RecordWell Data

Common Council Meeting — Agenda Packet

City of De Pere · Brown County · Common Council · meeting of Oct 20, 2026 · Agenda packets

Open the original document More from City of De Pere

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Common Council Regular Meeting Agenda Tuesday, October 20, 2026 at 7:30 PM Council Chambers and Virtual In-Person Attendance: City Hall Council Chambers 2nd Floor City Hall 335 S Broadway Electronic Meeting Access: https://www.gotomeet.me/DePere Telephonic Meeting Access: (866) 899-4679 -or- (312) 757-3117 Access Code: 154-883-28 1. Call to Order 2. Roll Call 3. Pledge of Allegiance 4. Approval of the Agenda 5. Public Hearings A. Public Hearing on a request to approve a zoning map amendment from Business Park 1 District to Business Park 2 District at 400 Destiny Drive. i. Notice of public hearing. ii. Recommendation from Plan Commission. iii. Ordinance #26-22 Approving Zoning Map Amendment from BP-1 Business Park 1 District to BP-2 Business Park 2 District (Parcels ED-2385 and ED-2386; 400 Destiny Drive). B. Public Hearing on a request to approve a conditional use for shipping container accessory use at 301-307 Main Av. i. Notice of public hearing. ii. Recommendation from Plan Commission. iii. Resolution #26-99 Authorizing and Approving a Conditional Use of Accessory Shipping Container in a MX1 (Downtown Mixed-Use) District (Parcels WD-906 and WD907; 301-305 Main Avenue). C. Public Hearing on a request to amend Chapter 46 De Pere Municipal Code regarding Platting and Land Division. i. Notice of public hearing. Page 1 of 183 ii. Recommendation from Plan Commission. iii. Ordinance #26-23 Amending Chapter 46 of the De Pere Municipal Code (Platting and Land Division). 6. Public Comments Comments made during the public comment period shall pertain only to matters under the jurisdiction of the Common Council. §6-3(f) DPMC 7. New Business A. Approval of the minutes of the October 6, 2026 Common Council meeting. B. Appointment of Scott Thompson to the Historic Preservation Commission by Mayor James Boyd; term to expire January 31, 2029. C. Recommendation from Board of Public Works on award of Contract 26-09 Pond and Drainage System Construction. D. Recommendation from Board of Public Works on Design Options for the Main Avenue Slope. E. Recommendation from Board of Public Works on award of Contract 26-10 Phoenix of De Pere Utility and Street Construction. F. Consideration and Possible Action on Final Payment Application for the De Pere Parking Garage Located at 224 N. Wisconsin ST. G. Recommendation from the Finance/Personnel Committee to approve 2027 benefit renewal & plan design changes. H. Recommendation from the Redevelopment Authority to authorize a purchase offer of up to $440,000 to acquire property located at 2535 Lawrence Drive and allow city employees and representatives to take all necessary steps to acquire the property. The Council may convene in closed session pursuant to Section 19.85(1)(e) Wisconsin Statutes for the purpose of deliberating or negotiating the purchasing of public properties, the investing of public funds, or conducting other specified public business, whenever competitive or bargaining reasons require a closed session. The Council may, thereafter, reconvene in open session pursuant to Section19.85(2) Wisconsin Statutes to report any actions taken during the closed session and to consider all other matters on the agenda. 8. Resolutions A. Resolution #26-100 Authorizing the fourth amendment for consulting services with Short-Elliot-Hendrickson, Incorporated (MSC Expansion). B. Resolution #26-101 Approving contract for HVAC preventive maintenance with Tweet - Garot Mechanical, Inc. C. Resolution #26-102 Ratifying grant application to Wisconsin Department of Transportation (Signals and ITS Standalone Program). D. Resolution #26-103 State/Municipal Maintenance Agreement for the Construction of a Wet Detention Pond within Wisconsin Department of Transportation Right-of-Way. Page 2 of 183 E. Resolution #26-104 Authorizing Parking Lease Agreement with Ahlstrom Nicolet LLC. 9. Future Agenda Items 10. Adjournment Any person wishing to attend this meeting who, because of disability, requires special accommodations should contact the Clerk’s office at 920-339-4050 by noon on the previous day so that arrangements can be made. The Public or Members of the Common Council, which may count toward an official quorum, may attend the meeting either in person in the Council Chambers or telephonically or electronically via video conferencing or other appropriate technological means. This meeting may also be rebroadcast on TV throughout the week and is available on demand at https://deperewi.portal.civicclerk.com/. Page 3 of 183 City of De Pere, Wisconsin Request for Common Council Action 5.A Meeting Date: October 20, 2026 Department: Development Services From: Peter Schleinz, City Planner/Zoning Administrator Subject: Public Hearing on a request to approve a zoning map amendment from Business Park 1 District to Business Park 2 District at 400 Destiny Drive. Recommendation: No Action Needed Attachments: None Page 4 of 183 City of De Pere, Wisconsin Request for Common Council Action 5.A.i Meeting Date: October 20, 2026 Department: City Clerk From: Carey Danen, City Clerk Subject: Notice of public hearing. Recommendation: No Action Needed Attachments: Public Hearing Notice_Zoning Map Amendment_Destiny Dr-Generations Blvd_10-20-26 mtg_Class 2 Page 5 of 183 Publish: October 2, 2026, and October 9, 2026, in the Press-Times (Class 2 Notice) NOTICE OF PUBLIC HEARING Notice is hereby given that on Tuesday, October 20, 2026, at 7:35 PM or as soon thereafter as can be heard, a public hearing will be held by the Common Council of the City of De Pere to act on the request for a zoning map amendment from BP-1 (Business Park 1 District) to BP-2 (Business Park 2 District) at the following properties: Parcels ED-2385 and ED-2386, approximately 0.0 feet northeast from the Destiny DR and Generations BL intersection. The public may attend the meeting either in person in the Council Chambers (2nd Floor City Hall, 335 S Broadway ST, De Pere WI) or electronically. Electronic or telephonic access to the meeting is below: Computer/smart phone accessing https://www.gotomeet.me/DePere OR dial by phone: United States (Toll Free): 1-866 899-4679 United States: +1 (312) 757-3117 Access Code: 154- 883-285. A map of the proposed zoning map amendment is available by emailing Peter Schleinz at pschleinz@deperewi.gov. Dated this 29th day of September, 2026. BY ORDER OF THE COMMON COUNCIL James G. Boyd Mayor Carey E. Danen City Clerk Page 6 of 183 City of De Pere, Wisconsin Request for Common Council Action 5.A.ii Meeting Date: October 20, 2026 Department: Development Services From: Peter Schleinz, City Planner/Zoning Administrator Subject: Recommendation from Plan Commission. Recommendation: Motion to approve. On September 28, 2026, Plan Commission unanimously recommended approval. Attachments: PC Report, Zoning Map Amendment, Application and supporting documents - 02 Sep 2026, Legal Description - 02 Sep 2026 Page 7 of 183 City of De Pere Plan Commission Staff Comments September 28, 2026 Consideration and possible action for a zoning map amendment from BP-1 (Business Park 1 District) to BP-2 Business Park 2 District) at 400 BLK Destiny DR (Parcels ED-2385, ED-2386).* SITE MAP REQUESTED ACTION: Zoning Map Amendment Request for three areas. (File ZMA 26-05) Note: Change BP-1 to BP-2 for future business park development. COMMON DESCRIPTION: 400 BLK Destiny DR, northeast from the Destiny DR and Generations BL intersection. SURROUNDING LAND USES: Business Park (BP-1, BP-2) to the north and east. Agricultural and residential (MX3) to the south. Commercial (C) to the west. COMPREHENSIVE PLAN: Business Park. APPLICANT / OWNERS: Authorized Representative Carolyn Adler McMahon & Associates 1445 McMahon DR Neenah, WI 54956 Property Owner ED-2385, ED-2386: City of De Pere 335 S Broadway ST De Pere, WI 54115-2593 Page 8 of 183 City of De Pere Plan Commission Staff Comments September 28, 2026 LAND USE HISTORY: Both undeveloped parcels were created in 2000 as part of the East Side Industrial Park Third Addition plat. In 2026, the owner of the business to the east a proposed an expansion, which would require a lot line adjustment and a zoning map amendment. STAFF REVIEW (GENERAL): When reviewing a zoning map amendment request, staff considers the future land use recommendation of the Comprehensive Plan, surrounding land uses, and desired development patterns. The proposed zoning map amendment complies with the Comprehensive Plan and surrounding land uses, including matching adjacent existing uses. Existing Zoning District The existing zoning district is BP-1, which permits industrial and certain commercial uses. The proposed zoning map amendment references a change to BP-2, allowing for moderate impact uses by right, and high impact uses with a conditional use. Surrounding Land Uses The existing site zoning and surrounding land uses are referenced near the beginning of this report. The 2010 Comprehensive Plan Update, with amendments, identifies future land use as Business Park. CLIP FROM FUTURE LAND USE MAP Desired Development Patterns The City's desired development pattern is shown in the Comprehensive Plan as Business Park. The permitted uses and conditional uses for the BP-2 District is in Zoning Ordinance Article VII and summarized in Table 7-1. NEIGHBOR OUTREACH: The publishing of a Class II public notice and public hearing is required for a zoning map amendment. Property owners within 300 feet of the proposed zoning map amendment were notified by mail and a sign was placed on the site prior to the Plan Commission meeting. No neighbor inquiries were made at the time this report was written. The public hearing is tentatively scheduled for the October 20, 2026, Common Council meeting. STAFF RECOMMENDATION: Staff recommends APPROVAL of the request for a zoning map amendment from BP-1 (Business Park 1 District) to BP-2 Business Park 2 District) at 400 BLK Destiny DR. A zoning map amendment must comply with the following: • Compliance with all state and local laws and regulations, including compliance with all the provisions of Chapter 14, De Pere Municipal Code. FUTURE BUSINESS PARK. Page 9 of 183 Page 10 of 183 Submitted On: Sep 2, 2026, 10:33AM EDT Planning/Zoning Application Planning & Zoning Department Parcel Number: (Include ALL parcels) ED-2385, ED-2386 Nearest property address to the project site: Street Address: 2020 COMMERCE DR City: DePere State: WI Zip: 54115 Check each project type that is being applied for: Zoning Map Amendment (Rezoning) Current De Pere Zoning Districts: BP-1 Existing Site Land Uses: Undeveloped/Vacant/Agricultural Proposed Site Land Uses: Business Park/Industrial Does the project comply with the Comprehensive Plan? Yes Has City Staff been contacted for a pre-consultation meeting? Yes Property Owner: First Name: City of DePere Last Name: City of DePere Is the property owner's address the same as the nearest property address? No Property Owner's Address: Street Address: 335 S BROADWAY City: DE PERE State: WI Zip: 54115 Property Owner's Phone Number: Property Owner's Email Address: Is someone processing the project for the property owner as their authorized representative? Yes Authorized Representative's Name: First Name: Carolyn Last Name: Adler Authorized Representative's Business Name: McMahon Associates Authorized Representative's Address: Street Address: 1445 McMahon Drive City: Neenah Page 11 of 183 State: WI Zip: 54956 Authorized Representative's Phone Number: Authorized Representative's Email Address: What is the basis for the zoning map amendment? Change two parcels from BP-1 to BP-2 to match zoning on the adjacent Belmark Plant 7 parcel (ED-3102) , to allow for combination of all three parcels with a CSM Proposed De Pere Zoning Districts: BP-2 Please attach an EXHIBIT MAP with the zoning boundary. ZONING AMENDMENT-EXHIBIT.pdf Please attach a WORD DOCUMENT with the boundary legal description. Rezoning Description BP1 to BP2.docx How do you plan on paying for your application? Online with a credit card Total Due: $350.00 Property Owner or Authorized Representative Signature First Name: Carolyn Last Name: Adler Email Address: Signed at: September 2, 2026 9:54AM America/New_York User's Session Information 67.53.157.66, Referrer URL Page 12 of 183 DESCRIPTION OF LANDS TO BE REZONED FROM BUSINESS PARK 1 (BP-1) TO BUSIBNESS PARK 2 (BP-2) All of Lots Thirty-three (33) and Thirty-four (34) of East Side Industrial Park Third Addition recorded in Volume 21 of Plats on Pages 117-118 as Document 1747462, located in the Southeast ¼ of the Southeast ¼ and the Southwest ¼ of the Southeast ¼ of Section 33, Township 23 North, Range 20 East, City of De Pere, Brown County, Wisconsin, containing 169,924 square feet (3.90 acres) of land. September 1, 2026 B0039 09-26-00588.08 Page 13 of 183 City of De Pere, Wisconsin Request for Common Council Action 5.A.iii Meeting Date: October 20, 2026 Department: City Attorney From: Angela Zills, Paralegal Subject: Ordinance #26-22 Approving Zoning Map Amendment from BP-1 Business Park 1 District to BP-2 Business Park 2 District (Parcels ED-2385 and ED-2386; 400 Destiny Drive). Recommendation: Motion to approve. Corresponding ordinance prepared by the Law Department to support the recommendation of the Plan Commission. Attachments: Ord26-22 Page 14 of 183 ORDINANCE #26-22 APPROVING ZONING MAP AMENDMENT FROM BP-1 BUSINESS PARK 1 DISTRICT TO BP-2 BUSINESS PARK 2 DISTRICT (Parcels ED-2385 and ED-2386; 400 Block Destiny Drive) WHEREAS, the Common Council of the City of De Pere, having reviewed the recommendation of the City Plan Commission regarding the proposed change in zoning classification and Zoning Map amendment for the property described below and having scheduled a public hearing then to be decided by the Common Council; and WHEREAS, the City Clerk, having published a Class 2 Notice of Public Hearing regarding such proposed zoning change and Zoning Map amendment and, pursuant thereto, a public hearing having been held on the 20th day of October, 2026 at 7:35 p.m. and the Common Council having heard all interested parties or their agents and attorneys; NOW, THEREFORE, the Common Council of the City of De Pere, Wisconsin, do ordain as follows: Section 1. That the following described property: ED-2385: All of Lot Thirty-three (33) of East Side Industrial Park Third Addition recorded in Volume 21 of Plats on Pages 117-118 as Document 1747462, located in the Southeast ¼ of the Southeast ¼ and the Southwest ¼ of the Southeast ¼ of Section 33, Township 23 North, Range 20 East, City of De Pere, Brown County, Wisconsin. containing 104,560 square feet (2.40 acres) of land; and ED-2386 All of Lot Thirty-four (34) of East Side Industrial Park Third Addition recorded in Volume 21 of Plats on Pages 117-118 as Document 1747462, located in the Southeast ¼ of the Southeast ¼ and the Southwest ¼ of the Southeast ¼ of Section 33, Township 23 North, Range 20 East, City of De Pere, Brown County, Wisconsin. containing 65,364 square feet (1.50 acres) of land Page 15 of 183 Ordinance #26-22 Page 2 of 2 shall be and the same is hereby rezoned from the present zoning classification of BP-1 Business Park 1 District to BP-2 Business Park District as set forth in and regulated by the provisions of Chapter 14, Article IV Commercial and Employment Districts, the permitted uses identified under Article VII. Uses and on the Principal Use Table (DPMC Chapter 14, Article VII – Uses, Table 7.1) and pursuant to Section 14-74 of the De Pere Zoning Code, conditioned upon compliance with the provisions of Chapter 14, De Pere Municipal Code, as well as all state and local laws and regulations. Section 2. The City Clerk is directed to amend the City of De Pere Zoning Map in conformity with the provisions of this ordinance. Section 3. All other ordinances in conflict herewith are hereby repealed. Section 4. This ordinance shall take effect upon its passage and publication according to law. Adopted by the Common Council of the City of De Pere, Wisconsin, this 20th day of October, 2026. APPROVED: ____________________________ James G. Boyd, Mayor ATTEST: _____________________________ Carey E. Danen, City Clerk Ayes: ______ Nays: ______ Board/Committee Approval: 09/28/2026 Publication Date: _______ Effective Date: _______ Page 16 of 183 City of De Pere, Wisconsin Request for Common Council Action 5.B Meeting Date: October 20, 2026 Department: Development Services From: Peter Schleinz, City Planner/Zoning Administrator Subject: Public Hearing on a request to approve a conditional use for shipping container accessory use at 301-307 Main Av. Recommendation: No Action Needed Attachments: None Page 17 of 183 City of De Pere, Wisconsin Request for Common Council Action 5.B.i Meeting Date: October 20, 2026 Department: City Clerk From: Carey Danen, City Clerk Subject: Notice of public hearing. Recommendation: No Action Needed Attachments: Public Hearing Notice _CU_301-307 Main Av_10-20-26 mtg_Class 2 Page 18 of 183 Publish: October 2, 2026, and October 9, 2026, in the Press-Times (Class 2 Notice) NOTICE OF PUBLIC HEARING Notice is hereby given, that on Tuesday, October 20, 2026, at 7:35 PM or as soon thereafter as can be heard, a public hearing will be held by the Common Council of the City of De Pere to act on the request for a conditional use for Shipping Container accessory use at the following property: Parcels WD-906 and WD-907 at 301-307 Main AV, approximately 0.0 feet southwest from the Main AV and Third ST intersection. The public may attend the meeting either in person in the Council Chambers (2nd Floor City Hall, 335 S Broadway ST, De Pere WI) or electronically. Electronic or telephonic access to the meeting is below: Computer/smart phone accessing https://www.gotomeet.me/DePere OR dial by phone: United States (Toll Free): 1-866 899-4679 United States: +1 (312) 757-3117 Access Code: 154-883-285. A map of the proposed conditional use is available by emailing Peter Schleinz at pschleinz@deperewi.gov. Dated this 29th day of September, 2026. BY ORDER OF THE COMMON COUNCIL James G. Boyd Mayor Carey E. Danen City Clerk Page 19 of 183 City of De Pere, Wisconsin Request for Common Council Action 5.B.ii Meeting Date: October 20, 2026 Department: Development Services From: Peter Schleinz, City Planner/Zoning Administrator Subject: Recommendation from Plan Commission. Recommendation: Motion to approve. On September 28, 2026, Plan Commission unanimously recommended approval. Attachments: PC Report, Conditional Use Map, Application and supporting documents - 14 Sep 2026 Page 20 of 183 City of De Pere Plan Commission Staff Comments September 28, 2026 Consideration and possible action for a conditional use of accessory shipping container in a MX1 (Downtown Mixed-Use) District at 301-305 Main AV (Parcels WD-906, WD-907).* SITE MAP Page 21 of 183 City of De Pere Plan Commission Staff Comments September 28, 2026 REQUESTED ACTION: Conditional use request (File CU 26-01). Proposed types of use include seasonal eating and drinking place with seating at the rear of the property. COMMON DESCRIPTION: 301-305 Main AV, southwest of the Main AV and Third ST intersection. SURROUNDING LAND USES: Downtown mixed uses (MX1) to the north, south, and west. St. Norbert College (PI-2) to the east. COMPREHENSIVE PLAN: Commercial. APPLICANT / OWNER: Applicant and Property Owner Gavic Holdings LLC ATTN: Tom Gavic 1818 Rainbow AV De Pere, WI 54115 LAND USE HISTORY: After a review of air photographs, the site developed prior to 1938 air photographs. STAFF REVIEW: When reviewing a conditional use request, staff and Plan Commission consider the following: • Review criteria and standards, from Zoning Ordinance 14-123(9), are required for all conditional use requests. The criteria are listed below with the petitioner’s responses from the application form. • Where allowed regulations, from Zoning Ordinance 14-78(14)(d), are included for the shipping container accessory use. The specific regulations are listed below; there was not a need for a petitioner’s response. • Supplemental regulations, from Zoning Ordinance 14-78(14)(e), are included for the shipping container accessory use. The criteria are listed below with the petitioner’s responses from a separate document. Conditional Use Review Criteria and Standards 1. That the establishment, maintenance or operation of the conditional use will not be detrimental to or endanger the public health, safety or general welfare; Petitioner’s response: This conditional use is for a shipping container for use of seasonal beverage, food service, and seating. It will follow all public health guidelines per city of De Pere Health Dept. 2. That the uses, values and enjoyment of surrounding properties for purposes already permitted in the district will not be substantially impaired or diminished by the establishment, maintenance or operation of the proposed conditional use; Petitioner’s response: The container has received support from all surrounding property owners and will add a convenient beverage and food service option to the Alley District - as well as additional seating for the public. 3. That establishment of the conditional use will not impede the normal and orderly development and improvement of surrounding properties for uses permitted in the district; Petitioner’s response: Container is located on private property and will Page 22 of 183 City of De Pere Plan Commission Staff Comments September 28, 2026 not impede the development of surrounding properties. 4. That adequate utilities, access roads, drainage and other necessary improvements have been or are being provided; Petitioner’s response: All utilities to the container will be run separately and winterized each season. Drainage will be maintained on site and gathering via a catch basin and connected to existing storm lateral. 5. That adequate measures have been or will be taken to provide ingress and egress that will minimize on- and off-site traffic congestion; and Petitioner’s response: The container will be located on the site per the approved site plan which shows "future container" location - the resulting location has no impact on ingress or egress traffic. 6. That the conditional use complies with all other applicable regulations of this zoning ordinance. Petitioner’s response: The container is located on an approved site plan which has been vetted by all departments. 7. Finally, provide details that will help with decision making about the operation of the use. Include hours and days of operations, seasonal operation, shipment/delivery requirements and hours, parking requirements, drop-off zones, queuing lines, height and width of existing and new structures (for wireless telecommunications, site plan details, etc.). Petitioner’s response: The container will operate seasonally from April - November annually, four days per week, Noon to 10PM daily. Customer parking will be via public parking in Nicolet Square and street parking. All customer queuing will be accommodated on site. The container dimensions will be 8 ft x 40 ft and 9.5 ft tall, with stair access to roof patio seating. Conditional Use Where Allowed Regulations Per Zoning Ordinance 14-78(14)(d): 1. Zoning Districts: Shipping containers may be allowed if approved by conditional use in the X Districts. 2. Within Parcel: Shipping containers must be located in the rear half of an interior side yard or in the rear yard of a parcel. 3. Setbacks: Shipping container setbacks are a minimum of 4 feet from all property lines. However, alley-fronted property lines may be reduced to 0 feet. Shipping Containers cannot be placed over a property line. 4. Easements: Shipping containers may not be placed on utility, storm water, access, or other public easements without written permission from the holder of the easements. 5. Separation: Shipping containers cannot be located within 200 feet of other approved shipping containers to prevent clusters from disrupting the X Districts or downtown. Shipping containers that are less than 200 feet apart may be considered if approved as a major design exception. Conditional Use Supplemental Regulations Per Zoning Ordinance 14-78(14)(e): Page 23 of 183 City of De Pere Plan Commission Staff Comments September 28, 2026 1. Site plan required: An approved site plan with the shipping container shown is required prior to the installation of a shipping container on a property. Petitioner response: Site Plan previously submitted with approval letter dated 7-31-26. 2. Building Codes: Use of shipping containers must comply with city inspection, WUCBC, and ICC regulations. Petitioner response: We will be working with the city building inspector to assure the container complies. 3. Utility connections: Shipping containers with kitchens, sinks, or restrooms, must include water, sanitary sewer, and stormwater/storm sewer services that are approved by department of public works. Petitioner response: All utilities will be run and approved by Dept of Public Works. 4. Permanent installation required: Shipping containers must be placed on and attached to a permanent foundation (piers, slab, or engineered footings). Petitioner response: The container will be permanently attached to approved reinforced concrete piers. 5. Accessibility: The shipping container order/receiving window(s) must be accessible, meeting ADA compliance regulations. At least one table must be provided that is ADA accessible between the order/receiving window(s) and the table. Petitioner response: None provided. 6. Maximum height: 10 feet tall. Petitioner response: We will maintain this maximum height. 7. Stacking prohibited: Shipping containers cannot be stacked on top of each other. Petitioner response: We will be using one 8ft x 40ft x 9.5ft container – with access to a seating deck on top. 8. Primary façade: The primary façade for the shipping container must face a public street, alley, or public pedestrian corridor. The primary façade may face into a courtyard or gathering space on the property if located along an alley. Petitioner response: The container’s primary façade will face into a gathering space. 9. Façade treatment: Street, alley, and public pedestrian corridor facing facades must include the addition of at least 20% major façade materials that are allowed in the X Districts. A major design exception may be requested for the following: i. The use of a mural(s) on the entirety of a façade instead of 20% major façade material on the same facade(s). Petitioner response: We are requesting a design exception and apply a mural on the west, south and east facades – we are happy to provide the mural concept for Page 24 of 183 City of De Pere Plan Commission Staff Comments September 28, 2026 review when available. ii. The use of no more than 20% fiber cement board or wood on a façade(s) as a major façade material. Petitioner response: Not needed. 10. Transparency: A minimum of 20% transparency is required for street, alley, and public pedestrian corridor facing facades. However, transparency is not required for alley facing facades of the primary façade faces into a courtyard or gathering space on the property. Windows, roll-up windows, garage style doors, and service windows may be included when calculating 20%. Petitioner response: Since the primary façade is facing into a gathering space, there will not be any transparency on the west, south and est facades. 11. Rooflines: Shipping containers must include a defined top edge such as a parapet, cap, rooftop amenity deck, or architectural band. Petitioner response: The container will have a rooftop amenity deck. 12. Rooftop use allowed: The rooftop of a shipping container may be used as a rooftop amenity deck. Petitioner response: The container will have a rooftop amenity deck. 13. Façade Colors: Colors used must be similar or complimentary to the colors used on the primary structure. Fluorescent façade colors are prohibited. However, fluorescent colors may be used in a mural. Petitioner response: The container will have a painted mural on the west, south and east facades – colors used on the primary façade will complement and coordinate with the other structures on site. 14. Seating areas: Seating areas cannot be within streets, alleys, and public pedestrian corridors. Petitioner response: All seating will be on private property on the site. 15. Queuing Areas: Queuing areas must be provided that do not obstruct streets, alleys, and public pedestrian corridors. Petitioner response: Queuing areas will be maintained on site. 16. Landscaping: At least 10% of the designated outdoor gathering space for shipping containers must include landscaping (planters, trellises, green screens) that soften the industrial appearance of the shipping container. Petitioner response: Landscaping is planned throughout the side that will help soften structures and hide exposed public utilities. 17. Illumination: The use of string lights, warm ambient lighting, and architectural lighting is encouraged. All shipping container façade lighting must be dark sky compliant and fall under the light spill thresholds identified in Section 14-95. Petitioner response: The site will string lighting and any Page 25 of 183 City of De Pere Plan Commission Staff Comments September 28, 2026 additional lighting will meet section 14-95 guidelines. 18. Refuse and Recyclable Materials: Refuse and recyclable material storage must be located in the rear yard only and must comply with Section 14-94. A shipping container may share refuse and recyclable material storage with the primary use. Petitioner response: There will be shared refuse and recycling containers for the site. 19. Signage: Each shipping container is allowed to have a maximum of two signs that are attached to the shipping container, if approved by sign permit. At a minimum, allowed sign types, sizes, and locations must comply with Sections 14-111 Table 11-4 and 13-113. Except that free standing signs that are not attached to the shipping container are prohibited. Petitioner response: All signage will be approved the cities sign permit process. 20. Murals: Shipping containers are allowed to have murals that do not include signage. Petitioner response: A mural will be painted on the west, south and east facades. 21. Liquor licensing: Shipping containers that serve beer, wine, and/or liquor must have a liquor license that is approved by the city clerk’s office. Petitioner response: The container will be included in Nicolet Ale Works Brewpub license premise description. 22. Required removal of unused Shipping Container: If a shipping container is unused for a period longer than 12 months, then the conditional use becomes invalid, and the shipping container must be removed from the property within 30 days. Petitioner response: We understand this removal requirement – the container will be in seasonal use May – November each year. Staff Review Summary The proposed MX1 District property may allow an accessory shipping container high-impact use if a conditional use is successfully approved. • The specific proposal includes a shipping container accessory use for a seasonal eating and drinking place with seating at the rear of the property. • The proposal references a site plan that was approved in July, 2026, If the conditional use is approved, the site plan needs to be amended to add the shipping container to the site plan. • The proposal include a property line that is crossed by the shipping container. The property line will need to be removed or relocated prior to amending the site plan. • The proposal responses did not include specific details about accommodating accessibility, which need to be addressed with the amended site plan. • The proposal references the desire to use murals as optional façade Page 26 of 183 City of De Pere Plan Commission Staff Comments September 28, 2026 materials, which requires a separate design exception review. Specific conditions must be adhered to. If any conditions are violated, the city may revoke the conditional use and the use must cease. Thus, it is extremely important that the petitioner, and future property owners, is aware of all the conditions that are included with an approved conditional use, in addition to Zoning Ordinance regulations. All conditions that the petitioner has agreed to are listed within the ‘Staff Recommendation’ section of this report. NEIGHBOR OUTREACH All property owners within 300 feet of the subject area have been notified of the application via mail. The authorized representative notified nearby property owners about the proposed conditional use. At the time this report was written, no public comment or concern was made to staff about the conditional use. Any additional comments will be shared at the time of the Plan Commission meeting. STAFF RECOMMENDATION: Staff recommends APPROVAL of the conditional use request for an accessory shipping container in a MX1 (Downtown Mixed-Use) District at 301-305 Main AV, subject to the following: 1. Compliance with all state and local laws and regulations, including compliance with all the provisions of De Pere Municipal Code Chapter 14 (Zoning Ordinance). 