
CARBON
DIOXIDE
DE
SEN
REMOTE
MOUNTE
CONNECT
TO
EXISTING
DUCTWORK
ORMENTONG.
INSTALLED
IN ACCORDANCE
WITH
THE
SPECIFICATIONS
INCLU
INSTALLED
IN
ACCORDANCE
WITH
TLETE
CONTRACT
DOCUMENTS
QUIPMENT
BRANCH
PIPE
SIZING
TABL
SCREPANCY
BE
THE
EQUIPMENT
SCHEDULE
AND
THE
PIPE
SIZING
TABLE,
THE
PIPE
SIZING
TABLE
SHALL
TAKE
PRECEDEN,
SIZE
103
HIOS
EXIBLE
DUC
MANUAL
VOLUME
DAMPER
CCESSIBLE
DUCT
ACCESS
DOOR
FIRE
DAMPERMPER
VWITH
ACCESSIBLE
ISTICAL
INSULA
DUCT.
LISTED
DMENSIO
ENSION
IS CLEAR
INSIDE
DIMENSION
DUCT.
UISTED
DMENMENSION
IS
CLEAR
INSIDE
DMENS
EXTERNAL
INSULATION
ON
AND
WEATHERPROOF
JACKET
ON
TURNING
VANE
NING
VANE
ECHANICAL
CONTRACTOR
CHARACTERISTICS
AT
JOB
SITE
PRIOR
TO
ORDERING
EQUIPMENT
GRILLE
LOCATIONS
WITH
THE
FINAL
LIGHTING
LAYOUOTLET
AND
ECTRICAL,
STRUCTURA
EQUIREMENT
EQUIPQUIPMENT
MANUFACTURER
LISTED
ON
THE
SCHEDULE
IS
REFLECTED
ON
N THE
DOCUMENTS
OF
ANY
MODIFICATIONS
NECES
ECESSARY
TO
ACCOMMODATE
A MANUFACTURER
OTHER
THAN
THAT
STED
IS
THE
RESPONSIBILITY
COORDI
PHASING
WITH
THE
GENERA
ER.
PROVIDE
TEMPORARY
PIPING,
DUCTWORK,
VENTILATION,
CONTROLS,
ETC.
AS
EQUIRED
TO
ACCOMMODATE
CONSTRUCTION
ROUTE
ALL
NEW
PIPING
AND
D
QUIRED
TO
AVOID
CONPLICTS
WITH
EXISTING
PIPING,
CONOUIT,
STRUCTURE,
LIGHTING,
ETC.
PROVIDE
ALL
OFFSETS,
IRED
TO
ETWEEN
POINT
City of De Pere
Municipal Services Center Renovation
925 S Sixth St
PROFE
ENGINE
ONAL
E
H202H205H206H207H301H302H303H304H305H401
MSA
JOB
No.
20487096
SCHEDULES
DEMOLITION
FLOOR
PLAN-OVERALL
BEROLIION
P
DEMOLITION
DEMOLITION
PLAN-OVERALL
PLAN-OVERALL
ROOFROOF
FIRST
FIRST
FLOOR
FLOOR
PLAN-
PLAN-AREA
AREA
11
FIRST
FIRST
FLOOR
FLOOR
PLAN-
PLAN
-
AREA
AREA
22
FIRST
FLOOR
PLAN
-AREA
4
OVERALL
ROOF
PLAN
PLENUM
PLAN
-AREA
FIRST
FLOOR
PIPING
PLAN
-
AREA
BASEMENT
PIPING
PLAN
-
AREA
1
FIRST
FLOOR
PIPING
PLAN
-AREA
2
FIRST
FLOOR
PIPING
PLAN
-AREA
3
FIRST
FLOOR
PIPING
PLAN
-
AREA
4
DETAILSDETAILS
BOSETREXREX
EESCRPTONDESCEPTONSCHEDULES01
H001
Page 137 of 183
AIR
COOLED
COMPRESSOR-CONDENSING
UNITS
No.NO.
SERVICE
COMP
SUCTIONSUCTION
TONS
REF.
TYPE
E OF
REDUCTION
SEER
TEMP
ONDENSER
NO.
OF
FANS
FAN
TYPE
DESIGN
DIMENSIONS
WEIG
DIRECT
EQUIP.
SUP.
RAILS
2-111/2
2-111/2
LBS.200
MANUF,
MODEL
GAS
FIRED
MAKE-UP
AIR
UNITS
UNIT
CFM
OF
SERVICE
STD.
AI
CFM
OF
O.A.
FEXT.
S.P.
IN
IN.
WATER
GASINPUT
GASOUTPUT
MEATING
SECTION
VIBRATION
ISOLAIORS
MBH
M6H
TYPE
TYPE
NIT
TO
BE
PROVIDED
AS
A
PART
OF
ALTERNATE
H-1
ON
AS
PART
OFA
9,000
9,000
TYOE
DEFLECT.
LENGTH
HEIGHT
WELOS
GREENHECK
DGX-P124
CABINET
HEATERS
CABINET
HEATERS
NO.
SERVICE
АP,
MBI
STD.
AIR
HPMOTOR
TYPE
SPEED
RECESS
ABOVEFIN.
FL.
ENT.
H20
TEMP.
LV.H20TEMP.
GLYCOL
CH-2
AIR
LO
0-8
160F
GPM
PIPE
SIZE
MODEL
VEST
WOMEN
1
160
°F
160
f
160
3/4
VARIABLE
AIR
VOLUME
BOXES
NO.
STD.
AIR
OF
STD.
AIR
DUCT
SIZEREAM
P.D.
IN IN.
OF
W
ENT
AIR
AINTENANCE
1-13
600
180
100
602
SSFSF
MAINTERANCE
OYFICE
1-1
R 1-143,
WATER
OFFICE
REAK
ROO1-14
CONFERENCE
1-133
1000
320
OFFICE
1-130
OFFICE
1-129
CONFERENCE
1-132
OFFICE
1-128
OFFICE
1-127
OFFICE
1-126
OFFICE
1-125
OFFICE
1-124
OFFICE
1-121
20
100
OFFICE
1-123
OFFICE
1-122
OFFICE
1-120
RECEPTION
1-101
OFFICE
CUBBICLES
1-117
OFFICE
CUBBICLES
1-116
COPY
1-112,
SUPPLY
1-114
-29
OFFICE
1-108
OFFICE
1-109
CE
1-110
ENGINEERINGFILE
ROOM
1-004
EXERCISE
AREA
1-013
EXERCISE
AREA
1-01
UNIT
HEATERS
-
ROOF
EXHAUSTЕ
ERS
EXISTING
GARAGEARAGE
KISTING
GARA
EPAIR
GAR
TOILETSESTINGOOM
FL
CFMSTD.
AIR
WATER
MOT
RHP
TOR
十年年年年年年年年年年年年年99年年年年年年
ENT.TEMP160
F ATING
COILTEMP.
RECTPIRERECT
CONTROL
VFD
ECN
M/VFD
DAMPERBY
B.A
GLYCOL
PIPE
SIZE
ABOVE
FIN.
GREBGREEGREE
GREENHGREENHGREEGNEGRE
GPM
PIPE
SIZE
RITTLING
LING
02
ROOM
AIR
CONDITIONING
UNITS
OUTDOOR
UNITS
LOW
UNIF
NO.
SERVICE
TYPE
YE
S.
STD.
AIRAR
CAP,
T)
(U
17F
NOYONS
SEK
SUPPORT
HEAT
HANU.MODRE
CAP
FURNACES
TGAS
PRES
UNINO.
SERVICE
STD
AIRDA
WATER
VE
N
SPIO
MODE
KITCHEN
EXHAUST
HOODS
PRICES
NO.
SERVICE
STD.
AIR
WIDTH
LENGTH
HEIGHT
(IN.
W.C.)
SIZE
WEIGHT
CONSTRUCTION
HOOD
SYSTEM
MODEL
K
BREAK
ROO
H.
RISER
HANGING
MOA
WEATHERPROOF
HOODS
THROAT
DIMENSIONS
WPH-
TYPE
WIDTH
LENGTH
EXISTING
MAU-4
(9%
OF
THROAT
AREA)
☐
ABOVE
ROOP
MIN.
OPENING
HEIGHT
MODEL
ELECTRIC
WALL
HEAТЕ
RS
STASTATAL
MANUF.
MODEL
VES
QMARK
AVWH
UNITNO.
SERVIC
PRICE
SDV
ECESS
EWH-1
ELEVATOR
SHAFT
EWH-2
PRIC
STORAGE
1-002
PRICPRIL
SDV
01/2"
PRICE
SDV
2
3/4
PRICE
SDV
1
PRICE
SDV
PRIO
ESDV
3/4
PRICE
SDV
PRICE
SOV
PICE
SEPARATED
COMBUSTION
G
NO.DE
ERVICE
ST
OF
ERU
DF-3
ERU-
GAS
FIRED
DUCT
FURNACES
GAS
INBUT
SOUTPUT
GAS
TYPE
(PSI)
VENT
VENT
DIA.
DESTRATIFICATION
FANS
-
HVLS
DIA
CONTROL
PANEL
12-0
BAS
INTEGRATION
15-0"
DS-2
VARIABLE
FREQUENCY
DRIVES
BLADEHEIGHT
BIG
ASS
POWERFOIL8
SEH
Prolect
Daner
MSA
(600)
362-4505-www.msa-ps.comCity of De Pere
Municipal Services Center Renovation
925 $ Sixth St
KEV/SION
BCHEDVLE
SCHEDULES01
H002
2
Page 138 of 183
马。
ST
FLOOR
PLAN
-
OVERALL0
8
1
X
*
REV
CESCARTOA
KEY
PLAN
FIRST
OVERAL
LAN-
01
H200
D
Priect
Dener
(600)
352-45
MSА
2-4505+
www
msa-pa.c
COPYRIGHT 0202
City of De Pere
Municipal Services Center Renovation
925 S Sixth St
DATE
SEH
Page 139 of 183
To: Honorable Mayor Boyd
Members of the Board of Public Works
From: Thomas Blohowiak, Maintenance Supervisor
Date: October 12,2026
RE: Consider Preventative Maintenance Contract for City Heating Ventilation and Air Conditioning
(HVAC) Equipment*
Several departments throughout the City of De Pere have HVAC Equipment. Over the last 3 years
Hurckman Mechanical even though they are lowest in price. They have failed to meet the standards of
the current contract, so we went out for new RFP.