2. Compliance with the following conditional use supplemental regulations and the attached petitioner’s responses in this report: a. Site plan required: An approved site plan with the shipping container shown is required prior to the installation of a shipping container on a property. b. Building Codes: Use of shipping containers must comply with city inspection, WUCBC, and ICC regulations. c. Utility connections: Shipping containers with kitchens, sinks, or restrooms, must include water, sanitary sewer, and stormwater/storm sewer services that are approved by department of public works. d. Permanent installation required: Shipping containers must be placed on and attached to a permanent foundation (piers, slab, or engineered footings). e. Accessibility: The shipping container order/receiving window(s) must be accessible, meeting ADA compliance regulations. At least one table must be provided that is ADA accessible between the order/receiving window(s) and the table. f. Maximum height: 10 feet tall. g. Stacking prohibited: Shipping containers cannot be stacked on top of each other. h. Primary façade: The primary façade for the shipping container must face a public street, alley, or public pedestrian corridor. The primary façade may face into a courtyard or gathering space on the property if located along an alley. i. Façade treatment: Street, alley, and public pedestrian corridor facing facades must include the addition of at least 20% major façade materials that are allowed in the X Districts. A major design exception Page 27 of 183 City of De Pere Plan Commission Staff Comments September 28, 2026 may be requested for the following: i. The use of a mural(s) on the entirety of a façade instead of 20% major façade material on the same facade(s). ii. The use of no more than 20% fiber cement board or wood on a façade(s) as a major façade material. j. Transparency: A minimum of 20% transparency is required for street, alley, and public pedestrian corridor facing facades. However, transparency is not required for alley facing facades of the primary façade faces into a courtyard or gathering space on the property. Windows, roll-up windows, garage style doors, and service windows may be included when calculating 20%. k. Rooflines: Shipping containers must include a defined top edge such as a parapet, cap, rooftop amenity deck, or architectural band. l. Rooftop use allowed: The rooftop of a shipping container may be used as a rooftop amenity deck. m. Façade Colors: Colors used must be similar or complimentary to the colors used on the primary structure. Fluorescent façade colors are prohibited. However, fluorescent colors may be used in a mural. n. Seating areas: Seating areas cannot be within streets, alleys, and public pedestrian corridors. o. Queuing Areas: Queuing areas must be provided that do not obstruct streets, alleys, and public pedestrian corridors. p. Landscaping: At least 10% of the designated outdoor gathering space for shipping containers must include landscaping (planters, trellises, green screens) that soften the industrial appearance of the shipping container. q. Illumination: The use of string lights, warm ambient lighting, and architectural lighting is encouraged. All shipping container façade lighting must be dark sky compliant and fall under the light spill thresholds identified in Section 14-95. r. Refuse and Recyclable Materials: Refuse and recyclable material storage must be located in the rear yard only and must comply with Section 14-94. A shipping container may share refuse and recyclable material storage with the primary use. s. Signage: Each shipping container is allowed to have a maximum of two signs that are attached to the shipping container, if approved by sign permit. At a minimum, allowed sign types, sizes, and locations must comply with Sections 14-111 Table 11-4 and 13-113. Except that free standing signs that are not attached to the shipping container are prohibited. t. Murals: Shipping containers are allowed to have murals that do not include signage. u. Liquor licensing: Shipping containers that serve beer, wine, and/or liquor must have a liquor license that is approved by the city clerk’s office. v. Required removal of unused Shipping Container: If a shipping container is unused for a period longer than 12 months, then the conditional use becomes invalid, and the shipping container must be removed from the property within 30 days. Page 28 of 183 Page 29 of 183 Submitted On: Sep 14, 2026, 10:10PM EDT Planning/Zoning Application Planning & Zoning Department Parcel Number: (Include ALL parcels) WD-906 & 907 Nearest property address to the project site: Street Address: 301-305 Main Avenue City: De Pere State: WI Zip: 54115 Check each project type that is being applied for: Conditional Use Current De Pere Zoning Districts: MX1 Existing Site Land Uses: Commercial Proposed Site Land Uses: Commercial Does the project comply with the Comprehensive Plan? Yes Has City Staff been contacted for a pre-consultation meeting? Yes Property Owner: First Name: Tom Last Name: Gavic Is the property owner's address the same as the nearest property address? No Property Owner's Address: Street Address: 1818 Rainbow Ave City: De Pere State: WI Zip: 54115 Property Owner's Phone Number: Property Owner's Email Address: Is someone processing the project for the property owner as their authorized representative? No What is the conditional use for? Restaurant A Conditional Use request requires a detailed narrative (project description) and site plan graphics. For the detailed narrative, would you prefer to attach a PDF Enter detailed narrative into the application form Revised Sep 17, 2026 Page 30 of 183 document or enter the information directly into this application form? 1. That the establishment, maintenance or operation of the conditional use will not be detrimental to or endanger the public health, safety or general welfare. This conditional use is for a shipping container for use of seasonal beverage, food service, and seating. It will follow all public health guidelines per city of De Pere Health Dept. 2. That the uses, values and enjoyment of surrounding properties for purposes already permitted in the district will be not be substantially impaired or diminished by the establishment, maintenance or operation of the proposed conditional use. The container has received support from all surrounding property owners and will add a convenient beverage and food service option to the Alley District - as well as additional seating for the public. 3. That establishment of the conditional use will not impede the normal and orderly development and improvement of surrounding properties for uses permitted in the district. Container is located on private property and will not impede the development of surrounding properties. 4. That adequate utilities, access roads, drainage and other necessary improvements have been or are being provide. All utilities to the container will be run separately and winterized each season. Drainage will be maintained on site and gathering via a catch basin and connected to existing storm lateral. 5. That adequate measures have been or will be taken to provide ingress and egress that will minimize on- and off-site traffic congestion. The container will be located on the site per the approved site plan which shows "future container" location - the resulting location has no impact on ingress or egress traffic. 6. That the conditional use complies with all other applicable regulations of this zoning ordinance. The container is located on an approved site plan which has been vetted by all departments. Finally, provide details that will help with decisionmaking about the operation of the use. Include hours and days of operations, seasonal operation, shipment/delivery requirements and hours, parking requirements, drop-off zones, queuing lines, height oand width of existing and new structures (for wireless The container will operate seasonally from April - November annually, four days per week, Noon to 10PM daily. Customer parking will be via public parking in Nicolet Square and street parking. All customer queuing will be accommodated on site. The container dimensions will be 8 ft x 40 ft and 9.5 ft tall, with stair access to roof patio seating. Page 31 of 183 telecommunications, site plan details, etc. Please attach a SITE PLAN GRAPHIC that details the Conditional Use location. 260184_Eng_Base (4).pdf How do you plan on paying for your application? Mail a check Total Due: $350.00 Property Owner or Authorized Representative Signature First Name: Tom Last Name: Gavic Email Address: Signed at: September 14, 2026 10:10PM America/New_York User's Session Information 74.135.166.226, Referrer URL Page 32 of 183 1 Design Standards for Shipping-Container Accessory Uses in the Mixed-Use Districts Supplemental Regulations (Gavic Holdings Responses in Blue Text) All shipping containers are subject to the following supplemental regulations: 1. Site plan required: An approved site plan with the shipping container shown is required prior to the installation of a shipping container on a property. i. Site Plan previously submitted with approval letter dated 7-31-26. 2. Building Codes: Use of shipping containers must comply with city inspection, WUCBC, and ICC regulations. i. We will be working with the city building inspector to assure the container complies. 3. Utility connections: Shipping containers with kitchens, sinks, or restrooms, must include water, sanitary sewer, and stormwater/storm sewer services that are approved by department of public works. i. All utilities will be run and approved by Dept of Public Works 4. Permanent installation required: Shipping containers must be placed on and attached to a permanent foundation (piers, slab, or engineered footings). i. The container will be permanently attached to approved reinforced concrete piers. 5. Accessibility: The shipping container order/receiving window(s) must be accessible, meeting ADA compliance regulations. At least one table must be provided that is ADA accessible between the order/receiving window(s) and the table. 6. Maximum height: 10 feet tall. i. We will maintain this maximum height. 7. Stacking prohibited: Shipping containers cannot be stacked on top of each other. i. We will be using one 8ft x 40ft x 9.5ft container – with access to a seating deck on top. 8. Primary façade: The primary façade for the shipping container must face a public street, alley, or public pedestrian corridor. The primary façade may face into a courtyard or gathering space on the property if located along an alley. i. The container’s primary façade will face into a gathering space. 9. Façade treatment: Street, alley, and public pedestrian corridor facing facades must include the addition of at least 20% major façade materials that are allowed in the X Districts. A major design exception may be requested for the following: Page 33 of 183 2 i. We are requesting a design exception and apply a mural on the west, south and east facades – we are happy to provide the mural concept for review when available. ii. The use of a mural(s) on the entirety of a façade instead of 20% major façade material on the same facade(s). iii. The use of no more than 20% fiber cement board or wood on a façade(s) as a major façade material. 10. Transparency: A minimum of 20% transparency is required for street, alley, and public pedestrian corridor facing facades. However, transparency is not required for alley facing facades of the primary façade faces into a courtyard or gathering space on the property. Windows, roll-up windows, garage style doors, and service windows may be included when calculating 20%. i. Since the primary façade is facing into a gathering space, there will not be any transparency on the west, south and est facades. 11. Rooflines: Shipping containers must include a defined top edge such as a parapet, cap, rooftop amenity deck, or architectural band. i. The container will have a rooftop amenity deck. 12. Rooftop use allowed: The rooftop of a shipping container may be used as a rooftop amenity deck. i. The container will have a rooftop amenity deck. 13. Façade Colors: Colors used must be similar or complimentary to the colors used on the primary structure. Fluorescent façade colors are prohibited. However, fluorescent colors may be used in a mural. i. The container will have a painted mural on the west, south and east facades – colors used on the primary façade will complement and coordinate with the other structures on site. 14. Seating areas: Seating areas cannot be within streets, alleys, and public pedestrian corridors. i. All seating will be on private property on the site. 15. Queuing Areas: Queuing areas must be provided that do not obstruct streets, alleys, and public pedestrian corridors. i. Queuing areas will be maintained on site. 16. Landscaping: At least 10% of the designated outdoor gathering space for shipping containers must include landscaping (planters, trellises, green screens) that soften the industrial appearance of the shipping container. i. Landscaping is planned throughout the side that will help soften structures and hide exposed public utilities. 17. Illumination: The use of string lights, warm ambient lighting, and architectural lighting is encouraged. All shipping container façade lighting must be dark sky compliant and fall under the light spill thresholds identified in Section 14-95. i. The site will string lighting and any additional lighting will meet section 14-95 guidelines. 18. Refuse and Recyclable Materials: Refuse and recyclable material storage must be located in the rear yard only and must comply with Section 14-94. A shipping Page 34 of 183 3 container may share refuse and recyclable material storage with the primary use. i. There will be shared refuse and recycling containers for the site. 19. Signage: Each shipping container is allowed to have a maximum of two signs that are attached to the shipping container, if approved by sign permit. At a minimum, allowed sign types, sizes, and locations must comply with Sections 14- 111 Table 11-4 and 13-113. Except that free standing signs that are not attached to the shipping container are prohibited. i. All signage will be approved the cities sign permit process. 20. Murals: Shipping containers are allowed to have murals that do not include signage. i. A mural will be painted on the west, south and east facades. 21. Liquor licensing: Shipping containers that serve beer, wine, and/or liquor must have a liquor license that is approved by the city clerk’s office. i. The container will be included in Nicolet Ale Works Brewpub license premise description. 22. Required removal of unused Shipping Container: If a shipping container is unused for a period longer than 12 months, then the conditional use becomes invalid, and the shipping container must be removed from the property within 30 days. i. We understand this removal requirement – the container will be in seasonal use May – November each year. # END # Page 35 of 183 Page 36 of 183 Page 37 of 183 Page 38 of 183 Page 39 of 183 Page 40 of 183 Page 41 of 183 ALLEY EATS8FT X 40 FT X 9.5FTCONTAINER PATIO ABOVE GREEN LANDSCAPINGHIDING UTILITIES 12FT X 16FT MUSICSTAGE Double Tap Cooler Service Window Counter StorageSinkCoolerCooler PizzaOven PizzaPrepTable Ice CreamBev 40'-0" 8'-2" Page 42 of 183 PATIO ABOVE ALLEY EATSSTAIRS TO PATIO16” SERVICEWINDOW 8FT X 40 FT STAIRS TO PATIO 16’ SERVICE WINDOW ELEVATION FLOOR PLAN Double Tap Cooler Pizza Oven Service Window Counter Bev Cooler Ice Cream CoolerSink Storage Pizza Prep Table HSS4 x 4 x 1/4 A A A A B B B B C D HSS3 X 3 X 3/16 HSS3 X 3 X 3/16 HSS3 X 3 X 3/16 HSS12 X 3 X 3/16 HSS12 X 3 X 3/16 PLATE 1/2 X 4 AS POST SUPPORTING HSS BEAM ABOVE. WELD TO WALL PANEL WITH 1/8" X 2" FILLET WELD AT 12" OC Page 43 of 183 PATIO ABOVE ALLEY EATSSTAIRS TO PATIO16” SERVICEWINDOW STAIRS TO PATIO 11’ X 40’ ROOFTOPPATIO Double Tap Cooler Pizza Oven Service Window Counter Bev Cooler Ice Cream CoolerSink Storage Pizza Prep Table ROOF FRAMING HSS8 X 3 X 1/4 HSS3 X 3 X 3/16 HSS3 X 3 X 3/16 HSS12 X 3 X 3/16 HSS12 X 3 X 3/16 HSS8 X 3 X 1/4 HSS8 X 3 X 1/4 HSS10 X 3 X 1/4 HSS10 X 3 X 1/4 HSS8 X 3 X 1/4 HSS8 X 3 X 1/4 HSS3 X 3 X 1/4 HSS3 X 3 X 1/4 HSS3 X 3 X 1/4 HSS3 X 3 X 1/4 D Page 44 of 183 ROOFTOP OVERFRAMING FOR UPPER PATIO HSS3 X 3 X 3/16 AT 16" OC. PROVIDE CLOSURE PLATE EACH END AND SEAL WELD. PROC 1/4" DIA DRAIN HOLES IN BOTTOM OF HSS HSS3 X 3 X 3/16. PROVIDE CLOSURE PLATE EACH END AND SEAL WELD E F COMPOSITE DECKING. REVIEW FASTENING REQUIREMTNS TO STEEL TUBES WITH MANUFACTURER Page 45 of 183 HSS POST - SEE PLAN EXISTING CHANNEL JOISTS AT 10" OC. EXISTING BENT PLATE STEEL RAIL. 3/8" STIFF PLATE. SEE DETAIL B. 1/8 3 SIDES 1/8 DETAIL AT NEW POST BASE HSS POST - SEE PLAN EXISTING BENT PLATE STEEL RAIL. 3/8" STIFF PLATE. SEE DETAIL B. 1/8 3 SIDES CONCRETE PAVER SHIM BENEATH POST TO PROVIDE TIGHT CONTACT BETWEEN COMPACTED SOIL AND BOTTOM OF STEEL RAIL A B DETAIL AT NEW POST BASE CONCRETE PAVER SHIM BENEATH POST TO PROVIDE TIGHT CONTACT BETWEEN COMPACTED SOIL AND BOTTOM OF STEEL RAIL Page 46 of 183 EXISTING CORRUGATED WALL PANEL EXISTING CHANNEL JOISTS AT 10" OC. EXISTING BENT PLATE STEEL RAIL. DETAIL AT NEW POST BASE CONCRETE PAVER SHIM BENEATH POST TO PROVIDE TIGHT CONTACT BETWEEN COMPACTED SOIL AND BOTTOM OF STEEL RAIL C STEEL POST - SEE PLAN STEEL BEAM - SEE PLAN 1/8 1/8 3 SIDES REMOVE AND REPLACE EXISTING FLOOR DECK AS REQUIRED TO INSTALL NEW STEEL Page 47 of 183 HSS POST - SEE PLAN HSS BEAM - SEE ELEVATION. NOTCH AROUND HSS POST AND SEAL WELD ALL AROUND DETAIL AT NEW POST BASE D SERVICE COUNTER BY OTHERS. COORD. WITH OWNER EXISTING CORRUGATED WALL PANEL. SEAL WELD TO HSS POST AND HSS BEAM DETAIL AT NEW POST BASE E EXIST. ROOF PANEL EXIST. TUBE SECTION HSS POST - SEE PLAN HSS BEAM - SEE PLAN GUARDRAIL BY OTHERS. COORD. WITH OWNER Page 48 of 183 DETAIL AT NEW POST BASE F EXIST. ROOF PANEL EXIST. TUBE SECTION EXISTING WALL PANEL GUARDRAIL BY OTHERS. COORD. WITH OWNER. UPRIGHTS MUST ALIGN WITH HSS3 RAFTERS Page 49 of 183 City of De Pere, Wisconsin Request for Common Council Action 5.B.iii Meeting Date: October 20, 2026 Department: City Attorney From: Angela Zills, Paralegal Subject: Resolution #26-99 Authorizing and Approving a Conditional Use of Accessory Shipping Container in a MX1 (Downtown Mixed-Use) District (Parcels WD-906 and WD907; 301-305 Main Avenue). Recommendation: Motion to approve. This item is the corresponding resolution for the Plan Commission's recommendation to approve a conditional use of an accessory shipping container at 301-305 Main Avenue. The Zoning Ordinance was recently revised, pursuant to Ordinance #26-19, to create a new accessory use subcategory, 14-78(14) Shipping Container. Attachments: Reso26-99 Page 50 of 183 RESOLUTION #26-99 AUTHORIZING AND APPROVING A CONDITIONAL USE OF ACCESSORY SHIPPING CONTAINER IN A MX1 (DOWNTOWN MIXED-USE) DISTRICT (Parcels WD-906 and WD-907; 301-305 Main Avenue) WHEREAS, the Common Council of the City of De Pere has reviewed the recommendation of the City Plan Commission regarding the granting of a conditional use as described below and has determined that the matter be scheduled for public hearing and decided by the Common Council; and WHEREAS, the City Clerk has published a Notice of Public Hearing regarding the proposed conditional use and, pursuant thereto, a Public Hearing has been held at the City Hall Council Chambers on the 20th day of October, 2026 at 7:35 p.m. whereupon the Common Council heard all interested parties, their agents and attorneys; NOW, THEREFORE, BE IT HEREBY RESOLVED, by the Common Council of the City of De Pere, Wisconsin, as follows: 1. The Common Council hereby finds and determines that an application for a conditional use has been made by a party in interest meeting the requirements of §14-123, De Pere Municipal Code (DPMC); and 2. The standards relating to the conditional use as set forth in DPMC §14-78(14) and §14-123(9) have been or will be complied with; and 3. The Common Council does therefore pursuant to DPMC §14-123(8)authorize and grant a conditional use as provided at DPMC §14-78(14(d), for purposes of permitting the use of a shipping container as an accessory structure to operate a public gathering space for use such as eating and drinking places, stages and other outdoor event spaces in a MX1, Downtown Mixed-Use District located at 301-305 Main Avenue, Parcels WD-906 and WD-907, as shown on the Principal Use Table (DPMC Chapter 14, Article VII – Uses, Table 7.1); and 4. This authorization is further subject to compliance with any other terms and conditions of the Plan Commission, including all of the following supplemental regulations as itemized in DPMC §14-78(14)(e). Page 51 of 183 Resolution #26-99 Page 2 of 2 5. Compliance with all requirements of Chapter 14 (Zoning Ordinance), De Pere Municipal Code, as well as all state and local laws and regulations. Adopted by the Common Council of the City of De Pere, Wisconsin, this 20 th day of October, 2026. APPROVED: _________________________________ James G. Boyd, Mayor ATTEST: _________________________________ Carey E. Danen, City Clerk Ayes: Nays: Board/Committee Approval: 09/28/2026 Page 52 of 183 City of De Pere, Wisconsin Request for Common Council Action 5.C Meeting Date: October 20, 2026 Department: Development Services From: Peter Schleinz, City Planner/Zoning Administrator Subject: Public Hearing on a request to amend Chapter 46 De Pere Municipal Code regarding Platting and Land Division. Recommendation: Motion to approve. Attachments: None Page 53 of 183 City of De Pere, Wisconsin Request for Common Council Action 5.C.i Meeting Date: October 20, 2026 Department: City Clerk From: Carey Danen, City Clerk Subject: Notice of public hearing. Recommendation: No Action Needed Attachments: Public Hearing Notice_Land Division_10-20-26 mtg_Class 2 Page 54 of 183 Publish: October 2, 2026, and October 9, 2026, in the Press-Times (Class 2 Notice) NOTICE OF PUBLIC HEARING Notice is hereby given, that on Tuesday, October 20, 2026, at 7:35 PM or as soon thereafter as can be heard, a public hearing will be held by the Common Council of the City of De Pere to act on the following: Revising document submittal/review/recording procedures, updating references for the director of development services or designee, updating references for zoning districts, adding street trees as required improvements, and removing regulations for the urban reserve area in Chapter 46 De Pere Municipal Code regarding the Platting and Land Division Ordinance. The public may attend the meeting either in person in the Council Chambers (2nd Floor City Hall, 335 S Broadway ST, De Pere WI) or electronically. Electronic or telephonic access to the meeting is below: Computer/smart phone accessing https://www.gotomeet.me/DePere OR dial by phone: United States (Toll Free): 1-866 899-4679 United States: +1 (312) 757-3117 Access Code: 154-883-285. A copy of the proposed revision to the Chapter 46 Platting and Land Division Ordinance is available by emailing Peter Schleinz at pschleinz@deperewi.gov. Dated this 29th day of September, 2026. BY ORDER OF THE COMMON COUNCIL James G. Boyd Mayor Carey E. Danen City Clerk Page 55 of 183 City of De Pere, Wisconsin Request for Common Council Action 5.C.ii Meeting Date: October 20, 2026 Department: Development Services From: Peter Schleinz, City Planner/Zoning Administrator Subject: Recommendation from Plan Commission. Recommendation: Motion to approve. On September 28, 2026, Plan Commission unanimously recommended approval. Attachments: Platting and Land Division Ordinance Memo - 28 Sep 2026 Page 56 of 183 To: James Boyd, Mayor Plan Commission Members From: Peter Schleinz, Senior Planner | Zoning Administrator Date: September 28, 2026 RE: Consideration and possible action for amendments to Municipal Code Chapter 46 (Platting and Land Division Ordinance).* Summary: In 2027 a thorough review and rewrite of the Platting and Division of Land Ordinance is proposed. Until then, staff proposes the following revisions: • The required document submittal, review, and recording procedures for plats and certified survey maps has been updated to reference the simplified City online application procedures, rather than submitting multiple paper copies. • References to the director of planning have been updated to be the director of development services or designee. • Zoning districts for land dedications have been updated to reference residential district names used in the Zoning Ordinance that was rewritten in 2023. • Street trees have been added as required improvements (1 tree in the right-of-way per 50 feet of street frontage). • References to regulations for the urban reserve area have been removed. A copy of the Platting and Land Division Ordinance is included with this memo. The revisions are redlined. Staff Request: Recommend that the Common Council approve an amendment to modify the Platting and Land Division Ordinance for submittal procedures, director of development services references, residential zoning district names, and street tree regulations. • A Class II public hearing will be held prior to the Common Council final decision. Page 57 of 183 City of De Pere, Wisconsin Request for Common Council Action 5.C.iii Meeting Date: October 20, 2026 Department: City Attorney From: Angela Zills, Paralegal Subject: Ordinance #26-23 Amending Chapter 46 of the De Pere Municipal Code (Platting and Land Division). Recommendation: Motion to approve. This ordinance was drafted by the Law Department to formalize the amendments to Chapter 46 DPMC as recommended by the Plan Commission Attachments: Ord26-23, Redline - De Pere - Revisions - 14 Jul 2026 Page 58 of 183 ORDINANCE #26-23 AMENDING CHAPTER 46 OF THE DE PERE MUNICIPAL CODE (Platting and Land Division) WHEREAS, the Common Council of the City of De Pere having reviewed the recommendation of the City Plan Commission regarding the proposed amendments to Chapter 46 (Platting and Land Division) of the City of De Pere Municipal Code and having scheduled a public hearing then to be decided by the Common Council; and WHEREAS, the City Clerk, having published a Class 2 Notice of Public Hearing regarding such proposed Platting and Land Division ordinance amendments, and pursuant thereto, a public hearing having been held on the 20th day of October, 2026 at 7:35 p.m. and the Common Council having heard all interested parties, their agents and/or attorneys; NOW, THEREFORE, THE COMMON COUNCIL OF THE CITY OF DE PERE, WISCONSIN, DOES ORDAIN AS FOLLOWS: Section 1. Chapter 46 – PLATTING AND LAND DIVISION shall be amended as follows: (a) Sec. 46-2 Definitions. shall be amended by: (i) deleting “director of economic development and planning” and replacing with “development services director” in the definition of extraterritorial plat approval jurisdiction. (ii) deleting the definition of urban reserve area of extraterritorial review jurisdiction in its entirety. (b) Sec. 46-3 Procedure. shall be amended by: (i) repealing subsection (1) under (b) Preliminary plat and replacing with: (1) Before submitting a final plat for approval, the subdivider shall submit to the development services director or designee an online application, a PDF copy and CAD copy of a preliminary plat, preliminary engineering drawings including street trees, and a review fee not less than 30 days preceding the meeting of the plan commission for preliminary review. Page 59 of 183 Ordinance #26-23 Page 2 of 2 (ii) adding the following language in subsection (2) under (b) Preliminary plat following “…the plan commission shall”: “refer the preliminary plat with its recommendation to the common council. The common council shall,”…within 90 days of its submission… (iii) repealing subsection (1) under (c) Final plat and replacing with: (1) An online application, a PDF copy and CAD copy of a final plat, final engineering drawing including street trees, and a review fee shall be submitted to the development services direct or designee within 36 months after the last required approval of the preliminary plat. The plan commission may extend the time for submission of the final plat. (iv) amending subsection (2) under (c) Final plat by deleting the references to “city director of planning and development” and “director of planning” and replacing with “development services director or designee.” (v) repealing subsection (4) under (c) Final plat and replacing with: (4) After recording the final plat the county register of deeds’ office, the subdivider shall submit to the city one PDF copy of the recorded plat. (c) Sec. 46-4 General requirements and design standards. shall be amended by: (i) deleting subsections (2) and (4) under (h) Lots. and renumbering the remaining subsections as appropriate. (d) Sec. 46-6 Required improvements. shall be amended by: (i) deleting subsection (b)(5) and renumbering the remaining parapraphs as appropriate. (ii) adding the following as subsection (c): Street trees. The subdivider shall pay a street tree fee for every linear foot of right-of-way frontage on each side of the street (both sides) in the subdivision to plant street trees. Street trees will be planted by the city after the issuing of 75% of the residential until occupancy permits within the subdivision or certified survey map. The final location and size for street trees shall be determined by the city forester. (iii) labeling the paragraph: “All facilities shall be installed according to standard plans and specification as adopted by the city.” as subsection (d). (e) Sec. 46-8 Land divisions other than subdivisions. shall be amended by: (i) repealing (a) and replacing with: (a) Procedure. The divider shall submit to the development services director or designee an online application, a PDF copy and CAD copy of a certified survey map, preliminary engineering drawings including street trees, and a review fee not less than 30 days preceding the meeting of the plan commission for review. If the certified survey map has no public lands and dedications, the plan commission shall, within 40 days, approve, approve conditionally or reject the certified survey map. If the certified survey map has public lands and/or dedications the plan commission shall refer the certified survey map with its Page 60 of 183 Ordinance #26-23 Page 2 of 2 recommendation to the common council to, within 40 days, approve, approve conditionally or reject the certified survey map. The divider shall be notified, in writing, of any conditions of approval or the reason for the rejection. (ii) adding the words “certified survey” before the word “map” in subsections (2) and (4) under (b) Requirements. and subsection (1) and (2) under (c) Certificates and affidavits. (iii) subsection (d) Map. shall be repealed and recreated as follows: (d) Map. The certified survey map shall be filed by the divider for recording with the county register of deeds and one PDF copy of the recorded certified survey map shall be filed with the development services director or designee. (f) Sec. 46-13. Condominium developments. shall be amended by deleting “director of development services” and replacing with “development services director” in subsection (b)(5). These amendments shall be made as referenced above, consistent with the redlined revision attached hereto and incorporated herein by reference. Section 2. That all other ordinances in conflict herewith are hereby repealed. Section 3. That this ordinance shall take effect upon passage and publication. Adopted by the Common Council of the City of De Pere, Wisconsin, this 20th day of October, 2026. APPROVED: ____________________________ James G. Boyd, Mayor ATTEST: ______________________________ Carey E. Danen, City Clerk Ayes: _____ Nays: _____ Board/Committee/Commission Approval: 09/28/2026 Publication Date: Page 61 of 183 - CODE OF ORDINANCES Chapter 46 PLATTING AND LAND DIVISION De Pere, Wisconsin, Code of Ordinances Created: 2025-11-24 15:33:33 [EST] (Supp. No. 8) Page 1 of 14 Chapter 46 PLATTING AND LAND DIVISION Sec. 46-1. Applicability. The regulations contained in this chapter shall apply to the following: (1) Subdivision. Any division of land within the city or its extraterritorial plat approval jurisdiction which results in a subdivision as defined in this chapter shall be, and any other division may be, surveyed and a plat thereof approved and recorded as required by this chapter and Wis. Stats. ch. 236. (2) Other than subdivision. Any division of land other than a subdivision within the city, or its extraterritorial plat approval jurisdiction, of which plat has not been approved and recorded, shall be surveyed and a certified survey map of such division approved and recorded in acc ordance with the provisions of section 46-8 and Wis. Stats. ch. 236. (3) Exception. The provisions of this chapter shall not apply to: a. Transfers of interest in land by will or pursuant to court order; b. Leases for a term not to exceed ten years, mortgages or easements; c. The sale or exchange of parcels of land between owners of adjoining property if additional lots are not thereby created and the lots resulting are not reduced below the minimum sizes required by this chapter or other applicable laws or ordinances; d. Condominium conversion of existing structures where no additional dwelling units, building sites or lot equivalents are being created; e. A division of original lots having a maximum size of 1½ acres within an approved and recorded subdivision plat. (Code 1974, § 13.01; Code 2001, § 46-1; Ord. No. 15-31, § 1, 12-1-2015) Sec. 46-2. Definitions. The following words, terms and phrases, when used in this chapter, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: Condominium development means a real estate development in which the condominium form of ownership pursuant to Wis. Stats. ch. 703 is utilized. Extraterritorial plat approval jurisdiction means the area within three miles of the corporate limits of the city and is delineated on a map filed in the office of the director of economic development and planning development services director. Street means a way of travel for vehicular traffic and is further described as follows: Collector street means any street which carry traffic from minor streets to the system of highways, thoroughfares and major streets and including the principal entrance streets of a residential development and streets for circulation within such a development. Connector street means any street which intersects at least two other streets, one of which shall be a collector street. Page 62 of 183 Created: 2025-11-24 15:33:33 [EST] (Supp. No. 8) Page 2 of 14 Cul-de-sac means a minor street which is accessible to motor vehicle traffic at only one point. Highways and thoroughfares mean state and federal routes and their connecting links. Loop street means a minor street which is accessible to motor vehicle traffic from only one other street (which has to be either a collector or connector) at two points. Major street and highway mean any street with high traffic densities serving relatively large areas. Minor street means any street which are used primarily for access to the abutting properties. Subdivisions means a division of a lot, parcel or tract of land by the owner thereof or his or her agent for the purpose of sale or of building development, where: (1) The act of division creates six or more building sites of 1½ acres or