The City of De Pere requested proposals from 5 vendors for this service. Hurckman Mechanical is our
current vendor for PM Service. Only 1 vendor did the walk through the buildings. The following two
quotes (see attached) were received for consideration. Attached is the email I sent with the attempt to
get Hurckman Mechanical to meet the contract requirements. They did not send out the required
information. Attached is an email from Bassett Mechanical declining to bid at this time.
Vendors Total
(Year - 2027)
Total
(Year - 2028)
Total
(Year - 2029)
Grand Total
Tweet Garot
Mechanical
$18.851.00 $29.014.18 $30,319.81 $78,184.99
Hurckman
Mechanical Industries
$10.256.70 $13.138.00 $13.491.13 $36.885.83
Bassett
Mechanical
X X X X
A&J
Mechanical
X X X X
Robinson Heating &
Cooling
X X X x
Attached
1. RFP HVAC PM 2026 final
2. TweetGarot Mechanical Proposal
3. Hurckman Mechanical Industries Inc. Proposal
4. Bassett Mechanical email
5. Email notice to Hurckman
Staff is recommending the contract be given to TweetGarot Mechanical for the Preventative
Maintenance service.
Page 140 of 183
JULY 10-AUGUST 3
CITY OF DE PERE
ADVERTISEMENT FOR QUOTES
HVAC PREVENTATIVE MAINTENANCE
The City of De Pere accepts quotes to conduct Preventative Maintenance on all HVAC equipment
within the city. Proposals are due by September 30, 2026, at 2:30 pm at the Municipal Service Center
at 925 South Sixth Street, De Pere, WI, 54115. Interested contractors are welcome to participate in a
city walkthrough on September 22nd, starting at 8:00 am at the Community Center (600 Grant Street).
Any questions or concerns may be directed to Thomas Blohowiak, Maintenance Supervisor at
(920) 339-4072 ext. 2250, or e-mail at tblohowiak@deperewi.gov
Agreement:
• The agreement shall be a period of three years, with an option to renew on a yearly basis contingent on
both parties approval for a maximum total of 5 Years.
• The City will use its standard Contractor Agreement (sample attached). No standard terms and
conditions of any firm or entity responding to this proposal will be incorporated into the Contractor
Agreement.
Scope of Services:
• Conduct a spring and fall maintenance check of listed HVAC related equipment owned
by the City of De Pere. Spring PM to be completed by the end of May and Fall PM
completed by November 15.
• Provide a status/condition report of each piece of equipment within one week of seasonal
maintenance completion.
• Cover all necessary labor and preventative maintenance to maintain all HVAC related equipment.
Preventative Maintenance shall consist of cleaning, aligning, cali brating, adjusting, change filter,
replace belts, and lubricating. Schedule A provides a general list of HVAC related equipment
owned by the City of De Pere.
• Submit Schedule B and C for consideration.
Customer Responsibilities:
• Customer assumes that all equipment is in satisfactory working condition. Any equipment
found in need of repair upon initial inspection or seasonal start -up will be reported to the
owner’s representative with a written estimate to repair the item in question.
• Repair work shall not commence unless authorized by City representative.
• Customer will provide all belts and air filters for replacement.
• Customer will cover the cost of repair parts outside of preventative maintenance agreement.
• Redesign, repair, or adaptation of any equipment due to the obsolescence or unavailability of refrigerant
and/or replacement parts is beyond the scope of the agreement.
• Customer shall provide reasonable means of access to all equipment.
• Customer shall make available all Material Safety Data Sheets.
• Customer agree to pay for any authorized work performed outside of preventative maintenance contract.
Submittal Requirements:
• Contractor shall submit all required documents by deadline.
• Contractor must submit Schedule B indicating contact information and references related to preventative
maintenance.
• Contractor shall submit Schedule C, indicating proposed fees.
Page 141 of 183
Questions:
For any questions or to review City HVAC equipment please contact Thomas Blohowiak, Maintenance
Supervisor at (920) 339-4072 ext. 2250, or e-mail at tblohowiak@mail.de-pere.org.
Page 142 of 183
City of De Pere
HVAC Preventative Maintenance
Schedule A
Generalized Inventory of HVAC
The below list is a representation of HVAC units and equipment throughout the City of De Pere. The
list should be used as a guide and not as an accurate inventory. Contractors are welcome to visit or
contact City representatives to get further information.
Location
Community Center Hot Water Boilers Hot Water Pumps Trane Condenser or
Chiller Units
Air Handling Unit
Air Compressor
Municipal Service
Center
Hot Water
Boilers
Air Handling Unit Air Conditioning Unit Make Up Air Units
Hot Water Pumps
City Hall Air Conditioning Units
Trane & McQuay
Lennox Air Handling Unit Air Compressor Hot Water Boilers
Humidifier Roof Top Unit Hot Water Pumps
Water Department
Building
Ninth St Pump
Station - Boiler
Fire Station East Hot Water Boilers Air Compressor Air Handling Unit Air Conditioning
Unit
Make Up Air Unit REF – Trane
Police Station Make Up Air Unit Roof Top Unit
Park Pool Buildings –
VFW & Legion
VFW Pool Boilers Legion Pool Boiler &
Building Boiler
Page 143 of 183
City of De Pere
HVAC Preventative Maintenance - RFP
Schedule B
Contact and Reference Page
Schedule B should be completed accurately and completely. For questions or concerns, contact Thomas
Blohowiak, Maintenance Supervisor at (920) 339 -4072 ext. 2250, or e -mail at tblohowiak@mail.de-
pere.org. Proposals shall be submitted to the Municipal Service Center by Wednesday, September 30th,
20206, at 2:30 pm. The Municipal Service Center is located at 925 South Sixth Street, De Pere, WI
54115.
Contact Information
Company Name: Hurckman Mechanical Industries, Inc
Contact Person: Clayton Aderholdt
E-mail claytonaderholdt@hurckman.com
Phone (Dispatch): (920) 327-4258
Cell Phone (920) 615-1950
Address: 164 N. Broadway, Green Bay, WI 54303
Reference Information
1. Company: Nicolet Bank
Phone: (920) 617-5588
Contact Person: Jim Edmondson
Address: Several Locations
In Green Bay
__________________
2. Company: Associated Banks
Phone: (920) 431-8072
Contact Person: Steve Kerscher
Address: Several Locations
In Green Bay
__________________
3. Company: Wisconsin Public Service
Phone: (920) 445-0778
Contact Person: Wade Handrich
Address: Several Locations
In NE Wisconsin
__________________
Page 144 of 183
City of De Pere
HVAC Preventative Maintenance
Schedule C
Price Quote
Please indicate price quotes based on the scope of services for each of the indicated City of De Pere
locations. Price quotes should reflect a total fee per year.
Location Price
2027 2028 2029 TOTALS
Community Center 2,113.69 2,171.50 2,229.31 6,514.50
Municipal Service Center 2,528.19 2,598.50 2,668.81 5,267.31
City Hall 3,008.69 3,091.50 3,174.31 9,274.50
Water Department Building
9th Street, Pump Station and
Tower
447.50 460.00 472.50 1,380.00
Fire Station (East) 1,689.13 1,736.00 1,782.88 5,208.00
Police Station 783.13 805.00 826.88 2,415.00
Park Pool Buildings – Legion
& VFW
2,214.56 2,275.50 2,336.44 6,826.50
Total (Year –2027) $10,256.70
Total (Year - 2028) $13,138.00
Total (Year - 2029) $13,491.13
Grand Total $36,885.83
Percent Increase (Year 2030) 2.75%
Percent Increase (Year 2031) 3.00%
Page 145 of 183
1
Thomas Blohowiak
From: Thomas Blohowiak
Sent: Wednesday, September 30, 2026 11:02 AM
To: 'claytonaderholdt@hurckman.com'; Chris Shefchik
Subject: FW: RFP HVAC Preventative Maintenance
Attachments: RFP HVAC PM 2026 pdf.pdf; 2023-2026 contract for PM.pdf
Clayton and Chris
I am giving you noƟce that we may not allow your bid. We need the status of all our equipment per the last
contract. On the 3rd page of the aƩached contract it states, “Provide a status/condiƟon report of each piece of
equipment within one (1) week of seasonal maintenance compleƟon.” By October 7 I will need to see the report
for all our equipment, or we will not except your proposal .
I also noƟced you did not use the new schedule C from the aƩached packed with your submission. Please use the new
schedule C.
Thomas Blohowiak
Maintenance Supervisor | City of De Pere
925 S Sixth St | De Pere, WI 54115
Tel: (920) 339-4072 x 2250 |Cell: (920) 639-1336
Fax: (920) 339-4071
From: Thomas Blohowiak <tblohowiak@deperewi.gov>
Sent: Friday, September 11, 2026 8:39 AM
To: Thomas Blohowiak <tblohowiak@deperewi.gov>
Subject: RFP HVAC Preventative Maintenance
The City of De Pere accepts quotes to conduct Preventative Maintenance on all HVAC equipment within the
city. Proposals are due by September 30, 2026, at 2:30 pm at the Municipal Service Center at 925 South Sixth
Street, De Pere, WI, 54115. Interested contractors are welcome to participate in a city walkthrough on September
22nd, starting at 8:00 am at the Community Center (600 Grant Street). Any questions or concerns may be directed
to Thomas Blohowiak, Maintenance Supervisor at
(920) 339-4072 ext. 2250, or e-mail at tblohowiak@deperewi.gov
Agreement:
The agreement shall be a period of three (3) years, with an option to renew on a yearly basis contingent
on both parties’ approval for a maximum total of five (5) years.
The city will use its standard Contractor Agreement (sample attached). No standard terms and conditions
of any firm or entity responding to this proposal will be incorporated into the Contractor Agreement.
Scope of Services:
Conduct a spring and fall maintenance check of listed HVAC related equipment owned by the City of
De Pere. Spring PM to be completed by the end of May and Fall PM completed by November 15.
Provide a status/condition report of each piece of equipment within one (1) week of seasonal
maintenance completion.
Cover all necessary labor and preventative maintenance to maintain listed HVAC related
equipment. Preventative Maintenance shall consist of cleaning, aligning, calibrating, adjusting,
changing filters, replacing belts, and lubricating. Schedule A provides a general list of HVAC related
equipment owned by the City of De Pere.
Page 146 of 183
2
Submit Schedules B and C for consideration.
Customer Responsibilities:
Customer assumes that all equipment is in satisfactory working condition. Any equipment found in need
of repair upon initial inspection or seasonal start-up will be reported to the owner’s representative with a
written estimate to repair the item in question.
Repair work shall not commence unless authorized by City representative.
Customer will provide all belts and air filters for replacement.
Customer will cover the cost of repair parts outside of preventative maintenance agreement.