less in area; or (2) Five or more parcels or building sites of 1½ acres each or less in area are created by successive divisions within a period of five years. Urban reserve area of extraterritorial review jurisdiction means that area designated as urban reserve in the latest update to the city's comprehensive plan. (Code 1974, § 13.02; Code 2001, § 46-2; Ord. No. 13-17, § 15, 8-20-2013; Ord. No. 15-31, § 2, 12-1-2015; Ord. No. 16-18, § 1, 9-6-2016; Ord. No. 20-16, § 1, 10-6-2020) Sec. 46-3. Procedure. (a) Preliminary matters. (1) If the time limits, deadlines, notice requirements or other provisions in this chapter are more restrictive than time limits, deadlines, notice requirements or other provisions that provide protections for a subdivider contained in Wis. Stats. ch. 236, the time limits, deadlines, notice requirements or other provisions that provide protections for a subdivider contained in Wis. Stats. ch. 236 shall apply. (2) Plat submissions shall comply with all ordinances in effect as of the date the preliminary plat is submitted. (3) Previous to filing a preliminary plat, the subdivider may consult the plan commission and its staff for advice and assistance. (b) Preliminary plat. (1) Before submitting a final plat for approval, the subdivider shall submit to the director of planning and economic development services director or designee an online application, a PDF copy and CAD copy14 copies of a preliminary plat, preliminary engineering drawings including street trees, and a review fee not less than 30ten days preceding the meeting of the plan commission for preliminary review.approval. One additional copy shall be submitted if the plat is adjacent to a state highway. The subdivider shall submit two copies if the plat is in the extraterritorial platting jurisdiction of the city. (2) After review of the preliminary plat and negotiations with the subdivider on changes deemed advisable and the kind and extent of public improvements which will be required, the plan commission shall refer the preliminary plat with its recommendation to the common council. The common council shall, within 90 days of its submission, approve, approve conditionally or reject the plat. The subdivider shall be notified, in writing, or any conditions or approval or the reasons for rejection. (3) Approval of the preliminary plat shall entitle the subdivider to final approval of the layout shown by such plat if the final plat conforms substantially to the preliminary plat and conditions of approval have been met. Page 63 of 183 Created: 2025-11-24 15:33:33 [EST] (Supp. No. 8) Page 3 of 14 (c) Final plat. (1) An online application, a PDF copy and CAD copy of a final plat, final engineering drawings including street trees, and a review feeThe final plat and nine copies for plats located within the city limits, or two copies for plats located in the extraterritorial platting jurisdiction shall be submitted to the director of planning and economic development services director or designee within 36 months after the last required approval of the preliminary plat. The plan commission may extend the time for submission of the final plat. (2) The plan commission shall refer the final plat with its recommendation to the common council. The council shall approve or reject the final plat within 60 days of its submission to the plan commission unless the time is extended by agreement with the subdivider. Conclusions and recommendations of the city director of planning and development services director or designee as to whether the final plat conforms substantially to the preliminary plat and the director of planning development services director or designee recommendation on approval of the final plat shall be made a part of the record either verbally or in writing of the council proceeding. Reasons for rejection shall be stated in the minutes of the council meeting and a copy thereof or a written statement o f such reasons shall be supplied the subdivider. (3) If the original of the final plat has been filed with another approving authority, the subdivider may file a true copy of such plat in lieu of the original. However, before the approval of the council will be inscribed on the original of the final plat, the surveyor or the subdivider shall certify the respects in which the original of the final plat differs from the true copy and all modifications must first be approved. (4) After recording the final plat at the county register of deeds' office, the subdivider shall submit to the city one PDF copyeight true copies of the finalrecorded plat. if the plat is located in the city, and two true copies if the plat is located within the extraterritorial platting jurisdiction of the city. The subdivider shall submit one additional copy of the recorded plat if it is located within the city adjacent to a state highway. (Code 1974, § 13.03; Code 2001, § 46-3; Ord. No. 10-28, § 1, 12-7-2010) Sec. 46-4. General requirements and design standards. (a) General conformance. The proposed subdivision shall conform to: (1) The provisions of Wis. Stats. ch. 236. (2) All applicable ordinances of the city. (3) The master plan, or functional segments thereof, as they may be completed. (4) The official map. (5) The rules of the state board of health relating to lot size and lot elevation if the subdivision is not served by a public sewer and provision for such service has not been made. (6) The rules of the state highway commission relating to safety of access and the preservation of the public interest and investment in the streets if the subdivision of any lot contained therein abuts on a state trunk highway or connecting street. (7) The preliminary plat shall be drawn at the scale not more than 100 feet to an inch. The required copies of the preliminary plat shall be made from a black ink line drawing. (b) Applicability to condominiums. This chapter is expressly applicable to condominium developments within the city's territorial or extraterritorial jurisdiction, pursuant to Wis. Stats. § 703.27(1). For the purposes of this Page 64 of 183 Created: 2025-11-24 15:33:33 [EST] (Supp. No. 8) Page 4 of 14 chapter, a condominium unit and any associated limited common elements shall be deemed to be equivalent to a lot or parcel created by the act of subdivision. (c) Streets. (1) General considerations. The streets shall be designed and located in relation to existing and planned streets, to topographical conditions and natural terrain features such as streams and existing tree growth, to public convenience and safety, and in their appropriate relation t o the proposed uses of the land to be served by such streets. The preliminary plat shall show topography or be accompanied by a map of the same scale showing topography using contour intervals not greater than five feet. (2) Conform to official map. The arrangement, width and location of all streets shall conform to the official map. (3) Arrangement. a. Major streets shall be properly integrated with the existing and proposed system of major streets, highways, and thoroughfares. b. Collector streets shall be properly related to the mass transit system, to special traffic generating from facilities such as schools, churches and shopping centers, to population densities, and to the arterial streets into which they feed. c. Minor streets shall be laid out to conform as much as possible to topography, to discourage use by through traffic, to permit efficient drainage and sewer systems, and to require the minimum amount of street necessary to provide convenient, safe access to property. The reasonable and intelligent use of curvilinear and cul-de-sac streets is encouraged. (4) Railroad right-of-way or limited access highway. Where a residential subdivision borders on or contains a railroad right-of-way or limited access highway right-of-way, the plan commission may require a street approximately parallel to and on each side of such right-of-way at a distance suitable for park or residential purposes. (5) Highways and thoroughfares. Where a subdivision borders on or contains an existing or proposed highway or thoroughfare, the plan commission may require that the backs of lots abut the highway or thoroughfare and be provided with screen planting contained in a nonaccess reservation along the rear property line, that deep lots with rear service alleys be provided, or that other provisions be made for the adequate protection of properties and the separation of through and local traffic. (6) Width. All streets shall be of the width specified on the official map or, if no width is specified there, they shall be not less than the width specified as follows: a. Highways: 80 feet, plus eight-foot tree planting easement on both sides of right-of-way. b. Collector streets: 80 feet. c. Minor streets: 70 feet. d. Minor streets designed with parking on one side: 60 feet, plus eight -foot tree planting easement on both sides of right-of-way. (7) Alignment and visibility. Clear visibility, measured along the centerline, shall be provided for at least 400 feet on major streets, 350 feet on collector streets, and 250 feet on minor streets. (8) Minimum radii or curvature on the centerline. a. Major streets: 300 feet. b. Collector streets: 200 feet. Page 65 of 183 Created: 2025-11-24 15:33:33 [EST] (Supp. No. 8) Page 5 of 14 c. Minor streets: 100 feet. (9) Tangents. A tangent at least 100 feet long shall be introduced between reverse curves on major and collector streets. (10) Street names. Any street which is the reasonable continuation of an existing street shall bear the same name. If the topography or other features of a permanent nature are such as to render the continuation of the actual roadway impossible, and where such nomenclature is apt to produce confusion, the street shall not carry the same name as the street to which it may be geometrically aligned. Type Dead-end Curving Straight Short streets Places or Courts Crescent, Way, Circle or Lane Terrace, Row, Lane Long streets Road or Drive Street or Avenue The term "boulevard" shall be reserved for such streets which, because of their breadth or monumental character, are to be especially designated. (d) Intersections. (1) Streets shall intersect as nearly as possible at right angles and the intersection of more than two streets at one point is discouraged. The number of streets converging at one intersection shall be reduced to the minimum possible. (2) Property lines at street intersections shall be rounded with a radius of 12 feet or a greater radius where the plan commission considers it necessary. Cutoffs or chords may be permitted in place of rounded corners. (3) Street jogs with centerline offsets of less than 125 feet shall be avoided. Where streets intersect highways, thoroughfares and major streets, their alignment shall be continuous. (e) Alleys. (1) Alleys shall be provided in all commercial and industrial districts, except that the plan commission may waive this requirement if definite and assured provision is made for service access such as off -street loading and parking consistent with, and adequate for, the uses proposed. (2) Alleys shall not be approved in residential areas unless necessary because of topography or other exceptional circumstances. (3) The width of alleys shall be not less than 20 feet. (4) Dead-end alleys are prohibited except under very unusual circumstances, and crooked and "T" alleys shall be discouraged. Where dead-end alleys are unavoidable, they shall be provided with adequate turnaround facilities at the dead end. (f) Easements and restrictive covenants. (1) Easements across lots or centered on rear or side lot lines shall be provided for utilities where required by the plan commission and shall be at least ten feet wide. (2) A drainage easement in favor of the city, centered on rear lot lines, shall be provided on all subdivisions of land. Such easement shall, at a minimum, contain the following restrictions: a. Any obstruction to the flow of water, by any means, shall be prohibited. Page 66 of 183 Created: 2025-11-24 15:33:33 [EST] (Supp. No. 8) Page 6 of 14 b. No structure, earthen berm, dam, erection of other improvement, tree, or landscaping shall be permitted. c. The erection of a fence or annual plantings may be allowed, provided that same do not obstruct the flow of water. d. Grantor (property owner) is prohibited from changing the grade elevation of the drainage easement from that established by grantee. e. Grantee shall have full rights of ingress and egress to carry on and all work in connection with the maintenance and operation in, over, under and across the lands of grantor. f. The property covered by said easement shall not be used in any way or manner that will impair the rights of grantee. g. The easement shall run with the land, and shall be binding upon the grantees, lessees, successors, heirs and assigns of grantor and grantee. h. The easement shall be assignable. (3) A stormwater covenant shall be provided on the face of each subdivision as follows: The land on the side of the lots within the area shall be graded by the subdivider and maintained by the abutting property owner to provide for the adequate drainage of surface water. (4) Where a subdivision is traversed by a watercourse, drainageway, channel or stream, there shall be provided a stormwater easement or drainage right-of-way of sufficient width conforming substantially with the lines of such watercourse. Grading or construction adequate for the purpose may be required. Wherever possible, the drainage shall be maintained by an open channel with landscaped banks and adequate width for maximum potential volume of flow as determined by the plan commission. Such improvement shall be installed prior to council approval of the final plat. (5) A stormwater covenant shall be provided on each plat as follows: The land on the rear of all lots and on the side of lots (specified) within the area shall be graded by the subdivider and maintained by the abutting property owner to provide for the adequate drainage of surface water. (6) An eight-foot tree planting easement shall be provided on the front or side of each lot fronting or siding a major street and streets with a width less than 70 feet, and no portion of the street shall be used for tree planting. Such easement shall be contained in a restrictive covenant written on the face of the plat. (g) Blocks. (1) The lengths, widths and shapes of blocks shall be such as are appropriate for the locality and the type of development contemplated, but block lengths in residential areas shall not exceed 1,500 feet between street lines. (2) Pedestrian crosswalks, not less than ten feet wide, may be required by the plan commission through the center of blocks more than 900 feet long where deemed essential to provide circulation or access to schools, playgrounds, shopping centers, transportation and other community facilities. (h) Lots. (1) General lot orientation of lots. The size, shape and orientation of lots shall be appropriate for the location of the subdivision and for the type of development and use contemplated. (2) Lots within the city's extraterritorial plat approval jurisdiction. Every lot within the city's extraterritorial plat approval jurisdiction that is identified in the city's current comprehensive plan as a growth area or an urban reserve area, shall be a minimum of ten acres in area. Page 67 of 183 Created: 2025-11-24 15:33:33 [EST] (Supp. No. 8) Page 7 of 14 (3) Lot dimensions. Lot dimensions shall conform to the requirements of the zoning ordinance, and in residential districts shall be not less than 75 feet in frontage nor less than 8,000 square feet in area. Residential lots to be served by private sewage disposal facilities shall comply with the rules of the state board of health in addition to the regulations contained in this section. Depth and width of properties reserved or laid out for commercial and industrial purposes shall be adequate to provide for the off-street service and parking facilities required by the type of use and development contemplated. Residential lots fronting or backing on major streets, highways, and thoroughfares should be platted with extra depth to permit generous distance between the buildings and such traffic ways. Excessive depth in relation to width shall otherwise be avoided. (4) Lot dimensions within urban reserve area of extraterritorial review jurisdiction. Every lot within the urban reserve area of the extraterritorial review jurisdiction shall have a minimum lot width and frontage of not less than 300 feet. (5) Corner lots. Corner lots for residential use shall have extra width to permit full building setback from both streets. (6) Access to public street. Every lot shall front on, or abut onto, a public street. (7) Lots at right angles. Lots at right angles to each other should be avoided wherever possible, especially in residential areas. (8) Lot lines. Side lot lines shall be substantially at right angles or radial to street lines. (9) Large lots. In case a tract is subdivided into parcels contained one or more acres, such parcels shall be arranged to allow the re-subdivision of any parcels into normal lots in accordance with the provisions of this chapter. (10) Municipal boundaries. Lots shall follow municipal boundary lines whenever practicable rather than cross them. (Code 1974, § 13.04; Code 2001, § 46-4; Ord. No. 03-23, § 1, 10-7-2003; Ord. No. 07-20, §§ 1—3, 8-7-2007; Ord. No. 15-31, § 3, 12-1-2015; Ord. No. 16-18, § 2, 9-6-2016; Ord. No. 19-26, § 1, 12-17-2019; Ord. No. 20-16, § 2, 10- 6-2020; Ord. No. 22-03, §§ 1, 2, 4-6-2022) Sec. 46-5. Public sites and open spaces. (a) Dedication of property unsuitable for development. Whenever a plat is filed of a subdivision containing submarginal land or containing or adjoining an open stream or watercourse, such land shall be dedicated to the city or other appropriate municipality for drainage purposes. Such dedication or reservatio n shall be made for the purpose of preventing the erection of structures on unsuitable property and to secure the public health and safety and to facilitate adequate provision for drainage. (b) Public open spaces. (1) Purpose. It is the purpose of this section that adequate open spaces may be properly located and preserved as the community develops, and that the cost of providing sites for parks, recreational areas, and all their uses related to the operation of the city government necessary to serve the additional population brought into the community by subdivision or condominium development may be most equitably apportioned on the basis of the additional need created by the individual subdivision or condominium. (2) Dedication of sites. Page 68 of 183 Created: 2025-11-24 15:33:33 [EST] (Supp. No. 8) Page 8 of 14 a. The subdivider shall provide, and dedicate to the public, land compatible with the comprehensive plan for the development of the community, provided that such development shall not exceed in area that provided in subsection (b)(2)b of this section. b. The amount of land to be provided and dedicated in R-1, R-2, R-3, and R-4 R1-, R2-, and RM- residential districts shall be 4.4 percent of the total nonpublic residential property developed. If dedicated land is set aside in the plat, it shall be done with the approval and in coordination with the city plan commission and the park board. (3) Payment in lieu of dedication. a. Where the plan commission determines that such dedication is not compatible with the comprehensive plan, the subdivider shall, in lieu thereof, pay to the city a fee as determined by resolution of the common council. b. Such fees shall be used only for open space acquisition or the preparation of park and open space plans, including a master plan of development. c. Payment shall be made at the time the building permit is issued. d. No payment shall be required for a parcel on which a permanent residential structure exists prior to the date of the division. However, a residence that is intentionally razed and a new structure built of additional dwellings would come under the provisions of this chapter and be subject to the fees in accordance with subsection (b)(3)a of this section. e. Where the plat, certified survey or condominium does not specify the number of dwelling units to be constructed, the land dedication or payment in lieu of dedication shall be based upon the maximum number of dwelling units permitted by the city zoning code and this chapter. (Code 1974, § 13.05; Code 2001, § 46-5; Ord. No. 14-20, § 2, 12-16-2014; Ord. No. 20-16, §§ 4, 5, 10-6-2020) Sec. 46-6. Required improvements. (a) The subdivision shall be monumented, as required by Wis. Stats. § 236.15, which is hereby adopted by reference and incorporated in this section as though fully set out. (b) Before the final plat or subdivision located within the corporate limits is approved, the subdivider may provide the following facilities: (1) Water and sanitary sewer mains and laterals to the lot line where connection to existing systems can be reasonably provided. (2) Streets graded to full width and roadway graveled. (3) Adequate facilities to provide surface water drainage. (4) Curb and gutter and gravel when so ordered by the common council. (5) Street trees of such variety, size, number and location as designated by the park board and forester. (65) Adequate facilities for interior lot improvement to provide surface water drainage. Surface water shall be drained over easements to public facilities where possible. Where necessary due to ground elevations and topography, storm sewer construction, including installation of catchbasins, shall be required at the expense of the subdivider. (76) The land surface within the proposed subdivision, including the street right -of-way to be dedicated, shall be graded to the proposed contours as approved on the preliminary plat. Any land surface so graded shall be appropriately and adequately protected to maintain the grade and protect the same Page 69 of 183 Created: 2025-11-24 15:33:33 [EST] (Supp. No. 8) Page 9 of 14 from erosion. As an alternative, the city shall design, construct and install such improvements after approval of the final plat at a time and under such conditions as the city shall determine in its discretion. If the city constructs such improvements, th e cost shall be assessed pursuant to chapter 13. (c) Street Trees. the subdivider shall pay a street tree fee for every linear foot of right-of-way frontage on each side of the street (both sides) in the subdivision to plant street trees. Street trees will be planted by the city after the issuing of 75% of the residential unit occupancy permits within the subdivision or certified survey map. The final location and size for street trees shall be determined by the city forester. (d) All facilities shall be installed according to standard plans and specifications as adopted by the city. (Code 1974, § 13.06; Code 2001, § 46-6) Sec. 46-7. Plats and data. (a) Preliminary consultation data. The following information shall be provided at the time of the preliminary consultation or upon filing the preliminary plat if no preliminary consultation is held: (1) Data on existing covenants, land characteristics and available community facilities and utilities, description of the subdivision proposal, such as number of residential lots, typical lot width and depth, business areas, playgrounds, park areas, other public areas, proposed protective covenants and proposed utilities and street improvements. (2) A location map showing the relationship of the proposed subdivision to existing community facilities which serve or influence it, including development name and location, main traffic arteries, public transportation lines, shopping centers, elementary and high schools, parks and playgrounds, and other community features such as hospitals and churches. The map shall also include title, scale, north arrow and date. (3) A sketch plan showing in simple sketch form the proposed layout of streets, lots and other features in relation to existing conditions. The sketch plan may be a free hand pencil sketch made directly on a print of the topographic survey. (b) Preliminary plat. (1) The preliminary plat shall be drawn with waterproof nonfading black ink or legibly drawn with pencil on tracing cloth, or tracing paper of good quality on a scale of not more than 100 feet to an inch and shall show correctly on its face: a. Date, scale and north point. b. The proposed subdivision name, which shall not duplicate the name of any plat previously recorded in the county. c. The name and address of the owner, the subdivider and a surveyor registered in the state preparing the plat. d. Location of the subdivision by government lot, quarter, quarter section, section, township, range and county. e. A small scale drawing of the section of government subdivision of the section in which the subdivision lies with the location of the subdivision indicated thereon. f. The exact length and bearing of the exterior boundaries of the subdivision. g. Location and names of adjacent subdivisions and the owners of adjoining parcels or unsubdivided land. Page 70 of 183 Created: 2025-11-24 15:33:33 [EST] (Supp. No. 8) Page 10 of 14 h. Zoning on the adjacent land to the subdivision for subdivisions outside the city. i. Location, widths and names of all existing platted or dedicated streets, alleys or other public ways and easements, railroad, and utility rights-of-way, parks, cemeteries, watercourses, drainage ditches, permanent buildings, bridges and other pertinent data, as determined by the city plan commission. j. The water elevations of adjoining lakes or streams at the date of survey and the approximate high and low water elevations of such lakes or streams. All elevations shall be referred to the U.S. Coast and Geodetic Survey or established city datum. k. If the subdivision borders a lake or stream, the distances and bearings of a meander line established not less than 20 feet back from the ordinary high-water mark of the lake or stream. l. Layout and width of all new streets and rights-of-way, such as alleys, highways, easements for sewers, water mains and other public utilities. m. Direction and distance to nearest water and sewer mains. n. Approximate dimensions of and areas of lots. o. Proposed building lines. p. Approximate radii of all curves and length of tangents. q. Approximate location and area of property proposed to be dedicated for public use or to be reserved by deed covenant for use of all property owners in the subdivision with the conditions, if any, of such dedication or reservation. (2) The subdivider shall furnish the following information along with his or her preliminary plat: a. A brief description of the improvements such as grading, paving, tree planting, installation of utilities which the subdivider proposes to make and the time when he or she proposes to make them. b. A brief description of the deed restrictions, if any, which will be put on the plat. c. A topographic plan illustrating the existing and proposed contours of the land surface within the proposed subdivision, including the proposed contours within and adjacent to the street right -of- way using contour intervals not greater than two feet within the city and five feet elsewhere at the same scale as the preliminary plat. (c) Final plat. (1) A final plat of subdivided land shall comply with the requirements of Wis. Stats. § 236.20, which is hereby adopted by reference and incorporated in this section as though fully set out. (2) The affidavits and certificates required by Wis. Stats. ch. 236, shall be lettered or printed legibly with black, durable ink or typed with black ribbon on the final plat. (3) Prior to approval of the final plat, the subdivider shall submit the grade or elevation of all streets located within the plat to the director of public works. The grades submitted shall be at the centerline of each street. Such grade or elevation shall be consistent with the topographic plan previously approved by the plan commission in accordance with subsection (b)(2)c of this section and shall assume as a base the datum plane of reference filed in accordance with section 22 -4, in the office of the director of public works. (Code 1974, § 13.07; Code 2001, § 46-7; Ord. No. 13-17, §§ 13, 15, 8-20-2013) Page 71 of 183 Created: 2025-11-24 15:33:33 [EST] (Supp. No. 8) Page 11 of 14 Sec. 46-8. Land divisions other than subdivisions. (a) Procedure. The divider shall submitfile a certified survey map with the plan commissionto the development services director or designee an online application, a PDF copy and CAD copy of a certified survey map, preliminary engineering drawings including street trees, and a review fee not less than 30 days preceding the meeting of the plan commission for review. If the certified survey map has no public lands and dedications, Tthe plan commission shall, within 40 days, approve, approve conditionally or reject the certified survey map. If the certified survey map has public lands and/or dedications, the plan commission shall refer the certified survey map with its recommendation to the common council to, within 40 days, approve, approve conditionally or reject the certified survey map. The divider shall be notified, in writing, of any conditions of approval or the reason for rejection. The divider shall submit to the city 13 copies of a preliminary certified survey map if the property is located within the city and two copies of the preliminary certified survey map if the property is located within the extraterritorial platting jurisdiction of the city. (b) Requirements. (1) To the extent reasonably practicable, the division shall comply with the provisions of this chapter relating to general requirements, design standards, required improvements, and public sites and open spaces. (2) The survey shall be performed and the certified survey map prepared by a surveyor registered in the state. (3) All corners shall be monumented in accordance with Wis. Stats. § 236.15(1)(c) and (d). (4) The certified survey map shall be prepared in accordance with Wis. Stats. § 236.20(2)(b), (c), (e), (f), (g), (h), (j), (k) and (l), on durable white paper 8½ inches wide by 14 inches long. All lines shall be made with nonfading black ink on a scale of not more than 200 feet to an inch. (c) Certificates and affidavits. (1) The certified survey map shall include the affidavit of the surveyor who surveyed and mapped the parcel, typed, lettered or reproduced legibly with nonfading black ink, giving a clear and concise description of the land surveyed by bearings and distances, commencing with some corner marked and established in the U.S. Public Land Survey or some corner providing reference to a corner marked and established in the U.S. Public Land Survey. Such affidavit shall include the certificate of the surveyor to the effect that he or she has fully complied with the requirements of this section. (2) The certificate of approval of the plan commission shall be typed, lettered or reproduced legibly with nonfading black ink on the face of the certified survey map. (d) Map. The certified survey map shall be filed by the divider for record with the county register of deeds, and two copies one PDF copy of the recorded certified survey map shall be filed with the city director of development services director or designee.planning if the property is located within the city. Two copies shall be filed with the director of planning if the property is located within the extraterritorial platting jurisdiction of the city. (Code 1974, § 13.08; Code 2001, § 46-8; Ord. No. 13-17, § 13, 8-20-2013) Sec. 46-9. Subdivisions created by successive divisions. (a) Where it is not practical to require that a final plat of a subdivision created by successive division be filed in accordance with this chapter, the common council may, in lieu thereof, order an assessor's plat to be made under Wis. Stats. § 70.27 and may assess the cost (as provided in such section) to the subdivider. Page 72 of 183 Created: 2025-11-24 15:33:33 [EST] (Supp. No. 8) Page 12 of 14 (b) Regardless of the type of plat filed, any such subdivision shall comply with all provisions of this chapter to the extent that they may reasonably be applied. (Code 1974, § 13.09; Code 2001, § 46-9) Sec. 46-10. Variances. (a) Plan commission authority to grant. In circumstances where the plan commission is the final approval authority for a subdivision and where, owing to special conditions, a literal enforcement of the provisions of this chapter or of the zoning code, would result in practical difficulty or unn ecessary hardship so that the spirit of this chapter and the zoning code shall be observed, public safety and welfare served, and substantial justice done, the plan commission may approve a certified survey map or plat which includes, in whole or in part, parcels of land which do not meet one or more of the following requirements in the district where such land is located: (1) Minimum lot area; (2) Minimum lot width; (3) Minimum open space; (4) Minimum setback; (5) Minimum side; or (6) Minimum rear yard. (b) Authority of common council. Where the common council has final approval authority over a subdivision, it may, upon its own motion or upon recommendation of the plan commission, grant such final approval of a certified survey map or plat which includes, in whole or in part, parcels o f land which do not meet one or more of the following requirements in the district where such land is located: (1) Minimum lot area; (2) Minimum lot width; (3) Minimum open space; (4) Minimum setback; (5) Minimum side; or (6) Minimum rear yard; where, owing to special conditions, a literal enforcement of the provisions of this chapter or the zoning code, would result in practical difficulty or unnecessary hardship so that the spirit of this chapter shall be observed, public safety and welfare served, and substantial justice done. (c) Limitation. Neither the plan commission nor common council shall waive the requirement of recording a plat or certified survey map. (d) Recording. Any modification or variance granted shall be entered in the minutes of the city plan commission and/or common council, setting forth the reasons which, in the opinion of the commission and/or council, justify the variance. (Code 