Redesign, repair, or adaptation of any equipment due to the obsolescence or unavailability of refrigerant
and/or replacement parts is beyond the scope of the agreement.
Customer shall provide reasonable means of access to all equipment.
Customer shall make available all Material Safety Data Sheets.
Customer agree to pay for any authorized work performed outside of preventative maintenance contract.
Submittal Requirements:
Contractor shall submit all required documents by the deadline.
Contractor must submit Schedule B indicating contact information and references related to preventative
maintenance.
Contractor shall submit Schedule C, indicating proposed fees.
Questions:
For any questions or to review City HVAC equipment please contact Thomas Blohowiak, Maintenance
Supervisor at (920) 339-4072 ext. 2250, or e-mail at tblohowiak@deperewi.gov
Page 147 of 183
3
Thomas Blohowiak
Maintenance Supervisor | City of De Pere
925 S Sixth St | De Pere, WI 54115
Tel: (920) 339-4072 x 2250 |Cell: (920) 639-1336
Fax: (920) 339-4071
Page 148 of 183
1
Thomas Blohowiak
From: Brian Bartelt <Brian.Bartelt@bassettmechanical.com>
Sent: Thursday, September 24, 2026 9:48 AM
To: Thomas Blohowiak
Subject: RE: RFP HVAC Preventative Maintenance
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the
sender and know the content is safe.
Good morning, Tom,
My apologies for the delayed response.
Thank you for including Bassett Mechanical in the HVAC maintenance RFP process. We appreciate the
opportunity and your consideration.
After careful review, we have decided to respectfully decline participation this time around. With several large
projects currently underway, as well as the ongoing efforts supporting customers affected by the recent
Menasha tornado, our resources are committed to ensuring we continue delivering the level of service our
customers expect.
We sincerely appreciate being considered and wish you the best of luck as you move through the selection
process. We value our relationship with the City of De Pere and would welcome the opportunity to be
considered again when the contract is rebid in 2029.
Thank you again, and we wish you continued success.
Best regards,
Brian Bartelt
Strategic Accounts Executive
C: +1 920-750-8704 | D: +1 920-462-1716
1-800-236-2500 | www.BassettMechanical.com
Safely delivering exceptional value
From: Thomas Blohowiak <tblohowiak@deperewi.gov>
Sent: Tuesday, September 22, 2026 11:47 AM
To: Thomas Blohowiak <tblohowiak@deperewi.gov>
Subject: RE: RFP HVAC Preventative Maintenance
CAUTION: This email originated from outside of Bassett Mechanical. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Team
AŌer the walk thru today, I had this aƩached informaƟon available for clarity. The community Center is geƫng a new
chiller system to replace the Trane AC unit. The MSC is geƫng new equipment per the schedule aƩached. If you have
any quesƟon please reach out.
Thomas Blohowiak
Page 149 of 183
2
Maintenance Supervisor | City of De Pere
925 S Sixth St | De Pere, WI 54115
Tel: (920) 339-4072 x 2250 |Cell: (920) 639-1336
Fax: (920) 339-4071
From: Thomas Blohowiak
Sent: Friday, September 11, 2026 8:39 AM
To: Thomas Blohowiak <tblohowiak@deperewi.gov>
Subject: RFP HVAC Preventative Maintenance
The City of De Pere accepts quotes to conduct Preventative Maintenance on all HVAC equipment within the
city. Proposals are due by September 30, 2026, at 2:30 pm at the Municipal Service Center at 925 South Sixth
Street, De Pere, WI, 54115. Interested contractors are welcome to participate in a city walkthrough on September
22nd, starting at 8:00 am at the Community Center (600 Grant Street). Any questions or concerns may be directed
to Thomas Blohowiak, Maintenance Supervisor at
(920) 339-4072 ext. 2250, or e-mail at tblohowiak@deperewi.gov
Agreement:
The agreement shall be a period of three (3) years, with an option to renew on a yearly basis contingent
on both parties’ approval for a maximum total of five (5) years.
The city will use its standard Contractor Agreement (sample attached). No standard terms and conditions
of any firm or entity responding to this proposal will be incorporated into the Contractor Agreement.
Scope of Services:
Conduct a spring and fall maintenance check of listed HVAC related equipment owned by the City of
De Pere. Spring PM to be completed by the end of May and Fall PM completed by November 15.
Provide a status/condition report of each piece of equipment within one (1) week of seasonal
maintenance completion.
Cover all necessary labor and preventative maintenance to maintain listed HVAC related
equipment. Preventative Maintenance shall consist of cleaning, aligning, calibrating, adjusting,
changing filters, replacing belts, and lubricating. Schedule A provides a general list of HVAC related
equipment owned by the City of De Pere.
Submit Schedules B and C for consideration.
Customer Responsibilities:
Customer assumes that all equipment is in satisfactory working condition. Any equipment found in need
of repair upon initial inspection or seasonal start-up will be reported to the owner’s representative with a
written estimate to repair the item in question.
Repair work shall not commence unless authorized by City representative.
Customer will provide all belts and air filters for replacement.
Customer will cover the cost of repair parts outside of preventative maintenance agreement.
Redesign, repair, or adaptation of any equipment due to the obsolescence or unavailability of refrigerant
and/or replacement parts is beyond the scope of the agreement.
Customer shall provide reasonable means of access to all equipment.
Customer shall make available all Material Safety Data Sheets.
Customer agree to pay for any authorized work performed outside of preventative maintenance contract.
Page 150 of 183
3
Submittal Requirements:
Contractor shall submit all required documents by the deadline.
Contractor must submit Schedule B indicating contact information and references related to preventative
maintenance.
Contractor shall submit Schedule C, indicating proposed fees.
Questions:
For any questions or to review City HVAC equipment please contact Thomas Blohowiak, Maintenance
Supervisor at (920) 339-4072 ext. 2250, or e-mail at tblohowiak@deperewi.gov
Page 151 of 183
4
Thomas Blohowiak
Maintenance Supervisor | City of De Pere
925 S Sixth St | De Pere, WI 54115
Tel: (920) 339-4072 x 2250 |Cell: (920) 639-1336
Fax: (920) 339-4071
The City of De Pere is subject to Wisconsin Statutes related to public records. Unless otherwise
exempted from the public records law, senders and receivers of City of De Pere e-mail should presume
that e-mail is subject to release upon request, and is subject to state records retention requirements.
See City of De Pere full e-mail disclaimer at https://www.deperewi.gov/emaildisclaimer.
This e-mail (including any attachments) may contain confidential, proprietary and privileged information,
and unauthorized disclosure or use of that information is prohibited. If you received this email in error,
please notify the sender and delete this e-mail from your system.
The preceding email message and any attachments may be confidential or contain
proprietary information and should be read or used only by the intended recipient. This
message should not be transmitted to, or received by, any unauthorized person. If you
have received this message in error, please inform us promptly by reply email, then
delete this message and destroy any printed copies of this message. Thank you
Page 152 of 183
City of De Pere, Wisconsin
Request for Common Council Action
8.C
Meeting Date: October 20, 2026
Department: Public Works
From: Eric Rakers, City Engineer
Subject: Resolution #26-102 Ratifying grant application to
Wisconsin Department of Transportation (Signals and ITS
Standalone Program).
Recommendation: Motion to approve.
The Board of Public Works at the October 12, 2026 meeting approved submittal for
application of a Wisconsin Department of Transportation SISP Grant. The motion
passed with a 5-0 vote.
Attachments:
Reso26-102, 2026 1012 SISP Grant, 2026 0918 DePere STH 32 and Cook Application
Page 153 of 183
RESOLUTION #26-102
RATIFYING GRANT APPLICATION TO WISCONSIN DEPARTMENT OF TRANSPORTATION
(Signals and ITS Standalone Program)
WHEREAS, the Wisconsin Department of Transportation (WisDOT) offers the Signals and
ITS Standalone Program (SISP) to fund traffic signals and intelligent transportation systems (ITS)
projects not incidental to other highway improvement projects with greater than 50% cost
associated with traffic signal or ITS hardware and construction; and
WHEREAS, city staff is desirous of making improvements to the Broadway/Cook Street
intersection as part of the WisDOT’s resurfacing project for STH 32/57 (Broadway Street), which
is a connecting highway; however, the DOT has indicated that reconstructing the intersection is
beyond the scope of its project; and
WHEREAS, connecting highways quality for 90% state funding and a 10% local match, if
approved, for traffic signal upgrades; however, the SISP grant application process deadline did
not allow the department sufficient time to obtain prior approval of its grant application
submission, requiring the department to submit its application and request ratification of its
actions after the fact; and
WHEREAS, this matter has been reviewed by the Board of Public Works which
recommends ratification of the actions taken by the department in submitting the application.
NOW, THEREFORE, BE IT HEREBY RESOLVED THAT:
The Common Council ratifies the submission of the grant application to
the Wisconsin Department of Transportation Signals and ITS Standalone
Program Project Application.
BE IT FURTHER RESOLVED THAT:
Page 154 of 183
Resolution #26-102
Page 2 of 2
If awarded, the Common Council authorizes the Director of Public Works to sign
all necessary documents and undertake other necessary action to direct and
complete the approved project.
BE IT FURTHER RESOLVED THAT:
Any such grant awarded shall be brought before the Common Council for formal
acceptance.
BE IT FURTHER RESOLVED THAT:
All City officials, officers and employees are authorized and directed to
take such steps as are lawful and necessary in furtherance thereof.
Adopted by the Common Council of the City of De Pere, Wisconsin, this 20th day of
October, 2026.
APPROVED:
___________________________________
James G. Boyd, Mayor
ATTEST:
_________________________________
Carey E. Danen, City Clerk
Ayes: ______
Nays: ______
Board/Committee Approval: 10/12/2026
Page 155 of 183
To: Honorable Mayor Boyd
Members of the Board of Public Works
From: Eric Rakers, P.E., City Engineer
Date: October 12, 2026
RE: Consideration and possible action on applying for a Wisconsin Department of Transportation
SISP Grant
The Wisconsin Department of Transportation (WisDOT) offers grants under the Signals and ITS
Standalone Program (SISP) for traffic signal upgrades. Staff applied for a grant in September to upgrade
the Broadway and Cook Street intersection traffic signal.
Background
The SISP is a stand-alone, state-funded program initiated in 2013 to assist with signal replacement. It
provides funding for traffic signal and Intelligent Transportation Systems (ITS) projects not tied to
broader highway improvement efforts.
Broadway Street is STH 32/57 is a connecting highway. Connecting highways qualify for 90% state
funding with a 10% local match from the city, county, or other local authority for traffic signal upgrades.