1974, § 13.10; Code 2001, § 46-10) Page 73 of 183 Created: 2025-11-24 15:33:33 [EST] (Supp. No. 8) Page 13 of 14 Sec. 46-11. Fees. Any person who shall plat or otherwise divide land subject to review and approval by the city pursuant to this chapter shall pay to the city such fees as determined by resolution of the common council, such fees may include late fees, penalties and expediting fees. All fees shall be non-returnable and shall be paid to the clerk. (Code 1974, § 13.11; Code 2001, § 46-11; Ord. No. 01-08, § 1, 7-2-2001; Ord. No. 06-33, § 4, 11-8-2006) Sec. 46-12. Penalties and remedies. (a) It shall be unlawful to build upon, divide, convey, record or monument any land in violation of this chapter or the state statutes, and no person, firm or corporation shall be issued a building permit by the city authorizing the building on, or improvement of, any subdivision, certified survey map, condominium or replat within the jurisdiction of this chapter not of record as of the effective date of the ordinance from which this chapter is derived until the provisions of this chapter have been fully met. The city may institute appropriate actions or proceedings to enjoin violations of this chapter or the applicable state statutes. (b) Any person who fails to comply with the provisions of this chapter shall, upon conviction, be subject to such forfeiture as determined by resolution of the common council. Each day a violation exists or continues shall constitute a separate offense. In addition, the remedies provided by Wis. Stats. ch. 236 shall be available to the city. (c) This chapter shall be in full force and effect after a public hearing is held thereon pursuant to Wis. Stats. § 236.45(4) and its subsequent passage and publication. (Code 1974, § 13.12; Code 2001, § 46-12; Ord. No. 14-20, § 1, 12-16-2014; Ord. No. 20-16, § 6, 10-6-2020) Sec. 46-13. Condominium developments. (a) Purpose. (1) The common council hereby finds that certain issues arise in condominium developments that require limited applicability of this chapter to condominium developments. The state legislature has recognized that subdivision ordinances may apply to condominiums but that subdivision ordinances may not impose burdens upon condominiums that are different from those imposed on other property of a similar character not subject to a declaration of condominium. (2) The factor that makes this chapter applicable to condominium development is the creation of multiple, distinct property entities at or near the ground surface, subject to property taxation and separate tax parcels, with each property entity having different ownership and management. The city determines that this factor makes a condominium development dissimilar, both physically and in ownership, from developments in which the land and improvements are under unitary ownership, management and control. (3) Thus, the common council hereby finds that new condominium developments can place impacts upon community resources in the same manner as other new developments that are characterized by division of land into lots. These impacts include: a. Additional population density. b. Possibility of use of particular land in a manner unsuitable to the land's characteristics. c. Additional demands upon city parks, recreation areas, utility facilities and schools. Page 74 of 183 Created: 2025-11-24 15:33:33 [EST] (Supp. No. 8) Page 14 of 14 d. Additional traffic and street use. (b) Portions of chapter applicable to condominium developments. Subject to the provisions of Wis. Stats. § 703.115, the following sections of this chapter shall apply to condominium developments other than the conversion of existing, attached two-unit buildings to condominium ownership: (1) Section 46-4(b) through (g) relating to design standards for improvements. (2) Section 46-5 relating to public sights and open spaces. (3) Section 46-6 relating to required improvements. (4) Section 46-11 relating to fees for review, except that this requirement shall not apply to existing structures converting to condominium ownership. (5) Review and approval or denial of condominium developments under this section shall be administratively performed by the director of development services director or designee in order to meet the review timeline of Wis. Stats. § 703.115. (c) Applicability. This section shall not apply to any condominium plat recorded prior to the effective date of the ordinance from which this chapter is derived. (Code 2001, § 46-13; Ord. No. 20-16 § 3, 10-6-2020; Ord. No. 21-10, § 1, 5-4-2021) Page 75 of 183 City of De Pere, Wisconsin Request for Common Council Action 7.A Meeting Date: October 20, 2026 Department: City Clerk From: Carey Danen, City Clerk Subject: Approval of the minutes of the October 6, 2026 Common Council meeting. Recommendation: Motion to approve. Attachments: 10-6-26 Common Council minutes_draft Page 76 of 183 Common Council Regular Meeting Draft Minutes 335 South Broadway De Pere, WI 54115 www.deperewi.gov Tuesday, October 6, 2026 7:30 PM Council Chambers/Virtual 1. Call to Order The meeting was called to order at 7:30 PM by Mayor James Boyd. 2. Roll Call Present: Mike Eserkaln, Pamela Gantz, Jonathon Hansen, Amy Kundinger, Shana Ledvina, Casey Nelson, Devin Perock, Dustin Thill, James Boyd 3. Pledge of Allegiance 4. Approval of the Agenda RESULT: APPROVED [UNANIMOUS] MOVER: Jonathon Hansen SECONDER: Pamela Gantz AYES: Mike Eserkaln, Pamela Gantz, Jonathon Hansen, Amy Kundinger, Shana Ledvina, Casey Nelson, Devin Perock, Dustin Thill, James Boyd 5. Presentations/Awards/Recognition A. Presentation from the De Pere Beautification Committee. Eben Erhard and Sue Walsh presented an overview of the Beautification Committee's accomplishments over the past year and shared a visual tour of the flower beds, planters, and roundabouts maintained throughout the City. They also reported on a new initiative launched this year: the installation of a butterfly habitat in the roundabout at Scheuring Road and Suburban Drive. Erhard noted that the City staff responsible for watering the plantings are becoming increasingly stretched. He added that additional roundabouts will be installed when the southern bridge opens, further expanding the workload. Erhard encouraged the Council to consider adding another staff position to support these efforts. He concluded by recognizing the Committee’s volunteers, donors, suppliers, and City staff for their ongoing support of the Beautification Committee. B. Proclamation for Wisconsin Stormwater Week. Page 77 of 183 Mayor Boyd read the proclamation and presented a plaque to Public Works Director Scott Thoresen and Assistant City Engineer Chase Kuffel. 6. Public Comments Comments made during the public comment period shall pertain only to matters under the jurisdiction of the Common Council. §6-3(f) DPMC None. 7. Consent Agenda Consent Agenda items are those items of a routine administrative nature that are voted on by the Council in a single roll call vote. Staff recommends approval of all items. Common Council may request that an item be removed from the Consent Agenda for discussion. RESULT: APPROVED [UNANIMOUS] MOVER: James Boyd SECONDER: Pamela Gantz AYES: Mike Eserkaln, Pamela Gantz, Jonathon Hansen, Amy Kundinger, Shana Ledvina, Casey Nelson, Devin Perock, Dustin Thill, James Boyd A. Approval of the minutes of the September 15, 2026 Common Council meeting. B. Recommendation from Board of Public Works to approve City Engineer Parking and Traffic Recommendations. C. Appointment of Sarah Inman to the Redevelopment Authority by Mayor Boyd (term to expire September 30, 2031). 8. New Business A. Recommendation from Board of Park Commissioners to approve bid from Bluemels in the amount of $40,520 for playground fall surfacing at Carney Park. Parks Director Marty Kosobucki reported that Bluemels was the sole bidder for this project. RESULT: APPROVED BY ROLL CALL VOTE [UNANIMOUS] MOVER: Jonathon Hansen SECONDER: Amy Kundinger AYES: Mike Eserkaln, Pamela Gantz, Jonathon Hansen, Amy Kundinger, Shana Ledvina, Casey Nelson, Devin Perock, Dustin Thill, James Boyd B. Recommendation from the Board of Park Commissioners to accept donation of $25,000 from the David and Rita Nelson Foundation to cover additional costs related to the Wilson Park improvement project. RESULT: ACCEPTED [UNANIMOUS] MOVER: James Boyd SECONDER: Amy Kundinger Page 78 of 183 AYES: Mike Eserkaln, Pamela Gantz, Jonathon Hansen, Amy Kundinger, Shana Ledvina, Casey Nelson, Devin Perock, Dustin Thill, James Boyd C. Recommendation from the License Committee on an application for a Class "B" Fermented Malt Beverage/"Class B" Intoxicating Liquor License for ASN Tavern & Grill LLC (DBA Baba Louie's), 419 Main Av. Agent: Sandeep Singh, Green Bay WI. RESULT: APPROVED [UNANIMOUS] MOVER: Devin Perock SECONDER: Pamela Gantz AYES: Mike Eserkaln, Pamela Gantz, Jonathon Hansen, Amy Kundinger, Shana Ledvina, Casey Nelson, Devin Perock, Dustin Thill, James Boyd D. Recommendation from the License Committee on an application for change of agent for Walgreen Co., DBA Walgreens East #15637, 150 S Wisconsin St. RESULT: APPROVED [UNANIMOUS] MOVER: Pamela Gantz SECONDER: Dustin Thill AYES: Mike Eserkaln, Pamela Gantz, Jonathon Hansen, Amy Kundinger, Shana Ledvina, Casey Nelson, Devin Perock, Dustin Thill, James Boyd E. Recommendation from the License Committee on an application for a premises description change submitted by Nicolet Ale Works, LLC, 301 Main Av. RESULT: APPROVED [UNANIMOUS] MOVER: Casey Nelson SECONDER: Amy Kundinger AYES: Mike Eserkaln, Pamela Gantz, Jonathon Hansen, Amy Kundinger, Shana Ledvina, Casey Nelson, Devin Perock, Dustin Thill, James Boyd F. Recommendation from Plan Commission to approve a 1-lot extraterritorial preliminary plat of Grande Ridge Estates Third Addition at 4835 Big Sky Pass in Ledgeview (Parcel D-2641). RESULT: APPROVED [UNANIMOUS] MOVER: Devin Perock SECONDER: Shana Ledvina AYES: Mike Eserkaln, Pamela Gantz, Jonathon Hansen, Amy Kundinger, Shana Ledvina, Casey Nelson, Devin Perock, Dustin Thill, James Boyd G. For consideration and possible action on EV Charger rates for the parking garage located at 224 N Wisconsin St. RESULT: APPROVED [UNANIMOUS] MOVER: James Boyd SECONDER: Pamela Gantz AYES: Mike Eserkaln, Pamela Gantz, Jonathon Hansen, Amy Kundinger, Shana Ledvina, Casey Nelson, Devin Perock, Dustin Thill, James Boyd Page 79 of 183 9. Resolutions Mayor Boyd moved, seconded by Alderperson Nelson to suspend the rules and approve items #9 A- D with one roll call vote. Upon vote, motion carried unanimously. RESULT: ADOPTED BY ROLL CALL VOTE [UNANIMOUS] MOVER: James Boyd SECONDER: Shana Ledvina AYES: Mike Eserkaln, Pamela Gantz, Jonathon Hansen, Amy Kundinger, Shana Ledvina, Casey Nelson, Devin Perock, Dustin Thill, James Boyd A. Resolution #26-95 Authorizing Utility Easement (747 Heritage Road; Parcel ED-F0103-2). B. Resolution #26-96 Authorizing Amendment #1 to Municipal Project Agreements for South Bridge Connector Segments GV-15, GV-16, and GV-18. C. Resolution #26-97 Regarding the vacation of a portion of a public thoroughfare (right-of-way discontinuance at 450 BLK Fortune AV adjacent to Parcels WD-1041-1 and WD-1043). - Intro resolution for referral to public hearing. D. Resolution #26-98 Authorizing agreement regarding the development of business park property with NSN Real Estate LLC (Parcel WD-L492-B-7; 2330 American Boulevard). 10. Future Agenda Items None. 11. Adjournment Mayor Boyd moved, seconded by Alderperson Gantz to adjourn the meeting at 8:14 PM. Upon vote, motion carried unanimously. Respectfully submitted, Carey Danen, City Clerk Page 80 of 183 City of De Pere, Wisconsin Request for Common Council Action 7.B Meeting Date: October 20, 2026 Department: Administration From: James Boyd, Mayor Subject: Appointment of Scott Thompson to the Historic Preservation Commission by Mayor James Boyd; term to expire January 31, 2029. Recommendation: Motion to approve. Scott has been a De Pere resident since 1993. He has been a history lover (was a history minor before switching to a comprehensive major) and grew up in historic Prairie du Chien, WI (second-oldest city after Green Bay). He graduated from UWEC in 1989 and is currently VP of Client Services for SGX. Scott loves to travel and spend time outdoors and playing golf. Attachments: None Page 81 of 183 City of De Pere, Wisconsin Request for Common Council Action 7.C Meeting Date: October 20, 2026 Department: Public Works From: Eric Rakers, City Engineer Subject: Recommendation from Board of Public Works on award of Contract 26-09 Pond and Drainage System Construction. Recommendation: Accept the bid from Kruczek Construction, Inc. in the amount of $171,171.00. The Board of Public Works at the October 12, 2026 meeting approved award of Contract 26-09 Pond and Drainage System Construction. The motion passed with a 5-0 vote. Attachments: 2026 1012 CI_BOPW_Project_26-09_Award, 2026 1008 CE_Project 26-09 Bid Tab Page 82 of 183 1 To: Honorable Mayor Boyd Members of the Board of Public Works From: Eric P. Rakers, P.E., City Engineer Date: October 12, 2026 RE: Consideration and Possible Action on Award of Contact 26-09 Pond and Drainage System Construction* The Engineering Division received bids on Project 26-09 Pond and Drainage System Construction on October 8, 2026. This project consists of the construction of a new storm water treatment pond in the vacant area to the southeast of the intersection of Cook Street and Honey Court. The bids received were as follows: Contractor Base Bid Kruczek Construction Inc. $171,171.00 Advance Construction Inc. $177,800.50 De Groot, Inc. $205,587.58 Dorner Inc. $232,962.00 Calnin & Goss, LLC $254,181.75 Relyco Plus LLC $281,721.04 The City allocated $180,000 for the wet pond construction in 2026 with $72,970 from a Wisconsin Department of Natural Resources grant, $72,970 from the storm water utility, and $34,060 from the water utility. Staff’s recommendation is to accept the bid from Kruczek Construction, Inc. in the amount of $171,171.00. Attachments 2026 1008 CE_Project 26-09 Bid Tab PDF Page 83 of 183 PROJECT 26-09 POND AND DRAINAGE SYSTEM CONSTRUCTION BID TAB ITEM DESCRIPTION UNIT QTY UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID ST-01Provide 15” PVC, RCP Class III, or PP Storm Sewer LF 80 $ 135.00 $ 10,800.00 $ 152.50 $ 12,200.00 $ 154.19 $ 12,335.20 $ 103.00 $ 8,240.00 $ 148.00 $ 11,840.00 $ 92.41 $ 7,392.80 ST-02Provide 4’ Diameter Storm Manhole VF 5 $ 1,050.00 $ 5,250.00 $ 1,017.00 $ 5,085.00 $ 1,339.97 $ 6,699.85 $ 1,180.00 $ 5,900.00 $ 1,475.00 $ 7,375.00 $ 1,226.50 $ 6,132.50 ST-03Connect to Existing Structure EA 2 $ 1,050.00 $ 2,100.00 $ 1,000.00 $ 2,000.00 $ 1,515.00 $ 3,030.00 $ 1,750.00 $ 3,500.00 $ 808.00 $ 1,616.00 $ 907.50 $ 1,815.00 ST-04Provide 15” RCP Endwall EA 2 $ 1,300.00 $ 2,600.00 $ 1,472.00 $ 2,944.00 $ 1,588.73 $ 3,177.46 $ 1,805.00 $ 3,610.00 $ 2,995.00 $ 5,990.00 $ 1,219.53 $ 2,439.06 ST-05Provide Pond Discharge Structure EA 1 $ 10,000.00 $ 10,000.00 $ 8,919.00 $ 8,919.00 $ 9,519.86 $ 9,519.86 $ 7,520.00 $ 7,520.00 $ 9,920.00 $ 9,920.00 $ 6,854.00 $ 6,854.00 ST-06Abandon/Remove Existing Storm Sewer AppurtenancesLS 1 $ 9,000.00 $ 9,000.00 $ 3,600.00 $ 3,600.00 $ 3,535.00 $ 3,535.00 $ 5,650.00 $ 5,650.00 $ 2,595.00 $ 2,595.00 $ 24,300.00 $ 24,300.00 W-01Provide 8” PVC Water Main (Granular Backfill)LF 15 $ 262.00 $ 3,930.00 $ 230.00 $ 3,450.00 $ 170.69 $ 2,560.35 $ 265.00 $ 3,975.00 $ 519.00 $ 7,785.00 $ 238.80 $ 3,582.00 W-02Provide 8" PVC Water Main - Directional DrillLF 200 $ 118.50 $ 23,700.00 $ 126.00 $ 25,200.00 $ 138.50 $ 27,700.00 $ 145.00 $ 29,000.00 $ 163.00 $ 32,600.00 $ 160.11 $ 32,022.00 W-03Provide 6" PVC Water Main (Granular Backfill)LF 5 $ 307.00 $ 1,535.00 $ 181.00 $ 905.00 $ 162.61 $ 813.05 $ 436.00 $ 2,180.00 $ 620.00 $ 3,100.00 $ 226.88 $ 1,134.40 W-04Provide 2" Corporation with Plug/Saddle with 2" EA 1 $ 1,000.00 $ 1,000.00 $ 1,400.00 $ 1,400.00 $ 2,020.00 $ 2,020.00 $ 1,500.00 $ 1,500.00 $ 1,855.00 $ 1,855.00 $ 1,538.73 $ 1,538.73 W-05Provide 8" Gate Valve EA 1 $ 3,200.00 $ 3,200.00 $ 2,755.00 $ 2,755.00 $ 3,125.95 $ 3,125.95 $ 3,660.00 $ 3,660.00 $ 4,470.00 $ 4,470.00 $ 3,095.95 $ 3,095.95 W-06Provide 6" Gate Valve EA 1 $ 2,221.00 $ 2,221.00 $ 1,925.00 $ 1,925.00 $ 2,297.75 $ 2,297.75 $ 2,750.00 $ 2,750.00 $ 3,425.00 $ 3,425.00 $ 2,178.75 $ 2,178.75 W-07Provide Connection to Existing Water Main EA 1 $ 2,150.00 $ 2,150.00 $ 2,528.00 $ 2,528.00 $ 8,231.50 $ 8,231.50 $ 3,000.00 $ 3,000.00 $ 3,205.00 $ 3,205.00 $ 5,055.00 $ 5,055.00 W-08Provide Connection to Existing Water Main 6”x 6” EA 1 $ 5,850.00 $ 5,850.00 $ 7,276.00 $ 7,276.00 $ 7,856.79 $ 7,856.79 $ 6,050.00 $ 6,050.00 $ 10,100.00 $ 10,100.00 $ 9,450.00 $ 9,450.00 W-09Provide Hydrant (7.0' Bury) EA 1 $ 7,150.00 $ 7,150.00 $ 6,376.00 $ 6,376.00 $ 9,267.76 $ 9,267.76 $ 7,350.00 $ 7,350.00 $ 9,360.00 $ 9,360.00 $ 6,291.25 $ 6,291.25 W-10Provide 6” PVC Hydrant Lead LF 25 $ 145.00 $ 3,625.00 $ 75.00 $ 1,875.00 $ 96.96 $ 2,424.00 $ 108.00 $ 2,700.00 $ 131.00 $ 3,275.00 $ 135.89 $ 3,397.25 W-11Abandon/Remove Water Main and AppurtenancesLS 1 $ 6,000.00 $ 6,000.00 $ 2,500.00 $ 2,500.00 $ 5,050.00 $ 5,050.00 $ 4,500.00 $ 4,500.00 $ 2,775.00 $ 2,775.00 $ 22,845.00 $ 22,845.00 SD-01Provide Clearing and Grubbing LS 1 $ 4,000.00 $ 4,000.00 $ 17,700.00 $ 17,700.00 $ 1,060.50 $ 1,060.50 $ 5,300.00 $ 5,300.00 $ 4,910.00 $ 4,910.00 $ 3,550.00 $ 3,550.00 SD-02Unclassified Excavation CY 3425 $ 12.00 $ 41,100.00 $ 11.40 $ 39,045.00 $ 13.32 $ 45,621.00 $ 26.00 $ 89,050.00 $ 24.75 $ 84,768.75 $ 29.41 $ 100,729.25 SD-03Provide Asphalt Patch (Full-Depth) SY 50 $ 87.00 $ 4,350.00 $ 83.50 $ 4,175.00 $ 197.25 $ 9,862.50 $ 105.00 $ 5,250.00 $ 243.00 $ 12,150.00 $ 185.95 $ 9,297.50 SD-04Remove and Replace 24” Concrete Curb and Gutter LF 60 $ 80.00 $ 4,800.00 $ 85.00 $ 5,100.00 $ 79.54 $ 4,772.40 $ 91.00 $ 5,460.00 $ 98.00 $ 5,880.00 $ 75.00 $ 4,500.00 SD-05Provide #4 Reinforcement Bars for Curb and SidewalkLF 120 $ 3.00 $ 360.00 $ 3.00 $ 360.00 $ 3.18 $ 381.60 $ 9.00 $ 1,080.00 $ 3.90 $ 468.00 $ 3.00 $ 360.00 SD-06Drilled Tie Bars (Existing Sidewalk, Driveway, and Curb EA 12 $ 10.00 $ 120.00 $ 10.00 $ 120.00 $ 13.13 $ 157.56 $ 11.00 $ 132.00 $ 39.50 $ 474.00 $ 10.00 $ 120.00 SD-07Landscaping – Topsoil, Mesic Prairie Planting, Fertilizer SY 850 $ 8.00 $ 6,800.00 $ 7.45 $ 6,332.50 $ 9.09 $ 7,726.50 $ 17.50 $ 14,875.00 $ 5.20 $ 4,420.00 $ 8.50 $ 7,225.00 SD-08Landscaping – Topsoil, Seed, Fertilizer and Mulch SY 200 $ 9.00 $ 1,800.00 $ 6.45 $ 1,290.00 $ 11.11 $ 2,222.00 $ 8.00 $ 1,600.00 $ 3.90 $ 780.00 $ 7.50 $ 1,500.00 SC-01Pipe Foundation Stabilization CY 10 $ 1.00 $ 10.00 $ 30.00 $ 300.00 $ 25.25 $ 252.50 $ 25.00 $ 250.00 $ 38.00 $ 380.00 $ 79.06 $ 790.60 SC-02Slurry Backfill (If Needed) CY 10 $ 140.00 $ 1,400.00 $ 100.00 $ 1,000.00 $ 202.00 $ 2,020.00 $ 150.00 $ 1,500.00 $ 183.00 $ 1,830.00 $ 100.00 $ 1,000.00 SC-03Provide Silt Fence LF 300 $ 2.25 $ 675.00 $ 2.05 $ 615.00 $ 3.03 $ 909.00 $ 3.00 $ 900.00 $ 6.50 $ 1,950.00 $ 5.00 $ 1,500.00 SC-04Provide Erosion Bales EA 10 $ 20.00 $ 200.00 $ 14.00 $ 140.00 $ 20.20 $ 202.00 $ 38.00 $ 380.00 $ 32.50 $ 325.00 $ 25.00 $ 250.00 SC-05Inlet Protection Type A EA 1 $ 125.00 $ 125.00 $ 105.00 $ 105.00 $ 202.00 $ 202.00 $ 250.00 $ 250.00 $ 209.00 $ 209.00 $ 160.00 $ 160.00 SC-06Inlet Protection Type D EA 4 $ 80.00 $ 320.00 $ 95.00 $ 380.00 $ 151.50 $ 606.00 $ 125.00 $ 500.00 $ 209.00 $ 836.00 $ 160.00 $ 640.00 SC-07Medium Rip Rap with Geotextile Fabric (Type HR)SY 50 $ 62.00 $ 3,100.00 $ 80.00 $ 4,000.00 $ 75.75 $ 3,787.50 $ 55.00 $ 2,750.00 $ 85.00 $ 4,250.00 $ 120.00 $ 6,000.00 SC-08Tracking Pad EA 1 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 1,313.00 $ 1,313.00 $ 1,900.00 $ 1,900.00 $ 1,520.00 $ 1,520.00 $ 2,500.00 $ 2,500.00 SC-09Polystyrene Insulation Board LF 20 $ 20.00 $ 400.00 $ 10.00 $ 200.00 $ 10.10 $ 202.00 $ 10.00 $ 200.00 $ 10.00 $ 200.00 $ 18.00 $ 360.00 SC-10Provide Temporary Plug and Storm Water Bypass LS 1 $ 500.00 $ 500.00 $ 5,000.00 $ 5,000.00 $ 14,645.00 $ 14,645.00 $ 500.00 $ 500.00 $ 7,545.00 $ 7,545.00 $ 1,715.00 $ 1,715.00 Relyco Plus LLC STORM SEWER CONSTRUCTION WATER MAIN CONSTRUCTION TOTAL AMOUNT BID BIDDER NO. 3 DE GROOT, INC. BIDDER NO. 5 Calnin & Goss, LLC $ 254,181.75 BIDDER NO. 1 Kruczek Construction Inc. $ 171,171.00 BIDDER NO. 2 $ 177,800.50 $ 232,962.00 $ 205,587.58 BIDDER NO. 4 Dorner Inc.Advance Construction Inc. STREET AND DRAINAGE CONSTRUCTION SPECIAL CONSTRUCTION $ 281,721.04 BIDDER NO. 6 X:\ENG\Projects\City Projects\2026\Project 26-09 Pond_and_Drainage_System_Construction\500- Bidder Correspondence\2026 1008 CE_Project 26-09 Bid Tab 1 of 1 Page 84 of 183 City of De Pere, Wisconsin Request for Common Council Action 7.D Meeting Date: October 20, 2026 Department: Public Works From: Scott Thoresen, Public Works Director Subject: Recommendation from Board of Public Works on Design Options for the Main Avenue Slope. Recommendation: Motion to approve. The Board of Public Works at the October 12, 2026 meeting approved the Natural Prairie Plantings Design Option for the Main Avenue Slope. The motion passed with a 5-0 vote. Attachments: Main Avenue Slopes 10-5-2026, Resolution #25-98, Main Avenue Slope Letter 9-14- 2026 Page 85 of 183 1 To: Honorable Mayor Boyd Members of the Board of Public Works From: Scott Thoresen, P.E., Director of Public Works Date: October 7, 2026 RE: Consider and Possible Action on Design Options for the Main Avenue Slope* Purpose: To summarize property owner feedback regarding slope treatment options along the 600 block of Main Avenue in preparation for WisDOT Project 4190-17-00 (Main Avenue & Reid Street Reconstruction) and to request direction from the Board of Public Works. Background: The City Council approved Resolution #25-98 (see attached), authorizing Revision #3 to the State/Municipal Agreement for the upcoming Main Avenue and Reid Street reconstruction project. This revision includes funding for slope improvements near the CN Railroad bridge, originally proposed as concrete slope paving. As part of the Council’s discussion, staff was directed to gather input from adjacent property owners on potential slope treatments before finalizing design. Staff sent the attached letter to eleven property owners along Main Avenue between Seventh Street and Reid Street outlining the following options: 1. Maintain slopes as they exist today. 2. Install natural prairie plantings. 3. Install concrete slope paving. Summary of Property Owner Responses: • 627 Main: First choice 3 • 633 Main: First choice 3 – Comment: “Best look for City.” • 649 Main: First choice 2, second choice 1 – Note: Option 2 only if weeds are not sprayed. • 655 Main: First choice 2, second choice 1 • 659 Main: First choice 2, second choice 3 – Comment: Not Option 1. • 665 Main: First choice 1 – Comment: Does not want Option 3. Discussion: The purpose of this item is to present the collected feedback and determine whether the Board wishes Page 86 of 183 2 to proceed with the originally planned concrete slope paving or consider one of the alternative options based on property owner preferences. Requested Action: Provide direction on which slope treatment option should be incorporated into the design for the WisDOT reconstruction project. Page 87 of 183 Page 88 of 183 Page 89 of 183 Page 90 of 183 Page 91 of 183 Page 92 of 183 City of De Pere, Wisconsin Request for Common Council Action 7.E Meeting Date: October 20, 2026 Department: Public Works From: Eric Rakers, City Engineer Subject: Recommendation from Board of Public Works on award of Contract 26-10 Phoenix of De Pere Utility and Street Construction. Recommendation: Accept the bid from PTS Contractors, Inc. in the amount of $868,960.00. The Board of Public Works at the October 12, 2026 meeting approved award of Contract 26-10 Phoenix of De Pere Utility and Street Construction. The motion passed with a 5-0 vote. Attachments: 2026 1012 CI_BOPW_Project_26-10_Award, 2026 1008 CE_Project 26-10 Bid Tab Page 93 of 183 1 To: Honorable Mayor Boyd Members of the Board of Public Works From: Eric P. Rakers, P.E., City Engineer Date: October 12, 2026 RE: Consideration and Possible Action on Award of Contact 26-10 Phoenix of De Pere Utility and Street Construction* The Engineering Division received bids on Project 26-10 Phoenix of De Pere Utility and Street Construction on October 8, 2026. This project consists of the construction of Longtail Court, its corresponding utilities, and stormwater treatment facilities for the second phase of the Phoenix of De Pere development on the City’s west side. Final curb and gutter installation and paving of Longtail Court will take place in 2027. Longtail Court is located north of Employers Boulevard and west of Lawrence Drive. This project will service and provide immediate access to four 42-unit multi-family buildings. The bids received were as follows: Contractor Base Bid PTS Contractors, Inc. $868,960.00 MCC, Inc. $878,765.00 Kruczek Construction Inc. $968,968.00 De Groot, Inc. $982,828.23 Peters Concrete Company $998,946.50 Dorner Inc. $1,009,073.00 Advance Construction Inc. $1,010,992.75 Relyco Plus LLC $1,159,210.39 Calnin & Goss, LLC $1,188,412.90 This project is funded by TID 15. Staff’s recommendation is to accept the bid from PTS Contractors, Inc. in the amount of $868,960.00. Attachments 2026 1008 CE_Project 26-10 Bid Tab PDF Page 94 of 183 PROJECT 26-10 PHOENIX OF DE PERE UTILITY AND STREET CONSTRUCTION BID TAB ITEM DESCRIPTION UNIT QTY UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID SS-01 Provide 8-Inch PVC Sanitary Sewer (Granular Backfill) LF460 $ 105.00 $ 48,300.00 $ 105.00 $ 48,300.00 $ 133.00 $ 61,180.00 $ 141.82 $ 65,237.20 $ 121.50 $ 55,890.00 $ 154.00 $ 70,840.00 $ 150.00 $ 69,000.00 $ 196.38 $ 90,334.80 $ 168.69 $ 77,597.40 SS-02 Provide 4-Foot Diameter Sanitary Sewer Manhole VF30 $ 575.00 $ 17,250.00 $ 575.00 $ 17,250.00 $ 450.00 $ 13,500.00 $ 570.15 $ 17,104.50 $ 465.00 $ 13,950.00 $ 490.00 $ 14,700.00 $ 513.00 $ 15,390.00 $ 597.44 $ 17,923.20 $ 619.00 $ 18,570.00 SS-03 Provide Connection to Existing Sanitary Sewer Manhole EA1 $ 8,840.00 $ 8,840.00 $ 8,840.00 $ 8,840.00 $ 1,200.00 $ 1,200.00 $ 4,242.00 $ 4,242.00 $ 7,070.00 $ 7,070.00 $ 3,864.00 $ 3,864.00 $ 2,500.00 $ 2,500.00 $ 3,980.50 $ 3,980.50 $ 1,740.00 $ 1,740.00 ST-01Provide 48-Inch PP or RCP (Class III) Storm SewerLF 80 $ 200.00 $ 16,000.00 $ 200.00 $ 16,000.00 $ 237.00 $ 18,960.00 $ 272.36 $ 21,788.80 $ 234.00 $ 18,720.00 $ 196.00 $ 15,680.00 $ 228.00 $ 18,240.00 $ 210.21 $ 16,816.80 $ 337.00 $ 26,960.00 ST-02Provide 42-Inch PP or RCP (Class III) Storm SewerLF 350 $ 156.00 $ 54,600.00 $ 156.00 $ 54,600.00 $ 174.00 $ 60,900.00 $ 170.51 $ 59,678.50 $ 176.00 $ 61,600.00 $ 177.00 $ 61,950.00 $ 184.00 $ 64,400.00 $ 171.03 $ 59,860.50 $ 250.00 $ 87,500.00 ST-03Provide 30-Inch PP or RCP (Class III) Storm SewerLF 65 $ 150.00 $ 9,750.00 $ 150.00 $ 9,750.00 $ 198.00 $ 12,870.00 $ 183.04 $ 11,897.60 $ 150.00 $ 9,750.00 $ 157.00 $ 10,205.00 $ 169.00 $ 10,985.00 $ 176.64 $ 11,481.60 $ 240.00 $ 15,600.00 ST-04Provide 24-Inch PP or RCP (Class III) Storm SewerLF 15 $ 152.00 $ 2,280.00 $ 152.00 $ 2,280.00 $ 182.00 $ 2,730.00 $ 153.49 $ 2,302.35 $ 120.00 $ 1,800.00 $ 143.00 $ 2,145.00 $ 144.50 $ 2,167.50 $ 144.30 $ 2,164.50 $ 217.00 $ 3,255.00 ST-05Provide 24-Inch PP or RCP (Class III) Storm SewerLF 875 $ 3.80 $ 3,325.00 $ 3.80 $ 3,325.00 $ 81.00 $ 70,875.00 $ 86.59 $ 75,766.25 $ 88.60 $ 77,525.00 $ 98.00 $ 85,750.00 $ 88.50 $ 77,437.50 $ 85.45 $ 74,768.75 $ 122.00 $ 106,750.00 ST-06Provide 18-Inch PP or RCP (Class III) Storm SewerLF 75 $ 102.00 $ 7,650.00 $ 102.00 $ 7,650.00 $ 90.00 $ 6,750.00 $ 108.32 $ 8,124.00 $ 76.00 $ 5,700.00 $ 89.00 $ 6,675.00 $ 114.65 $ 8,598.75 $ 94.42 $ 7,081.50 $ 135.00 $ 10,125.00 ST-07Provide 18-Inch PP or RCP (Class III) Storm SewerLF 50 $ 100.00 $ 5,000.00 $ 100.00 $ 5,000.00 $ 93.00 $ 4,650.00 $ 72.93 $ 3,646.50 $ 95.75 $ 4,787.50 $ 95.00 $ 4,750.00 $ 95.65 $ 4,782.50 $ 75.13 $ 3,756.50 $ 107.00 $ 5,350.00 ST-08Provide 12-Inch PVC, PP, or RCP (Class III) Storm SewerLF 70 $ 81.00 $ 5,670.00 $ 81.00 $ 5,670.00 $ 75.00 $ 5,250.00 $ 85.56 $ 5,989.20 $ 56.00 $ 3,920.00 $ 68.00 $ 4,760.00 $ 80.00 $ 5,600.00 $ 78.08 $ 5,465.60 $ 98.60 $ 6,902.00 ST-09Provide 12-Inch PVC, PP, or RCP (Class III) Storm SewerLF 325 $ 59.00 $ 19,175.00 $ 59.00 $ 19,175.00 $ 50.00 $ 16,250.00 $ 48.41 $ 15,733.25 $ 50.25 $ 16,331.25 $ 50.00 $ 16,250.00 $ 51.50 $ 16,737.50 $ 51.69 $ 16,799.25 $ 63.80 $ 20,735.00 ST-10Provide 7-Foot Diameter Storm Sewer ManholeVF 12 $ 1,340.00 $ 16,080.00 $ 1,340.00 $ 16,080.00 $ 1,300.00 $ 15,600.00 $ 1,410.03 $ 16,920.36 $ 1,230.00 $ 14,760.00 $ 1,298.00 $ 15,576.00 $ 1,331.00 $ 15,972.00 $ 1,362.17 $ 16,346.04 $ 1,625.00 $ 19,500.00 ST-11Provide 6-Foot Diameter Storm Sewer ManholeVF 20 $ 1,050.00 $ 21,000.00 $ 1,050.00 $ 21,000.00 $ 980.00 $ 19,600.00 $ 1,032.86 $ 20,657.20 $ 940.00 $ 18,800.00 $ 942.00 $ 18,840.00 $ 1,000.00 $ 20,000.00 $ 1,054.00 $ 21,080.00 $ 1,370.00 $ 27,400.00 ST-12Provide 5-Foot Diameter Storm Sewer ManholeVF 28 $ 865.00 $ 24,220.00 $ 865.00 $ 24,220.00 $ 765.00 $ 21,420.00 $ 873.67 $ 24,462.76 $ 800.00 $ 22,400.00 $ 686.00 $ 19,208.00 $ 783.00 $ 21,924.00 $ 851.68 $ 23,847.04 $ 1,100.00 $ 30,800.00 ST-13Provide 4-Foot Diameter Storm Sewer ManholeVF 28 $ 685.00 $ 19,180.00 $ 685.00 $ 19,180.00 $ 629.00 $ 17,612.00 $ 740.38 $ 20,730.64 $ 620.00 $ 17,360.00 $ 608.00 $ 17,024.00 $ 690.00 $ 19,320.00 $ 692.93 $ 19,402.04 $ 894.00 $ 25,032.00 ST-14Provide Type B Inlet EA 8 $ 3,030.00 $ 24,240.00 $ 3,030.00 $ 24,240.00 $ 3,530.00 $ 28,240.00 $ 3,482.28 $ 27,858.24 $ 3,595.00 $ 28,760.00 $ 3,520.00 $ 28,160.00 $ 2,884.00 $ 23,072.00 $ 3,685.69 $ 29,485.52 $ 5,050.00 $ 40,400.00 ST-15Provide 48-Inch Concrete Endwall EA 1 $ 3,200.00 $ 3,200.00 $ 3,200.00 $ 3,200.00 $ 3,950.00 $ 3,950.00 $ 3,346.13 $ 3,346.13 $ 3,465.00 $ 3,465.00 $ 4,121.00 $ 4,121.00 $ 4,004.00 $ 4,004.00 $ 3,499.75 $ 3,499.75 $ 5,570.00 $ 5,570.00 ST-16Provide 24-Inch Concrete Endwall EA 1 $ 1,445.00 $ 1,445.00 $ 1,445.00 $ 1,445.00 $ 1,800.00 $ 1,800.00 $ 1,760.43 $ 1,760.43 $ 2,200.00 $ 2,200.00 $ 1,662.00 $ 1,662.00 $ 1,544.00 $ 1,544.00 $ 1,757.50 $ 1,757.50 $ 2,825.00 $ 2,825.00 ST-17Salvage and Reinstall Existing Concrete EndwallEA 2 $ 350.00 $ 700.00 $ 350.00 $ 700.00 $ 950.00 $ 1,900.00 $ 858.50 $ 1,717.00 $ 1,950.00 $ 3,900.00 $ 1,181.00 $ 2,362.00 $ 1,000.00 $ 2,000.00 $ 1,250.25 $ 2,500.50 $ 734.00 $ 1,468.00 ST-18Provide Pond Discharge Structure EA 1 $ 6,525.00 $ 6,525.00 $ 6,525.00 $ 6,525.00 $ 7,150.00 $ 7,150.00 $ 8,524.88 $ 8,524.88 $ 6,050.00 $ 6,050.00 $ 5,182.00 $ 5,182.00 $ 7,925.00 $ 7,925.00 $ 6,402.50 $ 6,402.50 $ 8,190.00 $ 8,190.00 ST-19Abandon/Remove Existing Storm Sewer and LS 1 $ 1,325.00 $ 1,325.00 $ 1,325.00 $ 1,325.00 $ 14,000.00 $ 14,000.00 $ 2,525.00 $ 2,525.00 $ 500.00 $ 500.00 $ 4,000.00 $ 4,000.00 $ 1,000.00 $ 1,000.00 $ 6,310.00 $ 6,310.00 $ 104.00 $ 104.00 W-01Provide 12-Inch PVC Water Main (Natural Backfill)LF 850 $ 74.00 $ 62,900.00 $ 74.00 $ 62,900.00 $ 85.00 $ 72,250.00 $ 76.75 $ 65,237.50 $ 84.75 $ 72,037.50 $ 77.00 $ 65,450.00 $ 77.00 $ 65,450.00 $ 87.70 $ 74,545.00 $ 115.00 $ 97,750.00 W-02Provide 8-Inch PVC Water Main (Natural Backfill)LF 25 $ 85.00 $ 2,125.00 $ 85.00 $ 2,125.00 $ 108.00 $ 2,700.00 $ 96.68 $ 2,417.00 $ 82.25 $ 2,056.25 $ 78.00 $ 1,950.00 $ 62.50 $ 1,562.50 $ 80.44 $ 2,011.00 $ 146.00 $ 3,650.00 W-03Provide 12-Inch Gate Valve EA 1 $ 4,850.00 $ 4,850.00 $ 4,850.00 $ 4,850.00 $ 5,490.00 $ 5,490.00 $ 5,236.85 $ 5,236.85 $ 5,100.00 $ 5,100.00 $ 5,363.00 $ 5,363.00 $ 4,785.00 $ 4,785.00 $ 5,015.25 $ 5,015.25 $ 6,830.00 $ 6,830.00 W-04Provide 8-Inch Gate Valve EA 1 $ 2,725.00 $ 2,725.00 $ 2,725.00 $ 2,725.00 $ 3,030.00 $ 3,030.00 $ 3,014.85 $ 3,014.85 $ 2,800.00 $ 2,800.00 $ 3,025.00 $ 3,025.00 $ 2,645.00 $ 2,645.00 $ 2,920.25 $ 2,920.25 $ 4,105.00 $ 4,105.00 W-05Provide 6-Inch Gate Valve EA 2 $ 1,910.00 $ 3,820.00 $ 1,910.00 $ 3,820.00 $ 2,114.50 $ 4,229.00 $ 2,228.06 $ 4,456.12 $ 1,950.00 $ 3,900.00 $ 2,148.00 $ 4,296.00 $ 1,856.00 $ 3,712.00 $ 2,057.25 $ 4,114.50 $ 3,095.00 $ 6,190.00 W-06Provide Connection to Existing Water Main 12-Inch x 12-EA 1 $ 10,125.00 $ 10,125.00 $ 10,125.00 $ 10,125.00 $ 11,000.00 $ 11,000.00 $ 11,071.62 $ 11,071.62 $ 10,850.00 $ 10,850.00 $ 11,147.00 $ 11,147.00 $ 12,312.00 $ 12,312.00 $ 10,965.00 $ 10,965.00 $ 15,600.00 $ 15,600.00 W-07Provide Hydrant (7.5-Foot Bury) EA 1 $ 6,400.00 $ 6,400.00 $ 6,400.00 $ 6,400.00 $ 7,100.00 $ 7,100.00 $ 6,877.09 $ 6,877.09 $ 6,650.00 $ 6,650.00 $ 6,922.00 $ 6,922.00 $ 6,484.00 $ 6,484.00 $ 6,022.50 $ 6,022.50 $ 9,255.00 $ 9,255.00 W-08Provide Hydrant (7.0-Foot Bury) EA 1 $ 6,295.00 $ 6,295.00 $ 6,295.00 $ 6,295.00 $ 7,000.00 $ 7,000.00 $ 6,768.01 $ 6,768.01 $ 6,550.00 $ 6,550.00 $ 6,805.00 $ 6,805.00 $ 6,376.00 $ 6,376.00 $ 5,912.50 $ 5,912.50 $ 9,125.00 $ 9,125.00 W-09Provide 6-Inch PVC Hydrant Lead LF 10 $ 68.00 $ 680.00 $ 68.00 $ 680.00 $ 61.00 $ 610.00 $ 42.72 $ 427.20 $ 90.00 $ 900.00 $ 58.00 $ 580.00 $ 61.00 $ 610.00 $ 80.25 $ 802.50 $ 84.30 $ 843.00 SD-01Provide Clearing and Grubbing LS 1 $ 5,200.00 $ 5,200.