Discussion
WisDOT is resurfacing STH 32/57 in 2027. During the design of the project, De Pere staff has been
requesting improvements to the Broadway and Cook Street intersection for left turning vehicles. This
intersection has been an issue with accidents due to the offset left turn lanes. WisDOT has indicated
that reconstructing this intersection is beyond the scope of the project.
Based on subsequent e-mails, WisDOT has recommended the traffic signals be upgraded to include a
lead left turn arrows for both northbound and southbound traffic, similar to the lead left arrow for
southbound traffic at Broadway and Merrill Street. This will clear left-hand turning vehicles from the
intersection while through traffic is stopped. Specifically, WisDOT stated “With that being said, we have
reviewed the last 5 years of crash data again, which includes the crashes identified by the city. There
have been 23 crashes in the past 5+ years, 12 of which were left turn related crashes. 7 of those 12 left
turn crashes were injury related, including 1 fatality and 1 Type A serious injury crash. Based on our
analysis of the crashes, a far majority (if not all) of those 12 crashes could be eliminated if the signal
operations were modified to have a dedicated left turn phase so the left turning motorists can make their
turn without having to judge a safe gap from the oncoming through traffic. This intersection and traffic
signal is within the connecting highway limits which gives De Pere jurisdiction of the signal, thus adding a
left turn phase decision is up to the city.”
Page 156 of 183
2
The traffic signal must be upgraded to add the left turn arrows. Staff included funding in the 2027
budget. Municipal applications were due to the regional liaison on September 18th. Due to this, the
application was submitted prior to Board approval. If the Board does not agree with the submittal, staff
will contact WisDOT to withdraw the application. The estimated cost of the project is $670,306 with a
10% city allocation at $67,031 and a WisDOT grant fund of $603,275.
Recommendation
Staff recommends approval of the grant submittal.
Attachments
2026 0918 DePere STH 32 and Cook Application
Page 157 of 183
Page 158 of 183
Page 159 of 183
Page 160 of 183
Page 161 of 183
Page 162 of 183
Page 163 of 183
Page 164 of 183
Page 165 of 183
City of De Pere, Wisconsin
Request for Common Council Action
8.D
Meeting Date: October 20, 2026
Department: Public Works
From: Eric Rakers, City Engineer
Subject: Resolution #26-103 State/Municipal Maintenance
Agreement for the Construction of a Wet Detention Pond
within Wisconsin Department of Transportation Right-of-
Way.
Recommendation: Motion to approve.
The Board of Public Works at the October 12, 2026 meeting approved the
State/Municipal Maintenance Agreement for the Construction of a Wet Detention Pond
within Wisconsin Department of Transportation Right-of-Way. The motion passed with a
5-0 vote.
Attachments:
Reso26-103, 2026 1012 CI_BOPW_SMMA, City of De Pere Detention Pond SMMA -
STH 32 57 - Permit Application 168
Page 166 of 183
RESOLUTION #26-103
APPROVING STATE/MUNICIPAL MAINTENANCE AGREEMENT
(Wet Detention Pond in DOT right-of-way)
WHEREAS, Wis. Stats. § 84.07(1), permits the State of Wisconsin Department of Transportation
to enter into maintenance agreements with local units of government; and
WHEREAS, the attached State/Municipal Maintenance Agreement provides the terms and
conditions for maintenance of a wet detention pond to be constructed at the southeast corner of the
intersection Cook Street and Honey Court in connection with Project 26-09 that abuts South Broadway
Street in Wisconsin Department of Transportation right-of-way; and
WHEREAS, the Board of Public Works has reviewed the State/Municipal Maintenance
Agreement and recommends approval thereof;
NOW, THEREFORE, BE IT HEREBY RESOLVED:
That the City Manager is hereby authorized and directed to enter into the
attached State/Municipal Maintenance Agreement.
BE IT FURTHER RESOLVED:
That all City officials, officers, employees, and agents are authorized and
directed to take such steps as are lawful and necessary in furtherance thereof.
Adopted by the Common Council of the City of De Pere, Wisconsin, this 20th day of
October, 2026.
APPROVED:
__________________________________
James G. Boyd, Mayor
ATTEST:
_________________________________
Carey E. Danen, City Clerk
Ayes: _____
Nays: _____
Board/Committee Approval: 10/12/2026
Page 167 of 183
1
To: Honorable Mayor Boyd
Members of the Board of Public Works
From: Eric P. Rakers, P.E., City Engineer
Date: October 12, 2026
RE: Consideration and Possible Action on the State/Municipal Maintenance Agreement for the
Construction of a Wet Detention Pond within Wisconsin Department of Transportation Right-
of-Way*
As part of Project 26-09 Pond and Drainage System Construction, the City is proposing to construct a
wet detention pond in the vacant area located at the southeast corner of the intersection of Cook Street
and Honey Court. The purpose of this wet detention pond is to treat and store storm water prior to
conveying flow to the Fox River. This vacant land is abutting S. Broadway Street (STH 32-57) and is
Wisconsin Department of Transportation (WisDOT) right-of-way. To build the storm water pond within
WisDOT right-of-way, the City would need to enter into a State/Municipal Maintenance Agreement
(SMMA) with WisDOT for the maintenance of the pond and associated appurtenances after the pond
construction. A copy of the proposed SMMA is attached for the Board’s consideration.