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,252.00 $ 5,252.00 $ 17,490.00 $ 17,490.00 $ 5,279.00 $ 5,279.00 $ 12,155.00 $ 12,155.00 $ 10,000.00 $ 10,000.00 $ 38,700.00 $ 38,700.00 SD-02Unclassified Excavation (Pond) CY 38250 $ 4.40 $ 168,300.00 $ 4.50 $ 172,125.00 $ 4.30 $ 164,475.00 $ 4.42 $ 169,065.00 $ 5.56 $ 212,670.00 $ 5.20 $ 198,900.00 $ 4.29 $ 164,092.50 $ 7.99 $ 305,617.50 $ 5.55 $ 212,287.50 SD-03Unclassified Excavation (Street and Clay Stockpile)CY 7700 $ 4.80 $ 36,960.00 $ 4.75 $ 36,575.00 $ 4.75 $ 36,575.00 $ 4.84 $ 37,268.00 $ 5.20 $ 40,040.00 $ 8.20 $ 63,140.00 $ 3.50 $ 26,950.00 $ 5.20 $ 40,040.00 $ 6.15 $ 47,355.00 SD-05Remove Existing Paved Surfaces and Base CourseSY 1300 $ 3.20 $ 4,160.00 $ 3.25 $ 4,225.00 $ 3.20 $ 4,160.00 $ 3.22 $ 4,186.00 $ 4.00 $ 5,200.00 $ 2.80 $ 3,640.00 $ 5.00 $ 6,500.00 $ 6.25 $ 8,125.00 $ 4.50 $ 5,850.00 SD-06Topsoil Stripping (Fill Areas) SY 35100 $ 2.40 $ 84,240.00 $ 2.50 $ 87,750.00 $ 2.40 $ 84,240.00 $ 2.44 $ 85,644.00 $ 0.99 $ 34,749.00 $ 0.80 $ 28,080.00 $ 2.79 $ 97,929.00 $ 1.00 $ 35,100.00 $ 0.65 $ 22,815.00 SD-07Salvage and Reuse Asphaltic Concrete Pulverized CY 1200 $ 4.40 $ 5,280.00 $ 4.50 $ 5,400.00 $ 4.50 $ 5,400.00 $ 4.52 $ 5,424.00 $ 9.25 $ 11,100.00 $ 7.30 $ 8,760.00 $ 7.00 $ 8,400.00 $ 5.25 $ 6,300.00 $ 10.60 $ 12,720.00 SD-08Provide 1 1/4-Inch Crushed Aggregate Base CourseCY 1000 $ 36.20 $ 36,200.00 $ 36.10 $ 36,100.00 $ 36.75 $ 36,750.00 $ 36.62 $ 36,620.00 $ 35.35 $ 35,350.00 $ 36.50 $ 36,500.00 $ 30.00 $ 30,000.00 $ 38.50 $ 38,500.00 $ 41.00 $ 41,000.00 SD-092-Inch Asphalt Cold Patch (Employers Boulevard & Trail)SY 65 $ 25.00 $ 1,625.00 $ 25.00 $ 1,625.00 $ 30.00 $ 1,950.00 $ 38.84 $ 2,524.60 $ 25.00 $ 1,625.00 $ 38.00 $ 2,470.00 $ 28.00 $ 1,820.00 $ 40.00 $ 2,600.00 $ 88.60 $ 5,759.00 SD-10Landscaping - Topsoil, Mesic Prairie Planting, Fertilizer, SY 6000 $ 3.30 $ 19,800.00 $ 3.50 $ 21,000.00 $ 3.40 $ 20,400.00 $ 3.35 $ 20,100.00 $ 3.45 $ 20,700.00 $ 5.40 $ 32,400.00 $ 4.12 $ 24,720.00 $ 3.57 $ 21,420.00 $ 3.69 $ 22,140.00 SD-11Landscaping – Topsoil, Seed, Fertilizer and Mulch SY 16500 $ 1.90 $ 31,350.00 $ 2.00 $ 33,000.00 $ 2.00 $ 33,000.00 $ 1.93 $ 31,845.00 $ 2.35 $ 38,775.00 $ 2.00 $ 33,000.00 $ 2.75 $ 45,375.00 $ 3.12 $ 51,480.00 $ 1.95 $ 32,175.00 SD-12Landscaping - Topsoil, Temporary Nurse Crop and MulchSY 40500 $ 1.10 $ 44,550.00 $ 1.10 $ 44,550.00 $ 1.10 $ 44,550.00 $ 1.07 $ 43,335.00 $ 1.45 $ 58,725.00 $ 1.60 $ 64,800.00 $ 1.35 $ 54,675.00 $ 1.55 $ 62,775.00 $ 0.80 $ 32,400.00 SC-01Pipe Foundation Stabilization CY 100 $ 28.00 $ 2,800.00 $ 28.00 $ 2,800.00 $ 0.10 $ 10.00 $ 25.25 $ 2,525.00 $ 31.00 $ 3,100.00 $ 27.00 $ 2,700.00 $ 30.00 $ 3,000.00 $ 40.40 $ 4,040.00 $ 38.00 $ 3,800.00 SC-02Provide Silt Fence LF 2200 $ 2.25 $ 4,950.00 $ 2.20 $ 4,840.00 $ 2.25 $ 4,950.00 $ 2.29 $ 5,038.00 $ 2.20 $ 4,840.00 $ 2.40 $ 5,280.00 $ 2.20 $ 4,840.00 $ 2.20 $ 4,840.00 $ 2.60 $ 5,720.00 SC-03Provide Erosion Bales EA 20 $ 10.00 $ 200.00 $ 10.00 $ 200.00 $ 10.00 $ 200.00 $ 14.14 $ 282.80 $ 10.00 $ 200.00 $ 35.00 $ 700.00 $ 10.00 $ 200.00 $ 10.00 $ 200.00 $ 13.00 $ 260.00 SC-04Inlet Protection Type D EA 8 $ 105.00 $ 840.00 $ 100.00 $ 800.00 $ 89.00 $ 712.00 $ 111.10 $ 888.80 $ 100.00 $ 800.00 $ 112.00 $ 896.00 $ 100.00 $ 800.00 $ 100.00 $ 800.00 $ 130.00 $ 1,040.00 SC-05Medium Rip Rap with Geotextile Fabric (Type HR)SY 150 $ 38.00 $ 5,700.00 $ 40.00 $ 6,000.00 $ 38.00 $ 5,700.00 $ 38.64 $ 5,796.00 $ 40.00 $ 6,000.00 $ 10.00 $ 1,500.00 $ 80.00 $ 12,000.00 $ 70.00 $ 10,500.00 $ 46.10 $ 6,915.00 SC-06Tracking Pad EA 1 $ 1,130.00 $ 1,130.00 $ 1,100.00 $ 1,100.00 $ 1,100.00 $ 1,100.00 $ 1,515.00 $ 1,515.00 $ 1,500.00 $ 1,500.00 $ 1,786.00 $ 1,786.00 $ 1,000.00 $ 1,000.00 $ 3,500.00 $ 3,500.00 $ 1,755.00 $ 1,755.00 TOTAL AMOUNT BID BIDDER NO. 9 Calnin & Goss, LLC SANITARY SEWER CONSTRUCTION STORM SEWER CONSTRUCTION WATER MAIN CONSTRUCTION BIDDER NO. 6 BIDDER NO. 7 BIDDER NO. 8 Dorner Inc. Advance Construction Inc. Relyco Plus LLCDE GROOT, INC. $ 1,009,073.00 $ 1,010,992.75 $ 1,159,210.39 $ 1,188,412.90 BIDDER NO. 1 PTS Contractors, Inc $ 868,960.00 BIDDER NO. 2 $ 878,765.00 MCC, Inc. STREET AND DRAINAGE CONSTRUCTION SPECIAL CONSTRUCTION BIDDER NO. 3 Kruczek Construction Inc. BIDDER NO. 5 Peters Concrete Company $ 998,946.50 $ 982,828.23 $ 968,968.00 BIDDER NO. 4 X:\ENG\Projects\City Projects\2026\Project 26-10 Phoenix of De Pere Street Construction\500-Bidder_Correspondence\2026 1008 CE_Project 26-10 Bid Tab 1 of 1 Page 95 of 183 City of De Pere, Wisconsin Request for Common Council Action 7.F Meeting Date: October 20, 2026 Department: City Attorney From: Subject: Consideration and Possible Action on Final Payment Application for the De Pere Parking Garage Located at 224 N. Wisconsin ST. Recommendation: Motion to Approve. Attachments: Parking Ramp Final Pay Memo - 10202026, CM Advantages, 250840 Pay App 10 Sept 2026_GRAEF Page 96 of 183 To: Mayor James Boyd Common Council From: Daniel Lindstrom, Development Services Director Date: October 20, 2026 RE: Consideration and Possible Action on Final Payment Application for the De Pere Parking Garage. Overview In 2023, the City of De Pere approved a term sheet for redeveloping the former ShopKo retail store at the 200 block of Broadway and Wisconsin Streets. The approved term sheet included development terms for five new mixed-use buildings downtown and a publicly owned parking structure. Since then, the developer(s) have been slowly moving toward the redevelopment. Last week saw the ribbon-cutting of the 550 William Street, 60-unit mixed-use building, the first night of operation for the 90-room Marriott TownPlace Suites, and the soft opening of the parking structure. The City issued two RFPs for the development of the project – (1) Design and (2) Construction Manager at Risk (CMaR). GRAEF led the architectural and engineering work, with close coordination with Miron as the CMaR. What is Construction Management at Risk (CMaR) CMaR is a delivery method in which the Construction Manager commits to delivering the project within a Guaranteed Maximum Price (GMP) based on the construction documents and specifications at the time of the GMP. The CMaR provides professional services and acts as a consultant to the owner in the design development with the designer and construction phases with the contractor. Often, the CMaR also provides some of the actual construction of the project, depending on bidder availability and the company's expertise. In addition to acting in the owner's interest, the CMaR must manage and control construction costs to avoid exceeding the GMP because, contractually, any costs exceeding the GMP that are not change orders are the CMaR's financial liability. An additional benefit to the project is that having a CMaR with construction experience creates feedback for the designer, helping them identify construction challenges before the design is final. As such, they are able to streamline the overall design and bidding process. Overall Design and Key Features The project originally contemplated one level of underground parking. However, geotechnical analysis identified soil conditions that made below‑grade construction cost‑prohibitive. As a result, the design shifted to an above‑ground structure, requiring the entire development footprint to move approximately 20 feet south. This adjustment allowed the City and its development partners to create a new public plaza between the ramp and the 550 William Street mixed‑use building. The ramp incorporates several integrated systems, including: • EV charging stations on the ground floor. • Auto‑dimming lighting to reduce energy use and glare to the downtown/near downtown residents. • A street‑light controller and generator serving several downtown blocks. • Architectural concrete forms by Wells Precast that hold actual face brick, significantly improving aesthetics at a modest cost premium. Page 97 of 183 Delivery Method – Construction Manager at Risk (CMaR) The City selected Miron Construction as its Construction Manager at Risk in March 2025. Miron provided extensive preconstruction services, including value engineering, constructability review, and daily coordination that reduced the burden on Development Services Department and the Law Departments. The Guaranteed Maximum Price (GMP) and Construction Fee was set at approximately $9,620,000, providing cost certainty and risk protection for the City. Project Timeline • Feasibility & Concept Development: 2022–2024 • Design Start: Fall 2024 • CMaR Selection: March 2025 • Groundbreaking: December 2025 / January 2026 • Precast Installation & Topping Out: Spring 2026 • Substantial Completion: September 2026 • Final Completion: October 2026 (PARC system outstanding) Budget & Financing The original anticipated budget was $9,000,000 (construction only). The final project cost, including design and CMaR services, totaled $10,005,000, and broke down as follows (rounded figures): • Design: $385,000 (including one amendment for additional soil pressure testing) • CMaR: $233,000 • Construction (GMP): $9,387,000 • Total: $10,005,000 Change Orders The project included 35 Potential Change Orders (PCOs), most of which were minor refinements captured within four consolidated change orders. Change orders to $142,017.03. Resulting in a new total price of $9,761,911.03. These adjustments were theoretically funded through project contingency and did not require out-of-scope approvals. The net result shows a $546,975.91 balance to Finish/Retainage. Stated differently, no change orders exceeded the GMP, and the project remained under budget. Scope Changes Not Originally Included in the Design The team made material selections and minor refinements throughout the project, but no changes were driven by public input, Council direction, or contractor recommendations. Outside the Miron scope were the inclusion of enhanced security cameras with a Camera Corner Connecting Point (CCCP) and the addition of cell phone single boosters for the EV charging stations and users on the bottom floor in the ramp. The security camera system cost an additional $109,539.75. The cell phone system booster is still outstanding. Construction Challenges & Resolutions The project team navigated several challenges: • Architectural Aesthetic: The City prioritized a design that did not resemble a traditional parking ramp. Wells Precast's brick‑holding concrete forms provided a high‑quality façade at a modest cost premium (approximately $100,000–$130,000). • Soil Conditions: A major cost‑implication decision was the shift to above‑ground construction, which avoided roughly $1,000,000 in soil stabilization costs. Even with the additional $120,000 land purchase required for the site shift, the net savings were substantial. The inability to construct underground parking required a full redesign and site shift, ultimately improving the plaza layout and reducing costs. Page 98 of 183 • Coordination with Adjacent Projects: Miron, City Engineering, Immel Construction, and American Construction Services coordinated closely to manage street reconstruction, utility work, and site access. • Top Deck Concrete Shrinkage: The first concrete pour experienced plastic shrinkage due to rapid surface drying. After extensive evaluation, staff met with several industry professionals and ultimately selected an MMA sealant to "seal and heal" the cracks; this is a product similar to one used on highway bridge decks. Unfortunately, the MMA product is off-white/yellow. The temporary off‑white/yellow appearance will fade as the material wears. The City, Miron, and GRAEF will reconvene in spring 2027 to evaluate long‑term performance following the first winter freeze/thaw cycle. Additional Notes and Final Thoughts The project was a large undertaking for the City, one we have never undertaken before. What is most impressive was the construction coordination by Miron, the City Engineering Department for the reconstruction of William and Wisconsin Streets, Immel Construction (550 William Street), and American Construction Services (hotel development) – four large projects in a small space, all at once. The ramp will be fully operational in the coming month, following completion of the PARC training. General public feedback has been positive, particularly regarding the brick façade and overall integration with surrounding development. The PARC system and online portal will allow for minimal staffing and streamlined operations. The project was generally delivered on time with minimal delays, under budget, and with minimal disruption, supporting the City's broader redevelopment goals and providing essential structured parking for downtown. Page 99 of 183 PROJECT DELIVERY METHODS | MIRON CONSTRUCTION CO., INC. OWNER ARCHITECT GENERAL CONTRACTOR CONSULTANT ENGINEER SUB- CONTRACTORS SUPPLIERS DESIGN | BID | BUILD ROLE | General Contractor contracts directly with Owner | Architect contracts directly with Owner | General Contractor contracts directly with subcontractors/suppliers | Low bidder is generally selected on lump-sum basis ADVANTAGES | Design is complete prior to bidding | Bid documents are prepared at one time vs. phased bidding CONSIDERATIONS | No General Contractor input during design | May cause adversarial relationships among parties | Low bidders may lack proper qualifications | Can lead to increased change orders | No Owner input during subcontractor/supplier selection | No “open book” process; savings accrue to General Contractor | Overall project costs are not identified until design is complete and bid DESIGN-BUILD ROLE | Comprehensive services from beginning to end | Design-Builder contracts directly with Owner | Design-Builder holds all contracts (A/E, subcontractors, suppliers,etc.) | Early involvement and collaboration to achieve Owner’s objectives ADVANTAGES | Single point of responsibility throughout design and construction | GMP established at completion of design phase | Value engineering and constructability reviews may be completed during design | Typically requires fewer change orders than Design/Bid/Build method | Allows for phased and fast-track construction | Includes an “open book” process; savings accrue to Owner | Owner determines own level of involvement | Competitive bidding on all work with input from Owner CONSIDERATIONS | Limited checks and balances between design and construction team | Tendency to focus on Guaranteed Maximum Price (GMP) vs. quality | Many General Contractors are not qualified Design-Builders OWNER DESIGN-BUILDER CONSULTANT ENGINEER SUB- CONTRACTORS SUPPLIERS ARCHITECT CONSTRUCTION MANAGEMENT AT RISK OWNER ARCHITECT CONSTRUCTION MANAGER AT RISK CONSULTANT ENGINEER SUB- CONTRACTORS SUPPLIERS ROLE | CM collaborates with Owner and A/E throughout project | CM contracts directly with Owner, A/E contracts directly with Owner | CM holds all contracts (subcontractors, suppliers, etc.) | CM bonds entire project ADVANTAGES | Single point of responsibility for construction | Guaranteed Maximum Price (GMP) established at completion of design phase | CM selection based on experience and performance, not price | Allows for phased and fast-track construction | Includes an “open book” process; savings accrue to Owner | CM can provide value engineering and constructability reviews during design | Competitive bidding on all work with input from Owner | Subcontractor and supplier selection based on price, experience and performance | Creates a strong system of checks and balances between A/E and CM CONSIDERATIONS | May require additional bid packages | Requires additional coordination by design team | Many General Contractors are not qualified Construction Managers 11QQ 22QQ 33QQ 44QQ 11QQ 22QQ 33QQ OOwwnneerr AArrcchhiitteecctt ((DDeessiiggnn)) CCoonnssttrruuccttiioonn MMaannaaggeerr AArrcchhiitteecctt ((CCoonnttrraacctt MMaannaaggeemmeenntt)) SSuubbccoonnttrraaccttoorrss && SSuupppplliieerrss 11QQ 22QQ 33QQ 44QQ 11QQ 22QQ OOwwnneerr AArrcchhiitteecctt ((DDeessiiggnn)) CCoonnssttrruuccttiioonn MMaannaaggeerr AArrcchhiitteecctt ((CCoonnttrraacctt MMaannaaggeemmeenntt)) SSuubbccoonnttrraaccttoorrss && SSuupppplliieerrss 11QQ 22QQ 33QQ 44QQ 11QQ 22QQ 33QQ 44QQ 11QQ 22QQ 33QQ 44QQ OOwwnneerr AArrcchhiitteecctt ((DDeessiiggnn)) CCoonnssttrruuccttiioonn MMaannaaggeerr AArrcchhiitteecctt ((CCoonnttrraacctt MMaannaaggeemmeenntt)) SSuubbccoonnttrraaccttoorrss && SSuupppplliieerrss 11QQ 22QQ 33QQ 44QQ 11QQ 22QQ 33QQ 44QQ 11QQ OOwwnneerr AArrcchhiitteecctt ((DDeessiiggnn)) CCoonnssttrruuccttiioonn MMaannaaggeerr AArrcchhiitteecctt ((CCoonnttrraacctt MMaannaaggeemmeenntt)) SSuubbccoonnttrraaccttoorrss && SSuupppplliieerrss 27 months 24 months 24 months 24 months YEAR 1 YEAR 2 9 months YEAR 3 24 months YEAR 1 YEAR 3 6 months 12 months 12 months 12 months YEAR 2 36 months 9 months 24 months 24 months 18 months 12 months 12 months 12 months YEAR 2YEAR 1 YEAR 1 6 months 21 months YEAR 2 11QQ 22QQ 33QQ 44QQ 11QQ 22QQ 33QQ OOwwnneerr AArrcchhiitteecctt ((DDeessiiggnn)) CCoonnssttrruuccttiioonn MMaannaaggeerr AArrcchhiitteecctt ((CCoonnttrraacctt MMaannaaggeemmeenntt)) SSuubbccoonnttrraaccttoorrss && SSuupppplliieerrss 11QQ 22QQ 33QQ 44QQ 11QQ 22QQ OOwwnneerr AArrcchhiitteecctt ((DDeessiiggnn)) CCoonnssttrruuccttiioonn MMaannaaggeerr AArrcchhiitteecctt ((CCoonnttrraacctt MMaannaaggeemmeenntt)) SSuubbccoonnttrraaccttoorrss && SSuupppplliieerrss 11QQ 22QQ 33QQ 44QQ 11QQ 22QQ 33QQ 44QQ 11QQ 22QQ 33QQ 44QQ OOwwnneerr AArrcchhiitteecctt ((DDeessiiggnn)) CCoonnssttrruuccttiioonn MMaannaaggeerr AArrcchhiitteecctt ((CCoonnttrraacctt MMaannaaggeemmeenntt)) SSuubbccoonnttrraaccttoorrss && SSuupppplliieerrss 11QQ 22QQ 33QQ 44QQ 11QQ 22QQ 33QQ 44QQ 11QQ OOwwnneerr AArrcchhiitteecctt ((DDeessiiggnn)) CCoonnssttrruuccttiioonn MMaannaaggeerr AArrcchhiitteecctt ((CCoonnttrraacctt MMaannaaggeemmeenntt)) SSuubbccoonnttrraaccttoorrss && SSuupppplliieerrss 27 months 24 months 24 months 24 months YEAR 1 YEAR 2 9 months YEAR 3 24 months YEAR 1 YEAR 3 6 months 12 months 12 months 12 months YEAR 2 36 months 9 months 24 months 24 months 18 months 12 months 12 months 12 months YEAR 2YEAR 1 YEAR 1 6 months 21 months YEAR 2 11QQ 22QQ 33QQ 44QQ 11QQ 22QQ 33QQ OOwwnneerr AArrcchhiitteecctt ((DDeessiiggnn)) CCoonnssttrruuccttiioonn MMaannaaggeerr AArrcchhiitteecctt ((CCoonnttrraacctt MMaannaaggeemmeenntt)) SSuubbccoonnttrraaccttoorrss && SSuupppplliieerrss 11QQ 22QQ 33QQ 44QQ 11QQ 22QQ OOwwnneerr AArrcchhiitteecctt ((DDeessiiggnn)) CCoonnssttrruuccttiioonn MMaannaaggeerr AArrcchhiitteecctt ((CCoonnttrraacctt MMaannaaggeemmeenntt)) SSuubbccoonnttrraaccttoorrss && SSuupppplliieerrss 11QQ 22QQ 33QQ 44QQ 11QQ 22QQ 33QQ 44QQ 11QQ 22QQ 33QQ 44QQ OOwwnneerr AArrcchhiitteecctt ((DDeessiiggnn)) CCoonnssttrruuccttiioonn MMaannaaggeerr AArrcchhiitteecctt ((CCoonnttrraacctt MMaannaaggeemmeenntt)) SSuubbccoonnttrraaccttoorrss && SSuupppplliieerrss 11QQ 22QQ 33QQ 44QQ 11QQ 22QQ 33QQ 44QQ 11QQ OOwwnneerr AArrcchhiitteecctt ((DDeessiiggnn)) CCoonnssttrruuccttiioonn MMaannaaggeerr AArrcchhiitteecctt ((CCoonnttrraacctt MMaannaaggeemmeenntt)) SSuubbccoonnttrraaccttoorrss && SSuupppplliieerrss 27 months 24 months 24 months 24 months YEAR 1 YEAR 2 9 months YEAR 3 24 months YEAR 1 YEAR 3 6 months 12 months 12 months 12 months YEAR 2 36 months 9 months 24 months 24 months 18 months 12 months 12 months 12 months YEAR 2YEAR 1 YEAR 1 6 months 21 months YEAR 2 27 MONTHS 36 MONTHS 27 MONTHS TYPICAL SCHEDULETYPICAL SCHEDULETYPICAL SCHEDULE Page 100 of 183 APPLICATION AND CERTIFICATE FOR PAYMENT TO OWNER:City of De Pere 335 S Broadway St De Pere, Wl 54115 Page: 1 of 3 FROM Miron Construction Co., lnc. CONTRACTOR:pO Box 1372 Green Bay, Wl 54305-1372 CONTRACT FOR: De Pere Parkinq Facility is attached. 1. ORIGINAL CONTRACT SUM 2. Net change by change orders 3. CONTRACT SUM TO DATE ( Linel +l-2) . . . . . 4. TOTAL COMPLETED & STORED TO DATE . . . . (Column G on G703) 5. RETAINAGE: (Total retainage Column I of G703) 6. TOTAL EARNED LESS RETAINAGE (Line 4 less Line 5 Total ) 7. LESS PREVIOUS CERTIFICATES FOR PAYMENT (Line6from priorCertificate) . ... 8. CURRENT PAYMENT DUE. - 9. BALANCE TO FINISH, INCLUDING RETAINAGE (Line 3 less Line 6 ) PROJECT: De Pere Parking Facility 250 N. Wisconsin Street De Pere, Wl 54115 ARCHITECT:GRAEF 1 150 Springhurst Dr Ste 201 Green Bay, Wl 54304-5950 9,619,894.00 142,017.03 9,761,91 1.03 9,214,935.12 o.oo tY' 9,214,935.12 state of: 18,93 546,975.91 APPLICATION NO PÊRIOD TO PROJECT NOS INVOICE NO 10 09t30t2026 250E40 250840-001 0 Distribution to: ! owuen n ARcHrrEcr ! corurnncron ntrCONTRACT DAIE : O3lO4l2O25 APPLICATION AND CERTIFICATE FOR PAYMENT rheundersisnedGontractorcertifiesthattothebestofthecontractor'sknowledse, informationandbeliefthework covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts $ $ $ $ $ $ $ from the Owner, and that current paymeni shown herein is now due. WARNING: DO NOT CHANGE ESTABLISHED PAYMENT INSTRUCTIONS FOR PAYMENTS TO MIRON CONSTRUCTION CO., lNC.. Miron Construction Co., lnc. does not change its bank routing or account numbers. Do not accept or rely upon emails or corespondence requesting changes to Miron Construction Co., lnc.'s established payment instructions. Any change to Miron Construction Co., lnc.'s payment instructions can only be made by a fully executed Change Order to the Agreement between Owner and Miron Construction Co., lnc.. Confactor: Miron Construction Co., lnc. Date: $ $ CounÇ of: Winnebago Subscribed and sworn to before me this 0S of 2026 Notary Public: My Commission expires ARCHITECTS CERTIFICATE FOR PAYMENT ln accordance with the Contract Documents, based on on-site observations and the data comprising the above application, the Architect certifies to the Owner that to the best of the Architect's knowledge, information and belief the Work has progressed as indicated, the quality of Work is in accordance with the Contract Documents, and the Contraclor ¡s ent¡tled io the payment of the AMOUNT CERTIFIED. (Atþch explanation lf amount ært¡t¡ed ditrers from the amount aø¡ed for. lnitial frgures on this Application and on the Cont¡nuat¡on Sheet that are changed to conform to the amount certifred.) ARCHITECT: GRAEF Date: This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. lssuance, payment and acceptance of payment are without prejud¡ce to any rights of the Owner or Contractor under this Contract. By: ât¡eu\o AQ}\\oT DEDUCTIONS -15,932.98 0.00 o.oo tlet Change by Change Orders 142.017.03 ADDITIONS 157,950.01 0.o0 CHANGE ORDER SUMMARY Change Order approved in previous months by Owner APPROVED THIS MONTH Number Date Approved 49t15t2026 Cunent Total: coo04 AIA D@mênt G702 -'lgg2.Copfight O 1S53, 1963, '1S65, 1971, f S78, 1983 and l9g2 by The Amêri€n lnstitub of Architec'ts. Al ¡ights læded. WARNING: This AIA¡O Ddtunt ¡s polêct€d by U,S. Copyright Láw and lñtémâlioml T@tiês, ljnãuthoriæd ßprcducöon or distribut¡on of th¡s AIA@ D@ment, or any portion of it, may Edt ¡n ærere civl and simiml penallis, and wil¡ be pruæcuted lo the mdimum qtent pos¡ble under the law. Th¡6d@mntwasprcduædat10:13:12on10/012026underOrdorNo20240046063úìichdpi@oig7lz¿il2g27,arÌdisrctbrlæl€. Us.Notês: Page 101 of 183 Miron Co lnc. CONTINUATION SHEET AIA DOCUMENT G7O3 AIA DOCUMENT G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing Contractofs signed Certification is attached. ln tabulation below, amounts are stated to the nearest cent. Use Column I on Contracts where variable retainage for line items may apply. APPLICATION NUMBER: 10 APPLICATION DATE:'10/05/2026 PERIOD TO: 09/30/2026 PROJECT NO: 250840 Page: 2 INVOICE NO,: 250840-001 0 I RETAINAGE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 H BALANCE TO FINISH 0.0c 0.0c 0.0c 0.0c 0.0c 0.0c 71,833.0C 0.0c 0.0c 0.0c 0.0c 39,356.0C 0.0c 0.0c 0.0c 0.0c 0.0c 0.0( 0.0c 0.0( 0.0( 0.0c PER- 100 100 100 r00 100 100 42 100 100 100 100 76 100 100 100 100 100 r00 100 100 r00 100 G TOTAL COMPLETED \ND STOREE TO DATE 2,209,778.O1 1,787,579.00 995,614.00 377,033.00 219,442.13 44,000,00 52,667.00 255, I 09.00 22,212.O4 51,272.04 51,277.28 122,160.OQ 127,566.00 45,499.00 160,329.67 118,679.35 530,801.00 46r,031.93 482,300.00 66,400.00 21,206.67 14,978.0C F MATERIAL PRESENTLY STORED 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ED woRK ooMPLETED (D+E) THIS PERIOD -2,171.39 0.00 0.00 5,856.00 16,512.50 0.00 0.00 15,631 .00 0.00 0.00 0.00 16,376.00 3,816.00 -908.00 2,171.39 0.00 7,007,00 0.00 0.00 0.00 0.00 0.00 FROM PREVIOUS APPLICATION 2,211,949.40 '1,787,579.00 995,614.00 371,177.OA 202,929.63 ¿14,000.00 s2,667.00 239,478.O4 22,212.O4 51,272.04 51,277.28 '105,784.00 123,750.O4 46,407.O4 158,158.28 I 18,679.35 523,794.04 461 ,031.93 482,300.00 66,400.0c 21,206.67 14,978.0C c SCHEDULED VALUE CURRENT 2,209,778.O1 1,787,579.00 995,614.00 377,033.00 219,442.13 ¿t4,000.00 124,500.00 255, I 09.00 22,212.OO 51,272.OO 51,277.28 161,516.00 127,566.00 45,499.00 160,329.67 118,679.3s 530,801.00 461,031.93 482,300.00 66,400.00 21,206.67 14,978.00 CHANGE ORDERS -13,329.99 0.00 0.00 15,033.00 11,477.'t3 0.00 0,00 22,257.O0 0.00 554.00 -13,519.72 13,316.00 7,566.00 -908.00 M,O67.67 3,829.35 I 56,023.00 31,029.93 0.00 -55.00 -2,693.33 0.00 ORIGINAL 2,223,158.OO 1,787,579.00 995,614.00 362,000.00 207,965.00 44,000.00 124,s00.00 232,852.OO 22,212.OO 50,718.00 M,797.OO 148,200.00 120,000.00 46,407.OO 116,262.00 114,850.00 374,778.OO 430,002.00 482,300.00 66,455.00 23,900.00 14,978.00 B DESCRIPTION OF WORK Cast in P¡ace Concrete Precast Concrete Material Precast Concrete Erection Steel Fabrication and Erection General Trades Roofing Caulk¡ng (Allowance) Aluminum Windows, Entranc€s, Glass/Glazing Gypsum Board Systems Painting Signage Parking Access & Revenue Control System (PARCS) (Allowance) Elevators Fire Suppression Plumbing HVAC Electrical Earthwork and Selective Site Demol¡tion Rigid lnclus¡on Ground lmprovement Asphalt Paving Site Concrete Fencing A ITEM NO. 105 110 )15 J20 )25 t30 135 140 J45 t50 155 160 165 )70 175 180 t85 190 195 100 't05 110 Page 102 of 183 Miron Co lnc. CONTINUATION SHEET AIA DOCUMENT G7O3 AIA DOCUMENT G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing Contracto/s signed Certification is attached. ln tabulation below, amounts are stated to the nearest cent. Use Column I on Contracts where variable retiainage for line items may apply. APPLICATION NUMBER: 10 APPLICATION DATE: 10/05/2026 PERIOD TO: 09/30/2026 PROJECT NO: 250840 Page: 3 INVOICE NO 250840-001 0 I RETAINAGE and Landscaping 27 100 100 0 100 101 31 I 85 77 100 100 71 0 100 100 100 120 125 130 135 140 145 150 155 160 165 170 Utilities 16, 16,1 16, 0.00 0.00 17,077.50 6,300.36 0.00 0.00 0.00 0.00 0.00 16, Storefront (Allowance) Conditions Requirements (Allowance) 297 322,61 159,097 -388. 158, -1 Conditions / Temp Heat & Enclosure 0.00 23, 23, s1,81 0.00 (Allowance) 1 92,1 7 7 lnclusion Testing (Allowance) 0.00 0.00 25,467 25,467 Permit (Allowance) 24,31 24,31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Requirements 57,1 Risk 7 7.1 7.1 Expenses (Allowance) Manager's Cont¡ngency (Allowance) Softivare Fee 0 2, 2, 859. 75 -149, 289,81 289,81 80 85 90 0 1 1 232, 237,251.97 78,295.O1 237,251 237,251 Performance and Payment Bonds 1,947.O1 78,295.01 0.00 78,295.01 Project 142,0 9,761,91 1.03 I, 9,214,935- 94 0. H BALANCE TO FINISH PER- G TOTAL COMPLETED \ND STORED TO DATE F MATERIAL PRESENTLY SÏORED D E woRK CoMPLETED (D+E) THIS PERIOD FROM PREVIOUS APPLICATION c SCHEDULED VALUE CURRENTCHANGE ORDERSORIGINAL B DESCRIPTION OFWORK A ITEM NO. AIA DOCUMENT G7O3 - APPLICATION AND CERTIFICATE FOR PAYMENT THE AMERICAN INSTITUTE OF ARCHITECÏS 1735 NEW YORK AVENUE NW WASHINGTON DC 20006 Page 103 of 183 City of De Pere, Wisconsin Request for Common Council Action 7.G Meeting Date: October 20, 2026 Department: Human Resources From: Shannon Metzler, Human Resources Director Subject: Recommendation from the Finance/Personnel Committee to approve 2027 benefit renewal & plan design changes. Recommendation: Motion to approve. This item was unanimously approved by the Finance/Personnel Committee at its October 13, 2026, meeting. Attachments: 2027 Renewal Memo - City of De Pere Draft V1 (002) Page 104 of 183 To: Members of the Finance/Personnel Committee From: Shannon Metzler, Human Resources Director Date: October 13, 2026 RE: For consideration and possible action to approve 2027 benefit renewal & plan design changes* We continue to monitor the benefit plans provided to the employees to maintain high value, financially stable design and costs. After multiple years of reducing our health plan surplus, we are now in a position in which we must ensure that our budget matches our expected health plan costs. As in previous years, below showcases the status of the health plan as well as our recommendations for the 2027 plan year. HEALTH PLAN PERFORMANCE Current Plan Year: January 2026 – December 2026 | Claims Paid Through: August 2026 Page 105 of 183 2 MEDICAL PLAN RECOMMENDATIONS 2027 RENEWAL RATES We are recommending moving forward with a 6% increase for the 2027 plan year. This increase is based on increased medical claims costs for the City. Medical trend is 8.5-12% for other public sector and private sector plans for 2027. MEDICAL PLAN CURRENT RENEWAL Single: $802.59 $850.76 EE+1: $1,493.81 $1,583.46 Family: $2,450.09 $2,597.12 MEDICAL PLAN DESIGN In 2025, the City and M3 conducted a comprehensive review of the Medical Plan to evaluate opportunities for cost containment while preserving the quality and value of benefits provided to employees. The plan design modifications implemented in the prior year have demonstrated meaningful fiscal impact, generating substantial savings for the City. The most significant of last year’s changes, Garner Health, is estimated to have produced a gross $320,000 in savings as of July of 2026. As a reminder, Garner Health is a healthcare benefit navigation company that helps plan members find high-quality doctors that we highly incentivize to use. Given the significance of those changes and the importance of allowing plan members adequate time to adapt, the City is not recommending additional plan design modifications for the current plan year. STOP LOSS INSURANCE CARRIER CHANGE Each year the City purchases stop loss insurance to protect our health plan from the financial impact of high-cost claimants. Stop Loss is the City’s largest fixed cost related to the health plan and is estimated to cost approximately $700,000 in 2027. We solicit proposals from several different preferred carriers to ensure we have the most economically feasible option built into our plan. Our current carrier, Sun Life, proposed no increase to the 2026 rates. We marketed these plans to seven additional stop loss carriers. The best financial offer is with Tokio Marine HCC, who offered a 3% decrease to our current rates. The recommendation for 2027 is to change carriers to Tokio Marine HCC. There is no member impact to this change. DENTAL PLAN RECOMMENDATIONS 2027 RENEWAL RATES Based on the plan performance, we are not recommending an increase to our Delta Dental self-funded plan and recommend a plan enhancement. The CarePlus (Dental Associates) rates, which is a fully-insured plan, will not have an increase for 2027. DENTAL PLAN – DELTA DENTAL CURRENT RENEWAL Single: $47.16 $47.16 Family: $143.34 $143.34 DENTAL PLAN – CARE PLUS CURRENT RENEWAL Single: $37.43 $37.43 Family: $106.81 $106.81 Delta Dental – Dependent Orthodontic Coverage to Age 26 Our plan currently offers orthodontic benefits to dependents up to age 19, and most other dependent benefits to age 26. We recommend raising the orthodontic benefits for dependents to age 26 to mirror other dependent benefits. We can offer this additional benefit and keep premium rates at a 0% increase. If you have any questions in advance of the meeting, please give me a call at 920-339-4045. Thank you. Page 106 of 183 City of De Pere, Wisconsin Request for Common Council Action 7.H Meeting Date: October 20, 2026 Department: Development Services From: Quasan Shaw, Community & Economic Development Specialist Subject: Recommendation from the Redevelopment Authority to authorize a purchase offer of up to $440,000 to acquire property located at 2535 Lawrence Drive and allow city employees and representatives to take all necessary steps to acquire the property. The Council may convene in closed session pursuant to Section 19.85(1)(e) Wisconsin Statutes for the purpose of deliberating or negotiating the purchasing of public properties, the investing of public funds, or conducting other specified public business, whenever competitive or bargaining reasons require a closed session. The Council may, thereafter, reconvene in open session pursuant to Section19.85(2) Wisconsin Statutes to report any actions taken during the closed session and to consider all other matters on the agenda. Recommendation: Motion to approve. The RDA made the recommendation as suggested by outside counsel for an "up to" amount for submission of its offer to acquire the property at 2535 Lawrence Drive through the pending condemnation proceedings. Attachments: [CLEANED]2026-09-18 Memo re Condemnation of G&G Rebuilders Property; Process and Next Steps.pdf(44934691.1), [CLEANED]Appendix - Exhibits A-K (bookmarked, email size)(44934690.2) Page 107 of 183 City of De Pere, Wisconsin Request for Common Council Action 8.A Meeting Date: October 20, 2026 Department: Public Works From: Scott Thoresen, Public Works Director Subject: Resolution #26-100 Authorizing the fourth amendment for consulting services with Short-Elliot-Hendrickson, Incorporated (MSC Expansion). Recommendation: Motion to approve. The Board of Public Works at the October 12, 2026 meeting approved SEH's Fourth Amendment for Consulting Services for MSC Expansion in the amount of $226,422.00. The motion passed with a 5-0 vote. Attachments: Reso26-100, Amendment-Fourth-SEH (MSC Additional Scope 2026) Rev, Consider SEH's Fourth Amendment Proposal for Consulting Services for MSC Expansion, DePere Office Expansion Scope of Services 9-10-26 SEH Page 108 of 183 RESOLUTION #25-100 AUTHORIZING FOURTH AMENDMENT TO AGREEMENT FOR CONSULTING SERVICES BETWEEN THE CITY OF DE PERE AND SHORT-ELLIOTT-HENDRICKSON, INCORPORATED (Municipal Service Center Facility Expansion – Design and Construction Engineering Services) WHEREAS, the City and Short-Elliott-Hendrickson, Incorporated are parties to a Consulting Agreement (approved by Resolution #21-59) an Amendment thereto (approved by Resolution #23-02), a Second Amendment thereto (approved by Resolution #25-01) and a Third Amendment thereto (approved by Resolution #25-60) providing comprehensive design services and construction engineering services for expansion of City’s Municipal Service Center (“MSC”) facility; and WHEREAS, the City is in need of additional professional architectural and engineering consulting design services related to additional design servers for DSPS Special Inspections and testing for contaminated soils, along with additional staff requested changes resulting in the need to further amend the agreement, pursuant to the terms and conditions of the Fourth Amendment attached hereto; and WHEREAS, this matter has been reviewed by the Board of Public Works, which recommends approval thereof. NOW THEREFORE, BE IT HEREBY RESOLVED THAT: The City Manager and City Clerk are authorized and directed to execute the Fourth Amendment to Agreement for Consulting Services Between the City of De Pere and Short-Elliott-Hendrickson, Incorporated as is attached hereto. BE IT FURTHER RESOLVED THAT: All City officials, officers, employees, and agents are authorized and directed to take such steps as are lawful and necessary in furtherance thereof. Page 109 of 183 Resolution #25-100 Page 2 of 2 Adopted by the Common Council of the City of De Pere, Wisconsin, this 20th day of October, 2026. APPROVED: ______________________________ James G. Boyd, Mayor ATTEST: ______________________________ Carey E. Danen, City Clerk Ayes: Nays: Board/Committee Approval: 10/12/2026 Page 110 of 183 FOURTH AMENDMENT TO AGREEMENT FOR CONSULTING SERVICES BETWEEN THE CITY OF DE PERE AND SHORT- ELLIOTT-HENDRICKSON, INCORPORATED (MSC Facility Expansion – Design and Construction Engineering Services) THIS FOURTH AMENDMENT made and entered into this ____ day of _______________, 2026, by and between the City of De Pere, a Wisconsin municipal corporation (“City”) and Short- Elliott-Hendrickson, Incorporated, a foreign corporation authorized to conduct business in the State of Wisconsin (“Consultant”). WHEREAS, the City and Consultant are parties to an Agreement for Consulting Services dated June 30, 2021, Amendment #1 dated January 20, 2023, Amendment #2 dated January 22, 2025 and Amendment #3 dated April 14, 2025 (collectively “the Agreement”); and WHEREAS, the parties wish to further amend the Agreement to provide for additional professional architectural and engineering services for Consultant to perform, namely, as outlined in Consultant’s Proposal attached hereto. NOW , THEREFORE, upon the promises and obligations provided herein, together with such other consideration, the receipt and sufficiency of which is hereby acknowledged, the parties mutually agree to amend the Agreement as follows: 1. Consultant’s Scope of Work shall be amended to add consulting services to include additional design services for DSPS Special Inspections and testing for contaminated soils. This additional design work also includes Owner requested changes to the existing locker and toilet rooms, washbay revisions, removal and replacement of the yard retaining wall, and electrical upgrades to the existing office area. 2. The cost for such additional consulting services shall be performed in the lump sum amount of $56,253. 3. The cost for Special Inspections by Brander Engineering shall be performed on a Time and Material basis with an estimated maximum total fee of $170,170 4. All other terms and conditions of the Agreement shall remain in full force and effect, unless specifically modified by this Fourth Amendment. This Fourth Amendment has been duly executed as of the date and year first set forth above. SHORT-ELLIOTT-HENDRICKSON, INCORPORATED CITY OF DE PERE By: Trevor Frank, NCARB, AIA, PMP , LEED AP Sr. Architect /Project Manager Kimberly T. Flom, City Manager Carey E. Danen, City Clerk Page 111 of 183 To: Honorable Mayor Boyd Board of Public Works Members From: Scott J. Thoresen, Director of Public Works Date: September 21, 2026 RE: Consider and Possible Action Regarding SEH’s Fourth Amendment for Consulting Services for MSC Expansion * The City is currently under contract with SEH for design and construction services related to the Municipal Service Center (MSC) expansion, which includes enlarging existing facilities for City equipment and vehicles, expanding office areas, and updating the building to meet ADA requirements. Construction began in May. As construction progressed, several additional services were required that were not included in SEH’s original contract. These services and associated costs are as follows: 1. Testing for contaminated soils – $2,764 2. Architectural services – $8,750 3. Structural engineering services – $15,200 4. Civil engineering fees – $15,568 5. Electrical, plumbing, and HVAC fees – $13,970 6. Special inspections by Brander Engineering – $170,170 Total additional cost: $226,422 Staff recommends approval of SEH’s Fourth Amendment proposal in the amount of $226,422. Page 112 of 183 Engineers | Architects | Planners | Scientists Short Elliott Hendrickson Inc., 425 West Water Street, Suite 300, Appleton, WI 54911- 6058 920.380.2800 | 888.413.4214 | 888.908.8166 fax | sehinc.com SEH is 100% employee -owned | Affirmative Action –Equal Opportunity Employer September 10, 2026 RE: De Pere MSB Facility and Office Expansion and Renovation- Revised 9/10/26 Mr. Scott Thoreson City of De Pere 925 S 6th Street De Pere, WI 53533 Dear Scott: Short Elliott Hendrickson Inc. (SEH®) appreciates the opportunity to submit this proposal to the City of De Pere (Client) for professional architectural and engineering services related to scope changes for the renovated MSB facility and proposed Public Works office improvements in De Pere, Wisconsin (Project). PROJECT UNDERSTANDING This proposal is based on architectural and engineering services previously completed for the De Pere Public Works Department, which included the development of design documents, bidding documents, and a phasing plan for campus-wide improvements to the Municipal Services Building facility on 6th Street. This proposal has been revised from the most recent proposal for professional services (dated April 14, 2025) and includes additional design services requested by the City. Based on previous design efforts for the renovation and expansion of the existing office facility and site, the scope of work and professional service fees associated with this contract revision include the following: • Demolition and renovation of the existing locker rooms in the office area and the toilet rooms in the vehicle maintenance area. Additional office layout changes. • Revisions to the washbay scope. • Electrical upgrades to the existing office area to remove shared neutrals. • Site modifications within the Fuel Tank/Public Rubbish Drop-Off Area. • Soil testing for suspected contaminated soils. Professional Services Included 1. Testing for Contaminated Soils (PSI as a Subconsultant to Brander Engineering) Fee: $2,764 As a subconsultant to SEH through Brander Engineering, PSI provided soil testing for suspected contaminated soils encountered during excavation. 2. Architectural Services (SEH) Fee: $8,750 Architectural Scope: The proposed scope of work includes design services for City -requested improvements to upgrade and make ADA-accessible the men's and women's locker rooms in the office area, as well as the toilet rooms in the maintenance area. 3. Structural Engineering (SEH) Fee: $15,200 Structural Engineering Scope: The proposed scope of work includes design services for the removal and replacement of the retaining wall located within the Fuel Tank/Public Rubbish Drop- Page 113 of 183 Mr. Scott Thoreson City of De Pere MSB Expansion Page 2 Engineers | Architects | Planners | Scientists Short Elliott Hendrickson Inc., 425 West Water Street, Suite 300, Appleton, WI 54911- 6058 920.380.2800 | 888.413.4214 | 888.908.8166 fax | sehinc.com SEH is 100% employee -owned | Affirmative Action –Equal Opportunity Employer off Area. 4. Civil Engineering (raSmith) Fee: $15,568 Civil Engineering Scope: The proposed scope of work includes design services for site modifications within the Fuel Tank/Public Rubbish Drop-Off Area. 5. Electrical, Plumbing, and HVAC Engineering (MSA Professional Services) Fee: $13,970 MEP Engineering Scope: The proposed scope of work includes design services for locker room and toilet room upgrades, wash bay modifications, and electrical upgrades to the existing office area. 6. Special Inspections (Brander Engineering) Fee: $170,170 As a subconsultant to SEH, Brander Engineering is providing DSPS-required special inspections for the main facility and storage building expansion. This fee is an estimate and will be billed based on time and expenses incurred. Proposed Fee Our fee for these services shall be on a lump-sum basis for Items 1 through 5 and on a time-and-expense basis for Item 6. Monthly invoices will be based on work completed during the calendar month preceding the invoice date. The additional professional service fees proposed in this contract revision are in addition to the fees previously established under the existing agreement. A breakdown of the above fees is as follows: 1. Fee for the additional services identified in Items 1 through 5 above: $56,253 2. Estimated fee for the additional services identified in Item 6 above, on a time-and-materials basis: $170,170 3. Expenses: No additional expenses have been identified as part of these proposed professional services. Please let me know if this proposal meets your approval, after which our standard contract will be forwarded to you for signature. If you have any questions or concerns regarding this proposal, please contact me at 920.585.4320. Short Elliott Hendrickson Inc. (SEH ®) appreciates the opportunity to submit this proposal to the City of De Pere (client) for professional architectural and engineering services as required for scope changes to the renovated MSB facility and proposed new Public Works office improvements in De Pere, Wisconsin (Project). Sincerely, Trevor M. Frank, NCARB, AIA, PMP, LEED AP Sr. Architect / Project Manager (Lic WI, AZ, FL, GA, IA, IL, IN, KY, MI, MN, NC, ND, OH, RI, SD, TN, VA.) CC: File Page 114 of 183 City of De Pere, Wisconsin Request for Common Council Action 8.B Meeting Date: October 20, 2026 Department: Public Works From: Thomas Blohowiak , Maintenance Supervisor Subject: Resolution #26-101 Approving contract for HVAC preventive maintenance with Tweet - Garot Mechanical, Inc. Recommendation: Motion to approve. The Board of Public Works at the October 12, 2026 meeting approved a 3-year contract with TweetGarot Mechanical for Preventative Maintenance Service on City HVAC Equipment in the amount of $78,184.99. The motion passed with a 5-0 vote. Attachments: Reso26-101, Tweet Garot Mechanical(HVAC Preventive Maintenance)10-15-2026, Exhibits-TweetGarot Mechanical, Memo for Preventative Maintenance for HVAC Equipment 2023, Hurckman Mechanical Industries Inc. Proposal, Email notice to Hurckman, Bassett Mechanical email Page 115 of 183 RESOLUTION #26-101 APPROVING CONTRACT FOR HVAC PREVENTIVE MAINTENANCE BETWEEN THE CITY OF DE PERE AND TWEET - GAROT MECHANICAL, INC. WHEREAS, the City requires preventive maintenance services for all HVAC related equipment owned by the City; and WHEREAS, Tweet - Garot Mechanical, Inc. – De Pere has available and offers to provide personnel and equipment necessary to accomplish the requested preventive maintenance services within the required timeframe; and WHEREAS, the Board of Public Works has reviewed such proposal and recommends approval thereof. NOW, THEREFORE, BE IT HEREBY RESOLVED THAT: The City Manager and City Clerk are authorized and directed to execute the attached City of De Pere Contract for Purchase of Services with Tweet – Garot Mechanical, Inc. (HVAC Preventative Maintenance Services), subject to such changes as deemed necessary by the City Attorney. BE IT FURTHER RESOLVED THAT: All City officials, officers, and employees are authorized and directed to take such steps as are lawful and necessary in furtherance thereof. Adopted by the Common Council of the City of De Pere, Wisconsin, this 20th day of October, 2026. APPROVED: James G. Boyd, Mayor ATTEST: Carey E. Danen, City Clerk Ayes: _____ Nays: _____ Board/Committee Approval: 10/12/2026 Page 116 of 183 1 Contract for Services Version: 4/23/2026 CITY OF DE PERE CONTRACT FOR PURCHASE OF SERVICES 1. PARTIES. This is a Contract between the City of De Pere, a Wisconsin municipal corporation, hereafter referred to as the "City" and Tweet/Garot Mechanical, Inc. – De Pere, hereafter referred to as "Contractor." The Contractor is a: 2. PURPOSE. The purpose of this Contract is as set forth in Section 3. 3. SCOPE OF SERVICES AND SCHEDULE OF PAYMENTS. Contractor will perform the following services and be paid according to the following schedule(s) or attachment(s): City’s Request for Proposals dated , attached hereto as Exhibit A and Consultant’s Proposal thereto dated September 28, 2026, attached hereto as Exhibit B. The date for each progress payment should be the 3rd Tuesday of each month. The period covered by each Application for Payment starts on the day following the end of the preceding period and ends the 4th Friday of the month. 4. ORDER OF PRECEDENCE. In the event of a conflict between the terms of this Contract and the terms of any document attached or incorporated herein, the terms of this Contract, the City’s requests for proposals/bids, the version of the Contractor’s proposal/bid that was accepted by the City, and the City’s Purchase Order (if any) shall control and supersede any such conflicting term. 5. TERM AND EFFECTIVE DATE. This Contract shall become effective upon execution by the City Manager and the City Clerk (or the Purchasing Agent if so authorized) on behalf of the City of De Pere, unless another effective date is specified in the attachment(s) incorporated in Section 3. The effective date of this Contract shall be January 1, 2027. The term of this Contract shall be three years, terminating on December 31, 2029, with the option of two additional years (2030/2031), pursuant to the attached Schedule C Price Quote in Exhibit B. 6. ENTIRE AGREEMENT. This Contract for Purchase of Services, including any and all attachments, exhibits and other documents referenced in Section 3 (hereafter, “Agreement” or “Contract”) is the entire Agreement of the parties and supersedes any and all oral contracts and negotiations between the parties. If any document referenced in Section 3 includes a statement that expressly or implicitly disclaims the applicability of this Contract for Purchase of Services, or a statement that such other document is the “entire agreement,” such statement shall be deemed rejected and shall not apply to this Contract. 7. ASSIGNABILITY/SUBCONTRACTING. Contractor shall not assign or subcontract any interest or obligation under this Contract without the City's prior written approval. All of the services required hereunder will be performed by Contractor and employees of Contractor. 8. DESIGNATED REPRESENTATIVE A. Contractor designates as Contract Agent with primary responsibility for the performance of this Contract. In case this Contract Agent is replaced by another for any reason, the Contractor will designate another Contract Agent within seven (7) calendar days of the time the first terminates his or her employment or responsibility using the procedure set forth in Section 14, Notices. ☒Corporation ☐Limited Liability Company ☐General Partnership ☐LLP ☐Sole Proprietor ☐Unincorporated Association ☐Other: _____________________ Page 117 of 183 2 Contract for Services Version: 4/23/2026 B. In the event of the death, disability, removal or resignation of the person designated above as the Contract agent, the City may accept another person as the Contract agent or may terminate this Agreement under Section 25, at its option. 9. PROSECUTION AND PROGRESS. A. Services under this Agreement shall commence upon written order from the City to the Contractor, which order will constitute authorization to proceed; unless another date for commencement is specified elsewhere in this Contract including documents incorporated in Section 3. B. The Contractor shall complete the services under this Agreement within the time for completion specified in Section 3 and Section 5, the Scope of Services, including any amendments. The Contractor's services are completed when the City notifies the Contractor in writing that the services are complete and are acceptable. The time for completion shall not be extended because of any delay attributable to the Contractor, but it may be extended by the City in the event of a delay attributable to the City, or in the event of unavoidable delay caused by war, insurrection, natural disaster, strikes, labor disputes, epidemic or pandemic, or other unexpected event beyond the control of the Contractor. If at any time the Contractor believes that the time for completion of the work should be extended because of unavoidable delay caused by an unexpected event, or because of a delay attributable to the City, the Contractor shall notify the City as soon as possible, but not later than seven (7) calendar days after such an event. Such notice shall include any justification for an extension of time and shall identify the amount of time claimed to be necessary to complete the work. C. Services by the Contractor shall proceed continuously and expeditiously through completion of each phase of the work. D. Progress reports documenting the extent of completed services shall be prepared by the Contractor and submitted to the City with each invoice under Section 23 of this Agreement, and at such other times as the City may specify, unless another procedure is specified in Section 3. E. The Contractor shall notify the City in writing when the Contractor has determined that the services under this Agreement have been completed. When the City determines that the services are complete and are acceptable, the City will provide written notification to the Contractor, acknowledging formal acceptance of the completed services. 10. AMENDMENT. This Contract shall be binding on the parties hereto, their respective heirs, devisees, and successors, and cannot be varied or waived by any oral representations or promise of any agent or other person of the parties hereto. Any other change in any provision of this Contract may only be made by a written amendment, signed by the duly authorized agent or agents who executed this Contract. 11. EXTRA SERVICES. The City may request the Contractor to perform extra services or decreased services, according to the procedure set forth in Section 23.B. Extra services or decreased services means services which are not different in kind or nature from the services called for in the Scope of Services, Section 3, but which may increase or decrease the quantity and kind of labor or materials or expense of performing the services. Extra services may not increase the total Contract price, as set forth in Section 22, unless the Contract is amended as provided in Section 10 above. 12. NO WAIVER. No failure to exercise, and no delay in exercising, any right, power or remedy hereunder on the part of the City or Contractor shall operate as a waiver thereof, nor shall any single or partial exercise of any right, power or remedy preclude any other or further exercise thereof or the exercise of any other right, power or remedy. No express waiver shall affect any event or default other than the event or default specified in such waiver, and any such waiver, to be effective, must be in writing and shall be operative only for the time and to the extent expressly provided by the City or Contractor therein. A waiver of any covenant, term or condition contained herein shall not be construed as a waiver of any subsequent breach of the same covenant, term or condition. 13. SEVERABILITY. It is mutually agreed that in case any provision of this Contract is determined by any court of law to be unconstitutional, illegal or unenforceable, it is the intention of the parties that all other provisions of this Contract remain in full force and effect. 14. NOTICES. All notices to be given under the terms of this Contract shall be in writing and signed by the person serving the notice and shall be sent registered or certified mail, return receipt requested, postage prepaid, or hand delivered to the addresses of the parties listed below: Page 118 of 183 3 Contract for Services Version: 4/23/2026 FOR THE CITY: City of De Pere Attn: City Manager 335 South Broadway Street De Pere, WI 54115 FOR THE CONTRACTOR: Josh Andrews, Service Sales Account Representative Tweet-Garot Mechanical, Inc. – De Pere 325 Reid Street De Pere, WI 54115 15. STATUS OF CONTRACTOR/INDEPENDENT/TAX FILING. The parties hereto agree that the Contractor, its officers, agents, and employees, in the performance of this agreement shall act in the capacity of an independent contractor and not as an officer, employee, or agent of the City. The Contractor agrees to take such steps as may be necessary to ensure that each subcontractor of the Contractor will be deemed to be an independent contractor and will not be considered or permitted to be an agent, servant, joint venturer, or partner of the City. Contractor shall provide a valid IRS W9 form to the City prior to payment. The Contractor is informed that as an independent Contractor, they may have a responsibility to make estimated tax returns, file tax returns, and pay income taxes and make social security payments on the amounts received under this Contract and that no amounts will be withheld from payments made to this Contractor for these purposes and that payment of taxes and making social security payments are solely the responsibility and obligation of the Contractor. The Contractor is further informed that they may be subject to civil and/or criminal penalties if they fail to properly report income and pay taxes and social security taxes on the amount received under this Contract. 16. GOODWILL. Any and all goodwill arising out of this Contract inures solely to the benefit of the City; Contractor waives all claims to benefit of such goodwill. 17. THIRD PARTY RIGHTS. This Contract is intended to be solely between the parties hereto. No part of this Contract shall be construed to add, supplement, amend, abridge or repeal existing rights, benefits or privileges of any third party or parties, including but not limited to employees of either of the parties. 18. AUDIT AND RETAINING OF DOCUMENTS. The Contractor agrees to provide all reports requested by the City including, but not limited to, financial statements and reports, reports and accounting of services rendered, and any other reports or documents requested. Financial and service reports shall be provided according to a schedule (when applicable) to be included in this Contract. Any other reports or documents shall be provided within five (5) working days after the Contractor receives the City's written requests, unless the parties agree in writing on a longer period. Payroll records and any other documents relating to the performance of services under the terms of this Contract shall be retained by the Contractor for a period of three (3) years after completion of all work under this Contract, in order to be available for audit by the City or its designee. 19. CHOICE OF LAW. This Contract shall be governed by and construed, interpreted and enforced in accordance with the laws of the State of Wisconsin. The parties agree, for any claim or suit or other dispute relating to this Contract that cannot be mutually resolved, the venue shall be Brown County Circuit Court or the United States District Court for the Eastern District of Wisconsin. 20. CONTRACTOR COMPLIANCE AND RESPONSIBILITY. A. LAWS TO BE OBSERVED/LICENSING AND PERMITS. (1) The Contractor shall give all notices and shall at all times comply with and observe all federal and state laws, local laws, ordinances, and regulations which are in effect during the period of this Contract and which in any manner affect the work or its conduct. The Contractor shall indemnify and hold harmless the City and its Page 119 of 183 4 Contract for Services Version: 4/23/2026 officers, agents and employees against any claim or liability arising from or based on the violation of any such law, ordinance, or regulation whether by Contractor or its employees, subcontractors, or agents. The City reserves the right to cancel this Contract if the Contractor fails to follow the requirements of s. 77.66, Wis. Stats., and related statutes regarding certification for collection of sales and use tax. The City also reserves the right to cancel this Contract with any state or federally debarred contractor or a contractor that is presently identified on the list of parties excluded from federal procurement and non-procurement contracts. (2) Contractor shall procure and be required to demonstrate valid possession of appropriate required permits and licenses necessary and incidental to the work required hereunder and will keep them in effect for the term of this Contract. The Contractor shall also be required, when appropriate to obtain the necessary building permits prior to performing work on City facilities. B. WORK SAFETY AND HEALTH. (1) The Contractor shall comply with all federal, state and local laws governing work safety and health and shall provide all safeguards, safety devices and protective equipment, and take any other needed actions as the Contractor or the City may determine reasonably necessary , to protect the life and health employees on the job and the safety of the public and to protect the property in connection with the performance of the work covered by the Contract. C. CONTRACTOR’S RESPONSIBILITY FOR WORK. (1) Until acceptance of the work by the City, as provided under Section 9(E), the Contractor shall have the charge and care thereof and shall take every precaution against injury or damage to any part thereof by the action of the elements, or from any other cause, whether arising from the execution of nonexecution of the work. The Contractor shall rebuild, repair, restore and make good all injuries or damages to any portion of the work occasioned by any of the above cause before acceptance and shall bear the expense thereof, except damage to the work due to unforeseeable causes beyond control of and without the fault of negligence of the Contractor, including but not restricted to acts of God, of public adversaries or of governmental authorities. In case of suspension of work from any cause whatever, the Contractor, prior to suspension, shall take such precautions as may be necessary to prevent damage to the project, provide for normal drainage and shall erect any necessary temporary barricades, signs or other facilities, at the Contractor’s expense, as directed by the City. 21. CONFLICT OF INTEREST. A. The Contractor warrants that it and its agents and employees have no public or private interest and will not acquire directly or indirectly any such interest, which would conflict in any manner with the performance of the services under this Agreement. B. The Contractor shall not employ or Contract with any person currently employed by the City for any services included under the provisions of this Agreement. 22. COMPENSATION. It is expressly understood and agreed that in no event will the total compensation under this Contract exceed $ . 23. BASIS FOR PAYMENT. A. GENERAL. (1) The City will pay the Contractor for the completed and accepted services rendered under this Contract on the basis and at the Contract price set forth in Section 22 of this Contract. The City will pay the Contractor for completed and approved "extra services," if any, if such "extra services" are authorized according to the procedure established in this section. The rate of payment for "extra services" shall be the rate established in this Contract. Such payment shall be full compensation for services rendered and for all labor, material, supplies, equipment and incidentals necessary to complete the services. (2) The Contractor shall submit itemized invoices, on the form or format approved by the City and as may be further specified in Section 3 of this Contract. The City will pay the Contractor in accordance with the schedule, if any, set forth in Section 3. The final invoice, if applicable, shall be submitted to the City within three months of completion of services under this Agreement. (3) Payment shall not be construed as City acceptance of unsatisfactory or defective services or improper materials. (4) Final payment of any balance due to the Contractor will be made upon acceptance by the City of the services under the Agreement and upon receipt by the City of documents required to be returned or to be furnished Page 120 of 183 5 Contract for Services Version: 4/23/2026 by the Contractor under this Agreement. (5) The City has the equitable right to set off against any sum due and payable to the Contractor under this Agreement, any amount the City determines the Contractor owes the City, arising under this Agreement. (6) Compensation in excess of the total Contract price will not be allowed unless authorized by an amendment under Section 10, AMENDMENT. (7) The City will not compensate for unsatisfactory performance by the Contractor. B. SERVICE ORDERS, EXTRA SERVICE, OR DECREASED SERVICE. (1) Written orders regarding the services, including extra services or decreased services, will be given by the City, using the procedure set forth in Section 14, NOTICES. (2) The City may, by written order, request extra services or decreased services, as defined in Section 11 of this Contract. Unless the Contractor believes the extra services entitle it to extra compensation or additional time, the Contractor shall proceed to furnish the necessary labor, materials, and professional services to complete the services within the time limits specified in the Scope of Services, Section 3 of this Agreement, including any amendments under Section 10 of this Agreement. (3) If in the Contractor's opinion the order for extra service would entitle it to extra compensation or extra time, or both, the Contractor shall not proceed to carry out the extra service, but shall notify the City, pursuant to Section 14 of this Agreement. The notification shall include the justification for the claim for extra compensation or extra time, or both, and the amount of the additional fee or time requested. . (4) The City shall review the Contractor's submittal and respond in writing, either authorizing the Contractor to perform the extra service, or refusing to authorize it. The Contractor shall not receive additional compensation or time unless the extra compensation is authorized by the City in writing. 24. WARRANTY OF MATERIALS AND WORKMANSHIP. The Contractor warrants all materials furnished and work performed under this Agreement to be free of defects in materials and workmanship for a period of one (1) year from the date of final payment (the “Warranty Period”). The Contractor shall, at its expense and within a reasonable time after receipt of written notice from the City, promptly repair or replace any defective materials or workmanship. Any repair or replacement performed under this warranty shall itself be warranted for one (1) year from the date of repair or replacement. If the Contractor fails to commence correction within thirty (30) days of notice, the City may correct the defect and recover cost from the Contractor. The Contractor shall also obtain and assign to the City all warranties from any and all subcontractors, manufacturers, and suppliers, and shall enforce the same for the benefit of the City. 25. CANCELATION/TERMINATION. A. The City reserves the right to cancel any contract in whole or in part without penalty due to non-appropriation of funds. B. The City may terminate this Contract for any reason upon 30 days prior written notification to Contractor. Termination by City will entitle Contractor to payment for only those goods or services delivered, received and accepted and not subsequently rejected by the City. C. In the event the Contractor shall default in any of the covenants, agreements, commitments, or conditions and any such default shall continue unremedied for a period of ten (10) days after written notice to the Contractor, the City may, at its option and in addition to all other rights and remedies which it may have, terminate the Contract and all rights of the Contractor under the Contract. D. Failure to maintain the required certificates of insurance, permits, licenses and bonds will be cause for Contract termination. If the Contractor fails to maintain and keep in force the insurance, if required, the City shall have the right to cancel or terminate the Contract without notice. 26. INDEMNIFICATION. Contractor hereby agrees to indemnify, defend and hold harmless the City of De Pere its elected and appointed officials, officers, employees, agents, representatives and volunteers, and each of them, from and against any and all suits, actions, legal or administrative proceedings, claims, demands, damages, liabilities, interest, attorneys’ fees, costs and expenses of whatsoever kind or nature in any manner directly or indirectly caused, occasioned, or contributed to in whole or in part or claimed to be caused, occasioned, or contributed to in whole or in part, by reason of any act, omission, fault, or negligence, whether active or Page 121 of 183 6 Contract for Services Version: 4/23/2026 passive, of Contractor or of anyone acting under its direction or control or on its behalf, even if liability is also sought to be imposed on City of De Pere, its elected and appointed officials, officers, employees, agents, representatives and volunteers. The obligation to indemnify, defend and hold harmless the City of De Pere, its elected and appointed officials, officers, employees, agents, representatives and volunteers, and each of them, shall be applicable unless liability results from the sole negligence of the City of De Pere, its elected and appointed officials, officers, employees, agents, representatives and volunteers. Contractor shall reimburse the City of De Pere, its elected and appointed officials, officers, employees, agent or authorized representatives or volunteers for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. In the event that Contractor employs other persons, firms, corporations or entities (sub-contractor) as part of the work covered by this Agreement, it shall be Contractor’s responsibility to require and confirm that each sub-contractor enters into an Indemnity Agreement in favor of the City of De Pere, its elected and appointed officials, officers, employees, agents, representatives and volunteers, which is identical to this Indemnity Agreement. This indemnity provision shall survive the termination or expiration of this Agreement. 27. LIMITATION OF LIABILITY Neither City nor Contractor will be liable for any loss of use, interruption of business, lost profits, or any indirect, special, incidental, or consequential damages of any kind regardless of the form of action whether in contract, tort (including negligence), strict product liability, or otherwise, even if it has been advised of the possibility of such damages. 