Public Works staff already inspect and maintain our city-wide storm sewer system. The requirements
set forth in the SMMA fall in line with the City’s current maintenance and inspection plans.
City Staff also obtained an Urban Nonpoint Source and Storm Water Management (UNPS) Grant through
the Wisconsin Department of Natural Resources to construct this pond. Project 26-09 has been
designed and bid concurrently to the procurement of the SMMA with WisDOT. The award of this
project, and the UNPS grant is contingent on the approval of the SMMA. The award of Project 26-09
follows the Board’s consideration and possible action on this SMMA on today’s agenda.
Staff recommend the Board of Public Works approve the SMMA for the construction of a wet detention
pond within WisDOT right-of-way.
Attachments
City of De Pere Detention Pond SMMA – STH 32 57 – Permit Application 168 PDF
Page 168 of 183
Central File: Page 1 of 3 Brown County – NE Region
PLN\StateProgram\Agreements\State Municipal Maintenance Agreements_SMMA
STATE/MUNICIPAL
MAINTENANCE
AGREEMENT
Date: May 13, 2026
Road Name: WIS 32/57 (North Broadway
Street)
County: Brown
WisDOT Work on Highway Right-of-Way
Permit: Application 168
The signatory City of De Pere , hereinafter called the Municipality, through its undersigned duly authorized officers
or officials, hereby requests the State of Wisconsin Department of Transportation, hereinafter called the State, to
initiate and affect this agreement to include the associated maintenance responsibilities hereinafter described.
The authority for the Municipality to enter into this agreement with the State is provided by Section 84.07(1) of the
Statutes. Wisconsin statutes, Wisconsin Administrative Code, and State policy serve as the defining documents for
State Highway maintenance responsibilities.
DESCRIPTION OF FACILITY:
Existing Facility Description – WIS 32/57 (N. Broadway Street) at the Cook Street intersection is a four -lane
divided roadway (two lanes in each direction) located in the City of De Pere. The roadway includes 10-foot outside
shoulders (3 feet paved) and 8-foot inside shoulders (3 feet paved), with a grassed median containing a drainage
ditch. Rural roadside ditches are present along the outside of the roadway for drainage conveyance.
The intersection of WIS 32/57 and Cook Street is signalized and includes dedicated left-turn lanes on WIS 32/57.
No sidewalks or storm sewer are present along WIS 32/57. A sidewalk is present along the north side of Cook Street
and crosses the north leg of the intersection.
Proposed Facility Description – The proposed improvements include construction of a wet detention pond in the
southwest quadrant of the WIS 32/57 (Broadway Street) and Cook Street intersection within existing WisDOT right-
of-way.
New storm sewer infrastructure will be constructed, including 15-inch pipes and endwalls (EW 45 and EW 47), to
convey flow from the City of De Pere storm sewer system to the proposed pond. The proposed pond will discharge
to the City of De Pere storm sewer system. Storm sewer structure numbering is referenced in Exhibit 1 – Honey
Court to Cook Street Storm Sewer (prepared by the City of De Pere).
An emergency spillway will be constructed at the northeast corner of the pond and will discharge to the WIS 32/57
roadside ditch.
This request shall constitute agreement between the Municipality and the State ; is subject to the terms and
conditions that follow (pages [2] – [3]); is made by the undersigned under proper authority to make such
request for the designated Municipality and upon signature by the State , delivery to the Municipality. The
initiation and signature of the agreement will be subject to all the applicable federal and state regulations. No
term or provision of neither the State /Municipal Maintenance Agreement nor any of its attachments may be
changed, waived or terminated orally but only by an instrument in writing executed by both parties to the
State/Municipal Maintenance Agreement.
Page 169 of 183
Central File: Page 2 of 3 Brown County – NE Region
PLN\StateProgram\Agreements\State Municipal Maintenance Agreements_SMMA
Signed for and on behalf of the City of De Pere (Please sign in blue ink)
Name (print) Title
Signature Date
Signed for and on behalf of the State (Please sign in blue ink)
Name Title WisDOT Region Maintenance Chief
Signature Date
TERMS AND CONDITIONS:
1. In order to guarantee the Municipality’s foregoing agreements to maintain the facility to State standards, the
Municipality, through its above duly authorized officers or officials, agrees and authorizes the State to set off
and withhold General Transportation Aids or monies otherwise due and payable by the State to the
municipality, as determined by the State, for any maintenance the State must perform to the facility should
the Municipality fail to comply with the agreement.
2. The State will not install any additional items, not necessitated for the safe and efficient flow of traffic, to a state
highway facility without the Municipality agreeing to maintain those items. The State is responsible for
maintaining the through travel way of any given highway facility under the State’s jurisdiction including:
(a) The energy, operation, repair and replacement of traffic signals and associated street lighting required for
the signalized intersections within the limits of this agreement.
(b) Signing and pavement marking necessitated for the safe and efficient flow of traffic except those items listed
in #3.
(c) Permitting authority of utilities and access control on all State Trunk, US and Interstate Highways.
3. The Municipality shall at its own cost and expense maintain all portions within the specified limits of this
agreement that lie within its jurisdiction for such maintenance through statutory requirements in a manner
satisfactory to the State and shall make ample provision for such maintenance each year to include:
(a) Maintain all items out
Text truncated. Open the original for the full document.
Source: City of De Pere website. First collected Oct 24, 2026.