28. INSURANCE. It is hereby agreed and understood that the insurance required by the City of De Pere is primary coverage and that any insurance or self-insurance maintained by the City of De Pere, its officers, council members, agents, employees or authorized volunteers will not contribute to a loss. This insurance shall be written for not less than any limit of liability specified herein, or required by law, whichever is greater, notwithstanding that the policy may have lower limits applying elsewhere in the policy. All applicable insurance and endorsements shall be in full force and evidenced prior to commencing work and remain in force until the entire job is completed or the length of time that is specified in the Contract. 1. GENERAL LIABILITY COVERAGE Commercial General Liability. Policy will be written to provide coverage for, but not limited to, the following: Premises and Operations Liability, Products and Completed Operations, Personal Injury, Blanket Contractual Liability coverage for the joint negligence of the City of De Pere, its officers, council members, agents, employees, authorized volunteers and the named insured, Broad Form Property Damage, Independent Contractor’s coverage, and coverage for Property Damage from Perils of Explosion, Collapse, or Damage to Underground Utilities (commonly known as XCU coverage). Limits of liability not less than: 1. $2,000,000 general aggregate; 2. $1,000,000 products/completed operations aggregate per project; 3. $1,000,000 personal injury and advertising injury per project; and 4. $1,000,000 each occurrence limit. 2. AUTOMOBILE LIABILITY COVERAGE A. Minimum Limits - $1,000,000 Combined Single Limit for Bodily Injury and Property Damage each accident B. Business automobile policy must cover liability for "Any Auto" - including Owned, Non-Owned private passenger automobile and commercial vehicles and Hired automobiles 3. UMBRELLA LIABILITY Coverage to be in excess of employers’ liability, commercial general liability, and automobile liability insurance required above. Limits of liability not less than $2,000,000 each occurrence, $4,000,000 aggregate. 4. WORKERS COMPENSATION AND EMPLOYERS’ LIABILITY Workers Compensation and Employers’ Liability Insurance. Statutory workers compensation benefits and employers’ liability insurance with a limit of liability no less than $1,000,000 each accident. This policy shall be endorsed to include a waiver of subrogation in favor of City. Contractor shall require subcontractors and others not protected under its insurance to obtain and maintain such insurance. 5. PROPERTY COVERAGE Property Insurance. Each party to this Agreement will be responsible for maintaining property insurance on its own facilities, buildings, and other improvements, including all equipment, fixtures, and City structures, fencing, or support systems that may be placed on, within, or around City Facilities to fully protect against hazards of fire, vandalism, and malicious mischief, and such other perils as are covered by policies of insurance commonly referred to and known as “extended coverage” insurance. Page 122 of 183 7 Contract for Services Version: 4/23/2026 6. ADDITIONAL PROVISIONS * Additional Insured – The City of De Pere, and its elected or appointed officials, officers, employees, agents and authorized volunteers shall be named as “Additional Insureds” on all Liability policies. * Waiver of Workers Compensation Subrogation - The workers’ compensation policy is to be endorsed with a waiver of subrogation. The insurance company, in its endorsement, agrees to waive all rights of subrogation against the City, its officers, officials, employees and volunteers for losses paid under the terms of the policy that arises from the work performed by the named insured for or on behalf of the City of De Pere. * Certificates of Insurance – Certificates of Insurances, Commercial General, Umbrella and Additional Insured Endorsements acceptable to the City shall be submitted prior to commencement of the work. * Endorsement -The Additional Insured and Workers’ Compensation Subrogation Waiver policy endorsements must accompany the Certificate of Insurance. * Occurrence Basis – All policies, other than workers compensation, shall be written on an occurrence and not on an claims- made basis. * Notice - City of De Pere requires thirty (30) day advance written notice of cancellation. * Acceptability of Insurers - No insurance required hereunder shall be carried with an insurer not authorized to do business in Wisconsin. The City reserves the right to disapprove of any insurance company. A minimum rating of no less than A and Financial Size Category of no less than Class VI is required. * Prohibited Exclusions - No policies of insurance required to be obtained by Contractor or its contractors or subcontractors shall contain provisions (1) that exclude coverage of liability assumed by this Agreement with City except as to infringement of patents or copyrights or for libel and slander in program material, (2) that exclude coverage of liability arising from excavating, collapse, or underground work, (3) that exclude coverage for injuries to City’s employees or agents, or (4) that exclude coverage of liability for injuries or damages caused by Contractor’s contractors or contractors employees, servants, or agents. Proof of Insurance, Approval. The Contractor shall provide the City with certificate(s) of insurance showing the type, amount, effective dates, and expiration dates of required policies prior to commencing work under this Contract. Contractor shall provide the certificate(s) to the City’s representative upon execution of the Contract, or sooner, for approval by the City. If any of the policies required above expire while this Contract is still in effect, Contractor shall provide renewal certificate(s) to the City for approval. Certificate Holder language should be listed as follows: City of De Pere 335 South Broadway De Pere, WI 54115 The Contractor shall provide copies of additional insured endorsements or insurance policies, if requested by the City. The Contractor and/or Insurer shall give the City thirty (30) days advance written notice of cancellation, non-renewal or material changes to any of the above-required policies during the term of this Contract. 29. CONFIDENTIAL INFORMATION Each party (on its behalf and on behalf of its subcontractors, employees or representatives, or agents of any kind) agrees to hold and treat all confidential information of the other party, including, but not limited to, trade secrets, sales figures, employee and customer information and any other information that the receiving party reasonably should know is confidential (“Confidential Information”) as confidential and protect the Confidential Information with the same degree of care as each party uses to protect its own Confidential Information of like nature. Confidential Information does not include any information that (i) falls under Wisconsin Public Records Law (see section 28) at the time of the disclosure or thereafter is lawfully obtained from publicly available sources generally known by the public (other than as a result of a disclosure by the receiving party or its representatives); (ii) is available to the receiving party on a non- confidential basis from a source that is not and was not bound by a confidentiality agreement with respect to the Confidential Information; or (iii) has been independently acquired or developed by the receiving party without violating its obligations under this Agreement or under any federal or state law. 30. OPEN RECORDS Both parties understand that the City is bound by the Wisconsin Public Records Law, and as such, responses and contracts are subject to and conditioned on the provisions of the law. Contractor acknowledges that it is obligated to assist the City in retaining and producing records that are subject to Wisconsin Public Records Law, and that the failure to do so shall constitute a material breach of the Contract, and that the Contractor must defend and hold the City harmless from liability under that law. Except as otherwise authorized, those records shall be maintained for a period of seven (7) years after receipt of final payment under the Contract. 31. OWNERSHIP OF CONTRACT PRODUCT. Page 123 of 183 8 Contract for Services Version: 4/23/2026 All of the work product, including, but not limited to, documents, materials, files, reports, data, including magnetic tapes, disks of computer-aided designs or other electronically stored data or information (the "Documents"), which the Contractor prepares pursuant to the terms and conditions of this Contract are the sole property of the City. The Contractor will not publish any such materials or use them for any research or publication, other than as expressly required or permitted by this Contract, without the prior written permission of the City. The grant or denial of such permission shall be at the City's sole discretion. The Contractor intends that the copyright to the Documents shall be owned by City, whether as author (as a Work Made For Hire), or by assignment from Contractor to City. The parties expressly agree that the Documents shall be considered a Work Made For Hire as defined by Title 17, United States Code, Section 101(2). As further consideration for the City entering into this Contract, the Contractor hereby assigns to City all of the Contractor's rights, title, interest and ownership in the Documents, including the right to procure the copyright therein and the right to secure any renewals, reissues and extensions of any such copyright in any foreign country. The City shall be entitled to the sole and exclusive benefit of the Documents, including the copyright thereto, and whenever required by the City, the Contractor shall at no additional compensation, execute all documents of assignment of the full and exclusive benefit and copyright thereof to the City. Any subcontractors and other independent Contractors who prepare portions of the Documents shall be required by the Contractor to execute an assignment of ownership in favor of the City before commencing work. 32. FORCE MAJEURE. Neither party shall be in default by reason of any failure in performance of this contract in accordance with reasonable control and without fault or negligence on their part. Such causes may include, but are not restricted to, acts of nature or the public enemy, acts of the government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes and unusually severe weather, but in every case the failure to perform such must be beyond the reasonable control and without the fault or negligence of the party. 33. AUTHORITY. Contractor represents that it has the authority to enter into this Contract. If the Contractor is not an individual, the person signing on behalf of the Contractor represents and warrants that he or she has been duly authorized to bind the Contractor and sign this Contract on the Contractor’s behalf. 34. COUNTERPARTS, ELECTRONIC DELIVERY. This Contract may be signed in counterparts, each of which shall be taken together as a whole to comprise a single document. Signatures on this Contract may be exchanged between the parties by facsimile, electronic scanned copy (.pdf) or similar technology and shall be as valid as original. Executed copies or counterparts of this Contract may be delivered by facsimile or email and upon receipt will be deemed original and binding upon the parties hereto, whether or not a hard copy is also delivered. Copies of this Contract, fully executed, shall be as valid as an original. SIGNATURE PAGE FOLLOWS Page 124 of 183 IN WITNESS WHEREOF, the parties hereto have set their hands at De Pere, Wisconsin. CONTRACTOR: By: _____________________________________ (Signature) (Print Name and Title of Person Signing) Date: By: _________________________________ (Signature) _________________________________ (Print Name and Title of Person Signing) Date: _______________________________ CITY OF DE PERE A Wisconsin municipal corporation: By: Kimberly T. Flom, City Manager Date: By: Carey E. Danen, City Clerk Date: Page 125 of 183 JULY 10-AUGUST 3 CITY OF DE PERE ADVERTISEMENT FOR QUOTES HVAC PREVENTATIVE MAINTENANCE The City of De Pere accepts quotes to conduct Preventative Maintenance on all HVAC equipment within the city. Proposals are due by September 30, 2026, at 2:30 pm at the Municipal Service Center at 925 South Sixth Street, De Pere, WI, 54115. Interested contractors are welcome to participate in a city walkthrough on September 22th, starting at 8:00am at the Community Center (600 Grant Street). Any questions or concerns may be directed to Thomas Blohowiak, Maintenance Supervisor at (920) 339-4072 ext. 2250, or e-mail at tblohowiak@deperewi.gov Agreement: • The agreement shall be a period of three (3) years, with an option to renew on a yearly basis contingent on both parties’ approval for a maximum total of five (5) years. • The city will use its standard Contractor Agreement (sample attached). No standard terms and conditions of any firm or entity responding to this proposal will be incorporated into the Contractor Agreement. Scope of Services: • Conduct a spring and fall maintenance check of listed HVAC related equipment owned by the City of De Pere. Spring PM to be completed by end of May and Fall PM completed by November 15. • Provide a status/condition report of each piece of equipment within one (1) week of seasonal maintenance completion. • Cover all necessary labor and preventative maintenance to maintain listed HVAC related equipment. Preventative Maintenance shall consist of cleaning, aligning, calibrating, adjusting, changing filter, replacing belts, and lubricating. Schedule A provides a general list of HVAC related equipment owned by the City of De Pere. • Submit Schedule B and C for consideration. Customer Responsibilities: • Customer assumes that all equipment is in satisfactory working condition. Any equipment found in need of repair upon initial inspection or seasonal start -up will be reported to the owner’s representative with a written estimate to repair the item in question. • Repair work shall not commence unless authorized by City representative. • Customer will provide all belts and air filters for replacement. • Customer will cover the cost of repair parts outside of preventative maintenance agreement. • Redesign, repair, or adaptation of any equipment due to the obsolescence or unavailability of refrigerant and/or replacement parts is beyond the scope of the agreement. • Customer shall provide reasonable means of access to all equipment. • Customer shall make available all Material Safety Data Sheets. • Customer agree to pay for any authorized work performed outside of preventative maintenance contract. Exhibit A Page 126 of 183 Submittal Requirements: • Contractor shall submit all required documents by the deadline. • Contractor must submit Schedule B indicating contact information and references related to preventative maintenance. • Contractor shall submit Schedule C, indicating proposed fees. Questions: For any questions or to review City HVAC equipment please contact Thomas Blohowiak, Maintenance Supervisor at (920) 339-4072 ext. 2250, or e-mail at tblohowiak@deperewi.gov Page 127 of 183 V. 06/26 P a g e | 1 September 28, 2026 Mr. Thomas Blowhowiak City of De Pere 925 S. Sixth St. De Pere, WI 54115 RE: HVAC Preventive Maintenance Agreement Effective 1/1/27-12/31/29 Dear Tom: If selected, our pricing is contingent on meeting to clarify the scope and equipment list. During the walk through, several units were identified as requiring service less often than the spring and fall maintenance checks as required in the Scope of Services section. Calibrating is listed as a required maintenance step, quantities of pneumatic & other devices requiring calibration will also need to be confirmed. Also, equipment quantities will need to be verified based on the construction at the Municipal Service Center and an effort to maintain uniformity across City proper- ties. Our Proposal includes: ❖ Perform 24/7/365 emergency service and repairs as needed ❖ Priority status over non-agreement customers ❖ Repairs and service calls charged out at our “AA” rate which changes June 1st of each year in line with the Union collective bargaining agreement Our proposal does not include: • Provision of a second technician to accommodate a two man rule. • Air compressor at the community center as it is a component of a life safety system • Any equipment not called out specifically in the included equipment list received via email 9/22/26 • Belts, Filters, Humidification equipment, parts of any kind, refrigerants, and chemicals, which will be billed as material sale if not provided by customer • Labor to perform service outside of normal business hours • Rental of a lift to service various equipment, which will be billed at 15% over cost if not supplied by customer This proposal is valid for 30 days. Our standard payment terms are net 30 days. Interest will be charged on past due accounts at 1.5% per month. Pay- ments made via credit card are subject to a 2.5% service charge. Exhibit B Page 128 of 183 V. 06/26 P a g e | 2 In no event shall Tweet/Garot be responsible for lost, misdirected, misallocated, or misplaced Customer funds other- wise intended for the satisfaction of invoice(s) but directed to non-affiliated third-parties, including Contractor. Cus- tomer acknowledges and agrees it is the sole responsibility of Customer to confirm application and allocation of Cus- tomer funds to the correct invoice(s), and agrees to indemnify and hold harmless Tweet/Garot regarding the same. Acceptance of any proposal will be based upon receipt of a signed copy of this proposal or a written purchase order. All purchases are subject to Tweet/Garot Contract Terms and Conditions (see attached). Work will not commence prior to receipt of written authorization as stated above. Projects may be progress billed. Any applicable tax is not included in this proposal. If this project is tax-exempt, an exemption certificate must be submitted with your purchase order. Thank you for the opportunity to submit this proposal. Please call (920) 606-7325 or e-mail josh.adrews@tweetgarot.com with any questions. Sincerely, TWEET/GAROT MECHANICAL, INC. – De Pere Josh Andrews Service Sales Account Representative ACCEPTANCE OF PROPOSAL: By: ____________________________________________ Date: __________ P.O. No. _______________________________________________________ Page 129 of 183 City of De Pere HVAC Preventative Maintenance Schedule A Generalized Inventory of HVAC The list below is a representation of HVAC units and equipment throughout the City of De Pere. The list should be used as a guide and not as an accurate inventory. Contractors are welcome to visit or contact City representatives to get further information. Location Community Center HW Boilers Hot Water Pumps Train Condenser unit Or Chiller unit Air Handler Unit Municipal Service Center Hot Water Boilers Roof Top Units Oil Fired Unit Heater Make-up air units City Hall HW Boilers HW Pumps Split System Units Air Handler Units Roof Condenser Roof Top Packaged Unit Water Department Building Ninth St Pump Station HW Boiler Fire Station (East) HW Boilers Hot Water Pumps Roof Condenser Air Handler Unit Police Station Roof Top Packaged Unit Park Pool Buildings Pool boilers VFW Part of Spring PM Pool Boilers Legion Part of Spring PM Legion boiler for heat In Fall Page 130 of 183 City of De Pere HVAC Preventative Maintenance 2. Company: Mulva Cultural Center Phone: 920-309-8200 Address: 221 S. Broadway Contact Person: Jim Brozak De Pere, WI 54115 ___________________ 3. Company: St. Norbert College Phone: _920-337-3181 Address:__100 Grant St Contact Person: Ryan Guillette _De Pere, WI 54115 ___________________ Schedule B Contact and Reference Page Schedule B should be completed accurately and completely. For questions or concerns, contact Thomas Blohowiak, Maintenance Supervisor at (920) 339 -4072 ext. 2250, or e -mail at tblohowiak@deperewi.gov. Proposals shall be submitted to the Municipal Service Center by September 30, 2026, at 2:30 pm. The Municipal Service Center is located at 925 South Sixth Street, De Pere, WI, 54115. Contact Information Company Name: Tweet Garot Mechanical, Inc. Contact Person: Josh Andrews E-mail: josh.andrews@tweetgarot.com Phone: Cell Phone: 920-606-7325 Address: 325 Reid St De Pere, WI 54115 Reference Information 1. Company: Greater Green Bay YMCA Phone: 920-436-9622 Address: 235 N. Jefferson St Contact Person: Tom Wyckoff Green Bay, WI 54301 Page 131 of 183 City of De Pere HVAC Preventative Maintenance Schedule C Price Quote Please indicate price quotes based on the scope of services for each of the indicated City of De Pere locations. Price quotes should reflect the total fee per year Fall PM and Spring PM. (Note the Municipal Service Center is under construction in 2027) Location Price 2027 2028 2029 Community Center $4,225.00 $4,415.13 $4,613.81 Municipal Service Center $9,314.87 $9,734.04 City Hall $6,017.25 $6,288.03 $6,570.99 Water Department $757.50 $791.59 $827.21 Fire Department (East) $3,104.25 $3,243.94 $3,389.92 Police Station $1,398.00 $1,460.91 $1,526.65 Park Pool Buildings $3,349.00 $3,499.71 $3,657.19 Total (Year –2027) Total (Year - 2028) Total (Year - 2029) Grand Total Percent Increase (Year 2030) 6% Percent Increase (Year 2031) 5% $18,851.00 $29,014.18 $30,319.81 $78,184.99 Page 132 of 183 Tag Building Location Type Manufacturer Installed date Website Comments Belts Filter size Filters ACCU-1 City Hall HVAC > Air Conditioning Unit McQuay (1)-4L180 & 4L220 AHU-1 City Hall HVAC > Air Handling Unit Lennox 7/28/2016 (1)-4L350 (8)-20x20x2 AIR-1 City Hall Air Compressor Curtis (2)-4L480 BOL-1 City Hall HVAC > Boiler PK boiler BOL-2 City Hall HVAC > Boiler Pk boiler HUM-1 City Hall HVAC > Humidifier Dri-Steem P-1 City Hall HVAC Taco P-2 City Hall HVAC Taco P-3 City Hall HVAC Taco P-4 City Hall HVAC Taco RTU-1 City Hall HVAC Trane ACCU-1 Community Center HVAC > Air Conditioning Unit chiller unit AHU-1 Community Center HVAC > Air Handling Unit Trane (2)-3x475 (8)-20x25x2 (2)-20x20x2 AIR-1 Community Center Air Compressor BOL-1 Community Center HVAC > Boiler Trinity 1/18/2016 BOL-2 Community Center HVAC > Boiler Trinity BP-1 Community Center HVAC BP-2 Community Center HVAC GRILLE Community Center HVAC P-1 Community Center HVAC B&G P-2 Community Center HVAC B&G ACCU-1 Fire Station #1 HVAC > Air Conditioning Unit AHU-1 Fire Station #1 HVAC > Air Handling Unit Trane (1)-B44 & A37 (8)-20x20x2 AIR-1 Fire Station #1 Air Compressor Quincy Compressor BOL-1 Fire Station #1 HVAC > Boiler PK boiler BOL-2 Fire Station #1 HVAC > Boiler Pk boiler MAUH-1 Fire Station #1 HVAC > Makeup Air Handling Unit (1) B62 (4) 16x20x2 REF-1 Fire Station #1 HVAC Trane BOL-1 MSC HVAC > Boiler PK boiler BOL-2 MSC HVAC > Boiler PK boiler P-1 MSC HVAC Armstrong P-2 MSC HVAC Armstrong P-3 MSC HVAC B&G P-4 MSC HVAC B&G MUA-1 Police Station HVAC > Makeup Air Handling Unit Weather Rite RTU Police Station HVAC Aaon BLR-1 Pool, Legion HVAC > Boiler Peerless BLR-2 Pool, Legion HVAC > Boiler Ray Pack BLR-1,2,3 Pool, VFW HVAC > boilers, 3 for pools BLR-1 Water Dept, 9th Street Pump Station and Tower HVAC > Boiler Lochinvar Page 133 of 183 Inventory Location Model Number Serial # Serial number ID Belts Rooftop - Air Cooled Condensing Unit-Serves: AHU-1 245091 Filters & BeltsIst Floor/ Mechanical Room - Air Handling unit-1CB17-275V-1 245090 Belts Office/Basement 245046 1st Floor/ Mechanical Room 245093 1st Floor/ Mechanical Room 245094 Humidifier gas fired GTS-150 1020196 Pump P-1 Serves: Boiler B-3 1611C3N1 1020197 Pump P-2-Serves: Boiler B-4 1611C3N1 1020199 Pump P-3-Serves: Bldg Heat 1915C1N1 1020200 Pump P-4-Serves: Bldg Heat 1915C1N1 1020201 Rooftop unit-1 SLHFC25EBV37C3BD9001000E000KL000T008000C00G21148 1020203 Northside/Outside Building - Condenser 244996 Filters and BeltsMechanical Room MCCA025 244994 1st Floor/Fire Suppression Closet 245036 Mechanical Room LB1000 980 A99 48902 244999 Mechanical Room NRI LX800 82062 245000 Boiler Pump 1019668 Boiler Pump 1019669 Return grilles Intake/Exhaust for AHU-1 1019671 Hot Water System Pump 1019676 Hot Water System Pump 1019677 Roof - 20 ton Condenser 245134 Filters and BeltsBasement - Air Handler - Serves MCCA012GAY K00F06491A 245133 Air Compressor QC01006D00146 5133712 1020147 Basement - Hot water bolier - B-1 245138 Basement - Hot water bolier - B-2 245139 Filters and BeltsOutside /Front of Building F165 BDJ31KC3N56911X 245142 Return Air Fan-Serves: AHU-1 MCCA010GAY 1020184 245048 245049 System Pump 1019655 System Pump 1019656 Hot Water System Pump Basement 1019657 Hot Water System Pump Sign Shop FBOU000400178 CAH014FDAC 1019658 Make-up Air Unit Range GGBRT-30 J12011691580030G1 1027698 Roof Top Unit-Aaon-30 Ton 1030294 Boiler 1 1026738 Boiler 2 1026739 boiler 1, 2, 3 1027599 Boiler 1 1027635 Page 134 of 183 City of De Pere HVAC Preventative Maintenance Schedule A Generalized Inventory of HVAC The list below is a representation of HVAC units and equipment throughout the City of De Pere. The list should be used as a guide and not as an accurate inventory. Contractors are welcome to visit or contect City renresentatives to get further information contact City representatives to get further information. LocationCommunity Center HW Boilers Hot Water Pumps Municipal Service CeCity Hall Hot Water Boilers Roof Top Units HW Boilers HW Pumps Roof Condenser Roof Top Packaged Train Condenser unit Or Chiller unit Oil Fired Unit HeaterSplit System Units Air Handler Unit Make-up air units Air Handler Units Unit WaterDepartment Building Fire Station (East) Police Station Park Pool Buildings Ninth St Pump Station HW Boiler HW Boilers Hot Water Pumps Roof Condenser Roof Top Packaged UnitPool Pool boilers boilers VFWVFW Pool Boilers Legion Legion boiler for heat Part of Spring PM Part of Spring PM In Fall Air Handler Unit Page 135 of 183 A CHLLE ING DET NIR COOLE AIR COOLED WATER CHILLER SCHE CHEDULE NOTES: PUMP SCHEDULE SCHEDULE NOTES: BUFFER TANK SCHEDUL TAS LOCATICN MAMFACTURER MOEL T SCHEDULE NOEL E ANASME RATED FRESSURE VESSEL DESCAED, FABMLAC IF NOT FURN SHED NTEGRAL TO ARVENT, TYP SCHARGE TO GLYC NSTALL UNT BLO NECTION ION UNTS WT CHILED WATE ROL AND COOLING COIL SCHEDULE TAG LOCATON COL TIPE EXPANSION TANK SCHEDULE TAG LOCATION SCHEDULE NOTES: FAN ARRAY SCHEDULE TAG SERVCE LOCATION TCH, AND MANUAL SPEED CONTROLLER DE PERE COMMUNITY CENTER AHU UPGRADE 600 GRANT STREET, DE PERE, WI 54115 twee arot 325 REID STREET www.TWERTGAROT.COM DOCUMENTS SCHEDULES AS SH M601 THIS LINE SHOULD MEASURE 1' LON Page 136 of 183 8/20/2023 10/26:11 AM PACKAGED ROOFTOP UNITS - GAS/DX OF CFM SERVICE SYSTEM STOOF NO. ING LAB & SIGN RTU-1 STH SZVAV 970 100 SUPPLY FAN FAN HP TYPE TYPE VFD FILTE OFFICES VAV 12,00 2,65025 ENERGY RECOVERY UNITS NO.RU-2ERU SERVICE GARAGE ADDITION GARAGE ADDITION EXT. S.P. CFM OF CFM OF IN IN. STD. AIR OA. WATER 10,1006,.100 16,100 0.75 1.19 11 GAS FIRED UNIT HEATERS UNITNO. GARAGEADOLT ION GUH-19 VEHICLE MAINTENANCE MOTOR STARTERS COA MBH105,000 GAS OUTPUT AEWINTER TYPE HP ODP YES 2" NERV IE SUPPLY SIDE 1. D.B. W.. E.A.T. 15 MBH STD. AIR 87,150 ¥333333333 12 MOCP MOTOR HP VOLTAGE PHASE KW GAS PRES OR 2 ~ 02 23 2 3 20 VFD EXCHANGER 万万万万 ਨ ਨ ਨ ਨ SUPPROOF CURB YES ROOF YESYES GRILLES AND DIFFUSERS VENT DIA FUEL VENT CFM OF EXHAUST10,2503,259 IN IN.as 10,250 0.5 SUMMER E.A.T. SUM 65 °F 49.2 oF 87 °F W.B. 81 65 F 49.2°F 65 Coo AIR AIR TONS TYPE TEMP IG SECTIONMIN. NO. OF AIR COOLING DESIGN DIMENSIONS VIBRATION ISOLATORS CONDENSER FANS NO. TYPE EER WIDTH LENGTH HEIGHT LBS. TEMP. STAGES NO. PEE29 4-0 6-2 3-4 1,000 40 R454b 77.7 °F 53 MOTOR TYPE WYPE TEF UNDERCUT DOORS F DIGITAL 4 PROP. 8.7 8-5" 19-53/4 9-10" 6,500 DESIGN DIMENSION UPPORT ROOF CURB SPTYPE DEFLECT.EFLECT MANUF. MODEL SEH ROOF CURB SP 0-1" AAON RN MANUF 17-2 9- RENEWAIRE LE10XR 3,000 RENEWAIRE LE6XRTV ROOF CURB 4-10 6-1 ROOF CURB 1,500 RENEWAIRE HEXRTV 17-2 9- 4,000 RENEWAIRE LE10XRTV Project Oaner DIFFOSER FIN. FL. NECK ROUND है हैं हैं हैं हैं हैं हैं ВЕNOR UBXC-150 REZNOR UBXC-150 OR UBXC-150 REZNOR UBXC OR UBXC-150 ZNOR UBXC ZNOR UBXC REZNOR UBXC-100 NAME/NO. SYMBOL DESCRIPTION UNDERCUT SIZE CONN. SIZE DAMPER E LOCATION DUCT SIZE EG-1 EXHAUST GRILLE 12x12 0.01 DUCT TAKEOFF AIR PATTERN EGGCRATE MODELPRICE 80 EG-3 EXHAUST GRILLE 16x16 140 DUCT TAKEOFF EGGCRATE PRICE 80 SIDEWALL EXHAUST GRILLE 12x8 -DUCT TAKEOFF 45° PRICE 530 RG- RETURN GRILLE 12x12 100 DUCT TAKEOFF EGGCRATE PRICE 80 SIDEWALL SUPPLY GRILLE 40x24 DUCT TAKEOFF MSА (600) 362-4505 www.maa-pa.c SG-2 22.5° PRICE 520 SIDEWALL SUPPLY GRILLE 22x12 DUCT TAKEOFF SG-3 22.5° PRICE 520 PLAQUE DIFFUSER 24x24 8.0 DUCT TAKEOFF 4-WAY PRICE SPD PLAQUE DIFFUSER 24x24 10.0 DUCT TAKEOFF 4-WAY PRICE SPD SIDEWALL SUPPLY GRILLE 22x10 DUCT TAKEOFF 22.5° PRICE 520 SIDEWALL SUPPLY GRILLE 16x8 DUCT AKEOFF PURNISHED INSTALLED STARTER RកកកA BYHAC LOCATIONPREWIRED IREO YMBOLS STARTER ARKS A PRE-WIREDMPRE-WIREDDAEGREDY SP.SW. WIREDWIREDR UNTT AR UNIT SP.SW. WIREDWIREDWIREDWIREDWIREDWIRED E-WIRED ACY PREY DECMUPOT. AR UNIT MAN AR UNIT MAN. AR UNIT MANMAN.MAN UNITR UNIT MAN UNIT MANL UNIT MANMAN RED INTERLOCK W/CORR. OUTDOOR UNIT AR UNIT AR UNIT AR UNIT VFDVFDVFD -WIRED ECM/VFD WIRED ECM/VFD RED ECM/VFDCHуPOT IRED ECM/POT. IRED ECM/POT. IRED ECM/POT. IRED ECMYPOT.ECM/POT. MAe E 1 三 22.5° PRICE 520 TG-1 TRANSFER GRILLE 22x22 SEE SHEET EGGCRATE PRICE 80 TG-2 SIDEWALL TRANSFER GRILLE 24x12 45° PRICE 530 TG-4TG-S TRANSFER GRILLE 12x12 TRANSFER GRILLE 16x16 10.0140 EGGCRATEEGGCRATE PRICE 80 PRICE 80 GENERAL NO FLOW DIRECTION GAS VALVE A. THE MECHANIC E PREMISES AND TAKE NOTE OF ALL EXISTING CONDITIONS WHICH MAY AFFECT HIS WORK AN HE PREPARATION OF HIS BIO. LACK OF INFORMATION ON EXISTING FORMATION ON EXISTING ADDITIONAL COMPENSATION LOW PRESS MANUAL VOLUME DAMPER UNDERCUT BY GEN, CONTR ROOM SE ENSOR OR THERMOSTAT HUMOUM DISTAT CARBON DIOXIDE DE SEN REMOTE MOUNTE CONNECT TO EXISTING DUCTWORK ORMENTONG. INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS INCLU INSTALLED IN ACCORDANCE WITH TLETE CONTRACT DOCUMENTS QUIPMENT BRANCH PIPE SIZING TABL SCREPANCY BE THE EQUIPMENT SCHEDULE AND THE PIPE SIZING TABLE, THE PIPE SIZING TABLE SHALL TAKE PRECEDEN, SIZE 103 HIOS EXIBLE DUC MANUAL VOLUME DAMPER CCESSIBLE DUCT ACCESS DOOR FIRE DAMPERMPER VWITH ACCESSIBLE ISTICAL INSULA DUCT. LISTED DMENSIO ENSION IS CLEAR INSIDE DIMENSION DUCT. UISTED DMENMENSION IS CLEAR INSIDE DMENS EXTERNAL INSULATION ON AND WEATHERPROOF JACKET ON TURNING VANE NING VANE ECHANICAL CONTRACTOR CHARACTERISTICS AT JOB SITE PRIOR TO ORDERING EQUIPMENT GRILLE LOCATIONS WITH THE FINAL LIGHTING LAYOUOTLET AND ECTRICAL, STRUCTURA EQUIREMENT EQUIPQUIPMENT MANUFACTURER LISTED ON THE SCHEDULE IS REFLECTED ON N THE DOCUMENTS OF ANY MODIFICATIONS NECES ECESSARY TO ACCOMMODATE A MANUFACTURER OTHER THAN THAT STED IS THE RESPONSIBILITY COORDI PHASING WITH THE GENERA ER. PROVIDE TEMPORARY PIPING, DUCTWORK, VENTILATION, CONTROLS, ETC. AS EQUIRED TO ACCOMMODATE CONSTRUCTION ROUTE ALL NEW PIPING AND D QUIRED TO AVOID CONPLICTS WITH EXISTING PIPING, CONOUIT, STRUCTURE, LIGHTING, ETC. PROVIDE ALL OFFSETS, IRED TO ETWEEN POINT City of De Pere Municipal Services Center Renovation 925 S Sixth St PROFE ENGINE ONAL E H202H205H206H207H301H302H303H304H305H401 MSA JOB No. 20487096 SCHEDULES DEMOLITION FLOOR PLAN-OVERALL BEROLIION P DEMOLITION DEMOLITION PLAN-OVERALL PLAN-OVERALL ROOFROOF FIRST FIRST FLOOR FLOOR PLAN- PLAN-AREA AREA 11 FIRST FIRST FLOOR FLOOR PLAN- PLAN - AREA AREA 22 FIRST FLOOR PLAN -AREA 4 OVERALL ROOF PLAN PLENUM PLAN -AREA FIRST FLOOR PIPING PLAN - AREA BASEMENT PIPING PLAN - AREA 1 FIRST FLOOR PIPING PLAN -AREA 2 FIRST FLOOR PIPING PLAN -AREA 3 FIRST FLOOR PIPING PLAN - AREA 4 DETAILSDETAILS BOSETREXREX EESCRPTONDESCEPTONSCHEDULES01 H001 Page 137 of 183 AIR COOLED COMPRESSOR-CONDENSING UNITS No.NO. SERVICE COMP SUCTIONSUCTION TONS REF. TYPE E OF REDUCTION SEER TEMP ONDENSER NO. OF FANS FAN TYPE DESIGN DIMENSIONS WEIG DIRECT EQUIP. SUP. RAILS 2-111/2 2-111/2 LBS.200 MANUF, MODEL GAS FIRED MAKE-UP AIR UNITS UNIT CFM OF SERVICE STD. AI CFM OF O.A. FEXT. S.P. IN IN. WATER GASINPUT GASOUTPUT MEATING SECTION VIBRATION ISOLAIORS MBH M6H TYPE TYPE NIT TO BE PROVIDED AS A PART OF ALTERNATE H-1 ON AS PART OFA 9,000 9,000 TYOE DEFLECT. LENGTH HEIGHT WELOS GREENHECK DGX-P124 CABINET HEATERS CABINET HEATERS NO. SERVICE АP, MBI STD. AIR HPMOTOR TYPE SPEED RECESS ABOVEFIN. FL. ENT. H20 TEMP. LV.H20TEMP. GLYCOL CH-2 AIR LO 0-8 160F GPM PIPE SIZE MODEL VEST WOMEN 1 160 °F 160 f 160 3/4 VARIABLE AIR VOLUME BOXES NO. STD. AIR OF STD. AIR DUCT SIZEREAM P.D. IN IN. OF W ENT AIR AINTENANCE 1-13 600 180 100 602 SSFSF MAINTERANCE OYFICE 1-1 R 1-143, WATER OFFICE REAK ROO1-14 CONFERENCE 1-133 1000 320 OFFICE 1-130 OFFICE 1-129 CONFERENCE 1-132 OFFICE 1-128 OFFICE 1-127 OFFICE 1-126 OFFICE 1-125 OFFICE 1-124 OFFICE 1-121 20 100 OFFICE 1-123 OFFICE 1-122 OFFICE 1-120 RECEPTION 1-101 OFFICE CUBBICLES 1-117 OFFICE CUBBICLES 1-116 COPY 1-112, SUPPLY 1-114 -29 OFFICE 1-108 OFFICE 1-109 CE 1-110 ENGINEERINGFILE ROOM 1-004 EXERCISE AREA 1-013 EXERCISE AREA 1-01 UNIT HEATERS - ROOF EXHAUSTЕ ERS EXISTING GARAGEARAGE KISTING GARA EPAIR GAR TOILETSESTINGOOM FL CFMSTD. AIR WATER MOT RHP TOR 十年年年年年年年年年年年年年99年年年年年年 ENT.TEMP160 F ATING COILTEMP. RECTPIRERECT CONTROL VFD ECN M/VFD DAMPERBY B.A GLYCOL PIPE SIZE ABOVE FIN. GREBGREEGREE GREENHGREENHGREEGNEGRE GPM PIPE SIZE RITTLING LING 02 ROOM AIR CONDITIONING UNITS OUTDOOR UNITS LOW UNIF NO. SERVICE TYPE YE S. STD. AIRAR CAP, T) (U 17F NOYONS SEK SUPPORT HEAT HANU.MODRE CAP FURNACES TGAS PRES UNINO. SERVICE STD AIRDA WATER VE N SPIO MODE KITCHEN EXHAUST HOODS PRICES NO. SERVICE STD. AIR WIDTH LENGTH HEIGHT (IN. W.C.) SIZE WEIGHT CONSTRUCTION HOOD SYSTEM MODEL K BREAK ROO H. RISER HANGING MOA WEATHERPROOF HOODS THROAT DIMENSIONS WPH- TYPE WIDTH LENGTH EXISTING MAU-4 (9% OF THROAT AREA) ☐ ABOVE ROOP MIN. OPENING HEIGHT MODEL ELECTRIC WALL HEAТЕ RS STASTATAL MANUF. MODEL VES QMARK AVWH UNITNO. SERVIC PRICE SDV ECESS EWH-1 ELEVATOR SHAFT EWH-2 PRIC STORAGE 1-002 PRICPRIL SDV 01/2" PRICE SDV 2 3/4 PRICE SDV 1 PRICE SDV PRIO ESDV 3/4 PRICE SDV PRICE SOV PICE SEPARATED COMBUSTION G NO.DE ERVICE ST OF ERU DF-3 ERU- GAS FIRED DUCT FURNACES GAS INBUT SOUTPUT GAS TYPE (PSI) VENT VENT DIA. DESTRATIFICATION FANS - HVLS DIA CONTROL PANEL 12-0 BAS INTEGRATION 15-0" DS-2 VARIABLE FREQUENCY DRIVES BLADEHEIGHT BIG ASS POWERFOIL8 SEH Prolect Daner MSA (600) 362-4505-www.msa-ps.comCity of De Pere Municipal Services Center Renovation 925 $ Sixth St KEV/SION BCHEDVLE SCHEDULES01 H002 2 Page 138 of 183 马。 ST FLOOR PLAN - OVERALL0 8 1 X * REV CESCARTOA KEY PLAN FIRST OVERAL LAN- 01 H200 D Priect Dener (600) 352-45 MSА 2-4505+ www msa-pa.c COPYRIGHT 0202 City of De Pere Municipal Services Center Renovation 925 S Sixth St DATE SEH Page 139 of 183 To: Honorable Mayor Boyd Members of the Board of Public Works From: Thomas Blohowiak, Maintenance Supervisor Date: October 12,2026 RE: Consider Preventative Maintenance Contract for City Heating Ventilation and Air Conditioning (HVAC) Equipment* Several departments throughout the City of De Pere have HVAC Equipment. Over the last 3 years Hurckman Mechanical even though they are lowest in price. They have failed to meet the standards of the current contract, so we went out for new RFP. The City of De Pere requested proposals from 5 vendors for this service. Hurckman Mechanical is our current vendor for PM Service. Only 1 vendor did the walk through the buildings. The following two quotes (see attached) were received for consideration. Attached is the email I sent with the attempt to get Hurckman Mechanical to meet the contract requirements. They did not send out the required information. Attached is an email from Bassett Mechanical declining to bid at this time. Vendors Total (Year - 2027) Total (Year - 2028) Total (Year - 2029) Grand Total Tweet Garot Mechanical $18.851.00 $29.014.18 $30,319.81 $78,184.99 Hurckman Mechanical Industries $10.256.70 $13.138.00 $13.491.13 $36.885.83 Bassett Mechanical X X X X A&J Mechanical X X X X Robinson Heating & Cooling X X X x Attached 1. RFP HVAC PM 2026 final 2. TweetGarot Mechanical Proposal 3. Hurckman Mechanical Industries Inc. Proposal 4. Bassett Mechanical email 5. Email notice to Hurckman Staff is recommending the contract be given to TweetGarot Mechanical for the Preventative Maintenance service. Page 140 of 183 JULY 10-AUGUST 3 CITY OF DE PERE ADVERTISEMENT FOR QUOTES HVAC PREVENTATIVE MAINTENANCE The City of De Pere accepts quotes to conduct Preventative Maintenance on all HVAC equipment within the city. Proposals are due by September 30, 2026, at 2:30 pm at the Municipal Service Center at 925 South Sixth Street, De Pere, WI, 54115. Interested contractors are welcome to participate in a city walkthrough on September 22nd, starting at 8:00 am at the Community Center (600 Grant Street). Any questions or concerns may be directed to Thomas Blohowiak, Maintenance Supervisor at (920) 339-4072 ext. 2250, or e-mail at tblohowiak@deperewi.gov Agreement: • The agreement shall be a period of three years, with an option to renew on a yearly basis contingent on both parties approval for a maximum total of 5 Years. • The City will use its standard Contractor Agreement (sample attached). No standard terms and conditions of any firm or entity responding to this proposal will be incorporated into the Contractor Agreement. Scope of Services: • Conduct a spring and fall maintenance check of listed HVAC related equipment owned by the City of De Pere. Spring PM to be completed by the end of May and Fall PM completed by November 15. • Provide a status/condition report of each piece of equipment within one week of seasonal maintenance completion. • Cover all necessary labor and preventative maintenance to maintain all HVAC related equipment. Preventative Maintenance shall consist of cleaning, aligning, cali brating, adjusting, change filter, replace belts, and lubricating. Schedule A provides a general list of HVAC related equipment owned by the City of De Pere. • Submit Schedule B and C for consideration. Customer Responsibilities: • Customer assumes that all equipment is in satisfactory working condition. Any equipment found in need of repair upon initial inspection or seasonal start -up will be reported to the owner’s representative with a written estimate to repair the item in question. • Repair work shall not commence unless authorized by City representative. • Customer will provide all belts and air filters for replacement. • Customer will cover the cost of repair parts outside of preventative maintenance agreement. • Redesign, repair, or adaptation of any equipment due to the obsolescence or unavailability of refrigerant and/or replacement parts is beyond the scope of the agreement. • Customer shall provide reasonable means of access to all equipment. • Customer shall make available all Material Safety Data Sheets. • Customer agree to pay for any authorized work performed outside of preventative maintenance contract. Submittal Requirements: • Contractor shall submit all required documents by deadline. • Contractor must submit Schedule B indicating contact information and references related to preventative maintenance. • Contractor shall submit Schedule C, indicating proposed fees. Page 141 of 183 Questions: For any questions or to review City HVAC equipment please contact Thomas Blohowiak, Maintenance Supervisor at (920) 339-4072 ext. 2250, or e-mail at tblohowiak@mail.de-pere.org. Page 142 of 183 City of De Pere HVAC Preventative Maintenance Schedule A Generalized Inventory of HVAC The below list is a representation of HVAC units and equipment throughout the City of De Pere. The list should be used as a guide and not as an accurate inventory. Contractors are welcome to visit or contact City representatives to get further information. Location Community Center Hot Water Boilers Hot Water Pumps Trane Condenser or Chiller Units Air Handling Unit Air Compressor Municipal Service Center Hot Water Boilers Air Handling Unit Air Conditioning Unit Make Up Air Units Hot Water Pumps City Hall Air Conditioning Units Trane & McQuay Lennox Air Handling Unit Air Compressor Hot Water Boilers Humidifier Roof Top Unit Hot Water Pumps Water Department Building Ninth St Pump Station - Boiler Fire Station East Hot Water Boilers Air Compressor Air Handling Unit Air Conditioning Unit Make Up Air Unit REF – Trane Police Station Make Up Air Unit Roof Top Unit Park Pool Buildings – VFW & Legion VFW Pool Boilers Legion Pool Boiler & Building Boiler Page 143 of 183 City of De Pere HVAC Preventative Maintenance - RFP Schedule B Contact and Reference Page Schedule B should be completed accurately and completely. For questions or concerns, contact Thomas Blohowiak, Maintenance Supervisor at (920) 339 -4072 ext. 2250, or e -mail at tblohowiak@mail.de- pere.org. Proposals shall be submitted to the Municipal Service Center by Wednesday, September 30th, 20206, at 2:30 pm. The Municipal Service Center is located at 925 South Sixth Street, De Pere, WI 54115. Contact Information Company Name: Hurckman Mechanical Industries, Inc Contact Person: Clayton Aderholdt E-mail claytonaderholdt@hurckman.com Phone (Dispatch): (920) 327-4258 Cell Phone (920) 615-1950 Address: 164 N. Broadway, Green Bay, WI 54303 Reference Information 1. Company: Nicolet Bank Phone: (920) 617-5588 Contact Person: Jim Edmondson Address: Several Locations In Green Bay __________________ 2. Company: Associated Banks Phone: (920) 431-8072 Contact Person: Steve Kerscher Address: Several Locations In Green Bay __________________ 3. Company: Wisconsin Public Service Phone: (920) 445-0778 Contact Person: Wade Handrich Address: Several Locations In NE Wisconsin __________________ Page 144 of 183 City of De Pere HVAC Preventative Maintenance Schedule C Price Quote Please indicate price quotes based on the scope of services for each of the indicated City of De Pere locations. Price quotes should reflect a total fee per year. Location Price 2027 2028 2029 TOTALS Community Center 2,113.69 2,171.50 2,229.31 6,514.50 Municipal Service Center 2,528.19 2,598.50 2,668.81 5,267.31 City Hall 3,008.69 3,091.50 3,174.31 9,274.50 Water Department Building 9th Street, Pump Station and Tower 447.50 460.00 472.50 1,380.00 Fire Station (East) 1,689.13 1,736.00 1,782.88 5,208.00 Police Station 783.13 805.00 826.88 2,415.00 Park Pool Buildings – Legion & VFW 2,214.56 2,275.50 2,336.44 6,826.50 Total (Year –2027) $10,256.70 Total (Year - 2028) $13,138.00 Total (Year - 2029) $13,491.13 Grand Total $36,885.83 Percent Increase (Year 2030) 2.75% Percent Increase (Year 2031) 3.00% Page 145 of 183 1 Thomas Blohowiak From: Thomas Blohowiak Sent: Wednesday, September 30, 2026 11:02 AM To: 'claytonaderholdt@hurckman.com'; Chris Shefchik Subject: FW: RFP HVAC Preventative Maintenance Attachments: RFP HVAC PM 2026 pdf.pdf; 2023-2026 contract for PM.pdf Clayton and Chris I am giving you noƟce that we may not allow your bid. We need the status of all our equipment per the last contract. On the 3rd page of the aƩached contract it states, “Provide a status/condiƟon report of each piece of equipment within one (1) week of seasonal maintenance compleƟon.” By October 7 I will need to see the report for all our equipment, or we will not except your proposal . I also noƟced you did not use the new schedule C from the aƩached packed with your submission. Please use the new schedule C. Thomas Blohowiak Maintenance Supervisor | City of De Pere 925 S Sixth St | De Pere, WI 54115 Tel: (920) 339-4072 x 2250 |Cell: (920) 639-1336 Fax: (920) 339-4071 From: Thomas Blohowiak <tblohowiak@deperewi.gov> Sent: Friday, September 11, 2026 8:39 AM To: Thomas Blohowiak <tblohowiak@deperewi.gov> Subject: RFP HVAC Preventative Maintenance The City of De Pere accepts quotes to conduct Preventative Maintenance on all HVAC equipment within the city. Proposals are due by September 30, 2026, at 2:30 pm at the Municipal Service Center at 925 South Sixth Street, De Pere, WI, 54115. Interested contractors are welcome to participate in a city walkthrough on September 22nd, starting at 8:00 am at the Community Center (600 Grant Street). Any questions or concerns may be directed to Thomas Blohowiak, Maintenance Supervisor at (920) 339-4072 ext. 2250, or e-mail at tblohowiak@deperewi.gov Agreement:  The agreement shall be a period of three (3) years, with an option to renew on a yearly basis contingent on both parties’ approval for a maximum total of five (5) years.  The city will use its standard Contractor Agreement (sample attached). No standard terms and conditions of any firm or entity responding to this proposal will be incorporated into the Contractor Agreement. Scope of Services:  Conduct a spring and fall maintenance check of listed HVAC related equipment owned by the City of De Pere. Spring PM to be completed by the end of May and Fall PM completed by November 15.  Provide a status/condition report of each piece of equipment within one (1) week of seasonal maintenance completion.  Cover all necessary labor and preventative maintenance to maintain listed HVAC related equipment. Preventative Maintenance shall consist of cleaning, aligning, calibrating, adjusting, changing filters, replacing belts, and lubricating. Schedule A provides a general list of HVAC related equipment owned by the City of De Pere. Page 146 of 183 2  Submit Schedules B and C for consideration. Customer Responsibilities:  Customer assumes that all equipment is in satisfactory working condition. Any equipment found in need of repair upon initial inspection or seasonal start-up will be reported to the owner’s representative with a written estimate to repair the item in question.  Repair work shall not commence unless authorized by City representative.  Customer will provide all belts and air filters for replacement.  Customer will cover the cost of repair parts outside of preventative maintenance agreement.  Redesign, repair, or adaptation of any equipment due to the obsolescence or unavailability of refrigerant and/or replacement parts is beyond the scope of the agreement.  Customer shall provide reasonable means of access to all equipment.  Customer shall make available all Material Safety Data Sheets.  Customer agree to pay for any authorized work performed outside of preventative maintenance contract. Submittal Requirements:  Contractor shall submit all required documents by the deadline.  Contractor must submit Schedule B indicating contact information and references related to preventative maintenance.  Contractor shall submit Schedule C, indicating proposed fees. Questions: For any questions or to review City HVAC equipment please contact Thomas Blohowiak, Maintenance Supervisor at (920) 339-4072 ext. 2250, or e-mail at tblohowiak@deperewi.gov Page 147 of 183 3 Thomas Blohowiak Maintenance Supervisor | City of De Pere 925 S Sixth St | De Pere, WI 54115 Tel: (920) 339-4072 x 2250 |Cell: (920) 639-1336 Fax: (920) 339-4071 Page 148 of 183 1 Thomas Blohowiak From: Brian Bartelt <Brian.Bartelt@bassettmechanical.com> Sent: Thursday, September 24, 2026 9:48 AM To: Thomas Blohowiak Subject: RE: RFP HVAC Preventative Maintenance CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good morning, Tom, My apologies for the delayed response. Thank you for including Bassett Mechanical in the HVAC maintenance RFP process. We appreciate the opportunity and your consideration. After careful review, we have decided to respectfully decline participation this time around. With several large projects currently underway, as well as the ongoing efforts supporting customers affected by the recent Menasha tornado, our resources are committed to ensuring we continue delivering the level of service our customers expect. We sincerely appreciate being considered and wish you the best of luck as you move through the selection process. We value our relationship with the City of De Pere and would welcome the opportunity to be considered again when the contract is rebid in 2029. Thank you again, and we wish you continued success. Best regards, Brian Bartelt Strategic Accounts Executive C: +1 920-750-8704 | D: +1 920-462-1716 1-800-236-2500 | www.BassettMechanical.com Safely delivering exceptional value From: Thomas Blohowiak <tblohowiak@deperewi.gov> Sent: Tuesday, September 22, 2026 11:47 AM To: Thomas Blohowiak <tblohowiak@deperewi.gov> Subject: RE: RFP HVAC Preventative Maintenance CAUTION: This email originated from outside of Bassett Mechanical. Do not click links or open attachments unless you recognize the sender and know the content is safe. Team AŌer the walk thru today, I had this aƩached informaƟon available for clarity. The community Center is geƫng a new chiller system to replace the Trane AC unit. The MSC is geƫng new equipment per the schedule aƩached. If you have any quesƟon please reach out. Thomas Blohowiak Page 149 of 183 2 Maintenance Supervisor | City of De Pere 925 S Sixth St | De Pere, WI 54115 Tel: (920) 339-4072 x 2250 |Cell: (920) 639-1336 Fax: (920) 339-4071 From: Thomas Blohowiak Sent: Friday, September 11, 2026 8:39 AM To: Thomas Blohowiak <tblohowiak@deperewi.gov> Subject: RFP HVAC Preventative Maintenance The City of De Pere accepts quotes to conduct Preventative Maintenance on all HVAC equipment within the city. Proposals are due by September 30, 2026, at 2:30 pm at the Municipal Service Center at 925 South Sixth Street, De Pere, WI, 54115. Interested contractors are welcome to participate in a city walkthrough on September 22nd, starting at 8:00 am at the Community Center (600 Grant Street). Any questions or concerns may be directed to Thomas Blohowiak, Maintenance Supervisor at (920) 339-4072 ext. 2250, or e-mail at tblohowiak@deperewi.gov Agreement:  The agreement shall be a period of three (3) years, with an option to renew on a yearly basis contingent on both parties’ approval for a maximum total of five (5) years.  The city will use its standard Contractor Agreement (sample attached). No standard terms and conditions of any firm or entity responding to this proposal will be incorporated into the Contractor Agreement. Scope of Services:  Conduct a spring and fall maintenance check of listed HVAC related equipment owned by the City of De Pere. Spring PM to be completed by the end of May and Fall PM completed by November 15.  Provide a status/condition report of each piece of equipment within one (1) week of seasonal maintenance completion.  Cover all necessary labor and preventative maintenance to maintain listed HVAC related equipment. Preventative Maintenance shall consist of cleaning, aligning, calibrating, adjusting, changing filters, replacing belts, and lubricating. Schedule A provides a general list of HVAC related equipment owned by the City of De Pere.  Submit Schedules B and C for consideration. Customer Responsibilities:  Customer assumes that all equipment is in satisfactory working condition. Any equipment found in need of repair upon initial inspection or seasonal start-up will be reported to the owner’s representative with a written estimate to repair the item in question.  Repair work shall not commence unless authorized by City representative.  Customer will provide all belts and air filters for replacement.  Customer will cover the cost of repair parts outside of preventative maintenance agreement.  Redesign, repair, or adaptation of any equipment due to the obsolescence or unavailability of refrigerant and/or replacement parts is beyond the scope of the agreement.  Customer shall provide reasonable means of access to all equipment.  Customer shall make available all Material Safety Data Sheets.  Customer agree to pay for any authorized work performed outside of preventative maintenance contract. Page 150 of 183 3 Submittal Requirements:  Contractor shall submit all required documents by the deadline.  Contractor must submit Schedule B indicating contact information and references related to preventative maintenance.  Contractor shall submit Schedule C, indicating proposed fees. Questions: For any questions or to review City HVAC equipment please contact Thomas Blohowiak, Maintenance Supervisor at (920) 339-4072 ext. 2250, or e-mail at tblohowiak@deperewi.gov Page 151 of 183 4 Thomas Blohowiak Maintenance Supervisor | City of De Pere 925 S Sixth St | De Pere, WI 54115 Tel: (920) 339-4072 x 2250 |Cell: (920) 639-1336 Fax: (920) 339-4071 The City of De Pere is subject to Wisconsin Statutes related to public records. Unless otherwise exempted from the public records law, senders and receivers of City of De Pere e-mail should presume that e-mail is subject to release upon request, and is subject to state records retention requirements. See City of De Pere full e-mail disclaimer at https://www.deperewi.gov/emaildisclaimer. This e-mail (including any attachments) may contain confidential, proprietary and privileged information, and unauthorized disclosure or use of that information is prohibited. If you received this email in error, please notify the sender and delete this e-mail from your system. The preceding email message and any attachments may be confidential or contain proprietary information and should be read or used only by the intended recipient. This message should not be transmitted to, or received by, any unauthorized person. If you have received this message in error, please inform us promptly by reply email, then delete this message and destroy any printed copies of this message. Thank you Page 152 of 183 City of De Pere, Wisconsin Request for Common Council Action 8.C Meeting Date: October 20, 2026 Department: Public Works From: Eric Rakers, City Engineer Subject: Resolution #26-102 Ratifying grant application to Wisconsin Department of Transportation (Signals and ITS Standalone Program). Recommendation: Motion to approve. The Board of Public Works at the October 12, 2026 meeting approved submittal for application of a Wisconsin Department of Transportation SISP Grant. The motion passed with a 5-0 vote. Attachments: Reso26-102, 2026 1012 SISP Grant, 2026 0918 DePere STH 32 and Cook Application Page 153 of 183 RESOLUTION #26-102 RATIFYING GRANT APPLICATION TO WISCONSIN DEPARTMENT OF TRANSPORTATION (Signals and ITS Standalone Program) WHEREAS, the Wisconsin Department of Transportation (WisDOT) offers the Signals and ITS Standalone Program (SISP) to fund traffic signals and intelligent transportation systems (ITS) projects not incidental to other highway improvement projects with greater than 50% cost associated with traffic signal or ITS hardware and construction; and WHEREAS, city staff is desirous of making improvements to the Broadway/Cook Street intersection as part of the WisDOT’s resurfacing project for STH 32/57 (Broadway Street), which is a connecting highway; however, the DOT has indicated that reconstructing the intersection is beyond the scope of its project; and WHEREAS, connecting highways quality for 90% state funding and a 10% local match, if approved, for traffic signal upgrades; however, the SISP grant application process deadline did not allow the department sufficient time to obtain prior approval of its grant application submission, requiring the department to submit its application and request ratification of its actions after the fact; and WHEREAS, this matter has been reviewed by the Board of Public Works which recommends ratification of the actions taken by the department in submitting the application. NOW, THEREFORE, BE IT HEREBY RESOLVED THAT: The Common Council ratifies the submission of the grant application to the Wisconsin Department of Transportation Signals and ITS Standalone Program Project Application. BE IT FURTHER RESOLVED THAT: Page 154 of 183 Resolution #26-102 Page 2 of 2 If awarded, the Common Council authorizes the Director of Public Works to sign all necessary documents and undertake other necessary action to direct and complete the approved project. BE IT FURTHER RESOLVED THAT: Any such grant awarded shall be brought before the Common Council for formal acceptance. BE IT FURTHER RESOLVED THAT: All City officials, officers and employees are authorized and directed to take such steps as are lawful and necessary in furtherance thereof. Adopted by the Common Council of the City of De Pere, Wisconsin, this 20th day of October, 2026. APPROVED: ___________________________________ James G. Boyd, Mayor ATTEST: _________________________________ Carey E. Danen, City Clerk Ayes: ______ Nays: ______ Board/Committee Approval: 10/12/2026 Page 155 of 183 To: Honorable Mayor Boyd Members of the Board of Public Works From: Eric Rakers, P.E., City Engineer Date: October 12, 2026 RE: Consideration and possible action on applying for a Wisconsin Department of Transportation SISP Grant The Wisconsin Department of Transportation (WisDOT) offers grants under the Signals and ITS Standalone Program (SISP) for traffic signal upgrades. Staff applied for a grant in September to upgrade the Broadway and Cook Street intersection traffic signal. Background The SISP is a stand-alone, state-funded program initiated in 2013 to assist with signal replacement. It provides funding for traffic signal and Intelligent Transportation Systems (ITS) projects not tied to broader highway improvement efforts. Broadway Street is STH 32/57 is a connecting highway. Connecting highways qualify for 90% state funding with a 10% local match from the city, county, or other local authority for traffic signal upgrades. Discussion WisDOT is resurfacing STH 32/57 in 2027. During the design of the project, De Pere staff has been requesting improvements to the Broadway and Cook Street intersection for left turning vehicles. This intersection has been an issue with accidents due to the offset left turn lanes. WisDOT has indicated that reconstructing this intersection is beyond the scope of the project. Based on subsequent e-mails, WisDOT has recommended the traffic signals be upgraded to include a lead left turn arrows for both northbound and southbound traffic, similar to the lead left arrow for southbound traffic at Broadway and Merrill Street. This will clear left-hand turning vehicles from the intersection while through traffic is stopped. Specifically, WisDOT stated “With that being said, we have reviewed the last 5 years of crash data again, which includes the crashes identified by the city. There have been 23 crashes in the past 5+ years, 12 of which were left turn related crashes. 7 of those 12 left turn crashes were injury related, including 1 fatality and 1 Type A serious injury crash. Based on our analysis of the crashes, a far majority (if not all) of those 12 crashes could be eliminated if the signal operations were modified to have a dedicated left turn phase so the left turning motorists can make their turn without having to judge a safe gap from the oncoming through traffic. This intersection and traffic signal is within the connecting highway limits which gives De Pere jurisdiction of the signal, thus adding a left turn phase decision is up to the city.” Page 156 of 183 2 The traffic signal must be upgraded to add the left turn arrows. Staff included funding in the 2027 budget. Municipal applications were due to the regional liaison on September 18th. Due to this, the application was submitted prior to Board approval. If the Board does not agree with the submittal, staff will contact WisDOT to withdraw the application. The estimated cost of the project is $670,306 with a 10% city allocation at $67,031 and a WisDOT grant fund of $603,275. Recommendation Staff recommends approval of the grant submittal. Attachments 2026 0918 DePere STH 32 and Cook Application Page 157 of 183 Page 158 of 183 Page 159 of 183 Page 160 of 183 Page 161 of 183 Page 162 of 183 Page 163 of 183 Page 164 of 183 Page 165 of 183 City of De Pere, Wisconsin Request for Common Council Action 8.D Meeting Date: October 20, 2026 Department: Public Works From: Eric Rakers, City Engineer Subject: Resolution #26-103 State/Municipal Maintenance Agreement for the Construction of a Wet Detention Pond within Wisconsin Department of Transportation Right-of- Way. Recommendation: Motion to approve. The Board of Public Works at the October 12, 2026 meeting approved the State/Municipal Maintenance Agreement for the Construction of a Wet Detention Pond within Wisconsin Department of Transportation Right-of-Way. The motion passed with a 5-0 vote. Attachments: Reso26-103, 2026 1012 CI_BOPW_SMMA, City of De Pere Detention Pond SMMA - STH 32 57 - Permit Application 168 Page 166 of 183 RESOLUTION #26-103 APPROVING STATE/MUNICIPAL MAINTENANCE AGREEMENT (Wet Detention Pond in DOT right-of-way) WHEREAS, Wis. Stats. § 84.07(1), permits the State of Wisconsin Department of Transportation to enter into maintenance agreements with local units of government; and WHEREAS, the attached State/Municipal Maintenance Agreement provides the terms and conditions for maintenance of a wet detention pond to be constructed at the southeast corner of the intersection Cook Street and Honey Court in connection with Project 26-09 that abuts South Broadway Street in Wisconsin Department of Transportation right-of-way; and WHEREAS, the Board of Public Works has reviewed the State/Municipal Maintenance Agreement and recommends approval thereof; NOW, THEREFORE, BE IT HEREBY RESOLVED: That the City Manager is hereby authorized and directed to enter into the attached State/Municipal Maintenance Agreement. BE IT FURTHER RESOLVED: That all City officials, officers, employees, and agents are authorized and directed to take such steps as are lawful and necessary in furtherance thereof. Adopted by the Common Council of the City of De Pere, Wisconsin, this 20th day of October, 2026. APPROVED: __________________________________ James G. Boyd, Mayor ATTEST: _________________________________ Carey E. Danen, City Clerk Ayes: _____ Nays: _____ Board/Committee Approval: 10/12/2026 Page 167 of 183 1 To: Honorable Mayor Boyd Members of the Board of Public Works From: Eric P. Rakers, P.E., City Engineer Date: October 12, 2026 RE: Consideration and Possible Action on the State/Municipal Maintenance Agreement for the Construction of a Wet Detention Pond within Wisconsin Department of Transportation Right- of-Way* As part of Project 26-09 Pond and Drainage System Construction, the City is proposing to construct a wet detention pond in the vacant area located at the southeast corner of the intersection of Cook Street and Honey Court. The purpose of this wet detention pond is to treat and store storm water prior to conveying flow to the Fox River. This vacant land is abutting S. Broadway Street (STH 32-57) and is Wisconsin Department of Transportation (WisDOT) right-of-way. To build the storm water pond within WisDOT right-of-way, the City would need to enter into a State/Municipal Maintenance Agreement (SMMA) with WisDOT for the maintenance of the pond and associated appurtenances after the pond construction. A copy of the proposed SMMA is attached for the Board’s consideration. Public Works staff already inspect and maintain our city-wide storm sewer system. The requirements set forth in the SMMA fall in line with the City’s current maintenance and inspection plans. City Staff also obtained an Urban Nonpoint Source and Storm Water Management (UNPS) Grant through the Wisconsin Department of Natural Resources to construct this pond. Project 26-09 has been designed and bid concurrently to the procurement of the SMMA with WisDOT. The award of this project, and the UNPS grant is contingent on the approval of the SMMA. The award of Project 26-09 follows the Board’s consideration and possible action on this SMMA on today’s agenda. Staff recommend the Board of Public Works approve the SMMA for the construction of a wet detention pond within WisDOT right-of-way. Attachments City of De Pere Detention Pond SMMA – STH 32 57 – Permit Application 168 PDF Page 168 of 183 Central File: Page 1 of 3 Brown County – NE Region PLN\StateProgram\Agreements\State Municipal Maintenance Agreements_SMMA STATE/MUNICIPAL MAINTENANCE AGREEMENT Date: May 13, 2026 Road Name: WIS 32/57 (North Broadway Street) County: Brown WisDOT Work on Highway Right-of-Way Permit: Application 168 The signatory City of De Pere , hereinafter called the Municipality, through its undersigned duly authorized officers or officials, hereby requests the State of Wisconsin Department of Transportation, hereinafter called the State, to initiate and affect this agreement to include the associated maintenance responsibilities hereinafter described. The authority for the Municipality to enter into this agreement with the State is provided by Section 84.07(1) of the Statutes. Wisconsin statutes, Wisconsin Administrative Code, and State policy serve as the defining documents for State Highway maintenance responsibilities. DESCRIPTION OF FACILITY: Existing Facility Description – WIS 32/57 (N. Broadway Street) at the Cook Street intersection is a four -lane divided roadway (two lanes in each direction) located in the City of De Pere. The roadway includes 10-foot outside shoulders (3 feet paved) and 8-foot inside shoulders (3 feet paved), with a grassed median containing a drainage ditch. Rural roadside ditches are present along the outside of the roadway for drainage conveyance. The intersection of WIS 32/57 and Cook Street is signalized and includes dedicated left-turn lanes on WIS 32/57. No sidewalks or storm sewer are present along WIS 32/57. A sidewalk is present along the north side of Cook Street and crosses the north leg of the intersection. Proposed Facility Description – The proposed improvements include construction of a wet detention pond in the southwest quadrant of the WIS 32/57 (Broadway Street) and Cook Street intersection within existing WisDOT right- of-way. New storm sewer infrastructure will be constructed, including 15-inch pipes and endwalls (EW 45 and EW 47), to convey flow from the City of De Pere storm sewer system to the proposed pond. The proposed pond will discharge to the City of De Pere storm sewer system. Storm sewer structure numbering is referenced in Exhibit 1 – Honey Court to Cook Street Storm Sewer (prepared by the City of De Pere). An emergency spillway will be constructed at the northeast corner of the pond and will discharge to the WIS 32/57 roadside ditch. This request shall constitute agreement between the Municipality and the State ; is subject to the terms and conditions that follow (pages [2] – [3]); is made by the undersigned under proper authority to make such request for the designated Municipality and upon signature by the State , delivery to the Municipality. The initiation and signature of the agreement will be subject to all the applicable federal and state regulations. No term or provision of neither the State /Municipal Maintenance Agreement nor any of its attachments may be changed, waived or terminated orally but only by an instrument in writing executed by both parties to the State/Municipal Maintenance Agreement. Page 169 of 183 Central File: Page 2 of 3 Brown County – NE Region PLN\StateProgram\Agreements\State Municipal Maintenance Agreements_SMMA Signed for and on behalf of the City of De Pere (Please sign in blue ink) Name (print) Title Signature Date Signed for and on behalf of the State (Please sign in blue ink) Name Title WisDOT Region Maintenance Chief Signature Date TERMS AND CONDITIONS: 1. In order to guarantee the Municipality’s foregoing agreements to maintain the facility to State standards, the Municipality, through its above duly authorized officers or officials, agrees and authorizes the State to set off and withhold General Transportation Aids or monies otherwise due and payable by the State to the municipality, as determined by the State, for any maintenance the State must perform to the facility should the Municipality fail to comply with the agreement. 2. The State will not install any additional items, not necessitated for the safe and efficient flow of traffic, to a state highway facility without the Municipality agreeing to maintain those items. The State is responsible for maintaining the through travel way of any given highway facility under the State’s jurisdiction including: (a) The energy, operation, repair and replacement of traffic signals and associated street lighting required for the signalized intersections within the limits of this agreement. (b) Signing and pavement marking necessitated for the safe and efficient flow of traffic except those items listed in #3. (c) Permitting authority of utilities and access control on all State Trunk, US and Interstate Highways. 3. The Municipality shall at its own cost and expense maintain all portions within the specified limits of this agreement that lie within its jurisdiction for such maintenance through statutory requirements in a manner satisfactory to the State and shall make ample provision for such maintenance each year to include: (a) Maintain all items out

Text truncated. Open the original for the full document.

Source: City of De Pere website. First collected Oct 24, 2026.